Manoj-1

5
Curriculum vitae MANOJ KUMAR VILL - KANTI, Post - PADRAUNA, Dist – KUSHINAGAR, Email: [email protected] U P, INDIA, PIN – 274304. Mobile: +919768912867 / +919005358050 Position Applied For : INSTRUMENT TECHNICIAN Working Experience : Total 10 Years, (Gulf - 5 Years & India - 5 Years) Technical Qualification : Diploma in Instrumentation - 2003 Work Experience: 1) Designation : ELECTRICAL & INSTRUMENT TECHNICIAN Client : GREEN RAY TURBINES LTD / ONGC Company : Vtech Offshore Pvt Ltd, Mumbai Project/ Location Win Platform TG Unit 1, 2 & 3 Revamping Mumbai High Offshore India Period of employment : 01/04/2014 to till date Responsibilities Carried out Installation, Calibration & Testing of different types of Transmitters, Sensors, Gauges, Switches, Control Valves. Carried Out Instrument cable Tray work, JB Installation, Inst. Cable Laying, Glanding, Termination, fabrication and installation of SS Tube Size 1/4”, 3/8”, ½”, 5/8”, ¾” 1’. Removal of compressor, turbine, gearbox Vibration Proximitor, Probe & Extension cable and then check, calibrate & reinstalled in rotary equipment side. Carried out loop checking, Calibration of all the instruments Carried out PM, CM, Commissioning of all the Instruments Installation of Fire & Gas System Installation of Detronics Flame Detectors, UV Detectors & Gas Detectors MICC Cable Laying, Glanding & Termination Calibration of Gas Detectors Installation of Instruments like Heat Detector, Smoke Detector, Hooter, MCP, Abort Switch Installation of Electromagnetic pickup transducer(RPM SENSOR) in Starter Motor Removed and reinstalled Electric Motors, Loop checked and Meggered the cable

Transcript of Manoj-1

Page 1: Manoj-1

Curriculum vitae

MANOJ KUMAR VILL - KANTI, Post - PADRAUNA, Dist – KUSHINAGAR, Email: [email protected] U P, INDIA, PIN – 274304. Mobile: +919768912867 / +919005358050

Position Applied For : INSTRUMENT TECHNICIANWorking Experience : Total 10 Years, (Gulf - 5 Years & India - 5 Years) Technical Qualification : Diploma in Instrumentation - 2003

Work Experience:

1) Designation : ELECTRICAL & INSTRUMENT TECHNICIAN Client : GREEN RAY TURBINES LTD / ONGC Company : Vtech Offshore Pvt Ltd, Mumbai Project/ Location Win Platform TG Unit 1, 2 & 3 Revamping Mumbai High Offshore India Period of employment : 01/04/2014 to till date

Responsibilities

Carried out Installation, Calibration & Testing of different types of Transmitters, Sensors, Gauges, Switches, Control Valves.

Carried Out Instrument cable Tray work, JB Installation, Inst. Cable Laying, Glanding, Termination, fabrication and installation of SS Tube Size 1/4”, 3/8”, ½”, 5/8”, ¾” 1’.

Removal of compressor, turbine, gearbox Vibration Proximitor, Probe & Extension cable and then check, calibrate & reinstalled in rotary equipment side.

Carried out loop checking, Calibration of all the instruments Carried out PM, CM, Commissioning of all the Instruments Installation of Fire & Gas System Installation of Detronics Flame Detectors, UV Detectors & Gas Detectors MICC Cable Laying, Glanding & Termination Calibration of Gas Detectors Installation of Instruments like Heat Detector, Smoke Detector, Hooter, MCP, Abort Switch Installation of Electromagnetic pickup transducer(RPM SENSOR) in Starter Motor Removed and reinstalled Electric Motors, Loop checked and Meggered the cable

2) Designation : INSTRUMENT TECHNICIAN Client :  Air Liquide Middle East / Chiyoda Almana Engineering Company : KENTECH QATAR Project/ Location :   QSTec H2 Plant  / Dolphin Energy Triconix Modification

Ras laffan, Doha Qatar Period of employment : 17/01/2013 TO20/02/2014

Responsibilities

Performed all functional and calibration test of different instruments like Pressure Transmitter, Temperature Transmitter, Flow Transmitter, DP Transmitter, Level Transmitter, RTD, Thermocouple, Pressure Gauge, Temperature Gauge etc like Yokogawa, ABB, Rosemount, Vega

Cable Laying, glanding and termination of primary and secondary cable from field to Junction Box and to the PLC & DCS system.

Perform loop check and line checking as per tag number of field mounted instruments to junction box to control room.

Page 2: Manoj-1

Installation of instrument cable duct, impulse lines and supports Recording as built engineering changes on drawings

Identifies broken or failed devices for the replacements Identifies all the instruments with the help of Piping & Instrumentation Diagram and check

for the proper installation and cable connectivity. Performed Continuity checking of all Instrument Cables from Instruments to Junction and

Junction Box to Control Room with Loop Wiring Diagram Checked configuration of all Instruments are correct as data sheet from HART

Communicator Confirm all loop components indication/ranges/alarms/fault tests are correct

3) Designation : INSTRUMENT TECHNICIAN Client : ADCO/ NPCC Company : CCIC Project/ Location Phase 1: Thamama G &  Habshan - 2 Abu Dhabi Period of employment : 25/09/2011 to25/07/2012

Responsibilities

Carried out punch listing, loop checking, Calibration of the instruments Carried out Calibration & Testing of different types of field Instruments Carried out PM, CM, Commissioning of Instruments Worked on Fire & Gas System. Carried out Calibration & Testing of different types of Instruments, Hands on calibration experience on various types of master instruments like AMETEK Temperature

Calibrators, Druck Pressure Calibrators, and Dead Weight Tester. Testing & Calibration of various types of Temperature, Pressure, Level, Flow sensing Instruments,

sensors & loops. (Make: Rosemount, Yokogawa, Siemens, Foxboro, etc.) Checking trip setting with ABB DCS. Good experience in Calibration of Control Valves.

4) Designation : INSTRUMENT TECHNICIAN Client : JGC / KBR Company : QATAR KENTZ Project/ Location : Pearl Shell GTL Ras laffan Doha Qatar Period of employment : 25/05/2008 to30/05/2010

Responsibilities

Responsible for under ground cable laying,installation of cable tray and instruments and termination at both ends (field and control room marshelling panel) carried out clearing of punch list, Loop-check,and commissioning of the systems.

Also worked on DCS YOKOGAWA CENTUM CS 3000, and ESD SYSTEMS, Vibration System for Bentley Nevada (3500) for Rotating Equipments.

5) Designation : INSTRUMENT TECHNICIAN Client : ADCO / JGC Company : CCIC Project/ Location : Gas Processing Plant (Habshan-5) Abu Dhabi Period of employment : 13/03/2007 to19/04/2008

Responsibilities

Page 3: Manoj-1

Responsible for Instrument crew for all the maintenance activities. Having hands experience & good knowledge about (detronics) flame, smoke detectors & gas

sensors Having hands on experience in trouble shooting and fault finding for various process plants DCS

and PLC systems, control logics and process instruments. Hands-on experience on HART COMMUNICATOR (Fisher Rosemount-275 & 375), BT-200

(Yokogawa Blue Star). Calibration, installation, loop checking commissioning and troubleshooting of pressure, flow, level,

temperature transmitters Calibration and commissioning of control valves Calibration of Instruments, Loop checking & routine maintenance of all type of Instruments. Maintenance, calibration, installation & commissioning of SCADA System, high-pressure tubing, &

field instrument with Remote Telemetry Units (RTU) Maintenance instruments such as level transmitters, pressure Transmitters, Temperature

Transmitters, Flow Transmitters, Automatic control valves, Pneumatic Transmitters, Pneumatic controllers, control switches etc…

6) Designation : INSTRUMENT TECHNICIAN Client : ONGC Mumbai High Company : Dolphin Offshore Project/ Location : BHS & ICP PROCESS Platform Mumbai High Offshore India Period of employment : 04/04/2003 to12/06/2006

Responsibilities

Maintenance of process gas compressors and turbine generators with Rolls-Royce engine (AVON, RB211).

Carried out routine preventive and shutdown maintenance of Field Instruments and Process Control System.

Carried out the cabling and tubing works in the field as well as in the control room including laying, termination and glanding.

Installation of the following sensors Gas, Smoke, Thermal & UV (flame) Detectors. Vibration probe testing & Card calibration Installation of all instrumentation works like Thermocouples, RTD, sensors, vibration

probes, proximitor, transmitters, pressure control valve, Pressure safety valve, Pressure relief valve

Well-Known With The Plant Running, Predictive, Preventive, Breakdown And Corrective

Maintenance.

Safety Courses Elementary first aid Personal survival techniques Personal safety & social responsibilities Fire prevention & fire fighting Helicopter underwater escape training course H2s / Be Awareness

Page 4: Manoj-1

Personal Details

Date of Birth : 10/08/1983Gender : MaleNationality : INDIANMarital Status : SingleLanguages known : English, Hindi

Passport DetailsPassport No. : K 3461671 (ECNR)

Date of Issue : 08/10/2012

Date of Expiry : 07/10/2022

Place of Issue : LUCKNOW

Thanks & Regards,

Manoj Kumar