Netztechnik - TSPsicher.wirtschaftlich.schnell
ÖBB Infra.Betrieb AGETCS Level 1
Data PreparationJohann Berger
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
ETCS Level 1 – Data Preparation
• ETCS Level 1 in Austria
• Data Preparation and Simulation
• Engineering Tool for ETCS Level 1
• Results and Benefits
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
ETCS Level 1 in Austria
Mistel-bach
ETCS Level 1 network planned to be equipped2.500 km
BREGENZ
Feldkirch
(Buchs)
(Lindau-Reutin)
INNSBRUCK
(Brennero/ Brenner)
Kufstein
(Freilassing)
(Rosenheim)
SALZBURG
Wörgl
Bischofshofen
Schwarzach SV.
Selzthal
St. Michael
Bruck M.
GRAZ
Spielfeld Str.
Villach
KLAGENFURT
St. Veith G.
Stainach/ Irdning
LINZ
Wels
Attnang P.
(Passau)
St.Valentin
WIEN St. PÖLTEN
Tulln
Hollabrunn
Hohenau
Wiener Neustadt
Wampers- dorf
Rosenbach
(Jesenice)
(Tarvisio)
Arnoldstein
Sum- merau
Amstetten
(Breclav)
(Horni D.)
(Maribor)
ÖBBROEE
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
ETCS Level 1 in Austria
Mistel-bach
BREGENZ
Feldkirch
(Buchs)
(Lindau-Reutin)
INNSBRUCK
(Brennero/ Brenner)
Kufstein
(Freilassing)
(Rosenheim)
SALZBURG
Wörgl
Bischofshofen
Schwarzach SV.
Selzthal
St. Michael
Bruck M.
GRAZ
Spielfeld Str.
Villach
KLAGENFURT
St. Veith G.
Stainach/ Irdning
LINZ
Wels
Attnang P.
(Passau)
St.Valentin
WIEN St. PÖLTEN
Tulln
Hollabrunn
Hohenau
Wiener Neustadt
Wampers- dorf
Rosenbach
(Jesenice)
(Tarvisio)
Arnoldstein
Sum- merau
Amstetten
(Breclav)
(Horni D.)
(Maribor)
ÖBBROEE
ETCS Level 1 Vienna – Budapest Project
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
ETCS Level 1 in Austria
Mistel-bach
BREGENZ
Feldkirch
(Buchs)
(Lindau-Reutin)
INNSBRUCK
(Brennero/ Brenner)
Kufstein
(Freilassing)
(Rosenheim)
SALZBURG
Wörgl
Bischofshofen
Schwarzach SV.
Selzthal
St. Michael
Bruck M.
GRAZ
Spielfeld Str.
Villach
KLAGENFURT
St. Veith G.
Stainach/ Irdning
LINZ
Wels
Attnang P.
(Passau)
St.Valentin
WIEN St. PÖLTEN
Tulln
Hollabrunn
Hohenau
Wiener Neustadt
Wampers- dorf
Rosenbach
(Jesenice)
(Tarvisio)
Arnoldstein
Sum- merau
Amstetten
(Breclav)
(Horni D.)
(Maribor)
ÖBBROEE
ETCS Level 1 Vienna – Salzburg – PassauProject
Vienna – Budapest
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Data Preparation and Simulation
Data Preparation and Simulation• 2000: ÖBB starts using BEST (Betriebs- und
Stellwerkssimulation) as a simulation training tool for electronic interlockings
• 2001: ÖBB starts planning of electronic interlockings with the BEST editor
• 2003: Additional functions are implemented in the editor• 2005: ÖBB Planning centre for electronic interlockings is
fully established and uses the BEST editor and the BEST simulator not only for planning, but also for the verification of new interlockings and functionality with the users
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Data Preparation
• Eurointerlocking project o Pilot for Interlocking:
ÖBB Infra.Betrieb AG Graz Hbf
• ÖBB project o Pilot for HMI:
ÖBB Infra.Betrieb AG Graz Hbf
o Pilot for ETCS:Vienna – Budapest Vienna – Salzburg - Passau
LDAFF
Infrastructure Planning
Data Preparation Tool
IDAFF
EngineeringIndustry
EUR INTERLOCKING
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Data Preparation and ETCS (1)
• During the process of planning ETCS Level 1 Vienna – Salzburg and discussing the IDAFF, ÖBB mentioned, that most of the DATA needed for ETCS is included in IDAFF
• The amount of DATA for the Vienna - Salzburg Project seems to be so extensive, that an engineer alone cannot handle it (an experience from the smaller Vienna - Budapest project)
Data Preparation Tool
IDAFF
SignallingIndustry
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Data Preparation and ETCS (2)
• There are stations with very complex topology Simulation of breaking curves for checking the position and
data of balises Simulation of breaking curves for checking the necessity of
infill loops and balises• Electronic data exchange with the industry reduces
the amount of mistakes • During life time also non-specialists have to prepare
temporary speed restrictions They need assistance by a Tool!
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Engineering Tool for ETCS Level 1
• The described situation led to the purchase of an engineering tool extending the existing BEST simulation by Vossloh
• Main functions• Automatic placing of balises as a proposal• Manual adjustment of the proposal• Visualisation of braking curves according to the type of train,
speed and location of balises• Independent verification of the engineering of ETCS level 1
supplier
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Engineering Tool for ETCS Level 1
• How to work with the tool• Step 1: Basis is a fully engineered simulation of a station or line • Step 2: Add gradient values• Step 3: Add speed profile of the line• Step 4: Start automatic placing of balises• Step 5: Verify automatic placing and adjust if desired• Step 6: Let trains run in the simulation and view the braking
curves under different conditions and changes of signal aspects• Step 7: Adjust placement of infill balises and loops where desired• OR: compare with ETCS suppliers engineering for verification• OR: add TSR to view consequences
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Engineering Tool for ETCS Level 1
• Example for a braking curve
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Data Preparation and ETCS – industry (1)
Eurobaliseswitchable Eurobalise
fix programmed
Signalconnection
box
Interlocking
Default telegram for switchable Eurobalise
Fixed telegram for Eurobalise
Data needed Telegrams
(depending on signal type and signal aspect)
Configuration data(depending on lamp configuration and lamp types)
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Data Preparation and ETCS – industry (2)
TelegramsSoftware Package 1
Data Preparation Tool
Software Package 3Telegram Decoding
and Crosscheck
Software Package 2Telegram Coding
Programmingof LEUs andBalises
Project Validation
Route, Signal,
TopologyALCATELDataPreparation&Verification/ValidationToolchain
Telegrams
Tele
gram
cro
ss c
heckÖBB
Data Preparation
Tool
Railway Input
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Data Preparation and ETCS – industry (3)
GeschäftsbereichProjekttitel
Projekttitel: OrganisationseinheitName, DW, Datum
sicher.wirtschaftlich.schnell ETCS Level 1 DataPrep Netztechnik - TSPIng.Berger
Results and Benefits from the development
• Many of the engineering rules for ETCS had to be analysed and fixed during the work
• The engineering gets complex in complex topology, but could be covered by the rules
• The tool will help to standardise the engineering rules
• The limitations of ETCS level 1 can be clearly visualised to optimise the balise locations especially for TSR