    NORTHERN AVENUE BRIDGE

    February 4, 2015

    AGENDA

    1. Welcome & Introductions

    2. Participation Guidelines

    3. Schedule of Meetings

    - January 29th Kick-off meeting

    - February 4th Review options- February 11

    th Development of selection criteria

    - February 18

    th

    Shortlist of preferred options- February 25th Shortlist a movable and fixed option

    4. New Bridge Options

    5. Discussions

    6. Next Steps Action Items; Meeting Date

  • 7/25/2019 NAB - 2-4-15 - Agenda & Handouts (1)

    2/8

    February 4, 2015

    Northern Avenue Bridge Options

    February 4, 2015

    1.Rehabilitate to a raised, three barrel fixed bridge - $ 70 ++ million

    o Bridge has 3 barrelso Need to justify the transportation need to receive federal fundso US Coast Guard has to approve the raised/fixed concept independent public

    outreach process

    2.New 60 fixed bridge - $ 60 +/- million

    o Carries vehicular, bicycle and pedestrian traffico Two 10 sidewalks + 40 roadwayo Raised to allow navigational traffic; fixed bridgeo Same width of existing bridgeo Includescost of demolition of existing bridge ($15 million)

    2A. New 40 fixed bridge - $ 45+/- million

    o Carries vehicular, bicycle and pedestrian traffico Two 10 sidewalks + 20 roadwayo Raised to allow navigational traffic; fixed bridgeo Includescost of demolition of existing bridge ($15 million)

    3.Rehabilitated and Movable Lite Bridge $ 25- $ 30 +/- million

    o Middle barrel of bridge to carry pedestrian traffic and designed to carry multi-modal traffic

    o Bridge decks in outside barrels of the swing span removed to lessen the bridgeweight

    o Pedestrian gathering places in outside barrels of the fixed sectiono Bridge opensto navigational traffic

  • 7/25/2019 NAB - 2-4-15 - Agenda & Handouts (1)

    3/8

    February 4, 2015

    3A. Rehabilitated and Movable Lite Bridge with sidewalks$ 26-$ 31 +/- million

    o Middle barrel (20) is multi-purpose use, designed to carry multi-modal (buses,taxis, cars, bicycles, shuttle buses, trolleys, etc.) traffic.

    o

    Middle barrel has cantilevered 10 sidewalkso Bridge decks in outside barrels of the swing span removed to lessen the bridgeweight

    o Pedestrian gathering places in outside barrels of the fixed sectiono Bridge opensto navigational traffic

    4.Demolition/Removal of bridge - $15 +/- million

    o Necessary option if bridge has deteriorated to be a safety hazard to navigational

    traffic

    5.Rehabilitate to a movable one-barrel bridge - $35 +/- million

    o Single 20 rehabilitated barrel with cantilevered 10 sidewalkso Designed to carry vehicular traffico Bridge opensto navigational traffic

    6.Rehabilitate to a raised, one barrel fixed bridge - $ 45 +/- million

    o Single 20 rehabilitated barrel with cantilevered 10 sidewalkso Designed to carry vehicular traffic

  • 7/25/2019 NAB - 2-4-15 - Agenda & Handouts (1)

    4/8

    Northern Avenue BridgeOptions

    2/4/15

    Option 1: Rehabilitated to a raised, fixed bridge - $70 +/+ million

    Option 2: New 60 fixed bridge - $60 +/- million

  • 7/25/2019 NAB - 2-4-15 - Agenda & Handouts (1)

    5/8

    Northern Avenue BridgeOptions

    2/4/15

    Option 2A: New 40 fixed bridge - $45 +/- million

    Option 3: Rehabilitated and movable Lite bridge - $25-$30 +/- million

  • 7/25/2019 NAB - 2-4-15 - Agenda & Handouts (1)

    6/8

    Northern Avenue BridgeOptions

    2/4/15

    Option 3A: Rehabilitated and Movable Lite Bridge with sidewalks-$ 26-$ 31 +/- million

    Option 4: - Demolition/Removal of Bridge - $15 +/- million

  • 7/25/2019 NAB - 2-4-15 - Agenda & Handouts (1)

    7/8

    Northern Avenue BridgeOptions

    2/4/15

    Option 5: - Rehabili tate to a movable one-barrel bridge - $35+/- million

    Option 6: Rehabilitate to a raised, one barrel fixed bridge - $ 45 +/- million

  • 7/25/2019 NAB - 2-4-15 - Agenda & Handouts (1)

    8/8

    Northern Avenue Bridge

    Participants

    Abutters Direct

    US Courthouse

    Barking Crab

    James Hook & Co.

    USCG

    Abutters Neighborhood/District

    Seaport TMA

    Fort Point Neighborhood Association

    Interest/Advocacy Groups

    Boston Preservation Alliance

    WalkBoston

    Livable Streets

    Boston Cyclists Union

    Friends of the Fort Point Channel

    Friends of the Northern Avenue Bridge

    Boston Harbor Association

    A Better City

    City Agencies (Non-Voting)

    Mayors Office of Neighborhood Services (MONS)

    Public Works Department (PWD)

    Office of Budget Management (OBM)

    Boston Transportation Department (BTD)

    Boston Redevelopment Authority (BRA)

    Boston Bikes