PROYECTO : MEJORAMIENTO DE LA INSTITUCIÓN EDUCATIVA Nº 82467 FRANCISCO DELGADO GUERRERO, PROYECTISTA : LDGBNAMO - DISTRITO HUASMÍN - CELENDÍN - CAJAMARCA LOCALIDAD : NAMO
DISTRITO : HUASMÍN DPTO : CAJAMARCA
PROVINCIA : CELENDÍN FECHA : Octubre 2012
ITEM DESCRIPCION VOLUMEN (m3) AREAS (m2) METRO LINEAL (m) UND ACERO
a/Area l ó e h ó% n ó esp Vol. a/Area l n Area l n Lt u (KG)
03.00.00 ARQUITECTURA
03.01.00 MUROS Y TABIQUES DE ALBAÑILERÍA
03.01.01 MURO DE LADRILLO DE ARCILLA K K DE SOGA
PABELLÓN
PRIMER NIVEL
EJE 1, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23
EJE 3, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23
EJE 5, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23
EJE 7, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23
EJE A, ENTRE EJE 1 - EJE 7 1.05 3.05 6.00 19.22
EJE B, ENTRE EJE 1 - EJE 7 1.85 2.02 6.00 22.42
SEGUNDO NIVEL
EJE 1, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40
EJE 4, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40
EJE 5, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40
EJE 7, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40
EJE A, ENTRE EJE 1 - EJE 7 1.10 3.05 6.00 20.13
EJE B, ENTRE EJE 1 - EJE 7 1.95 2.02 5.00 19.70
EJE B, ENTRE EJE 2 - EJE 3 1.95 3.05 1.00 5.95
VOLADO
ENTRE EJE 1 - EJE 2 0.90 4.05 1.00 3.65
ENTRE EJE 2 - EJE 3 0.90 3.90 1.00 3.51
ENTRE EJE 3 - EJE 4 0.90 3.90 1.00 3.51
ENTRE EJE 4 - EJE 5 0.90 3.90 1.00 3.51
ENTRE EJE 5 - EJE 6 0.90 3.90 1.00 3.51
ENTRE EJE 6 - EJE 7 0.90 4.05 1.00 3.65
ENTRE EJE 11- EJE 12 0.90 4.50 1.00 4.05
EJE 1 0.90 1.75 1.00 1.58
EJE 12 0.90 1.75 1.00 1.58
ESCALERA
EJE 11 (altura media = (4.35+2.81)/2) 3.58 2.70 1.00 9.67
EJE 11 1.00 1.95 1.00 1.95
EJE 12 (altura media = (2.65+1.10)/2) 1.88 2.70 1.00 5.08
EJE 12 1.00 1.95 1.00 1.95
DESCANSO 1.00 4.55 1.00 4.55
BEBAJO - DESCANSO 1.53 8.20 1.00 12.55
SS.HH. - COCINA
EJE 8, ENTRE EJE C - EJE F 2.40 5.25 1.00 12.60
EJE 8, ENTRE EJE E - EJE F (Ventana) 2.10 0.60 1.00 1.26
EJE 9, ENTRE EJE C - EJE F 2.73 1.50 1.00 4.10
EJE 10, ENTRE EJE C - EJE F 2.30 2.85 1.00 6.56
EJE 10, ENTRE EJE C - EJE F 1.00 1.20 1.00 1.20
EJE 10, ENTRE EJE C - EJE F 1.80 4.35 1.00 7.83
EJE C, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 3.55 1.00 9.33
EJE D, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 4.35 1.00 11.42
EJE E, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 4.35 1.00 11.42
ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 (altura media = (2.70+2.35)/2) 2.63 5.20 1.00 13.65
EJE F, ENTRE EJE 8 - EJE 10 2.63 1.95 1.00 5.12
EJE F, ENTRE EJE 8 - EJE 10 0.80 2.40 1.00 1.92
PARAPETO BAÑO VARONES 1.70 1.05 1.00 1.79
PARAPETO BAÑO DAMAS 1.70 0.85 1.00 1.45
371.89
03.01.02 MURO DE LADRILLO DE ARCILLA K K DE CANTO
SS. HH. CABALLEROS 1.80 4.30 1.00 7.74
SS. HH. DAMAS 1.80 4.00 1.00 7.20
14.94
03.02.00 REVOQUES Y ENLUCIDOS
03.02.01 TARRAJEO EN EXTERIORES CON CEMENTO ARENA 1:4
PABELLÓN
MUROS
PRIMER NIVEL
EJE 1, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23
EJE 7, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23
EJE A, ENTRE EJE 1 - EJE 7 1.05 3.05 6.00 19.22
EJE B, ENTRE EJE 1 - EJE 7 1.85 2.02 6.00 22.42
SEGUNDO NIVEL
EJE 1, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 3.33 2.00 20.81
EJE 7, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 3.33 2.00 20.81
EJE A, ENTRE EJE 1 - EJE 7 1.10 3.05 6.00 20.13
EJE B, ENTRE EJE 1 - EJE 7 1.95 2.02 5.00 19.70
EJE B, ENTRE EJE 2 - EJE 3 1.95 3.05 1.00 5.95
VOLADO
ENTRE EJE 1 - EJE 2 0.90 4.05 1.00 3.65
ENTRE EJE 2 - EJE 3 0.90 3.90 1.00 3.51
ENTRE EJE 3 - EJE 4 0.90 3.90 1.00 3.51
ENTRE EJE 4 - EJE 5 0.90 3.90 1.00 3.51
ENTRE EJE 5 - EJE 6 0.90 3.90 1.00 3.51
ENTRE EJE 6 - EJE 7 0.90 4.05 1.00 3.65
ENTRE EJE 11- EJE 12 0.90 4.50 1.00 4.05
EJE 1 0.90 1.75 1.00 1.58
EJE 12 0.90 1.75 1.00 1.58
ESCALERA
EJE 11 (altura media = (4.35+2.81)/2) 3.58 2.70 1.00 9.67
EJE 11 1.00 1.95 1.00 1.95
EJE 12 (altura media = (2.65+1.10)/2) 1.88 2.70 1.00 5.08
EJE 12 1.00 1.95 1.00 1.95
DESCANSO 1.00 4.55 1.00 4.55
SS.HH. - COCINA
EJE 8, ENTRE EJE C - EJE F 2.40 5.25 1.00 12.60
EJE 8, ENTRE EJE E - EJE F 2.10 0.60 1.00 1.26
EJE 10, ENTRE EJE C - EJE F 2.30 2.85 1.00 6.56
EJE 10, ENTRE EJE C - EJE F 1.00 1.20 1.00 1.20
EJE 10, ENTRE EJE C - EJE F 1.80 4.35 1.00 7.83
EJE C, ENTRE EJE 8 - EJE 10 (altura media = (2.70+2.35)/2) 2.63 3.56 1.00 9.36
EJE F, ENTRE EJE 8 - EJE 10 2.63 1.95 1.00 5.13
EJE F, ENTRE EJE 8 - EJE 10 0.80 2.40 1.00 1.92
255.11
03.02.02 TARRAJEO EN INTERIORES CON CEMENTO 1:4
PABELLÓN
PRIMER NIVEL
EJE 1, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23
EJE 3, ENTRE EJE A - EJE B 2.42 2.94 4.00 28.46
EJE 5, ENTRE EJE A - EJE B 2.42 2.94 4.00 28.46
EJE 7, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23
EJE A, ENTRE EJE 1 - EJE 7 1.05 2.82 6.00 17.77
EJE B, ENTRE EJE 1 - EJE 7 1.85 1.90 6.00 21.09
SEGUNDO NIVEL
EJE 1, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40
EJE 4, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 4.00 36.81
EJE 5, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 4.00 36.81
EJE 7, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40
EJE A, ENTRE EJE 1 - EJE 7 1.10 3.05 6.00 20.13
EJE B, ENTRE EJE 1 - EJE 7 1.95 2.02 5.00 19.70
EJE B, ENTRE EJE 2 - EJE 3 1.95 3.05 1.00 5.95
VOLADO
ENTRE EJE 1 - EJE 2 0.90 4.05 1.00 3.65
ENTRE EJE 2 - EJE 3 0.90 3.90 1.00 3.51
ENTRE EJE 3 - EJE 4 0.90 3.90 1.00 3.51
ENTRE EJE 4 - EJE 5 0.90 3.90 1.00 3.51
ENTRE EJE 5 - EJE 6 0.90 3.90 1.00 3.51
ENTRE EJE 6 - EJE 7 0.90 4.05 1.00 3.65
ENTRE EJE 11- EJE 12 0.90 4.50 1.00 4.05
EJE 1 0.90 1.75 1.00 1.58
EJE 12 0.90 1.75 1.00 1.58
ESCALERA
EJE 11 (altura media = (4.35+2.81)/2) 3.58 2.70 1.00 9.67
EJE 11 1.00 1.95 1.00 1.95
EJE 12 (altura media = (2.65+1.10)/2) 1.88 2.70 1.00 5.08
EJE 12 1.00 1.95 1.00 1.95
DESCANSO 1.00 4.55 1.00 4.55
MURO ESCALERA PRIMER TRAMO 2.70 1.05 2.00 5.67
MURO ESCALERA SEGUNDO TRAMO 2.70 1.05 2.00 5.67
SS.HH. - COCINA
EJE 8, ENTRE EJE C - EJE F 2.40 5.25 1.00 12.60
EJE 8, ENTRE EJE E - EJE F 2.10 0.60 1.00 1.26
EJE 9, ENTRE EJE C - EJE F 2.73 1.50 2.00 8.19
EJE 10, ENTRE EJE C - EJE F 2.30 2.70 1.00 6.21
EJE 10, ENTRE EJE C - EJE F 1.00 1.20 1.00 1.20
EJE 10, ENTRE EJE C - EJE F 1.80 4.35 1.00 7.83
EJE C, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 3.31 1.00 8.69
EJE D, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 4.35 2.00 22.84
EJE E, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 4.35 2.00 22.84
ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 (altura media = (2.4+2.85)/2) 2.63 4.35 2.00 22.84
EJE F, ENTRE EJE 8 - EJE 10 2.63 2.05 1.00 5.38
EJE F, ENTRE EJE 8 - EJE 10 0.80 2.40 1.00 1.92
PARAPETO BAÑO VARONES 1.70 1.05 2.00 3.57
PARAPETO BAÑO DAMAS 1.70 0.85 2.00 2.89
SS. HH. CABALLEROS 1.80 4.30 2.00 15.48
SS. HH. DAMAS 1.80 4.00 2.00 14.40
501.67
03.02.03 TARRAJEO DE COLUMNAS y COLUMNETAS C.A. 1:5 E=1.5 cm
COLUMNAS
EXTERIORES
C-1 0.90 6.75 4.00 24.30
C-2 0.65 6.75 10.00 43.88
C-3 0.30 6.10 1.00 1.83
C-3 0.75 6.10 1.00 4.58
C-3 0.45 5.30 1.00 2.39
C-4 0.40 2.80 2.00 2.24
C-4 0.55 3.25 1.00 1.79
C-5 0.30 2.80 3.00 2.52
C-5 0.45 2.80 3.00 3.78
C-6 0.45 2.80 1.00 1.26
INTERIORES
C-1 0.40 6.70 4.00 10.72
C-2 0.80 6.70 10.00 53.60
C-3 0.30 6.10 2.00 3.66
C-3 0.30 5.30 1.00 1.59
C-3 0.75 5.30 1.00 3.98
C-4 0.40 2.80 1.00 1.12
C-4 0.40 3.25 6.00 7.80
C-5 0.30 2.80 9.00 7.56
C-6 0.60 2.80 1.00 1.68
C-7 0.45 1.80 2.00 1.62
COLUMNETAS
EXTERIORES
PRIMER NIVEL
COLUMNETA Cc 1 0.25 1.20 12.00 3.60
COLUMNETA Cc 1 0.25 2.00 12.00 6.00
COLUMNETA Cc 1 0.25 2.57 6.00 3.86
SEGUNDO NIVEL
COLUMNETA Cc 1 0.25 1.25 12.00 3.75
COLUMNETA Cc 1 0.25 2.10 12.00 6.30
COLUMNETA Cc 1 0.25 3.03 4.00 3.03
COLUMNETA Cc 1 0.25 3.67 2.00 1.84
VOLADO
COLUMNETA Cc 2 0.15 1.00 18.00 2.70
INTERIORES
PRIMER NIVEL
COLUMNETA Cc 1 0.25 1.20 12.00 3.60
COLUMNETA Cc 1 0.25 2.00 12.00 6.00
COLUMNETA Cc 1 0.25 2.57 18.00 11.57
SEGUNDO NIVEL
COLUMNETA Cc 1 0.25 1.25 12.00 3.75
COLUMNETA Cc 1 0.25 2.10 12.00 6.30
COLUMNETA Cc 1 0.25 3.03 12.00 9.09
COLUMNETA Cc 1 0.25 3.67 6.00 5.51
VOLADO
COLUMNETA Cc 2 0.15 1.00 14.00 2.10
260.90
03.02.04 TARRAJEO DE VIGAS y VIGUETAS C.A. 1:5 E=1.5 cm
VIGAS
PABELLÓN
PRIMER NIVEL
VP-101
EJE 1, ENTRE EJE A - EJE B 1.45 6.70 1.00 9.72
EJE 7, ENTRE EJE A - EJE B 1.45 6.70 1.00 9.72
VP-101 VOLADO
EJE 1, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 7, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
VP-102
EJE 2, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 3, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 4, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 5, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 6, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
VP-102 VOLADO
EJE 2, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 3, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 4, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 5, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 6, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
VA-101
EJE A, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE A, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
EJE B, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE B, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
Vb-101
EJE B', ENTRE EJE 1 - EJE 2 0.70 3.35 1.00 2.35
EJE B', ENTRE EJE 2 - EJE 3 0.70 3.38 1.00 2.37
EJE B', ENTRE EJE 3 - EJE 4 0.70 3.38 1.00 2.37
EJE B', ENTRE EJE 4 - EJE 5 0.70 3.38 1.00 2.37
EJE B', ENTRE EJE 5 - EJE 6 0.70 3.38 1.00 2.37
EJE B', ENTRE EJE 6 - EJE 7 0.70 3.35 1.00 2.35
SEGUNDO NIVEL
VP-201
EJE 1, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 2, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 3, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 4, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 5, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 6, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 7, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
VP-201 VOLADO
EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
VA-201
EJE A, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE A, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
EJE B, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE B, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
EJE C, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE C, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE C, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE C, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE C, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE C, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
VOLADO (ambos lados) 1.10 1.00 3.00 3.30
VA-202
EJE A', ENTRE EJE 1 - EJE 2 0.55 3.35 1.00 1.84
EJE A', ENTRE EJE 2 - EJE 3 0.55 3.38 1.00 1.86
EJE A', ENTRE EJE 3 - EJE 4 0.55 3.38 1.00 1.86
EJE A', ENTRE EJE 4 - EJE 5 0.55 3.38 1.00 1.86
EJE A', ENTRE EJE 5 - EJE 6 0.55 3.38 1.00 1.86
EJE A', ENTRE EJE 6 - EJE 7 0.55 3.35 1.00 1.84
EJE C', ENTRE EJE 1 - EJE 2 0.55 3.35 1.00 1.84
EJE C', ENTRE EJE 2 - EJE 3 0.55 3.38 1.00 1.86
EJE C', ENTRE EJE 3 - EJE 4 0.55 3.38 1.00 1.86
EJE C', ENTRE EJE 4 - EJE 5 0.55 3.38 1.00 1.86
EJE C', ENTRE EJE 5 - EJE 6 0.55 3.38 1.00 1.86
EJE C', ENTRE EJE 6 - EJE 7 0.55 3.35 1.00 1.84
VOLADO (ambos lados) 0.55 1.00 2.00 1.10
ESCALERA
VE-101
EJE H, ENTRE EJE 11 - EJE 12 1.40 4.40 1.00 6.16
VE-102
EJE G, ENTRE EJE 11 - EJE 12 1.20 4.40 1.00 5.28
VE-103
EJE 11, ENTRE EJE H - EJE G 0.70 2.70 1.00 1.89
VE-103
EJE 12, ENTRE EJE H - EJE G 0.70 2.70 1.00 1.89
VP-101 VOLADO
EJE 11, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 1.10 2.00 1.00 2.20
EJE 12, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 1.10 2.00 1.00 2.20
VE-201
EJE H, ENTRE EJE 11 - EJE 12 1.40 4.90 1.00 6.86
VE-201
EJE G, ENTRE EJE 11 - EJE 12 1.40 4.90 1.00 6.86
VE-201
EJE 11, ENTRE EJE H - EJE G 0.90 2.70 1.00 2.43
VE-201
EJE 12, ENTRE EJE H - EJE G 0.90 2.70 1.00 2.43
VE-201 VOLADO
EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.00 1.00 1.60
EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.00 1.00 1.60
VE-201 VOLADO
EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.35 1.00 1.88
EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.35 1.00 1.88
VE-202
EJE H', ENTRE EJE 11 - EJE 12 0.55 4.90 1.00 2.70
EJE G', ENTRE EJE 11 - EJE 12 0.55 4.90 1.00 2.70
SS.HH. - COCINA
VA-103
EJE C, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.4*2+0.3)) 0.75 6.22 1.00 4.67
EJE D, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74
EJE E, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74
EJE F, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74
EJE 8, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.15)) 0.75 10.60 1.00 7.95
EJE 9, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. 4*0.15) 0.75 11.05 1.00 8.29
EJE 10, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.45)) 0.75 10.30 1.00 7.73
VA-104
EJE 8', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 0.55 11.05 1.00 6.08
EJE 10', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 0.55 11.05 1.00 6.08
VIGUETAS
EJE A, ENTRE EJE 1 - EJE 7 (1° y 2° nivel) 0.20 3.35 12.00 8.04
EJE B, ENTRE EJE 1 - EJE 8 (1° y 2° nivel) 0.20 2.30 11.00 5.06
EJE B, ENTRE EJE 2 - EJE3 (2° nivel) 0.20 3.35 1.00 0.67
EJE 1, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96
EJE 3, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96
EJE 5, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96
EJE 7, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96
EJE 1, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05
EJE 4, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05
EJE 5, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05
EJE 7, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05
VOLADO
ENTRE EJE 1 - EJE 2 0.20 4.35 1.00 0.87
ENTRE EJE 2 - EJE 3 0.20 4.20 1.00 0.84
ENTRE EJE 3 - EJE 4 0.20 4.20 1.00 0.84
ENTRE EJE 4 - EJE 5 0.20 4.20 1.00 0.84
ENTRE EJE 5 - EJE 6 0.20 4.20 1.00 0.84
ENTRE EJE 6 - EJE 7 0.20 4.35 1.00 0.87
ENTRE EJE 11- EJE 12 0.20 5.00 1.00 1.00
EJE 1 0.20 2.00 1.00 0.40
EJE 12 0.20 2.00 1.00 0.40
468.00
03.02.05 VESTIDURA DE DERRAMES
PABELLÓN
VENTANA ILUMINACIÓN PABELLÓN 10.67 12.00 128.04 10.40
PUERTA - VENTANA VENTILACIÓN PABELLÓN 11.95 11.00 131.45 10.30
VENTANA VENTILACIÓN PABELLÓN 8.86 1.00 8.86
SS.HH. - COCINA
PUERTA (0.90x2.10) 5.10 4.00 20.40
PUERTA (0.70x2.10) 4.90 1.00 4.90
PUERTA - VENTANA SS.HH. DOCENTES 7.00 1.00 7.00
VENTANA SS.HH. VARONES 4.90 1.00 4.90
VENTANA SS.HH. DAMAS 6.60 1.00 6.60
VENTANA COCINA 5.40 1.00 5.40
VENTANA COCINA 5.20 2.00 10.40
PUERTA BATERÍA DE BAÑOS 1.80 6.00 10.80
338.75
03.02.06 BRUÑAS DE 1 cm
PABELLÓN - ESCALERA
ELEVACIÓN PRINCIPAL
COLUNMAS 2.10 13.00 27.30
VOLADO 10.10 2.00 20.20
VOLADO 9.80 4.00 39.20
VOLADO 11.40 1.00 11.40
ELEVACIÓN POSTERIOR
COLUNMAS 1.40 24.00 33.60
VIGAS 3.35 18.00 60.30
ELEVACIÓN LATERAL IZQUIERDA
COLUNMAS 2.80 2.00 5.60
COLUNMAS 3.10 2.00 6.20
VIGAS 6.60 2.00 13.20
VIGAS 6.66 1.00 6.66
VOLADO 5.50 1.00 5.50
ELEVACIÓN LATERAL DERECHA
COLUNMAS 2.80 2.00 5.60
COLUNMAS 3.10 2.00 6.20
VIGAS 6.60 2.00 13.20
VIGAS 6.66 1.00 6.66
VOLADO 5.50 1.00 5.50
SS.HH. - COCINA
ELEVACIÓN PRINCIPAL
2.40 3.00 7.20
ELEVACIÓN POSTERIOR
2.40 4.00 9.60
1.80 2.00 3.60
ELEVACIÓN LATERAL IZQUIERDA
5.85 2.00 11.70
ELEVACIÓN LATERAL DERECHA
5.85 2.00 11.70
310.12
03.02.07 TARRAJEO EN FONDO DE ESCALERA C.A. 1:5 E=1.5 cm
PRIMER TRAMO 3.15 2.20 1.00 6.93
DESCANSO 5.00 1.95 1.00 9.75
SEGUNDO TRAMO 3.15 2.20 1.00 6.93
23.61
03.02.08 PREPARACIÓN DE GRADAS DE CONCRETO
PRIMER TRAMO 2.20 10.00 22.00
SEGUNDO TRAMO 2.20 10.00 22.00
44.00
03.02.09 PREPARACIÓN DE DESCANSOS
DESCANSO 5.00 1.95 1.00 9.75
9.75
03.03.00 CIELORRASOS
03.03.01 CIELORRASOS CON CON MEZCLA C:A 1:4 x 1.50 cm
PABELLÓN
PRIMER NIVEL
VOLADO PASADIZO 30.63 2.00 1.00 61.26
AULAS PRIMER NIVEL 182.91 - 1.00 182.91
ESCALERA 21.30 - 1.00 21.30
265.47
03.03.02 CIELORRASOS CON TRIPLAY
(teniendo en cuenta la pendiente de techo)
PABELLÓN - ESCALERA
SALA DE USOS MÚLTIPLES 12.65 7.46 1.00 94.37
DIRECCIÓN 4.10 7.46 1.00 30.59
AULA DE INNOVACIÓN PEDAGÓGICA 8.40 7.46 1.00 62.66
ESCALERA 4.40 5.65 1.00 24.86
PASADIZO 30.62 2.15 1.00 65.83
SS.HH. - COCINA
INTERIOR DE AMBIENTES 10.35 5.20 1.00 53.82
332.13
03.04.00 PISOS Y PAVIMENTOS
03.04.01 CONTRAPISO DE CEMENTO E= 2"
(Área calculada con AutoCAD Arquitectural 2013, regiones)
SS.HH. VARONES 13.13 1.00 13.13
SS.HH. MUJERES 14.14 1.00 14.14
DUCHA 1.41 1.00 1.41
SS.HH. DOCENTES 3.68 1.00 3.68
COCINA 12.62 1.00 12.62
44.98
03.04.02 PISO CERAMICO DE ALTO TRANSITO 30X30 cm
(Área calculada con AutoCAD Arquitectural 2013, regiones)
SS.HH. VARONES 13.13 1.00 13.13
SS.HH. MUJERES 14.14 1.00 14.14
DUCHA 1.41 1.00 1.41
SS.HH. DOCENTES 3.68 1.00 3.68
COCINA 12.62 1.00 12.62
44.98
03.04.03 PISO DE CONCRETO E= 2",PULIDO, COLOREADO Y BRUÑADO
(Área calculada con AutoCAD Arquitectural 2013, regiones)
AULAS (1° NIVEL) 182.93 182.93
ESCALERA 22.40 1.00 22.40
ALMACEN 3.68 1.00 3.68
AULAS (2° NIVEL)
AULAS 182.93 182.93
PASADIZO 65.83 - 1.00 65.83
457.77
03.04.05 VEREDAS F'C=140 KG/CM², E=10CM PASTA 1:2
(Área calculada con AutoCAD Arquitectural 2013, regiones)
AULAS - ESCALERA 97.00 - 1.00 97.00
SS. HH., COCINA 31.34 - 1.00 31.34
128.34
03.04.06 ENCOFRADO Y DESENCOFRADO EN VEREDAS
PABELLÓN - ESCALERA
PERÍMETRO 84.65 0.20 1.00 16.93
JUNTAS 2.00 0.10 8.00 1.60
JUNTAS 0.70 0.10 16.00 1.12
SS.HH. - COCINA
PERÍMETRO 38.80 0.20 1.00 7.76
JUNTAS 1.30 0.10 4.00 0.52
JUNTAS 0.70 0.10 10.00 0.70
28.63
03.04.07 CANTONERAS DE ALUMINIO ESCALERA Y JUNTAS PISOS
PRIMER TRAMO 2.10 10.00 21.00
SEGUNDO TRAMO 2.10 10.00 21.00
42.00
03.04.08 JUNTAS ASFÁLTICAS 1" VEREDAS
PABELLÓN - ESCALERA
JUNTAS 2.00 8.00 16.00
JUNTAS 0.70 16.00 11.20
SS.HH. - COCINA
JUNTAS 1.30 4.00 5.20
JUNTAS 0.70 10.00 7.00
39.40
03.04.09 JUNTAS ASFÁLTICAS 1" CANAL DE EVACUACIÓN PLUVIAL
PABELLÓN - ESCALERA
JUNTAS 1.60 24.00 38.40
SS.HH. - COCINA
JUNTAS 1.60 14.00 22.40
60.80
03.04.10 JUNTAS ASFÁLTICAS 1/2" AULAS
JUNTAS 8.40 3.00 25.20
JUNTAS 6.60 3.00 19.80
45.00
03.05.00 ZOCALOS Y CONTRAZOCALOS
03.05.01 CONTRAZOCALO DE CEMENTO H=0.10 M
AULAS 31.58 3.00 94.74
AULA DE INNOVACIÓN PEDAGÓGICA 31.58 1.00 31.58
DIRECCIÓN 21.76 1.00 21.76
SALA DE USOS MÚLTIPLES 40.22 1.00 40.22
ALMACÉN 11.14 1.00 11.14
199.44
03.05.02 CONTRAZOCALO DE CEMENTO H=0.30 M
PABELLÓN - ESCALERA
PRIMER NIVEL 70.55 1.00 70.55
SEGUNDO NIVEL 56.07 1.00 56.07
SS.HH. - COCINA
PERÍMETRO 23.85 1.00 23.85
150.47
03.05.03 ZOCALO DE MAYOLICA BLANCA DE 20 X 30 (PRIMERA)
SS.HH. VARONES
URINARIO + BEBEDERO
13.20 1.80 1.00 13.20
INODORO
3.90 1.80 2.00 7.80
SS.HH. DAMAS
URINARIO + BEBEDERO
12.00 1.80 1.00 12.00
INODORO
3.90 1.80 3.00 11.70
SS.HH. DOCENTES
7.15 1.80 1.00 7.15
DUCHA
4.10 1.80 1.00 7.38
COCINA
3.90 2.50 1.00 3.90
1.20 1.00 3.00 3.60
1.65 2.75 1.00 1.65
5.05 2.75 1.00 5.05
73.43
03.06.00 CARPINTERÍA DE MADERA
03.06.01 PUERTA DE MADERA DE CEDRO ENTABLERADA
PUERTAS TIPO P1 (1.05 m x 2.10 m) 1.05 2.10 11.00 24.26
PUERTAS TIPO P2 (1.05 m x 2.10 m) 0.90 2.10 5.00 9.45
PUERTAS TIPO P3 (0.70 m x 2.10 m) 0.70 2.10 1.00 1.47
35.18
03.06.02 PUERTA DE MADERA DE CEDRO CONTRAPLACADA triplay 6mm
PUERTAS TIPO P4 (0.70 m x 1.60 m) 0.70 1.60 5.00 5.60
03.06.03 COLOCACIÓN DE PUERTAS 22.00
03.06.04 VENTANA DE MADERA DE CEDRO
VENTANAS TIPO V1 (3.60 m x 0.80 m) 3.60 0.80 6.00 17.28
VENTANAS TIPO V2 (3.60 m x 1.60 m) 3.60 1.60 6.00 34.56
VENTANAS TIPO V3 (3.60 m x 1.73 m) 3.60 1.73 6.00 37.37
VENTANAS TIPO V4 (3.60 m x 0.88 m) 3.60 0.88 6.00 19.01
VENTANAS TIPO V5 (1.20m x 1.40 m) 1.20 1.40 2.00 3.36
VENTANAS TIPO V6 (1.20 m x 1.50 m) 1.20 1.50 1.00 1.80
VENTANAS TIPO V7 (2.60 m x 0.70 m) 2.60 0.70 1.00 1.82
VENTANAS TIPO V8 (1.75 m x 0.70 m) 1.75 0.70 1.00 1.23
VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.50 0.40 1.00 0.60
117.03
03.06.05 COLOCACIÓN DE VENTANAS 30.00
03.06.06 TICERO DE MADERA CEDRO L=5 m BARNIZADO 5.00
03.07.00 CARPINTERÍA METÁLICA
03.07.01 BARRAS DE SEGURIDAD FIERRO LISO Ø 1/2" EN VENTANAS
VENTANAS TIPO V1 (3.60 m x 0.80 m) 3.60 0.80 29.20 6.00 175.20
VENTANAS TIPO V2 (3.60 m x 1.60 m) 3.60 1.60 58.40 6.00 350.40
VENTANAS TIPO V3 (3.60 m x 1.73 m) 3.60 1.73 63.82 6.00 382.92
VENTANAS TIPO V4 (3.60 m x 0.88 m) 3.60 0.88 30.32 6.00 181.92
VENTANAS TIPO V5 (1.20m x 1.40 m) 1.20 1.40 16.40 2.00 32.80
VENTANAS TIPO V6 (1.20 m x 1.50 m) 1.20 1.50 18.00 1.00 18.00
VENTANAS TIPO V7 (2.60 m x 0.70 m) 2.60 0.70 17.40 1.00 17.40
VENTANAS TIPO V8 (1.75 m x 0.70 m) 1.75 0.70 11.90 1.00 11.90
VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.50 0.40 5.40 1.00 5.40
1,175.94
03.08.00 CERRAJERÍA
03.08.01 BISAGRA Ac. ALUMINIZADA DE 4" X 4"
PUERTAS TIPO P1 (1.05 m x 2.10 m) 44.00
PUERTAS TIPO P2 (1.05 m x 2.10 m) 20.00
PUERTAS TIPO P3 (0.70 m x 2.10 m) 4.00
68.00
03.08.02 BISAGRA Ac. ALUMINIZADA DE 3" X 3"
PUERTAS TIPO P4 (0.70 m x 1.60 m) 15.00
03.08.03 BISAGRA Ac. ALUMINIZADA DE 2 1/2" X 2 1/2"
VENTANAS TIPO V1 (3.60 m x 0.80 m) 48.00
VENTANAS TIPO V2 (3.60 m x 1.60 m) 48.00
VENTANAS TIPO V3 (3.60 m x 1.73 m) 48.00
VENTANAS TIPO V4 (3.60 m x 0.88 m) 48.00
VENTANAS TIPO V5 (1.20m x 1.40 m) 8.00
VENTANAS TIPO V6 (1.20 m x 1.50 m) 4.00
VENTANAS TIPO V7 (2.60 m x 0.70 m) 8.00
VENTANAS TIPO V8 (1.75 m x 0.70 m) 4.00
VENTANAS TIPO V9 (1.50 m x 0.40 m) 2.00
218.00
03.08.04 CERRADURA PARA PUERTA PESADA
PUERTAS TIPO P1 (1.05 m x 2.10 m) 11.00
PUERTAS TIPO P2 (1.05 m x 2.10 m) 5.00
PUERTAS TIPO P3 (0.70 m x 2.10 m) 1.00
17.00
03.08.05 PESTILLO 4"
PUERTAS TIPO P1 (1.05 m x 2.10 m) 5.00
03.08.06 PESTILLO 3"
VENTANAS TIPO V1 (3.60 m x 0.80 m) 24.00
VENTANAS TIPO V2 (3.60 m x 1.60 m) 24.00
VENTANAS TIPO V3 (3.60 m x 1.73 m) 24.00
VENTANAS TIPO V4 (3.60 m x 0.88 m) 24.00
VENTANAS TIPO V5 (1.20m x 1.40 m) 4.00
VENTANAS TIPO V6 (1.20 m x 1.50 m) 2.00
VENTANAS TIPO V7 (2.60 m x 0.70 m) 4.00
VENTANAS TIPO V8 (1.75 m x 0.70 m) 2.00
VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.00
109.00
03.09.00 VIDRIOS, CRISTALES Y SIMILARES
03.09.01 VIDRIO SEMI DOBLE INCOLORO
VENTANAS TIPO V1 (3.60 m x 0.80 m) 3.60 0.80 6.00 17.28
VENTANAS TIPO V2 (3.60 m x 1.60 m) 3.60 1.60 6.00 34.56
VENTANAS TIPO V3 (3.60 m x 1.73 m) 3.60 1.73 6.00 37.37
VENTANAS TIPO V4 (3.60 m x 0.88 m) 3.60 0.88 6.00 19.01
VENTANAS TIPO V5 (1.20m x 1.40 m) 1.20 1.40 2.00 3.36
VENTANAS TIPO V6 (1.20 m x 1.50 m) 1.20 1.50 1.00 1.80
VENTANAS TIPO V7 (2.60 m x 0.70 m) 2.60 0.70 1.00 1.82
VENTANAS TIPO V8 (1.75 m x 0.70 m) 1.75 0.70 1.00 1.23
VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.50 0.40 1.00 0.60
117.03
PIE CUADRADO = 1,258.39
03.10.00 PINTURA
03.10.01 PINTURA LATEX EN DOS MANOS
TARRAJEO DE MUROS y CIELORRAZOS EXTERIORES - - - 255.11
TARRAJEO DE MUROS y CIELORRAZOS INTERIORES - - - 501.67
TARRAJEO DE COLUMNAS y COLUMNETAS - - - 260.90
TARRAJEO DE VIGAS y VIGUETAS - - - 468.00
VESTIDURA DE DERRAMES 0.15 338.75 - 50.81
TARRAJEO EN FONDO DE ESCALERA - - - 23.61
1,560.10
03.10.02 PINTURA BARNIZ EN PUERTAS DE MADERA
PUERTAS TIPO P1 (1.05 m x 2.10 m) 1.05 2.10 11.00 24.26
PUERTAS TIPO P2 (1.05 m x 2.10 m) 0.90 2.10 5.00 9.45
PUERTAS TIPO P3 (0.70 m x 2.10 m) 0.70 2.10 1.00 1.47
PUERTAS TIPO P4 (0.70 m x 1.60 m) 0.70 1.60 5.00 5.60
40.78
03.10.03 PINTURA BARNIZ EN VENTANAS DE MADERA
VENTANAS TIPO V1 (3.60 m x 0.80 m) 3.60 0.80 6.00 17.28
VENTANAS TIPO V2 (3.60 m x 1.60 m) 3.60 1.60 6.00 34.56
VENTANAS TIPO V3 (3.60 m x 1.73 m) 3.60 1.73 6.00 37.37
VENTANAS TIPO V4 (3.60 m x 0.88 m) 3.60 0.88 6.00 19.01
VENTANAS TIPO V5 (1.20m x 1.40 m) 1.20 1.40 2.00 3.36
VENTANAS TIPO V6 (1.20 m x 1.50 m) 1.20 1.50 1.00 1.80
VENTANAS TIPO V7 (2.60 m x 0.70 m) 2.60 0.70 1.00 1.82
VENTANAS TIPO V8 (1.75 m x 0.70 m) 1.75 0.70 1.00 1.23
VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.50 0.40 1.00 0.60
117.03
03.10.04 PINTURA BARNIZ EN CIELORRAZO TRYPLAY
(teniendo en cuenta la pendiente de techo)
PABELLÓN - ESCALERA
SALA DE USOS MÚLTIPLES 12.65 7.46 1.00 94.37
DIRECCIÓN 4.10 7.46 1.00 30.59
AULA DE INNOVACIÓN PEDAGÓGICA 8.40 7.46 1.00 62.66
ESCALERA 4.40 5.65 1.00 24.86
PASADIZO 30.62 2.15 1.00 65.83
SS.HH. - COCINA
INTERIOR DE AMBIENTES 10.35 5.20 1.00 53.82
332.13
03.10.05 PINTURA DE CONTRAZOCALO CON ESMALTE
CONTRAZOCALO DE CEMENTO H=0.10 M 0.10 199.44 - 19.94
CONTRAZOCALO DE CEMENTO H=0.30 M 0.30 150.47 - 45.14
65.08
03.10.06 PINTURA DE PIZARRA DE CEMENTO 1.10 5.00 5.00 27.50
27.50
03.11.00 VARIOS, LIMPIEZA,JARDINERÍA
03.11.01 LIMPIEZA GENERAL DE OBRA #REF!
03.11.02 SEMBRÍO DE GRASS
( Área calculada con AutoCAD Civil 3D Land Desktop 2013) 136.62
PROYECTO : MEJORAMIENTO DE LA INSTITUCIÓN EDUCATIVA Nº 82467 FRANCISCO DELGADO GUERRERO, PROYECTISTA : LDGBNAMO - DISTRITO HUASMÍN - CELENDÍN - CAJAMARCA LOCALIDAD : NAMO
DISTRITO : HUASMÍN DPTO : CAJAMARCA
PROVINCIA : CELENDÍN FECHA : Octubre 2012
ITEM DESCRIPCION VOLUMEN (m3) AREAS (m2) METRO LINEAL (m) UND ACERO
a/Area l ó e h ó% n ó esp Vol. a/Area l n Area l n Lt u (KG)
02.00.00 ESTRUCTURAS
02.01.00 MOVIMIENTO DE TIERRAS
02.01.01 NIVELACION DEL TERRENO
PABELLÓN - ESCALERA (inc/veredas) #REF! - 1.00 #REF!
SS.HH. COCINA (inc/veredas) #REF! - 1.00 #REF!
#REF!
02.01.02 CORTE DE TERRENO A NIVEL DE AFIRMADO PARA PISO Y VEREDAS
(Volumen calculado con AutoCAD Civil 3D Land Desktop 2013)
PABELLÓN - ESCALERA (hasta cota 2,617.11), inc/veredas 330.63
SS.HH. COCINA (hasta cota 2,616.06), inc/veredas 109.07
GRADERÍA (hasta cota 2,616.06) 6.60
446.30
02.01.03 CORTE DE TERRENO PARA CONFORMACIÓN DE TALUD
(Volumen calculado con AutoCAD Civil 3D Land Desktop 2013)
PABELLÓN - ESCALERA, SS.HH. COCINA (hasta cota 2,617.31) 95.83
02.01.04 EXCAVACION DE ZANJAS
ZAPATAS PABELLÓN - ESCALERA
EJE A - EJE 1 (Z-1) 1.70 1.70 2.00 1.00 5.78
EJE A - EJE 2 (Z-2) 2.00 2.00 2.00 1.00 8.00
EJE A - EJE 3 (Z-2) 2.00 2.00 2.00 1.00 8.00
EJE A - EJE 4 (Z-2) 2.00 2.00 2.00 1.00 8.00
EJE A - EJE 5 (Z-2) 2.00 2.00 2.00 1.00 8.00
EJE A - EJE 6 (Z-2) 2.00 2.00 2.00 1.00 8.00
EJE A - EJE 7 (Z-1) 1.70 1.70 2.00 1.00 5.78
EJE B - EJE 1 (Z-3) 1.90 1.90 2.00 1.00 7.22
EJE B - EJE 2 (Z-4) 2.20 2.20 2.00 1.00 9.68
EJE B - EJE 3 (Z-4) 2.20 2.20 2.00 1.00 9.68
EJE B - EJE 4 (Z-4) 2.20 2.20 2.00 1.00 9.68
EJE B - EJE 5 (Z-4) 2.20 2.20 2.00 1.00 9.68
EJE B - EJE 6 (Z-4) 2.20 2.20 2.00 1.00 9.68
EJE B - EJE 7 (Z-3) 1.90 1.90 2.00 1.00 7.22
EJE G - EJE 11 (Z-5) 1.50 1.50 1.70 1.00 3.83
EJE G - EJE 11 (Z-5) 1.50 1.50 1.70 1.00 3.83
EJE H - EJE 11 (Z-5) 1.50 1.50 1.70 1.00 3.83
EJE H - EJE 12 (Z-5) 1.50 1.50 1.70 1.00 3.83
ZAPATAS SS.HH. COCINA
EJE C - EJE 8 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE C - EJE 9 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE C - EJE 10 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE D - EJE 8 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE D - EJE 9 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE D - EJE 10 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE E - EJE 8 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE E - EJE 9 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE E - EJE 10 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE F - EJE 8 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE F - EJE 9 (Z-6) 1.00 1.00 1.50 1.00 1.50
EJE F - EJE 10 (Z-6) 1.00 1.00 1.50 1.00 1.50
VIGAS DE CIMENTACIÓN, CIMIENTO CORRIDO PABELLÓN - ESCALERA
EJE A, ENTRE EJE 1 - EJE 2 2.40 0.30 1.00 1.00 0.72
EJE A, ENTRE EJE 2 - EJE 3 2.25 0.30 1.00 1.00 0.68
EJE A, ENTRE EJE 3 - EJE 4 2.25 0.30 1.00 1.00 0.68
EJE A, ENTRE EJE 4 - EJE 5 2.25 0.30 1.00 1.00 0.68
EJE A, ENTRE EJE 5 - EJE 6 2.25 0.30 1.00 1.00 0.68
EJE A, ENTRE EJE 6 - EJE 7 2.40 0.30 1.00 1.00 0.72
EJE B, ENTRE EJE 1 - EJE 2 2.18 0.30 1.00 1.00 0.65
EJE B, ENTRE EJE 2 - EJE 3 2.05 0.30 1.00 1.00 0.62
EJE B, ENTRE EJE 3 - EJE 4 2.05 0.30 1.00 1.00 0.62
EJE B, ENTRE EJE 4 - EJE 5 2.05 0.30 1.00 1.00 0.62
EJE B, ENTRE EJE 5 - EJE 6 2.05 0.30 1.00 1.00 0.62
EJE B, ENTRE EJE 6 - EJE 7 2.18 0.30 1.00 1.00 0.65
EJE 1, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50
EJE 2, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50
EJE 3, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50
EJE 4, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50
EJE 5, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50
EJE 6, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50
EJE 7, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50
EJE 11, ENTRE EJE G - EJE H 1.50 0.45 0.90 1.00 0.61
EJE 12, ENTRE EJE G - EJE H 1.50 0.45 0.90 1.00 0.61
ESCALERA 1.00 0.50 1.10 1.00 0.55
CIMIENTOS CORRIDOS SS.HH. COCINA
EJE C, ENTRE EJE 8 - EJE 9 1.40 0.60 1.10 1.00 0.92
EJE D, ENTRE EJE 8 - EJE 9 1.40 0.60 1.10 1.00 0.92
EJE E, ENTRE EJE 8 - EJE 9 1.40 0.60 1.10 1.00 0.92
EJE F, ENTRE EJE 8 - EJE 9 1.40 0.60 1.10 1.00 0.92
EJE C, ENTRE EJE 9 - EJE 10 1.40 0.60 1.10 1.00 0.92
EJE D, ENTRE EJE 9 - EJE 10 1.40 0.60 1.10 1.00 0.92
EJE E, ENTRE EJE 9 - EJE 10 1.40 0.60 1.10 1.00 0.92
EJE F, ENTRE EJE 9 - EJE 10 1.40 0.60 1.10 1.00 0.92
ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.00 0.60 1.10 1.00 2.64
EJE 8, ENTRE EJE C - EJE F 11.10 0.60 1.10 1.00 7.33
EJE 9, ENTRE EJE C - EJE F 0.85 0.60 1.10 1.00 0.56
EJE 10, ENTRE EJE C - EJE F 11.10 0.60 1.10 1.00 7.33
ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.60 1.10 1.00 0.79
ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.60 1.10 1.00 0.66
GRADERÍA VEREDA 1.30 0.50 0.60 1.00 0.39
CANAL DE EVACUACIÓN PLUVIAL
(Volumen calculado con AutoCAD Civil 3D Land Desktop 2013)
PABELLÓN - ESCALERA (hasta cota 2,616.61), inc/veredas 26.12
SS.HH. COCINA (hasta cota 2,615.56), inc/veredas 12.35
ZANJA PARA TUBERÍA DE EVACUACIÓN PLUVIAL
PABELLÓN - ESCALERA 2.50 0.40 0.60 1.00 0.60
SS.HH. COCINA 32.60 0.40 0.60 1.00 7.82
241.88
02.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO MANUAL.
ZAPATAS PABELLÓN - ESCALERA
ZAPATA (Z-1) 1.70 1.70 1.00 2.00 5.78
Volúmen de columna y viga de cimentación 0.35 - (0.60) 2.00 (0.42)
Volúmen de columna y sobrecimiento 0.28 - (0.40) 2.00 (0.22)
ZAPATA (Z-2) 2.00 2.00 1.00 5.00 20.00
Volúmen de columna y viga de cimentación 0.66 - (0.60) 5.00 (1.98)
Volúmen de columna y sobrecimiento 0.46 - (0.40) 5.00 (0.92)
ZAPATA (Z-3) 1.90 1.90 1.00 2.00 7.22
Volúmen de columna y viga de cimentación 0.39 - (0.60) 2.00 (0.47)
Volúmen de columna y sobrecimiento 0.30 - (0.40) 2.00 (0.24)
ZAPATA (Z-4) 2.20 2.20 1.00 5.00 24.20
Volúmen de columna y viga de cimentación 0.72 - (0.60) 5.00 (2.16)
Volúmen de columna y sobrecimiento 0.45 - (0.40) 5.00 (0.90)
ZAPATA (Z-5) 1.50 1.50 0.80 3.00 5.40
Volúmen de columna y cimiento corrido 0.41 - (0.80) 3.00 (0.98)
ZAPATA (Z-5) 1.50 1.50 0.80 1.00 1.80
Volúmen de columna, cimentación escalera y cim. corrido 0.97 - (0.80) 1.00 (0.78)
ZAPATAS SS.HH. COCINA
C-4 ZAPATA (Z-6) 1.00 1.00 0.65 1.00 0.65
Volúmen de columna y cimiento corrido 0.84 - (0.35) 1.00 (0.29)
Volúmen de columna y sobrecimiento 0.21 - (0.30) 1.00 (0.06)
C-4 ZAPATA (Z-6) 1.00 1.00 0.65 4.00 2.60
Volúmen de columna y cimiento corrido 0.60 - (0.35) 4.00 (0.84)
Volúmen de columna y sobrecimiento 0.15 - (0.30) 4.00 (0.18)
C-5 ZAPATA (Z-6) 1.00 1.00 0.65 3.00 1.95
Volúmen de columna y cimiento corrido 0.84 - (0.35) 3.00 (0.88)
Volúmen de columna y sobrecimiento 0.21 - (0.30) 3.00 (0.19)
C-5 ZAPATA (Z-6) 1.00 1.00 0.65 3.00 1.95
Volúmen de columna y cimiento corrido 0.84 - (0.35) 3.00 (0.88)
Volúmen de columna y sobrecimiento 0.24 - (0.30) 3.00 (0.22)
C-6 ZAPATA (Z-6) 1.00 1.00 0.65 1.00 0.65
Volúmen de columna y cimiento corrido 0.84 - (0.35) 1.00 (0.29)
Volúmen de columna y sobrecimiento 0.24 - (0.30) 1.00 (0.07)
VIGAS DE CIMENTACIÓN, CIMIENTO CORRIDO PABELLÓN - ESCALERA
EJE A, ENTRE EJE 1 - EJE 2 2.40 0.15 0.40 1.00 0.14
EJE A, ENTRE EJE 2 - EJE 3 2.25 0.15 0.40 1.00 0.14
EJE A, ENTRE EJE 3 - EJE 4 2.25 0.15 0.40 1.00 0.14
EJE A, ENTRE EJE 4 - EJE 5 2.25 0.15 0.40 1.00 0.14
EJE A, ENTRE EJE 5 - EJE 6 2.25 0.15 0.40 1.00 0.14
EJE A, ENTRE EJE 6 - EJE 7 2.40 0.15 0.40 1.00 0.14
EJE B, ENTRE EJE 1 - EJE 2 2.18 0.15 0.40 1.00 0.13
EJE B, ENTRE EJE 2 - EJE 3 2.05 0.15 0.40 1.00 0.12
EJE B, ENTRE EJE 3 - EJE 4 2.05 0.15 0.40 1.00 0.12
EJE B, ENTRE EJE 4 - EJE 5 2.05 0.15 0.40 1.00 0.12
EJE B, ENTRE EJE 5 - EJE 6 2.05 0.15 0.40 1.00 0.12
EJE B, ENTRE EJE 6 - EJE 7 2.18 0.15 0.40 1.00 0.13
EJE 1, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30
EJE 2, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30
EJE 3, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30
EJE 4, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30
EJE 5, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30
EJE 6, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30
EJE 7, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30
EJE 11, ENTRE EJE G - EJE H 1.50 0.30 0.10 2.00 0.09
EJE 12, ENTRE EJE G - EJE H 1.50 0.30 0.10 3.00 0.14
ESCALERA 1.00 0.20 0.10 3.00 0.06
CIMIENTOS CORRIDOS SS.HH. COCINA
EJE C, ENTRE EJE 8 - EJE 9 1.40 0.45 0.30 1.00 0.19
EJE D, ENTRE EJE 8 - EJE 9 1.40 0.45 0.30 1.00 0.19
EJE E, ENTRE EJE 8 - EJE 9 1.40 0.45 0.30 1.00 0.19
EJE F, ENTRE EJE 8 - EJE 9 1.40 0.45 0.30 1.00 0.19
EJE C, ENTRE EJE 9 - EJE 10 1.40 0.45 0.30 1.00 0.19
EJE D, ENTRE EJE 9 - EJE 10 1.40 0.45 0.30 1.00 0.19
EJE E, ENTRE EJE 9 - EJE 10 1.40 0.45 0.30 1.00 0.19
EJE F, ENTRE EJE 9 - EJE 10 1.40 0.45 0.30 1.00 0.19
ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.00 0.45 0.30 1.00 0.54
EJE 8, ENTRE EJE C - EJE F 11.10 0.45 0.30 1.00 1.50
EJE 9, ENTRE EJE C - EJE F 0.85 0.45 0.30 1.00 0.11
EJE 10, ENTRE EJE C - EJE F 11.10 0.45 0.30 1.00 1.50
ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.45 0.30 1.00 0.16
ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.45 0.30 1.00 0.14
ZANJA PARA TUBERÍA DE EVACUACIÓN PLUVIAL
PABELLÓN - ESCALERA 2.50 0.40 0.60 1.00 0.60
SS.HH. COCINA 32.60 0.40 0.60 1.00 7.82
77.09
02.01.06 BASE COMPACTADO CON MATERIAL PRESTAMO (AFIRMADO e=0.30m) BAJO CIMENTACION
ZAPATAS PABELLÓN - ESCALERA
ZAPATA (Z-1) 1.70 1.70 0.30 2.00 1.73
ZAPATA (Z-2) 2.00 2.00 0.30 5.00 6.00
ZAPATA (Z-3) 1.90 1.90 0.30 5.00 5.42
ZAPATA (Z-4) 2.20 2.20 0.30 2.00 2.90
ZAPATA (Z-5) 1.50 1.50 0.30 4.00 2.70
ZAPATA (Z-6) 1.00 1.00 0.30 12.00 3.60
ESCALERA 1.00 0.50 0.20 1.00 0.10
22.45
02.01.07 BASE COMPACTADO CON MATERIAL PRESTAMO (AFIRMADO e=0.10m) PARA FALSO PISOS Y VEREDAS
PISO Y VEREDAS PABELLÓN - ESCALERA
#REF! - 0.10 1.00 #REF!
PISO Y VEREDAS SS.HH. COCINA, GRADERÍA
#REF! - 0.10 1.00 #REF!
3.30 - 0.10 1.00 0.33
#REF!
02.01.08 ELIMINACION DE MATERIAL EXCEDENTE
CORTE DE TERRENO A NIVEL DE AFIRMADO PARA PISO Y VEREDAS 446.30 - - 1.25 557.88
CORTE DE TERRENO PARA CONFORMACIÓN DE TALUD 95.83 - - 1.25 119.79
EXCAVACION DE ZANJAS 241.88 - - 1.25 302.35
RELLENO COMPACTADO CON MATERIAL PROPIO MANUAL. 77.09 - - (1.25) (96.36)
883.66
02.02.00 CONCRETO SIMPLE
02.02.01 SOLADO C:H 1:12 (e=0.10m)
ZAPATAS PABELLÓN - ESCALERA
EJE A - EJE 1 (Z-1) 1.70 1.70 1.00 2.89
EJE A - EJE 2 (Z-2) 2.00 2.00 1.00 4.00
EJE A - EJE 3 (Z-2) 2.00 2.00 1.00 4.00
EJE A - EJE 4 (Z-2) 2.00 2.00 1.00 4.00
EJE A - EJE 5 (Z-2) 2.00 2.00 1.00 4.00
EJE A - EJE 6 (Z-2) 2.00 2.00 1.00 4.00
EJE A - EJE 7 (Z-1) 1.70 1.70 1.00 2.89
EJE B - EJE 1 (Z-3) 1.90 1.90 1.00 3.61
EJE B - EJE 2 (Z-4) 2.20 2.20 1.00 4.84
EJE B - EJE 3 (Z-4) 2.20 2.20 1.00 4.84
EJE B - EJE 4 (Z-4) 2.20 2.20 1.00 4.84
EJE B - EJE 5 (Z-4) 2.20 2.20 1.00 4.84
EJE B - EJE 6 (Z-4) 2.20 2.20 1.00 4.84
EJE B - EJE 7 (Z-3) 1.90 1.90 1.00 3.61
EJE G - EJE 11 (Z-5) 1.50 1.50 1.00 2.25
EJE G - EJE 11 (Z-5) 1.50 1.50 1.00 2.25
EJE H - EJE 11 (Z-5) 1.50 1.50 1.00 2.25
EJE H - EJE 12 (Z-5) 1.50 1.50 1.00 2.25
ZAPATAS SS.HH. COCINA
EJE C - EJE 8 (Z-6) 1.00 1.00 1.00 1.00
EJE C - EJE 9 (Z-6) 1.00 1.00 1.00 1.00
EJE C - EJE 10 (Z-6) 1.00 1.00 1.00 1.00
EJE D - EJE 8 (Z-6) 1.00 1.00 1.00 1.00
EJE D - EJE 9 (Z-6) 1.00 1.00 1.00 1.00
EJE D - EJE 10 (Z-6) 1.00 1.00 1.00 1.00
EJE E - EJE 8 (Z-6) 1.00 1.00 1.00 1.00
EJE E - EJE 9 (Z-6) 1.00 1.00 1.00 1.00
EJE E - EJE 10 (Z-6) 1.00 1.00 1.00 1.00
EJE F - EJE 8 (Z-6) 1.00 1.00 1.00 1.00
EJE F - EJE 9 (Z-6) 1.00 1.00 1.00 1.00
EJE F - EJE 10 (Z-6) 1.00 1.00 1.00 1.00
VIGAS DE CIMENTACIÓN PABELLÓN - CIMENTACIÓN ESCALERA
EJE A, ENTRE EJE 1 - EJE 2 2.40 0.30 1.00 0.72
EJE A, ENTRE EJE 2 - EJE 3 2.25 0.30 1.00 0.68
EJE A, ENTRE EJE 3 - EJE 4 2.25 0.30 1.00 0.68
EJE A, ENTRE EJE 4 - EJE 5 2.25 0.30 1.00 0.68
EJE A, ENTRE EJE 5 - EJE 6 2.25 0.30 1.00 0.68
EJE A, ENTRE EJE 6 - EJE 7 2.40 0.30 1.00 0.72
EJE B, ENTRE EJE 1 - EJE 2 2.18 0.30 1.00 0.65
EJE B, ENTRE EJE 2 - EJE 3 2.05 0.30 1.00 0.62
EJE B, ENTRE EJE 3 - EJE 4 2.05 0.30 1.00 0.62
EJE B, ENTRE EJE 4 - EJE 5 2.05 0.30 1.00 0.62
EJE B, ENTRE EJE 5 - EJE 6 2.05 0.30 1.00 0.62
EJE B, ENTRE EJE 6 - EJE 7 2.18 0.30 1.00 0.65
EJE 1, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50
EJE 2, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50
EJE 3, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50
EJE 4, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50
EJE 5, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50
EJE 6, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50
EJE 7, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50
ESCALERA 1.00 0.50 1.00 0.50
97.14
02.02.02 CIMIENTO CORRIDO 1:10 (C:H) + 30% P.G MÁX. 8"
CIMIENTOS CORRIDOS ESCALERA
EJE 11, ENTRE EJE G - EJE H 2.90 0.45 0.80 1.00 1.04
EJE 12, ENTRE EJE G - EJE H 2.90 0.45 0.80 1.00 1.04
ESCALERA 2.05 0.50 0.75 1.00 0.77
CIMIENTOS CORRIDOS SS.HH. COCINA, GRADERÍA VEREDA
EJE C, ENTRE EJE 8 - EJE 9 2.10 0.60 0.80 1.00 1.01
EJE D, ENTRE EJE 8 - EJE 9 2.10 0.60 0.80 1.00 1.01
EJE E, ENTRE EJE 8 - EJE 9 2.10 0.60 0.80 1.00 1.01
EJE F, ENTRE EJE 8 - EJE 9 2.10 0.60 0.80 1.00 1.01
EJE C, ENTRE EJE 9 - EJE 10 2.10 0.60 0.80 1.00 1.01
EJE D, ENTRE EJE 9 - EJE 10 2.10 0.60 0.80 1.00 1.01
EJE E, ENTRE EJE 9 - EJE 10 2.10 0.60 0.80 1.00 1.01
EJE F, ENTRE EJE 9 - EJE 10 2.10 0.60 0.80 1.00 1.01
ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.60 0.60 0.80 1.00 2.21
EJE 8, ENTRE EJE C - EJE F 11.10 0.60 0.80 1.00 5.33
EJE 9, ENTRE EJE C - EJE F 0.85 0.60 0.80 1.00 0.41
EJE 10, ENTRE EJE C - EJE F 11.10 0.60 0.80 1.00 5.33
ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.60 0.80 1.00 0.58
ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.60 0.80 1.00 0.48
25.27
02.02.03 CONCRETO EN SOBRECIMIENTO f'c=175 kg/cm²
PABELLÓN - ESCALERA
EJE A, ENTRE EJE 1 - EJE 2 3.35 0.15 0.80 1.00 0.40
EJE A, ENTRE EJE 2 - EJE 3 3.38 0.15 0.80 1.00 0.41
EJE A, ENTRE EJE 3 - EJE 4 3.38 0.15 0.80 1.00 0.41
EJE A, ENTRE EJE 4 - EJE 5 3.38 0.15 0.80 1.00 0.41
EJE A, ENTRE EJE 5 - EJE 6 3.38 0.15 0.80 1.00 0.41
EJE A, ENTRE EJE 6 - EJE 7 3.35 0.15 0.80 1.00 0.40
EJE B, ENTRE EJE 1 - EJE 2 3.35 0.15 0.80 1.00 0.40
EJE B, ENTRE EJE 2 - EJE 3 3.38 0.15 0.80 1.00 0.41
EJE B, ENTRE EJE 3 - EJE 4 3.38 0.15 0.80 1.00 0.41
EJE B, ENTRE EJE 4 - EJE 5 3.38 0.15 0.80 1.00 0.41
EJE B, ENTRE EJE 5 - EJE 6 3.38 0.15 0.80 1.00 0.41
EJE B, ENTRE EJE 6 - EJE 7 3.35 0.15 0.80 1.00 0.40
EJE 1, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79
EJE 2, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79
EJE 3, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79
EJE 4, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79
EJE 5, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79
EJE 6, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79
EJE 7, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79
EJE 11, ENTRE EJE G - EJE H 2.70 0.15 0.40 1.00 0.16
EJE 12, ENTRE EJE G - EJE H 2.70 0.15 0.40 1.00 0.16
SS.HH. COCINA
EJE C, ENTRE EJE 8 - EJE 9 2.10 0.15 0.70 1.00 0.22
EJE D, ENTRE EJE 8 - EJE 9 2.10 0.15 0.70 1.00 0.22
EJE E, ENTRE EJE 8 - EJE 9 2.10 0.15 0.70 1.00 0.22
EJE C, ENTRE EJE 9 - EJE 10 2.10 0.15 0.70 1.00 0.22
EJE D, ENTRE EJE 9 - EJE 10 2.10 0.15 0.70 1.00 0.22
EJE E, ENTRE EJE 9 - EJE 10 2.10 0.15 0.70 1.00 0.22
ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.60 0.15 0.70 1.00 0.48
EJE 8, ENTRE EJE C - EJE F 6.20 0.15 0.70 1.00 0.65
EJE 9, ENTRE EJE C - EJE F 0.85 0.15 0.70 1.00 0.09
EJE 10, ENTRE EJE C - EJE F 11.10 0.15 0.70 1.00 1.17
ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.15 0.70 1.00 0.13
ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.15 0.70 1.00 0.11
14.68
02.02.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
PABELLÓN - ESCALERA
EJE A, ENTRE EJE 1 - EJE 2 3.35 0.80 2.00 5.36
EJE A, ENTRE EJE 2 - EJE 3 3.38 0.80 2.00 5.41
EJE A, ENTRE EJE 3 - EJE 4 3.38 0.80 2.00 5.41
EJE A, ENTRE EJE 4 - EJE 5 3.38 0.80 2.00 5.41
EJE A, ENTRE EJE 5 - EJE 6 3.38 0.80 2.00 5.41
EJE A, ENTRE EJE 6 - EJE 7 3.35 0.80 2.00 5.36
EJE B, ENTRE EJE 1 - EJE 2 3.35 0.80 2.00 5.36
EJE B, ENTRE EJE 2 - EJE 3 3.38 0.80 2.00 5.41
EJE B, ENTRE EJE 3 - EJE 4 3.38 0.80 2.00 5.41
EJE B, ENTRE EJE 4 - EJE 5 3.38 0.80 2.00 5.41
EJE B, ENTRE EJE 5 - EJE 6 3.38 0.80 2.00 5.41
EJE B, ENTRE EJE 6 - EJE 7 3.35 0.80 2.00 5.36
EJE 1, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 2, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 3, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 4, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 5, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 6, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 7, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 11, ENTRE EJE G - EJE H 2.70 0.40 2.00 2.16
EJE 12, ENTRE EJE G - EJE H 2.70 0.40 2.00 2.16
SS.HH. COCINA
EJE C, ENTRE EJE 8 - EJE 9 2.10 0.70 2.00 2.94
EJE D, ENTRE EJE 8 - EJE 9 2.10 0.70 2.00 2.94
EJE E, ENTRE EJE 8 - EJE 9 2.10 0.70 2.00 2.94
EJE C, ENTRE EJE 9 - EJE 10 2.10 0.70 2.00 2.94
EJE D, ENTRE EJE 9 - EJE 10 2.10 0.70 2.00 2.94
EJE E, ENTRE EJE 9 - EJE 10 2.10 0.70 2.00 2.94
ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.60 0.70 2.00 6.44
EJE 8, ENTRE EJE C - EJE F 6.20 0.70 2.00 8.68
EJE 9, ENTRE EJE C - EJE F 0.85 0.70 2.00 1.19
EJE 10, ENTRE EJE C - EJE F 11.10 0.70 2.00 15.54
ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.70 2.00 1.68
ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.70 2.00 1.40
195.53
02.02.05 CONCRETO f'c=140 kg/cm² GRADAS
(Área calculada con AutoCAD Arquitectural 2013, corte lateral grada)
GRADA VEREDA 0.40 1.30 - 1.00 0.52
02.02.06 ENCOFRADO Y DESENCOFRADO DE GRADAS
0.40 - 2.00 0.80
02.02.07 FALSO PISO E=4" 1:8
(Área calculada con AutoCAD Arquitectural 2013, regiones)
SS. HH., COCINA (no incluye almacén) 45.71 - 1.00 45.71
45.71
02.02.08 CONCRETO f'c=175 kg/cm² LOSA CANAL DE EVACUACIÓN PLUVIAL
(Área calculada con AutoCAD Civil 3D Land Desktop 2013)
PABELLÓN - ESCALERA 52.24 - 0.15 1.00 7.84
SS.HH. COCINA 24.70 - 0.15 1.00 3.71
11.55
02.02.09 CONCRETO f'c=175 kg/cm² DADO DE PROTECCIÓN DE MONTANTE PLUVIAL
PABELLÓN - ESCALERA 0.04 - 1.40 8.00 0.42
SS.HH. COCINA 0.04 - 1.40 4.00 0.21
0.63
02.02.10 ENCOFRADO Y DESENCOFRADO EN DADO DE PROTECCIÓN DE MONTANTE PLUVIAL
PABELLÓN - ESCALERA 0.55 1.40 8.00 6.16
SS.HH. COCINA 0.55 1.40 4.00 3.08
9.24
02.03.00 CONCRETO ARMADO
02.03.01 CONCRETO EN ZAPATAS f'c=210 kg/cm²
ZAPATAS
ZAPATA (Z-1) 1.70 1.70 0.60 2.00 3.47
ZAPATA (Z-2) 2.00 2.00 0.60 5.00 12.00
ZAPATA (Z-3) 1.90 1.90 0.60 2.00 4.33
ZAPATA (Z-4) 2.20 2.20 0.60 5.00 14.52
ZAPATA (Z-5) 1.50 1.50 0.50 4.00 4.50
ZAPATA (Z-6) 1.00 1.20 0.45 12.00 6.48
45.30
02.03.02 ACERO EN ZAPATAS f'y = 4,200 Kg/cm²
VER PLANILLA #REF!
02.03.03 CONCRETO EN VIGAS DE CIMENTACIÓN f'c=210 kg/cm²
VIGAS DE CIMENTACIÓN
EJE A, ENTRE EJE 1 - EJE 2 3.35 0.30 0.80 1.00 0.80
EJE A, ENTRE EJE 2 - EJE 3 3.38 0.30 0.80 1.00 0.81
EJE A, ENTRE EJE 3 - EJE 4 3.38 0.30 0.80 1.00 0.81
EJE A, ENTRE EJE 4 - EJE 5 3.38 0.30 0.80 1.00 0.81
EJE A, ENTRE EJE 5 - EJE 6 3.38 0.30 0.80 1.00 0.81
EJE A, ENTRE EJE 6 - EJE 7 3.35 0.30 0.80 1.00 0.80
EJE B, ENTRE EJE 1 - EJE 2 3.35 0.30 0.80 1.00 0.80
EJE B, ENTRE EJE 2 - EJE 3 3.38 0.30 0.80 1.00 0.81
EJE B, ENTRE EJE 3 - EJE 4 3.38 0.30 0.80 1.00 0.81
EJE B, ENTRE EJE 4 - EJE 5 3.38 0.30 0.80 1.00 0.81
EJE B, ENTRE EJE 5 - EJE 6 3.38 0.30 0.80 1.00 0.81
EJE B, ENTRE EJE 6 - EJE 7 3.35 0.30 0.80 1.00 0.80
EJE 1, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58
EJE 2, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58
EJE 3, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58
EJE 4, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58
EJE 5, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58
EJE 6, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58
EJE 7, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58
20.74
02.03.04 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIÓN
VIGAS RIOSTRAS Y DE CIMENTACIÓN PABELLÓN - ESCALERA
EJE A, ENTRE EJE 1 - EJE 2 3.35 0.80 2.00 5.36
EJE A, ENTRE EJE 2 - EJE 3 3.38 0.80 2.00 5.41
EJE A, ENTRE EJE 3 - EJE 4 3.38 0.80 2.00 5.41
EJE A, ENTRE EJE 4 - EJE 5 3.38 0.80 2.00 5.41
EJE A, ENTRE EJE 5 - EJE 6 3.38 0.80 2.00 5.41
EJE A, ENTRE EJE 6 - EJE 7 3.35 0.80 2.00 5.36
EJE B, ENTRE EJE 1 - EJE 2 3.35 0.80 2.00 5.36
EJE B, ENTRE EJE 2 - EJE 3 3.38 0.80 2.00 5.41
EJE B, ENTRE EJE 3 - EJE 4 3.38 0.80 2.00 5.41
EJE B, ENTRE EJE 4 - EJE 5 3.38 0.80 2.00 5.41
EJE B, ENTRE EJE 5 - EJE 6 3.38 0.80 2.00 5.41
EJE B, ENTRE EJE 6 - EJE 7 3.35 0.80 2.00 5.36
EJE 1, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 2, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 3, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 4, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 5, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 6, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
EJE 7, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56
138.64
02.03.05 ACERO EN VIGAS DE CIMENTACIÓN f'y = 4,200 Kg/cm²
VER PLANILLA #REF!
02.03.06 CONCRETO EN SOBRECIMIENTO f'c=175 kg/cm²
EJE F, ENTRE EJE 8 - EJE 9 2.10 0.15 0.70 1.00 0.22
EJE F, ENTRE EJE 9 - EJE 10 2.10 0.15 0.70 1.00 0.22
EJE 8, ENTRE EJE E - EJE F 4.00 0.15 0.70 1.00 0.42
0.86
02.03.07 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
EJE F, ENTRE EJE 8 - EJE 9 2.10 0.70 2.00 2.94
EJE F, ENTRE EJE 9 - EJE 10 2.10 0.70 2.00 2.94
EJE 8, ENTRE EJE E - EJE F 4.00 0.70 2.00 5.60
8.54
02.03.08 ACERO EN SOBRECIMIENTO f'y = 4,200 Kg/cm²
VER PLANILLA #REF!
02.03.09 CONCRETO EN COLUMNAS f'c=210 kg/cm²
COLUMNA (C -1) 0.22 - 8.10 4.00 7.13
COLUMNA (C -2) 0.30 - 8.10 10.00 24.30
COLUMNA (C -3) 0.09 - 7.15 2.00 1.29
COLUMNA (C -3) 0.09 - 6.25 2.00 1.13
COLUMNA (C -4) 0.06 - 3.70 1.00 0.22
COLUMNA (C -4) 0.06 - 4.15 4.00 1.00
COLUMNA (C -5) 0.07 - 3.70 6.00 1.55
COLUMNA (C -6) 0.09 - 3.70 1.00 0.33
COLUMNA (C -7) 0.02 - 2.80 2.00 0.11
COLUMNA (C -7) 1.02 - 3.80 1.00 3.88
40.94
02.03.10 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
COLUMNA (C -1) 2.20 8.10 4.00 71.28
COLUMNA (C -2) 2.80 8.10 10.00 226.80
COLUMNA (C -3) 1.20 7.15 2.00 17.16
COLUMNA (C -3) 1.20 6.25 2.00 15.00
COLUMNA (C -4) 1.10 3.70 1.00 4.07
COLUMNA (C -4) 1.10 4.15 4.00 18.26
COLUMNA (C -5) 1.20 3.70 6.00 26.64
COLUMNA (C -6) 1.50 3.70 1.00 5.55
COLUMNA (C -7) 0.60 2.80 2.00 3.36
COLUMNA (C -7) 0.60 3.80 1.00 2.28
390.40
02.03.11 ACERO EN COLUMNAS f'y = 4,200 Kg/cm²
VER PLANILLA #REF!
02.03.12 CONCRETO EN COLUMNETAS f'c=175 kg/cm²
PRIMER NIVEL
COLUMNETA Cc 1 0.15 0.25 1.20 12.00 0.54
COLUMNETA Cc 1 0.15 0.25 2.00 12.00 0.90
COLUMNETA Cc 1 0.15 0.25 2.60 12.00 1.17
SEGUNDO NIVEL
COLUMNETA Cc 1 0.15 0.25 1.25 12.00 0.56
COLUMNETA Cc 1 0.15 0.25 2.10 12.00 0.95
COLUMNETA Cc 1 0.15 0.25 3.03 8.00 0.91
COLUMNETA Cc 1 0.15 0.25 3.67 4.00 0.55
VOLADO
COLUMNETA Cc 2 0.15 0.15 1.00 16.00 0.36
5.94
02.03.13 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS
PRIMER NIVEL
COLUMNETA Cc 1 0.80 1.20 12.00 11.52
COLUMNETA Cc 1 0.80 2.00 12.00 19.20
COLUMNETA Cc 1 0.80 2.60 12.00 24.96
SEGUNDO NIVEL
COLUMNETA Cc 1 0.80 1.25 12.00 12.00
COLUMNETA Cc 1 0.80 2.10 12.00 20.16
COLUMNETA Cc 1 0.80 3.03 8.00 19.39
COLUMNETA Cc 1 0.80 3.67 4.00 11.74
VOLADO
COLUMNETA Cc 2 0.60 1.00 18.00 10.80
129.77
02.03.14 ACERO EN COLUMNETAS f'y = 4,200 kg/cm²
VER PLANILLA #REF!
02.03.15 CONCRETO EN VIGAS f'c=210 kg/cm²
PABELLÓN
PRIMER NIVEL
VP-101
EJE 1, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99
EJE 7, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99
VP-101 VOLADO
EJE 1, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20
EJE 7, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20
VP-102
EJE 2, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99
EJE 3, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99
EJE 4, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99
EJE 5, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99
EJE 6, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99
VP-102 VOLADO
EJE 2, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20
EJE 3, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20
EJE 4, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20
EJE 5, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20
EJE 6, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20
VA-101
EJE A, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40
EJE A, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41
EJE A, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41
EJE A, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41
EJE A, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41
EJE A, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40
EJE B, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40
EJE B, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41
EJE B, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41
EJE B, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41
EJE B, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41
EJE B, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40
Vb-101
EJE B', ENTRE EJE 1 - EJE 2 3.35 0.20 0.25 1.00 0.17
EJE B', ENTRE EJE 2 - EJE 3 3.38 0.20 0.25 1.00 0.17
EJE B', ENTRE EJE 3 - EJE 4 3.38 0.20 0.25 1.00 0.17
EJE B', ENTRE EJE 4 - EJE 5 3.38 0.20 0.25 1.00 0.17
EJE B', ENTRE EJE 5 - EJE 6 3.38 0.20 0.25 1.00 0.17
EJE B', ENTRE EJE 6 - EJE 7 3.35 0.20 0.25 1.00 0.17
SEGUNDO NIVEL
VP-201
EJE 1, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81
EJE 2, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81
EJE 3, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81
EJE 4, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81
EJE 5, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81
EJE 6, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81
EJE 7, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81
VP-201 VOLADO
EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17
EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17
EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17
EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17
EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17
EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17
EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17
EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06
EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06
EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06
EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06
EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06
EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06
EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06
VA-201
EJE A, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40
EJE A, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41
EJE A, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41
EJE A, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41
EJE A, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41
EJE A, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40
EJE B, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40
EJE B, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41
EJE B, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41
EJE B, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41
EJE B, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41
EJE B, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40
EJE C, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40
EJE C, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41
EJE C, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41
EJE C, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41
EJE C, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41
EJE C, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40
VOLADO (ambos lados) 1.00 0.30 0.40 3.00 0.36
VA-202
EJE A', ENTRE EJE 1 - EJE 2 3.35 0.15 0.20 1.00 0.10
EJE A', ENTRE EJE 2 - EJE 3 3.38 0.15 0.20 1.00 0.10
EJE A', ENTRE EJE 3 - EJE 4 3.38 0.15 0.20 1.00 0.10
EJE A', ENTRE EJE 4 - EJE 5 3.38 0.15 0.20 1.00 0.10
EJE A', ENTRE EJE 5 - EJE 6 3.38 0.15 0.20 1.00 0.10
EJE A', ENTRE EJE 6 - EJE 7 3.35 0.15 0.20 1.00 0.10
EJE C', ENTRE EJE 1 - EJE 2 3.35 0.15 0.20 1.00 0.10
EJE C', ENTRE EJE 2 - EJE 3 3.38 0.15 0.20 1.00 0.10
EJE C', ENTRE EJE 3 - EJE 4 3.38 0.15 0.20 1.00 0.10
EJE C', ENTRE EJE 4 - EJE 5 3.38 0.15 0.20 1.00 0.10
EJE C', ENTRE EJE 5 - EJE 6 3.38 0.15 0.20 1.00 0.10
EJE C', ENTRE EJE 6 - EJE 7 3.35 0.15 0.20 1.00 0.10
VOLADO (ambos lados) 1.00 0.15 0.20 2.00 0.06
ESCALERA
VE-101
EJE H, ENTRE EJE 11 - EJE 12 4.40 0.30 0.55 1.00 0.73
VE-102
EJE G, ENTRE EJE 11 - EJE 12 4.40 0.30 0.45 1.00 0.59
VE-103
EJE 11, ENTRE EJE H - EJE G 2.70 0.30 0.20 1.00 0.16
VE-103
EJE 12, ENTRE EJE H - EJE G 2.70 0.30 0.20 1.00 0.16
VP-101 VOLADO (verificar descripción)
EJE 11, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 2.00 0.30 0.40 1.00 0.24
EJE 12, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 2.00 0.30 0.40 1.00 0.24
VE-201
EJE H, ENTRE EJE 11 - EJE 12 4.90 0.30 0.55 1.00 0.81
VE-201
EJE G, ENTRE EJE 11 - EJE 12 4.90 0.30 0.55 1.00 0.81
VE-201
EJE 11, ENTRE EJE H - EJE G 2.70 0.30 0.30 1.00 0.24
VE-201
EJE 12, ENTRE EJE H - EJE G 2.70 0.30 0.30 1.00 0.24
VE-201 VOLADO
EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 2.00 0.30 0.25 1.00 0.15
EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 2.00 0.30 0.25 1.00 0.15
VE-201 VOLADO
EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 2.35 0.30 0.25 1.00 0.18
EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 2.35 0.30 0.25 1.00 0.18
VE-202
EJE H', ENTRE EJE 11 - EJE 12 4.90 0.15 0.20 1.00 0.15
EJE G', ENTRE EJE 11 - EJE 12 4.90 0.15 0.20 1.00 0.15
SS.HH. - COCINA
VA-103
EJE C, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.4*2+0.3)) 6.22 0.15 0.30 1.00 0.28
EJE D, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 6.32 0.15 0.30 1.00 0.28
EJE E, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 6.32 0.15 0.30 1.00 0.28
EJE F, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 6.32 0.15 0.30 1.00 0.28
EJE 8, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.15)) 10.60 0.15 0.30 1.00 0.48
EJE 9, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. 4*0.15) 11.05 0.15 0.30 1.00 0.50
EJE 10, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.45)) 10.30 0.15 0.30 1.00 0.46
VA-104
EJE 8', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 11.05 0.15 0.20 1.00 0.33
EJE 10', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 11.05 0.15 0.20 1.00 0.33
38.85
02.03.16 ENCOFRADO Y DESENCOFRADO EN VIGAS
PABELLÓN
PRIMER NIVEL
VP-101
EJE 1, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 7, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
VP-101 VOLADO
EJE 1, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 7, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
VP-102
EJE 2, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 3, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 4, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 5, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
EJE 6, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57
VP-102 VOLADO
EJE 2, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 3, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 4, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 5, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
EJE 6, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10
VA-101
EJE A, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE A, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
EJE B, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE B, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
Vb-101
EJE B', ENTRE EJE 1 - EJE 2 0.70 3.35 1.00 2.35
EJE B', ENTRE EJE 2 - EJE 3 0.70 3.38 1.00 2.37
EJE B', ENTRE EJE 3 - EJE 4 0.70 3.38 1.00 2.37
EJE B', ENTRE EJE 4 - EJE 5 0.70 3.38 1.00 2.37
EJE B', ENTRE EJE 5 - EJE 6 0.70 3.38 1.00 2.37
EJE B', ENTRE EJE 6 - EJE 7 0.70 3.35 1.00 2.35
SEGUNDO NIVEL
VP-201
EJE 1, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 2, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 3, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 4, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 5, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 6, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
EJE 7, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28
VP-201 VOLADO
EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89
EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63
VA-201
EJE A, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE A, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE A, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
EJE B, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE B, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE B, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
EJE C, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69
EJE C, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72
EJE C, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72
EJE C, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72
EJE C, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72
EJE C, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69
VOLADO (ambos lados) 1.10 1.00 3.00 3.30
VA-202
EJE A', ENTRE EJE 1 - EJE 2 0.55 3.35 1.00 1.84
EJE A', ENTRE EJE 2 - EJE 3 0.55 3.38 1.00 1.86
EJE A', ENTRE EJE 3 - EJE 4 0.55 3.38 1.00 1.86
EJE A', ENTRE EJE 4 - EJE 5 0.55 3.38 1.00 1.86
EJE A', ENTRE EJE 5 - EJE 6 0.55 3.38 1.00 1.86
EJE A', ENTRE EJE 6 - EJE 7 0.55 3.35 1.00 1.84
EJE C', ENTRE EJE 1 - EJE 2 0.55 3.35 1.00 1.84
EJE C', ENTRE EJE 2 - EJE 3 0.55 3.38 1.00 1.86
EJE C', ENTRE EJE 3 - EJE 4 0.55 3.38 1.00 1.86
EJE C', ENTRE EJE 4 - EJE 5 0.55 3.38 1.00 1.86
EJE C', ENTRE EJE 5 - EJE 6 0.55 3.38 1.00 1.86
EJE C', ENTRE EJE 6 - EJE 7 0.55 3.35 1.00 1.84
VOLADO (ambos lados) 0.55 1.00 2.00 1.10
ESCALERA
VE-101
EJE H, ENTRE EJE 11 - EJE 12 1.40 4.40 1.00 6.16
VE-102
EJE G, ENTRE EJE 11 - EJE 12 1.20 4.40 1.00 5.28
VE-103
EJE 11, ENTRE EJE H - EJE G 0.70 2.70 1.00 1.89
VE-103
EJE 12, ENTRE EJE H - EJE G 0.70 2.70 1.00 1.89
VP-101 VOLADO
EJE 11, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 1.10 2.00 1.00 2.20
EJE 12, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 1.10 2.00 1.00 2.20
VE-201
EJE H, ENTRE EJE 11 - EJE 12 1.40 4.90 1.00 6.86
VE-201
EJE G, ENTRE EJE 11 - EJE 12 1.40 4.90 1.00 6.86
VE-201
EJE 11, ENTRE EJE H - EJE G 0.90 2.70 1.00 2.43
VE-201
EJE 12, ENTRE EJE H - EJE G 0.90 2.70 1.00 2.43
VE-201 VOLADO
EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.00 1.00 1.60
EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.00 1.00 1.60
VE-201 VOLADO
EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.35 1.00 1.88
EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.35 1.00 1.88
VE-202
EJE H', ENTRE EJE 11 - EJE 12 0.55 4.90 1.00 2.70
EJE G', ENTRE EJE 11 - EJE 12 0.55 4.90 1.00 2.70
SS.HH. - COCINA
VA-103
EJE C, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.4*2+0.3)) 0.75 6.22 1.00 4.67
EJE D, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74
EJE E, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74
EJE F, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74
EJE 8, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.15)) 0.75 10.60 1.00 7.95
EJE 9, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. 4*0.15) 0.75 11.05 1.00 8.29
EJE 10, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.45)) 0.75 10.30 1.00 7.73
VA-104
EJE 8', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 0.55 11.05 1.00 6.08
EJE 10', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 0.55 11.05 1.00 6.08
414.99
02.03.17 ACERO EN VIGAS f'y = 4,200 kg/cm²
VER PLANILLAS #REF!
02.03.18 CONCRETO EN VIGUETAS f'c=175 kg/cm²
EJE A, ENTRE EJE 1 - EJE 7 (1° y 2° nivel) 3.35 0.15 0.10 12.00 0.60
EJE B, ENTRE EJE 1 - EJE 8 (1° y 2° nivel) 2.30 0.15 0.10 11.00 0.38
EJE B, ENTRE EJE 2 - EJE3 (2° nivel) 3.35 0.15 0.10 1.00 0.05
EJE 1, ENTRE EJE A - EJE B (1° nivel) 6.60 0.15 0.15 2.00 0.30
EJE 3, ENTRE EJE A - EJE B (1° nivel) 6.60 0.15 0.15 2.00 0.30
EJE 5, ENTRE EJE A - EJE B (1° nivel) 6.60 0.15 0.15 2.00 0.30
EJE 7, ENTRE EJE A - EJE B (1° nivel) 6.60 0.15 0.15 2.00 0.30
EJE 1, ENTRE EJE A - EJE B (2° nivel) 6.75 0.15 0.15 2.00 0.30
EJE 4, ENTRE EJE A - EJE B (2° nivel) 6.75 0.15 0.15 2.00 0.30
EJE 5, ENTRE EJE A - EJE B (2° nivel) 6.75 0.15 0.15 2.00 0.30
EJE 7, ENTRE EJE A - EJE B (2° nivel) 6.75 0.15 0.15 2.00 0.30
VOLADO
ENTRE EJE 1 - EJE 2 4.35 0.15 0.10 1.00 0.07
ENTRE EJE 2 - EJE 3 4.20 0.15 0.10 1.00 0.06
ENTRE EJE 3 - EJE 4 4.20 0.15 0.10 1.00 0.06
ENTRE EJE 4 - EJE 5 4.20 0.15 0.10 1.00 0.06
ENTRE EJE 5 - EJE 6 4.20 0.15 0.10 1.00 0.06
ENTRE EJE 6 - EJE 7 4.35 0.15 0.10 1.00 0.07
ENTRE EJE 11- EJE 12 5.00 0.15 0.10 1.00 0.08
EJE 1 2.00 0.15 0.10 1.00 0.03
EJE 12 2.00 0.15 0.10 1.00 0.03
3.95
02.03.19 ENCOFRADO Y DESENCOFRADO EN VIGUETAS
EJE A, ENTRE EJE 1 - EJE 7 (1° y 2° nivel) 0.20 3.35 12.00 8.04
EJE B, ENTRE EJE 1 - EJE 8 (1° y 2° nivel) 0.20 2.30 11.00 5.06
EJE B, ENTRE EJE 2 - EJE3 (2° nivel) 0.20 3.35 1.00 0.67
EJE 1, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96
EJE 3, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96
EJE 5, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96
EJE 7, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96
EJE 1, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05
EJE 4, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05
EJE 5, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05
EJE 7, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05
VOLADO
ENTRE EJE 1 - EJE 2 0.20 4.35 1.00 0.87
ENTRE EJE 2 - EJE 3 0.20 4.20 1.00 0.84
ENTRE EJE 3 - EJE 4 0.20 4.20 1.00 0.84
ENTRE EJE 4 - EJE 5 0.20 4.20 1.00 0.84
ENTRE EJE 5 - EJE 6 0.20 4.20 1.00 0.84
ENTRE EJE 6 - EJE 7 0.20 4.35 1.00 0.87
ENTRE EJE 11- EJE 12 0.20 5.00 1.00 1.00
EJE 1 0.20 2.00 1.00 0.40
EJE 12 0.20 2.00 1.00 0.40
52.71
02.03.20 ACERO EN VIGUETAS f'y = 4,200 kg/cm²
VER PLANILLAS #REF!
02.03.21 CONCRETO EN DINTEL f'c=175 kg/cm²
EJE 8, ENTRE EJE C - EJE F 10.60 0.15 0.20 1.00 0.32
EJE 10, ENTRE EJE E - EJE F 1.65 0.15 0.20 1.00 0.05
0.37
02.03.22 ENCOFRADO Y DESENCOFRADO EN DINTEL
EJE 8, ENTRE EJE C - EJE F 0.55 10.60 1.00 5.83
EJE 10, ENTRE EJE E - EJE F 0.55 1.65 1.00 0.91
6.74
02.03.23 ACERO EN DINTEL f'y = 4,200 kg/cm²
VER PLANILLAS #REF!
02.03.24 CONCRETO EN ESCALERA f'c=210 kg/cm²
PRIMER TRAMO (área lateral*ancho) 1.15 2.20 1.00 2.53
SEGUNDO TRAMO (área lateral*ancho) 1.30 2.20 1.00 2.86
5.39
02.03.25 ENCOFRADO Y DESENCOFRADO EN ESCALERA
PRIMER TRAMO 4.85 2.20 1.00 10.67
SEGUNDO TRAMO 4.85 2.20 1.00 10.67
LATERAL PRIMER TRAMO 1.15 1.00 1.15
LATERAL SEGUNDO TRAMO 1.30 1.00 1.30
CONTRAPASOS PRIMER TRAMO 2.20 0.17 10.00 3.74
CONTRAPASOS SEGUNDO TRAMO 2.20 0.17 10.00 3.74
31.27
02.03.26 ACERO EN ESCALERA f'y = 4,200 kg/cm²
VER PLANILLAS #REF!
02.03.27 CONCRETO EN LOSA ALIGERADA f'c=210 kg/cm²
VIGUETAS PRIMER NIVEL
ENTRE EJE A - EJE B y ENTRE EJE 1 - EJE 2 3.93 0.10 0.20 21.00 1.65
ENTRE EJE A - EJE B y ENTRE EJE 2 - EJE 3 3.95 0.10 0.20 21.00 1.66
ENTRE EJE A - EJE B y ENTRE EJE 3 - EJE 4 3.95 0.10 0.20 21.00 1.66
ENTRE EJE A - EJE B y ENTRE EJE 4 - EJE 5 3.95 0.10 0.20 21.00 1.66
ENTRE EJE A - EJE B y ENTRE EJE 5 - EJE 6 3.95 0.10 0.20 21.00 1.66
ENTRE EJE A - EJE B y ENTRE EJE 6 - EJE 7 3.93 0.10 0.20 21.00 1.65
ENTRE EJE G - EJE H y ENTRE EJE 11 - EJE 9 4.40 0.10 0.20 4.00 0.35
LOSA PRIMER NIVEL
ENTRE EJE A - EJE B y ENTRE EJE 1 - EJE 2 3.93 9.00 0.05 1.00 1.77
ENTRE EJE A - EJE B y ENTRE EJE 2 - EJE 3 3.95 9.00 0.05 1.00 1.78
ENTRE EJE A - EJE B y ENTRE EJE 3 - EJE 4 3.95 9.00 0.05 1.00 1.78
ENTRE EJE A - EJE B y ENTRE EJE 4 - EJE 5 3.95 9.00 0.05 1.00 1.78
ENTRE EJE A - EJE B y ENTRE EJE 5 - EJE 6 3.95 9.00 0.05 1.00 1.78
ENTRE EJE A - EJE B y ENTRE EJE 6 - EJE 7 3.93 9.00 0.05 1.00 1.77
ENTRE EJE G - EJE H y ENTRE EJE 11 - EJE 9 4.40 2.00 0.05 1.00 0.44
21.39
02.03.28 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA
LOSA PRIMER NIVEL
PABELLÓN 23.66 9.00 1.00 212.94
ESCALERA 4.40 2.00 1.00 8.80
221.74
02.03.29 LADRILLO HUECO DE COCRETO H=20 cm PARA LOSA ALIGERADA
LOSA PRIMER NIVEL 2,217.00
02.03.30 ACERO EN LOSA ALIGERADA f'y = 4,200 kg/cm²
VER PLANILLAS #REF!
02.03.31 CONCRETO EN MURO ESCALERA f'c=210 kg/cm²
PRIMER TRAMO 2.70 0.10 1.05 1.00 0.28
SEGUNDO TRAMO 2.70 0.10 1.05 1.00 0.28
0.56
02.03.32 ENCOFRADO Y DESENCOFRADO EN MURO ESCALERA
PRIMER TRAMO 2.70 1.05 2.00 5.67
SEGUNDO TRAMO 2.70 1.05 2.00 5.67
11.34
02.03.33 ACERO EN MURO ESCALERA f'y = 4,200 kg/cm²
VER PLANILLAS #REF!
02.03.34 CONCRETO f'c=175 kg/cm² MUROS CANAL DE EVACUACIÓN PLUVIAL
(Perímetro medio calculado con AutoCAD Civil 3D Land Desktop 2013)
PABELLÓN - ESCALERA 87.05 0.35 0.10 2.00 6.09
SS.HH. COCINA 41.17 0.35 0.10 2.00 2.88
8.97
02.03.35 ENCOFRADO Y DESENCOFRADO EN MUROS CANAL DE EVACUACIÓN PLUVIAL
PABELLÓN - ESCALERA 87.05 0.35 2.00 60.94
SS.HH. COCINA 41.17 0.35 2.00 28.82
89.76
02.03.36 ACERO EN MUROS CANAL DE EVACUACIÓN PLUVIAL f'y = 4,200 kg/cm²
VER PLANILLAS #REF!
02.04.00 ESTRUCTURA DE MADERA
02.04.01 MADERA TORNILLO PARA LA ARMADURA DE LA COBERTURA (considerar vigas de 4"x8" y correas de 3"x2")
PABELLÓN (S = 19.5%) 27.15 6.00 1.00 162.90
PABELLÓN (S = 23%) 27.15 4.75 1.00 128.96
ESCALERA (S = 19.5%) 5.70 6.00 1.00 34.20
ESCALERA (S = 27%) 5.70 2.15 1.00 12.26
338.32
02.04.02 MADERA TORNILLO PARA LA ARMADURA DE LA COBERTURA (considerar vigas de 4"X8"y correas de 2"x1.5")
SS.HH.-COCINA (S = 19.0%) 12.05 3.45 1.00 41.57
SS.HH.-COCINA (S = 17.0%) 12.05 4.00 1.00 48.20
89.77
02.04.03 COBERTURA CON ETERNIT- TEJA ANDINA
PABELLÓN -ESCALERA 338.32
SS.HH.-COCINA 89.77
428.09
02.04.04 CUMBRERA ARTICULADA
PABELLÓN -ESCALERA 32.85 1.00 32.85
SS.HH.-COCINA 12.05 1.00 12.05
44.90
02.05.00 VARIOS
02.05.01 CURADO DE CONCRETO
(considerando las áreas de las caras encofradas de las estructuras)
ENCOFRADO Y DESENCOFRADO EN COLUMNAS 390.40
ENCOFRADO Y DESENCOFRADO EN COLUMNETAS 129.77
ENCOFRADO Y DESENCOFRADO EN VIGAS 414.99
ENCOFRADO Y DESENCOFRADO EN VIGUETAS 52.71
ENCOFRADO Y DESENCOFRADO EN DINTEL 6.74
ENCOFRADO Y DESENCOFRADO EN ESCALERA 31.27
ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA 221.74
ENCOFRADO Y DESENCOFRADO EN MURO ESCALERA 11.34
1,258.96
02.05.02 JUNTAS SÍSMICAS e=1"
PRIMER NIVEL
COLUMNETA Cc 1 1.30 0.15 12.00 2.34
COLUMNETA Cc 1 2.10 0.15 10.00 3.15
SEGUNDO NIVEL
COLUMNETA Cc 1 1.25 0.15 12.00 2.25
COLUMNETA Cc 1 2.10 0.15 7.00 2.21
COLUMNETA Cc 1 3.03 0.15 8.00 3.64
13.59