MultiModal Facility Feasibility Study Community Open House #3 November 16, 2017 1 The presentation will begin at 7:05 p.m.

Transcript of Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study...

Page 1: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Multi‐Modal Facility Feasibility StudyCommunity Open House #3November 16, 2017

1

The presentation will begin at 7:05 p.m.

Page 2: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Introductions

Mike Costa – City of Elk Grove Interim Transit ManagerTom Metcalf – City of Elk Grove Project ManagerAdam Dankberg – Consultant Project ManagerKrista Pedersen – Consultant Public OutreachDaniel Harrison – Consultant Public OutreachBrynn Jensen – Consultant Public Outreach

2

Page 3: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Community Open House #3

Presentation

Q&A Session

Open House

3

Page 4: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Agenda

• Introduce the feasibility study• Identify purpose and goals of the feasibility study• Describe site selection process• Present potential sites along the Union Pacific Rail Road’s Sacramento Subdivision Line (west side line)• Answer questions• Gather community input 4

Page 5: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Study Goals

1. Identify and assess the feasibility of potential locations for a multi‐modal facility on existing or future passenger rail service lines

2. Evaluate potential reductions to commuter traffic3. Select a recommended location(s) using a detailed 

evaluation process and public input4. Inform future planning and funding efforts for a 

multi‐modal facility5

Page 6: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Study Process

Schedule – 8 to 9 months (June 2017 to Jan/Feb 2018)

Process:1. Identify potential site locations2. Estimate ridership and congestion relief3. Evaluate site locations based on evaluation criteria4. Present draft results to the public5. Incorporate public input6. Identify recommended multi‐modal facility site(s) 6

Page 7: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Partnering Agencies

San Joaquin Joint Powers Authority (SJJPA)

Sacramento Area Council of Governments (SACOG)

Sacramento Regional Transit (SacRT)

7

Page 8: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

What is a Multi‐Modal Facility?

Many modes of transportation in one place, such as:• Bus• Rail• Car and Bicycle Parking• Pick‐up/Drop‐off• Taxi/Lyft/Uber/Shuttle• Bicycle Facilities• Pedestrian Facilities

8

Page 9: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Benefits of a Multi‐Modal Facility

•Provides centralized access to bus & rail transit

• Improves connectivity between modes

•Enhances access to transportation alternatives which can reduce traffic, commute times & emissions

•Potential to generate economic development activity

9

Page 10: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Rail Service Connectivity

Connecting to existing or future rail services will maximize the benefits of a Multi‐Modal Facility:• Gain access to national, state and regional destinations

• Leverages past and future infrastructure investments 

• Potential to have Multi‐Modal Facility costs partially or fully covered by near term grant opportunities

Feasibility Study has focused on potential sites immediately adjacent to existing or future rail services

10

Page 11: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Existing Rail Facilities

11

UPRR Fresno Subdivision Line (East Side Line)

UPRR Sacramento Subdivision Line (West Side Line)

SacRT Light Rail(Blue Line)

Page 12: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

UPRR West Side Line – Tonight’s Focus

12

10/25 City Council Direction• Focus on the UPRR West Side Line• Rail line of likely future passenger service as provided by the SJJPA

UPRR Sacramento Subdivision Line (West Side Line)

Page 13: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Site Requirements – Initial Screening

• Adjacent to a current or future passenger rail corridor

• Within or adjacent to City Limits

• Space for 1,000‐foot long platform along tracks

• 5‐10 acres for facilities including parking

• Connectivity to existing transportation system

• Prefer vacant lots or lots with low real estate impacts

• Minimize risk of environmental issues (e.g. wetlands, soil contamination)

• Avoid excessive construction/site design costs 13

Page 14: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Site Requirements – Detailed Evaluation Criteria

• Within City Limits

• Rail service feasibility

• Site adequacy for multimodal use

• Grant potential

• Accessibility

• Ridership estimation

• Site acquisition feasibility14

• Cost

• Other risk factors

• Congestion relief

• Changes to bus network

• Nearby bus and bike facilities

• Opportunity for supporting uses

Page 15: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Community OutreachThree Open Houses• August 2, 2017• September 14, 2017• Tonight (November 16, 2017)

Two Online Forums• August 2 – 16 (Questionnaire)• September 14 – 21 (Comment Forum)

City Council update on August 23rd via Consent Agenda

Preliminary Results Presented to City Council on October 25th

15

Page 16: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Four Sites For Consideration along UPRR West Side Line

16

Site W1 – Bilby & Willard

Site W2 –Franklin & Elk Grove Blvd

Site W3 – Laguna & Dwight 

Site W4 – Dwight

Page 17: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Site W1 – Bilby & Willard

17

Future Kammererfrom I‐5 to Hwy 99

Future Willard extension to Future Kammerer

N

Page 18: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Previous Public Input on Site W1 – Bilby & Willard

18

Previous Public Input on Site W1:

• Not a centralized location.• Viewed by some as the most viable location for commuting to Sacramento Area

• Possibilities for future bay area connections 

• Neighborhood concerns with home values, crime, traffic, train noise

Page 19: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Site W2 – Franklin & Elk Grove Blvd

19

N

Page 20: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Previous Public Input on Site W2 – Franklin & Elk Grove Blvd

20

Previous Public Input on Site W2:

• Concerns with impacts to the Stone Lakes National Wildlife Refuge

• Impacts to view shed of refuge open space 

• Neighborhoods concerns with home values, crime, traffic, train noise

Page 21: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Neighborhood Impacts

21

• Crime• San Diego Association of Governments, 2009. Understanding Transit’s Impact on Public Safety. http://sandiegohealth.org/sandag/publicationid_1483_10995.pdf

• City of Tracy 

• Property Values• Diaz, Roderick, 1999. Impacts of Rail Transit on Property Values. http://www.reconnectingamerica.org/assets/Uploads/bestpractice083.pdf

• University of California, Berkeley, 2017. Rail and the California Economy. http://www.dot.ca.gov/californiarail/docs/Rail_CAEconomy_Book_Report_V28_LowResPages.pdf

• Strategic Economics, 2014. Property Value and Fiscal Benefits of BART. https://www.bart.gov/sites/default/files/docs/2014‐08%20BARTPropValues_Final.pdf

• Noise• Elk Grove is currently in a designated “Quiet Zone”, where trains cannot use their horns unless there is a special circumstance requiring the horn

• Traffic

Page 22: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Neighborhood Impacts – City of Tracy (ACE)

22

Page 23: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Neighborhood Impacts – City of Tracy (ACE)

23

Page 24: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Site W3 & W4 – Laguna & Dwight

24

N

Page 25: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Previous Public Input on Sites W3 & W4

25

Previous Public Input on Sites W3 & W4:• These sites are new and are being further considered as a result of previous public input on Sites W1 & W2

• Impacts existing businesses & results in higher project costs

Page 26: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Current Study Recap

26

• Focus on sites along the UPRR West Side line

• Goal is to identify a preferred location based on analysis of all site factors

• City Council will receive all public input regarding all of the sites discussed at Open Houses in the Study, and either identify a preferred location for further site specific analysis, or identify multiple sites that could be considered for future site analysis/study

Page 27: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Next Steps

Tonight – Receive Community Input for Sites along the UPRR West Side Line

Nov/Dec – Finalize the Feasibility Study

Date TBD ‐ City Council Approval of Study

27

Page 28: Multi Modal Facility Feasibility Study Open House #3 · Multi‐Modal Facility Feasibility Study Community Open House #3 November 16, 2017 1 ... UPRR West Side Line –Tonight’s

Thank You For Your Participation

28

Contact Information

Tom Metcalf, Project [email protected]‐478‐2281

8401 Laguna Palms WayElk Grove, CA 95758

Project Webpage& Online Comment Forum

bit.ly/ElkGroveMultimodal