Newport Mesa USD Site Survey Report for:
California Elementary
TeWinkle Intermediate
Killybrook Elementary
Paularino Elementary
Early College High
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 1
www.oed‐inc.com
California Elementary School Buildings / Current HVAC systems
Building 1: Administration / packaged rooftop unit & mini split
Building 2: MPR & Kitchen / NOT IN SCOPE
Building 3: Library & Computer Lab / upflow split systems
Building 4: Classrooms / upflow split systems
Building 5: Classrooms / upflow furnaces – no cooling
Building 6: Classrooms / upflow furnaces – no cooling
Building 7: Classrooms / upflow furnaces – no cooling
Building 8: Classrooms / upflow furnaces – no cooling
Building 9: Kindergarten / upflow furnaces – no cooling
Summary of Areas of Concern / Recommended Course of Action
Building 1 has old and leaky rooftop duct for the existing rooftop AC unit / demolish duct, reuse the roof openings
& reuse the rooftop unit for a new VRF system.
The MDF room mini split system at building 1 is old / replace with new mini split.
The computer lab and library at building 3 share the same conditioned air / separate the library from the
computer lab, and provide additional cooling if needed at the computer lab.
Buildings 5 through 9 are heat only upflow systems with no cooling / provide cooling coil to match existing closet
furnace in buildings 5 through 9.
Building 9 has the supply duct exposed on the roof / replace rooftop supply duct.
All classrooms and the administration rooms have relief louvers / seal all louvers within conditioned spaces.
All existing split systems and closet furnaces are about 10 years old / replace existing systems like for like with new
units.
The return plenums at buildings 3 through 8 are plywood without sheet metal lining / provide new sheet metal
return air plenums.
Overall Campus Site Assessment:
Building 1 is the administration building and has two types of systems, a packaged rooftop AC unit (see figure 1) and a
mini split system for the MDF room (see figures 2 & 3). The rooftop unit is ducted to each supply grille with the supply
duct exposed on the roof (see figures 4 & 5). The return air grille for the rooftop unit that is located in the admin lunch
room is adequately sized, but the return duct in the wall is not, so there is not adequate return air for the system. The
thermostat that is controlling the rooftop unit is not located at the back of the lunch room by the return air grille as
specified on the mechanical plans, but near the front entrance where it is exposed to sunlight, and outside air every
time the door opens (see figure 6); recommend relocating the tstat. The Mitsubishi mini split for the MDF room is old
and needs to be replaced with a new mini split. The existing rooftop unit and roof penetrations should be reused to
accommodate a new VRF system.
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 2
www.oed‐inc.com
The remaining buildings on the campus are all conditioned by upflow furnaces in a closet with the supply duct exposed
within the classroom (see figures 7 & 8) or exposed on the roof (building 9, see figure 9). The condensate drains to a
drywell (see figure 10) and each system is bringing in some outside air. All classrooms have an existing relief louver that
needs to be sealed (see figure 11). There are also obstructions at all the return air grilles‐these obstructions need to be
moved to provide adequate return.
Buildings 3 & 4 are conditioned using upflow split systems, and are the only buildings that have cooling coils and
condensers (see figures 12 & 13). The supply duct is exposed within the classrooms, and the return grille is at the
bottom of the unit. The library and computer lab at building 3 share the same conditioned space, and need to be
separated so that one room or the other do not get too hot or too cold (see figure 14). The condenser refrigerant lines
need to be properly supported as well (see figure 15).
Buildings 5 through 8 have the same upflow furnace in a closet, the only difference being different number of
classrooms. These buildings do not have a cooling coil connected to the upflow furnace, and so should have one put in.
Building 9 has the Kindergarten classrooms and is the only classroom building with the supply duct exposed on the
roof. This supply duct is old and needs to be replaced. This building also needs a cooling coil at each upflow furnace.
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 3
www.oed‐inc.com
List of equipment to consider replacing
Building 1 Administration rooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
packaged AC unit Carrier,
48HJD007‐551 roof admin rooms 1 2005, good
split system wall unit
Mitsubishi, PK12FK3
MDF rm MDF rm 1 old, replace
split system outdoor unit
Mitsubishi, PU12EK
roof MDF rm 1 old, replace
Buildings 5 ‐ 8 Classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
upflow furnace in closet
Carrier, 58MXA080‐16
closet classrooms 3 2004, good
Buildings 6 & 8 only have (2) furnaces
Building 9 Kindergarten Classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
upflow furnace in closet
Carrier, 58MXA100‐20
closet classrooms 2 2004, good
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 4
www.oed‐inc.com
Figures
1 2
3
4
5 6
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 5
www.oed‐inc.com
7 8
9 10
11
12
13 14
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 6
www.oed‐inc.com
15
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 7
www.oed‐inc.com
TeWinkle Intermediate School Buildings / Current HVAC systems
A: Classrooms / closet furnace system – no cooling.
B: Classrooms / closet furnace system – no cooling.
C: teen center & classrooms / rooftop heat pumps – no AC at teen center.
D: Library, library admin rooms & computer lab / rooftop heat pumps, upflow split systems for computer lab.
E: Classrooms / rooftop heat pumps F: Classrooms / rooftop heat pumps K: Music rooms, admin rooms / packaged rooftop AC, upflow furnaces, & mini split for MDF room.
Summary of Areas of Concern / Recommended Course of Action
The upflow furnaces at buildings A, B, & K (band room system) do not have a cooling coil / provide cooling coil to
match existing furnace & replace rooftop supply duct.
The mechanical rooms for buildings A, B, & K need an appropriate condensate drain / provide adequate floor sink
at mechanical rooms.
The teen center (previously wood shop) at building C does not have an AC system / demolish existing Reznor unit
heaters and provide new AC system.
The upflow furnaces at building the D admin rooms (east side of building) do not have a cooling coil / demolish
furnaces and associated ductwork & grilles, and replace with new VRF system.
The existing rooftop heat pumps at the building D library (center of building) are in poor condition / replace
rooftop heat pumps like‐for‐like.
The rooftop supply duct above the computer lab (building D, west side) is old / replace rooftop supply duct for
computer lab split systems.
Building E & F have old rooftop heat pumps / replace all heat pumps like‐for‐like.
Building E has two new rooftop heat pumps (recently installed by the district) that need an economizer.
The band room at building K does not have cooling / provide cooling coil to match existing upflow furnaces or a
new packaged rooftop AC unit.
The choral room has an old Lennox rooftop unit / replace Lennox rooftop unit with York equivalent.
The dual upflow furnaces for the band room share the same outside air plenum as the MPR and kitchen system /
provide backdraft damper at the outside air takeoff for the dual upflow systems.
The administration offices at building K have upflow furnaces without cooling / demolish furnaces & rooftop
supply duct, and reuse roof penetrations for new VRF system.
Mitsubishi mini split for MDR room is old / replace mini split.
All relief louvers need to be sealed.
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 8
www.oed‐inc.com
Overall Campus Site Assessment:
This campus has many types of systems: packaged rooftop heat pump, packaged rooftop AC units, upflow furnaces,
upflow split systems, and a mini split for the MDF room in the administration offices. The only upflow systems that
have cooling are at building D for the computer lab. The remaining upflow systems need a cooling coil. The upflow
systems at the mechanical rooms also need to have an adequate condensate floor sink put in. Each classroom and also
the administration rooms have relief louvers that need to be sealed.
The music rooms are located at the north end of building K (see figures 1 & 2). These rooms have existing packaged
rooftop AC units (see figures 3 & 4). The choral room, shown in figure 2, has an old Lennox unit that needs to be
replaced. The band room is located at the north end of building K as well (see figures 5 & 6), but it is conditioned using
dual upflow furnaces (see figure 7). The supply air ductwork for this room is not per the mechanical plans, and there is
an exhaust fan installed which is not shown on the mechanical plans. The dual furnaces draw their outside air from a
plenum which is also connected to the kitchen & MPR system. There needs to be a backdraft damper installed at the
takeoff for the band room system (see figure 8). The dual furnace system for the band room needs to have cooling
coils added or replaced with a new packaged rooftop AC unit.
The south end of building K has the main administration rooms (see figures 9 & 10). These are conditioned with three
upflow furnaces without a cooling coil (see figure 11). The supply duct is on the roof and penetrates the roof to
connect to the supply grilles (see figure 12). This portion of building K is a great candidate for a new VRF system. OED
recommends demolishing the existing furnaces, supply duct & grilles, and reusing the roof penetrations for the new
VRF system. The MDF room in this portion of building K has a mini split that needs to be replaced (see figure 13).
Buildings A & B have similar floor plans and the same types of furnaces. There is a total of six upflow furnaces in
mechanical rooms with the condensate draining into a floor drain (see figure 14). The supply duct is exposed on the
roof and is old and leaky (see figure 15). The upflow furnaces need a cooling coil, and the rooftop supply duct needs to
be replaced.
Building C contains the teen center (see figure 16) and two classrooms. The classrooms are conditioned using packaged
rooftop heat pumps which are in good condition (see figure 17). The teen center currently has two old Reznor unit
heaters (see figure 18) that need to be demolished and replaced with a new AC system.
Building D has three systems; a dual split system for the computer lab, rooftop heat pumps for the library, and upflow
furnaces for the library admin rooms (no cooling). The split systems at the computer lab are in good condition and can
remain (see figure 19), but the rooftop supply duct should be replaced. The rooftop heat pumps are in poor condition
and should be swapped out like‐for‐like (see figure 20). The admin rooms on the east side of building D are a great
candidate for a new VRF system. OED recommends demolishing the existing furnaces, supply duct & grilles, and
reusing roof penetrations for new VRF system.
Buildings E & F are both the same floor plan, and are conditioned using old rooftop heat pumps (see figure 21). All
rooftop heat pumps (except two new units at building E) should be replaced like‐for‐like. The two new rooftop heat
pumps at building E need to have an economizer (see figure 22).
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 9
www.oed‐inc.com
List of equipment to consider replacing
Building C Classrooms & Teen Center
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
Unit Heater Reznor suspended
unit heater Teen Center
Teen Center 2 Old, replace
Building D
Classrooms, computer lab, library, & library admin rms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
packaged heat pump
Carrier, 50HJQ005‐531
roof library 2 2005, poor
upflow furnace in mech rm
Carrier, 58MXA080‐12
library admin area
library admin rms 1 2005, good
upflow furnace in mech rm
Carrier, 58MXA080‐16
library admin area
library admin rms 1 2005, good
Building E Classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
packaged heat pump
York, B1HH036A25B
roof classrooms 6 old 1998, replace
packaged heat pump
York, B1HH048A25B
roof classrooms 1 old 1998, replace
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 10
www.oed‐inc.com
Building F Classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
packaged heat pump
York, B1HH036A25B
roof classrooms 11 old 1998, replace
Building K Music rooms, band room, admin rooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
upflow furnace Carrier
58MXA100‐20 mech rm
Band room 2 2005, good
Packaged rooftop AC
Lennox, GCS16‐090‐200‐1Y
roof Choral rm 1 1999, old‐replace
heat pump quietside, QSCC241
roof MDF room 1 2007, poor ‐ replace
indoor unit quietside, QSCE241
wall MDF room 1 2007, poor ‐ replace
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 11
www.oed‐inc.com
Figures
1 2
3
4
5 6
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 12
www.oed‐inc.com
7
8
9 10
11
12
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 13
www.oed‐inc.com
13 14
15 16
17 18
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 14
www.oed‐inc.com
19 20
21
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 15
www.oed‐inc.com
Killybrook Elementary School (Killybrook ES has similar floor plans & mechanical systems as California ES) Buildings / Current HVAC systems
Building 1: Administration / packaged rooftop unit & mini split
Building 2: MPR & Kitchen / NOT IN SCOPE
Building 3: Classrooms / upflow furnaces – no cooling
Building 4: Classrooms / upflow furnaces – no cooling
Building 5: Classroom, computer lab & library / upflow furnace & mini splits
Building 6: Classrooms / upflow furnaces – no cooling
Building 7: Classrooms / upflow furnaces – no cooling
Building 8: Classrooms / upflow furnaces – no cooling
Building 9: Kindergarten / upflow furnaces – no cooling
Summary of Areas of Concern / Recommended Course of Action
Building 1 has old and leaky rooftop duct for the existing rooftop AC unit / demolish duct, reuse the roof openings
& reuse the rooftop unit for a new VRF system.
The MDF room mini split system at building 1 is old / replace with new mini split.
The computer lab at building 5 is being cooled with old mini split / replace with new, larger mini split.
Buildings 3 through 9 are heat only upflow systems with no cooling / provide cooling coil to match existing closet
furnace in buildings 3 through 9.
Building 9 has the supply duct exposed on the roof / replace rooftop supply duct.
All classrooms and the administration rooms have relief louvers / seal all louvers within conditioned spaces.
All existing split systems and closet furnaces are about 10 years old / replace existing systems like for like with new
units.
The return plenums at buildings 3 through 8 are plywood without sheet metal lining / provide new sheet metal
return air plenums.
Overall Campus Site Assessment:
Building 1 is the administration building and has two types of systems; a packaged rooftop AC unit and a mini split
system for the MDF room. The rooftop unit is ducted to each supply grille with the supply duct exposed on the roof.
The return air grille for the rooftop unit that is located in the admin lunch room is adequately sized, but the return duct
in the wall is not, so there is not adequate return air for the system. The thermostat that is controlling the rooftop unit
is not located at the back of the lunch room by the return air grille as specified on the mechanical plans, but near the
front entrance where it is exposed to sunlight, and outside air every time the door opens; recommend relocating the
tstat. The Mitsubishi mini split for the MDF room is old and needs to be replaced with a new mini split. The existing
rooftop unit and roof penetrations should be reused to accommodate a new VRF system.
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 16
www.oed‐inc.com
The remaining buildings on the campus are all conditioned by upflow furnaces in a closet with the supply duct exposed
within the classroom or exposed on the roof (building 9). The condensate drains to a drywell and each system is
bringing in some outside air. All classrooms have an existing relief louver that needs to be sealed. There are also
obstructions at all the return air grilles‐these obstructions need to be moved to provide adequate return.
Building 5 contains the computer lab & library. Both rooms are cooled using old 2 ton mini splits (see figures 1 ‐ 5). The
computer lab will need additional cooling.
Buildings 6 through 8 have the same upflow furnace in a closet, the only difference being different number of
classrooms. These buildings do not have a cooling coil connected to the upflow furnace, and so should have one put in.
Building 9 has the Kindergarten classrooms and is the only classroom building with the supply duct exposed on the
roof. This supply duct is old and needs to be replaced. This building also needs a cooling coil at each upflow furnace.
List of equipment to consider replacing
Building 1 Administration rooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
packaged AC unit Carrier,
48HJD007‐551 roof admin rooms 1 2004, good
split system wall unit
Mitsubishi, PK12FK3
MDF rm MDF rm 1 old, replace
heat pump Mitsubishi, PU12EK1
roof MDF rm 1 old, replace
Building 5 classroom, computer lab & Library
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
heat pump Fujitsu AOU30C1 roof computer lab &
library 2 old, replace
indoor wall unit Fujitsu ASU30C1 wall computer lab &
library 2 old, replace
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 17
www.oed‐inc.com
Figures
1 2
3 4
5
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 18
www.oed‐inc.com
Paularino Elementary School (Paularino ES has similar floor plans & mechanical systems as California ES) Buildings / Current HVAC systems
Building 1: Administration / packaged rooftop unit & mini split
Building 3: Classrooms & library / upflow furnaces – no cooling
Building 4: Classrooms / upflow furnaces – no cooling
Building 5: Classrooms / upflow furnaces – no cooling
Building 6: Classroom & computer lab / upflow furnaces, & mini split
Building 7: Classrooms / upflow furnaces – no cooling
Building 8: Classrooms / upflow furnaces – no cooling
Building 9: Kindergarten / upflow furnaces – no cooling
Summary of Areas of Concern / Recommended Course of Action
Building 1 has old and leaky rooftop duct for the existing rooftop AC unit / demolish duct, reuse the roof openings
& reuse the rooftop unit for a new VRF system.
The MDF room mini split system at building 1 is old / replace with new mini split.
Buildings 3 through 9 are heat only upflow systems with no cooling / provide cooling coil to match existing closet
furnace in buildings 3 through 9.
The mini split cooling the computer lab at building 6 is old & undersized / replace with new, bigger mini split.
Building 9 has the supply duct exposed on the roof / replace rooftop supply duct.
All classrooms and the administration rooms have relief louvers / seal all louvers within conditioned spaces.
All existing split systems and closet furnaces are about 10 years old / replace existing systems like for like with new
units.
The return plenums at buildings 3 through 8 are plywood without sheet metal lining / provide new sheet metal
return air plenums.
Overall Campus Site Assessment:
Building 1 is the administration building and has two types of systems; a packaged rooftop AC unit and a mini split
system for the MDF room. The rooftop unit is ducted to each supply grille with the supply duct exposed on the roof.
The return air grille for the rooftop unit that is located in the admin lunch room is adequately sized, but the return duct
in the wall is not, so there is not adequate return air for the system. The thermostat that is controlling the rooftop unit
is not located at the back of the lunch room by the return air grille as specified on the mechanical plans, but near the
front entrance where it is exposed to sunlight, and outside air every time the door opens; recommend relocating the
tstat. The Mitsubishi mini split for the MDF room is old and needs to be replaced with a new mini split. The existing
rooftop unit and roof penetrations should be reused to accommodate a new VRF system.
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 19
www.oed‐inc.com
The remaining buildings on the campus are all conditioned by upflow furnaces in a closet with the supply duct exposed
within the classroom or exposed on the roof (building 9). The condensate drains to a drywell and each system is
bringing in some outside air. All classrooms have an existing relief louver that needs to be sealed. There are also
obstructions at all the return air grilles‐these obstructions need to be moved to provide adequate return.
Buildings 6 has a computer lab with about 40 PCs and is only being cooled with a 2.5 ton mini split (see figures 1 & 2);
OED recommends upsizing existing unit.
Buildings 3 through 8 have the same upflow furnace in a closet, the only difference being different number of
classrooms. These buildings do not have a cooling coil connected to the upflow furnace, and so should have one put in.
Building 9 has the Kindergarten classrooms and is the only classroom building with the supply duct exposed on the
roof. This supply duct is old and needs to be replaced. This building also needs a cooling coil at each upflow furnace.
List of equipment to consider replacing
Building 1 Administration rooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
packaged AC unit Carrier,
48HJD007‐551 roof admin rooms 1 2005, good
split system wall unit
Mitsubishi, PK12FK3
MDF rm MDF rm 1 old, replace
heat pump Mitsubishi, PU12EK
roof MDF rm 1 old, replace
Building 6 classroom & computer lab
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
heat pump Mitsubishi,
PUH‐30G6.US closet computer lab 1 old, replace
mini Mitsubishi, PCH‐3AG
ceiling hung
computer lab 1 old, replace
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 20
www.oed‐inc.com
Figures
1 2
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 21
www.oed‐inc.com
Early College High School Buildings / Current HVAC systems
Building A: Administration / packaged rooftop unit & mini split
Building B: MPR & Kitchen / NOT IN SCOPE
Building C: Classrooms / old down‐shot furnaces, and one packaged rooftop unit
Building D: Classrooms / old down‐shot furnaces – no cooling
Building E: Classrooms / old down‐shot furnaces – no cooling
Building F: Classrooms / packaged rooftop units
Building G: Classrooms / old down‐shot furnaces – no cooling
Rooms 1‐5: Classrooms / NOT IN SCOPE, brand new systems
Summary of Areas of Concern / Recommended Course of Action
The admin building rooftop unit is old / replace with new VRF system & replace MDF room mini split.
Classroom buildings C through E, and also building G have old, down‐shot furnaces / demo furnaces and replace
with new YORK packaged rooftop units similar to those installed at rooms 1‐5 or upflow split systems.
The rooftop units installed at building F are old / replace with new YORK rooftop units.
The computer lab at portable building room 10 needs additional cooling; current system is a 2.5 ton Bard wall
mount unit, and there are 30 PCs.
The Conference room at portable building room 13 does not have CO2 sensor, is sharing a zone with another
space and the tstat is not inside the conference room / provide demand control ventilation and dedicated zone.
Classrooms and administration rooms have relief louvers / seal all relief louvers.
Overall Campus Site Assessment:
This campus has a similar floor plan as California Elementary, but many of the classrooms have very old systems. The
administration building needs to have a new VRF system put in to replace the current rooftop unit (see figure 1). The
classrooms at buildings C, D, and E are currently being heated by old downshot furnaces (see figures 2 & 3). These
furnaces need to be demolished and replaced with packaged rooftop AC units or upflow split systems like at California
Elementary, building 3.
Building F has rooftop units (see figure 4), but these are old, and should be replaced with newer models. Building G
contains the kindergarten classrooms and has old downshot furnaces that are not operational (see figures 5). These
rooms should be conditioned using upflow split systems or new rooftop units.
The computer lab at portable building room 10 only has one Bard wall mount unit conditioning the space with 30 PCs,
and needs additional cooling (see figure 6). The conference room at portable building room 13 has the thermostat
outside the conference room, and only one supply grille within the conference room space. There is also no CO2
sensor in place & only one zone for the conference room, and an adjacent room. This area needs to be split into two
separate zones with demand control ventilation for the conference room. The classrooms labeled 1 through 5 have
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 22
www.oed‐inc.com
brand new YORK rooftop units (see figure 7). These rooms are not within the scope of work, but the current systems
can be used as a template for other classrooms at this campus.
List of equipment to consider replacing
Building A Administration
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
heat pump Carrier,
38AN012320 roof MDF room 1 old, replace
indoor unit to match heat pump
Carrier model MDF room
MDF room 1 old, replace
packaged rooftop AC
Trane, 2YCC3048A1075AA
roof admin rooms 1 2007, poor
Building C classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
roodtop packaged AC
Trane, YCC036F1M0BJ
roof classroom 1 2002, poor‐replace
downshot furnace York diamond 80 mech room
classrooms 2 old, replace
Building D classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
downshot furnace York diamond 80 mech room
classrooms 2 old, replace
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 23
www.oed‐inc.com
Building E classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
downshot furnace York diamond 80 mech room
classrooms 2 old, replace
Building F classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
packaged rooftop AC
Rheem, RRKA‐A036JK06X
roof classrooms 3 1999, old‐replace
Building G Kindergarten classrooms
Equipment Tag/Description
Mfg. & Model # Building Location
Rooms Serviced Total
quantity Approximate age
& condition
downshot furnace York diamond 80 mech room
classrooms 2 old, replace
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 24
www.oed‐inc.com
Figures
1
2
3 4
5 6
_____________________________________________________________________________
5200 E. La Palma, Anaheim, CA 92807 Tel: 714‐693‐2277 P a g e | 25
www.oed‐inc.com
7