Crest Builder S/B Ref. No: CBSB/TTDI /INSP/M&E Rev : 0 E. Date : PRE-CPC INSPECTION CHECKLIST (M&E/PLUMBING/WATER FEATURES) Building : Ref. No. : Unit Type No : Material Used* : Location / Area : Date : Floor Leel : Ti !e : No Descr!"o# I#s!ec"o# S"$"%s T$re" "o Co'!e"e Re'$rs  A ELECTRICAL " Fitting #unit$ % Fi tt ing # corr idor & r iser & M'( r oo!$ ) Loy fitting + Ri ser #(L, ca l e ter!inat ion$ * Riser #DB installation$ - Ri ser # a l e ta p o ff to DB$ 0 Ri ser #a l e 1n su la ti on te st $ 2 Riser #ca le te r!ination$ 3 Fire!an 1nterc o! Fittin g "4 T esting 5MAT, # unit$ "" T esting 5MAT, #r iser$ "% T esting 1nterco! #uni t$ ") T esting T, #l o y$ "+ T esting li g6 ti ng f un ct ion B FIRE FIGHTING " onduit and 7iring % 5p ri n8 le r pip in g and syst e! ) 9u!p syste! + 5!o8 e det ec to r/ gl as s e a8 er Fir e 6ose rail #ris er $ - Al ar ! a le T er!in at io n 0 Riser trun8ing co er 2 Fir e (;tiguis6er #AB$ 3 T esting #fire alar!$ "4 T esting # 7e t r iser pipe$ "" T esting # sprin8ler pipe$ "% T esting # 6ose reel pi pe$ C ACMV  " A/ unit % (; 6aust an d e nti la ti on ) Ducting + <rille T esting #FU ' U$ - T e st ing #(; 6aus t Fan $ 0 T esting #=et Fan$ 2 T esting # FAF ' (AF$ D VERTICAL TRANSPORTATION " 9assanger L if t all Button % Bo! a Li ft all Button ) Lift Finis6es E PLUMBING  " >c

Transcript of MEP PreCPC Checklist

8/16/2019 MEP PreCPC Checklist

http://slidepdf.com/reader/full/mep-precpc-checklist 1/2

Crest

Builder

S/B

Ref. No: CBSB/TTDI /INSP/M&E Rev : 0 E. Date :

PRE-CPC INSPECTION CHECKLIST (M&E/PLUMBING/WATER FEATURES)

Building : Ref. No. :

Unit Type No : Material Used* :

Location / Area : Date :

Floor Leel : Ti!e :

No Descr!"o# I#s!ec"o# S"$"%sT$re" "oCo'!e"e

Re'$rs

 A ELECTRICAL

" Fitting #unit$

% Fitting #corridor& riser& M'( roo!$

) Loy fitting

+ Riser #(L, cale ter!ination$

* Riser #DB installation$

- Riser #ale tap off to DB$

0 Riser #ale 1nsulation test$

2 Riser #cale ter!ination$

3 Fire!an 1nterco! Fitting"4 Testing 5MAT, #unit$

"" Testing 5MAT, #riser$

"% Testing 1nterco! #unit$

") Testing T, #loy$

"+ Testing lig6ting function

B FIRE FIGHTING 

" onduit and 7iring

% 5prin8ler piping and syste!

) 9u!p syste!

+ 5!o8e detector/glass ea8er

Fire 6ose rail #riser$- Alar! ale Ter!ination

0 Riser trun8ing coer

2 Fire (;tiguis6er #AB$

3 Testing #fire alar!$

"4 Testing #7et riser pipe$

"" Testing #sprin8ler pipe$

"% Testing #6ose reel pipe$

C ACMV  

" A/ unit

% (;6aust and entilation

) Ducting

+ <rille

Testing #FU ' U$

- Testing #(;6aust Fan$

0 Testing #=et Fan$

2 Testing #FAF ' (AF$

D VERTICAL TRANSPORTATION 

" 9assanger Lift all Button

% Bo!a Lift all Button

) Lift Finis6es

E PLUMBING  

" >c

8/16/2019 MEP PreCPC Checklist

http://slidepdf.com/reader/full/mep-precpc-checklist 2/2

Crest

Builder

S/B

Ref. No: CBSB/TTDI /INSP/M&E Rev : 0 E. Date :

% Basin

) Fitting #7ater tap unit$

+ Floor trap garden terrace

9u!p syste!

- ?ydrant c/7 pillar 6ydrant

0 >ater rec c/7 !etering stand

2 Riser #!eter installation$

F WATER FEATURES 

" 57i!!ing 9ools

% >ater Feature

o!!ent:

6ec8ed By (SC) ,erified By (MC)  Approed By (CL)

S%+-Co#"r$c"or,s Re!rese#"$"e Cres" B%.er SB,s re!rese#"$"e Ce#",s Re!rese#"$"e

Na!e: Na!e: Na!e:

Date: Date: Date:

*Acceptability : ✔   for Accept ✘  for Reject *Attach document for further clarification, if necessary