MHI New Turbines

35
Mitsubishi Business Confidential Advanced Turbine Technologies for Advanced Turbine Technologies for High Efficiency Coal High Efficiency Coal - - Fired Power Plants Fired Power Plants 2 2 nd nd India India - - Japan Energy Forum Japan Energy Forum Promoting cooperation in energy efficiency Promoting cooperation in energy efficiency 4-5 February 2008

description

MHI Turbines

Transcript of MHI New Turbines

Page 1: MHI New Turbines

�Mitsubishi Business Confidential

Advanced Turbine Technologies forAdvanced Turbine Technologies forHigh Efficiency CoalHigh Efficiency Coal--Fired Power PlantsFired Power Plants

22ndnd IndiaIndia--Japan Energy ForumJapan Energy Forum““Promoting cooperation in energy efficiencyPromoting cooperation in energy efficiency””

4-5 February 2008

����������������� �������������

Page 2: MHI New Turbines

�Mitsubishi Business Confidential

1. THERMAL EFFICIENCY & STEAMCONDITIONS

2. MITSUBISHI 500����1000MWCLASS TURBINE

3. MHI ADVANCED TECHNOLOGY FOR HIGH EFFICIENCY

4. CONCLUSION

CONTENTS

Page 3: MHI New Turbines

�Mitsubishi Business Confidential

1. THERMAL EFFICIENCY & STEAM CONDITIONS

Page 4: MHI New Turbines

�Mitsubishi Business Confidential

STEAM CONDITON & EFFICIENCYSTEAM CONDITON & EFFICIENCY

��������

��������

��������

��������

��������

��������

� �� �� �� �

� �� �� �� �

� �� �� �� �

� �� �� �� �

� �� �� �� �

����

������������

�� � ��� � ��� � ��� � �

� � � �� � � �� � � �� � � �

� � �� � �� � �� � �

� � � �� � � �� � � �� � � �

������������

�� ��� ��� ��� �

�� ��� ��� ��� �

�� ��� ��� ��� �

� � �� � �� � �� � �

� � �� � �� � �� � �

� � �� � �� � �� � �

� � �� � �� � �� � �

Steam Temperature (����)

Net

Eff

icie

ncy

(%LH

V)

CO

2R

educ

tion

(%)

Net Efficiency

CO2 Reduction

Inlet Steam Temperature������������

Page 5: MHI New Turbines

�Mitsubishi Business Confidential

THERMAL EFFICIENCY & HEAT RATETHERMAL EFFICIENCY & HEAT RATE

BASE

��������600/600

566/593

566/566

538/566

538/538

MPa x degC(%)

1.7

0.8

0.9

0.8

0.9

24.216.7Steam Pressure (MPa abs.)

Hea

t Rat

e di

ffer

ence

of T

urbi

ne

Page 6: MHI New Turbines

�Mitsubishi Business Confidential

0

500

1000

1950 1960 1970 1980 1990 2000OPERATION YEAR

MW

75 MW REHEAT STEAM TURBINE

SUPERCRITICAL600 MW

NUCLEAR 340 MW

SUPERCRITICAL1000 MW

SUPERCRITICAL1050MW

1175 MW

156 MW

1000 MW1050 MW

1371 MW

1180 MW

NUCLEAR

FOSSIL

HISTORY OF MHI LARGE STEAM TURBINES

DEVELOPMENT OF TURBINE CAPACITY

Page 7: MHI New Turbines

�Mitsubishi Business Confidential

HISTORY����OF MHI LARGE STEAM TURBINESDEVELOPMENT OF STEAM PRESSURE & TEMPERATURE

400

450

500

550

600

650����

350

OPERATION YEAR1950 1960 1970 1980 1990 2000

510����

566����

480����

538����

SHIN-TOKYO #4 (538/538����)

75MW

OSAKA #3 (566/538����) 156.25MW

GOI #5 (566/566����)

350MW

WAKAMATSU STEP1 (593/593����)

50MW

WAKAMATSU STEP2 (649/593����)

50MW

HEKINAN #3 (538/593����)

700MW

MISUMI #1 (600/600����)

1000MW

MATSUURA #2 (593/593����)

1000MW

TACHIBANAWAN #2 (600/610����)

1050MW

4259 60

88102

127

169190

246 250 255

0

50

100

150

200

250

300

350

400kg/cm2g

2010

PRESSURE

TEMPERATURE

Page 8: MHI New Turbines

�Mitsubishi Business Confidential

MHI EXPERIENCE OF SUPERCRITICAL LARGE STEAM TURBINE

600/600C24.5MPa1000MW#1MISUMI

600/610C25.0MPa1050MW#2TACHIBANAWAN

595/595C24.5MPa900MW#1MAIZURU

600/600C24.5MPa600MW#5HIRONO

593/593C24.1MPa1000MW#2MATSUURA

566/593C24.1MPa500MW#1NANAO-OTA

538/593C24.1MPa700MW#3HEKINAN

ADVANCED STEAM CONDITION

MORE THAN 34 YEARS:LONG TERM OPERATIONEXPERIENCE

(ALL UNITS IN SERVICE)

28 UNITS:LARGE CAPACITY (�600MW)

Page 9: MHI New Turbines

�Mitsubishi Business Confidential

HIGHEST STEAM TURBINETHERMAL PERFORMANCE

Turbine Type : CC4F-46 Steam Condition : 25.1MPa 600/610�YEAR IN OPERATION : DEC. 2000

J-POWER TACHIBANAWAN #2 1050MW

Page 10: MHI New Turbines

��Mitsubishi Business Confidential

3000rpm 48inch Steel ISB

2 pad journal bearing

Advanced direct support LP frame

Advancedflow guide

12Cr HIP Rotor

600°C class advancedHP-IP combined frame

HIGH EFFICIENCY AND ECONOMICAL DESIGN 600MW CLASS with 3000rpm 48inch ISB

TOKYO ELEC. HIRONO #5 600MW

TURBINE TYPE : TC2F-48STEAM CONDITON : 24.6MPa����600/600����YEAR IN OPERATION : Jul.2004

Page 11: MHI New Turbines

��Mitsubishi Business Confidential

2. MITSUBISHI 500MW����1000MW Class Turbine

Page 12: MHI New Turbines

��Mitsubishi Business Confidential

OPTIMIZED COMBINATION OF TURBINE COMPONENTS FOR VARIOUS POWER OUTPUT

1200

1100

1000

900

800

700

600

500

400

App

licat

ion

Ran

ge (M

W)

2 Casings

1LP+HIP

4 Casings

2LP+HP+IP

3 Casings

2LP+HIP

4 Casings(Cross Compound)

1000MW

800MW

660MW

500MW

Page 13: MHI New Turbines

��Mitsubishi Business Confidential

OPTIMIZED COMBINATION OF TURBINE COMPONENTS FOR VARIOUS POWER OUTPUT

���������������� ��������������������� ��������������������� ��������������������� ��������������������� ��������������������� ��������������������� ��������������������� �����

� ���� ���� ���� ���� ���� ���� ���� ������������������� ��������������������������������

� ������ ������ ������ ������ ������ ������ ������ �����

HIP TurbineHIP Turbine

LP TurbineLP Turbine HP TurbineHP TurbineIP TurbineIP TurbineGeneratorGenerator

� ���������� ���������� ���������� ���������� ���������� ���������� ���������� ���������

� ������ ������ ������ ������ ������ ������ ������ �����

HIP TurbineHIP Turbine

Page 14: MHI New Turbines

��Mitsubishi Business Confidential

HP-IP Combined Turbine

F3D ISB Reaction Blade

IP Inlet Cooling

Advanced 12Cr Rotor Forging

Features of HP-IP Combined Turbine � Shorter longitudinal span� Smaller differential expansion� Easy maintenance

Page 15: MHI New Turbines

��Mitsubishi Business Confidential

F3D ISB REACTION BLADEF3D ISB REACTION BLADE

Advanced steam path design by fully 3-D CFD analysis methodologies

Stationary BladesStationary Blades Rotating BladesRotating BladesEFFICIENCY VERIFICATION TEST IN LABORATORY

F3D blades are now applied to all new orders since 1991

Test Result of Static Pressure CFD Analysis

Page 16: MHI New Turbines

��Mitsubishi Business Confidential

ROTOR COOLING ARRANGEMENTRotor surface around IP inlet is cooled by the HP exhaust steam

Cooling Steam Path

COOLING STEAM

FROM HP EXHAUST

Page 17: MHI New Turbines

��Mitsubishi Business Confidential

���������������� �� � � ���� � � ���� � � ���� � � �� � �� � ��� �� � ��� �� � ��� �� � �� � � ��� � ��� � ��� � �� � ��� ��� ��� �� � � ��� � ��� � ��� � ��

���� � ����� � ����� � ����� � � � �� � � � �� � � � �� � � � �� � �

ISB FLEET FOR LAST BLADE (For 50Hz)

� � ��� � � � � � � � �� � ��� � � � � � � � �� � ��� � � � � � � � �� � ��� � � � � � � � �

Page 18: MHI New Turbines

��Mitsubishi Business Confidential

ADVANTAGES OF ISB LP END BLADES

ISB Conventional Grouped Blade

Larger damping is generated by the contact at the shrouds and snubbers, which is caused by the twist-back deformation due to centrifugal force.

Reduction in Vibration Stress

��

ISB GB

Damping

Page 19: MHI New Turbines

��Mitsubishi Business Confidential

3. MHI ADVANCED TECHNOLOGY FOR HIGH EFFICIENCY

Page 20: MHI New Turbines

��Mitsubishi Business Confidential

Steady FlowSteady Flow

Measured

CFDCFD

Base

Tip

LATEST����CFD����ANALYSIS����Measured

Tip

Base

Unsteady FlowUnsteady Flow

Blade ExitBlade Exit

Page 21: MHI New Turbines

��Mitsubishi Business ConfidentialSectional View

Stationary blade

Test EquipmentTest Equipment Test of MHI bladeTest of MHI bladeat Cambridge Univ.at Cambridge Univ.

Measurement

CFDLoss Coefficient

Rotating blade

COLLABORATION WITH CAMBRIDGE UNIV.

Page 22: MHI New Turbines

��Mitsubishi Business Confidential

Model Test Turbine

Measuring at MHI Model Test Turbinewith Fast Response Aerodynamic Probe (FRAP)

Measurement Result(Total pressure at blade exit)

ETH: Eidgenossische Technische Hochschule Zurich Swiss Federal Institute of Technology Zurich

COLLABORATION WITH ETH

Page 23: MHI New Turbines

��Mitsubishi Business Confidential

������������

�������������

���������

�������

����������

��

���������������

����������

�������

������

������ ���

���������

��������

���

CFD APPLICATION TO ENTIRE TURBINE����

Page 24: MHI New Turbines

��Mitsubishi Business Confidential

NEW HEAT-RESISTANT ALLOY DEVELOPMENT

Type 316H Type 316H 3Co12CrMoWVNbB3Co12CrMoWVNbB

(MTV10A)(MTV10A)Super 9CrSuper 9Cr

(T91)(T91)2.25CrMo2.25CrMoValveValve

W545W5453Co12CrMoWVNbB3Co12CrMoWVNbB

(MTB10A)(MTB10A)12CrMoWVNb12CrMoWVNb(10705MBU)(10705MBU)

12CrMoWV12CrMoWV(Type 422)(Type 422)BladeBlade

Type 316HType 316H3Co12CrMoWVNbB3Co12CrMoWVNbB

(MTC10A)(MTC10A)12CrMoVNb12CrMoVNb

(MJC(MJC--12)12)2.25CrMo2.25CrMo

Inner Inner CasingCasing

Nozzle Box Nozzle Box

Modified Modified A286A286

3Co12CrMoWVNbB3Co12CrMoWVNbB(MTR10A)(MTR10A)

12CrMoVNb12CrMoVNb(TMK(TMK--1)1)

CrMoVCrMoVHP/IP RotorHP/IP Rotor

�������� 650650���������������� 630630���������������� 610610���������������� 566566��������Steam Steam

TempTempTurbine PartsTurbine Parts

Developed by MHIDeveloped by MHI

Page 25: MHI New Turbines

��Mitsubishi Business Confidential

WAKAMATSU HIGH TEMPERATURE TURBINE ����J-POWER��������New heat-resistant material were tested in the actual turbine in 1986-91����

STEP ���� STEP ����102kg/cm2g x 593/593����FERRITIC����MATERIAL

102kg/cm2g x 649/593����AUSTENITIC����MATERIAL

NEW 12Cr Rotor Forging TMK1

NEW 12Cr Cast Steel MJC12

9Cr2Mo Forged Steel HCM9M

Modified A286 Rotor Forging

SUSF316H Forged Steel

SUSF316H Forged Steel

Page 26: MHI New Turbines

��Mitsubishi Business Confidential400ton/h steam can be applied to test facility.

Turbine Casing

CondenserControl Room

LP TURBINE TEST FACILITY

Page 27: MHI New Turbines

��Mitsubishi Business Confidential

VERIFICATION TEST RESULT(3000RPM 48-INCH BLADE)

��� �� � �

� � � � � � � � � � � � � � � � � � �

� � � �� �

����������

� �� �� � � �� � � � � � ��� �� � ! "# � �$ $ %& '( )

�� �� � ! "# � � $ $ %& '( )

� 0 150 300 450 600

Load (MW)

500mmHg600mmHg722mmHg

Exhaust flow (t/h)

Vib

rato

ry S

tress

Field Telemetry Test (700mmHg)Field Telemetry Test (722mmHg)

Model Turbine Test

Exhaust Volumetric Flow

Test ResultDesign Value

Blade Vibratory Stress Turbine EfficiencyLow Stress in All Range High Efficiency Confirmed

Page 28: MHI New Turbines

��Mitsubishi Business Confidential

ROTATING VIBRATORY TEST RESULT(3000RPM 48-INCH BLADE)

Rotating vibratory test rotorwith 48-inch steel blades

Test results of the vibratory Characteristics

Rotating speed (rpm)Fr

eque

ncy

(Hz)

2nd Mode

1st Mode

Rated Speed

Page 29: MHI New Turbines

��Mitsubishi Business Confidential

IN-HOUSE POWER PLANT(T-Point)

Gas Turbine

Steam TurbineHRSG

ACC

ST Type : SRT-36 (Single Cylinder Reheat Turbine)

ST Output : 105MWSteam Condition : 139 kg/cm2g ����566 / 410 ����Commercial Operation : JULY 1997

Execute the Verification Program in Order to Confirm the Reliability of New Technology

Page 30: MHI New Turbines

��Mitsubishi Business Confidential

WIRING

(LOWER CASING & ROTOR INSTALLATION)

WIRING

(UPPER CASING INSTALLATION)

NEW TECHNOLOGY VERIFICATION (IN-HOUSE POWER PLANT)

Page 31: MHI New Turbines

��Mitsubishi Business Confidential

4. CONCLUSION

1. MHI’s abundant experience of super-critical turbines with high temperature represents that the technologies are innovative and reliable.

2. MHI achieves a high level of technologies, especially for steam flow optimization with CFD and heat-resistance material development, which are regarded as the key technology.

3. Comprehensive verification, utilizing world-class facility and full-scale test turbine, ensures the performance and reliability of the latest technologies, even which are innovative ones.

Page 32: MHI New Turbines

��Mitsubishi Business Confidential

L&T-MHI Turbine Generator Private Limited-Indigenized Domestic Company-

JV has been established on Nov.5th, 2007 byL&T (LARSEN & TOUBRO LIMITED) of 51% share, MHI (Mitsubishi Heavy Industries, Ltd.) of 49% share (MELCO takes 10% share from 49%)

<Investment > 1,030 Crores<Capability> 4,000MW

per annum<Employee> 900<Location> Mumbai and

Surat (Hazira)

Surat(Factory)

����������� ��!!�"�#

Page 33: MHI New Turbines

��Mitsubishi Business Confidential

L&T-MHI Turbine Generator Private Limited-Indigenized Domestic Company-

<Line up of Products >

500/600/800/1000MWSupercritical Steam Turbine

Generator and

150/300MW Steam Turbine Generator for Gas Turbine

Combined Cycle

Assembly of 1000MW Turbine in MHI Nagasaki

Page 34: MHI New Turbines

��Mitsubishi Business Confidential

L&T-MHI Turbine Generator Private Limited-Indigenized Domestic Company-

JV can;(1) Solve Huge Electric

Demand

(2) Achieve Customer Satisfaction in Maintenance

(3) Produce Lots of Employment in India

Rotor Assembly Shop in MHI Nagasaki

High Speed Balance Machine

JV factory will have the same capability as of MHI Nagasaki

Page 35: MHI New Turbines

��Mitsubishi Business Confidential

L&T-MHI Turbine Generator Private Limited-Indigenized Domestic Company-

JV Should be Qualified,Because;

(1) Fully Supported by MHI, MELCO and L&T Financially and Technically

(2) Transferring Mitsubishi’s Most Advanced Technology for Steam Turbine Generator

(3) Of Course, Indigenized Domestic Company