Centar za EU projekte Sveučilišta u Rijeci
• 10 faculties, 4 departments, University Library and Students’ Centre
• No. of students: 17,306
• Average yearly admission: abt. 4,000 first-year students
• 3rd largest among 7 Croatian state universities
• Founded in 1973 – first school of higher education in Rijeka in 1672
RIJEKA• Rector’s Office• Faculty of Medicine• Faculty of Engineering• Faculty of Maritime Studies• Faculty of Economics• Faculty of Civil Engineering• Faculty of Law• Faculty of Philosophy• Academy of Applied Arts• Faculty of Teacher Education• University Departments of Information
Science, Mathematics,Physics and Biotechnology
• University Library• Students’ Centre
OPATIJA
• Faculty of Tourism and Hospitality Management
First Croatian University that came up with
its Strategy – focus on excellence, quality
assurance, LLL, active collaboration with
the local community & economy, active
inclusion into EHEA & ERA
Aim – to harmonize with EU universities in accordance with Bologna Process requirements and goals
Implementation of Bologna Process started in 2005 - 3 cycles (undergraduate/graduate/
doctoral) and ECTS system
Transformance from predominately teaching to research university
Recognizible for its excellence in many fields:
- engineering- shipbuilding- maritime affairs- biomedicine & basic medical research- social sciences- humanities sciences- natural sciences
Objective
University Departments of Mathematics, Physics, Informatics and Biotechnology
Centre for Projects
established in 2007 in accordance with the Strategy Document within the Tempus Project “Capacity Buliding for Research in Croatia”
basic mission - to raise awareness and support researchers in submitting & implementing projects
Main programmes CEUP is involved in: Tempus, Jean Monnet, IPA, Framework Programmes
International Relations Department
established in 2001
divided into:
• Office for Bilateral and Multilateral Relations
• Mobility Office
International cooperation• 32 bilateral agreements• 5 agreements in the framework of the
Bilateral Mobility Programme
University Campus
Construction started in 2007 Phase I completedPhase II.A to be completed by mid 2016Phase II.B to be completed by 2020
23mEUR from ERDF already obtainedThe whole 2nd phase
before...
... after
University of Rijeka – Campus Trsat
University of Rijeka – Campus Trsat
Changing landscape (2007)
University of Rijeka – Campus Trsat
Changing landscape (2008)
Changing landscape (2009)
University of Rijeka – Campus Trsat
Changing landscape (2010)University of Rijeka – Campus Trsat
University of Rijeka Campus
18
total area 43.21 ha University Campus 23.40 ha Clinical Hospital Centre 8.40 ha infrastructure 6.83 ha living 3.49 ha green 1.09 ha
Area of the University Campus within the area of Trsat, the north-east part of the City of Rijeka
Outline of the area
19
Detailed Spatial Plan of the Trsat area
20
Spatial plan - model
21
Long Term Loan Agreement in theamount of 490 million HRK / 64,45 m
EUR
22
December 2004
Seated from left: Frano Luković, president of ZABA Daniel Rukavina, rectorDragan Primorac, minister of sciencesPetar Radaković, president of ERSTE&S. BankBožo Prka, president of PBZStaying from left: Zlatko Komadina, governor of Primorsko-Goranska CountyKolinda Grabar Kitarović, minister of European Integration Ivo Sanader, Prime-ministerVojko Obersnel, Mayor of the City of Rijeka mons. Ivan Devčić, archbishop of Rijeka
Campus 1st phase overview
23
PHASE I
Academy of Applied Arts (reconstruction and equipping)
Science and Technology Park (reconstruction)
Faculty of Humanities and Social Sciences and Faculty of Teacher Education (construction)
Student Centre and student restaurant (construction and equipping)
Faculty of Civil Engineering(construction)
University Departments(construction)
Equipping of Faculty of Humanities and Social Sciences, Faculty of Teacher Education, Faculty of Civil Engineering and University Departments
Supporting infrastructure
Academy of Applied Arts
24
Academy of Applied Arts
25
total area of 8,140 m2 the facility was built in 1928 reconstruction started in
November 2005, and completed in September 2006
in function since academic year 2006/2007
cost of facility reconstruction: 3,926,031 €
35 teaching rooms 1 computer room 33 cabinets
Science and Technology Park
26
Science and Technology Park
27
facility was built in 1962. total area of 3,600 m2
reconstruction started in August 2008 and completed in March 2009
cost of remodeling the existing building: 1,614,382 €
In function since April 2009
Faculty of Humanities and Social Sciences and Faculty of Teacher
Education
28
Faculty of Humanities and Social Sciences and Faculty of Teacher Education
29
total area of 21,050 m2
200 parking spots in the underground garage
construction started in October 2007
construction contract price: 23,151,263 €
in function since January 2011 20 teaching rooms 4 computer rooms 25 lecture halls 18 seminar rooms 138 cabinets
Student Restaurant
30
Student Restaurant
31
total area of 7,240 m2
100 parking spots in the underground garage
construction started in October 2007
construction contract price: 9,157,806 €
in function since April 2011
Faculty of Civil Engineering
32
Faculty of Civil Engineering
33
total area of 14,252 m2
200 parking spots in the underground garage
the University Centre for Studies is located in the building
construction started in March 2008 construction contract price:
16,213,570 € in function since November 2011 takeover delayed due to minor
defects in construction 83 offices 15 practicums 9 laboratories 8 lecture rooms
University Departments of Mathematics, Physics, Informatics and
Biotechnology
34
University Departments of Mathematics, Physics, Informatics and
Biotechnology
35
total area of 16,350 m2
construction started in October 2007
construction contract price: 15,392,096 €
in function since July 2012 takeover delayed due to
problems with the building facade
15 teaching rooms 4 lecture halls 10 seminar rooms 32 laboratories 92 cabinets
36
University of Rijeka Campus - 1st phase (2012)
University of Rijeka, Phase II.A facilities (2014-2016)
37
Investment Total value
CAMPUS PHASE II
Student accommodation, phase I
20.485.000 €
Socio-cultural Centre 7.227.500 €
Sports Hall and Outdoor sports facilities phase I
10.000.000 €
Supporting infrastructure 3.643.750 €
International Centre for Tourism and Sustainable Development - Opatija
7.059.038 €
University of Rijeka Campus, Phase II.A facilities
38
Sports Hall and Outdoor sports facilities-phase I
Student accomodation facilities
Supporting infrastructure
Socio-cultural centre
University of Rijeka Campus, Phase II.A facilitiesStudent Accommodation Facilities, phase I
– Pavilions 1 and 2
39
Student accomodation facilities (Pavilions 1 and 2)
Student Accommodation Facilities, Phase II.A – Pavilions 1 and 2
© 2013 University of Rijeka 40
total area of 13,800 m2
total of 598 beds estimated (engineering) value of
investment: 9 m EUR construction permit obtained
University of Rijeka Campus, Phase II.A facilities
© 2013 University of Rijeka 41
Student accomodation facilities (Pavilion 4)
Student Accommodation Facilities, Phase II.A – Pavilion 4 with the Student Centre, Technical
Machinery and Laundromat
© 2013 University of Rijeka 42
total area of 5,050 m2
total of 160 beds estimated (engineering) value
of investment: 4 m EUR construction permit obtained
University of Rijeka Campus, Phase II.A facilities
© 2013 University of Rijeka 43
Socio-cultural centre
Socio-cultural Centre
© 2013 University of Rijeka 44
total area of 4,452 m2
University ceremony hall (Auditorium Maximum), polyvalent premises for various cultural and social events, cultural and art organizations and student clubs.
these same premises can be used for the organization of symposiums and congresses.
premises for an Internet café, restaurant, three establishments, bookstore, student radio, television, newspapers, etc.
estimated (engineering) value of investment: 7,23 m EUR
construction permit obtained activities for the amendment of the
project related to new and planned study programs
University of Rijeka Campus, Phase II.A facilities
© 2013 University of Rijeka 45
Sports Hall and Outdoor sports facilities phase I
Sports Hall and Outdoor Sports Facilities part I
© 2013 University of Rijeka 46
estimated area of 5,500 m2 of above-ground floors and 3,900 m2 underground floors (two floors of underground garages)
min 300 parking spots in underground garage
other facilities which are in the function of the basic purpose or are compatible with it, such as outdoor sports facilities phase I, and athletic track, catering and service facilities, shops, business premises, etc.
estimated value of investment: 10 m EUR
location permit obtained
University of Rijeka Campus, Phase II.A facilities
© 2013 University of Rijeka 47
Supporting infrastructure
Supporting infrastructure
© 2013 University of Rijeka 48
estimated value of investment:3,64 m EUR
construction permit obtained
University of Rijeka Campus, Phase II.B facilities (2014-2020)
© 2013 University of Rijeka 49
Facility Value
PHASE II.B facilities
Student accommodation, phase II
56,4 m EUR
University Library 19,8 m EUR
Translational medicine 5,4 m EUR
Faculty of Medicine and Faculty of Health Sciences
22 m EUR
Faculty of Engineering 21,4 m EUR
Faculty of Economics 14,4 m EUR
Outdoor sports facilities, phase II 0,24 m EUR
Heating and Power Plant 10,0 m EUR
University Library
© 2013 University of Rijeka 50
total area of 20,300 m2
library complex - premises for users as well as a depository and protection of library holdings (approximately 600,000 books)
out-of-library complex – bookshop and computer equipment shop, café, smaller exclusive restaurant, club premises, exhibition area, sales gallery, multifunctional hall
estimated investment value: 19,8 m EUR
Translational Medicine Centre
© 2013 University of Rijeka 51
total area of 5,366 m2
Research centre for four main areas : imunology, tumors, regenerative medicine and functional neuroresearch
University core facilities: Biobank, Unit for clinical drug research, laboratories for genomic analyses, bioinformatics laboratory, etc.
estimated investment value: 5,4 m EUR
location permit obtained
Faculty of Medicine, Engineering and Economics
© 2013 University of Rijeka 52
Faculty of Economics 25 study programmes 15 departments estimated investment value:
14,4 m EUR
Faculty of Engineering 17 study programmes 11 departments estimated investment value:
21,4 m EUR
Faculty of Medicine and Faculty of Health Sciences
17 study programmes 43 departments estimated investment value:
22 m EUR
Outdoor sports facilities, part II
© 2013 University of Rijeka 53
total area of 2,530 m2
a handball and basketball court and athletic track with associated bleachers
estimated (engineering) value of investment: 240,000 EUR
location permit obtained
Heating and Power Plant
© 2013 University of Rijeka 54
The heating/power plant is drafted as a joint energy unit of the University Campus on Trsat and the Clinical Hospital Centre (construction in phases)
1st phase - needed thermal power of approximately 17 MW; while in the final state 41MW
estimated (engineering) value of investment: 10 m EUR
Location permit has been obtained
Sveučilišna bolnica