______________________________________________________________________________ 5200 E. La Palma, Anaheim, CA 92807 Tel: 7146932277 Page | 0 www.oedinc.com Newport Mesa USD Site Survey Report for: California Elementary TeWinkle Intermediate Killybrook Elementary Paularino Elementary Early College High

Transcript of NMUSD Mechanical Report_Abridged

Page 1: NMUSD Mechanical Report_Abridged

______________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                     P a g e  | 0 

www.oed‐inc.com 

 

 

 

Newport Mesa USD Site Survey Report for: 

California Elementary 

TeWinkle Intermediate 

Killybrook Elementary 

Paularino Elementary 

Early College High  

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 2: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 1 

www.oed‐inc.com 

California Elementary School  Buildings / Current HVAC systems 

Building 1: Administration / packaged rooftop unit & mini split 

Building 2: MPR & Kitchen / NOT IN SCOPE 

Building 3: Library & Computer Lab / upflow split systems 

Building 4: Classrooms / upflow split systems 

Building 5: Classrooms / upflow furnaces – no cooling 

Building 6: Classrooms / upflow furnaces – no cooling 

Building 7: Classrooms / upflow furnaces – no cooling 

Building 8: Classrooms / upflow furnaces – no cooling  

Building 9: Kindergarten / upflow furnaces – no cooling  

 Summary of Areas of Concern / Recommended Course of Action  

Building 1 has old and leaky rooftop duct for the existing rooftop AC unit / demolish duct, reuse the roof openings 

& reuse the rooftop unit for a new VRF system. 

The MDF room mini split system at building 1 is old / replace with new mini split. 

The  computer  lab  and  library  at  building  3  share  the  same  conditioned  air  /  separate  the  library  from  the 

computer lab, and provide additional cooling if needed at the computer lab. 

Buildings 5 through 9 are heat only upflow systems with no cooling / provide cooling coil to match existing closet 

furnace in buildings 5 through 9. 

Building 9 has the supply duct exposed on the roof / replace rooftop supply duct. 

All classrooms and the administration rooms have relief louvers / seal all louvers within conditioned spaces. 

All existing split systems and closet furnaces are about 10 years old / replace existing systems like for like with new 

units. 

The return plenums at buildings 3 through 8 are plywood without sheet metal  lining / provide new sheet metal 

return air plenums.  

 

Overall Campus Site Assessment: 

Building 1 is the administration building and has two types of systems, a packaged rooftop AC unit (see figure 1) and a 

mini split system for the MDF room (see figures 2 & 3). The rooftop unit is ducted to each supply grille with the supply 

duct exposed on the roof (see figures 4 & 5). The return air grille for the rooftop unit that is located in the admin lunch 

room is adequately sized, but the return duct in the wall is not, so there is not adequate return air for the system. The 

thermostat that is controlling the rooftop unit is not located at the back of the lunch room by the return air grille as 

specified on the mechanical plans, but near the front entrance where it is exposed to sunlight, and outside air every 

time the door opens (see figure 6); recommend relocating the tstat. The Mitsubishi mini split for the MDF room is old 

and needs to be replaced with a new mini split. The existing rooftop unit and roof penetrations should be reused to 

accommodate a new VRF system. 

Page 3: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 2 

www.oed‐inc.com 

The remaining buildings on the campus are all conditioned by upflow furnaces in a closet with the supply duct exposed 

within the classroom (see figures 7 & 8) or exposed on the roof (building 9, see figure 9). The condensate drains to a 

drywell (see figure 10) and each system is bringing in some outside air. All classrooms have an existing relief louver that 

needs to be sealed (see figure 11). There are also obstructions at all the return air grilles‐these obstructions need to be 

moved to provide adequate return. 

Buildings 3 & 4 are  conditioned using upflow  split  systems, and are  the only buildings  that have  cooling  coils and 

condensers  (see  figures 12 & 13). The supply duct  is exposed within  the classrooms, and  the  return grille  is at  the 

bottom of  the unit. The  library and computer  lab at building 3  share  the  same conditioned  space, and need  to be 

separated so that one room or the other do not get too hot or too cold (see figure 14). The condenser refrigerant lines 

need to be properly supported as well (see figure 15).  

Buildings  5  through  8  have  the  same  upflow  furnace  in  a  closet,  the  only  difference  being  different  number  of 

classrooms. These buildings do not have a cooling coil connected to the upflow furnace, and so should have one put in. 

Building 9 has the Kindergarten classrooms and  is the only classroom building with the supply duct exposed on the 

roof. This supply duct is old and needs to be replaced. This building also needs a cooling coil at each upflow furnace. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 4: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 3 

www.oed‐inc.com 

 

List of equipment to consider replacing  

Building 1     Administration rooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

packaged AC unit Carrier,          

48HJD007‐551 roof  admin rooms  1  2005, good 

split system wall unit 

Mitsubishi, PK12FK3 

MDF rm  MDF rm  1  old, replace 

split system outdoor unit 

Mitsubishi, PU12EK 

roof  MDF rm  1  old, replace 

 

Buildings 5 ‐ 8     Classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

upflow furnace in closet 

Carrier, 58MXA080‐16 

closet  classrooms  3  2004, good 

Buildings 6 & 8 only have (2) furnaces 

 

Building 9     Kindergarten Classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

upflow furnace in closet 

Carrier, 58MXA100‐20 

closet  classrooms  2  2004, good 

 

 

 

Page 5: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 4 

www.oed‐inc.com 

 

Figures 

1  2 

 

 

5  6 

 

Page 6: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 5 

www.oed‐inc.com 

7  8 

 

9  10

 

11 

 

12

13  14

Page 7: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 6 

www.oed‐inc.com 

15   

 

          

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 8: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 7 

www.oed‐inc.com 

TeWinkle Intermediate School  Buildings / Current HVAC systems 

A: Classrooms / closet furnace system – no cooling. 

B: Classrooms / closet furnace system – no cooling.  

C: teen center & classrooms / rooftop heat pumps – no AC at teen center. 

D: Library, library admin rooms & computer lab / rooftop heat pumps, upflow split systems for computer lab. 

E: Classrooms / rooftop heat pumps F: Classrooms / rooftop heat pumps K: Music rooms, admin rooms / packaged rooftop AC, upflow furnaces, & mini split for MDF room. 

 Summary of Areas of Concern / Recommended Course of Action  

The upflow furnaces at buildings A, B, & K (band room system) do not have a cooling coil / provide cooling coil to 

match existing furnace & replace rooftop supply duct. 

The mechanical rooms for buildings A, B, & K need an appropriate condensate drain / provide adequate floor sink 

at mechanical rooms.  

The teen center (previously wood shop) at building C does not have an AC system / demolish existing Reznor unit 

heaters and provide new AC system. 

The upflow furnaces at building the D admin rooms (east side of building) do not have a cooling coil / demolish 

furnaces and associated ductwork & grilles, and replace with new VRF system. 

The  existing  rooftop heat pumps  at  the building D  library  (center of building)  are  in poor  condition  /  replace 

rooftop heat pumps like‐for‐like.  

The rooftop supply duct above the computer  lab (building D, west side)  is old / replace rooftop supply duct for 

computer lab split systems. 

Building E & F have old rooftop heat pumps / replace all heat pumps like‐for‐like. 

Building E has two new rooftop heat pumps (recently installed by the district) that need an economizer. 

The band room at building K does not have cooling / provide cooling coil to match existing upflow furnaces or a 

new packaged rooftop AC unit.  

The choral room has an old Lennox rooftop unit / replace Lennox rooftop unit with York equivalent. 

The dual upflow furnaces for the band room share the same outside air plenum as the MPR and kitchen system / 

provide backdraft damper at the outside air takeoff for the dual upflow systems. 

The  administration  offices  at  building  K  have  upflow  furnaces without  cooling  /  demolish  furnaces &  rooftop 

supply duct, and reuse roof penetrations for new VRF system.  

Mitsubishi mini split for MDR room is old / replace mini split. 

All relief louvers need to be sealed. 

 

Page 9: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 8 

www.oed‐inc.com 

 

Overall Campus Site Assessment: 

This campus has many types of systems: packaged rooftop heat pump, packaged rooftop AC units, upflow furnaces, 

upflow split systems, and a mini split for the MDF room  in the administration offices. The only upflow systems that 

have cooling are at building D  for the computer  lab. The remaining upflow systems need a cooling coil. The upflow 

systems at the mechanical rooms also need to have an adequate condensate floor sink put in. Each classroom and also 

the administration rooms have relief louvers that need to be sealed. 

The music rooms are  located at the north end of building K (see figures 1 & 2). These rooms have existing packaged 

rooftop AC units  (see  figures 3 & 4). The choral  room,  shown  in  figure 2, has an old Lennox unit  that needs  to be 

replaced. The band room is located at the north end of building K as well (see figures 5 & 6), but it is conditioned using 

dual upflow furnaces (see figure 7). The supply air ductwork for this room is not per the mechanical plans, and there is 

an exhaust fan installed which is not shown on the mechanical plans. The dual furnaces draw their outside air from a 

plenum which is also connected to the kitchen & MPR system. There needs to be a backdraft damper installed at the 

takeoff for the band room system (see figure 8). The dual furnace system for the band room needs to have cooling 

coils added or replaced with a new packaged rooftop AC unit.   

The south end of building K has the main administration rooms (see figures 9 & 10). These are conditioned with three 

upflow  furnaces without  a  cooling  coil  (see  figure 11).  The  supply duct  is on  the  roof  and penetrates  the  roof  to 

connect to the supply grilles (see figure 12). This portion of building K is a great candidate for a new VRF system. OED 

recommends demolishing the existing furnaces, supply duct & grilles, and reusing the roof penetrations for the new 

VRF system. The MDF room in this portion of building K has a mini split that needs to be replaced (see figure 13). 

Buildings A & B have  similar  floor plans and  the  same  types of  furnaces. There  is a  total of  six upflow  furnaces  in 

mechanical rooms with the condensate draining into a floor drain (see figure 14). The supply duct is exposed on the 

roof and is old and leaky (see figure 15). The upflow furnaces need a cooling coil, and the rooftop supply duct needs to 

be replaced.  

Building C contains the teen center (see figure 16) and two classrooms. The classrooms are conditioned using packaged 

rooftop heat pumps which are  in good condition  (see  figure 17). The teen center currently has two old Reznor unit 

heaters (see figure 18) that need to be demolished and replaced with a new AC system. 

Building D has three systems; a dual split system for the computer lab, rooftop heat pumps for the library, and upflow 

furnaces for the library admin rooms (no cooling). The split systems at the computer lab are in good condition and can 

remain (see figure 19), but the rooftop supply duct should be replaced. The rooftop heat pumps are in poor condition 

and should be swapped out  like‐for‐like (see figure 20). The admin rooms on the east side of building D are a great 

candidate  for  a  new  VRF  system. OED  recommends  demolishing  the  existing  furnaces,  supply  duct &  grilles,  and 

reusing roof penetrations for new VRF system. 

Buildings E & F are both the same floor plan, and are conditioned using old rooftop heat pumps  (see  figure 21). All 

rooftop heat pumps (except two new units at building E) should be replaced  like‐for‐like. The two new rooftop heat 

pumps at building E need to have an economizer (see figure 22).   

 

 

Page 10: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 9 

www.oed‐inc.com 

 

 

List of equipment to consider replacing  

Building C     Classrooms & Teen Center 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

Unit Heater Reznor suspended 

unit heater Teen Center 

Teen Center  2  Old, replace 

 

Building D    

Classrooms, computer lab, library, & library admin rms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

packaged heat pump 

Carrier, 50HJQ005‐531 

roof  library  2  2005, poor 

upflow furnace in mech rm 

Carrier,          58MXA080‐12 

library admin area 

library admin rms  1  2005, good 

upflow furnace in mech rm 

Carrier,          58MXA080‐16 

library admin area 

library admin rms  1  2005, good 

 

Building E     Classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

packaged heat pump 

York, B1HH036A25B 

roof  classrooms  6  old 1998, replace 

packaged heat pump 

York, B1HH048A25B 

roof  classrooms  1  old 1998, replace 

 

Page 11: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 10 

www.oed‐inc.com 

 

Building F     Classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

packaged heat pump 

York, B1HH036A25B 

roof  classrooms  11  old 1998, replace 

 

Building K     Music rooms, band room, admin rooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

upflow furnace Carrier 

58MXA100‐20 mech rm 

Band room  2  2005, good 

Packaged rooftop AC 

Lennox, GCS16‐090‐200‐1Y 

roof  Choral rm  1  1999, old‐replace 

heat pump quietside, QSCC241 

roof  MDF room  1 2007, poor ‐ replace 

indoor unit quietside, QSCE241 

wall  MDF room  1 2007, poor ‐ replace 

 

 

 

 

 

 

 

 

 

Page 12: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 11 

www.oed‐inc.com 

 

Figures 

1  2 

 

5  6 

Page 13: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 12 

www.oed‐inc.com 

 

9  10

11 

 

12

Page 14: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 13 

www.oed‐inc.com 

13  14

15  16

17  18

 

Page 15: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 14 

www.oed‐inc.com 

19  20

21   

 

          

 

 

 

 

 

 

 

Page 16: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 15 

www.oed‐inc.com 

Killybrook Elementary School  (Killybrook ES has similar floor plans & mechanical systems as California ES)  Buildings / Current HVAC systems 

Building 1: Administration / packaged rooftop unit & mini split 

Building 2: MPR & Kitchen / NOT IN SCOPE 

Building 3: Classrooms / upflow furnaces – no cooling 

Building 4: Classrooms / upflow furnaces – no cooling 

Building 5: Classroom, computer lab & library / upflow furnace & mini splits 

Building 6: Classrooms / upflow furnaces – no cooling 

Building 7: Classrooms / upflow furnaces – no cooling 

Building 8: Classrooms / upflow furnaces – no cooling  

Building 9: Kindergarten / upflow furnaces – no cooling  

 Summary of Areas of Concern / Recommended Course of Action  

Building 1 has old and leaky rooftop duct for the existing rooftop AC unit / demolish duct, reuse the roof openings 

& reuse the rooftop unit for a new VRF system. 

The MDF room mini split system at building 1 is old / replace with new mini split. 

The computer lab at building 5 is being cooled with old mini split / replace with new, larger mini split. 

Buildings 3 through 9 are heat only upflow systems with no cooling / provide cooling coil to match existing closet 

furnace in buildings 3 through 9. 

Building 9 has the supply duct exposed on the roof / replace rooftop supply duct. 

All classrooms and the administration rooms have relief louvers / seal all louvers within conditioned spaces. 

All existing split systems and closet furnaces are about 10 years old / replace existing systems like for like with new 

units. 

The return plenums at buildings 3 through 8 are plywood without sheet metal  lining / provide new sheet metal 

return air plenums.  

 

Overall Campus Site Assessment: 

Building 1  is the administration building and has two types of systems; a packaged rooftop AC unit and a mini split 

system for the MDF room. The rooftop unit is ducted to each supply grille with the supply duct exposed on the roof. 

The return air grille for the rooftop unit that is located in the admin lunch room is adequately sized, but the return duct 

in the wall is not, so there is not adequate return air for the system. The thermostat that is controlling the rooftop unit 

is not located at the back of the lunch room by the return air grille as specified on the mechanical plans, but near the 

front entrance where it is exposed to sunlight, and outside air every time the door opens; recommend relocating the 

tstat. The Mitsubishi mini split for the MDF room  is old and needs to be replaced with a new mini split. The existing 

rooftop unit and roof penetrations should be reused to accommodate a new VRF system. 

Page 17: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 16 

www.oed‐inc.com 

The remaining buildings on the campus are all conditioned by upflow furnaces in a closet with the supply duct exposed 

within  the  classroom or exposed on  the  roof  (building 9). The  condensate drains  to  a drywell  and each  system  is 

bringing  in  some outside  air. All  classrooms have  an existing  relief  louver  that needs  to be  sealed.  There  are  also 

obstructions at all the return air grilles‐these obstructions need to be moved to provide adequate return. 

Building 5 contains the computer lab & library. Both rooms are cooled using old 2 ton mini splits (see figures 1 ‐ 5). The 

computer lab will need additional cooling. 

Buildings  6  through  8  have  the  same  upflow  furnace  in  a  closet,  the  only  difference  being  different  number  of 

classrooms. These buildings do not have a cooling coil connected to the upflow furnace, and so should have one put in. 

Building 9 has the Kindergarten classrooms and  is the only classroom building with the supply duct exposed on the 

roof. This supply duct is old and needs to be replaced. This building also needs a cooling coil at each upflow furnace. 

 

List of equipment to consider replacing  

Building 1     Administration rooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

packaged AC unit Carrier,          

48HJD007‐551 roof  admin rooms  1  2004, good 

split system wall unit 

Mitsubishi, PK12FK3 

MDF rm  MDF rm  1  old, replace 

heat pump Mitsubishi, PU12EK1 

roof  MDF rm  1  old, replace 

 

Building 5     classroom, computer lab & Library 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

heat pump  Fujitsu AOU30C1  roof computer lab & 

library 2  old, replace 

indoor wall unit  Fujitsu ASU30C1  wall computer lab & 

library 2  old, replace 

 

Page 18: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 17 

www.oed‐inc.com 

 

Figures 

1  2

 

3  4

5   

 

      

 

Page 19: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 18 

www.oed‐inc.com 

Paularino Elementary School  (Paularino ES has similar floor plans & mechanical systems as California ES)  Buildings / Current HVAC systems 

Building 1: Administration / packaged rooftop unit & mini split 

Building 3: Classrooms & library / upflow furnaces – no cooling 

Building 4: Classrooms / upflow furnaces – no cooling 

Building 5: Classrooms / upflow furnaces – no cooling 

Building 6: Classroom & computer lab / upflow furnaces, & mini split 

Building 7: Classrooms / upflow furnaces – no cooling 

Building 8: Classrooms / upflow furnaces – no cooling  

Building 9: Kindergarten / upflow furnaces – no cooling  

 Summary of Areas of Concern / Recommended Course of Action  

Building 1 has old and leaky rooftop duct for the existing rooftop AC unit / demolish duct, reuse the roof openings 

& reuse the rooftop unit for a new VRF system. 

The MDF room mini split system at building 1 is old / replace with new mini split. 

Buildings 3 through 9 are heat only upflow systems with no cooling / provide cooling coil to match existing closet 

furnace in buildings 3 through 9. 

The mini split cooling the computer lab at building 6 is old & undersized / replace with new, bigger mini split. 

Building 9 has the supply duct exposed on the roof / replace rooftop supply duct. 

All classrooms and the administration rooms have relief louvers / seal all louvers within conditioned spaces. 

All existing split systems and closet furnaces are about 10 years old / replace existing systems like for like with new 

units. 

The return plenums at buildings 3 through 8 are plywood without sheet metal  lining / provide new sheet metal 

return air plenums.  

 

Overall Campus Site Assessment: 

Building 1  is the administration building and has two types of systems; a packaged rooftop AC unit and a mini split 

system for the MDF room. The rooftop unit is ducted to each supply grille with the supply duct exposed on the roof. 

The return air grille for the rooftop unit that is located in the admin lunch room is adequately sized, but the return duct 

in the wall is not, so there is not adequate return air for the system. The thermostat that is controlling the rooftop unit 

is not located at the back of the lunch room by the return air grille as specified on the mechanical plans, but near the 

front entrance where it is exposed to sunlight, and outside air every time the door opens; recommend relocating the 

tstat. The Mitsubishi mini split for the MDF room  is old and needs to be replaced with a new mini split. The existing 

rooftop unit and roof penetrations should be reused to accommodate a new VRF system. 

Page 20: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 19 

www.oed‐inc.com 

The remaining buildings on the campus are all conditioned by upflow furnaces in a closet with the supply duct exposed 

within  the  classroom or exposed on  the  roof  (building 9). The  condensate drains  to  a drywell  and each  system  is 

bringing  in  some outside  air. All  classrooms have  an existing  relief  louver  that needs  to be  sealed.  There  are  also 

obstructions at all the return air grilles‐these obstructions need to be moved to provide adequate return. 

Buildings 6 has a computer lab with about 40 PCs and is only being cooled with a 2.5 ton mini split (see figures 1 & 2); 

OED recommends upsizing existing unit.  

Buildings  3  through  8  have  the  same  upflow  furnace  in  a  closet,  the  only  difference  being  different  number  of 

classrooms. These buildings do not have a cooling coil connected to the upflow furnace, and so should have one put in. 

Building 9 has the Kindergarten classrooms and  is the only classroom building with the supply duct exposed on the 

roof. This supply duct is old and needs to be replaced. This building also needs a cooling coil at each upflow furnace. 

 

List of equipment to consider replacing  

Building 1     Administration rooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

packaged AC unit Carrier,          

48HJD007‐551 roof  admin rooms  1  2005, good 

split system wall unit 

Mitsubishi, PK12FK3 

MDF rm  MDF rm  1  old, replace 

heat pump Mitsubishi, PU12EK 

roof  MDF rm  1  old, replace 

 

Building 6     classroom & computer lab 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

heat pump Mitsubishi,          

PUH‐30G6.US closet  computer lab  1  old, replace 

mini Mitsubishi,          PCH‐3AG 

ceiling hung 

computer lab  1  old, replace 

 

Page 21: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 20 

www.oed‐inc.com 

 

Figures 

1  2

 

          

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 22: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 21 

www.oed‐inc.com 

Early College High School  Buildings / Current HVAC systems 

Building A: Administration / packaged rooftop unit & mini split 

Building B: MPR & Kitchen / NOT IN SCOPE 

Building C: Classrooms / old down‐shot furnaces, and one packaged rooftop unit 

Building D: Classrooms / old down‐shot furnaces – no cooling 

Building E: Classrooms / old down‐shot furnaces – no cooling 

Building F: Classrooms / packaged rooftop units 

Building G: Classrooms / old down‐shot furnaces – no cooling  

Rooms 1‐5: Classrooms / NOT IN SCOPE, brand new systems 

 Summary of Areas of Concern / Recommended Course of Action  

The admin building rooftop unit is old / replace with new VRF system & replace MDF room mini split. 

Classroom buildings C through E, and also building G have old, down‐shot furnaces / demo furnaces and replace 

with new YORK packaged rooftop units similar to those installed at rooms 1‐5 or upflow split systems. 

The rooftop units installed at building F are old / replace with new YORK rooftop units. 

The computer  lab at portable building room 10 needs additional cooling; current system  is a 2.5  ton Bard wall 

mount unit, and there are 30 PCs.  

The Conference  room at portable building  room 13 does not have CO2 sensor,  is  sharing a zone with another 

space and the tstat is not inside the conference room / provide demand control ventilation and dedicated zone. 

Classrooms and administration rooms have relief louvers / seal all relief louvers. 

 

Overall Campus Site Assessment: 

This campus has a similar floor plan as California Elementary, but many of the classrooms have very old systems. The 

administration building needs to have a new VRF system put in to replace the current rooftop unit (see figure 1). The 

classrooms at buildings C, D, and E are currently being heated by old downshot  furnaces  (see  figures 2 & 3). These 

furnaces need to be demolished and replaced with packaged rooftop AC units or upflow split systems like at California 

Elementary, building 3.  

Building F has rooftop units (see figure 4), but these are old, and should be replaced with newer models. Building G 

contains the kindergarten classrooms and has old downshot furnaces that are not operational (see figures 5). These 

rooms should be conditioned using upflow split systems or new rooftop units. 

The computer lab at portable building room 10 only has one Bard wall mount unit conditioning the space with 30 PCs, 

and needs additional cooling  (see  figure 6). The conference  room at portable building  room 13 has  the  thermostat 

outside  the  conference  room,  and only one  supply  grille within  the  conference  room  space. There  is  also no CO2 

sensor in place & only one zone for the conference room, and an adjacent room. This area needs to be split into two 

separate zones with demand control ventilation for the conference room. The classrooms  labeled 1 through 5 have 

Page 23: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 22 

www.oed‐inc.com 

brand new YORK rooftop units (see figure 7). These rooms are not within the scope of work, but the current systems 

can be used as a template for other classrooms at this campus. 

 

List of equipment to consider replacing  

Building A     Administration 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

heat pump Carrier, 

38AN012320  roof  MDF room  1  old, replace 

indoor unit to match heat pump 

Carrier model MDF room 

MDF room  1  old, replace 

packaged rooftop AC 

Trane, 2YCC3048A1075AA

roof  admin rooms  1  2007, poor 

 

Building C     classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

roodtop packaged AC 

Trane, YCC036F1M0BJ 

roof  classroom  1  2002, poor‐replace

downshot furnace  York diamond 80 mech room 

classrooms  2  old, replace 

 

Building D     classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

downshot furnace  York diamond 80 mech room 

classrooms  2  old, replace 

Page 24: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 23 

www.oed‐inc.com 

 

Building E     classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

downshot furnace  York diamond 80 mech room 

classrooms  2  old, replace 

 

Building F     classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

packaged rooftop AC 

Rheem,             RRKA‐A036JK06X 

roof  classrooms  3  1999, old‐replace 

 

Building G     Kindergarten classrooms 

Equipment Tag/Description 

Mfg. & Model # Building Location

Rooms Serviced Total 

quantity Approximate age 

& condition 

downshot furnace  York diamond 80 mech room 

classrooms  2  old, replace 

 

 

 

 

 

 

 

 

 

 

 

 

Page 25: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 24 

www.oed‐inc.com 

 

Figures 

 

2

3  4

 

5  6

 

Page 26: NMUSD Mechanical Report_Abridged

_____________________________________________________________________________

   

5200 E. La Palma, Anaheim, CA 92807                   Tel: 714‐693‐2277                                                                   P a g e  | 25 

www.oed‐inc.com 

7