MINISTÉRIO DO DESENVOLVIMENTO AGRÁRIO - MDA … · NBR 5626 – Instalação predial de água...
Transcript of MINISTÉRIO DO DESENVOLVIMENTO AGRÁRIO - MDA … · NBR 5626 – Instalação predial de água...
1
MINISTÉRIO DO DESENVOLVIMENTO AGRÁRIO - MDA
INSTITUTO NACIONAL DE COLONIZAÇÃO E REFORMA AGRÁRIA INCRA
SUPERINTENDÊNCIA REGIONAL DO RIO GRANDE DO SUL - SR 11 / RS
MEMORIAL DE CALCULO
NOVA SOCIEDADE – PIRATINI
2
1. Apresentação ................................................................................................................ 3
2. Referências Normativas ............................................................................................... 3
3. Terminologia ................................................................................................................. 4
4. Demanda Hidráulica ................................................................................................. 5
5. Fator de Consumo .................................................................................................... 5
6. Perda de Carga .......................................................................................................... 7
7. Disposição Geral da Rede de Abastecimento ............................................................ 7
8. Comportamento da Rede............................................................................................. 9
3
1. Apresentação
Este memorial tem por finalidade apresentar as bases fundamentadas para o
dimensionamento e escolhas utilizadas no projeto do sistema de abastecimento de água do
assentamento de Nova Sociedade, no Município de Piratini - RS.
2. Referências Normativas
A presente especificação técnica possui referências nas seguintes normas
2.1. Da ABNT:
NBR 5626 – Instalação predial de água fria.
NBR 12211 – Estudos de concepção de sistemas públicos de abastecimento de
água.
NBR 12212 – Projeto de poço para captação de água subterrânea.
NBR 12214 – Projeto de sistema de bombeamento de água para abastecimento
público.
NBR 12217 – Projeto de reservatório de distribuição de água para abastecimento
público.
NBR 12218 – Projeto de rede de distribuição de água para abastecimento
público.
NBR 12266 – Projeto e execução de valas para assentamento de tubulação de
água, esgoto ou drenagem urbana.
2.2. Da CORSAN/RS:
Regulamento dos Serviços de Água e de Esgoto (RSAE) - Resolução 1093 da
Agência Estadual de Regulação dos Serviços Públicos Delegados do Rio Grande
do Sul (AGERGS).
4
2.3. Do INCRA/RS:
Norma de Execução nº 54 – Dispõe sobre a implantação de obras de engenharia
componentes de infra-estrutura básica de projetos de assentamento.
2.4. Atualização:
Cada referência citada neste texto deve ser observada em sua edição em vigor, desde
que mantidos os mesmos objetivos da data de aprovação da presente Norma.
3. Terminologia
Para efeito deste memorial, são adotadas as seguintes definições:
REDE DE DISTRIBUIÇÃO - Parte do sistema de abastecimento formada de tubulações
e órgãos acessórios, destinada a colocar água potável à disposição dos consumidores, de
forma contínua, em quantidade e pressão recomendadas.
CONSUMO – Quantidade de água utilizada por uma unidade consumidora, expressa
em unidade de volume por unidade de tempo;
VAZÃO DE PROJETO – Vazão determinada para funcionamento da rede de
abastecimento na pior hipótese possível de trabalho, expressa em litros por segundo;
PRESSÃO ESTÁTICA – Pressão de trabalho da rede de abastecimento na hipótese de
consumo nulo, expresso em M.C.A (metro de coluna d’água);
PRESSÃO DINÂMICA – Pressão de trabalho da rede de abastecimento na hipótese de
consumo não nulo, expresso em M.C.A (metro de coluna d’água);
PERDA DE CARGA – Perda de pressão na rede de abastecimento devido ao atrito da
água com as tubulações e órgãos acessórios, expresso em m/km;
5
PROJETO EXECUTIVO - Conjunto dos elementos necessários e suficientes à
execução completa da obra, de acordo com as normas pertinentes da Associação Brasileira
de Normas Técnicas – ABNT.
4. Demanda Hidráulica
Será estabelecido um consumo por pessoa de 150l/dia (incluindo neste insumo perdas
de água, naturais nestes sistemas), projeção um pouco acima ao creditado a famílias em
zonas de características rurais.
Para fins de cálculo da demanda considerou-se a capacidade máxima do
Assentamento, considerando-se o número de lotes multiplicado por cinco. Portanto, a
população considerada é de 130 pessoas, com um consumo diário teórico total de 19,50 m³
de água.
A vazão média teórica total no final do plano de atuação será de aproximadamente
(19.500 / 24 x 60 x 60) 0,22569 L/s, muito baixo em comparação a outros sistemas de
abastecimento de água.
Será creditada uma taxa sazonal e diária de pico de consumo de 1.5, razoável para o
tipo de consumo existente, tendo, portanto, um consumo de pico total teórico de
aproximadamente (0,22569 x 1.5) 0,33854 L/s.
Como solicita a ABNT, será creditada uma taxa de erro de 1.2 ao cálculo de pico final,
concluindo que, teoricamente, a rede de abastecimento trabalhará no pior caso, com uma
vazão total de aproximadamente (0,33854 x 1.2) 0,40625 L/s.
A perda de carga com a vazão requerida pelo sistema é baixa ao utilizar tubulações de
médio diâmetro nos trechos principais.
5. Fator de Consumo
Existem diferenças nas taxas de consumo de uma unidade consumidora de acordo
com o horário, mostrando seu pico durante o dia e baixo consumo durante a noite.
6
Tendo em vista esta variação, será estabelecido um fator de consumo em relação a
média diária de acordo com o horário analizado:
1:00h = 50% consumo diário;
2:00h = 40% consumo diário;
3:00h = 40% consumo diário;
4:00h = 60% consumo diário;
5:00h = 65% consumo diário;
6:00h = 70% consumo diário;
7:00h = 80% consumo diário;
8:00h = 85% consumo diário;
9:00h = 90% consumo diário;
10:00h = 130% consumo diário;
11:00h = 150% consumo diário;
12:00h = 180% consumo diário;
13:00h = 160% consumo diário;
14:00h = 140% consumo diário;
15:00h = 150% consumo diário;
16:00h = 160% consumo diário;
17:00h = 180% consumo diário;
18:00h = 130% consumo diário;
19:00h = 100% consumo diário;
20:00h = 90% consumo diário;
21:00h = 75% consumo diário;
22:00h = 60% consumo diário;
7
23:00h = 55% consumo diário;
24:00h = 50% consumo diário.
6. Perda de Carga
Para os cálculos de perda de carga foram utilizadas as formulas de Hazen-Williams.
O projeto foi concebido para ser executado em PVC, devido as baixas vazões
apresentadas, e nos cálculos foi atribuído um coeficiente de rugosidade para estas
tubulações de 130, caracterizadas para tubos já desgastados.
7. Disposição Geral da Rede de Abastecimento
Trecho (ID) Início (Nó) Fim (Nó) Comprimento (m) Diâmetro (mm)
T1 A-1 PV-1 740 50
T2 PV-1 PV-2 1405.5 50
T3 PV-2 R-1 683.5 50
T4 R-1 PV-3 386.5 150
T5 PV-3 U-16D 30 75
T6 U-16D U-16C 78 75
T7 U-16C U-16B 135.5 75
T8 U-16B U-16A 70 75
T9 PV-3 U-16 73 150
T10 U-16 U-15 91 150
T11 U-15 DET-1 67 150
T12 DET-1 U-14 184.5 150
T13 U-14 V-1 211 150
T14 U-13 U-12 61 150
T15 U-12 U-11 266.5 150
T16 U-11 PV-4 638 150
T17 PV-4 U-9 260 75
T18 V-2 U-8 101.5 150
T19 U-8 DET-2 113.5 150
8
T20 DET-2 U-7 168 150
T21 U-7 U-6 424 150
T22 U-6 DET-3 138 150
T23 DET-3 DET-4 448 150
T24 DET-4 PV-5 206 150
T25 PV-5 U-1A 63 75
T26 U-1A U-5 178.5 75
T27 PV-5 U-3 408 75
T28 U-3 DET-5 263.5 75
T29 DET-5 U-2 119.5 75
T30 U-2 U-1 59.5 75
T31 A-2 R-2 1388.5 50
T32 R-2 PV-6 30.5 75
T33 PV-6 U-4A 56 75
T34 U-4A U-3A 156.5 75
T35 U-3A U-2A 145.5 75
T36 U-2A U-1B 138 75
T37 U-16D 16D 10 50
T38 U-16C 16C 10 50
T39 U-16B 16B 10 50
T40 U-16A 16A 10 50
T41 U-16 16 10 50
T42 U-15 15 10 50
T43 U-14 14 10 50
T44 U-13 13 10 50
T45 U-12 12 10 50
T46 U-11 11 10 50
T47 PV-4 10 10 50
T48 U-9 9 10 50
T49 U-8 8 10 50
T50 U-7 7 10 50
T51 U-6 6 10 50
T52 PV-5 4 20 50
T53 U-1A 1A 10 50
T54 U-5 5 10 50
T55 U-3 3 10 50
T56 U-2 2 10 50
T57 U-1 1 20 50
T58 PV-6 5A 10 50
T59 U-4A 4A 10 50
T60 U-3A 3A 10 50
T61 U-2A 2A 10 50
T62 U-1B 1B 10 50
B-1 P-1 A-1 - Bomba
B-2 P-2 A-2 - Bomba
VRP-1 V-1 U-13 - Válvula
VRP-2 PV-4 V-2 - Válvula
9
8. Comportamento da Rede
Resultado nos Nós às 0:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.16 123.77 16.77
1A 0.16 123.92 40.92
2 0.16 123.77 17.77
2A 0.16 166.28 28.28
3 0.16 123.82 31.82
3A 0.16 166.30 21.30
4 0.16 123.93 43.93
4A 0.16 166.34 12.34
5 0.16 123.92 40.92
5A 0.16 166.36 10.36
6 0.16 123.96 47.96
7 0.16 123.97 22.97
8 0.16 123.99 19.99
9 0.16 154.88 34.88
10 0.16 154.89 49.89
11 0.16 154.96 18.96
12 0.16 154.99 11.99
13 0.16 155.00 11.00
14 0.16 199.02 48.02
15 0.16 199.06 35.06
16 0.16 199.08 33.08
16A 0.16 199.04 46.04
16B 0.16 199.05 40.05
16C 0.16 199.06 31.06
16D 0.16 199.08 31.08
U-1 0.00 123.77 16.77
U-1A 0.00 123.92 40.92
U-1B 0.00 166.28 30.28
U-2 0.00 123.77 17.77
U-2A 0.00 166.28 28.28
U-3 0.00 123.82 31.82
U-3A 0.00 166.30 21.30
U-4A 0.00 166.34 13.34
U-5 0.00 123.92 40.92
U-6 0.00 123.96 46.96
U-7 0.00 123.98 23.98
U-8 0.00 123.99 20.99
U-9 0.00 154.89 34.89
U-11 0.00 154.96 18.96
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 199.02 47.02
U-15 0.00 199.07 35.07
10
U-16 0.00 199.08 34.08
U-16A 0.00 199.05 46.05
U-16B 0.00 199.05 40.05
U-16C 0.00 199.07 32.07
U-16D 0.00 199.09 32.09
PV-1 0.00 317.69 193.69
PV-2 0.00 237.99 100.99
PV-3 0.00 199.10 32.10
PV-4 0.00 154.90 50.90
PV-5 0.00 123.93 42.93
PV-6 0.00 166.37 10.37
DET-1 0.00 199.05 36.05
DET-2 0.00 123.99 20.99
DET-3 0.00 123.95 48.95
DET-4 0.00 123.94 49.94
DET-5 0.00 123.79 24.79
1B 0.16 166.27 30.27
A-1 0.00 359.66 267.66
A-2 0.00 261.80 202.80
V-1 0.00 198.99 53.99
V-2 0.00 124.00 20.00
P-1 -2.91 46.00 -46.00
P-2 -3.23 29.50 -29.50
R-1 -0.37 199.23 9.23
R-2 2.45 166.39 10.39
Resultado nos Trechos às 0:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.91 1.48 56.71
T2 2.91 1.48 56.71
T3 2.91 1.48 56.71
T4 3.28 0.19 0.34
T5 0.63 0.14 0.46
T6 0.47 0.11 0.27
T7 0.31 0.07 0.13
T8 0.16 0.04 0.04
T9 2.66 0.15 0.23
T10 2.50 0.14 0.20
T11 2.34 0.13 0.18
T12 2.34 0.13 0.18
T13 2.19 0.12 0.16
T14 2.03 0.11 0.14
T15 1.88 0.11 0.12
T16 1.72 0.10 0.10
T17 0.16 0.04 0.03
T18 1.41 0.08 0.07
T19 1.25 0.07 0.06
T20 1.25 0.07 0.06
11
T21 1.09 0.06 0.04
T22 0.94 0.05 0.03
T23 0.94 0.05 0.03
T24 0.94 0.05 0.03
T25 0.31 0.07 0.13
T26 0.16 0.04 0.03
T27 0.47 0.11 0.27
T28 0.31 0.07 0.13
T29 0.31 0.07 0.13
T30 0.16 0.04 0.04
T31 3.23 1.64 68.72
T32 0.78 0.18 0.69
T33 0.63 0.14 0.46
T34 0.47 0.11 0.27
T35 0.31 0.07 0.13
T36 0.16 0.04 0.04
T37 0.16 0.08 0.25
T38 0.16 0.08 0.25
T39 0.16 0.08 0.25
T40 0.16 0.08 0.25
T41 0.16 0.08 0.25
T42 0.16 0.08 0.25
T43 0.16 0.08 0.25
T44 0.16 0.08 0.25
T45 0.16 0.08 0.25
T46 0.16 0.08 0.25
T47 0.16 0.08 0.25
T48 0.16 0.08 0.25
T49 0.16 0.08 0.25
T50 0.16 0.08 0.25
T51 0.16 0.08 0.25
T52 0.16 0.08 0.25
T53 0.16 0.08 0.25
T54 0.16 0.08 0.25
T55 0.16 0.08 0.25
T56 0.16 0.08 0.25
T57 0.16 0.08 0.25
T58 0.16 0.08 0.25
T59 0.16 0.08 0.25
T60 0.16 0.08 0.25
T61 0.16 0.08 0.25
T62 0.16 0.08 0.25
B-1 2.91 0.00 -313.66
B-2 3.23 0.00 -232.30
VRP-1 2.19 0.12 43.99
VRP-2 1.41 0.08 30.90
12
Resultado nos Nós às 1:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.12 123.85 16.85
1A 0.12 123.95 40.95
2 0.12 123.85 17.85
2A 0.12 166.32 28.32
3 0.12 123.88 31.88
3A 0.12 166.33 21.33
4 0.12 123.95 43.95
4A 0.12 166.36 12.36
5 0.12 123.94 40.94
5A 0.12 166.38 10.38
6 0.12 123.97 47.97
7 0.12 123.98 22.98
8 0.12 123.99 19.99
9 0.12 154.92 34.92
10 0.12 154.93 49.93
11 0.12 154.97 18.97
12 0.12 154.99 11.99
13 0.12 155.00 11.00
14 0.12 199.09 48.09
15 0.12 199.12 35.12
13
16 0.12 199.13 33.13
16A 0.12 199.11 46.11
16B 0.12 199.11 40.11
16C 0.12 199.12 31.12
16D 0.12 199.13 31.13
U-1 0.00 123.85 16.85
U-1A 0.00 123.95 40.95
U-1B 0.00 166.32 30.32
U-2 0.00 123.85 17.85
U-2A 0.00 166.32 28.32
U-3 0.00 123.88 31.88
U-3A 0.00 166.33 21.33
U-4A 0.00 166.36 13.36
U-5 0.00 123.95 40.95
U-6 0.00 123.97 46.97
U-7 0.00 123.98 23.98
U-8 0.00 124.00 21.00
U-9 0.00 154.92 34.92
U-11 0.00 154.97 18.97
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 199.09 47.09
U-15 0.00 199.12 35.12
U-16 0.00 199.13 34.13
U-16A 0.00 199.11 46.11
U-16B 0.00 199.11 40.11
U-16C 0.00 199.12 32.12
U-16D 0.00 199.13 32.13
PV-1 0.00 315.68 191.68
PV-2 0.00 237.33 100.33
PV-3 0.00 199.14 32.14
PV-4 0.00 154.93 50.93
PV-5 0.00 123.96 42.96
PV-6 0.00 166.38 10.38
DET-1 0.00 199.11 36.11
DET-2 0.00 123.99 20.99
DET-3 0.00 123.97 48.97
DET-4 0.00 123.96 49.96
DET-5 0.00 123.86 24.86
1B 0.12 166.32 30.32
A-1 0.00 356.93 264.93
A-2 0.00 260.81 201.81
V-1 0.00 199.07 54.07
V-2 0.00 124.00 20.00
P-1 -2.88 36.80 -55.20
P-2 -3.21 23.60 -35.40
R-1 0.26 199.23 9.23
R-2 2.59 166.39 10.39
14
Resultado nos Trechos às 1:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.88 1.47 55.74
T2 2.88 1.47 55.74
T3 2.88 1.47 55.74
T4 2.63 0.15 0.22
T5 0.50 0.11 0.30
T6 0.38 0.08 0.18
T7 0.25 0.06 0.08
T8 0.12 0.03 0.02
T9 2.13 0.12 0.15
T10 2.00 0.11 0.13
T11 1.88 0.11 0.12
T12 1.88 0.11 0.12
T13 1.75 0.10 0.10
T14 1.63 0.09 0.09
T15 1.50 0.08 0.08
T16 1.38 0.08 0.07
T17 0.12 0.03 0.02
T18 1.13 0.06 0.05
T19 1.00 0.06 0.04
T20 1.00 0.06 0.04
15
T21 0.88 0.05 0.03
T22 0.75 0.04 0.02
T23 0.75 0.04 0.02
T24 0.75 0.04 0.02
T25 0.25 0.06 0.08
T26 0.12 0.03 0.02
T27 0.38 0.08 0.18
T28 0.25 0.06 0.08
T29 0.25 0.06 0.08
T30 0.12 0.03 0.02
T31 3.21 1.64 68.00
T32 0.63 0.14 0.46
T33 0.50 0.11 0.30
T34 0.38 0.08 0.18
T35 0.25 0.06 0.08
T36 0.12 0.03 0.02
T37 0.12 0.06 0.17
T38 0.12 0.06 0.17
T39 0.12 0.06 0.17
T40 0.12 0.06 0.17
T41 0.12 0.06 0.17
T42 0.12 0.06 0.17
T43 0.12 0.06 0.17
T44 0.12 0.06 0.17
T45 0.12 0.06 0.17
T46 0.12 0.06 0.17
T47 0.12 0.06 0.17
T48 0.12 0.06 0.17
T49 0.12 0.06 0.17
T50 0.12 0.06 0.17
T51 0.12 0.06 0.17
T52 0.12 0.06 0.17
T53 0.12 0.06 0.17
T54 0.12 0.06 0.17
T55 0.12 0.06 0.17
T56 0.12 0.06 0.17
T57 0.12 0.06 0.17
T58 0.12 0.06 0.17
T59 0.12 0.06 0.17
T60 0.12 0.06 0.17
T61 0.12 0.06 0.17
T62 0.12 0.06 0.17
B-1 2.88 0.00 -320.13
B-2 3.21 0.00 -237.21
VRP-1 1.75 0.10 44.07
VRP-2 1.13 0.06 30.93
16
Resultado nos Nós às 2:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.12 123.85 16.85
1A 0.12 123.95 40.95
2 0.12 123.85 17.85
2A 0.12 166.32 28.32
3 0.12 123.88 31.88
3A 0.12 166.34 21.34
4 0.12 123.95 43.95
4A 0.12 166.36 12.36
5 0.12 123.94 40.94
5A 0.12 166.38 10.38
6 0.12 123.97 47.97
7 0.12 123.98 22.98
8 0.12 123.99 19.99
9 0.12 154.92 34.92
10 0.12 154.93 49.93
11 0.12 154.97 18.97
12 0.12 154.99 11.99
13 0.12 155.00 11.00
14 0.12 199.09 48.09
15 0.12 199.12 35.12
17
16 0.12 199.13 33.13
16A 0.12 199.11 46.11
16B 0.12 199.11 40.11
16C 0.12 199.12 31.12
16D 0.12 199.13 31.13
U-1 0.00 123.85 16.85
U-1A 0.00 123.95 40.95
U-1B 0.00 166.32 30.32
U-2 0.00 123.85 17.85
U-2A 0.00 166.33 28.33
U-3 0.00 123.88 31.88
U-3A 0.00 166.34 21.34
U-4A 0.00 166.37 13.37
U-5 0.00 123.95 40.95
U-6 0.00 123.97 46.97
U-7 0.00 123.98 23.98
U-8 0.00 124.00 21.00
U-9 0.00 154.92 34.92
U-11 0.00 154.97 18.97
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 199.09 47.09
U-15 0.00 199.12 35.12
U-16 0.00 199.13 34.13
U-16A 0.00 199.11 46.11
U-16B 0.00 199.11 40.11
U-16C 0.00 199.12 32.12
U-16D 0.00 199.14 32.14
PV-1 0.00 315.68 191.68
PV-2 0.00 237.33 100.33
PV-3 0.00 199.14 32.14
PV-4 0.00 154.93 50.93
PV-5 0.00 123.96 42.96
PV-6 0.00 166.38 10.38
DET-1 0.00 199.11 36.11
DET-2 0.00 123.99 20.99
DET-3 0.00 123.97 48.97
DET-4 0.00 123.96 49.96
DET-5 0.00 123.86 24.86
1B 0.12 166.32 30.32
A-1 0.00 356.93 264.93
A-2 0.00 260.81 201.81
V-1 0.00 199.07 54.07
V-2 0.00 124.00 20.00
P-1 -2.88 36.80 -55.20
P-2 -3.21 23.60 -35.40
R-1 0.26 199.23 9.23
R-2 2.59 166.40 10.40
18
Resultado nos Trechos às 2:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.88 1.47 55.74
T2 2.88 1.47 55.74
T3 2.88 1.47 55.74
T4 2.63 0.15 0.22
T5 0.50 0.11 0.30
T6 0.38 0.08 0.18
T7 0.25 0.06 0.08
T8 0.12 0.03 0.02
T9 2.13 0.12 0.15
T10 2.00 0.11 0.13
T11 1.88 0.11 0.12
T12 1.88 0.11 0.12
T13 1.75 0.10 0.10
T14 1.63 0.09 0.09
T15 1.50 0.08 0.08
T16 1.38 0.08 0.07
T17 0.12 0.03 0.02
T18 1.13 0.06 0.05
T19 1.00 0.06 0.04
T20 1.00 0.06 0.04
19
T21 0.88 0.05 0.03
T22 0.75 0.04 0.02
T23 0.75 0.04 0.02
T24 0.75 0.04 0.02
T25 0.25 0.06 0.08
T26 0.12 0.03 0.02
T27 0.38 0.08 0.18
T28 0.25 0.06 0.08
T29 0.25 0.06 0.08
T30 0.12 0.03 0.02
T31 3.21 1.64 68.00
T32 0.63 0.14 0.46
T33 0.50 0.11 0.30
T34 0.38 0.08 0.18
T35 0.25 0.06 0.08
T36 0.12 0.03 0.02
T37 0.12 0.06 0.17
T38 0.12 0.06 0.17
T39 0.12 0.06 0.17
T40 0.12 0.06 0.17
T41 0.12 0.06 0.17
T42 0.12 0.06 0.17
T43 0.12 0.06 0.17
T44 0.12 0.06 0.17
T45 0.12 0.06 0.17
T46 0.12 0.06 0.17
T47 0.12 0.06 0.17
T48 0.12 0.06 0.17
T49 0.12 0.06 0.17
T50 0.12 0.06 0.17
T51 0.12 0.06 0.17
T52 0.12 0.06 0.17
T53 0.12 0.06 0.17
T54 0.12 0.06 0.17
T55 0.12 0.06 0.17
T56 0.12 0.06 0.17
T57 0.12 0.06 0.17
T58 0.12 0.06 0.17
T59 0.12 0.06 0.17
T60 0.12 0.06 0.17
T61 0.12 0.06 0.17
T62 0.12 0.06 0.17
B-1 2.88 0.00 -320.13
B-2 3.21 0.00 -237.21
VRP-1 1.75 0.10 44.07
VRP-2 1.13 0.06 30.93
20
Resultado nos Nós às 3:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.19 123.67 16.67
1A 0.19 123.89 40.89
2 0.19 123.68 17.68
2A 0.19 166.25 28.25
3 0.19 123.75 31.75
3A 0.19 166.27 21.27
4 0.19 123.90 43.90
4A 0.19 166.33 12.33
5 0.19 123.88 40.88
5A 0.19 166.37 10.37
6 0.19 123.94 47.94
7 0.19 123.96 22.96
8 0.19 123.99 19.99
9 0.19 154.84 34.84
10 0.19 154.85 49.85
11 0.19 154.94 18.94
12 0.19 154.98 11.98
13 0.19 155.00 11.00
14 0.19 198.93 47.93
21
15 0.19 199.00 35.00
16 0.19 199.02 33.02
16A 0.19 198.97 45.97
16B 0.19 198.97 39.97
16C 0.19 199.00 31.00
16D 0.19 199.03 31.03
U-1 0.00 123.68 16.68
U-1A 0.00 123.89 40.89
U-1B 0.00 166.25 30.25
U-2 0.00 123.68 17.68
U-2A 0.00 166.25 28.25
U-3 0.00 123.75 31.75
U-3A 0.00 166.28 21.28
U-4A 0.00 166.34 13.34
U-5 0.00 123.89 40.89
U-6 0.00 123.94 46.94
U-7 0.00 123.97 23.97
U-8 0.00 123.99 20.99
U-9 0.00 154.84 34.84
U-11 0.00 154.94 18.94
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 198.94 46.94
U-15 0.00 199.00 35.00
U-16 0.00 199.03 34.03
U-16A 0.00 198.97 45.97
U-16B 0.00 198.98 39.98
U-16C 0.00 199.00 32.00
U-16D 0.00 199.03 32.03
PV-1 0.00 319.71 195.71
PV-2 0.00 238.65 101.65
PV-3 0.00 199.05 32.05
PV-4 0.00 154.85 50.85
PV-5 0.00 123.91 42.91
PV-6 0.00 166.37 10.37
DET-1 0.00 198.98 35.98
DET-2 0.00 123.98 20.98
DET-3 0.00 123.94 48.94
DET-4 0.00 123.91 49.91
DET-5 0.00 123.71 24.71
1B 0.19 166.24 30.24
A-1 0.00 362.38 270.38
A-2 0.00 262.81 203.81
V-1 0.00 198.89 53.89
V-2 0.00 124.00 20.00
P-1 -2.94 55.20 -36.80
P-2 -3.25 35.40 -23.60
R-1 -1.00 199.23 9.23
R-2 2.31 166.40 10.40
22
Resultado nos Trechos às 3:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.94 1.50 57.67
T2 2.94 1.50 57.67
T3 2.94 1.50 57.67
T4 3.94 0.22 0.47
T5 0.75 0.17 0.64
T6 0.56 0.13 0.37
T7 0.38 0.08 0.18
T8 0.19 0.04 0.05
T9 3.19 0.18 0.32
T10 3.00 0.17 0.28
T11 2.81 0.16 0.25
T12 2.81 0.16 0.25
T13 2.63 0.15 0.22
T14 2.44 0.14 0.19
T15 2.25 0.13 0.17
T16 2.06 0.12 0.14
T17 0.19 0.04 0.05
T18 1.69 0.10 0.10
T19 1.50 0.08 0.08
23
T20 1.50 0.08 0.08
T21 1.31 0.07 0.06
T22 1.13 0.06 0.05
T23 1.13 0.06 0.05
T24 1.13 0.06 0.05
T25 0.38 0.08 0.18
T26 0.19 0.04 0.05
T27 0.56 0.13 0.37
T28 0.38 0.08 0.18
T29 0.38 0.08 0.18
T30 0.19 0.04 0.05
T31 3.25 1.65 69.43
T32 0.94 0.21 0.96
T33 0.75 0.17 0.64
T34 0.56 0.13 0.37
T35 0.38 0.08 0.18
T36 0.19 0.04 0.05
T37 0.19 0.10 0.35
T38 0.19 0.10 0.35
T39 0.19 0.10 0.35
T40 0.19 0.10 0.35
T41 0.19 0.10 0.35
T42 0.19 0.10 0.35
T43 0.19 0.10 0.35
T44 0.19 0.10 0.35
T45 0.19 0.10 0.35
T46 0.19 0.10 0.35
T47 0.19 0.10 0.35
T48 0.19 0.10 0.35
T49 0.19 0.10 0.35
T50 0.19 0.10 0.35
T51 0.19 0.10 0.35
T52 0.19 0.10 0.35
T53 0.19 0.10 0.35
T54 0.19 0.10 0.35
T55 0.19 0.10 0.35
T56 0.19 0.10 0.35
T57 0.19 0.10 0.35
T58 0.19 0.10 0.35
T59 0.19 0.10 0.35
T60 0.19 0.10 0.35
T61 0.19 0.10 0.35
T62 0.19 0.10 0.35
B-1 2.94 0.00 -307.18
B-2 3.25 0.00 -227.41
VRP-1 2.63 0.15 43.89
VRP-2 1.69 0.10 30.85
24
Resultado nos Nós às 4:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.20 123.62 16.62
1A 0.20 123.87 40.87
2 0.20 123.63 17.63
2A 0.20 166.23 28.23
3 0.20 123.71 31.71
3A 0.20 166.26 21.26
4 0.20 123.88 43.88
4A 0.20 166.33 12.33
5 0.20 123.86 40.86
5A 0.20 166.37 10.37
6 0.20 123.93 47.93
7 0.20 123.96 22.96
8 0.20 123.98 19.98
9 0.20 154.81 34.81
10 0.20 154.83 49.83
11 0.20 154.93 18.93
12 0.20 154.98 11.98
13 0.20 155.00 11.00
25
14 0.20 198.88 47.88
15 0.20 198.96 34.96
16 0.20 198.99 32.99
16A 0.20 198.93 45.93
16B 0.20 198.93 39.93
16C 0.20 198.96 30.96
16D 0.20 198.99 30.99
U-1 0.00 123.63 16.63
U-1A 0.00 123.88 40.88
U-1B 0.00 166.22 30.22
U-2 0.00 123.63 17.63
U-2A 0.00 166.23 28.23
U-3 0.00 123.71 31.71
U-3A 0.00 166.26 21.26
U-4A 0.00 166.33 13.33
U-5 0.00 123.87 40.87
U-6 0.00 123.93 46.93
U-7 0.00 123.96 23.96
U-8 0.00 123.99 20.99
U-9 0.00 154.81 34.81
U-11 0.00 154.93 18.93
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 198.89 46.89
U-15 0.00 198.96 34.96
U-16 0.00 198.99 33.99
U-16A 0.00 198.93 45.93
U-16B 0.00 198.93 39.93
U-16C 0.00 198.96 31.96
U-16D 0.00 199.00 32.00
PV-1 0.00 320.71 196.71
PV-2 0.00 238.98 101.98
PV-3 0.00 199.02 32.02
PV-4 0.00 154.83 50.83
PV-5 0.00 123.89 42.89
PV-6 0.00 166.37 10.37
DET-1 0.00 198.94 35.94
DET-2 0.00 123.98 20.98
DET-3 0.00 123.93 48.93
DET-4 0.00 123.90 49.90
DET-5 0.00 123.66 24.66
1B 0.20 166.22 30.22
A-1 0.00 363.74 271.74
A-2 0.00 263.31 204.31
V-1 0.00 198.83 53.83
V-2 0.00 124.00 20.00
P-1 -2.95 59.80 -32.20
P-2 -3.26 38.35 -20.65
R-1 -1.32 199.23 9.23
R-2 2.24 166.41 10.41
26
Resultado nos Trechos às 4:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.95 1.50 58.15
T2 2.95 1.50 58.15
T3 2.95 1.50 58.15
T4 4.27 0.24 0.55
T5 0.81 0.18 0.74
T6 0.61 0.14 0.43
T7 0.41 0.09 0.21
T8 0.20 0.05 0.06
T9 3.45 0.20 0.37
T10 3.25 0.18 0.33
T11 3.05 0.17 0.29
T12 3.05 0.17 0.29
T13 2.84 0.16 0.26
T14 2.64 0.15 0.22
T15 2.44 0.14 0.19
T16 2.23 0.13 0.16
T17 0.20 0.05 0.06
T18 1.83 0.10 0.11
27
T19 1.63 0.09 0.09
T20 1.63 0.09 0.09
T21 1.42 0.08 0.07
T22 1.22 0.07 0.05
T23 1.22 0.07 0.05
T24 1.22 0.07 0.05
T25 0.41 0.09 0.21
T26 0.20 0.05 0.06
T27 0.61 0.14 0.43
T28 0.41 0.09 0.21
T29 0.41 0.09 0.21
T30 0.20 0.05 0.06
T31 3.26 1.66 69.79
T32 1.02 0.23 1.12
T33 0.81 0.18 0.74
T34 0.61 0.14 0.43
T35 0.41 0.09 0.21
T36 0.20 0.05 0.06
T37 0.20 0.10 0.41
T38 0.20 0.10 0.41
T39 0.20 0.10 0.41
T40 0.20 0.10 0.41
T41 0.20 0.10 0.41
T42 0.20 0.10 0.41
T43 0.20 0.10 0.41
T44 0.20 0.10 0.41
T45 0.20 0.10 0.41
T46 0.20 0.10 0.41
T47 0.20 0.10 0.41
T48 0.20 0.10 0.41
T49 0.20 0.10 0.41
T50 0.20 0.10 0.41
T51 0.20 0.10 0.41
T52 0.20 0.10 0.41
T53 0.20 0.10 0.41
T54 0.20 0.10 0.41
T55 0.20 0.10 0.41
T56 0.20 0.10 0.41
T57 0.20 0.10 0.41
T58 0.20 0.10 0.41
T59 0.20 0.10 0.41
T60 0.20 0.10 0.41
T61 0.20 0.10 0.41
T62 0.20 0.10 0.41
B-1 2.95 0.00 -303.94
B-2 3.26 0.00 -224.96
VRP-1 2.84 0.16 43.83
VRP-2 1.83 0.10 30.83
28
Resultado nos Nós às 5:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.22 123.57 16.57
1A 0.22 123.85 40.85
2 0.22 123.58 17.58
2A 0.22 166.21 28.21
3 0.22 123.67 31.67
3A 0.22 166.24 21.24
4 0.22 123.86 43.86
4A 0.22 166.32 12.32
5 0.22 123.84 40.84
5A 0.22 166.37 10.37
6 0.22 123.92 47.92
7 0.22 123.95 22.95
8 0.22 123.98 19.98
9 0.22 154.78 34.78
10 0.22 154.80 49.80
11 0.22 154.92 18.92
12 0.22 154.98 11.98
13 0.22 155.00 11.00
29
14 0.22 198.83 47.83
15 0.22 198.91 34.91
16 0.22 198.95 32.95
16A 0.22 198.88 45.88
16B 0.22 198.88 39.88
16C 0.22 198.92 30.92
16D 0.22 198.95 30.95
U-1 0.00 123.58 16.58
U-1A 0.00 123.86 40.86
U-1B 0.00 166.20 30.20
U-2 0.00 123.58 17.58
U-2A 0.00 166.21 28.21
U-3 0.00 123.67 31.67
U-3A 0.00 166.25 21.25
U-4A 0.00 166.32 13.32
U-5 0.00 123.85 40.85
U-6 0.00 123.92 46.92
U-7 0.00 123.96 23.96
U-8 0.00 123.99 20.99
U-9 0.00 154.79 34.79
U-11 0.00 154.93 18.93
U-12 0.00 154.98 11.98
U-13 0.00 155.00 10.00
U-14 0.00 198.83 46.83
U-15 0.00 198.92 34.92
U-16 0.00 198.95 33.95
U-16A 0.00 198.88 45.88
U-16B 0.00 198.89 39.89
U-16C 0.00 198.92 31.92
U-16D 0.00 198.96 31.96
PV-1 0.00 321.71 197.71
PV-2 0.00 239.30 102.30
PV-3 0.00 198.98 31.98
PV-4 0.00 154.80 50.80
PV-5 0.00 123.87 42.87
PV-6 0.00 166.37 10.37
DET-1 0.00 198.90 35.90
DET-2 0.00 123.97 20.97
DET-3 0.00 123.91 48.91
DET-4 0.00 123.89 49.89
DET-5 0.00 123.61 24.61
1B 0.22 166.20 30.20
A-1 0.00 365.10 273.10
A-2 0.00 263.81 204.81
V-1 0.00 198.77 53.77
V-2 0.00 124.00 20.00
P-1 -2.96 64.40 -27.60
P-2 -3.26 41.30 -17.70
R-1 -1.63 199.23 9.23
R-2 2.17 166.41 10.41
30
Resultado nos Trechos às 5:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.96 1.51 58.63
T2 2.96 1.51 58.63
T3 2.96 1.51 58.63
T4 4.59 0.26 0.63
T5 0.88 0.20 0.85
T6 0.66 0.15 0.50
T7 0.44 0.10 0.24
T8 0.22 0.05 0.07
T9 3.72 0.21 0.42
T10 3.50 0.20 0.38
T11 3.28 0.19 0.34
T12 3.28 0.19 0.34
T13 3.06 0.17 0.30
T14 2.84 0.16 0.26
T15 2.63 0.15 0.22
T16 2.41 0.14 0.19
T17 0.22 0.05 0.07
T18 1.97 0.11 0.13
31
T19 1.75 0.10 0.10
T20 1.75 0.10 0.10
T21 1.53 0.09 0.08
T22 1.31 0.07 0.06
T23 1.31 0.07 0.06
T24 1.31 0.07 0.06
T25 0.44 0.10 0.24
T26 0.22 0.05 0.07
T27 0.66 0.15 0.50
T28 0.44 0.10 0.24
T29 0.44 0.10 0.24
T30 0.22 0.05 0.07
T31 3.26 1.66 70.15
T32 1.09 0.25 1.28
T33 0.88 0.20 0.85
T34 0.66 0.15 0.50
T35 0.44 0.10 0.24
T36 0.22 0.05 0.07
T37 0.22 0.11 0.47
T38 0.22 0.11 0.47
T39 0.22 0.11 0.47
T40 0.22 0.11 0.47
T41 0.22 0.11 0.47
T42 0.22 0.11 0.47
T43 0.22 0.11 0.47
T44 0.22 0.11 0.47
T45 0.22 0.11 0.47
T46 0.22 0.11 0.47
T47 0.22 0.11 0.47
T48 0.22 0.11 0.47
T49 0.22 0.11 0.47
T50 0.22 0.11 0.47
T51 0.22 0.11 0.47
T52 0.22 0.11 0.47
T53 0.22 0.11 0.47
T54 0.22 0.11 0.47
T55 0.22 0.11 0.47
T56 0.22 0.11 0.47
T57 0.22 0.11 0.47
T58 0.22 0.11 0.47
T59 0.22 0.11 0.47
T60 0.22 0.11 0.47
T61 0.22 0.11 0.47
T62 0.22 0.11 0.47
B-1 2.96 0.00 -300.70
B-2 3.26 0.00 -222.51
VRP-1 3.06 0.17 43.77
VRP-2 1.97 0.11 30.80
32
Resultado nos Nós às 6:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.25 123.45 16.45
1A 0.25 123.81 40.81
2 0.25 123.46 17.46
2A 0.25 166.15 28.15
3 0.25 123.57 31.57
3A 0.25 166.20 21.20
4 0.25 123.83 43.83
4A 0.25 166.30 12.30
5 0.25 123.80 40.80
5A 0.25 166.36 10.36
6 0.25 123.89 47.89
7 0.25 123.94 22.94
8 0.25 123.98 19.98
9 0.25 154.72 34.72
10 0.25 154.74 49.74
11 0.25 154.90 18.90
12 0.25 154.97 11.97
13 0.25 154.99 10.99
33
14 0.25 198.72 47.72
15 0.25 198.82 34.82
16 0.25 198.87 32.87
16A 0.25 198.78 45.78
16B 0.25 198.78 39.78
16C 0.25 198.83 30.83
16D 0.25 198.87 30.87
U-1 0.00 123.46 16.46
U-1A 0.00 123.82 40.82
U-1B 0.00 166.15 30.15
U-2 0.00 123.46 17.46
U-2A 0.00 166.16 28.16
U-3 0.00 123.58 31.58
U-3A 0.00 166.20 21.20
U-4A 0.00 166.30 13.30
U-5 0.00 123.80 40.80
U-6 0.00 123.90 46.90
U-7 0.00 123.95 23.95
U-8 0.00 123.98 20.98
U-9 0.00 154.73 34.73
U-11 0.00 154.90 18.90
U-12 0.00 154.98 11.98
U-13 0.00 155.00 10.00
U-14 0.00 198.72 46.72
U-15 0.00 198.83 34.83
U-16 0.00 198.87 33.87
U-16A 0.00 198.78 45.78
U-16B 0.00 198.79 39.79
U-16C 0.00 198.83 31.83
U-16D 0.00 198.88 31.88
PV-1 0.00 323.72 199.72
PV-2 0.00 239.96 102.96
PV-3 0.00 198.91 31.91
PV-4 0.00 154.75 50.75
PV-5 0.00 123.84 42.84
PV-6 0.00 166.36 10.36
DET-1 0.00 198.80 35.80
DET-2 0.00 123.97 20.97
DET-3 0.00 123.89 48.89
DET-4 0.00 123.85 49.85
DET-5 0.00 123.50 24.50
1B 0.25 166.14 30.14
A-1 0.00 367.82 275.82
A-2 0.00 264.81 205.81
V-1 0.00 198.64 53.64
V-2 0.00 124.00 20.00
P-1 -2.99 73.60 -18.40
P-2 -3.28 47.20 -11.80
R-1 -2.26 199.22 9.22
R-2 2.03 166.41 10.41
34
Resultado nos Trechos às 6:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.99 1.52 59.59
T2 2.99 1.52 59.59
T3 2.99 1.52 59.59
T4 5.25 0.30 0.80
T5 1.00 0.23 1.09
T6 0.75 0.17 0.64
T7 0.50 0.11 0.30
T8 0.25 0.06 0.08
T9 4.25 0.24 0.54
T10 4.00 0.23 0.48
T11 3.75 0.21 0.43
T12 3.75 0.21 0.43
T13 3.50 0.20 0.38
T14 3.25 0.18 0.33
T15 3.00 0.17 0.28
T16 2.75 0.16 0.24
T17 0.25 0.06 0.08
T18 2.25 0.13 0.17
35
T19 2.00 0.11 0.13
T20 2.00 0.11 0.13
T21 1.75 0.10 0.10
T22 1.50 0.08 0.08
T23 1.50 0.08 0.08
T24 1.50 0.08 0.08
T25 0.50 0.11 0.30
T26 0.25 0.06 0.08
T27 0.75 0.17 0.64
T28 0.50 0.11 0.30
T29 0.50 0.11 0.30
T30 0.25 0.06 0.08
T31 3.28 1.67 70.86
T32 1.25 0.28 1.65
T33 1.00 0.23 1.09
T34 0.75 0.17 0.64
T35 0.50 0.11 0.30
T36 0.25 0.06 0.08
T37 0.25 0.13 0.60
T38 0.25 0.13 0.60
T39 0.25 0.13 0.60
T40 0.25 0.13 0.60
T41 0.25 0.13 0.60
T42 0.25 0.13 0.60
T43 0.25 0.13 0.60
T44 0.25 0.13 0.60
T45 0.25 0.13 0.60
T46 0.25 0.13 0.60
T47 0.25 0.13 0.60
T48 0.25 0.13 0.60
T49 0.25 0.13 0.60
T50 0.25 0.13 0.60
T51 0.25 0.13 0.60
T52 0.25 0.13 0.60
T53 0.25 0.13 0.60
T54 0.25 0.13 0.60
T55 0.25 0.13 0.60
T56 0.25 0.13 0.60
T57 0.25 0.13 0.60
T58 0.25 0.13 0.60
T59 0.25 0.13 0.60
T60 0.25 0.13 0.60
T61 0.25 0.13 0.60
T62 0.25 0.13 0.60
B-1 2.99 0.00 -294.22
B-2 3.28 0.00 -217.61
VRP-1 3.50 0.20 43.64
VRP-2 2.25 0.13 30.75
36
Resultado nos Nós às 7:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.27 123.38 16.38
1A 0.27 123.79 40.79
2 0.27 123.39 17.39
2A 0.27 166.13 28.13
3 0.27 123.52 31.52
3A 0.27 166.17 21.17
4 0.27 123.81 43.81
4A 0.27 166.29 12.29
5 0.27 123.77 40.77
5A 0.27 166.35 10.35
6 0.27 123.88 47.88
7 0.27 123.93 22.93
8 0.27 123.97 19.97
9 0.27 154.69 34.69
10 0.27 154.71 49.71
11 0.27 154.89 18.89
12 0.27 154.97 11.97
13 0.27 154.99 10.99
37
14 0.27 198.65 47.65
15 0.27 198.77 34.77
16 0.27 198.82 32.82
16A 0.27 198.72 45.72
16B 0.27 198.73 39.73
16C 0.27 198.77 30.77
16D 0.27 198.83 30.83
U-1 0.00 123.39 16.39
U-1A 0.00 123.80 40.80
U-1B 0.00 166.12 30.12
U-2 0.00 123.40 17.40
U-2A 0.00 166.13 28.13
U-3 0.00 123.53 31.53
U-3A 0.00 166.18 21.18
U-4A 0.00 166.29 13.29
U-5 0.00 123.78 40.78
U-6 0.00 123.89 46.89
U-7 0.00 123.94 23.94
U-8 0.00 123.98 20.98
U-9 0.00 154.70 34.70
U-11 0.00 154.89 18.89
U-12 0.00 154.98 11.98
U-13 0.00 155.00 10.00
U-14 0.00 198.66 46.66
U-15 0.00 198.78 34.78
U-16 0.00 198.83 33.83
U-16A 0.00 198.73 45.73
U-16B 0.00 198.73 39.73
U-16C 0.00 198.78 31.78
U-16D 0.00 198.84 31.84
PV-1 0.00 324.72 200.72
PV-2 0.00 240.28 103.28
PV-3 0.00 198.87 31.87
PV-4 0.00 154.72 50.72
PV-5 0.00 123.82 42.82
PV-6 0.00 166.36 10.36
DET-1 0.00 198.75 35.75
DET-2 0.00 123.96 20.96
DET-3 0.00 123.88 48.88
DET-4 0.00 123.84 49.84
DET-5 0.00 123.44 24.44
1B 0.27 166.11 30.11
A-1 0.00 369.17 277.17
A-2 0.00 265.31 206.31
V-1 0.00 198.57 53.57
V-2 0.00 124.00 20.00
P-1 -3.00 78.20 -13.80
P-2 -3.29 50.15 -8.85
R-1 -2.58 199.22 9.22
R-2 1.96 166.42 10.42
38
Resultado nos Trechos às 7:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.00 1.53 60.08
T2 3.00 1.53 60.08
T3 3.00 1.53 60.08
T4 5.58 0.32 0.90
T5 1.06 0.24 1.22
T6 0.80 0.18 0.71
T7 0.53 0.12 0.34
T8 0.27 0.06 0.09
T9 4.52 0.26 0.61
T10 4.25 0.24 0.54
T11 3.98 0.23 0.48
T12 3.98 0.23 0.48
T13 3.72 0.21 0.42
T14 3.45 0.20 0.37
T15 3.19 0.18 0.32
T16 2.92 0.17 0.27
T17 0.27 0.06 0.09
T18 2.39 0.14 0.19
39
T19 2.13 0.12 0.15
T20 2.13 0.12 0.15
T21 1.86 0.11 0.12
T22 1.59 0.09 0.09
T23 1.59 0.09 0.09
T24 1.59 0.09 0.09
T25 0.53 0.12 0.34
T26 0.27 0.06 0.09
T27 0.80 0.18 0.71
T28 0.53 0.12 0.34
T29 0.53 0.12 0.34
T30 0.27 0.06 0.09
T31 3.29 1.68 71.22
T32 1.33 0.30 1.84
T33 1.06 0.24 1.22
T34 0.80 0.18 0.71
T35 0.53 0.12 0.34
T36 0.27 0.06 0.09
T37 0.27 0.14 0.67
T38 0.27 0.14 0.67
T39 0.27 0.14 0.67
T40 0.27 0.14 0.67
T41 0.27 0.14 0.67
T42 0.27 0.14 0.67
T43 0.27 0.14 0.67
T44 0.27 0.14 0.67
T45 0.27 0.14 0.67
T46 0.27 0.14 0.67
T47 0.27 0.14 0.67
T48 0.27 0.14 0.67
T49 0.27 0.14 0.67
T50 0.27 0.14 0.67
T51 0.27 0.14 0.67
T52 0.27 0.14 0.67
T53 0.27 0.14 0.67
T54 0.27 0.14 0.67
T55 0.27 0.14 0.67
T56 0.27 0.14 0.67
T57 0.27 0.14 0.67
T58 0.27 0.14 0.67
T59 0.27 0.14 0.67
T60 0.27 0.14 0.67
T61 0.27 0.14 0.67
T62 0.27 0.14 0.67
B-1 3.00 0.00 -290.97
B-2 3.29 0.00 -215.16
VRP-1 3.72 0.21 43.57
VRP-2 2.39 0.14 30.72
40
Resultado nos Nós às 8:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.28 123.31 16.31
1A 0.28 123.77 40.77
2 0.28 123.32 17.32
2A 0.28 166.10 28.10
3 0.28 123.47 31.47
3A 0.28 166.15 21.15
4 0.28 123.78 43.78
4A 0.28 166.28 12.28
5 0.28 123.75 40.75
5A 0.28 166.35 10.35
6 0.28 123.87 47.87
7 0.28 123.92 22.92
8 0.28 123.97 19.97
9 0.28 154.65 34.65
10 0.28 154.68 49.68
11 0.28 154.87 18.87
12 0.28 154.97 11.97
13 0.28 154.99 10.99
41
14 0.28 198.58 47.58
15 0.28 198.72 34.72
16 0.28 198.77 32.77
16A 0.28 198.66 45.66
16B 0.28 198.67 39.67
16C 0.28 198.72 30.72
16D 0.28 198.78 30.78
U-1 0.00 123.33 16.33
U-1A 0.00 123.78 40.78
U-1B 0.00 166.09 30.09
U-2 0.00 123.33 17.33
U-2A 0.00 166.10 28.10
U-3 0.00 123.48 31.48
U-3A 0.00 166.16 21.16
U-4A 0.00 166.28 13.28
U-5 0.00 123.76 40.76
U-6 0.00 123.88 46.88
U-7 0.00 123.93 23.93
U-8 0.00 123.98 20.98
U-9 0.00 154.66 34.66
U-11 0.00 154.88 18.88
U-12 0.00 154.97 11.97
U-13 0.00 155.00 10.00
U-14 0.00 198.59 46.59
U-15 0.00 198.73 34.73
U-16 0.00 198.78 33.78
U-16A 0.00 198.67 45.67
U-16B 0.00 198.68 39.68
U-16C 0.00 198.73 31.73
U-16D 0.00 198.79 31.79
PV-1 0.00 325.72 201.72
PV-2 0.00 240.60 103.60
PV-3 0.00 198.83 31.83
PV-4 0.00 154.69 50.69
PV-5 0.00 123.80 42.80
PV-6 0.00 166.36 10.36
DET-1 0.00 198.69 35.69
DET-2 0.00 123.96 20.96
DET-3 0.00 123.86 48.86
DET-4 0.00 123.82 49.82
DET-5 0.00 123.38 24.38
1B 0.28 166.08 30.08
A-1 0.00 370.53 278.53
A-2 0.00 265.81 206.81
V-1 0.00 198.49 53.49
V-2 0.00 124.00 20.00
P-1 -3.02 82.80 -9.20
P-2 -3.30 53.10 -5.90
R-1 -2.89 199.21 9.21
R-2 1.89 166.42 10.42
42
Resultado nos Trechos às 8:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.02 1.54 60.56
T2 3.02 1.54 60.56
T3 3.02 1.54 60.56
T4 5.91 0.33 1.00
T5 1.13 0.25 1.35
T6 0.84 0.19 0.79
T7 0.56 0.13 0.37
T8 0.28 0.06 0.10
T9 4.78 0.27 0.67
T10 4.50 0.25 0.60
T11 4.22 0.24 0.53
T12 4.22 0.24 0.53
T13 3.94 0.22 0.47
T14 3.66 0.21 0.41
T15 3.38 0.19 0.35
T16 3.09 0.18 0.30
T17 0.28 0.06 0.10
T18 2.53 0.14 0.21
43
T19 2.25 0.13 0.17
T20 2.25 0.13 0.17
T21 1.97 0.11 0.13
T22 1.69 0.10 0.10
T23 1.69 0.10 0.10
T24 1.69 0.10 0.10
T25 0.56 0.13 0.37
T26 0.28 0.06 0.10
T27 0.84 0.19 0.79
T28 0.56 0.13 0.37
T29 0.56 0.13 0.37
T30 0.28 0.06 0.10
T31 3.30 1.68 71.58
T32 1.41 0.32 2.05
T33 1.13 0.25 1.35
T34 0.84 0.19 0.79
T35 0.56 0.13 0.37
T36 0.28 0.06 0.10
T37 0.28 0.14 0.75
T38 0.28 0.14 0.75
T39 0.28 0.14 0.75
T40 0.28 0.14 0.75
T41 0.28 0.14 0.75
T42 0.28 0.14 0.75
T43 0.28 0.14 0.75
T44 0.28 0.14 0.75
T45 0.28 0.14 0.75
T46 0.28 0.14 0.75
T47 0.28 0.14 0.75
T48 0.28 0.14 0.75
T49 0.28 0.14 0.75
T50 0.28 0.14 0.75
T51 0.28 0.14 0.75
T52 0.28 0.14 0.75
T53 0.28 0.14 0.75
T54 0.28 0.14 0.75
T55 0.28 0.14 0.75
T56 0.28 0.14 0.75
T57 0.28 0.14 0.75
T58 0.28 0.14 0.75
T59 0.28 0.14 0.75
T60 0.28 0.14 0.75
T61 0.28 0.14 0.75
T62 0.28 0.14 0.75
B-1 3.02 0.00 -287.73
B-2 3.30 0.00 -212.71
VRP-1 3.94 0.22 43.49
VRP-2 2.53 0.14 30.69
44
Resultado nos Nós às 9:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.41 122.64 15.64
1A 0.41 123.54 40.54
2 0.41 122.66 16.66
2A 0.41 165.78 27.78
3 0.41 122.95 30.95
3A 0.41 165.89 20.89
4 0.41 123.57 43.57
4A 0.41 166.14 12.14
5 0.41 123.50 40.50
5A 0.41 166.29 10.29
6 0.41 123.74 47.74
7 0.41 123.85 22.85
8 0.41 123.94 19.94
9 0.41 154.32 34.32
10 0.41 154.37 49.37
11 0.41 154.75 18.75
12 0.41 154.94 11.94
13 0.41 154.99 10.99
45
14 0.41 197.96 46.96
15 0.41 198.23 34.23
16 0.41 198.34 32.34
16A 0.41 198.12 45.12
16B 0.41 198.13 39.13
16C 0.41 198.23 30.23
16D 0.41 198.35 30.35
U-1 0.00 122.67 15.67
U-1A 0.00 123.56 40.56
U-1B 0.00 165.77 29.77
U-2 0.00 122.68 16.68
U-2A 0.00 165.80 27.80
U-3 0.00 122.96 30.96
U-3A 0.00 165.91 20.91
U-4A 0.00 166.15 13.15
U-5 0.00 123.52 40.52
U-6 0.00 123.76 46.76
U-7 0.00 123.87 23.87
U-8 0.00 123.96 20.96
U-9 0.00 154.33 34.33
U-11 0.00 154.76 18.76
U-12 0.00 154.95 11.95
U-13 0.00 155.00 10.00
U-14 0.00 197.98 45.98
U-15 0.00 198.24 34.24
U-16 0.00 198.35 33.35
U-16A 0.00 198.13 45.13
U-16B 0.00 198.14 39.14
U-16C 0.00 198.25 31.25
U-16D 0.00 198.37 31.37
PV-1 0.00 333.72 209.72
PV-2 0.00 243.22 106.22
PV-3 0.00 198.45 31.45
PV-4 0.00 154.38 50.38
PV-5 0.00 123.60 42.60
PV-6 0.00 166.30 10.30
DET-1 0.00 198.17 35.17
DET-2 0.00 123.92 20.92
DET-3 0.00 123.73 48.73
DET-4 0.00 123.64 49.64
DET-5 0.00 122.77 23.77
1B 0.41 165.76 29.76
A-1 0.00 381.36 289.36
A-2 0.00 269.79 210.79
V-1 0.00 197.78 52.78
V-2 0.00 124.00 20.00
P-1 -3.12 119.60 27.60
P-2 -3.37 76.70 17.70
R-1 -5.41 199.21 9.21
R-2 1.34 166.42 10.42
46
Resultado nos Trechos às 9:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.12 1.59 64.39
T2 3.12 1.59 64.39
T3 3.12 1.59 64.39
T4 8.53 0.48 1.97
T5 1.63 0.37 2.67
T6 1.22 0.28 1.57
T7 0.81 0.18 0.74
T8 0.41 0.09 0.21
T9 6.91 0.39 1.33
T10 6.50 0.37 1.19
T11 6.09 0.34 1.06
T12 6.09 0.34 1.06
T13 5.69 0.32 0.93
T14 5.28 0.30 0.81
T15 4.88 0.28 0.70
T16 4.47 0.25 0.59
T17 0.41 0.09 0.21
T18 3.66 0.21 0.41
47
T19 3.25 0.18 0.33
T20 3.25 0.18 0.33
T21 2.84 0.16 0.26
T22 2.44 0.14 0.19
T23 2.44 0.14 0.19
T24 2.44 0.14 0.19
T25 0.81 0.18 0.74
T26 0.41 0.09 0.21
T27 1.22 0.28 1.57
T28 0.81 0.18 0.74
T29 0.81 0.18 0.74
T30 0.41 0.09 0.21
T31 3.37 1.72 74.44
T32 2.03 0.46 4.04
T33 1.63 0.37 2.67
T34 1.22 0.28 1.57
T35 0.81 0.18 0.74
T36 0.41 0.09 0.21
T37 0.41 0.21 1.48
T38 0.41 0.21 1.48
T39 0.41 0.21 1.48
T40 0.41 0.21 1.48
T41 0.41 0.21 1.48
T42 0.41 0.21 1.48
T43 0.41 0.21 1.48
T44 0.41 0.21 1.48
T45 0.41 0.21 1.48
T46 0.41 0.21 1.48
T47 0.41 0.21 1.48
T48 0.41 0.21 1.48
T49 0.41 0.21 1.48
T50 0.41 0.21 1.48
T51 0.41 0.21 1.48
T52 0.41 0.21 1.48
T53 0.41 0.21 1.48
T54 0.41 0.21 1.48
T55 0.41 0.21 1.48
T56 0.41 0.21 1.48
T57 0.41 0.21 1.48
T58 0.41 0.21 1.48
T59 0.41 0.21 1.48
T60 0.41 0.21 1.48
T61 0.41 0.21 1.48
T62 0.41 0.21 1.48
B-1 3.12 0.00 -261.76
B-2 3.37 0.00 -193.09
VRP-1 5.69 0.32 42.78
VRP-2 3.66 0.21 30.38
48
Resultado nos Nós às 10:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.47 122.22 15.22
1A 0.47 123.40 40.40
2 0.47 122.26 16.26
2A 0.47 165.59 27.59
3 0.47 122.63 30.63
3A 0.47 165.73 20.73
4 0.47 123.44 43.44
4A 0.47 166.05 12.05
5 0.47 123.35 40.35
5A 0.47 166.25 10.25
6 0.47 123.66 47.66
7 0.47 123.81 22.81
8 0.47 123.93 19.93
9 0.47 154.11 34.11
10 0.47 154.18 49.18
11 0.47 154.67 18.67
12 0.47 154.92 11.92
13 0.47 154.98 10.98
49
14 0.47 197.57 46.57
15 0.47 197.92 33.92
16 0.47 198.06 32.06
16A 0.47 197.77 44.77
16B 0.47 197.79 38.79
16C 0.47 197.92 29.92
16D 0.47 198.08 30.08
U-1 0.00 122.26 15.26
U-1A 0.00 123.42 40.42
U-1B 0.00 165.57 29.57
U-2 0.00 122.28 16.28
U-2A 0.00 165.61 27.61
U-3 0.00 122.65 30.65
U-3A 0.00 165.75 20.75
U-4A 0.00 166.07 13.07
U-5 0.00 123.37 40.37
U-6 0.00 123.68 46.68
U-7 0.00 123.82 23.82
U-8 0.00 123.95 20.95
U-9 0.00 154.13 34.13
U-11 0.00 154.69 18.69
U-12 0.00 154.94 11.94
U-13 0.00 155.00 10.00
U-14 0.00 197.59 45.59
U-15 0.00 197.94 33.94
U-16 0.00 198.08 33.08
U-16A 0.00 197.79 44.79
U-16B 0.00 197.81 38.81
U-16C 0.00 197.94 30.94
U-16D 0.00 198.10 31.10
PV-1 0.00 337.70 213.70
PV-2 0.00 244.52 107.52
PV-3 0.00 198.21 31.21
PV-4 0.00 154.20 50.20
PV-5 0.00 123.48 42.48
PV-6 0.00 166.27 10.27
DET-1 0.00 197.85 34.85
DET-2 0.00 123.90 20.90
DET-3 0.00 123.65 48.65
DET-4 0.00 123.53 49.53
DET-5 0.00 122.39 23.39
1B 0.47 165.55 29.55
A-1 0.00 386.76 294.76
A-2 0.00 271.77 212.77
V-1 0.00 197.34 52.34
V-2 0.00 124.00 20.00
P-1 -3.17 138.00 46.00
P-2 -3.41 88.50 29.50
R-1 -6.68 199.20 9.20
R-2 1.06 166.43 10.43
50
Resultado nos Trechos às 10:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.17 1.61 66.30
T2 3.17 1.61 66.30
T3 3.17 1.61 66.30
T4 9.84 0.56 2.57
T5 1.88 0.42 3.48
T6 1.41 0.32 2.05
T7 0.94 0.21 0.97
T8 0.47 0.11 0.27
T9 7.97 0.45 1.74
T10 7.50 0.42 1.55
T11 7.03 0.40 1.38
T12 7.03 0.40 1.38
T13 6.56 0.37 1.21
T14 6.09 0.34 1.06
T15 5.63 0.32 0.91
T16 5.16 0.29 0.78
T17 0.47 0.11 0.27
T18 4.22 0.24 0.53
51
T19 3.75 0.21 0.43
T20 3.75 0.21 0.43
T21 3.28 0.19 0.34
T22 2.81 0.16 0.25
T23 2.81 0.16 0.25
T24 2.81 0.16 0.25
T25 0.94 0.21 0.97
T26 0.47 0.11 0.27
T27 1.41 0.32 2.05
T28 0.94 0.21 0.97
T29 0.94 0.21 0.97
T30 0.47 0.11 0.27
T31 3.41 1.73 75.87
T32 2.34 0.53 5.27
T33 1.88 0.42 3.48
T34 1.41 0.32 2.05
T35 0.94 0.21 0.97
T36 0.47 0.11 0.27
T37 0.47 0.24 1.93
T38 0.47 0.24 1.93
T39 0.47 0.24 1.93
T40 0.47 0.24 1.93
T41 0.47 0.24 1.93
T42 0.47 0.24 1.93
T43 0.47 0.24 1.93
T44 0.47 0.24 1.93
T45 0.47 0.24 1.93
T46 0.47 0.24 1.93
T47 0.47 0.24 1.93
T48 0.47 0.24 1.93
T49 0.47 0.24 1.93
T50 0.47 0.24 1.93
T51 0.47 0.24 1.93
T52 0.47 0.24 1.93
T53 0.47 0.24 1.93
T54 0.47 0.24 1.93
T55 0.47 0.24 1.93
T56 0.47 0.24 1.93
T57 0.47 0.24 1.93
T58 0.47 0.24 1.93
T59 0.47 0.24 1.93
T60 0.47 0.24 1.93
T61 0.47 0.24 1.93
T62 0.47 0.24 1.93
B-1 3.17 0.00 -248.76
B-2 3.41 0.00 -183.27
VRP-1 6.56 0.37 42.34
VRP-2 4.22 0.24 30.20
52
Resultado nos Nós às 11:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.56 121.51 14.51
1A 0.56 123.16 40.16
2 0.56 121.56 15.56
2A 0.56 165.26 27.26
3 0.56 122.08 30.08
3A 0.56 165.45 20.45
4 0.56 123.22 43.22
4A 0.56 165.90 11.90
5 0.56 123.10 40.10
5A 0.56 166.18 10.18
6 0.56 123.53 47.53
7 0.56 123.73 22.73
8 0.56 123.90 19.90
9 0.56 153.75 33.75
10 0.56 153.85 48.85
11 0.56 154.54 18.54
12 0.56 154.88 11.88
53
13 0.56 154.97 10.97
14 0.56 196.91 45.91
15 0.56 197.39 33.39
16 0.56 197.59 31.59
16A 0.56 197.19 44.19
16B 0.56 197.22 38.22
16C 0.56 197.40 29.40
16D 0.56 197.62 29.62
U-1 0.00 121.56 14.56
U-1A 0.00 123.19 40.19
U-1B 0.00 165.23 29.23
U-2 0.00 121.59 15.59
U-2A 0.00 165.28 27.28
U-3 0.00 122.10 30.10
U-3A 0.00 165.48 20.48
U-4A 0.00 165.93 12.93
U-5 0.00 123.12 40.12
U-6 0.00 123.55 46.55
U-7 0.00 123.75 23.75
U-8 0.00 123.92 20.92
U-9 0.00 153.78 33.78
U-11 0.00 154.57 18.57
U-12 0.00 154.91 11.91
U-13 0.00 155.00 10.00
U-14 0.00 196.93 44.93
U-15 0.00 197.42 33.42
U-16 0.00 197.62 32.62
U-16A 0.00 197.22 44.22
U-16B 0.00 197.24 38.24
U-16C 0.00 197.43 30.43
U-16D 0.00 197.65 30.65
PV-1 0.00 343.67 219.67
PV-2 0.00 246.46 109.46
PV-3 0.00 197.80 30.80
PV-4 0.00 153.88 49.88
PV-5 0.00 123.27 42.27
PV-6 0.00 166.20 10.20
DET-1 0.00 197.29 34.29
DET-2 0.00 123.86 20.86
DET-3 0.00 123.51 48.51
DET-4 0.00 123.35 49.35
DET-5 0.00 121.75 22.75
1B 0.56 165.21 29.21
A-1 0.00 394.85 302.85
A-2 0.00 274.74 215.74
V-1 0.00 196.58 51.58
V-2 0.00 124.00 20.00
P-1 -3.24 165.60 73.60
P-2 -3.46 106.20 47.20
R-1 -8.57 199.19 9.19
54
R-2 0.65 166.43 10.43
Resultado nos Trechos às 11:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.24 1.65 69.16
T2 3.24 1.65 69.16
T3 3.24 1.65 69.16
T4 11.81 0.67 3.60
T5 2.25 0.51 4.88
T6 1.69 0.38 2.87
T7 1.13 0.25 1.35
T8 0.56 0.13 0.37
T9 9.56 0.54 2.43
T10 9.00 0.51 2.18
T11 8.44 0.48 1.93
T12 8.44 0.48 1.93
T13 7.88 0.45 1.70
T14 7.31 0.41 1.48
T15 6.75 0.38 1.28
T16 6.19 0.35 1.09
T17 0.56 0.13 0.37
55
T18 5.06 0.29 0.75
T19 4.50 0.25 0.60
T20 4.50 0.25 0.60
T21 3.94 0.22 0.47
T22 3.38 0.19 0.35
T23 3.38 0.19 0.35
T24 3.38 0.19 0.35
T25 1.13 0.25 1.35
T26 0.56 0.13 0.37
T27 1.69 0.38 2.87
T28 1.13 0.25 1.35
T29 1.13 0.25 1.35
T30 0.56 0.13 0.37
T31 3.46 1.76 78.01
T32 2.81 0.64 7.38
T33 2.25 0.51 4.88
T34 1.69 0.38 2.87
T35 1.13 0.25 1.35
T36 0.56 0.13 0.37
T37 0.56 0.29 2.70
T38 0.56 0.29 2.70
T39 0.56 0.29 2.70
T40 0.56 0.29 2.70
T41 0.56 0.29 2.70
T42 0.56 0.29 2.70
T43 0.56 0.29 2.70
T44 0.56 0.29 2.70
T45 0.56 0.29 2.70
T46 0.56 0.29 2.70
T47 0.56 0.29 2.70
T48 0.56 0.29 2.70
T49 0.56 0.29 2.70
T50 0.56 0.29 2.70
T51 0.56 0.29 2.70
T52 0.56 0.29 2.70
T53 0.56 0.29 2.70
T54 0.56 0.29 2.70
T55 0.56 0.29 2.70
T56 0.56 0.29 2.70
T57 0.56 0.29 2.70
T58 0.56 0.29 2.70
T59 0.56 0.29 2.70
T60 0.56 0.29 2.70
T61 0.56 0.29 2.70
T62 0.56 0.29 2.70
B-1 3.24 0.00 -229.25
B-2 3.46 0.00 -168.54
VRP-1 7.88 0.45 41.58
VRP-2 5.06 0.29 29.88
56
Resultado nos Nós às 12:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.50 122.00 15.00
1A 0.50 123.33 40.33
2 0.50 122.04 16.04
2A 0.50 165.49 27.49
3 0.50 122.45 30.45
3A 0.50 165.65 20.65
4 0.50 123.37 43.37
4A 0.50 166.01 12.01
5 0.50 123.27 40.27
5A 0.50 166.23 10.23
6 0.50 123.62 47.62
7 0.50 123.78 22.78
8 0.50 123.92 19.92
9 0.50 154.00 34.00
10 0.50 154.07 49.07
11 0.50 154.63 18.63
12 0.50 154.91 11.91
57
13 0.50 154.98 10.98
14 0.50 197.34 46.34
15 0.50 197.73 33.73
16 0.50 197.89 31.89
16A 0.50 197.56 44.56
16B 0.50 197.59 38.59
16C 0.50 197.73 29.73
16D 0.50 197.91 29.91
U-1 0.00 122.04 15.04
U-1A 0.00 123.35 40.35
U-1B 0.00 165.47 29.47
U-2 0.00 122.06 16.06
U-2A 0.00 165.51 27.51
U-3 0.00 122.48 30.48
U-3A 0.00 165.67 20.67
U-4A 0.00 166.03 13.03
U-5 0.00 123.29 40.29
U-6 0.00 123.64 46.64
U-7 0.00 123.80 23.80
U-8 0.00 123.94 20.94
U-9 0.00 154.02 34.02
U-11 0.00 154.65 18.65
U-12 0.00 154.93 11.93
U-13 0.00 155.00 10.00
U-14 0.00 197.36 45.36
U-15 0.00 197.75 33.75
U-16 0.00 197.91 32.91
U-16A 0.00 197.59 44.59
U-16B 0.00 197.61 38.61
U-16C 0.00 197.76 30.76
U-16D 0.00 197.93 30.93
PV-1 0.00 339.67 215.67
PV-2 0.00 245.14 108.14
PV-3 0.00 198.05 31.05
PV-4 0.00 154.10 50.10
PV-5 0.00 123.42 42.42
PV-6 0.00 166.25 10.25
DET-1 0.00 197.65 34.65
DET-2 0.00 123.88 20.88
DET-3 0.00 123.60 48.60
DET-4 0.00 123.48 49.48
DET-5 0.00 122.19 23.19
1B 0.50 165.45 29.45
A-1 0.00 389.44 297.44
A-2 0.00 272.76 213.76
V-1 0.00 197.07 52.07
V-2 0.00 124.00 20.00
P-1 -3.19 147.20 55.20
P-2 -3.42 94.40 35.40
R-1 -7.31 199.17 9.17
58
R-2 0.92 166.43 10.43
Resultado nos Trechos às 12:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.19 1.63 67.26
T2 3.19 1.63 67.26
T3 3.19 1.63 67.26
T4 10.50 0.59 2.89
T5 2.00 0.45 3.93
T6 1.50 0.34 2.31
T7 1.00 0.23 1.09
T8 0.50 0.11 0.30
T9 8.50 0.48 1.96
T10 8.00 0.45 1.75
T11 7.50 0.42 1.55
T12 7.50 0.42 1.55
T13 7.00 0.40 1.37
T14 6.50 0.37 1.19
T15 6.00 0.34 1.03
T16 5.50 0.31 0.87
T17 0.50 0.11 0.30
59
T18 4.50 0.25 0.60
T19 4.00 0.23 0.48
T20 4.00 0.23 0.48
T21 3.50 0.20 0.38
T22 3.00 0.17 0.28
T23 3.00 0.17 0.28
T24 3.00 0.17 0.28
T25 1.00 0.23 1.09
T26 0.50 0.11 0.30
T27 1.50 0.34 2.31
T28 1.00 0.23 1.09
T29 1.00 0.23 1.09
T30 0.50 0.11 0.30
T31 3.42 1.74 76.58
T32 2.50 0.57 5.94
T33 2.00 0.45 3.93
T34 1.50 0.34 2.31
T35 1.00 0.23 1.09
T36 0.50 0.11 0.30
T37 0.50 0.25 2.17
T38 0.50 0.25 2.17
T39 0.50 0.25 2.17
T40 0.50 0.25 2.17
T41 0.50 0.25 2.17
T42 0.50 0.25 2.17
T43 0.50 0.25 2.17
T44 0.50 0.25 2.17
T45 0.50 0.25 2.17
T46 0.50 0.25 2.17
T47 0.50 0.25 2.17
T48 0.50 0.25 2.17
T49 0.50 0.25 2.17
T50 0.50 0.25 2.17
T51 0.50 0.25 2.17
T52 0.50 0.25 2.17
T53 0.50 0.25 2.17
T54 0.50 0.25 2.17
T55 0.50 0.25 2.17
T56 0.50 0.25 2.17
T57 0.50 0.25 2.17
T58 0.50 0.25 2.17
T59 0.50 0.25 2.17
T60 0.50 0.25 2.17
T61 0.50 0.25 2.17
T62 0.50 0.25 2.17
B-1 3.19 0.00 -242.24
B-2 3.42 0.00 -178.36
VRP-1 7.00 0.40 42.07
VRP-2 4.50 0.25 30.10
60
Resultado nos Nós às 13:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.44 122.44 15.44
1A 0.44 123.47 40.47
2 0.44 122.47 16.47
2A 0.44 165.70 27.70
3 0.44 122.79 30.79
3A 0.44 165.82 20.82
4 0.44 123.51 43.51
4A 0.44 166.10 12.10
5 0.44 123.43 40.43
5A 0.44 166.27 10.27
6 0.44 123.70 47.70
7 0.44 123.83 22.83
8 0.44 123.94 19.94
9 0.44 154.22 34.22
10 0.44 154.28 49.28
11 0.44 154.71 18.71
12 0.44 154.93 11.93
61
13 0.44 154.98 10.98
14 0.44 197.73 46.73
15 0.44 198.03 34.03
16 0.44 198.16 32.16
16A 0.44 197.90 44.90
16B 0.44 197.92 38.92
16C 0.44 198.04 30.04
16D 0.44 198.18 30.18
U-1 0.00 122.47 15.47
U-1A 0.00 123.49 40.49
U-1B 0.00 165.68 29.68
U-2 0.00 122.48 16.48
U-2A 0.00 165.71 27.71
U-3 0.00 122.81 30.81
U-3A 0.00 165.84 20.84
U-4A 0.00 166.12 13.12
U-5 0.00 123.45 40.45
U-6 0.00 123.72 46.72
U-7 0.00 123.85 23.85
U-8 0.00 123.95 20.95
U-9 0.00 154.23 34.23
U-11 0.00 154.73 18.73
U-12 0.00 154.94 11.94
U-13 0.00 155.00 10.00
U-14 0.00 197.74 45.74
U-15 0.00 198.05 34.05
U-16 0.00 198.17 33.17
U-16A 0.00 197.92 44.92
U-16B 0.00 197.94 38.94
U-16C 0.00 198.05 31.05
U-16D 0.00 198.19 31.19
PV-1 0.00 335.67 211.67
PV-2 0.00 243.82 106.82
PV-3 0.00 198.28 31.28
PV-4 0.00 154.29 50.29
PV-5 0.00 123.54 42.54
PV-6 0.00 166.29 10.29
DET-1 0.00 197.97 34.97
DET-2 0.00 123.91 20.91
DET-3 0.00 123.69 48.69
DET-4 0.00 123.59 49.59
DET-5 0.00 122.59 23.59
1B 0.44 165.66 29.66
A-1 0.00 384.03 292.03
A-2 0.00 270.78 211.78
V-1 0.00 197.52 52.52
V-2 0.00 124.00 20.00
P-1 -3.14 128.80 36.80
P-2 -3.39 82.60 23.60
R-1 -6.05 199.16 9.16
62
R-2 1.20 166.43 10.43
Resultado nos Trechos às 13:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.14 1.60 65.35
T2 3.14 1.60 65.35
T3 3.14 1.60 65.35
T4 9.19 0.52 2.26
T5 1.75 0.40 3.07
T6 1.31 0.30 1.80
T7 0.88 0.20 0.85
T8 0.44 0.10 0.24
T9 7.44 0.42 1.53
T10 7.00 0.40 1.37
T11 6.56 0.37 1.21
T12 6.56 0.37 1.21
T13 6.13 0.35 1.07
T14 5.69 0.32 0.93
T15 5.25 0.30 0.80
T16 4.81 0.27 0.68
T17 0.44 0.10 0.24
63
T18 3.94 0.22 0.47
T19 3.50 0.20 0.38
T20 3.50 0.20 0.38
T21 3.06 0.17 0.30
T22 2.63 0.15 0.22
T23 2.63 0.15 0.22
T24 2.63 0.15 0.22
T25 0.88 0.20 0.85
T26 0.44 0.10 0.24
T27 1.31 0.30 1.80
T28 0.88 0.20 0.85
T29 0.88 0.20 0.85
T30 0.44 0.10 0.24
T31 3.39 1.73 75.15
T32 2.19 0.50 4.64
T33 1.75 0.40 3.07
T34 1.31 0.30 1.80
T35 0.88 0.20 0.85
T36 0.44 0.10 0.24
T37 0.44 0.22 1.69
T38 0.44 0.22 1.70
T39 0.44 0.22 1.70
T40 0.44 0.22 1.70
T41 0.44 0.22 1.70
T42 0.44 0.22 1.70
T43 0.44 0.22 1.70
T44 0.44 0.22 1.70
T45 0.44 0.22 1.70
T46 0.44 0.22 1.70
T47 0.44 0.22 1.70
T48 0.44 0.22 1.70
T49 0.44 0.22 1.70
T50 0.44 0.22 1.70
T51 0.44 0.22 1.70
T52 0.44 0.22 1.70
T53 0.44 0.22 1.70
T54 0.44 0.22 1.70
T55 0.44 0.22 1.70
T56 0.44 0.22 1.70
T57 0.44 0.22 1.70
T58 0.44 0.22 1.70
T59 0.44 0.22 1.70
T60 0.44 0.22 1.69
T61 0.44 0.22 1.70
T62 0.44 0.22 1.69
B-1 3.14 0.00 -255.23
B-2 3.39 0.00 -188.18
VRP-1 6.13 0.35 42.52
VRP-2 3.94 0.22 30.29
64
Resultado nos Nós às 14:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.47 122.22 15.22
1A 0.47 123.40 40.40
2 0.47 122.26 16.26
2A 0.47 165.60 27.60
3 0.47 122.63 30.63
3A 0.47 165.74 20.74
4 0.47 123.44 43.44
4A 0.47 166.06 12.06
5 0.47 123.35 40.35
5A 0.47 166.25 10.25
6 0.47 123.66 47.66
7 0.47 123.81 22.81
8 0.47 123.93 19.93
9 0.47 154.11 34.11
10 0.47 154.18 49.18
11 0.47 154.67 18.67
12 0.47 154.92 11.92
65
13 0.47 154.98 10.98
14 0.47 197.52 46.52
15 0.47 197.87 33.87
16 0.47 198.01 32.01
16A 0.47 197.72 44.72
16B 0.47 197.74 38.74
16C 0.47 197.87 29.87
16D 0.47 198.03 30.03
U-1 0.00 122.26 15.26
U-1A 0.00 123.42 40.42
U-1B 0.00 165.58 29.58
U-2 0.00 122.28 16.28
U-2A 0.00 165.62 27.62
U-3 0.00 122.65 30.65
U-3A 0.00 165.76 20.76
U-4A 0.00 166.08 13.08
U-5 0.00 123.37 40.37
U-6 0.00 123.68 46.68
U-7 0.00 123.82 23.82
U-8 0.00 123.95 20.95
U-9 0.00 154.13 34.13
U-11 0.00 154.69 18.69
U-12 0.00 154.94 11.94
U-13 0.00 155.00 10.00
U-14 0.00 197.54 45.54
U-15 0.00 197.89 33.89
U-16 0.00 198.03 33.03
U-16A 0.00 197.74 44.74
U-16B 0.00 197.76 38.76
U-16C 0.00 197.89 30.89
U-16D 0.00 198.05 31.05
PV-1 0.00 337.66 213.66
PV-2 0.00 244.47 107.47
PV-3 0.00 198.15 31.15
PV-4 0.00 154.20 50.20
PV-5 0.00 123.48 42.48
PV-6 0.00 166.27 10.27
DET-1 0.00 197.79 34.79
DET-2 0.00 123.90 20.90
DET-3 0.00 123.65 48.65
DET-4 0.00 123.53 49.53
DET-5 0.00 122.39 23.39
1B 0.47 165.56 29.56
A-1 0.00 386.73 294.73
A-2 0.00 271.78 212.78
V-1 0.00 197.28 52.28
V-2 0.00 124.00 20.00
P-1 -3.17 138.00 46.00
P-2 -3.41 88.50 29.50
R-1 -6.68 199.15 9.15
66
R-2 1.06 166.43 10.43
Resultado nos Trechos às 14:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.17 1.61 66.31
T2 3.17 1.61 66.31
T3 3.17 1.61 66.31
T4 9.84 0.56 2.57
T5 1.88 0.42 3.49
T6 1.41 0.32 2.05
T7 0.94 0.21 0.97
T8 0.47 0.11 0.27
T9 7.97 0.45 1.74
T10 7.50 0.42 1.55
T11 7.03 0.40 1.38
T12 7.03 0.40 1.38
T13 6.56 0.37 1.21
T14 6.09 0.34 1.06
T15 5.63 0.32 0.91
T16 5.16 0.29 0.78
T17 0.47 0.11 0.27
67
T18 4.22 0.24 0.53
T19 3.75 0.21 0.43
T20 3.75 0.21 0.43
T21 3.28 0.19 0.34
T22 2.81 0.16 0.25
T23 2.81 0.16 0.25
T24 2.81 0.16 0.25
T25 0.94 0.21 0.97
T26 0.47 0.11 0.27
T27 1.41 0.32 2.05
T28 0.94 0.21 0.97
T29 0.94 0.21 0.97
T30 0.47 0.11 0.27
T31 3.41 1.73 75.87
T32 2.34 0.53 5.27
T33 1.88 0.42 3.48
T34 1.41 0.32 2.05
T35 0.94 0.21 0.97
T36 0.47 0.11 0.27
T37 0.47 0.24 1.93
T38 0.47 0.24 1.93
T39 0.47 0.24 1.93
T40 0.47 0.24 1.93
T41 0.47 0.24 1.93
T42 0.47 0.24 1.93
T43 0.47 0.24 1.93
T44 0.47 0.24 1.93
T45 0.47 0.24 1.93
T46 0.47 0.24 1.93
T47 0.47 0.24 1.93
T48 0.47 0.24 1.93
T49 0.47 0.24 1.93
T50 0.47 0.24 1.93
T51 0.47 0.24 1.93
T52 0.47 0.24 1.93
T53 0.47 0.24 1.93
T54 0.47 0.24 1.93
T55 0.47 0.24 1.93
T56 0.47 0.24 1.93
T57 0.47 0.24 1.93
T58 0.47 0.24 1.93
T59 0.47 0.24 1.93
T60 0.47 0.24 1.93
T61 0.47 0.24 1.93
T62 0.47 0.24 1.93
B-1 3.17 0.00 -248.73
B-2 3.41 0.00 -183.28
VRP-1 6.56 0.37 42.28
VRP-2 4.22 0.24 30.20
68
Resultado nos Nós às 15:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.50 122.00 15.00
1A 0.50 123.33 40.33
2 0.50 122.04 16.04
2A 0.50 165.49 27.49
3 0.50 122.45 30.45
3A 0.50 165.65 20.65
4 0.50 123.37 43.37
4A 0.50 166.01 12.01
5 0.50 123.27 40.27
5A 0.50 166.23 10.23
6 0.50 123.62 47.62
7 0.50 123.78 22.78
8 0.50 123.92 19.92
9 0.50 154.00 34.00
10 0.50 154.07 49.07
11 0.50 154.63 18.63
12 0.50 154.91 11.91
69
13 0.50 154.98 10.98
14 0.50 197.30 46.30
15 0.50 197.69 33.69
16 0.50 197.85 31.85
16A 0.50 197.53 44.53
16B 0.50 197.55 38.55
16C 0.50 197.70 29.70
16D 0.50 197.88 29.88
U-1 0.00 122.04 15.04
U-1A 0.00 123.35 40.35
U-1B 0.00 165.47 29.47
U-2 0.00 122.06 16.06
U-2A 0.00 165.52 27.52
U-3 0.00 122.48 30.48
U-3A 0.00 165.67 20.67
U-4A 0.00 166.04 13.04
U-5 0.00 123.29 40.29
U-6 0.00 123.64 46.64
U-7 0.00 123.80 23.80
U-8 0.00 123.94 20.94
U-9 0.00 154.02 34.02
U-11 0.00 154.65 18.65
U-12 0.00 154.93 11.93
U-13 0.00 155.00 10.00
U-14 0.00 197.32 45.32
U-15 0.00 197.71 33.71
U-16 0.00 197.87 32.87
U-16A 0.00 197.55 44.55
U-16B 0.00 197.57 38.57
U-16C 0.00 197.72 30.72
U-16D 0.00 197.90 30.90
PV-1 0.00 339.64 215.64
PV-2 0.00 245.11 108.11
PV-3 0.00 198.02 31.02
PV-4 0.00 154.10 50.10
PV-5 0.00 123.42 42.42
PV-6 0.00 166.26 10.26
DET-1 0.00 197.61 34.61
DET-2 0.00 123.88 20.88
DET-3 0.00 123.60 48.60
DET-4 0.00 123.48 49.48
DET-5 0.00 122.19 23.19
1B 0.50 165.45 29.45
A-1 0.00 389.42 297.42
A-2 0.00 272.77 213.77
V-1 0.00 197.04 52.04
V-2 0.00 124.00 20.00
P-1 -3.19 147.20 55.20
P-2 -3.42 94.40 35.40
R-1 -7.31 199.13 9.13
70
R-2 0.92 166.44 10.44
Resultado nos Trechos às 15:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.19 1.63 67.26
T2 3.19 1.63 67.26
T3 3.19 1.63 67.26
T4 10.50 0.59 2.89
T5 2.00 0.45 3.93
T6 1.50 0.34 2.31
T7 1.00 0.23 1.09
T8 0.50 0.11 0.30
T9 8.50 0.48 1.96
T10 8.00 0.45 1.75
T11 7.50 0.42 1.55
T12 7.50 0.42 1.55
T13 7.00 0.40 1.37
T14 6.50 0.37 1.19
T15 6.00 0.34 1.03
T16 5.50 0.31 0.87
T17 0.50 0.11 0.30
71
T18 4.50 0.25 0.60
T19 4.00 0.23 0.48
T20 4.00 0.23 0.48
T21 3.50 0.20 0.38
T22 3.00 0.17 0.28
T23 3.00 0.17 0.28
T24 3.00 0.17 0.28
T25 1.00 0.23 1.09
T26 0.50 0.11 0.30
T27 1.50 0.34 2.31
T28 1.00 0.23 1.09
T29 1.00 0.23 1.09
T30 0.50 0.11 0.30
T31 3.42 1.74 76.58
T32 2.50 0.57 5.94
T33 2.00 0.45 3.93
T34 1.50 0.34 2.31
T35 1.00 0.23 1.09
T36 0.50 0.11 0.30
T37 0.50 0.25 2.17
T38 0.50 0.25 2.17
T39 0.50 0.25 2.17
T40 0.50 0.25 2.17
T41 0.50 0.25 2.17
T42 0.50 0.25 2.17
T43 0.50 0.25 2.17
T44 0.50 0.25 2.17
T45 0.50 0.25 2.17
T46 0.50 0.25 2.17
T47 0.50 0.25 2.17
T48 0.50 0.25 2.17
T49 0.50 0.25 2.17
T50 0.50 0.25 2.17
T51 0.50 0.25 2.17
T52 0.50 0.25 2.17
T53 0.50 0.25 2.17
T54 0.50 0.25 2.17
T55 0.50 0.25 2.17
T56 0.50 0.25 2.17
T57 0.50 0.25 2.17
T58 0.50 0.25 2.17
T59 0.50 0.25 2.17
T60 0.50 0.25 2.17
T61 0.50 0.25 2.17
T62 0.50 0.25 2.17
B-1 3.19 0.00 -242.22
B-2 3.42 0.00 -178.37
VRP-1 7.00 0.40 42.04
VRP-2 4.50 0.25 30.10
72
Resultado nos Nós às 16:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.56 121.51 14.51
1A 0.56 123.16 40.16
2 0.56 121.56 15.56
2A 0.56 165.27 27.27
3 0.56 122.08 30.08
3A 0.56 165.46 20.46
4 0.56 123.22 43.22
4A 0.56 165.91 11.91
5 0.56 123.10 40.10
5A 0.56 166.19 10.19
6 0.56 123.53 47.53
7 0.56 123.73 22.73
8 0.56 123.90 19.90
9 0.56 153.75 33.75
10 0.56 153.85 48.85
11 0.56 154.54 18.54
12 0.56 154.88 11.88
73
13 0.56 154.97 10.97
14 0.56 196.84 45.84
15 0.56 197.33 33.33
16 0.56 197.53 31.53
16A 0.56 197.12 44.12
16B 0.56 197.15 38.15
16C 0.56 197.33 29.33
16D 0.56 197.56 29.56
U-1 0.00 121.56 14.56
U-1A 0.00 123.19 40.19
U-1B 0.00 165.24 29.24
U-2 0.00 121.59 15.59
U-2A 0.00 165.29 27.29
U-3 0.00 122.10 30.10
U-3A 0.00 165.49 20.49
U-4A 0.00 165.94 12.94
U-5 0.00 123.12 40.12
U-6 0.00 123.55 46.55
U-7 0.00 123.75 23.75
U-8 0.00 123.92 20.92
U-9 0.00 153.78 33.78
U-11 0.00 154.57 18.57
U-12 0.00 154.91 11.91
U-13 0.00 155.00 10.00
U-14 0.00 196.87 44.87
U-15 0.00 197.35 33.35
U-16 0.00 197.55 32.55
U-16A 0.00 197.15 44.15
U-16B 0.00 197.18 38.18
U-16C 0.00 197.36 30.36
U-16D 0.00 197.58 30.58
PV-1 0.00 343.62 219.62
PV-2 0.00 246.40 109.40
PV-3 0.00 197.73 30.73
PV-4 0.00 153.88 49.88
PV-5 0.00 123.27 42.27
PV-6 0.00 166.21 10.21
DET-1 0.00 197.23 34.23
DET-2 0.00 123.86 20.86
DET-3 0.00 123.51 48.51
DET-4 0.00 123.35 49.35
DET-5 0.00 121.75 22.75
1B 0.56 165.21 29.21
A-1 0.00 394.80 302.80
A-2 0.00 274.75 215.75
V-1 0.00 196.51 51.51
V-2 0.00 124.00 20.00
P-1 -3.24 165.60 73.60
P-2 -3.46 106.20 47.20
R-1 -8.57 199.12 9.12
74
R-2 0.65 166.44 10.44
Resultado nos Trechos às 16:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.24 1.65 69.17
T2 3.24 1.65 69.17
T3 3.24 1.65 69.17
T4 11.81 0.67 3.60
T5 2.25 0.51 4.88
T6 1.69 0.38 2.87
T7 1.13 0.25 1.35
T8 0.56 0.13 0.37
T9 9.56 0.54 2.43
T10 9.00 0.51 2.18
T11 8.44 0.48 1.93
T12 8.44 0.48 1.93
T13 7.88 0.45 1.70
T14 7.31 0.41 1.48
T15 6.75 0.38 1.28
T16 6.19 0.35 1.09
T17 0.56 0.13 0.37
75
T18 5.06 0.29 0.75
T19 4.50 0.25 0.60
T20 4.50 0.25 0.60
T21 3.94 0.22 0.47
T22 3.38 0.19 0.35
T23 3.38 0.19 0.35
T24 3.38 0.19 0.35
T25 1.13 0.25 1.35
T26 0.56 0.13 0.37
T27 1.69 0.38 2.87
T28 1.13 0.25 1.35
T29 1.13 0.25 1.35
T30 0.56 0.13 0.37
T31 3.46 1.76 78.01
T32 2.81 0.64 7.38
T33 2.25 0.51 4.88
T34 1.69 0.38 2.87
T35 1.13 0.25 1.35
T36 0.56 0.13 0.37
T37 0.56 0.29 2.70
T38 0.56 0.29 2.70
T39 0.56 0.29 2.70
T40 0.56 0.29 2.70
T41 0.56 0.29 2.70
T42 0.56 0.29 2.70
T43 0.56 0.29 2.70
T44 0.56 0.29 2.70
T45 0.56 0.29 2.70
T46 0.56 0.29 2.70
T47 0.56 0.29 2.70
T48 0.56 0.29 2.70
T49 0.56 0.29 2.70
T50 0.56 0.29 2.70
T51 0.56 0.29 2.70
T52 0.56 0.29 2.70
T53 0.56 0.29 2.70
T54 0.56 0.29 2.70
T55 0.56 0.29 2.70
T56 0.56 0.29 2.70
T57 0.56 0.29 2.70
T58 0.56 0.29 2.70
T59 0.56 0.29 2.70
T60 0.56 0.29 2.70
T61 0.56 0.29 2.70
T62 0.56 0.29 2.70
B-1 3.24 0.00 -229.20
B-2 3.46 0.00 -168.55
VRP-1 7.88 0.45 41.51
VRP-2 5.06 0.29 29.88
76
Resultado nos Nós às 17:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.41 122.64 15.64
1A 0.41 123.54 40.54
2 0.41 122.66 16.66
2A 0.41 165.80 27.80
3 0.41 122.95 30.95
3A 0.41 165.91 20.91
4 0.41 123.57 43.57
4A 0.41 166.15 12.15
5 0.41 123.50 40.50
5A 0.41 166.30 10.30
6 0.41 123.74 47.74
7 0.41 123.85 22.85
8 0.41 123.94 19.94
9 0.41 154.32 34.32
10 0.41 154.37 49.37
11 0.41 154.75 18.75
12 0.41 154.94 11.94
77
13 0.41 154.99 10.99
14 0.41 197.86 46.86
15 0.41 198.12 34.12
16 0.41 198.23 32.23
16A 0.41 198.01 45.01
16B 0.41 198.03 39.03
16C 0.41 198.13 30.13
16D 0.41 198.25 30.25
U-1 0.00 122.67 15.67
U-1A 0.00 123.56 40.56
U-1B 0.00 165.78 29.78
U-2 0.00 122.68 16.68
U-2A 0.00 165.81 27.81
U-3 0.00 122.96 30.96
U-3A 0.00 165.92 20.92
U-4A 0.00 166.17 13.17
U-5 0.00 123.52 40.52
U-6 0.00 123.76 46.76
U-7 0.00 123.87 23.87
U-8 0.00 123.96 20.96
U-9 0.00 154.33 34.33
U-11 0.00 154.76 18.76
U-12 0.00 154.95 11.95
U-13 0.00 155.00 10.00
U-14 0.00 197.87 45.87
U-15 0.00 198.14 34.14
U-16 0.00 198.25 33.25
U-16A 0.00 198.03 45.03
U-16B 0.00 198.04 39.04
U-16C 0.00 198.14 31.14
U-16D 0.00 198.26 31.26
PV-1 0.00 333.64 209.64
PV-2 0.00 243.12 106.12
PV-3 0.00 198.34 31.34
PV-4 0.00 154.38 50.38
PV-5 0.00 123.60 42.60
PV-6 0.00 166.32 10.32
DET-1 0.00 198.07 35.07
DET-2 0.00 123.92 20.92
DET-3 0.00 123.73 48.73
DET-4 0.00 123.64 49.64
DET-5 0.00 122.77 23.77
1B 0.41 165.77 29.77
A-1 0.00 381.29 289.29
A-2 0.00 269.80 210.80
V-1 0.00 197.68 52.68
V-2 0.00 124.00 20.00
P-1 -3.12 119.60 27.60
P-2 -3.37 76.70 17.70
R-1 -5.41 199.11 9.11
78
R-2 1.34 166.44 10.44
Resultado nos Trechos às 17:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.12 1.59 64.40
T2 3.12 1.59 64.40
T3 3.12 1.59 64.40
T4 8.53 0.48 1.97
T5 1.63 0.37 2.67
T6 1.22 0.28 1.57
T7 0.81 0.18 0.74
T8 0.41 0.09 0.20
T9 6.91 0.39 1.33
T10 6.50 0.37 1.19
T11 6.09 0.34 1.06
T12 6.09 0.34 1.06
T13 5.69 0.32 0.93
T14 5.28 0.30 0.81
T15 4.88 0.28 0.70
T16 4.47 0.25 0.59
T17 0.41 0.09 0.21
79
T18 3.66 0.21 0.41
T19 3.25 0.18 0.33
T20 3.25 0.18 0.33
T21 2.84 0.16 0.26
T22 2.44 0.14 0.19
T23 2.44 0.14 0.19
T24 2.44 0.14 0.19
T25 0.81 0.18 0.74
T26 0.41 0.09 0.21
T27 1.22 0.28 1.57
T28 0.81 0.18 0.74
T29 0.81 0.18 0.74
T30 0.41 0.09 0.21
T31 3.37 1.72 74.44
T32 2.03 0.46 4.04
T33 1.63 0.37 2.67
T34 1.22 0.28 1.57
T35 0.81 0.18 0.74
T36 0.41 0.09 0.21
T37 0.41 0.21 1.48
T38 0.41 0.21 1.48
T39 0.41 0.21 1.48
T40 0.41 0.21 1.48
T41 0.41 0.21 1.48
T42 0.41 0.21 1.48
T43 0.41 0.21 1.48
T44 0.41 0.21 1.48
T45 0.41 0.21 1.48
T46 0.41 0.21 1.48
T47 0.41 0.21 1.48
T48 0.41 0.21 1.48
T49 0.41 0.21 1.48
T50 0.41 0.21 1.48
T51 0.41 0.21 1.48
T52 0.41 0.21 1.48
T53 0.41 0.21 1.48
T54 0.41 0.21 1.48
T55 0.41 0.21 1.48
T56 0.41 0.21 1.48
T57 0.41 0.21 1.48
T58 0.41 0.21 1.48
T59 0.41 0.21 1.48
T60 0.41 0.21 1.48
T61 0.41 0.21 1.48
T62 0.41 0.21 1.48
B-1 3.12 0.00 -261.69
B-2 3.37 0.00 -193.10
VRP-1 5.69 0.32 42.68
VRP-2 3.66 0.21 30.38
80
Resultado nos Nós às 18:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.31 123.16 16.16
1A 0.31 123.72 40.72
2 0.31 123.18 17.18
2A 0.31 166.05 28.05
3 0.31 123.35 31.35
3A 0.31 166.11 21.11
4 0.31 123.74 43.74
4A 0.31 166.26 12.26
5 0.31 123.70 40.70
5A 0.31 166.36 10.36
6 0.31 123.84 47.84
7 0.31 123.91 22.91
8 0.31 123.97 19.97
9 0.31 154.58 34.58
10 0.31 154.61 49.61
11 0.31 154.85 18.85
12 0.31 154.96 11.96
81
13 0.31 154.99 10.99
14 0.31 198.33 47.33
15 0.31 198.49 34.49
16 0.31 198.56 32.56
16A 0.31 198.42 45.42
16B 0.31 198.43 39.43
16C 0.31 198.49 30.49
16D 0.31 198.57 30.57
U-1 0.00 123.18 16.18
U-1A 0.00 123.73 40.73
U-1B 0.00 166.04 30.04
U-2 0.00 123.19 17.19
U-2A 0.00 166.06 28.06
U-3 0.00 123.36 31.36
U-3A 0.00 166.12 21.12
U-4A 0.00 166.27 13.27
U-5 0.00 123.70 40.70
U-6 0.00 123.85 46.85
U-7 0.00 123.92 23.92
U-8 0.00 123.97 20.97
U-9 0.00 154.59 34.59
U-11 0.00 154.86 18.86
U-12 0.00 154.97 11.97
U-13 0.00 155.00 10.00
U-14 0.00 198.34 46.34
U-15 0.00 198.50 34.50
U-16 0.00 198.57 33.57
U-16A 0.00 198.43 45.43
U-16B 0.00 198.44 39.44
U-16C 0.00 198.50 31.50
U-16D 0.00 198.58 31.58
PV-1 0.00 327.63 203.63
PV-2 0.00 241.15 104.15
PV-3 0.00 198.63 31.63
PV-4 0.00 154.62 50.62
PV-5 0.00 123.76 42.76
PV-6 0.00 166.37 10.37
DET-1 0.00 198.46 35.46
DET-2 0.00 123.95 20.95
DET-3 0.00 123.83 48.83
DET-4 0.00 123.78 49.78
DET-5 0.00 123.24 24.24
1B 0.31 166.03 30.03
A-1 0.00 373.16 281.16
A-2 0.00 266.82 207.82
V-1 0.00 198.22 53.22
V-2 0.00 124.00 20.00
P-1 -3.04 92.00 0.00
P-2 -3.32 59.00 0.00
R-1 -3.52 199.10 9.10
82
R-2 1.76 166.44 10.44
Resultado nos Trechos às 18:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.04 1.55 61.53
T2 3.04 1.55 61.53
T3 3.04 1.55 61.53
T4 6.56 0.37 1.21
T5 1.25 0.28 1.64
T6 0.94 0.21 0.97
T7 0.63 0.14 0.46
T8 0.31 0.07 0.13
T9 5.31 0.30 0.82
T10 5.00 0.28 0.73
T11 4.69 0.27 0.65
T12 4.69 0.27 0.65
T13 4.38 0.25 0.57
T14 4.06 0.23 0.50
T15 3.75 0.21 0.43
T16 3.44 0.19 0.37
T17 0.31 0.07 0.13
83
T18 2.81 0.16 0.25
T19 2.50 0.14 0.20
T20 2.50 0.14 0.20
T21 2.19 0.12 0.16
T22 1.88 0.11 0.12
T23 1.88 0.11 0.12
T24 1.88 0.11 0.12
T25 0.63 0.14 0.46
T26 0.31 0.07 0.13
T27 0.94 0.21 0.97
T28 0.63 0.14 0.46
T29 0.63 0.14 0.46
T30 0.31 0.07 0.13
T31 3.32 1.69 72.29
T32 1.56 0.35 2.49
T33 1.25 0.28 1.64
T34 0.94 0.21 0.97
T35 0.63 0.14 0.46
T36 0.31 0.07 0.13
T37 0.31 0.16 0.91
T38 0.31 0.16 0.91
T39 0.31 0.16 0.91
T40 0.31 0.16 0.91
T41 0.31 0.16 0.91
T42 0.31 0.16 0.91
T43 0.31 0.16 0.91
T44 0.31 0.16 0.91
T45 0.31 0.16 0.91
T46 0.31 0.16 0.91
T47 0.31 0.16 0.91
T48 0.31 0.16 0.91
T49 0.31 0.16 0.91
T50 0.31 0.16 0.91
T51 0.31 0.16 0.91
T52 0.31 0.16 0.91
T53 0.31 0.16 0.91
T54 0.31 0.16 0.91
T55 0.31 0.16 0.91
T56 0.31 0.16 0.91
T57 0.31 0.16 0.91
T58 0.31 0.16 0.91
T59 0.31 0.16 0.91
T60 0.31 0.16 0.91
T61 0.31 0.16 0.91
T62 0.31 0.16 0.91
B-1 3.04 0.00 -281.16
B-2 3.32 0.00 -207.82
VRP-1 4.38 0.25 43.22
VRP-2 2.81 0.16 30.62
84
Resultado nos Nós às 19:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.28 123.31 16.31
1A 0.28 123.77 40.77
2 0.28 123.32 17.32
2A 0.28 166.12 28.12
3 0.28 123.47 31.47
3A 0.28 166.17 21.17
4 0.28 123.78 43.78
4A 0.28 166.30 12.30
5 0.28 123.75 40.75
5A 0.28 166.37 10.37
6 0.28 123.87 47.87
7 0.28 123.92 22.92
8 0.28 123.97 19.97
9 0.28 154.65 34.65
10 0.28 154.68 49.68
11 0.28 154.87 18.87
12 0.28 154.97 11.97
85
13 0.28 154.99 10.99
14 0.28 198.46 47.46
15 0.28 198.59 34.59
16 0.28 198.65 32.65
16A 0.28 198.54 45.54
16B 0.28 198.54 39.54
16C 0.28 198.59 30.59
16D 0.28 198.66 30.66
U-1 0.00 123.33 16.33
U-1A 0.00 123.78 40.78
U-1B 0.00 166.11 30.11
U-2 0.00 123.33 17.33
U-2A 0.00 166.13 28.13
U-3 0.00 123.48 31.48
U-3A 0.00 166.18 21.18
U-4A 0.00 166.31 13.31
U-5 0.00 123.76 40.76
U-6 0.00 123.88 46.88
U-7 0.00 123.93 23.93
U-8 0.00 123.98 20.98
U-9 0.00 154.66 34.66
U-11 0.00 154.88 18.88
U-12 0.00 154.97 11.97
U-13 0.00 155.00 10.00
U-14 0.00 198.47 46.47
U-15 0.00 198.60 34.60
U-16 0.00 198.65 33.65
U-16A 0.00 198.54 45.54
U-16B 0.00 198.55 39.55
U-16C 0.00 198.60 31.60
U-16D 0.00 198.66 31.66
PV-1 0.00 325.62 201.62
PV-2 0.00 240.49 103.49
PV-3 0.00 198.70 31.70
PV-4 0.00 154.69 50.69
PV-5 0.00 123.80 42.80
PV-6 0.00 166.38 10.38
DET-1 0.00 198.56 35.56
DET-2 0.00 123.96 20.96
DET-3 0.00 123.86 48.86
DET-4 0.00 123.82 49.82
DET-5 0.00 123.38 24.38
1B 0.28 166.11 30.11
A-1 0.00 370.44 278.44
A-2 0.00 265.83 206.83
V-1 0.00 198.37 53.37
V-2 0.00 124.00 20.00
P-1 -3.02 82.80 -9.20
P-2 -3.30 53.10 -5.90
R-1 -2.89 199.09 9.09
86
R-2 1.89 166.44 10.44
Resultado nos Trechos às 19:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 3.02 1.54 60.57
T2 3.02 1.54 60.57
T3 3.02 1.54 60.57
T4 5.91 0.33 1.00
T5 1.13 0.25 1.35
T6 0.84 0.19 0.79
T7 0.56 0.13 0.37
T8 0.28 0.06 0.10
T9 4.78 0.27 0.67
T10 4.50 0.25 0.60
T11 4.22 0.24 0.53
T12 4.22 0.24 0.53
T13 3.94 0.22 0.47
T14 3.66 0.21 0.41
T15 3.38 0.19 0.35
T16 3.09 0.18 0.30
T17 0.28 0.06 0.10
87
T18 2.53 0.14 0.21
T19 2.25 0.13 0.17
T20 2.25 0.13 0.17
T21 1.97 0.11 0.13
T22 1.69 0.10 0.10
T23 1.69 0.10 0.10
T24 1.69 0.10 0.10
T25 0.56 0.13 0.37
T26 0.28 0.06 0.10
T27 0.84 0.19 0.79
T28 0.56 0.13 0.37
T29 0.56 0.13 0.37
T30 0.28 0.06 0.10
T31 3.30 1.68 71.58
T32 1.41 0.32 2.05
T33 1.13 0.25 1.35
T34 0.84 0.19 0.79
T35 0.56 0.13 0.37
T36 0.28 0.06 0.10
T37 0.28 0.14 0.75
T38 0.28 0.14 0.75
T39 0.28 0.14 0.75
T40 0.28 0.14 0.75
T41 0.28 0.14 0.75
T42 0.28 0.14 0.75
T43 0.28 0.14 0.75
T44 0.28 0.14 0.75
T45 0.28 0.14 0.75
T46 0.28 0.14 0.75
T47 0.28 0.14 0.75
T48 0.28 0.14 0.75
T49 0.28 0.14 0.75
T50 0.28 0.14 0.75
T51 0.28 0.14 0.75
T52 0.28 0.14 0.75
T53 0.28 0.14 0.75
T54 0.28 0.14 0.75
T55 0.28 0.14 0.75
T56 0.28 0.14 0.75
T57 0.28 0.14 0.75
T58 0.28 0.14 0.75
T59 0.28 0.14 0.75
T60 0.28 0.14 0.75
T61 0.28 0.14 0.75
T62 0.28 0.14 0.75
B-1 3.02 0.00 -287.64
B-2 3.30 0.00 -212.73
VRP-1 3.94 0.22 43.37
VRP-2 2.53 0.14 30.69
88
Resultado nos Nós às 20:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.23 123.51 16.51
1A 0.23 123.83 40.83
2 0.23 123.52 17.52
2A 0.23 166.22 28.22
3 0.23 123.62 31.62
3A 0.23 166.26 21.26
4 0.23 123.85 43.85
4A 0.23 166.34 12.34
5 0.23 123.82 40.82
5A 0.23 166.40 10.40
6 0.23 123.91 47.91
7 0.23 123.95 22.95
8 0.23 123.98 19.98
1 0.23 154.75 34.75
10 0.23 154.77 49.77
11 0.23 154.91 18.91
12 0.23 154.98 11.98
89
13 0.23 154.99 10.99
14 0.23 198.63 47.63
15 0.23 198.73 34.73
16 0.23 198.77 32.77
16A 0.23 198.69 45.69
16B 0.23 198.69 39.69
16C 0.23 198.73 30.73
16D 0.23 198.77 30.77
U-1 0.00 123.52 16.52
U-1A 0.00 123.84 40.84
U-1B 0.00 166.21 30.21
U-2 0.00 123.52 17.52
U-2A 0.00 166.22 28.22
U-3 0.00 123.63 31.63
U-3A 0.00 166.26 21.26
U-4A 0.00 166.35 13.35
U-5 0.00 123.83 40.83
U-6 0.00 123.91 46.91
U-7 0.00 123.95 23.95
U-8 0.00 123.98 20.98
U-9 0.00 154.76 34.76
U-11 0.00 154.91 18.91
U-12 0.00 154.98 11.98
U-13 0.00 155.00 10.00
U-14 0.00 198.64 46.64
U-15 0.00 198.73 34.73
U-16 0.00 198.77 33.77
U-16A 0.00 198.69 45.69
U-16B 0.00 198.70 39.70
U-16C 0.00 198.74 31.74
U-16D 0.00 198.78 31.78
PV-1 0.00 322.60 198.60
PV-2 0.00 239.50 102.50
PV-3 0.00 198.81 31.81
PV-4 0.00 154.78 50.78
PV-5 0.00 123.86 42.86
PV-6 0.00 166.40 10.40
DET-1 0.00 198.71 35.71
DET-2 0.00 123.97 20.97
DET-3 0.00 123.90 48.90
DET-4 0.00 123.87 49.87
DET-5 0.00 123.56 24.56
1B 0.23 166.21 30.21
A-1 0.00 366.36 274.36
A-2 0.00 264.34 205.34
V-1 0.00 198.57 53.57
V-2 0.00 124.00 20.00
P-1 -2.98 69.00 -23.00
P-2 -3.27 44.25 -14.75
R-1 -1.94 199.08 9.08
90
R-2 2.10 166.45 10.45
Resultado nos Trechos às 20:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.98 1.52 59.13
T2 2.98 1.52 59.13
T3 2.98 1.52 59.13
T4 4.92 0.28 0.71
T5 0.94 0.21 0.97
T6 0.70 0.16 0.57
T7 0.47 0.11 0.27
T8 0.23 0.05 0.07
T9 3.98 0.23 0.48
T10 3.75 0.21 0.43
T11 3.52 0.20 0.38
T12 3.52 0.20 0.38
T13 3.28 0.19 0.34
T14 3.05 0.17 0.29
T15 2.81 0.16 0.25
T16 2.58 0.15 0.21
T17 0.23 0.05 0.07
91
T18 2.11 0.12 0.15
T19 1.88 0.11 0.12
T20 1.88 0.11 0.12
T21 1.64 0.09 0.09
T22 1.41 0.08 0.07
T23 1.41 0.08 0.07
T24 1.41 0.08 0.07
T25 0.47 0.11 0.27
T26 0.23 0.05 0.07
T27 0.70 0.16 0.57
T28 0.47 0.11 0.27
T29 0.47 0.11 0.27
T30 0.23 0.05 0.07
T31 3.27 1.67 70.50
T32 1.17 0.27 1.46
T33 0.94 0.21 0.97
T34 0.70 0.16 0.57
T35 0.47 0.11 0.27
T36 0.23 0.05 0.07
T37 0.23 0.12 0.53
T38 0.23 0.12 0.53
T39 0.23 0.12 0.53
T40 0.23 0.12 0.53
T41 0.23 0.12 0.53
T42 0.23 0.12 0.53
T43 0.23 0.12 0.53
T44 0.23 0.12 0.53
T45 0.23 0.12 0.53
T46 0.23 0.12 0.53
T47 0.23 0.12 0.53
T48 0.23 0.12 0.53
T49 0.23 0.12 0.53
T50 0.23 0.12 0.53
T51 0.23 0.12 0.53
T52 0.23 0.12 0.53
T53 0.23 0.12 0.53
T54 0.23 0.12 0.53
T55 0.23 0.12 0.53
T56 0.23 0.12 0.53
T57 0.23 0.12 0.53
T58 0.23 0.12 0.53
T59 0.23 0.12 0.53
T60 0.23 0.12 0.53
T61 0.23 0.12 0.53
T62 0.23 0.12 0.53
B-1 2.98 0.00 -297.36
B-2 3.27 0.00 -220.09
VRP-1 3.28 0.19 43.57
VRP-2 2.11 0.12 30.78
92
Resultado nos Nós às 21:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.19 123.67 16.67
1A 0.19 123.89 40.89
2 0.19 123.68 17.68
2A 0.19 166.30 28.30
3 0.19 123.75 31.75
3A 0.19 166.32 21.32
4 0.19 123.90 43.90
4A 0.19 166.38 12.38
5 0.19 123.88 40.88
5A 0.19 166.42 10.42
6 0.19 123.94 47.94
7 0.19 123.96 22.96
8 0.19 123.99 19.99
9 0.19 154.84 34.84
10 0.19 154.85 49.85
11 0.19 154.94 18.94
12 0.19 154.98 11.98
93
13 0.19 155.00 11.00
14 0.19 198.78 47.78
15 0.19 198.85 34.85
16 0.19 198.87 32.87
16A 0.19 198.82 45.82
16B 0.19 198.82 39.82
16C 0.19 198.85 30.85
16D 0.19 198.88 30.88
U-1 0.00 123.68 16.68
U-1A 0.00 123.89 40.89
U-1B 0.00 166.30 30.30
U-2 0.00 123.68 17.68
U-2A 0.00 166.30 28.30
U-3 0.00 123.75 31.75
U-3A 0.00 166.33 21.33
U-4A 0.00 166.39 13.39
U-5 0.00 123.89 40.89
U-6 0.00 123.94 46.94
U-7 0.00 123.97 23.97
U-8 0.00 123.99 20.99
U-9 0.00 154.84 34.84
U-11 0.00 154.94 18.94
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 198.79 46.79
U-15 0.00 198.85 34.85
U-16 0.00 198.88 33.88
U-16A 0.00 198.82 45.82
U-16B 0.00 198.83 39.83
U-16C 0.00 198.85 31.85
U-16D 0.00 198.88 31.88
PV-1 0.00 319.59 195.59
PV-2 0.00 238.51 101.51
PV-3 0.00 198.90 31.90
PV-4 0.00 154.85 50.85
PV-5 0.00 123.91 42.91
PV-6 0.00 166.42 10.42
DET-1 0.00 198.83 35.83
DET-2 0.00 123.98 20.98
DET-3 0.00 123.94 48.94
DET-4 0.00 123.91 49.91
DET-5 0.00 123.71 24.71
1B 0.19 166.29 30.29
A-1 0.00 362.28 270.28
A-2 0.00 262.85 203.85
V-1 0.00 198.74 53.74
V-2 0.00 124.00 20.00
P-1 -2.94 55.20 -36.80
P-2 -3.25 35.40 -23.60
R-1 -1.00 199.08 9.08
94
R-2 2.31 166.45 10.45
Resultado nos Trechos às 21:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.94 1.50 57.69
T2 2.94 1.50 57.69
T3 2.94 1.50 57.69
T4 3.94 0.22 0.47
T5 0.75 0.17 0.64
T6 0.56 0.13 0.37
T7 0.38 0.08 0.18
T8 0.19 0.04 0.05
T9 3.19 0.18 0.32
T10 3.00 0.17 0.28
T11 2.81 0.16 0.25
T12 2.81 0.16 0.25
T13 2.63 0.15 0.22
T14 2.44 0.14 0.19
T15 2.25 0.13 0.17
T16 2.06 0.12 0.14
T17 0.19 0.04 0.05
95
T18 1.69 0.10 0.10
T19 1.50 0.08 0.08
T20 1.50 0.08 0.08
T21 1.31 0.07 0.06
T22 1.13 0.06 0.05
T23 1.13 0.06 0.05
T24 1.13 0.06 0.05
T25 0.38 0.08 0.18
T26 0.19 0.04 0.05
T27 0.56 0.13 0.37
T28 0.38 0.08 0.18
T29 0.38 0.08 0.18
T30 0.19 0.04 0.05
T31 3.25 1.65 69.43
T32 0.94 0.21 0.96
T33 0.75 0.17 0.64
T34 0.56 0.13 0.37
T35 0.38 0.08 0.18
T36 0.19 0.04 0.05
T37 0.19 0.10 0.35
T38 0.19 0.10 0.35
T39 0.19 0.10 0.35
T40 0.19 0.10 0.35
T41 0.19 0.10 0.35
T42 0.19 0.10 0.35
T43 0.19 0.10 0.35
T44 0.19 0.10 0.35
T45 0.19 0.10 0.35
T46 0.19 0.10 0.35
T47 0.19 0.10 0.35
T48 0.19 0.10 0.35
T49 0.19 0.10 0.35
T50 0.19 0.10 0.35
T51 0.19 0.10 0.35
T52 0.19 0.10 0.35
T53 0.19 0.10 0.35
T54 0.19 0.10 0.35
T55 0.19 0.10 0.35
T56 0.19 0.10 0.35
T57 0.19 0.10 0.35
T58 0.19 0.10 0.35
T59 0.19 0.10 0.35
T60 0.19 0.10 0.35
T61 0.19 0.10 0.35
T62 0.19 0.10 0.35
B-1 2.94 0.00 -307.08
B-2 3.25 0.00 -227.45
VRP-1 2.63 0.15 43.74
VRP-2 1.69 0.10 30.85
96
Resultado nos Nós às 22:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.17 123.72 16.72
1A 0.17 123.91 40.91
2 0.17 123.73 17.73
2A 0.17 166.33 28.33
3 0.17 123.79 31.79
3A 0.17 166.35 21.35
4 0.17 123.91 43.91
4A 0.17 166.40 12.40
5 0.17 123.90 40.90
5A 0.17 166.43 10.43
6 0.17 123.95 47.95
7 0.17 123.97 22.97
8 0.17 123.99 19.99
9 0.17 154.86 34.86
10 0.17 154.87 49.87
11 0.17 154.95 18.95
12 0.17 154.99 11.99
97
13 0.17 155.00 11.00
14 0.17 198.82 47.82
15 0.17 198.88 34.88
16 0.17 198.90 32.90
16A 0.17 198.86 45.86
16B 0.17 198.86 39.86
16C 0.17 198.88 30.88
16D 0.17 198.90 30.90
U-1 0.00 123.73 16.73
U-1A 0.00 123.91 40.91
U-1B 0.00 166.32 30.32
U-2 0.00 123.73 17.73
U-2A 0.00 166.33 28.33
U-3 0.00 123.79 31.79
U-3A 0.00 166.35 21.35
U-4A 0.00 166.40 13.40
U-5 0.00 123.90 40.90
U-6 0.00 123.95 46.95
U-7 0.00 123.97 23.97
U-8 0.00 123.99 20.99
U-9 0.00 154.86 34.86
U-11 0.00 154.95 18.95
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 198.83 46.83
U-15 0.00 198.88 34.88
U-16 0.00 198.90 33.90
U-16A 0.00 198.86 45.86
U-16B 0.00 198.86 39.86
U-16C 0.00 198.88 31.88
U-16D 0.00 198.91 31.91
PV-1 0.00 318.58 194.58
PV-2 0.00 238.18 101.18
PV-3 0.00 198.92 31.92
PV-4 0.00 154.87 50.87
PV-5 0.00 123.92 42.92
PV-6 0.00 166.43 10.43
DET-1 0.00 198.87 35.87
DET-2 0.00 123.98 20.98
DET-3 0.00 123.95 48.95
DET-4 0.00 123.93 49.93
DET-5 0.00 123.75 24.75
1B 0.17 166.32 30.32
A-1 0.00 360.91 268.91
A-2 0.00 262.35 203.35
V-1 0.00 198.79 53.79
V-2 0.00 124.00 20.00
P-1 -2.92 50.60 -41.40
P-2 -3.24 32.45 -26.55
R-1 -0.68 199.08 9.08
98
R-2 2.38 166.46 10.46
Resultado nos Trechos às 22:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.92 1.49 57.21
T2 2.92 1.49 57.21
T3 2.92 1.49 57.21
T4 3.61 0.20 0.40
T5 0.69 0.16 0.54
T6 0.52 0.12 0.32
T7 0.34 0.08 0.15
T8 0.17 0.04 0.04
T9 2.92 0.17 0.27
T10 2.75 0.16 0.24
T11 2.58 0.15 0.21
T12 2.58 0.15 0.21
T13 2.41 0.14 0.19
T14 2.23 0.13 0.16
T15 2.06 0.12 0.14
T16 1.89 0.11 0.12
99
T17 0.17 0.04 0.04
T18 1.55 0.09 0.08
T19 1.38 0.08 0.07
T20 1.38 0.08 0.07
T21 1.20 0.07 0.05
T22 1.03 0.06 0.04
T23 1.03 0.06 0.04
T24 1.03 0.06 0.04
T25 0.34 0.08 0.15
T26 0.17 0.04 0.04
T27 0.52 0.12 0.32
T28 0.34 0.08 0.15
T29 0.34 0.08 0.15
T30 0.17 0.04 0.04
T31 3.24 1.65 69.07
T32 0.86 0.19 0.82
T33 0.69 0.16 0.54
T34 0.52 0.12 0.32
T35 0.34 0.08 0.15
T36 0.17 0.04 0.04
T37 0.17 0.09 0.30
T38 0.17 0.09 0.30
T39 0.17 0.09 0.30
T40 0.17 0.09 0.30
T41 0.17 0.09 0.30
T42 0.17 0.09 0.30
T43 0.17 0.09 0.30
T44 0.17 0.09 0.30
T45 0.17 0.09 0.30
T46 0.17 0.09 0.30
T47 0.17 0.09 0.30
T48 0.17 0.09 0.30
T49 0.17 0.09 0.30
T50 0.17 0.09 0.30
T51 0.17 0.09 0.30
T52 0.17 0.09 0.30
T53 0.17 0.09 0.30
T54 0.17 0.09 0.30
T55 0.17 0.09 0.30
T56 0.17 0.09 0.30
T57 0.17 0.09 0.30
T58 0.17 0.09 0.30
T59 0.17 0.09 0.30
T60 0.17 0.09 0.30
T61 0.17 0.09 0.30
T62 0.17 0.09 0.30
B-1 2.92 0.00 -310.31
B-2 3.24 0.00 -229.90
VRP-1 2.41 0.14 43.79
VRP-2 1.55 0.09 30.87
100
Resultado nos Nós às 23:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.16 123.77 16.77
1A 0.16 123.92 40.92
2 0.16 123.77 17.77
2A 0.16 166.35 28.35
3 0.16 123.82 31.82
3A 0.16 166.37 21.37
4 0.16 123.93 43.93
4A 0.16 166.41 12.41
5 0.16 123.92 40.92
5A 0.16 166.44 10.44
6 0.16 123.96 47.96
7 0.16 123.97 22.97
8 0.16 123.99 19.99
9 0.16 154.88 34.88
10 0.16 154.89 49.89
11 0.16 154.96 18.96
101
12 0.16 154.99 11.99
13 0.16 155.00 11.00
14 0.16 198.86 47.86
15 0.16 198.91 34.91
16 0.16 198.93 32.93
16A 0.16 198.89 45.89
16B 0.16 198.89 39.89
16C 0.16 198.91 30.91
16D 0.16 198.93 30.93
U-1 0.00 123.77 16.77
U-1A 0.00 123.92 40.92
U-1B 0.00 166.35 30.35
U-2 0.00 123.77 17.77
U-2A 0.00 166.35 28.35
U-3 0.00 123.82 31.82
U-3A 0.00 166.37 21.37
U-4A 0.00 166.41 13.41
U-5 0.00 123.92 40.92
U-6 0.00 123.96 46.96
U-7 0.00 123.98 23.98
U-8 0.00 123.99 20.99
U-9 0.00 154.89 34.89
U-11 0.00 154.96 18.96
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 198.87 46.87
U-15 0.00 198.91 34.91
U-16 0.00 198.93 33.93
U-16A 0.00 198.89 45.89
U-16B 0.00 198.90 39.90
U-16C 0.00 198.91 31.91
U-16D 0.00 198.93 31.93
PV-1 0.00 317.57 193.57
PV-2 0.00 237.85 100.85
PV-3 0.00 198.95 31.95
PV-4 0.00 154.90 50.90
PV-5 0.00 123.93 42.93
PV-6 0.00 166.44 10.44
DET-1 0.00 198.90 35.90
DET-2 0.00 123.99 20.99
DET-3 0.00 123.95 48.95
DET-4 0.00 123.94 49.94
DET-5 0.00 123.79 24.79
1B 0.16 166.35 30.35
A-1 0.00 359.55 267.55
A-2 0.00 261.86 202.86
V-1 0.00 198.83 53.83
V-2 0.00 124.00 20.00
P-1 -2.91 46.00 -46.00
P-2 -3.23 29.50 -29.50
102
R-1 -0.37 199.08 9.08
R-2 2.45 166.46 10.46
Resultado nos Trechos às 23:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.91 1.48 56.72
T2 2.91 1.48 56.72
T3 2.91 1.48 56.72
T4 3.28 0.19 0.34
T5 0.63 0.14 0.46
T6 0.47 0.11 0.27
T7 0.31 0.07 0.13
T8 0.16 0.04 0.03
T9 2.66 0.15 0.23
T10 2.50 0.14 0.20
T11 2.34 0.13 0.18
T12 2.34 0.13 0.18
T13 2.19 0.12 0.16
T14 2.03 0.11 0.14
T15 1.88 0.11 0.12
T16 1.72 0.10 0.10
103
T17 0.16 0.04 0.03
T18 1.41 0.08 0.07
T19 1.25 0.07 0.06
T20 1.25 0.07 0.06
T21 1.09 0.06 0.04
T22 0.94 0.05 0.03
T23 0.94 0.05 0.03
T24 0.94 0.05 0.03
T25 0.31 0.07 0.13
T26 0.16 0.04 0.03
T27 0.47 0.11 0.27
T28 0.31 0.07 0.13
T29 0.31 0.07 0.13
T30 0.16 0.04 0.04
T31 3.23 1.64 68.71
T32 0.78 0.18 0.69
T33 0.63 0.14 0.46
T34 0.47 0.11 0.27
T35 0.31 0.07 0.13
T36 0.16 0.04 0.03
T37 0.16 0.08 0.25
T38 0.16 0.08 0.25
T39 0.16 0.08 0.25
T40 0.16 0.08 0.25
T41 0.16 0.08 0.25
T42 0.16 0.08 0.25
T43 0.16 0.08 0.25
T44 0.16 0.08 0.25
T45 0.16 0.08 0.25
T46 0.16 0.08 0.25
T47 0.16 0.08 0.25
T48 0.16 0.08 0.25
T49 0.16 0.08 0.25
T50 0.16 0.08 0.25
T51 0.16 0.08 0.25
T52 0.16 0.08 0.25
T53 0.16 0.08 0.25
T54 0.16 0.08 0.25
T55 0.16 0.08 0.25
T56 0.16 0.08 0.25
T57 0.16 0.08 0.25
T58 0.16 0.08 0.25
T59 0.16 0.08 0.25
T60 0.16 0.08 0.25
T61 0.16 0.08 0.25
T62 0.16 0.08 0.25
B-1 2.91 0.00 -313.55
B-2 3.23 0.00 -232.36
VRP-1 2.19 0.12 43.83
VRP-2 1.41 0.08 30.90
104
Resultado nos Nós às 24:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.16 123.77 16.77
1A 0.16 123.92 40.92
2 0.16 123.77 17.77
2A 0.16 166.36 28.36
3 0.16 123.82 31.82
3A 0.16 166.37 21.37
4 0.16 123.93 43.93
4A 0.16 166.42 12.42
5 0.16 123.92 40.92
5A 0.16 166.44 10.44
6 0.16 123.96 47.96
7 0.16 123.97 22.97
8 0.16 123.99 19.99
9 0.16 154.88 34.88
10 0.16 154.89 49.89
11 0.16 154.96 18.96
105
12 0.16 154.99 11.99
13 0.16 155.00 11.00
14 0.16 198.86 47.86
15 0.16 198.91 34.91
16 0.16 198.93 32.93
16A 0.16 198.89 45.89
16B 0.16 198.89 39.89
16C 0.16 198.91 30.91
16D 0.16 198.93 30.93
U-1 0.00 123.77 16.77
U-1A 0.00 123.92 40.92
U-1B 0.00 166.35 30.35
U-2 0.00 123.77 17.77
U-2A 0.00 166.36 28.36
U-3 0.00 123.82 31.82
U-3A 0.00 166.38 21.38
U-4A 0.00 166.42 13.42
U-5 0.00 123.92 40.92
U-6 0.00 123.96 46.96
U-7 0.00 123.98 23.98
U-8 0.00 123.99 20.99
U-9 0.00 154.89 34.89
U-11 0.00 154.96 18.96
U-12 0.00 154.99 11.99
U-13 0.00 155.00 10.00
U-14 0.00 198.87 46.87
U-15 0.00 198.91 34.91
U-16 0.00 198.93 33.93
U-16A 0.00 198.89 45.89
U-16B 0.00 198.90 39.90
U-16C 0.00 198.91 31.91
U-16D 0.00 198.93 31.93
PV-1 0.00 317.57 193.57
PV-2 0.00 237.85 100.85
PV-3 0.00 198.95 31.95
PV-4 0.00 154.90 50.90
PV-5 0.00 123.93 42.93
PV-6 0.00 166.44 10.44
DET-1 0.00 198.90 35.90
DET-2 0.00 123.99 20.99
DET-3 0.00 123.95 48.95
DET-4 0.00 123.94 49.94
DET-5 0.00 123.79 24.79
1B 0.16 166.35 30.35
A-1 0.00 359.55 267.55
A-2 0.00 261.86 202.86
V-1 0.00 198.83 53.83
V-2 0.00 124.00 20.00
P-1 -2.91 46.00 -46.00
P-2 -3.23 29.50 -29.50
106
R-1 -0.37 199.08 9.08
R-2 2.45 166.47 10.47
Resultado nos Trechos às 24:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 2.91 1.48 56.72
T2 2.91 1.48 56.72
T3 2.91 1.48 56.72
T4 3.28 0.19 0.34
T5 0.63 0.14 0.46
T6 0.47 0.11 0.27
T7 0.31 0.07 0.13
T8 0.16 0.04 0.04
T9 2.66 0.15 0.23
T10 2.50 0.14 0.20
T11 2.34 0.13 0.18
T12 2.34 0.13 0.18
T13 2.19 0.12 0.16
T14 2.03 0.11 0.14
T15 1.88 0.11 0.12
T16 1.72 0.10 0.10
107
T17 0.16 0.04 0.03
T18 1.41 0.08 0.07
T19 1.25 0.07 0.06
T20 1.25 0.07 0.06
T21 1.09 0.06 0.04
T22 0.94 0.05 0.03
T23 0.94 0.05 0.03
T24 0.94 0.05 0.03
T25 0.31 0.07 0.13
T26 0.16 0.04 0.03
T27 0.47 0.11 0.27
T28 0.31 0.07 0.13
T29 0.31 0.07 0.13
T30 0.16 0.04 0.04
T31 3.23 1.64 68.71
T32 0.78 0.18 0.69
T33 0.63 0.14 0.46
T34 0.47 0.11 0.27
T35 0.31 0.07 0.13
T36 0.16 0.04 0.03
T37 0.16 0.08 0.25
T38 0.16 0.08 0.25
T39 0.16 0.08 0.25
T40 0.16 0.08 0.25
T41 0.16 0.08 0.25
T42 0.16 0.08 0.25
T43 0.16 0.08 0.25
T44 0.16 0.08 0.25
T45 0.16 0.08 0.25
T46 0.16 0.08 0.25
T47 0.16 0.08 0.25
T48 0.16 0.08 0.25
T49 0.16 0.08 0.25
T50 0.16 0.08 0.25
T51 0.16 0.08 0.25
T52 0.16 0.08 0.25
T53 0.16 0.08 0.25
T54 0.16 0.08 0.25
T55 0.16 0.08 0.25
T56 0.16 0.08 0.25
T57 0.16 0.08 0.25
T58 0.16 0.08 0.25
T59 0.16 0.08 0.25
T60 0.16 0.08 0.25
T61 0.16 0.08 0.25
T62 0.16 0.08 0.25
B-1 2.91 0.00 -313.55
B-2 3.23 0.00 -232.36
VRP-1 2.19 0.12 43.83
VRP-2 1.41 0.08 30.90