Recently enacted Federal EPA Quad O Regulations have caused the entire Oil and Gas
Industry to reassess the way storage tank facilities are configured and maintained.
HY-BON specializes in providing solutions that address these regulations and recapture lost
revenues in the process.
VRU’s
HY-BON sets the Industry
Standard in Vapor Recovery
Electric Drive
Engine Drive
20+ standard designs
HY-BON solutions include:
Vapor Recovery Units
Vapor Recovery Towers
Vapor Combustor Units
(Enclosed)
Site Surveys (IQR)
Parts and Service
The HY-BON VRT provides flash gas
recovery at near atmospheric pressure
without the potential of oxygen ingress
from the top of the storage tanks. The
ability to create the vapor flash inside
the VRT often reduces storage tank
emissions to less than 6 tons per year,
exempting the tank battery from Quad O
reporting requirements.
The VRT creates a “closed system”,
preventing the potential for human error
or vapor leakage from open or leaking
thief hatches.
36” x 30’ S/S 75# MAWP
Oil flow rate up to 1500 BPD
Minimum retention time: 25 minutes
Notes:
For higher flow rates multiple towers are
recommended
Maximum tank height of 20’
Vapor Recovery Tower
NEW HY-BON PRODUCTS
HY-BON has a long history in providing “best in class” Vapor Recovery Equipment dating back to the
early 1950’s and prides itself on lessons learned over the years. HY-BON has added new products
addressing the new Quad O Regulations, completing its total solutions approach.
Enclosed Vapor Combustor Units
can be used to destroy VOC’s
from a storage tank facility. The
enclosed VCU provides a
solution when vapor recovery is
not economically viable, or as a
backup for a Vapor Recovery
Unit.
The enclosed VCU has been
Quad O Performance Tested at
99% Destruction Removal
Efficiency (DRE), exceeding the
95% DRE required by the new
regulations. The VCU package
includes a control box that logs
operational data, as required in
the new regulations.
The enclosed VCU has two
standard sizes:
Abutec 20: Up to 20 MSCFD
Abutec 100: Up to 100 MSCFD
Vapor Combustor Unit
Infrared Cameras, used for gas leak detection
Turbine Meter, used to measure tank vapors
Site Survey (IQR)
Identify: Using the newest identification technology
on the market, the IQR team can provide
visual documentation of the emission
Quantify: The IQR team has the ability to accurately
measure tank vapors.
Rectify: The IQR team will provide complete
reports documenting all emission
sources.
Report includes:
Direct 24 hour measurement of tank emissions
Extended Gas Analysis
VOC, GHG, HAP calculations
Vapor Recovery, Vapor Combustor Unit or Bio
Filter recommendations
Engineering solutions defining cost, best gas
capture method and pay back economics
HY-BON’s Total Solution Approach
HY-BON Engineering Company
2404 Commerce Drive
Midland, TX 79703
Phone: (432) 697-2292
Fax: (432) 697-2310
www.hy-bon.com
Electronic Design for Industry
100 Ayers Blvd.
Belpre, OH 45714
Phone: (740) 401-4000
Fax: (740) 401-4005
www.ediplungerlift.com
Vapor Recovery Tower (VRT)
Tank Battery
Vapor Combustor Unit (VCU)
Vapor Recovery Unit (VRU)
High Pressure Separator
To Well Heads
Compressor Building