LOGOTIPO EDIFICIO AUTO SUSTENTABLE DE 3 NIVELES CON DEPARTAMENTOS ACCESORIA PARA MINI SUPER...
-
Upload
abelardo-suarez -
Category
Documents
-
view
4 -
download
2
Transcript of LOGOTIPO EDIFICIO AUTO SUSTENTABLE DE 3 NIVELES CON DEPARTAMENTOS ACCESORIA PARA MINI SUPER...
PLAN DE NEGOCIOS
LOGOTIPO
EDIFICIO AUTO SUSTENTABLEDE 3 NIVELES
CON DEPARTAMENTOS
ACCESORIA PARA MINI SUPER
REPRESENTA LA FACHADA DEL MINISUPER
UBICACIÓN DEL MINI SUPER JACK
• EXCELENTE UBICACIÓN • CENTRICO
• TODOS LOS SERVICIOS
TEZOZOMOC
AV. AQU
ILES SERDAN
AQUI
ESTRUCTURA DEL EDIFICIO
PLANO DE EDIFICIO PLANO DE DEPTO.
½ BAÑO
5 6 M T R S
20 MTR
ZOTEHUELA
RECAMARA PRINCIPAL
ALCOBA NIÑA
BAÑO
COMEDOR
COCINA
SALA
TERRAZA
ALCOBA NIÑO
MAPA DEL ESTABLECIMIENTOCON ESTE MAPA PUEDES ENCONTRAR FACILMENTE EL PASILLO CON
LOS PRODUCTOS QUE NECESITES
COSTOS DEL PROYECTO
ADQUISISICION $1,800,000.00 0 3 30
$60,000.0013%
PERMISOS $18,900.00 0 10 60
$315.000%
PLANO $15,200.00 0 3 15 $1,013.33
0%
MAQUINARIA $186,336.00 28 28
23 $8,101.571%
COSTO DE MATERIAL $1,687,546.00 28 667 90
$18,750.5112%
COSTO OBRA NEGRA $1,687,546.00 28 164 963
$0.0020%
COSTO INTERMEDIA $1,687,546.00 28 42 164 $0.00
3%
COSTO ACABADOS $1,687,546.00 28 61 115 $0.00
2%0%0%0%0%0%0%0%0%0%0%
COSTO ACABADOS $1,687,546.00
NUMERO TOTAL DE DIAS PARA
TERMINAR EL EDIFICIO 978 1460 COSTO TOTAL DE
MANO DE OBRA DE TODAS LAS ETAPAS
50%
Otros50%
COSTO DE MANO DE OBRA POR ETAPA COMPRADISEÑOCONSTRUCCIONMANO DE OBRATRABAJO GENERADO
POR ETAPADIRECTAMENTEINDIRECTAMENTE
FUENTE DE TRABAJO UNA LISTA Y UNA GRAFICA
0
100
200
300
400
500
600
700
164
674
164
42 618 822
12767
15 1250 35
FUENTES DE TRABAJO GENERADO EMPLEO GENERADO
FUENTES DE TRABAJO GENERADO EMPLEOS INDIRECTOS
FUENTES DE TRABAJO GENERADO
ETAPAS EMPLEO GENERADO
EMPLEOS INDIRECTOS
TOTAL DE EMPLEOS
ADQUISICION 164 22 186OBRA NEGRA 674 127 801
OBRA INTERMEDIA 164 67 231ACABADOS 42 15 57
DEPTOS 61 12 73MINI-SUPER 8 50 58VIVIENDAS 8 35 43
GRAN TOTAL 1449
GRAFICA COSTOS DE MANO DE OBRA X ETAPA
ADQUISISICION $1,800,000.00 0 3 30 $60,000.00
13%
PERMISOS $18,900.00 0 10 60 $315.000%
PLANO $15,200.00 0 3 15 $1,013.330%
MAQUINARIA $186,336.00 28 28 23 $8,101.57
1%
COSTO DE MATERIAL $1,687,546.00 28 667 90 $18,750.51
12%
COSTO OBRA NEGRA
$1,687,546.00 28 164 963 $0.00
20%
COSTO INTERMEDIA $1,687,546.00 28 42 164 $0.00
3%
COSTO ACABADOS $1,687,546.00 28 61 115 $0.00
2%
COSTO ACABADOS $1,687,546.00 NUMERO
TOTAL DE DIAS PARA TERMINAR EL EDIFICIO
978 1460 COSTO TOTAL DE MANO DE OBRA DE
TODAS LAS ETAPAS50%
COSTO DE MANO DE OBRA POR ETAPA
ETAPA DE CONSTRUCCION
HORAS RENTADAS
NUMERO DE TRABAJADORES
NECESARIOS
NUMERO DE DIAS HASTA LA ETAPA DE TERMINACION
COSTO DE MANO DE OBRA
POR HORA Ó M2
COSTO DE MANO DE OBRA POR
ETAPA
ADQUISICION 0 3 30 $60,000.00 $1,800,000.00
PERMISOS 0 10 60 $315.00 $18,900.00
PLANO 3 15 $1,013.33 $15,200.00
MAQUINARIA 28 28 23 $8,101.57 $186,336.00
COSTO DE MATERIAL 667 90 $18,750.51 $1,687,546.
00
COSTO OBRA NEGRA 164 963 $0.00 $2,775,976.
00
COSTO INTERMEDIA 42 164 $0.00
$393,610.00
COSTO ACABADOS 61 115 $0.00
$218,640.00
PRESUPUESTO
LISTAS DE OBRA NEGRA Y MEDIAOBRA NEGRA
CONCEPTO UNIDAD CANTIDAD DIAS PERSONAL COSTO TOTAL
TERRENO PZA 1 30 3 $1,800,000.$1,800,000.0
0
PLANO PZA 4 15 3 $3,800.00 $15,200.00
PERMISOS PZA 3 60 10 $6,300.00 $18,900.00
DEMOLICION M2 1120 5 8 $98.00 $109,760.00
EXCAVACION M2 1120 18 20 $64.80 $72,576.00
CIMIENTOS PZA 16 30 18 $10,300.00 $164,800.00
BARDAS PZA 6 23 12 $12,830.00 $76,980.00
CISTRNAS PZA 3 25 8 $19,300.00 $57,900.00
INGENIERO PZA 17 33 10 $3,200.00 $54,400.00
PAREDES PZA 28 43 21 $3,600.00 $100,800.00
MUROS PZA 36 90 18 $530.00 $19,080.00
LOZA PISO 5 18 20 $45,600.00 $228,000.00
ARQUITECTO MES 2 30 2 $5,300.00 $10,600.00
INGENIERO MES 2 30 2 $5,600.00 $11,200.00
PLOMERO MES 2 30 2 $2,400.00 $4,800.00
ELECTRISISTA MES 2 30 2 $2,580.00 $5,160.00
LIMPIEZA DIA 30 453 5 $194.00 $5,820.00
TOTALES 963 164
$2,755,976.00
OBRA INTERMEDIA
CONCEPTO UNIDAD CANTIDAD DIAS PERSONAL COSTO TOTAL
INST ELECTRICA PISO 6 34 6 $45,000.00 $270,000.00
INST PLOMERIA PISO 6 38 9 $6,000.00 $36,000.00
HERRERO PISO 5 45 11 $12,300.00 $61,500.00
CARPINTERO PZA 38 28 6 $320.00 $12,160.00
INST DE VIDRIOS PZA 75 19 10 $186.00 $13,950.00
TOTALES
164 42
$393,610.00
LISTA DE ACABADOS
CONCEPTO UNIDAD CANTIDAD DIAS PERSONAL COSTO TOTAL
APLANADO PISO 6 18 11 $12,000.00 $72,000.00
INST DE BAÑOS JGO 8 12 8 $2,200.00 $17,600.00
INST DE FREGADEROS JGO 6 7 4 $580.00 $3,480.00
INST LAVADEROS JGO 6 9 3 $420.00 $2,520.00
PINTURA EDIF 1 30 10 $30,000.00 $30,000.00
LIMPIEZA DIA 2 1 5 $82.00 $82.00
IMPERMEABILIZACION EDIF 1 9 8 $10,000.00 $10,000.00
COLOCACION DE HERRERIA PISO 6 15 8 $12,000.00 $72,000.00
CERRAJERO PZA 48 15 4 $230.00 $11,040.00
TOTAL
115 61 $218,640.00
FUENTES DE TRABAJO GENERADO
ETAPAS EMPLEO GENERADO EMPLEOS INDIRECTOS
ADQUISICION 164 22OBRA NEGRA 674 127
OBRA INTERMEDIA 164 67ACABADOS 42 15
DEPARTAMENTOS 61 12MINI-SUPER 8 50VIVIENDAS 8 35
ASECSORIOS PARA EL MINI SUPER
COSTO DE MATERIALES
MATERIAL CANTIDAD COSTO UNIDAD COMPRA Ó RENTA TOTAL
VARILLA 23 $5,700.00 TON. $131,100.00CEMENTO 7200 $60.00 BULTO $432,000.00
ARENA 4600 $36.00 M2 $165,600.00CIMBRA 1120 $40.00 M2 RENTA $44,800.00
TUBO 343 $122.00 TRAMO $41,846.00GRAVA 40 $3,425.00 CAMION $137,000.00
POLINES 766 $8.00 PZA $6,128.00TABLA ROCA 198 $327.00 TABLA $64,746.00
PINTURA 120 $498.00 CUBETA $59,760.00LAMPARAS 159 $45.00 PZA. $7,155.00
CELDAS 26 $2,800.00 PZA $72,800.00APAGADORES 159 $17.00 PZA $2,703.00CONTACTOS 230 $23.00 PZA $5,290.00
TINACOS 6 $1,200.00 PZA $7,200.00SOLDADURA 50 $36.00 KG $1,800.00
VIDRIOS 178 $320.00 PZA $56,960.00JGOS DE BAÑO 8 $1,200.00 JGO. $9,600.00
LAVADEROS 6 $400.00 PZA $2,400.00JGOS FREGADEROS 6 $350.00 PZA $2,100.00
LADRILLO 200 $1,700.00 MILLAR $340,000.00PUERTAS 16 $548.00 PZA $8,768.00
ANDAMIOS 4 $2,300.00 PZA RENTA $9,200.00ESCALERAS 6 $2,800.00 PZA $16,800.00
CUBETAS 30 $35.00 PZA $1,050.00PICOS 20 $231.00 PZA $4,620.00PALAS 20 $231.00 PZA $4,620.00
EQUIPO DE PROTECCION 60 $629.00 JGO $37,740.00OTROS 40 $128.00 $5,120.00
CERRADURAS 48 $180.00 $8,640.00TOTAL $1,687,546.00
FUENTES DE TRABAJO GENERADO
ETAPAS EMPLEO GENERADO
EMPLEOS INDIRECTOS
TOTAL DE EMPLEOS
ADQUISICION 164 22 186OBRA NEGRA 674 127 801
OBRA INTERMEDIA 164 67 231ACABADOS 42 15 57
DEPTOS 61 12 73MINI-SUPER 8 50 58VIVIENDAS 8 35 43
GRAN TOTAL1449
FOLLETO DE INAUGURACION
PRODUCTOS Y SERVICIOS
AQUÍ ENCONTRARAS GRAN VARIEDAD DE PRODUCTOS PARA EL HOGAR,SOPAS,GALLETAS,LECHE,PAN,GELATINAS,BOTANAS,REFRESCOS,
JUGOS,VINOS Y LICORES,CIGARROS,ENCENDEDORES,CAFE,RECARGAS PARA CELULAR,ETC…..
COMO INCREMENTAR NUESTRAS GANANCIAS
PONIENDO OFERTAS DE ALGUNOS PRODUCTOS EN PROMOCION, DANDO OBSEQUIOS PARA GANAR CLIENTELA, HACIENDO RIFAS
Y OFRECIENDO ENTREGAS A DOMICILIO
FORMAS DE COMPRA:
DINERO EN EFECTIVOTARJETAS DE CREDITONO SE RECIBEN BILLETES DE 1000.00FAVOR DE TRAER CAMBIO NOTA: NO SE ACEPTAN BILLETES FALSOS
PROGRAMAS QUE OCUPAMOS:PAIN
DRAWWORD
INTERNET•WORD oEXCEL
POWER POINTNOTA:COSTOS
REALES Y ACTUALES
2012
REALIZADO POR:
LETYGINA
GRACIAS POR SU DISPONIBILIDAD DE TIEMPO Y PACIENCIA
LULU