LISTA DE PRECIOS ICCU 2013.xlsx

738

Click here to load reader

Transcript of LISTA DE PRECIOS ICCU 2013.xlsx

Page 1: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,479,374 1,506,272 1,522,491 1,528,961 1,505,088 1,518,156 1,488,4791.2 CAMPAMENTO 9 M2 UN 862,223 875,672 883,782 887,017 875,080 881,614 866,7761.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,102 10,102 10,102 10,102 10,102 10,102 10,1021.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,374 11,374 11,374 11,374 11,374 11,374 11,3741.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,232 13,232 13,232 13,232 13,232 13,232 13,2321.6 CERCA EN TABLA H=2.30 M ML 48,234 48,234 48,234 48,234 48,234 48,234 48,2341.7 CERCA EN TEJA DE ZINC H=1.80 M ML 34,651 34,935 35,118 35,238 34,922 35,068 34,7451.8 CERCA EN TELA VERDE H = 2.10 M ML 15,503 15,787 15,970 16,090 15,774 15,920 15,5971.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 610,996 614,237 618,254 617,664 614,208 617,658 612,137

1.41 M2 7,196 7,196 7,196 7,196 7,196 7,196 7,196

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,275 2,275 2,275 2,275 2,275 2,275 2,2751.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,131,217 1,131,217 1,131,217 1,131,217 1,131,217 1,131,217 1,131,217

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 2: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

1.44 RED TELEFÓNICA PROVISIONAL UN 161,479 161,479 161,479 161,479 161,479 161,479 161,4791.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 58,181 63,355 91,812 68,529 64,648 90,518 60,7682.2 BASE ARENA CEMENTO 1:20 M3 134,922 167,471 183,094 172,679 166,169 176,585 146,6392.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,580 4,580 4,580 4,580 4,580 4,580 4,5802.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 510,624 538,763 556,511 566,831 537,500 551,715 520,0122.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 525,561 554,374 573,058 585,950 553,064 567,976 535,0852.8 ZAPATAS EN CONCRETO 3500 PSI M3 492,021 519,000 536,495 548,567 517,774 531,736 500,9382.9 PILOTE DE MADERA D=20 CM ML 36,217 36,217 36,217 36,217 36,217 36,217 36,217

2.10 ML 110,548 110,548 110,548 110,548 110,548 110,548 110,548

2.11 ML 133,094 133,094 133,094 133,094 133,094 133,094 133,094

2.12 ML 160,359 160,359 160,359 160,359 160,359 160,359 160,359

2.13 ML 197,062 197,062 197,062 197,062 197,062 197,062 197,062

2.14 PILOTE HINCADO 25X25 ML 90,291 92,221 93,523 94,616 92,131 93,165 90,9202.15 PILOTE HINCADO 30X30 ML 109,988 112,785 114,672 116,256 112,656 114,154 110,9002.16 DADOS EN CONCRETO 3500PSI M3 481,244 508,224 525,719 537,790 506,997 520,960 490,1622.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 118,983 118,983 118,983 118,983 118,983 118,983 118,983

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 27,609 27,811 27,908 27,844 27,803 27,868 27,6823.2 SIFÓN EN PVC 6" UN 141,314 141,516 141,613 141,549 141,508 141,573 141,3873.3 CAJA DE INSPECCIÓN DE 100X100 UN 342,687 358,501 383,189 366,666 358,809 380,285 348,7523.4 CAJA DE INSPECCIÓN DE 40X40 UN 175,044 179,324 182,924 181,060 179,229 182,237 176,5983.5 CAJA DE INSPECCIÓN DE 60X60 UN 195,138 202,230 208,052 204,958 202,066 206,877 197,7143.6 CAJA DE INSPECCIÓN DE 80X80 UN 258,080 269,832 278,039 274,123 269,477 276,115 262,3073.7 DUCTO ELÉCTRICO PVC 4" ML 74,754 74,793 75,012 74,833 74,803 75,002 74,7733.8 POZO SÉPTICO ETERNIT 1000 LT UN 938,517 938,915 941,104 939,313 939,015 941,005 938,7163.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 82,823 85,057 86,129 85,414 84,968 85,683 83,627

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 47,971 49,150 49,716 49,338 49,103 49,480 48,3953.11 TUBERÍA DRENAJE PVC 110 ML 20,434 20,984 21,247 21,071 20,962 21,181 20,6323.12 TUBERÍA DRENAJE PVC 160 ML 30,878 31,428 31,692 31,516 31,406 31,626 31,0763.13 TUBERÍA DRENAJE PVC 200 ML 42,319 43,088 43,457 43,211 43,057 43,365 42,5963.14 TUBERÍA DRENAJE PVC 250 ML 57,402 58,281 58,702 58,421 58,245 58,597 57,7183.15 TUBERÍA DRENAJE PVC 315 ML 78,844 79,613 79,983 79,737 79,583 79,890 79,1213.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 722,271 731,061 735,280 732,467 730,709 734,225 725,4353.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1,027,029 1,044,609 1,053,048 1,047,422 1,043,906 1,050,938 1,033,3583.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1,350,028 1,385,188 1,402,065 1,390,814 1,383,782 1,397,846 1,362,686

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 3: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 27,436 27,436 27,436 27,436 27,436 27,436 27,4364.2 CASETÓN DE LONA 0.80X0.70 M2 36,018 36,018 36,018 36,018 36,018 36,018 36,0184.3 COLUMNAS 3500 PSI M3 633,309 660,289 677,784 689,855 659,063 673,025 642,2274.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 214,790 238,372 254,304 255,204 237,156 250,134 221,774

4.5 M2 75,967 78,586 80,285 81,457 78,467 79,823 76,833

4.6 M2 89,489 92,633 94,671 96,077 92,490 94,116 90,528

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 101,764 105,955 108,673 110,548 105,765 107,933 103,1494.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 107,435 111,888 114,775 116,768 111,685 113,990 108,9074.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 123,814 129,315 132,882 135,343 129,065 131,912 125,633

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 138,039 144,325 148,402 151,214 144,039 147,293 140,1174.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 153,484 160,557 165,143 168,307 160,235 163,895 155,8224.12 ENTREPISO VIGUETA PLACA M2 72,598 73,091 73,368 73,398 73,069 73,278 72,7684.13 ESCALERA MACIZA 3500 PSI M3 739,528 766,508 784,003 796,074 765,281 779,244 748,4464.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 68,523 68,839 69,138 69,707 68,822 69,051 68,6114.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 62,101 64,799 66,549 67,756 64,677 66,073 62,9934.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 70,528 73,828 75,968 77,445 73,678 75,386 71,6194.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 82,853 86,991 89,675 91,527 86,803 88,945 84,2214.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 569,291 596,271 613,765 625,837 595,044 609,007 578,209

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 38,274 39,091 39,641 40,104 39,053 39,490 38,5404.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 226,100 238,150 245,963 251,354 237,602 243,838 230,083

4.21000000000001 ACERO FIGURADO 37000 PSI KG 3,091 3,091 3,091 3,091 3,091 3,091 3,0914.22 ACERO FIGURADO 60000 PSI KG 3,211 3,211 3,211 3,211 3,211 3,211 3,211

4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,449 4,449 4,449 4,449 4,449 4,449 4,4494.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 672,509 699,489 716,984 729,055 698,262 712,225 681,427

4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 623,091 652,629 671,769 684,921 651,287 666,564 632,8574.26 VIGA AÉREA 3500 PSI M3 672,063 699,043 716,537 728,609 697,816 711,779 680,981

4.27000000000001 VIGA CINTA 3500 PSI M3 656,717 683,696 701,191 713,263 682,470 696,432 665,6344.28 VIGA CANAL EN CONCRETO 3500 PSI M3 815,673 842,652 860,147 872,219 841,426 855,388 824,590

4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 268,609 299,392 317,954 325,358 298,037 312,993 279,029

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 22,949 23,696 24,160 24,404 23,663 24,019 23,2005.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,484 39,231 39,695 39,938 39,197 39,554 38,7345.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,414 24,616 24,713 24,649 24,608 24,673 24,4875.4 ARCOS EN LADRILLO PRENSADO ML 118,409 118,813 119,007 118,878 118,797 118,926 118,5545.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 34,277 35,094 35,645 36,107 35,056 35,493 34,5445.6 DINTELES EN BLOQUE 0.15 M ML 19,806 20,123 20,422 20,990 20,105 20,334 19,8945.7 ENCHAPES LADRILLO PRENSADO M2 65,420 66,229 66,617 66,358 66,197 66,456 65,7125.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 70,835 73,557 75,392 76,934 73,431 74,889 71,7225.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,024 53,024 53,024 53,024 53,024 53,024 53,024

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,547 32,547 32,547 32,547 32,547 32,547 32,5475.11 MURO DRYWALL DOBLE CARA 0.10 M M2 51,399 51,399 51,399 51,399 51,399 51,399 51,3995.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 31,734 31,734 31,734 31,734 31,734 31,734 31,734

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 4: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 64,215 64,215 64,215 64,215 64,215 64,215 64,2155.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,149 39,149 39,149 39,149 39,149 39,149 39,1495.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 65,727 65,727 65,727 65,727 65,727 65,727 65,7275.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 39,905 39,905 39,905 39,905 39,905 39,905 39,9055.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 26,588 26,995 27,190 27,060 26,978 27,108 26,7355.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,580 16,783 16,880 16,815 16,775 16,840 16,653

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 37,119 37,390 37,520 37,433 37,379 37,466 37,2165.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 22,656 22,792 22,857 22,814 22,786 22,830 22,705

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 43,775 44,046 44,176 44,090 44,035 44,122 43,8735.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 26,497 26,633 26,698 26,655 26,627 26,671 26,546

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 78,527 79,882 80,532 80,099 79,828 80,261 79,0155.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 46,178 46,856 47,181 46,964 46,829 47,045 46,422

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 24,599 24,870 25,000 24,914 24,859 24,946 24,6975.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,332 15,467 15,532 15,489 15,462 15,505 15,380

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 47,107 47,649 47,909 47,736 47,627 47,801 47,3025.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 29,388 29,659 29,789 29,703 29,649 29,735 29,486

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 63,794 64,110 64,409 64,978 64,093 64,322 63,8825.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,009 39,167 39,317 39,601 39,159 39,273 39,053

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 117,799 119,696 120,606 119,999 119,620 120,227 118,4825.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 72,909 73,857 74,312 74,009 73,819 74,122 73,250

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 57,924 58,840 59,280 58,987 58,803 59,097 58,2535.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 36,074 36,532 36,752 36,606 36,514 36,661 36,239

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 34,826 35,433 35,724 35,530 35,408 35,602 35,0445.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 21,296 21,599 21,745 21,648 21,587 21,684 21,405

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 25,155 25,426 25,556 25,469 25,415 25,502 25,2535.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,400 15,535 15,600 15,557 15,530 15,573 15,449

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 37,831 38,373 38,633 38,459 38,351 38,524 38,0265.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 23,318 23,589 23,719 23,633 23,578 23,665 23,416

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 72,563 73,376 73,766 73,506 73,344 73,604 72,8565.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 44,468 44,874 45,069 44,939 44,858 44,988 44,614

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 53,138 53,680 53,940 53,767 53,659 53,832 53,3335.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 32,200 32,471 32,601 32,515 32,460 32,547 32,298

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 112,303 114,200 115,110 114,503 114,124 114,731 112,9865.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 68,540 69,488 69,943 69,640 69,450 69,754 68,881

5.47000000000002 REMATES LADRILLO PRENSADO ML 21,402 21,604 21,701 21,636 21,596 21,660 21,4745.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 26,775 27,435 27,751 27,540 27,408 27,619 27,013

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 45,311 46,190 46,612 46,330 46,155 46,436 45,6275.50 LAVADA DE FACHADA M2 3,995 3,995 3,995 3,995 3,995 3,995 3,995

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,654 39,400 39,865 40,108 39,367 39,723 38,9045.52 DOVELA, GROUTING 3000 PSI ML 7,600 7,600 7,600 7,600 7,600 7,600 7,600

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,051 10,051 10,051 10,051 10,051 10,051 10,0515.54 ANCLAJE 1/2" L=50CM UN 13,143 13,143 13,143 13,143 13,143 13,143 13,143

5.55000000000003 ANCLAJE 5/8" L=70CM UN 18,295 18,295 18,295 18,295 18,295 18,295 18,2955.56 ANCLAJE 3/4" L=70CM UN 27,236 27,236 27,236 27,236 27,236 27,236 27,236

5.57000000000003 ANCLAJE 1" L= 70CM UN 3,978 4,182 4,310 4,385 4,172 4,275 4,046

Page 5: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,775 11,775 11,775 11,775 11,775 11,775 11,7756.2 FILOS O DILATACIONES B/PLACA ML 4,362 4,564 4,661 4,596 4,556 4,620 4,4346.3 FILOS O DILATACIONES S/MURO ML 5,265 5,467 5,564 5,499 5,459 5,524 5,3386.4 GOTERA EN MORTERO 1:4 ML 6,344 6,546 6,643 6,578 6,538 6,602 6,4166.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,284 4,284 4,284 4,284 4,284 4,284 4,2846.6 MALLA BAJO ENTRAMADO M2 10,258 10,258 10,258 10,258 10,258 10,258 10,2586.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 18,613 19,254 19,562 19,357 19,229 19,434 18,8446.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,282 11,603 11,757 11,654 11,590 11,693 11,3986.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 16,346 16,915 17,188 17,006 16,892 17,074 16,551

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 9,912 10,197 10,333 10,242 10,185 10,276 10,0156.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 15,650 16,291 16,599 16,394 16,265 16,471 15,8806.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,564 9,885 10,039 9,936 9,872 9,975 9,6806.13 PAÑETE CULATAS 1:4, E=2 CM M2 16,346 16,915 17,188 17,006 16,892 17,074 16,5516.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 9,912 10,197 10,333 10,242 10,185 10,276 10,0156.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 15,933 16,390 16,609 16,463 16,371 16,518 16,0976.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,705 9,933 10,043 9,970 9,924 9,997 9,7876.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 13,583 14,016 14,224 14,086 13,999 14,138 13,7396.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,311 8,528 8,632 8,563 8,519 8,589 8,389

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,052 13,541 13,776 13,619 13,522 13,678 13,2286.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,046 8,290 8,408 8,329 8,281 8,359 8,134

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 16,939 17,507 17,780 17,598 17,485 17,667 17,1436.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,193 10,478 10,614 10,523 10,467 10,558 10,296

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,242 16,884 17,192 16,986 16,858 17,063 16,4736.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 9,845 10,166 10,320 10,217 10,153 10,256 9,961

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 13,517 14,006 14,241 14,084 13,986 14,143 13,6936.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,265 8,509 8,626 8,548 8,499 8,578 8,353

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 16,920 17,561 17,869 17,664 17,535 17,741 17,1516.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,492 10,813 10,967 10,864 10,800 10,902 10,607

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 20,811 21,624 22,014 21,754 21,591 21,851 21,104

7.2 M2 64,566 65,926 66,844 67,615 65,863 66,592 65,009

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 39,311 39,311 39,311 39,311 39,311 39,311 39,3117.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,043 16,043 16,043 16,043 16,043 16,043 16,0437.5 ML 25,145 25,145 25,145 25,145 25,145 25,145 25,1457.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 58,450 58,450 58,450 58,450 58,450 58,450 58,4507.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 41,927 41,927 41,927 41,927 41,927 41,927 41,9277.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,293 25,293 25,293 25,293 25,293 25,293 25,2937.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 56,894 56,894 56,894 56,894 56,894 56,894 56,894

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 73,387 73,387 73,387 73,387 73,387 73,387 73,3877.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 95,394 95,394 95,394 95,394 95,394 95,394 95,3947.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 42,058 42,058 42,058 42,058 42,058 42,058 42,0587.13 CANAL PVC AMAZONAS ML 61,043 61,043 61,043 61,043 61,043 61,043 61,0437.14 CANAL PVC RAINGO ML 53,987 53,987 53,987 53,987 53,987 53,987 53,987

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

Page 6: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 85,457 85,457 85,457 85,457 85,457 85,457 85,4577.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 49,350 49,350 49,350 49,350 49,350 49,350 49,3507.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 40,561 40,561 40,561 40,561 40,561 40,561 40,5617.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,411 23,411 23,411 23,411 23,411 23,411 23,411

7.19000000000001 TEJA DE BARRO M2 44,962 45,973 46,458 46,135 45,933 46,256 45,3267.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 33,795 33,795 33,795 33,795 33,795 33,795 33,795

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,023 31,023 31,023 31,023 31,023 31,023 31,0237.22 TEJA FIBROCEMENTO Nº4 M2 26,442 26,442 26,442 26,442 26,442 26,442 26,442

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 25,670 25,670 25,670 25,670 25,670 25,670 25,6707.24 TEJA FIBROCEMENTO No. 8 M2 26,407 26,407 26,407 26,407 26,407 26,407 26,407

7.25000000000001 TEJA TERMOACÚSTICA M2 36,523 36,523 36,523 36,523 36,523 36,523 36,5237.26 TEJA PLÁSTICA No.6 M2 32,215 32,215 32,215 32,215 32,215 32,215 32,215

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 59,001 59,001 59,001 59,001 59,001 59,001 59,0017.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 107,152 107,152 107,152 107,152 107,152 107,152 107,152

7.29000000000001 TEJA SIN TRASLAPO M2 48,275 48,275 48,275 48,275 48,275 48,275 48,2757.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,432 31,432 31,432 31,432 31,432 31,432 31,432

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 24,763 24,763 24,763 24,763 24,763 24,763 24,763

7.32 M2 39,589 39,589 39,589 39,589 39,589 39,589 39,589

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,694 14,694 14,694 14,694 14,694 14,694 14,6947.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,550 17,550 17,550 17,550 17,550 17,550 17,550

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 19,916 19,916 19,916 19,916 19,916 19,916 19,9167.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 25,575 25,575 25,575 25,575 25,575 25,575 25,575

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,055 16,055 16,055 16,055 16,055 16,055 16,0557.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 37,638 37,638 37,638 37,638 37,638 37,638 37,638

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 218,785 218,785 218,785 218,785 218,785 218,785 218,7857.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 284,349 284,349 284,349 284,349 284,349 284,349 284,349

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 179,369 179,369 179,369 179,369 179,369 179,369 179,3697.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 257,822 257,822 257,822 257,822 257,822 257,822 257,822

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 386,993 414,963 433,830 449,671 413,667 428,652 396,1108.2 CONCRETO 3500 PSI M3 336,531 362,725 379,710 391,430 361,534 375,090 345,1898.3 CONCRETO 3000 PSI M3 330,065 357,385 374,616 384,635 356,158 369,959 339,1808.4 CONCRETO 2500 PSI M3 297,760 324,974 343,331 358,745 323,713 338,293 306,6318.5 CONCRETO 2000 PSI M3 276,482 304,908 323,186 335,196 303,621 318,224 285,9058.6 CONCRETO 1500 PSI M3 249,277 279,163 297,185 304,373 277,848 292,368 259,3938.7 MORTERO SECO 1:10 M3 176,996 204,896 218,287 209,360 203,779 212,708 187,0408.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 355,023 382,114 395,117 386,449 381,030 389,700 364,7768.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 321,868 352,413 367,075 357,301 351,192 360,966 332,864

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 376,575 405,142 418,855 409,713 404,000 413,141 386,8598.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 501,875 530,442 544,155 535,013 529,300 538,441 512,159

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 87,985 87,985 87,985 87,985 87,985 87,985 87,9859.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,720 2,922 3,019 2,955 2,914 2,979 2,793

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 7: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 99,271 99,271 99,271 99,271 99,271 99,271 99,2719.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 120,824 120,824 120,824 120,824 120,824 120,824 120,8249.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 166,249 166,249 166,249 166,249 166,249 166,249 166,2499.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 185,603 185,603 185,603 185,603 185,603 185,603 185,6039.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 204,983 204,983 204,983 204,983 204,983 204,983 204,9839.8 HOJA PUERTA FORTEC 0.81 UN 145,232 145,232 145,232 145,232 145,232 145,232 145,2329.9 HOJA PUERTA FORTEC 0.91 UN 160,387 160,387 160,387 160,387 160,387 160,387 160,387

9.10 HOJA PUERTA FORTEC 1.50 UN 237,667 237,667 237,667 237,667 237,667 237,667 237,6679.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 90,108 90,108 90,108 90,108 90,108 90,108 90,1089.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 119,508 119,508 119,508 119,508 119,508 119,508 119,5089.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 132,337 132,337 132,337 132,337 132,337 132,337 132,3379.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 336,001 336,001 336,001 336,001 336,001 336,001 336,0019.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,008 30,008 30,008 30,008 30,008 30,008 30,0089.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,206 19,206 19,206 19,206 19,206 19,206 19,2069.17 VENTANERÍA EN MADERA CEDRO MACHO M2 69,947 69,947 69,947 69,947 69,947 69,947 69,9479.18 CERRADURA DE ENTRADA PRINCIPAL UN 86,211 86,211 86,211 86,211 86,211 86,211 86,2119.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 67,074 67,074 67,074 67,074 67,074 67,074 67,0749.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 21,103 21,103 21,103 21,103 21,103 21,103 21,1039.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,103 21,103 21,103 21,103 21,103 21,103 21,1039.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,033 20,033 20,033 20,033 20,033 20,033 20,0339.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 74,122 74,122 74,122 74,122 74,122 74,122 74,1229.24 ESPEJO BISELADO INCOLORO 4 MM M2 95,718 95,718 95,718 95,718 95,718 95,718 95,7189.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 43,888 43,888 43,888 43,888 43,888 43,888 43,8889.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 52,526 52,526 52,526 52,526 52,526 52,526 52,5269.27 VIDRIO TEMPLADO PULIDO 10 MM M2 210,958 210,958 210,958 210,958 210,958 210,958 210,9589.28 VIDRIO TEMPLADO PULIDO 8 MM M2 189,362 189,362 189,362 189,362 189,362 189,362 189,3629.29 VIDRIO TRANSPARENTE 3 MM M2 47,128 47,128 47,128 47,128 47,128 47,128 47,1289.30 VIDRIO TRANSPARENTE 4 MM M2 54,686 54,686 54,686 54,686 54,686 54,686 54,6869.31 VIDRIO TRANSPARENTE 5 MM M2 61,165 61,165 61,165 61,165 61,165 61,165 61,1659.32 VIDRIO TRANSPARENTE 6 MM M2 65,053 65,053 65,053 65,053 65,053 65,053 65,053

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 55,009 55,009 55,009 55,009 55,009 55,009 55,00910.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 158,939 158,939 158,939 158,939 158,939 158,939 158,939

10.3 ML 80,101 80,101 80,101 80,101 80,101 80,101 80,101

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 105,161 105,161 105,161 105,161 105,161 105,161 105,16110.5 MARCO TAPA CAJA DE INSPECCIÓN UN 99,921 99,921 99,921 99,921 99,921 99,921 99,92110.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 69,725 69,725 69,725 69,725 69,725 69,725 69,72510.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 148,288 148,288 148,288 148,288 148,288 148,288 148,28810.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 79,466 79,466 79,466 79,466 79,466 79,466 79,46610.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,791 4,791 4,791 4,791 4,791 4,791 4,791

10.10 M2 73,564 73,564 73,564 73,564 73,564 73,564 73,564

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 30,799 30,799 30,799 30,799 30,799 30,799 30,79910.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 383,838 383,838 383,838 383,838 383,838 383,838 383,838

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

Page 8: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 138,938 138,938 138,938 138,938 138,938 138,938 138,93810.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 153,753 153,753 153,753 153,753 153,753 153,753 153,753

10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 350,884 350,884 350,884 350,884 350,884 350,884 350,884

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 93,552 93,552 93,552 93,552 93,552 93,552 93,55210.17 PUERTA CORTINA INCLUYE ESMALTE M2 279,522 279,522 279,522 279,522 279,522 279,522 279,52210.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,452 4,452 4,452 4,452 4,452 4,452 4,45210.19 VENTANA EN ALUMINIO CORREDIZA M2 197,579 197,579 197,579 197,579 197,579 197,579 197,57910.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 89,310 89,310 89,310 89,310 89,310 89,310 89,31010.21 REJILLA PISO 0.30 M M2 62,928 62,928 62,928 62,928 62,928 62,928 62,92810.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 64,581 64,581 64,581 64,581 64,581 64,581 64,581

10.23 KG 7,404 7,404 7,404 7,404 7,404 7,404 7,404

10.24 KG 8,208 8,208 8,208 8,208 8,208 8,208 8,208

10.25 KG 6,456 6,456 6,456 6,456 6,456 6,456 6,456

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 165,421 165,421 165,421 165,421 165,421 165,421 165,42111.2 ACOMETIDA EN PVC 3/4" 5M UN 196,661 196,661 196,661 196,661 196,661 196,661 196,66111.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,043 16,043 16,043 16,043 16,043 16,043 16,04311.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,145 25,145 25,145 25,145 25,145 25,145 25,14511.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,367 24,367 24,367 24,367 24,367 24,367 24,36711.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,087 31,087 31,087 31,087 31,087 31,087 31,08711.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 63,662 63,662 63,662 63,662 63,662 63,662 63,66211.8 CONEXIÓN TANQUE ELEVADO PVC UN 165,457 165,457 165,457 165,457 165,457 165,457 165,45711.9 INSTALACIÓN APARATO SANITARIO UN 33,382 33,382 33,382 33,382 33,382 33,382 33,382

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,419 23,419 23,419 23,419 23,419 23,419 23,41911.13 NIPLE PASAMURO 2" UN 49,918 49,918 49,918 49,918 49,918 49,918 49,91811.14 NIPLE PASAMURO 4" UN 74,537 74,537 74,537 74,537 74,537 74,537 74,53711.15 PUNTO AGUA CALIENTE CPVC UN 61,954 61,954 61,954 61,954 61,954 61,954 61,95411.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 45,622 45,622 45,622 45,622 45,622 45,622 45,62211.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,331 48,331 48,331 48,331 48,331 48,331 48,33111.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 61,012 61,012 61,012 61,012 61,012 61,012 61,01211.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 48,348 48,348 48,348 48,348 48,348 48,348 48,34811.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 59,982 59,982 59,982 59,982 59,982 59,982 59,98211.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 64,033 64,033 64,033 64,033 64,033 64,033 64,03311.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 53,394 53,394 53,394 53,394 53,394 53,394 53,394

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 9: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

11.23 RED SUMINISTRO CPVC 1/2" ML 9,074 9,074 9,074 9,074 9,074 9,074 9,07411.24 RED SUMINISTRO CPVC 3/4" ML 12,676 12,676 12,676 12,676 12,676 12,676 12,67611.25 RED SUMINISTRO PVC 1 1/2" ML 16,301 16,301 16,301 16,301 16,301 16,301 16,30111.26 RED SUMINISTRO PVC 1" ML 10,127 10,127 10,127 10,127 10,127 10,127 10,12711.27 RED SUMINISTRO PVC 1/2" ML 6,111 6,111 6,111 6,111 6,111 6,111 6,11111.28 RED SUMINISTRO PVC 2 1/2" ML 40,965 40,965 40,965 40,965 40,965 40,965 40,96511.29 RED SUMINISTRO PVC 2" ML 23,571 23,571 23,571 23,571 23,571 23,571 23,57111.30 RED SUMINISTRO PVC 3/4" ML 7,615 7,615 7,615 7,615 7,615 7,615 7,61511.31 RED SANITARIA PVC-S 2" ML 17,951 17,951 17,951 17,951 17,951 17,951 17,95111.32 RED SANITARIA PVC-S 3" ML 24,856 24,856 24,856 24,856 24,856 24,856 24,85611.33 RED SANITARIA PVC-S 4" ML 33,621 33,621 33,621 33,621 33,621 33,621 33,62111.34 RED SANITARIA PVC-S 6" ML 62,589 62,589 62,589 62,589 62,589 62,589 62,58911.35 REGISTRO 1" UN 81,840 81,840 81,840 81,840 81,840 81,840 81,84011.36 REGISTRO 1/2" UN 46,877 46,877 46,877 46,877 46,877 46,877 46,87711.37 REGISTRO 3/4" UN 57,367 57,367 57,367 57,367 57,367 57,367 57,36711.38 REGISTRO 1 1/2" UN 106,687 106,687 106,687 106,687 106,687 106,687 106,68711.39 REGISTRO 2 1/2" UN 274,768 274,768 274,768 274,768 274,768 274,768 274,76811.40 REGISTRO 2" UN 204,945 204,945 204,945 204,945 204,945 204,945 204,94511.41 REVENTILACIÓN 2" ML 12,560 12,560 12,560 12,560 12,560 12,560 12,56011.42 REVENTILACIÓN 3" ML 15,850 15,850 15,850 15,850 15,850 15,850 15,85011.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 125,532 125,532 125,532 125,532 125,532 125,532 125,53211.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 203,369 203,369 203,369 203,369 203,369 203,369 203,36911.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 334,454 334,454 334,454 334,454 334,454 334,454 334,45411.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 35,163 35,163 35,163 35,163 35,163 35,163 35,163

11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 40,613 40,613 40,613 40,613 40,613 40,613 40,613

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 66,681 66,681 66,681 66,681 66,681 66,681 66,68111.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 51,771 51,771 51,771 51,771 51,771 51,771 51,771

11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 73,509 73,509 73,509 73,509 73,509 73,509 73,509

11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 77,347 77,347 77,347 77,347 77,347 77,347 77,34711.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 179,710 179,710 179,710 179,710 179,710 179,710 179,71011.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,397 35,397 35,397 35,397 35,397 35,397 35,39711.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,536 35,536 35,536 35,536 35,536 35,536 35,53611.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,490 28,490 28,490 28,490 28,490 28,490 28,49011.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,209 32,209 32,209 32,209 32,209 32,209 32,20911.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 2,906 2,906 2,906 2,906 2,906 2,906 2,90611.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,507 4,507 4,507 4,507 4,507 4,507 4,50711.59 GABINETE TIPO III UN 1,006,842 1,006,842 1,006,842 1,006,842 1,006,842 1,006,842 1,006,84211.60 GABINETE TIPO I UN 795,373 795,373 795,373 795,373 795,373 795,373 795,37311.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,254,532 1,254,532 1,254,532 1,254,532 1,254,532 1,254,532 1,254,53211.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,198,725 1,198,725 1,198,725 1,198,725 1,198,725 1,198,725 1,198,72511.63 VÁLVULA MARIPOSA 3" UN 651,923 651,923 651,923 651,923 651,923 651,923 651,92311.64 VÁLVULA MARIPOSA 4" UN 743,781 743,781 743,781 743,781 743,781 743,781 743,78111.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 319,112 319,112 319,112 319,112 319,112 319,112 319,112

Page 10: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 223,363 223,363 223,363 223,363 223,363 223,363 223,36312.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 32,480 32,480 32,480 32,480 32,480 32,480 32,48012.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 39,981 39,981 39,981 39,981 39,981 39,981 39,98112.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 43,487 43,487 43,487 43,487 43,487 43,487 43,48712.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 53,017 53,017 53,017 53,017 53,017 53,017 53,01712.6 SALIDA TELÉFONO PVC COMPLETA UN 35,445 35,445 35,445 35,445 35,445 35,445 35,44512.7 SALIDA TIMBRE PVC COMPLETA UN 35,479 35,479 35,479 35,479 35,479 35,479 35,47912.8 STRIP TELEFÓNICO 10 PARES UN 106,733 106,733 106,733 106,733 106,733 106,733 106,73312.9 SALIDA TOMA DOBLE PVC COMPLETA UN 30,716 30,716 30,716 30,716 30,716 30,716 30,716

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 72,191 72,191 72,191 72,191 72,191 72,191 72,19112.11 SALIDA T.V PVC COMPLETA. UN 47,556 47,556 47,556 47,556 47,556 47,556 47,55612.12 SALIDA BIFÁSICA C.N. UN 27,926 27,926 27,926 27,926 27,926 27,926 27,92612.13 TABLERO PARCIAL 4 CIRCUITOS UN 80,325 80,325 80,325 80,325 80,325 80,325 80,32512.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 331,163 331,163 331,163 331,163 331,163 331,163 331,16312.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 445,366 445,366 445,366 445,366 445,366 445,366 445,36612.16 TUBERÍA PVC CONDUIT 1/2" ML 2,590 2,590 2,590 2,590 2,590 2,590 2,59012.17 TUBERÍA PVC CONDUIT 3/4" ML 3,374 3,374 3,374 3,374 3,374 3,374 3,37412.18 TUBERÍA PVC CONDUIT 1" ML 5,186 5,186 5,186 5,186 5,186 5,186 5,18612.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,320 9,320 9,320 9,320 9,320 9,320 9,32012.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 179,246 179,246 179,246 179,246 179,246 179,246 179,24612.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 56,807 56,807 56,807 56,807 56,807 56,807 56,80712.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 76,649 76,649 76,649 76,649 76,649 76,649 76,64912.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,599 27,599 27,599 27,599 27,599 27,599 27,59912.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,033,969 1,033,969 1,033,969 1,033,969 1,033,969 1,033,969 1,033,96912.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 765,435 765,435 765,435 765,435 765,435 765,435 765,43512.26 POSTE METÁLICO 6M UN 954,669 954,669 954,669 954,669 954,669 954,669 954,66912.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 433,223 433,223 433,223 433,223 433,223 433,223 433,22312.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 75,230 75,230 75,230 75,230 75,230 75,230 75,23012.29 LUMINARIA 70W SODIO UN 192,112 192,112 192,112 192,112 192,112 192,112 192,11212.30 LUMINARIA 150W SODIO UN 226,323 226,323 226,323 226,323 226,323 226,323 226,32312.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,217,928 1,217,928 1,217,928 1,217,928 1,217,928 1,217,928 1,217,92812.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 897,200 897,200 897,200 897,200 897,200 897,200 897,200

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 33,039 34,137 34,665 34,313 34,093 34,445 33,43413.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 28,009 29,108 29,635 29,283 29,064 29,415 28,40413.3 ALISTADO PARA LISTÓN M2 11,005 11,224 11,330 11,259 11,216 11,286 11,08413.4 ALISTADO PISOS 1:3, E=0.04 M2 21,460 23,657 24,712 24,009 23,570 24,273 22,25113.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 59,174 61,371 62,426 61,723 61,283 61,986 59,96513.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,812 21,381 21,747 21,987 21,355 21,647 21,00113.7 CONCRETO BASE GRADAS 2500 PSI M2 47,059 49,780 51,616 53,158 49,654 51,112 47,94613.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 65,743 70,097 73,034 75,500 69,895 72,228 67,16213.9 MANTO FIBERGLASS 600X1 M2 22,064 22,064 22,064 22,064 22,064 22,064 22,064

13.10 PEGANTE MORTERO-CONCRETO M2 19,008 19,008 19,008 19,008 19,008 19,008 19,00813.11 PERMA PLY 2 CAPAS M2 19,829 19,829 19,829 19,829 19,829 19,829 19,829

Page 11: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 38,558 41,008 42,660 44,047 40,894 42,206 39,35713.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 45,307 48,300 50,320 52,015 48,162 49,766 46,28313.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 65,946 70,573 73,693 76,314 70,358 72,837 67,45413.15 TRITURADO FINO 1/2 M3 77,325 99,959 110,823 103,580 99,053 108,107 85,47313.16 TRITURADO GRUESO 3/4 M3 78,047 98,977 117,016 103,664 98,602 114,297 85,805

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 36,436 36,876 37,087 36,946 36,858 36,999 36,59414.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 22,535 22,755 22,861 22,790 22,746 22,817 22,61514.3 ADOQUÍN CONCRETO 6CM M2 47,404 48,502 49,030 48,678 48,459 48,810 47,79914.4 ADOQUÍN CONCRETO 8CM M2 56,504 57,602 58,130 57,778 57,559 57,910 56,89914.5 ADOQUÍN GRES PEATONAL M2 46,368 47,467 47,994 47,643 47,423 47,775 46,764

14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 50,977 51,417 51,628 51,487 51,399 51,540 51,136

14.7 GRAVILLA PARA GRADAS ML 28,866 29,320 29,539 29,393 29,302 29,467 29,02914.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 102,684 104,662 105,611 104,979 104,583 105,216 103,39614.9 ACABADO EN GRAVILLA LAVADA M2 35,823 36,952 37,494 37,133 36,907 37,306 36,229

14.10 GUARDAESCOBA EN GRANITO ML 29,484 29,484 29,484 29,484 29,484 29,484 29,48414.11 GUARDAESCOBA EN GRAVILLA ML 7,871 8,326 8,544 8,399 8,308 8,472 8,03514.12 GUARDAESCOBA PVC CARAMELO ML 7,170 7,170 7,170 7,170 7,170 7,170 7,17014.13 GUARDAESCOBA PVC CEDRO ML 9,078 9,078 9,078 9,078 9,078 9,078 9,07814.14 GUARDAESCOBA PINO CARIBE ML 7,658 7,658 7,658 7,658 7,658 7,658 7,65814.15 GUARDAESCOBA CEDRO BLANCO ML 7,647 7,647 7,647 7,647 7,647 7,647 7,64714.16 GUARDAESCOBA EN MADERA SAPAN ML 12,047 12,047 12,047 12,047 12,047 12,047 12,04714.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,838 6,838 6,838 6,838 6,838 6,838 6,83814.18 LISTÓN M.H. AMARILLO M2 54,030 54,030 54,030 54,030 54,030 54,030 54,03014.19 PASO ESCALERA GRANITO ML 79,285 80,824 81,562 81,070 80,762 81,254 79,83914.20 PIRLANES ALUMINIO ML 5,750 5,750 5,750 5,750 5,750 5,750 5,75014.21 PIRLANES LADRILLO ML 24,205 24,609 24,803 24,674 24,593 24,722 24,35014.22 PISO VINILO TRÁFICO RESIDENCIAL M2 30,819 30,819 30,819 30,819 30,819 30,819 30,81914.23 PISO VINILO TRÁFICO PESADO M2 41,112 41,112 41,112 41,112 41,112 41,112 41,11214.24 PULIDA LACADA PISO MADERA M2 41,002 41,002 41,002 41,002 41,002 41,002 41,00214.25 TABLETA DE GRES 25X25 M2 36,186 36,626 36,837 36,696 36,608 36,749 36,34514.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 36,847 37,286 37,497 37,356 37,268 37,409 37,00514.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,075 8,075 8,075 8,075 8,075 8,075 8,07514.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 33,402 34,008 34,299 34,105 33,984 34,178 33,62014.29 JABONERA PORCELANA ACUARIO UN 14,036 14,036 14,036 14,036 14,036 14,036 14,036

14.30 UN 97,225 97,225 97,225 97,225 97,225 97,225 97,225

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,600 7,600 7,600 7,600 7,600 7,600 7,60014.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,504 15,504 15,504 15,504 15,504 15,504 15,50414.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,470 10,470 10,470 10,470 10,470 10,470 10,47014.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 9,973 9,973 9,973 9,973 9,973 9,973 9,97314.35 REMATES BOCEL ALUMINIO ML 6,379 6,379 6,379 6,379 6,379 6,379 6,37914.36 REMATES BOCEL PORCELANA ML 6,486 6,486 6,486 6,486 6,486 6,486 6,48614.37 TAPA REGISTRO 20X20 UN 14,532 14,532 14,532 14,532 14,532 14,532 14,532

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

Page 12: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

14.38 TAPA REGISTRO 6X6 UN 12,822 12,822 12,822 12,822 12,822 12,822 12,82214.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 14,005 14,005 14,005 14,005 14,005 14,005 14,00514.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 16,250 16,250 16,250 16,250 16,250 16,250 16,25014.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 46,504 46,943 47,154 47,013 46,925 47,066 46,66214.42 MEDIA CAÑA EN GRANITO ML 56,371 56,371 56,371 56,371 56,371 56,371 56,37114.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,184 26,184 26,184 26,184 26,184 26,184 26,18414.44 PINTURA ACRÍLICA PARA PISOS M2 10,257 10,257 10,257 10,257 10,257 10,257 10,25714.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,631 11,631 11,631 11,631 11,631 11,631 11,63114.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 81,289 81,289 81,289 81,289 81,289 81,289 81,289

15 CIELO RASO15.1 APLIQUE YESO ML 56,036 56,036 56,036 56,036 56,036 56,036 56,03615.2 ARMADURA MADERA Y MALLA M2 26,568 26,568 26,568 26,568 26,568 26,568 26,56815.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51,078 51,078 51,078 51,078 51,078 51,078 51,07815.4 CIELO RASO DURACUSTIC M2 50,432 50,432 50,432 50,432 50,432 50,432 50,43215.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 46,629 46,629 46,629 46,629 46,629 46,629 46,62915.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 66,201 66,201 66,201 66,201 66,201 66,201 66,20115.7 CORNISAS YESO ML 35,020 35,020 35,020 35,020 35,020 35,020 35,02015.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 73,554 73,554 73,554 73,554 73,554 73,554 73,55415.9 MALLA CON VENA M2 10,207 10,207 10,207 10,207 10,207 10,207 10,207

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 45,831 51,005 79,462 56,179 52,298 78,168 48,41816.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 85,976 111,840 124,255 115,978 110,805 121,151 95,286

16.10 M3 121,692 126,866 155,323 132,040 128,160 154,030 124,279

16.11 AFRIMADO (NORMA INVIAS 311) M3 53,781 58,955 87,412 64,129 60,249 86,119 56,36816.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 112,785 117,959 146,416 123,133 119,252 145,122 115,37216.13 BASE GRANULAR (NORMA INVIAS 330) M3 122,333 127,507 155,964 132,681 128,801 154,671 124,920

17 APARATOS SANITARIOS17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 214,740 214,740 214,740 214,740 214,740 214,740 214,74017.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 676,772 676,772 676,772 676,772 676,772 676,772 676,77217.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 382,642 382,642 382,642 382,642 382,642 382,642 382,64217.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 123,373 123,373 123,373 123,373 123,373 123,373 123,37317.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 152,740 152,740 152,740 152,740 152,740 152,740 152,740

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

Page 13: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 180,661 180,661 180,661 180,661 180,661 180,661 180,66117.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 278,938 278,938 278,938 278,938 278,938 278,938 278,93817.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 731,852 731,852 731,852 731,852 731,852 731,852 731,85217.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 228,717 228,717 228,717 228,717 228,717 228,717 228,717

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 110,170 110,170 110,170 110,170 110,170 110,170 110,17017.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 62,686 62,686 62,686 62,686 62,686 62,686 62,686

17.12 UN 182,265 182,265 182,265 182,265 182,265 182,265 182,265

17.13 UN 291,207 291,207 291,207 291,207 291,207 291,207 291,207

18 PINTURAS18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,455 4,455 4,455 4,455 4,455 4,455 4,45518.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,206 2,206 2,206 2,206 2,206 2,206 2,20618.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,359 8,359 8,359 8,359 8,359 8,359 8,35918.4 BARNIZ SOBRE MUEBLES M2 31,693 31,693 31,693 31,693 31,693 31,693 31,69318.5 CARBURO SOBRE PAÑETES M2 4,302 4,302 4,302 4,302 4,302 4,302 4,30218.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,504 10,504 10,504 10,504 10,504 10,504 10,50418.7 DEMARCACIÓN CON MARMOLINA ML 2,681 2,681 2,681 2,681 2,681 2,681 2,68118.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,918 1,918 1,918 1,918 1,918 1,918 1,91818.9 ESMALTE SOBRE LÁMINA LLENA M2 9,964 9,964 9,964 9,964 9,964 9,964 9,964

18.10 ESMALTE SOBRE MADERA LINEAL ML 2,985 2,985 2,985 2,985 2,985 2,985 2,98518.11 ESMALTE SOBRE MADERA LLENA M2 11,056 11,056 11,056 11,056 11,056 11,056 11,05618.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,894 3,894 3,894 3,894 3,894 3,894 3,89418.13 ESMALTE SOBRE MARCOS MADERA M2 4,646 4,646 4,646 4,646 4,646 4,646 4,64618.14 ESTUCO M2 5,847 5,847 5,847 5,847 5,847 5,847 5,84718.15 ESTUCO (LINEAL) ML 3,605 3,605 3,605 3,605 3,605 3,605 3,60518.16 ESTUCO Y VINILO 3 MANOS M2 12,192 12,192 12,192 12,192 12,192 12,192 12,19218.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,527 7,527 7,527 7,527 7,527 7,527 7,52718.18 LACA PISOS MADERA M2 17,981 17,981 17,981 17,981 17,981 17,981 17,98118.19 LÍNEAS TRÁFICO 0.10 ML 2,068 2,068 2,068 2,068 2,068 2,068 2,06818.20 MARMOLINA SOBRE PAÑETE M2 8,683 8,683 8,683 8,683 8,683 8,683 8,68318.21 TINTILLA SOBRE MADERA LINEAL ML 2,531 2,531 2,531 2,531 2,531 2,531 2,53118.22 TINTILLA SOBRE MADERA LLENA M2 9,693 9,693 9,693 9,693 9,693 9,693 9,69318.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,320 5,320 5,320 5,320 5,320 5,320 5,32018.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,361 3,361 3,361 3,361 3,361 3,361 3,36118.25 WASH-PRIMER SOBRE ALUMNIO M2 16,220 16,220 16,220 16,220 16,220 16,220 16,22018.26 PINTURA EPÓXICA M2 10,042 10,042 10,042 10,042 10,042 10,042 10,04218.27 PINTURA EPÓXICA (LINEAL) ML 6,170 6,170 6,170 6,170 6,170 6,170 6,170

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,675,571 3,675,571 3,675,571 3,675,571 3,675,571 3,675,571 3,675,571

19.2 UN 6,451,912 6,451,912 6,451,912 6,451,912 6,451,912 6,451,912 6,451,912

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,935,461 1,935,461 1,935,461 1,935,461 1,935,461 1,935,461 1,935,46119.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,424,492 5,424,492 5,424,492 5,424,492 5,424,492 5,424,492 5,424,492

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 14: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,400,004 5,400,004 5,400,004 5,400,004 5,400,004 5,400,004 5,400,00419.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,068 2,068 2,068 2,068 2,068 2,068 2,06819.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,931,038 1,931,038 1,931,038 1,931,038 1,931,038 1,931,038 1,931,03819.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 61,901 61,901 61,901 61,901 61,901 61,901 61,90119.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,089,239 1,089,519 1,089,708 1,089,866 1,089,506 1,089,656 1,089,331

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 561,475 568,305 572,612 575,117 567,998 571,448 563,753

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 22,887 22,887 22,887 22,887 22,887 22,887 22,88720.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 33,836 33,836 33,836 33,836 33,836 33,836 33,83620.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 41,758 41,758 41,758 41,758 41,758 41,758 41,75820.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,301 25,301 25,301 25,301 25,301 25,301 25,30120.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 28,887 28,887 28,887 28,887 28,887 28,887 28,88720.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,291 42,291 42,291 42,291 42,291 42,291 42,29120.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,634 19,634 19,634 19,634 19,634 19,634 19,63420.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,704 20,704 20,704 20,704 20,704 20,704 20,70420.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,599 25,599 25,599 25,599 25,599 25,599 25,599

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,535 11,535 11,535 11,535 11,535 11,535 11,53520.11 VÁLVULA DE BOLA GAS 3/4" UN 17,973 17,973 17,973 17,973 17,973 17,973 17,97320.12 VÁLVULA DE BOLA GAS 1" UN 26,888 26,888 26,888 26,888 26,888 26,888 26,88820.13 VÁLVULA POLIETILENO GAS 1/2" UN 159,733 159,733 159,733 159,733 159,733 159,733 159,73320.14 VÁLVULA POLIETILENO GAS 3/4" UN 164,277 164,277 164,277 164,277 164,277 164,277 164,27720.15 VÁLVULA POLIETILENO GAS 1" UN 266,079 266,079 266,079 266,079 266,079 266,079 266,07920.16 ACOMETIDA GAS 1/2" ML 220,063 220,063 220,063 220,063 220,063 220,063 220,063

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 97,255 97,255 97,255 97,255 97,255 97,255 97,25521.2 CABLE DETECTOR LINEAL DE CALOR ML 24,179 24,179 24,179 24,179 24,179 24,179 24,17921.3 SIRENA DE 110 V UN 68,802 68,802 68,802 68,802 68,802 68,802 68,80221.4 CÁMARA CCTV UN 201,682 201,682 201,682 201,682 201,682 201,682 201,68221.5 PARLANTE-CIELO FALSO UN 39,350 39,350 39,350 39,350 39,350 39,350 39,35021.6 AMPLIFICADOR 100W UN 422,871 422,871 422,871 422,871 422,871 422,871 422,87121.7 AMPLIFICADOR 300W UN 1,045,862 1,045,862 1,045,862 1,045,862 1,045,862 1,045,862 1,045,86221.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,688 32,688 32,688 32,688 32,688 32,688 32,68821.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 167,207 167,207 167,207 167,207 167,207 167,207 167,207

21.10 TOMA PARA MICRÓFONO UN 33,432 33,432 33,432 33,432 33,432 33,432 33,43221.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,571 2,571 2,571 2,571 2,571 2,571 2,57121.12 SPLITERS UN 4,130 4,130 4,130 4,130 4,130 4,130 4,13021.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,109 14,109 14,109 14,109 14,109 14,109 14,10921.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,549 18,549 18,549 18,549 18,549 18,549 18,54921.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,495 25,495 25,495 25,495 25,495 25,495 25,49521.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 93,421 93,421 93,421 93,421 93,421 93,421 93,42121.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 24,570 24,570 24,570 24,570 24,570 24,570 24,57021.18 BANDEJA PORTACABLES PARA RACK UN 80,385 80,385 80,385 80,385 80,385 80,385 80,38521.19 RACK 2' X 24" UN 129,937 129,937 129,937 129,937 129,937 129,937 129,93721.20 RACK 3' X 24" UN 157,734 157,734 157,734 157,734 157,734 157,734 157,734

Page 15: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

21.21 RACK 5' X 24" UN 248,894 248,894 248,894 248,894 248,894 248,894 248,89421.22 RACK 7' X 24" UN 321,593 321,593 321,593 321,593 321,593 321,593 321,59321.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 366,695 366,695 366,695 366,695 366,695 366,695 366,69521.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 220,317 220,317 220,317 220,317 220,317 220,317 220,31721.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 52,819 52,819 52,819 52,819 52,819 52,819 52,81921.26 PATCH CORD 2M CATEGORÍA 6A UN 5,474 5,474 5,474 5,474 5,474 5,474 5,47421.27 PATCH CORD 5M CATEGORÍA 6A UN 13,887 13,887 13,887 13,887 13,887 13,887 13,88721.28 CABLE UTP CATEGORÍA 6A ML 2,576 2,576 2,576 2,576 2,576 2,576 2,57621.29 CANALETA METÁLICA 4X6 CMS ML 25,820 25,820 25,820 25,820 25,820 25,820 25,82021.30 CANALETA METÁLICA 4X10 CMS ML 26,942 26,942 26,942 26,942 26,942 26,942 26,94221.31 CANALETA METÁLICA 6X10 CMS ML 27,503 27,503 27,503 27,503 27,503 27,503 27,50321.32 CANALETA PLÁSTICA 13X7 MM ML 15,325 15,325 15,325 15,325 15,325 15,325 15,32521.33 CANALETA PLÁSTICA 20X12 MM ML 17,135 17,135 17,135 17,135 17,135 17,135 17,13521.34 CANALETA PLÁSTICA 32X12 MM ML 17,065 17,065 17,065 17,065 17,065 17,065 17,06521.35 CANALETA PLÁSTICA 40X60 MM ML 27,244 27,244 27,244 27,244 27,244 27,244 27,24421.36 SWITCH 10/100/1000 24 PUERTOS UN 367,277 367,277 367,277 367,277 367,277 367,277 367,27721.37 SWITCH 10/100/1000 16 PUERTOS UN 232,426 232,426 232,426 232,426 232,426 232,426 232,42621.38 SWITCH 10/100/1000 8 PUERTOS UN 62,296 62,296 62,296 62,296 62,296 62,296 62,29621.39 CABLE TELEFÓNICO 2 PARES ML 1,340 1,340 1,340 1,340 1,340 1,340 1,34021.40 CABLE TELEFÓNICO 10 PARES ML 6,491 6,491 6,491 6,491 6,491 6,491 6,49121.41 CABLE TELEFÓNICO 20 PARES ML 8,678 8,678 8,678 8,678 8,678 8,678 8,67821.42 CABLE TELEFÓNICO 40 PARES ML 12,091 12,091 12,091 12,091 12,091 12,091 12,09121.43 CABLE TELEVISIÓN RG6 ML 1,654 1,654 1,654 1,654 1,654 1,654 1,65421.44 ACOMETIDA TELEFÓNICA 1/2" ML 15,975 15,975 15,975 15,975 15,975 15,975 15,97521.45 ACOMETIDA TELEFÓNICA 1" ML 24,483 24,483 24,483 24,483 24,483 24,483 24,48321.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,131 13,131 13,131 13,131 13,131 13,131 13,13121.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 10,669 10,669 10,669 10,669 10,669 10,669 10,66921.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 474,637 474,637 474,637 474,637 474,637 474,637 474,637

Page 16: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,277 19,277 19,277 19,277 19,277 19,277 19,2771.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 63,994 63,994 63,994 63,994 63,994 63,994 63,9941.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 358,584 358,584 358,584 358,584 358,584 358,584 358,5841.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 765,206 765,206 765,206 765,206 765,206 765,206 765,2061.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 87,994 87,994 87,994 87,994 87,994 87,994 87,9941.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 533,970 533,970 533,970 533,970 533,970 533,970 533,9701.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,147,979 1,147,979 1,147,979 1,147,979 1,147,979 1,147,979 1,147,9791.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,554 9,554 9,554 9,554 9,554 9,554 9,5541.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,687 11,687 11,687 11,687 11,687 11,687 11,687

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,583 14,583 14,583 14,583 14,583 14,583 14,5831.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 15,910 15,910 15,910 15,910 15,910 15,910 15,9101.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 18,997 18,997 18,997 18,997 18,997 18,997 18,9971.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 18,997 18,997 18,997 18,997 18,997 18,997 18,9971.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 75,084 75,084 75,084 75,084 75,084 75,084 75,0841.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 87,015 87,015 87,015 87,015 87,015 87,015 87,0151.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 269,042 269,042 269,042 269,042 269,042 269,042 269,0421.17 TEE PVC UNIÓN MECÁNICA 2" UN 100,954 100,954 100,954 100,954 100,954 100,954 100,9541.18 TEE PVC UNIÓN MECÁNICA 4" UN 166,408 166,408 166,408 166,408 166,408 166,408 166,4081.19 TEE PVC UNIÓN MECÁNICA 8" UN 735,262 735,262 735,262 735,262 735,262 735,262 735,2621.20 TEE PVC UNIÓN MECÁNICA 10" UN 846,940 846,940 846,940 846,940 846,940 846,940 846,9401.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 9,899 9,899 9,899 9,899 9,899 9,899 9,8991.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,787 8,787 8,787 8,787 8,787 8,787 8,7871.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 20,680 20,680 20,680 20,680 20,680 20,680 20,6801.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 83,206 83,206 83,206 83,206 83,206 83,206 83,2061.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 123,169 123,169 123,169 123,169 123,169 123,169 123,1691.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 20,490 20,490 20,490 20,490 20,490 20,490 20,4901.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 69,997 69,997 69,997 69,997 69,997 69,997 69,9971.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 103,000 103,000 103,000 103,000 103,000 103,000 103,0001.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,422 21,422 21,422 21,422 21,422 21,422 21,4221.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 44,010 44,010 44,010 44,010 44,010 44,010 44,0101.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 176,254 176,254 176,254 176,254 176,254 176,254 176,2541.32 UNIÓN REPARACION PVC 4" UN 51,278 51,278 51,278 51,278 51,278 51,278 51,2781.33 UNIÓN REPARACIÓN PVC 8" UN 204,911 204,911 204,911 204,911 204,911 204,911 204,9111.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 124,040 124,040 124,040 124,040 124,040 124,040 124,0401.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 349,750 349,750 349,750 349,750 349,750 349,750 349,7501.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,030,120 1,030,120 1,030,120 1,030,120 1,030,120 1,030,120 1,030,1201.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,522,043 1,522,043 1,522,043 1,522,043 1,522,043 1,522,043 1,522,043

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,039 8,039 8,039 8,039 8,039 8,039 8,0392.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,485 18,485 18,485 18,485 18,485 18,485 18,4852.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 74,922 99,611 111,461 103,561 98,623 108,499 83,8092.5 RELLENO TIPO 2 "RECEBO" M3 42,651 47,825 76,282 52,999 49,119 74,989 45,238

Page 17: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 55,001 60,175 88,632 65,349 61,469 87,339 57,5882.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 72,092 85,415 97,713 89,514 84,390 94,639 74,1422.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 61,611 75,193 87,730 79,372 74,148 84,596 63,7012.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 51,674 77,956 90,572 82,162 76,905 85,316 61,136

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 80,015 80,015 80,015 80,015 80,015 80,015 80,0153.2 CODO 45 PVC ALCANTARILLADO 16" UN 833,454 833,454 833,454 833,454 833,454 833,454 833,4543.3 CODO 90 PVC ALCANTARILLADO 8" UN 104,548 104,548 104,548 104,548 104,548 104,548 104,5483.4 CODO 90 PVC ALCANTARILLADO 16" UN 965,014 965,014 965,014 965,014 965,014 965,014 965,0143.5 CODO 90 PVC ALCANTARILLADO 24" UN 672,453 672,453 672,453 672,453 672,453 672,453 672,4533.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 57,856 57,856 57,856 57,856 57,856 57,856 57,8563.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 79,737 79,737 79,737 79,737 79,737 79,737 79,7373.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 187,881 187,881 187,881 187,881 187,881 187,881 187,8813.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 187,880 187,880 187,880 187,880 187,880 187,880 187,880

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 301,539 301,539 301,539 301,539 301,539 301,539 301,5393.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 79,738 79,738 79,738 79,738 79,738 79,738 79,7383.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 79,737 79,737 79,737 79,737 79,737 79,737 79,7373.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 187,881 187,881 187,881 187,881 187,881 187,881 187,8813.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 187,881 187,881 187,881 187,881 187,881 187,881 187,8813.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 301,540 301,540 301,540 301,540 301,540 301,540 301,5403.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 277,822 277,822 277,822 277,822 277,822 277,822 277,8223.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 445,156 445,156 445,156 445,156 445,156 445,156 445,1563.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 710,873 710,873 710,873 710,873 710,873 710,873 710,8733.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 44,412 44,412 44,412 44,412 44,412 44,412 44,4123.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 234,294 234,294 234,294 234,294 234,294 234,294 234,2943.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 254,162 254,162 254,162 254,162 254,162 254,162 254,1623.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 745,109 745,109 745,109 745,109 745,109 745,109 745,1093.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 41,757 42,028 42,158 42,071 42,017 42,103 41,8543.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 212,901 212,901 212,901 212,901 212,901 212,901 212,9013.25 TUBERÍA PVC ALCANTARILLADO 8" ML 35,064 35,064 35,064 35,064 35,064 35,064 35,0643.26 TUBERÍA PVC ALCANTARILLADO 10" ML 49,476 49,476 49,476 49,476 49,476 49,476 49,4763.27 TUBERÍA PVC ALCANTARILLADO 12" ML 71,275 71,275 71,275 71,275 71,275 71,275 71,2753.28 TUBERÍA PVC ALCANTARILLADO 16" ML 109,321 109,321 109,321 109,321 109,321 109,321 109,3213.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 175,445 175,445 175,445 175,445 175,445 175,445 175,4453.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 257,987 257,987 257,987 257,987 257,987 257,987 257,9873.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 325,510 325,510 325,510 325,510 325,510 325,510 325,5103.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 427,600 427,600 427,600 427,600 427,600 427,600 427,6003.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 586,279 586,279 586,279 586,279 586,279 586,279 586,279

4 ALCANTARILLADO - SUMIDEROS Y POZOS4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 516,929 533,321 543,659 549,671 532,585 540,865 522,398

4.2 ML 483,657 497,655 504,374 499,894 497,095 501,574 488,696

4.3 UN 508,552 519,480 526,373 530,380 518,989 524,510 512,198

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

Page 18: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 614,604 635,094 648,017 655,531 634,173 644,524 621,440

4.5 ML 684,804 704,515 713,977 707,669 703,727 710,034 691,900

4.6 UN 594,988 610,014 619,491 625,002 609,340 616,930 600,002

4.7 SUMIDERO EN LADRILLO SL-100 UN 721,180 729,921 734,764 734,920 729,549 733,115 724,2134.8 SUMIDERO EN LADRILLO SL-250 UN 1,067,763 1,092,091 1,106,455 1,110,908 1,091,029 1,102,005 1,076,0504.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,522,392 1,565,378 1,593,232 1,612,373 1,563,424 1,585,657 1,536,604

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,063,048 2,134,502 2,180,803 2,212,625 2,131,255 2,168,211 2,086,6724.11 SUMIDERO PREFABRICADO SL-100 UN 947,441 947,441 947,441 947,441 947,441 947,441 947,4414.12 SUMIDERO PREFABRICADO SL-250 UN 2,215,578 2,215,578 2,215,578 2,215,578 2,215,578 2,215,578 2,215,578

4.13 UN 100,688 101,259 101,533 101,350 101,236 101,419 100,893

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 42,318 43,733 44,412 43,959 43,676 44,129 42,8275.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 49,026 50,441 51,120 50,667 50,384 50,837 49,5355.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 45,573 48,430 50,358 51,976 48,298 49,829 46,5045.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 48,965 51,833 53,643 54,695 51,704 53,154 49,9225.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 49,644 52,394 54,177 55,408 52,269 53,692 50,5535.6 BORDE SEPARADOR VERDE A-170 ML 190,955 191,526 191,800 191,618 191,503 191,686 191,1615.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,440 14,783 15,014 15,208 14,767 14,951 14,5525.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 32,722 34,736 36,095 37,235 34,643 35,722 33,3795.9 CAÑUELA PREFABRICADA TIPO A-120 ML 62,813 63,119 63,265 63,168 63,106 63,204 62,923

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 426,997 434,776 438,510 436,021 434,465 437,143 429,7985.11 LOSETA PREFABRICADA A-40 M2 44,833 46,140 46,768 46,349 46,088 46,506 45,3035.12 LOSETA PREFABRICADA A-60 M2 64,400 65,708 66,336 65,917 65,656 66,074 64,8715.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 26,663 27,810 28,534 28,955 27,759 28,338 27,0465.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 43,345 45,667 47,132 47,983 45,563 46,736 44,1205.15 SARDINEL PREFABRICADO A-10 ML 77,584 78,685 83,210 79,530 78,872 82,950 78,0925.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 43,543 44,334 44,714 44,460 44,302 44,555 43,828

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 112,140 113,506 114,367 114,868 113,444 114,135 112,5966.2 BANCA EN CONCRETO M-30 UN 469,695 471,607 472,814 473,515 471,521 472,488 470,3336.3 BOLARDO M-63 ALTO/HIERRO UN 170,397 170,681 170,864 170,984 170,669 170,815 170,4916.4 BOLARDO M-60 CONCRETO UN 109,021 110,660 111,694 112,295 110,587 111,415 109,5686.5 BOLARDO M-61 BAJO/CONCRETO UN 110,443 112,083 113,116 113,718 112,009 112,837 110,9906.6 BOLARDO M-62 BAJO/HIERRO UN 152,932 154,638 155,734 156,455 154,560 155,437 153,4976.7 BORDE CONTENEDOR DE RAICES A-70 ML 44,806 45,889 46,409 46,063 45,846 46,193 45,1966.8 BORDILLO PREFABRICADO A-80 ML 50,631 51,844 52,427 52,039 51,796 52,184 51,0686.9 CANECA M-120 UN 235,869 236,140 236,270 236,183 236,129 236,215 235,966

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 617,758 618,577 619,094 619,395 618,541 618,955 618,0316.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,351,844 2,352,391 2,352,735 2,352,936 2,352,366 2,352,642 2,352,0266.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,769,777 2,770,324 2,770,668 2,770,869 2,770,299 2,770,575 2,769,9596.13 CICLOPARQUEADERO M100 TIPO 1 UN 387,181 387,749 388,115 388,355 387,723 388,016 387,369

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 19: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

6.14 CICLOPARQUEADERO M101 TIPO 2 UN 513,698 515,972 517,435 518,395 515,869 517,038 514,4526.15 BANCA EN MADERA M-50 UN 350,937 350,937 350,937 350,937 350,937 350,937 350,9376.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 178,011 178,830 179,347 179,648 178,793 179,207 178,2846.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 421,021 421,698 422,023 421,806 421,671 421,888 421,2656.18 POSTE HISTÓRICO M-131 UN 3,550,180 3,554,278 3,556,862 3,558,365 3,554,094 3,556,164 3,551,547

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,426 1,426 1,426 1,426 1,426 1,426 1,4267.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,471 14,471 14,471 14,471 14,471 14,471 14,4717.3 SEÑAL DOBLE DE CICLORUTA UN 359,666 359,952 360,089 359,998 359,941 360,032 359,7697.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 416,098 417,235 417,966 418,447 417,184 417,768 416,4757.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 241,661 241,947 242,084 241,993 241,936 242,027 241,7647.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 284,446 284,732 284,869 284,778 284,721 284,812 284,5497.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 390,479 390,765 390,902 390,811 390,754 390,845 390,5827.8 TACHAS REFLECTIVAS UN 10,160 10,160 10,160 10,160 10,160 10,160 10,1607.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,720 10,720 10,720 10,720 10,720 10,720 10,720

7.10 UN 41,483 41,483 41,483 41,483 41,483 41,483 41,483TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 20: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,472 7,472 7,472 7,472 7,472 7,4722.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,553 28,553 28,553 28,553 28,553 28,553 28,5532.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 6,753 6,753 6,753 6,753 6,753 6,753 6,7532.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 46,972 46,972 46,972 46,972 46,972 46,972 46,972

2.11 600.3 M3 58,118 58,118 58,118 58,118 58,118 58,118 58,118

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 112,785 117,959 146,416 123,133 119,252 145,122 115,3723.3 330.1 BASE GRANULAR M3 122,333 127,507 155,964 132,681 128,801 154,671 124,920

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,063 2,063 2,063 2,063 2,063 2,063 2,063

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

Page 21: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,040 1,040 1,040 1,040 1,040 1,040 1,0403.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 155,036 161,468 164,813 163,927 161,202 163,955 157,3073.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 53,804 55,737 56,711 56,303 55,658 56,331 54,4923.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 491,264 503,702 531,064 471,364 483,802 529,820 509,9203.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 523,120 535,558 562,920 503,220 515,658 561,677 541,7773.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 547,289 559,726 587,089 527,389 539,826 585,845 565,9453.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 558,638 571,075 598,438 538,738 551,175 597,194 577,2943.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 218,411 223,585 252,042 228,759 224,878 250,748 220,9983.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 208,222 213,396 241,853 218,570 214,690 240,560 210,8093.15 311.1 AFIRMADO M3 53,781 58,955 87,412 64,129 60,249 86,119 56,3683.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,519 11,990 12,215 12,065 11,971 12,159 11,6893.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,768 5,003 5,116 5,040 4,993 5,087 4,852

3.18 500.1 M3 515,543 540,867 557,949 572,292 539,693 553,261 523,798

3.19 500.1 M3 542,749 569,207 587,054 602,040 567,982 582,157 551,374

3.20 500.1 M3 560,905 588,058 606,459 622,227 586,797 601,404 569,742

3.21 *** ML 5,734 5,734 5,734 5,734 5,734 5,734 5,734

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 80,092 94,321 107,455 98,699 93,226 104,171 82,281

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 862,051 890,777 910,154 926,424 889,446 904,836 871,4154.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 760,823 789,073 808,128 824,128 787,764 802,899 770,0314.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 797,542 826,911 846,721 863,354 825,550 841,284 807,1154.4 630 P CONCRETOS f´c =3500 psi (bases) M3 482,384 508,840 525,995 537,832 507,638 521,329 491,1294.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 571,218 598,722 616,556 628,862 597,471 611,705 580,3094.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 475,854 503,447 520,850 530,970 502,208 516,147 485,0604.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 564,429 593,115 611,207 621,727 591,827 606,318 574,0004.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 703,326 730,919 748,322 758,441 729,680 743,619 712,5324.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 491,238 519,924 538,016 548,536 518,635 533,126 500,8094.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 737,768 766,454 784,546 795,066 765,165 779,656 747,3384.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 8,315 8,315 8,315 8,315 8,315 8,315 8,315

4.12 650 P KG 11,161 11,161 11,161 11,161 11,161 11,161 11,161

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,229 1,229 1,229 1,229 1,229 1,229 1,229

4.14 621.1 ML 1,934,548 1,934,548 1,934,548 1,934,548 1,934,548 1,934,548 1,934,548

4.15 621.1 P ML 3,151,980 3,201,117 3,234,261 3,262,092 3,198,840 3,225,165 3,167,998

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,075,712 1,103,032 1,120,263 1,130,282 1,101,805 1,115,606 1,084,8274.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 68,879 68,879 68,879 68,879 68,879 68,879 68,8794.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 262,958 266,236 268,304 269,506 266,089 267,745 264,0524.19 632 P BARANDA METÁLICA ML 298,486 298,486 298,486 298,486 298,486 298,486 298,4864.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,121 12,121 12,121 12,121 12,121 12,121 12,1214.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 379,488 410,702 447,122 448,670 410,199 441,137 390,217

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

Page 22: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 79,883 94,111 107,245 98,489 93,017 103,962 82,0724.23 610.1 RELLENO PARA ESTRUCTURAS M3 39,360 44,136 70,404 48,912 45,330 69,210 41,7484.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 314,066 342,776 361,237 373,367 341,477 356,226 323,5834.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 306,028 328,258 344,001 348,023 327,088 339,830 312,4784.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 330,670 352,900 368,643 372,665 351,730 364,471 337,1204.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 318,795 340,298 356,088 362,152 339,143 351,871 324,9144.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 343,437 364,939 380,730 386,794 363,785 376,513 349,5564.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 438,896 466,382 484,923 500,491 465,108 479,834 447,8564.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 526,179 554,753 574,028 590,213 553,429 568,738 535,4934.31 681.1 GAVIÓN M3 149,042 162,624 175,161 166,803 161,579 172,027 151,1324.32 681.1 GAVIÓN MALLA PVC M3 155,511 169,092 181,629 173,271 168,048 178,495 157,6004.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 33,890 35,578 36,716 37,672 35,500 36,403 34,4404.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 13,280 14,124 14,693 15,171 14,085 14,537 13,555

4.35 *** M2 7,963 7,963 7,963 7,963 7,963 7,963 7,963

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,384 11,384 11,384 11,384 11,384 11,384 11,384

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,346 15,346 15,346 15,346 15,346 15,346 15,346

4.38 *** M2 18,411 18,411 18,411 18,411 18,411 18,411 18,411

4.39 *** M2 23,662 23,662 23,662 23,662 23,662 23,662 23,662

4.40 *** M2 5,480 5,480 5,480 5,480 5,480 5,480 5,480

4.41 *** M2 6,243 6,243 6,243 6,243 6,243 6,243 6,243

4.42 *** M2 6,485 6,485 6,485 6,485 6,485 6,485 6,485

4.43 *** M2 5,550 5,550 5,550 5,550 5,550 5,550 5,550

4.44 *** M2 7,086 7,086 7,086 7,086 7,086 7,086 7,086

4.45 *** M2 5,204 5,204 5,204 5,204 5,204 5,204 5,204

4.46 *** M2 6,990 6,990 6,990 6,990 6,990 6,990 6,990

4.47 *** M2 11,965 11,965 11,965 11,965 11,965 11,965 11,965

4.48 661.1 ML 312,100 312,420 312,722 313,296 312,402 312,634 312,189

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML 261,376 267,633 271,562 273,782 267,352 270,456 263,4664.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML 614,485 614,485 614,485 614,485 614,485 614,485 614,4854.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 102,763 107,738 135,100 112,713 108,981 133,856 105,2504.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,211 3,211 3,211 3,211 3,211 3,211 3,2114.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 49,126 49,126 49,126 49,126 49,126 49,126 49,1264.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 79,099 79,099 79,099 79,099 79,099 79,099 79,0994.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 428,082 456,656 475,931 492,116 455,332 470,641 437,3964.56 682.1 P COLCHONETA RENO M3 164,460 178,042 190,579 182,221 176,997 187,444 166,549

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

Page 23: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Chocontá Machetá Manta Sesquilé Suesca Tibirita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALMEIDAS

4.57 *** TRINCHO EN MADERA M2 46,970 46,970 46,970 46,970 46,970 46,970 46,970

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,425 1,425 1,425 1,425 1,425 1,425 1,4255.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,471 14,471 14,471 14,471 14,471 14,471 14,4715.3 730.3 TOPE DEFENSA METÁLICA UN 66,476 66,476 66,476 66,476 66,476 66,476 66,4765.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 66,476 66,476 66,476 66,476 66,476 66,476 66,4765.5 730.1 DEFENSA METÁLICA ML 170,309 171,724 172,624 173,176 171,660 172,380 170,7805.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 10,160 10,160 10,160 10,160 10,160 10,160 10,160

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 563 563 563 563 563 563 563

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,2866.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 11,912 11,912 11,912 11,912 11,912 11,912 11,9126.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 32,102 32,102 32,102 32,102 32,102 32,102 32,1026.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,885 5,885 5,885 5,885 5,885 5,885 5,885

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 24: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,482,710 1,460,779 1,449,629 1,453,191 1,461,491 1,493,385 1,464,119 1,468,9991.2 CAMPAMENTO 9 M2 UN 864,570 853,605 848,030 849,811 853,961 869,908 855,275 857,7151.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,175 10,175 10,175 10,175 10,175 10,175 10,175 10,1751.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,457 11,457 11,457 11,457 11,457 11,457 11,457 11,4571.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,324 13,324 13,324 13,324 13,324 13,324 13,324 13,3241.6 CERCA EN TABLA H=2.30 M ML 48,872 48,872 48,872 48,872 48,872 48,872 48,872 48,8721.7 CERCA EN TEJA DE ZINC H=1.80 M ML 34,912 34,690 34,564 34,606 34,693 35,029 34,704 34,7691.8 CERCA EN TELA VERDE H = 2.10 M ML 15,491 15,268 15,142 15,185 15,271 15,607 15,282 15,3471.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 618,229 614,979 615,208 616,827 615,206 620,287 615,248 617,588

1.41 M2 7,274 7,274 7,274 7,274 7,274 7,274 7,274 7,274

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,303 2,303 2,303 2,303 2,303 2,303 2,303 2,303

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 25: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,145,730 1,145,730 1,145,730 1,145,730 1,145,730 1,145,730 1,145,730 1,145,7301.44 RED TELEFÓNICA PROVISIONAL UN 163,496 163,496 163,496 163,496 163,496 163,496 163,496 163,4961.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 64,752 49,732 69,135 84,657 52,319 76,394 55,698 75,1002.2 BASE ARENA CEMENTO 1:20 M3 153,153 140,859 125,158 131,675 138,164 164,854 128,417 142,0442.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,602 4,602 4,602 4,602 4,602 4,602 4,602 4,6022.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 499,438 477,159 464,911 468,970 477,581 510,840 479,158 485,1762.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 512,372 489,992 477,069 481,443 490,213 524,199 491,061 497,8212.8 ZAPATAS EN CONCRETO 3500 PSI M3 479,490 458,535 446,435 450,530 458,742 490,565 459,536 465,8662.9 PILOTE DE MADERA D=20 CM ML 36,319 36,319 36,319 36,319 36,319 36,319 36,319 36,319

2.10 ML 110,824 110,824 110,824 110,824 110,824 110,824 110,824 110,824

2.11 ML 133,710 133,710 133,710 133,710 133,710 133,710 133,710 133,710

2.12 ML 161,385 161,385 161,385 161,385 161,385 161,385 161,385 161,385

2.13 ML 198,639 198,639 198,639 198,639 198,639 198,639 198,639 198,639

2.14 PILOTE HINCADO 25X25 ML 89,496 88,039 87,136 87,451 88,033 90,303 88,014 88,5262.15 PILOTE HINCADO 30X30 ML 108,836 106,725 105,416 105,872 106,717 110,006 106,689 107,4312.16 DADOS EN CONCRETO 3500PSI M3 468,714 447,759 435,658 439,754 447,966 479,789 448,760 455,089

2.17 ML 119,145 119,145 119,145 119,145 119,145 119,145 119,145 119,145

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 28,007 27,930 27,833 27,873 27,914 28,080 27,853 27,9383.2 SIFÓN EN PVC 6" UN 143,495 143,418 143,321 143,361 143,402 143,567 143,341 143,4263.3 CAJA DE INSPECCIÓN DE 100X100 UN 351,709 334,839 341,999 353,737 336,436 363,797 335,711 352,7483.4 CAJA DE INSPECCIÓN DE 40X40 UN 176,908 173,228 172,696 174,047 173,440 179,019 173,664 175,5893.5 CAJA DE INSPECCIÓN DE 60X60 UN 197,720 191,965 190,909 193,139 192,220 201,165 192,290 195,5793.6 CAJA DE INSPECCIÓN DE 80X80 UN 261,574 252,609 249,659 252,536 252,883 266,740 253,025 257,3323.7 DUCTO ELÉCTRICO PVC 4" ML 75,111 75,009 75,158 75,277 75,028 75,201 75,022 75,1913.8 POZO SÉPTICO ETERNIT 1000 LT UN 953,370 952,341 953,833 955,027 952,540 954,265 952,474 954,1663.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 84,817 83,973 82,895 83,342 83,788 85,620 83,119 84,054

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 49,143 48,698 48,130 48,366 48,601 49,567 48,248 48,7413.11 TUBERÍA DRENAJE PVC 110 ML 20,589 20,083 19,906 19,950 20,126 20,786 20,281 20,3023.12 TUBERÍA DRENAJE PVC 160 ML 31,191 30,685 30,508 30,552 30,728 31,389 30,883 30,9043.13 TUBERÍA DRENAJE PVC 200 ML 42,777 42,069 41,821 41,883 42,129 43,054 42,346 42,3753.14 TUBERÍA DRENAJE PVC 250 ML 58,084 57,275 56,992 57,062 57,343 58,400 57,592 57,6253.15 TUBERÍA DRENAJE PVC 315 ML 79,890 79,183 78,935 78,996 79,242 80,167 79,460 79,488

3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 731,909 723,822 720,987 721,690 724,503 735,074 726,987 727,316

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 26: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

3.17 UN 1,040,637 1,024,463 1,018,792 1,020,198 1,025,824 1,046,965 1,030,792 1,031,449

3.18 UN 1,366,882 1,334,535 1,323,193 1,326,006 1,337,257 1,379,540 1,347,193 1,348,508

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 27,769 27,769 27,769 27,769 27,769 27,769 27,769 27,7694.2 CASETÓN DE LONA 0.80X0.70 M2 36,492 36,492 36,492 36,492 36,492 36,492 36,492 36,4924.3 COLUMNAS 3500 PSI M3 621,728 600,773 588,672 592,767 600,980 632,802 601,774 608,1034.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 206,522 187,941 174,253 179,570 186,427 217,478 191,081 194,845

4.5 M2 75,231 73,196 72,021 72,419 73,216 76,306 73,293 73,908

4.6 M2 88,617 86,176 84,766 85,243 86,200 89,907 86,292 87,030

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 100,023 96,767 94,888 95,524 96,800 101,743 96,923 97,9064.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 105,583 102,125 100,128 100,804 102,159 107,411 102,290 103,3354.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 121,490 117,218 114,751 115,586 117,260 123,748 117,422 118,712

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 135,368 130,485 127,666 128,620 130,534 137,949 130,719 132,1934.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 150,463 144,970 141,798 142,872 145,024 153,366 145,232 146,8924.12 ENTREPISO VIGUETA PLACA M2 73,413 73,114 72,889 72,973 73,100 73,603 73,050 73,2004.13 ESCALERA MACIZA 3500 PSI M3 729,327 708,372 696,271 700,367 708,579 740,402 709,373 715,7024.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 68,944 68,778 68,566 68,654 68,742 69,102 68,610 68,7944.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 60,964 58,868 57,658 58,068 58,889 62,071 58,968 59,6014.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 69,106 66,542 65,062 65,563 66,568 70,461 66,665 67,4394.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 81,036 77,821 75,965 76,593 77,853 82,734 77,975 78,9464.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 557,079 536,123 524,023 528,118 536,330 568,153 537,125 543,454

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 37,929 37,313 36,931 37,064 37,311 38,271 37,303 37,5194.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 220,460 211,102 205,697 207,526 211,194 225,406 211,549 214,375

4.21000000000001 ACERO FIGURADO 37000 PSI KG 3,135 3,135 3,135 3,135 3,135 3,135 3,135 3,1354.22 ACERO FIGURADO 60000 PSI KG 3,257 3,257 3,257 3,257 3,257 3,257 3,257 3,257

4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,493 4,493 4,493 4,493 4,493 4,493 4,493 4,4934.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 660,468 639,513 627,412 631,508 639,720 671,543 640,514 646,843

4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 609,504 586,550 573,312 577,790 586,782 621,625 587,673 594,5864.26 VIGA AÉREA 3500 PSI M3 660,267 639,312 627,211 631,307 639,519 671,342 640,313 646,642

4.27000000000001 VIGA CINTA 3500 PSI M3 644,925 623,970 611,870 615,965 624,177 656,000 624,971 631,3014.28 VIGA CANAL EN CONCRETO 3500 PSI M3 803,982 783,027 770,926 775,022 783,234 815,057 784,028 790,357

4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 256,455 231,357 218,596 222,673 232,172 268,672 235,179 240,764

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 22,784 22,297 21,945 22,074 22,279 23,085 22,213 22,4425.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,335 37,848 37,496 37,625 37,829 38,635 37,763 37,9925.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,671 24,595 24,497 24,538 24,578 24,744 24,518 24,6025.4 ARCOS EN LADRILLO PRENSADO ML 119,391 119,239 119,044 119,125 119,205 119,537 119,084 119,2535.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 33,923 33,307 32,925 33,058 33,305 34,265 33,297 33,5135.6 DINTELES EN BLOQUE 0.15 M ML 19,450 19,284 19,072 19,160 19,248 19,608 19,116 19,3005.7 ENCHAPES LADRILLO PRENSADO M2 66,694 66,388 65,998 66,160 66,321 66,984 66,079 66,418

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 27: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 69,623 67,570 66,296 66,740 67,561 70,761 67,535 68,2565.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,459 53,459 53,459 53,459 53,459 53,459 53,459 53,459

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,764 32,764 32,764 32,764 32,764 32,764 32,764 32,7645.11 MURO DRYWALL DOBLE CARA 0.10 M M2 51,808 51,808 51,808 51,808 51,808 51,808 51,808 51,8085.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 31,938 31,938 31,938 31,938 31,938 31,938 31,938 31,9385.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 64,875 64,875 64,875 64,875 64,875 64,875 64,875 64,8755.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,478 39,478 39,478 39,478 39,478 39,478 39,478 39,4785.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 66,413 66,413 66,413 66,413 66,413 66,413 66,413 66,4135.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 40,248 40,248 40,248 40,248 40,248 40,248 40,248 40,2485.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,038 26,885 26,689 26,770 26,851 27,184 26,729 26,9005.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,805 16,728 16,630 16,670 16,711 16,878 16,650 16,735

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 37,685 37,583 37,452 37,506 37,560 37,783 37,479 37,5935.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 22,940 22,888 22,823 22,850 22,877 22,988 22,837 22,893

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 44,421 44,319 44,188 44,242 44,296 44,519 44,215 44,3295.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 26,820 26,769 26,704 26,731 26,758 26,869 26,717 26,774

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 80,136 79,624 78,971 79,242 79,512 80,623 79,106 79,6745.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 46,983 46,727 46,400 46,536 46,671 47,226 46,468 46,752

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 24,948 24,846 24,715 24,769 24,823 25,045 24,742 24,8565.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,506 15,455 15,389 15,416 15,443 15,555 15,403 15,460

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 47,843 47,639 47,377 47,486 47,594 48,038 47,432 47,6585.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 29,757 29,654 29,524 29,578 29,632 29,854 29,551 29,664

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 64,098 63,932 63,720 63,808 63,895 64,256 63,764 63,9485.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,161 39,078 38,972 39,016 39,060 39,240 38,994 39,086

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 120,270 119,554 118,639 119,018 119,396 120,952 118,829 119,6235.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 74,144 73,786 73,328 73,518 73,707 74,485 73,423 73,820

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 59,094 58,747 58,305 58,489 58,672 59,423 58,397 58,7815.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 36,659 36,486 36,265 36,357 36,448 36,824 36,311 36,503

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 35,504 35,275 34,982 35,104 35,225 35,722 35,043 35,2975.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 21,635 21,521 21,374 21,435 21,495 21,744 21,405 21,532

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 25,520 25,418 25,287 25,341 25,395 25,618 25,314 25,4285.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,582 15,531 15,466 15,493 15,520 15,631 15,479 15,536

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 38,524 38,319 38,058 38,166 38,274 38,719 38,112 38,3395.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 23,665 23,562 23,432 23,486 23,540 23,762 23,459 23,572

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 73,816 73,509 73,117 73,280 73,442 74,108 73,198 73,5395.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 45,094 44,940 44,744 44,826 44,907 45,240 44,785 44,955

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 54,027 53,822 53,561 53,669 53,777 54,221 53,615 53,8425.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 32,651 32,548 32,418 32,472 32,526 32,748 32,445 32,558

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 114,626 113,910 112,995 113,375 113,753 115,308 113,185 113,9795.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 69,710 69,352 68,895 69,085 69,274 70,051 68,990 69,387

5.47000000000002 REMATES LADRILLO PRENSADO ML 21,695 21,619 21,521 21,562 21,602 21,768 21,542 21,6265.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 27,375 27,126 26,808 26,940 27,072 27,612 26,874 27,150

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 46,199 45,867 45,443 45,619 45,794 46,515 45,531 45,8995.50 LAVADA DE FACHADA M2 4,003 4,003 4,003 4,003 4,003 4,003 4,003 4,003

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,504 38,017 37,665 37,794 37,999 38,805 37,933 38,1625.52 DOVELA, GROUTING 3000 PSI ML 7,614 7,614 7,614 7,614 7,614 7,614 7,614 7,614

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,094 10,094 10,094 10,094 10,094 10,094 10,094 10,094

Page 28: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

5.54 ANCLAJE 1/2" L=50CM UN 13,206 13,206 13,206 13,206 13,206 13,206 13,206 13,2065.55000000000003 ANCLAJE 5/8" L=70CM UN 18,423 18,423 18,423 18,423 18,423 18,423 18,423 18,423

5.56 ANCLAJE 3/4" L=70CM UN 27,481 27,481 27,481 27,481 27,481 27,481 27,481 27,4815.57000000000003 ANCLAJE 1" L= 70CM UN 3,890 3,729 3,640 3,670 3,732 3,973 3,743 3,787

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,809 11,809 11,809 11,809 11,809 11,809 11,809 11,8096.2 FILOS O DILATACIONES B/PLACA ML 4,482 4,406 4,308 4,349 4,389 4,555 4,328 4,4136.3 FILOS O DILATACIONES S/MURO ML 5,385 5,309 5,211 5,252 5,292 5,458 5,232 5,3166.4 GOTERA EN MORTERO 1:4 ML 6,477 6,401 6,304 6,344 6,384 6,550 6,324 6,4086.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,325 4,325 4,325 4,325 4,325 4,325 4,325 4,3256.6 MALLA BAJO ENTRAMADO M2 10,310 10,310 10,310 10,310 10,310 10,310 10,310 10,3106.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,019 18,777 18,467 18,596 18,724 19,250 18,532 18,8006.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,485 11,364 11,209 11,274 11,337 11,600 11,241 11,3766.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 16,727 16,512 16,238 16,352 16,465 16,932 16,295 16,533

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,103 9,995 9,858 9,915 9,972 10,205 9,887 10,0066.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,056 15,813 15,504 15,632 15,760 16,286 15,568 15,8376.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,767 9,646 9,491 9,556 9,620 9,883 9,523 9,6586.13 PAÑETE CULATAS 1:4, E=2 CM M2 16,727 16,512 16,238 16,352 16,465 16,932 16,295 16,5336.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,103 9,995 9,858 9,915 9,972 10,205 9,887 10,0066.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,273 16,100 15,880 15,971 16,062 16,437 15,926 16,1176.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,875 9,789 9,678 9,724 9,770 9,957 9,701 9,7976.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 13,873 13,710 13,501 13,587 13,674 14,029 13,544 13,7256.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,456 8,375 8,270 8,313 8,357 8,534 8,292 8,382

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,362 13,177 12,941 13,039 13,137 13,537 12,990 13,1956.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,201 8,108 7,990 8,039 8,088 8,288 8,015 8,117

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,320 17,105 16,830 16,944 17,058 17,524 16,887 17,1266.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,384 10,277 10,139 10,196 10,253 10,486 10,168 10,287

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,648 16,406 16,097 16,225 16,353 16,879 16,161 16,4296.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,048 9,927 9,772 9,837 9,901 10,164 9,805 9,939

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 13,827 13,642 13,406 13,504 13,602 14,002 13,455 13,6606.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,419 8,327 8,209 8,258 8,307 8,507 8,234 8,336

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,326 17,083 16,774 16,902 17,030 17,556 16,838 17,1076.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,695 10,574 10,419 10,483 10,547 10,810 10,451 10,585

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 21,356 21,049 20,657 20,819 20,981 21,648 20,738 21,078

7.2 M2 64,349 63,322 62,686 62,907 63,318 64,918 63,305 63,665

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 39,826 39,826 39,826 39,826 39,826 39,826 39,826 39,8267.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,204 16,204 16,204 16,204 16,204 16,204 16,204 16,2047.5 ML 25,414 25,414 25,414 25,414 25,414 25,414 25,414 25,4147.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 59,261 59,261 59,261 59,261 59,261 59,261 59,261 59,2617.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 42,466 42,466 42,466 42,466 42,466 42,466 42,466 42,4667.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,562 25,562 25,562 25,562 25,562 25,562 25,562 25,5627.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 57,679 57,679 57,679 57,679 57,679 57,679 57,679 57,679

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

Page 29: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 74,443 74,443 74,443 74,443 74,443 74,443 74,443 74,4437.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 96,810 96,810 96,810 96,810 96,810 96,810 96,810 96,8107.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 42,583 42,583 42,583 42,583 42,583 42,583 42,583 42,5837.13 CANAL PVC AMAZONAS ML 61,754 61,754 61,754 61,754 61,754 61,754 61,754 61,7547.14 CANAL PVC RAINGO ML 54,582 54,582 54,582 54,582 54,582 54,582 54,582 54,5827.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 86,597 86,597 86,597 86,597 86,597 86,597 86,597 86,5977.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 50,042 50,042 50,042 50,042 50,042 50,042 50,042 50,0427.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 41,108 41,108 41,108 41,108 41,108 41,108 41,108 41,1087.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,607 23,607 23,607 23,607 23,607 23,607 23,607 23,607

7.19000000000001 TEJA DE BARRO M2 45,863 45,481 44,994 45,196 45,398 46,227 45,095 45,5187.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 34,255 34,255 34,255 34,255 34,255 34,255 34,255 34,255

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,439 31,439 31,439 31,439 31,439 31,439 31,439 31,4397.22 TEJA FIBROCEMENTO Nº4 M2 26,708 26,708 26,708 26,708 26,708 26,708 26,708 26,708

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 25,934 25,934 25,934 25,934 25,934 25,934 25,934 25,9347.24 TEJA FIBROCEMENTO No. 8 M2 26,683 26,683 26,683 26,683 26,683 26,683 26,683 26,683

7.25000000000001 TEJA TERMOACÚSTICA M2 36,976 36,976 36,976 36,976 36,976 36,976 36,976 36,9767.26 TEJA PLÁSTICA No.6 M2 32,597 32,597 32,597 32,597 32,597 32,597 32,597 32,597

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 59,801 59,801 59,801 59,801 59,801 59,801 59,801 59,8017.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 108,724 108,724 108,724 108,724 108,724 108,724 108,724 108,724

7.29000000000001 TEJA SIN TRASLAPO M2 48,938 48,938 48,938 48,938 48,938 48,938 48,938 48,9387.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,655 31,655 31,655 31,655 31,655 31,655 31,655 31,655

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 24,975 24,975 24,975 24,975 24,975 24,975 24,975 24,975

7.32 M2 40,043 40,043 40,043 40,043 40,043 40,043 40,043 40,043

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,788 14,788 14,788 14,788 14,788 14,788 14,788 14,7887.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,690 17,690 17,690 17,690 17,690 17,690 17,690 17,690

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,104 20,104 20,104 20,104 20,104 20,104 20,104 20,1047.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 25,855 25,855 25,855 25,855 25,855 25,855 25,855 25,855

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,191 16,191 16,191 16,191 16,191 16,191 16,191 16,1917.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 37,974 37,974 37,974 37,974 37,974 37,974 37,974 37,974

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 222,220 222,220 222,220 222,220 222,220 222,220 222,220 222,2207.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 286,389 286,389 286,389 286,389 286,389 286,389 286,389 286,389

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 181,658 181,658 181,658 181,658 181,658 181,658 181,658 181,6587.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 261,500 261,500 261,500 261,500 261,500 261,500 261,500 261,500

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 371,898 350,795 337,705 342,262 350,707 383,598 350,433 357,8508.2 CONCRETO 3500 PSI M3 324,176 303,831 292,083 296,059 304,032 334,928 304,803 310,9488.3 CONCRETO 3000 PSI M3 318,399 296,769 284,878 288,819 297,179 329,469 298,710 304,5538.4 CONCRETO 2500 PSI M3 281,774 261,242 248,506 252,939 261,156 293,158 260,890 268,1058.5 CONCRETO 2000 PSI M3 262,170 239,959 227,326 231,575 240,241 273,793 241,312 247,7998.6 CONCRETO 1500 PSI M3 237,477 213,110 200,721 204,679 213,901 249,338 216,821 222,2438.7 MORTERO SECO 1:10 M3 193,355 182,817 169,359 174,946 180,507 203,385 172,153 183,8338.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 373,175 362,943 349,875 355,299 360,699 382,914 352,587 363,9298.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 341,202 329,665 314,931 321,047 327,135 352,183 317,989 330,777

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 395,813 385,023 371,243 376,963 382,657 406,083 374,103 386,063

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 30: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 523,153 512,363 498,583 504,303 509,997 533,423 501,443 513,403

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 89,027 89,027 89,027 89,027 89,027 89,027 89,027 89,0279.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,846 2,770 2,672 2,713 2,753 2,919 2,692 2,7779.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 100,337 100,337 100,337 100,337 100,337 100,337 100,337 100,3379.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 122,243 122,243 122,243 122,243 122,243 122,243 122,243 122,2439.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 168,644 168,644 168,644 168,644 168,644 168,644 168,644 168,6449.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 188,307 188,307 188,307 188,307 188,307 188,307 188,307 188,3079.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 207,995 207,995 207,995 207,995 207,995 207,995 207,995 207,9959.8 HOJA PUERTA FORTEC 0.81 UN 147,447 147,447 147,447 147,447 147,447 147,447 147,447 147,4479.9 HOJA PUERTA FORTEC 0.91 UN 162,850 162,850 162,850 162,850 162,850 162,850 162,850 162,850

9.10 HOJA PUERTA FORTEC 1.50 UN 241,395 241,395 241,395 241,395 241,395 241,395 241,395 241,3959.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 91,420 91,420 91,420 91,420 91,420 91,420 91,420 91,4209.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 121,302 121,302 121,302 121,302 121,302 121,302 121,302 121,3029.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 134,341 134,341 134,341 134,341 134,341 134,341 134,341 134,3419.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 341,338 341,338 341,338 341,338 341,338 341,338 341,338 341,3389.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,326 30,326 30,326 30,326 30,326 30,326 30,326 30,3269.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,346 19,346 19,346 19,346 19,346 19,346 19,346 19,3469.17 VENTANERÍA EN MADERA CEDRO MACHO M2 70,670 70,670 70,670 70,670 70,670 70,670 70,670 70,6709.18 CERRADURA DE ENTRADA PRINCIPAL UN 87,537 87,537 87,537 87,537 87,537 87,537 87,537 87,5379.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 68,087 68,087 68,087 68,087 68,087 68,087 68,087 68,0879.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 21,363 21,363 21,363 21,363 21,363 21,363 21,363 21,3639.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,363 21,363 21,363 21,363 21,363 21,363 21,363 21,3639.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,277 20,277 20,277 20,277 20,277 20,277 20,277 20,2779.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 75,183 75,183 75,183 75,183 75,183 75,183 75,183 75,1839.24 ESPEJO BISELADO INCOLORO 4 MM M2 97,132 97,132 97,132 97,132 97,132 97,132 97,132 97,1329.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 44,454 44,454 44,454 44,454 44,454 44,454 44,454 44,4549.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 53,233 53,233 53,233 53,233 53,233 53,233 53,233 53,2339.27 VIDRIO TEMPLADO PULIDO 10 MM M2 214,139 214,139 214,139 214,139 214,139 214,139 214,139 214,1399.28 VIDRIO TEMPLADO PULIDO 8 MM M2 192,190 192,190 192,190 192,190 192,190 192,190 192,190 192,1909.29 VIDRIO TRANSPARENTE 3 MM M2 47,746 47,746 47,746 47,746 47,746 47,746 47,746 47,7469.30 VIDRIO TRANSPARENTE 4 MM M2 55,428 55,428 55,428 55,428 55,428 55,428 55,428 55,4289.31 VIDRIO TRANSPARENTE 5 MM M2 62,013 62,013 62,013 62,013 62,013 62,013 62,013 62,0139.32 VIDRIO TRANSPARENTE 6 MM M2 65,965 65,965 65,965 65,965 65,965 65,965 65,965 65,965

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 55,631 55,631 55,631 55,631 55,631 55,631 55,631 55,63110.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 161,261 161,261 161,261 161,261 161,261 161,261 161,261 161,261

10.3 ML 81,040 81,040 81,040 81,040 81,040 81,040 81,040 81,040

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 105,951 105,951 105,951 105,951 105,951 105,951 105,951 105,95110.5 MARCO TAPA CAJA DE INSPECCIÓN UN 100,997 100,997 100,997 100,997 100,997 100,997 100,997 100,99710.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 70,493 70,493 70,493 70,493 70,493 70,493 70,493 70,49310.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 149,979 149,979 149,979 149,979 149,979 149,979 149,979 149,97910.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 80,299 80,299 80,299 80,299 80,299 80,299 80,299 80,299

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

Page 31: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,837 4,837 4,837 4,837 4,837 4,837 4,837 4,837

10.10 M2 74,070 74,070 74,070 74,070 74,070 74,070 74,070 74,070

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 31,025 31,025 31,025 31,025 31,025 31,025 31,025 31,02510.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 389,613 389,613 389,613 389,613 389,613 389,613 389,613 389,61310.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 140,863 140,863 140,863 140,863 140,863 140,863 140,863 140,86310.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 155,570 155,570 155,570 155,570 155,570 155,570 155,570 155,570

10.15 M2 355,975 355,975 355,975 355,975 355,975 355,975 355,975 355,975

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 94,284 94,284 94,284 94,284 94,284 94,284 94,284 94,28410.17 PUERTA CORTINA INCLUYE ESMALTE M2 283,819 283,819 283,819 283,819 283,819 283,819 283,819 283,81910.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,497 4,497 4,497 4,497 4,497 4,497 4,497 4,49710.19 VENTANA EN ALUMINIO CORREDIZA M2 200,414 200,414 200,414 200,414 200,414 200,414 200,414 200,41410.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 90,073 90,073 90,073 90,073 90,073 90,073 90,073 90,07310.21 REJILLA PISO 0.30 M M2 63,670 63,670 63,670 63,670 63,670 63,670 63,670 63,67010.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 65,289 65,289 65,289 65,289 65,289 65,289 65,289 65,289

10.23 KG 7,461 7,461 7,461 7,461 7,461 7,461 7,461 7,461

10.24 KG 8,279 8,279 8,279 8,279 8,279 8,279 8,279 8,279

10.25 KG 6,498 6,498 6,498 6,498 6,498 6,498 6,498 6,498

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 166,780 166,780 166,780 166,780 166,780 166,780 166,780 166,78011.2 ACOMETIDA EN PVC 3/4" 5M UN 198,535 198,535 198,535 198,535 198,535 198,535 198,535 198,53511.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,204 16,204 16,204 16,204 16,204 16,204 16,204 16,20411.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,414 25,414 25,414 25,414 25,414 25,414 25,414 25,41411.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,598 24,598 24,598 24,598 24,598 24,598 24,598 24,59811.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,410 31,410 31,410 31,410 31,410 31,410 31,410 31,41011.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 64,405 64,405 64,405 64,405 64,405 64,405 64,405 64,40511.8 CONEXIÓN TANQUE ELEVADO PVC UN 166,819 166,819 166,819 166,819 166,819 166,819 166,819 166,81911.9 INSTALACIÓN APARATO SANITARIO UN 33,391 33,391 33,391 33,391 33,391 33,391 33,391 33,391

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,579 23,579 23,579 23,579 23,579 23,579 23,579 23,57911.13 NIPLE PASAMURO 2" UN 50,197 50,197 50,197 50,197 50,197 50,197 50,197 50,19711.14 NIPLE PASAMURO 4" UN 74,988 74,988 74,988 74,988 74,988 74,988 74,988 74,98811.15 PUNTO AGUA CALIENTE CPVC UN 62,430 62,430 62,430 62,430 62,430 62,430 62,430 62,43011.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 45,828 45,828 45,828 45,828 45,828 45,828 45,828 45,828

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 32: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,585 48,585 48,585 48,585 48,585 48,585 48,585 48,58511.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 61,339 61,339 61,339 61,339 61,339 61,339 61,339 61,33911.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 48,692 48,692 48,692 48,692 48,692 48,692 48,692 48,69211.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 60,515 60,515 60,515 60,515 60,515 60,515 60,515 60,51511.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 64,634 64,634 64,634 64,634 64,634 64,634 64,634 64,63411.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 54,023 54,023 54,023 54,023 54,023 54,023 54,023 54,02311.23 RED SUMINISTRO CPVC 1/2" ML 9,169 9,169 9,169 9,169 9,169 9,169 9,169 9,16911.24 RED SUMINISTRO CPVC 3/4" ML 12,829 12,829 12,829 12,829 12,829 12,829 12,829 12,82911.25 RED SUMINISTRO PVC 1 1/2" ML 16,494 16,494 16,494 16,494 16,494 16,494 16,494 16,49411.26 RED SUMINISTRO PVC 1" ML 10,233 10,233 10,233 10,233 10,233 10,233 10,233 10,23311.27 RED SUMINISTRO PVC 1/2" ML 6,165 6,165 6,165 6,165 6,165 6,165 6,165 6,16511.28 RED SUMINISTRO PVC 2 1/2" ML 41,523 41,523 41,523 41,523 41,523 41,523 41,523 41,52311.29 RED SUMINISTRO PVC 2" ML 23,867 23,867 23,867 23,867 23,867 23,867 23,867 23,86711.30 RED SUMINISTRO PVC 3/4" ML 7,690 7,690 7,690 7,690 7,690 7,690 7,690 7,69011.31 RED SANITARIA PVC-S 2" ML 18,156 18,156 18,156 18,156 18,156 18,156 18,156 18,15611.32 RED SANITARIA PVC-S 3" ML 25,156 25,156 25,156 25,156 25,156 25,156 25,156 25,15611.33 RED SANITARIA PVC-S 4" ML 34,037 34,037 34,037 34,037 34,037 34,037 34,037 34,03711.34 RED SANITARIA PVC-S 6" ML 63,479 63,479 63,479 63,479 63,479 63,479 63,479 63,47911.35 REGISTRO 1" UN 82,910 82,910 82,910 82,910 82,910 82,910 82,910 82,91011.36 REGISTRO 1/2" UN 47,477 47,477 47,477 47,477 47,477 47,477 47,477 47,47711.37 REGISTRO 3/4" UN 58,138 58,138 58,138 58,138 58,138 58,138 58,138 58,13811.38 REGISTRO 1 1/2" UN 108,165 108,165 108,165 108,165 108,165 108,165 108,165 108,16511.39 REGISTRO 2 1/2" UN 278,929 278,929 278,929 278,929 278,929 278,929 278,929 278,92911.40 REGISTRO 2" UN 207,964 207,964 207,964 207,964 207,964 207,964 207,964 207,96411.41 REVENTILACIÓN 2" ML 12,692 12,692 12,692 12,692 12,692 12,692 12,692 12,69211.42 REVENTILACIÓN 3" ML 16,020 16,020 16,020 16,020 16,020 16,020 16,020 16,02011.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 126,914 126,914 126,914 126,914 126,914 126,914 126,914 126,91411.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 205,801 205,801 205,801 205,801 205,801 205,801 205,801 205,801

11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 338,584 338,584 338,584 338,584 338,584 338,584 338,584 338,584

11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 35,365 35,365 35,365 35,365 35,365 35,365 35,365 35,365

11.47 ML 40,892 40,892 40,892 40,892 40,892 40,892 40,892 40,892

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 67,100 67,100 67,100 67,100 67,100 67,100 67,100 67,100

11.49 ML 52,410 52,410 52,410 52,410 52,410 52,410 52,410 52,410

11.50 ML 74,461 74,461 74,461 74,461 74,461 74,461 74,461 74,461

11.51 ML 78,148 78,148 78,148 78,148 78,148 78,148 78,148 78,148

11.52 ML 180,832 180,832 180,832 180,832 180,832 180,832 180,832 180,832

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,627 35,627 35,627 35,627 35,627 35,627 35,627 35,62711.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,768 35,768 35,768 35,768 35,768 35,768 35,768 35,768

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

Page 33: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,788 28,788 28,788 28,788 28,788 28,788 28,788 28,78811.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,567 32,567 32,567 32,567 32,567 32,567 32,567 32,56711.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 2,944 2,944 2,944 2,944 2,944 2,944 2,944 2,94411.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,571 4,571 4,571 4,571 4,571 4,571 4,571 4,57111.59 GABINETE TIPO III UN 1,021,044 1,021,044 1,021,044 1,021,044 1,021,044 1,021,044 1,021,044 1,021,04411.60 GABINETE TIPO I UN 806,113 806,113 806,113 806,113 806,113 806,113 806,113 806,11311.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,273,343 1,273,343 1,273,343 1,273,343 1,273,343 1,273,343 1,273,343 1,273,34311.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,216,623 1,216,623 1,216,623 1,216,623 1,216,623 1,216,623 1,216,623 1,216,62311.63 VÁLVULA MARIPOSA 3" UN 660,820 660,820 660,820 660,820 660,820 660,820 660,820 660,82011.64 VÁLVULA MARIPOSA 4" UN 754,181 754,181 754,181 754,181 754,181 754,181 754,181 754,18111.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 324,187 324,187 324,187 324,187 324,187 324,187 324,187 324,187

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 226,190 226,190 226,190 226,190 226,190 226,190 226,190 226,19012.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 32,885 32,885 32,885 32,885 32,885 32,885 32,885 32,88512.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 40,506 40,506 40,506 40,506 40,506 40,506 40,506 40,50612.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 44,035 44,035 44,035 44,035 44,035 44,035 44,035 44,03512.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 53,719 53,719 53,719 53,719 53,719 53,719 53,719 53,71912.6 SALIDA TELÉFONO PVC COMPLETA UN 35,892 35,892 35,892 35,892 35,892 35,892 35,892 35,89212.7 SALIDA TIMBRE PVC COMPLETA UN 35,914 35,914 35,914 35,914 35,914 35,914 35,914 35,91412.8 STRIP TELEFÓNICO 10 PARES UN 107,997 107,997 107,997 107,997 107,997 107,997 107,997 107,99712.9 SALIDA TOMA DOBLE PVC COMPLETA UN 31,093 31,093 31,093 31,093 31,093 31,093 31,093 31,093

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 73,109 73,109 73,109 73,109 73,109 73,109 73,109 73,10912.11 SALIDA T.V PVC COMPLETA. UN 48,163 48,163 48,163 48,163 48,163 48,163 48,163 48,16312.12 SALIDA BIFÁSICA C.N. UN 28,277 28,277 28,277 28,277 28,277 28,277 28,277 28,27712.13 TABLERO PARCIAL 4 CIRCUITOS UN 81,347 81,347 81,347 81,347 81,347 81,347 81,347 81,34712.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 335,265 335,265 335,265 335,265 335,265 335,265 335,265 335,26512.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 451,046 451,046 451,046 451,046 451,046 451,046 451,046 451,04612.16 TUBERÍA PVC CONDUIT 1/2" ML 2,623 2,623 2,623 2,623 2,623 2,623 2,623 2,62312.17 TUBERÍA PVC CONDUIT 3/4" ML 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,41612.18 TUBERÍA PVC CONDUIT 1" ML 5,252 5,252 5,252 5,252 5,252 5,252 5,252 5,25212.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,436 9,436 9,436 9,436 9,436 9,436 9,436 9,43612.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 181,496 181,496 181,496 181,496 181,496 181,496 181,496 181,49612.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 57,493 57,493 57,493 57,493 57,493 57,493 57,493 57,49312.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 77,660 77,660 77,660 77,660 77,660 77,660 77,660 77,66012.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,807 27,807 27,807 27,807 27,807 27,807 27,807 27,80712.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,046,149 1,046,149 1,046,149 1,046,149 1,046,149 1,046,149 1,046,149 1,046,14912.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 774,367 774,367 774,367 774,367 774,367 774,367 774,367 774,36712.26 POSTE METÁLICO 6M UN 968,287 968,287 968,287 968,287 968,287 968,287 968,287 968,28712.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 439,866 439,866 439,866 439,866 439,866 439,866 439,866 439,86612.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 76,192 76,192 76,192 76,192 76,192 76,192 76,192 76,19212.29 LUMINARIA 70W SODIO UN 194,935 194,935 194,935 194,935 194,935 194,935 194,935 194,93512.30 LUMINARIA 150W SODIO UN 229,706 229,706 229,706 229,706 229,706 229,706 229,706 229,70612.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,237,528 1,237,528 1,237,528 1,237,528 1,237,528 1,237,528 1,237,528 1,237,52812.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 911,548 911,548 911,548 911,548 911,548 911,548 911,548 911,548

Page 34: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 33,922 33,507 32,977 33,197 33,416 34,317 33,087 33,54713.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 28,883 28,468 27,938 28,158 28,377 29,278 28,048 28,50813.3 ALISTADO PARA LISTÓN M2 11,177 11,094 10,988 11,032 11,076 11,256 11,010 11,10213.4 ALISTADO PISOS 1:3, E=0.04 M2 22,787 21,957 20,897 21,337 21,775 23,577 21,117 22,03713.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 61,062 60,232 59,172 59,612 60,050 61,852 59,392 60,31213.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,544 20,100 19,847 19,932 20,105 20,776 20,127 20,25613.7 CONCRETO BASE GRADAS 2500 PSI M2 45,487 43,434 42,160 42,603 43,425 46,625 43,399 44,12013.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 63,225 59,940 57,902 58,611 59,926 65,046 59,883 61,03813.9 MANTO FIBERGLASS 600X1 M2 22,319 22,319 22,319 22,319 22,319 22,319 22,319 22,319

13.10 PEGANTE MORTERO-CONCRETO M2 19,174 19,174 19,174 19,174 19,174 19,174 19,174 19,17413.11 PERMA PLY 2 CAPAS M2 19,960 19,960 19,960 19,960 19,960 19,960 19,960 19,96013.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 37,133 35,285 34,139 34,538 35,277 38,157 35,253 35,90313.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 43,562 41,303 39,902 40,390 41,294 44,814 41,264 42,05813.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 63,255 59,765 57,600 58,353 59,750 65,191 59,705 60,93213.15 TRITURADO FINO 1/2 M3 75,737 54,914 47,612 49,423 56,666 83,886 63,062 63,90913.16 TRITURADO GRUESO 3/4 M3 79,473 57,567 57,299 63,622 59,860 90,017 65,062 72,551

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,003 36,837 36,625 36,713 36,801 37,161 36,669 36,85314.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 22,819 22,736 22,630 22,674 22,718 22,898 22,652 22,74414.3 ADOQUÍN CONCRETO 6CM M2 48,430 48,015 47,485 47,705 47,924 48,825 47,595 48,05514.4 ADOQUÍN CONCRETO 8CM M2 57,680 57,265 56,735 56,955 57,174 58,075 56,845 57,30514.5 ADOQUÍN GRES PEATONAL M2 47,367 46,952 46,422 46,642 46,861 47,762 46,532 46,992

14.6 M2 51,798 51,632 51,420 51,508 51,596 51,956 51,464 51,648

14.7 GRAVILLA PARA GRADAS ML 28,997 28,697 28,516 28,578 28,697 29,160 28,698 28,79914.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 104,908 104,161 103,207 103,603 103,998 105,619 103,405 104,23314.9 ACABADO EN GRAVILLA LAVADA M2 36,217 35,536 35,066 35,235 35,517 36,623 35,453 35,746

14.10 GUARDAESCOBA EN GRANITO ML 29,617 29,617 29,617 29,617 29,617 29,617 29,617 29,61714.11 GUARDAESCOBA EN GRAVILLA ML 7,976 7,676 7,495 7,557 7,676 8,139 7,677 7,77814.12 GUARDAESCOBA PVC CARAMELO ML 7,271 7,271 7,271 7,271 7,271 7,271 7,271 7,27114.13 GUARDAESCOBA PVC CEDRO ML 9,211 9,211 9,211 9,211 9,211 9,211 9,211 9,21114.14 GUARDAESCOBA PINO CARIBE ML 7,725 7,725 7,725 7,725 7,725 7,725 7,725 7,72514.15 GUARDAESCOBA CEDRO BLANCO ML 7,714 7,714 7,714 7,714 7,714 7,714 7,714 7,71414.16 GUARDAESCOBA EN MADERA SAPAN ML 12,187 12,187 12,187 12,187 12,187 12,187 12,187 12,18714.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,857 6,857 6,857 6,857 6,857 6,857 6,857 6,85714.18 LISTÓN M.H. AMARILLO M2 54,565 54,565 54,565 54,565 54,565 54,565 54,565 54,56514.19 PASO ESCALERA GRANITO ML 80,698 80,117 79,375 79,683 79,989 81,251 79,529 80,17314.20 PIRLANES ALUMINIO ML 5,759 5,759 5,759 5,759 5,759 5,759 5,759 5,75914.21 PIRLANES LADRILLO ML 24,556 24,403 24,208 24,289 24,370 24,702 24,249 24,41814.22 PISO VINILO TRÁFICO RESIDENCIAL M2 31,195 31,195 31,195 31,195 31,195 31,195 31,195 31,19514.23 PISO VINILO TRÁFICO PESADO M2 41,663 41,663 41,663 41,663 41,663 41,663 41,663 41,66314.24 PULIDA LACADA PISO MADERA M2 41,392 41,392 41,392 41,392 41,392 41,392 41,392 41,39214.25 TABLETA DE GRES 25X25 M2 36,764 36,598 36,386 36,474 36,562 36,922 36,430 36,61414.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 37,436 37,270 37,058 37,146 37,233 37,594 37,102 37,286

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

Page 35: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,114 8,114 8,114 8,114 8,114 8,114 8,114 8,11414.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,016 33,787 33,494 33,616 33,736 34,234 33,555 33,80914.29 JABONERA PORCELANA ACUARIO UN 14,199 14,199 14,199 14,199 14,199 14,199 14,199 14,199

14.30 UN 98,525 98,525 98,525 98,525 98,525 98,525 98,525 98,525

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,638 7,638 7,638 7,638 7,638 7,638 7,638 7,63814.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,670 15,670 15,670 15,670 15,670 15,670 15,670 15,67014.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,554 10,554 10,554 10,554 10,554 10,554 10,554 10,55414.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,049 10,049 10,049 10,049 10,049 10,049 10,049 10,04914.35 REMATES BOCEL ALUMINIO ML 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,40014.36 REMATES BOCEL PORCELANA ML 6,508 6,508 6,508 6,508 6,508 6,508 6,508 6,50814.37 TAPA REGISTRO 20X20 UN 14,683 14,683 14,683 14,683 14,683 14,683 14,683 14,68314.38 TAPA REGISTRO 6X6 UN 12,945 12,945 12,945 12,945 12,945 12,945 12,945 12,94514.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 14,234 14,234 14,234 14,234 14,234 14,234 14,234 14,234

14.40 M2 16,516 16,516 16,516 16,516 16,516 16,516 16,516 16,516

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 47,290 47,124 46,912 47,000 47,087 47,448 46,956 47,14014.42 MEDIA CAÑA EN GRANITO ML 57,200 57,200 57,200 57,200 57,200 57,200 57,200 57,20014.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,224 26,224 26,224 26,224 26,224 26,224 26,224 26,22414.44 PINTURA ACRÍLICA PARA PISOS M2 10,357 10,357 10,357 10,357 10,357 10,357 10,357 10,35714.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,792 11,792 11,792 11,792 11,792 11,792 11,792 11,79214.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 82,502 82,502 82,502 82,502 82,502 82,502 82,502 82,502

15 CIELO RASO15.1 APLIQUE YESO ML 56,853 56,853 56,853 56,853 56,853 56,853 56,853 56,85315.2 ARMADURA MADERA Y MALLA M2 26,685 26,685 26,685 26,685 26,685 26,685 26,685 26,68515.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51,630 51,630 51,630 51,630 51,630 51,630 51,630 51,63015.4 CIELO RASO DURACUSTIC M2 50,975 50,975 50,975 50,975 50,975 50,975 50,975 50,97515.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 47,156 47,156 47,156 47,156 47,156 47,156 47,156 47,15615.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 66,968 66,968 66,968 66,968 66,968 66,968 66,968 66,96815.7 CORNISAS YESO ML 35,543 35,543 35,543 35,543 35,543 35,543 35,543 35,54315.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 74,470 74,470 74,470 74,470 74,470 74,470 74,470 74,47015.9 MALLA CON VENA M2 10,258 10,258 10,258 10,258 10,258 10,258 10,258 10,258

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 54,872 41,498 60,901 76,423 44,085 66,514 43,231 65,220

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 36: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 84,162 60,367 52,022 54,091 62,369 93,472 69,677 70,645

16.10 M3 133,334 121,692 159,204 164,378 150,149 144,975 121,692 143,682

16.11 AFRIMADO (NORMA INVIAS 311) M3 60,353 45,332 64,735 80,257 47,919 71,994 51,298 70,70116.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 124,426 112,785 150,296 155,470 141,242 136,068 115,372 134,77416.13 BASE GRANULAR (NORMA INVIAS 330) M3 133,975 122,333 159,845 165,019 150,790 145,616 122,333 144,323

17 APARATOS SANITARIOS17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 217,717 217,717 217,717 217,717 217,717 217,717 217,717 217,71717.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 687,253 687,253 687,253 687,253 687,253 687,253 687,253 687,25317.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 388,367 388,367 388,367 388,367 388,367 388,367 388,367 388,36717.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 124,795 124,795 124,795 124,795 124,795 124,795 124,795 124,79517.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 154,702 154,702 154,702 154,702 154,702 154,702 154,702 154,702

17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 183,080 183,080 183,080 183,080 183,080 183,080 183,080 183,080

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 282,966 282,966 282,966 282,966 282,966 282,966 282,966 282,96617.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 743,234 743,234 743,234 743,234 743,234 743,234 743,234 743,23417.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 231,923 231,923 231,923 231,923 231,923 231,923 231,923 231,923

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 111,376 111,376 111,376 111,376 111,376 111,376 111,376 111,37617.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 63,174 63,174 63,174 63,174 63,174 63,174 63,174 63,174

17.12 UN 184,711 184,711 184,711 184,711 184,711 184,711 184,711 184,711

17.13 UN 295,435 295,435 295,435 295,435 295,435 295,435 295,435 295,435

18 PINTURAS18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,470 4,470 4,470 4,470 4,470 4,470 4,470 4,47018.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,225 2,225 2,225 2,225 2,225 2,225 2,225 2,22518.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,397 8,397 8,397 8,397 8,397 8,397 8,397 8,39718.4 BARNIZ SOBRE MUEBLES M2 31,969 31,969 31,969 31,969 31,969 31,969 31,969 31,96918.5 CARBURO SOBRE PAÑETES M2 4,322 4,322 4,322 4,322 4,322 4,322 4,322 4,32218.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,609 10,609 10,609 10,609 10,609 10,609 10,609 10,60918.7 DEMARCACIÓN CON MARMOLINA ML 2,691 2,691 2,691 2,691 2,691 2,691 2,691 2,69118.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,932 1,932 1,932 1,932 1,932 1,932 1,932 1,93218.9 ESMALTE SOBRE LÁMINA LLENA M2 10,024 10,024 10,024 10,024 10,024 10,024 10,024 10,024

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,007 3,007 3,007 3,007 3,007 3,007 3,007 3,00718.11 ESMALTE SOBRE MADERA LLENA M2 11,130 11,130 11,130 11,130 11,130 11,130 11,130 11,13018.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,936 3,936 3,936 3,936 3,936 3,936 3,936 3,93618.13 ESMALTE SOBRE MARCOS MADERA M2 4,692 4,692 4,692 4,692 4,692 4,692 4,692 4,69218.14 ESTUCO M2 5,876 5,876 5,876 5,876 5,876 5,876 5,876 5,87618.15 ESTUCO (LINEAL) ML 3,620 3,620 3,620 3,620 3,620 3,620 3,620 3,62018.16 ESTUCO Y VINILO 3 MANOS M2 12,271 12,271 12,271 12,271 12,271 12,271 12,271 12,27118.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,567 7,567 7,567 7,567 7,567 7,567 7,567 7,56718.18 LACA PISOS MADERA M2 18,062 18,062 18,062 18,062 18,062 18,062 18,062 18,06218.19 LÍNEAS TRÁFICO 0.10 ML 2,079 2,079 2,079 2,079 2,079 2,079 2,079 2,07918.20 MARMOLINA SOBRE PAÑETE M2 8,771 8,771 8,771 8,771 8,771 8,771 8,771 8,771

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 37: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

18.21 TINTILLA SOBRE MADERA LINEAL ML 2,557 2,557 2,557 2,557 2,557 2,557 2,557 2,55718.22 TINTILLA SOBRE MADERA LLENA M2 9,762 9,762 9,762 9,762 9,762 9,762 9,762 9,76218.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,354 5,354 5,354 5,354 5,354 5,354 5,354 5,35418.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,378 3,378 3,378 3,378 3,378 3,378 3,378 3,37818.25 WASH-PRIMER SOBRE ALUMNIO M2 16,379 16,379 16,379 16,379 16,379 16,379 16,379 16,37918.26 PINTURA EPÓXICA M2 10,099 10,099 10,099 10,099 10,099 10,099 10,099 10,09918.27 PINTURA EPÓXICA (LINEAL) ML 6,199 6,199 6,199 6,199 6,199 6,199 6,199 6,199

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,734,912 3,734,912 3,734,912 3,734,912 3,734,912 3,734,912 3,734,912 3,734,912

19.2 UN 6,556,053 6,556,053 6,556,053 6,556,053 6,556,053 6,556,053 6,556,053 6,556,053

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,966,696 1,966,696 1,966,696 1,966,696 1,966,696 1,966,696 1,966,696 1,966,69619.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,511,973 5,511,973 5,511,973 5,511,973 5,511,973 5,511,973 5,511,973 5,511,97319.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,487,485 5,487,485 5,487,485 5,487,485 5,487,485 5,487,485 5,487,485 5,487,48519.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,079 2,079 2,079 2,079 2,079 2,079 2,079 2,07919.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,962,188 1,962,188 1,962,188 1,962,188 1,962,188 1,962,188 1,962,188 1,962,18819.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 62,914 62,914 62,914 62,914 62,914 62,914 62,914 62,91419.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,106,547 1,106,336 1,106,205 1,106,250 1,106,335 1,106,664 1,106,332 1,106,406

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 564,810 559,403 556,430 557,415 559,505 567,578 559,888 561,349

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,114 23,114 23,114 23,114 23,114 23,114 23,114 23,11420.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 34,227 34,227 34,227 34,227 34,227 34,227 34,227 34,22720.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 42,261 42,261 42,261 42,261 42,261 42,261 42,261 42,26120.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,456 25,456 25,456 25,456 25,456 25,456 25,456 25,45620.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 29,093 29,093 29,093 29,093 29,093 29,093 29,093 29,09320.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,594 42,594 42,594 42,594 42,594 42,594 42,594 42,59420.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,757 19,757 19,757 19,757 19,757 19,757 19,757 19,75720.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,836 20,836 20,836 20,836 20,836 20,836 20,836 20,83620.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,781 25,781 25,781 25,781 25,781 25,781 25,781 25,781

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,682 11,682 11,682 11,682 11,682 11,682 11,682 11,68220.11 VÁLVULA DE BOLA GAS 3/4" UN 18,221 18,221 18,221 18,221 18,221 18,221 18,221 18,22120.12 VÁLVULA DE BOLA GAS 1" UN 27,277 27,277 27,277 27,277 27,277 27,277 27,277 27,27720.13 VÁLVULA POLIETILENO GAS 1/2" UN 162,159 162,159 162,159 162,159 162,159 162,159 162,159 162,15920.14 VÁLVULA POLIETILENO GAS 3/4" UN 166,777 166,777 166,777 166,777 166,777 166,777 166,777 166,77720.15 VÁLVULA POLIETILENO GAS 1" UN 270,197 270,197 270,197 270,197 270,197 270,197 270,197 270,19720.16 ACOMETIDA GAS 1/2" ML 223,283 223,283 223,283 223,283 223,283 223,283 223,283 223,283

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 98,593 98,593 98,593 98,593 98,593 98,593 98,593 98,59321.2 CABLE DETECTOR LINEAL DE CALOR ML 24,565 24,565 24,565 24,565 24,565 24,565 24,565 24,56521.3 SIRENA DE 110 V UN 69,716 69,716 69,716 69,716 69,716 69,716 69,716 69,71621.4 CÁMARA CCTV UN 203,712 203,712 203,712 203,712 203,712 203,712 203,712 203,71221.5 PARLANTE-CIELO FALSO UN 39,782 39,782 39,782 39,782 39,782 39,782 39,782 39,78221.6 AMPLIFICADOR 100W UN 428,733 428,733 428,733 428,733 428,733 428,733 428,733 428,733

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 38: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

21.7 AMPLIFICADOR 300W UN 1,061,962 1,061,962 1,061,962 1,061,962 1,061,962 1,061,962 1,061,962 1,061,96221.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,734 32,734 32,734 32,734 32,734 32,734 32,734 32,73421.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 169,786 169,786 169,786 169,786 169,786 169,786 169,786 169,786

21.10 TOMA PARA MICRÓFONO UN 33,737 33,737 33,737 33,737 33,737 33,737 33,737 33,73721.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,603 2,603 2,603 2,603 2,603 2,603 2,603 2,60321.12 SPLITERS UN 4,191 4,191 4,191 4,191 4,191 4,191 4,191 4,19121.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,181 14,181 14,181 14,181 14,181 14,181 14,181 14,18121.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,657 18,657 18,657 18,657 18,657 18,657 18,657 18,65721.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,677 25,677 25,677 25,677 25,677 25,677 25,677 25,67721.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 94,762 94,762 94,762 94,762 94,762 94,762 94,762 94,76221.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 24,919 24,919 24,919 24,919 24,919 24,919 24,919 24,91921.18 BANDEJA PORTACABLES PARA RACK UN 81,610 81,610 81,610 81,610 81,610 81,610 81,610 81,61021.19 RACK 2' X 24" UN 131,005 131,005 131,005 131,005 131,005 131,005 131,005 131,00521.20 RACK 3' X 24" UN 159,256 159,256 159,256 159,256 159,256 159,256 159,256 159,25621.21 RACK 5' X 24" UN 251,379 251,379 251,379 251,379 251,379 251,379 251,379 251,37921.22 RACK 7' X 24" UN 325,268 325,268 325,268 325,268 325,268 325,268 325,268 325,26821.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 369,519 369,519 369,519 369,519 369,519 369,519 369,519 369,51921.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 221,804 221,804 221,804 221,804 221,804 221,804 221,804 221,80421.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 53,516 53,516 53,516 53,516 53,516 53,516 53,516 53,51621.26 PATCH CORD 2M CATEGORÍA 6A UN 5,554 5,554 5,554 5,554 5,554 5,554 5,554 5,55421.27 PATCH CORD 5M CATEGORÍA 6A UN 14,105 14,105 14,105 14,105 14,105 14,105 14,105 14,10521.28 CABLE UTP CATEGORÍA 6A ML 2,597 2,597 2,597 2,597 2,597 2,597 2,597 2,59721.29 CANALETA METÁLICA 4X6 CMS ML 26,056 26,056 26,056 26,056 26,056 26,056 26,056 26,05621.30 CANALETA METÁLICA 4X10 CMS ML 27,196 27,196 27,196 27,196 27,196 27,196 27,196 27,19621.31 CANALETA METÁLICA 6X10 CMS ML 27,766 27,766 27,766 27,766 27,766 27,766 27,766 27,76621.32 CANALETA PLÁSTICA 13X7 MM ML 15,448 15,448 15,448 15,448 15,448 15,448 15,448 15,44821.33 CANALETA PLÁSTICA 20X12 MM ML 17,288 17,288 17,288 17,288 17,288 17,288 17,288 17,28821.34 CANALETA PLÁSTICA 32X12 MM ML 17,217 17,217 17,217 17,217 17,217 17,217 17,217 17,21721.35 CANALETA PLÁSTICA 40X60 MM ML 27,561 27,561 27,561 27,561 27,561 27,561 27,561 27,56121.36 SWITCH 10/100/1000 24 PUERTOS UN 372,230 372,230 372,230 372,230 372,230 372,230 372,230 372,23021.37 SWITCH 10/100/1000 16 PUERTOS UN 235,436 235,436 235,436 235,436 235,436 235,436 235,436 235,43621.38 SWITCH 10/100/1000 8 PUERTOS UN 62,786 62,786 62,786 62,786 62,786 62,786 62,786 62,78621.39 CABLE TELEFÓNICO 2 PARES ML 1,354 1,354 1,354 1,354 1,354 1,354 1,354 1,35421.40 CABLE TELEFÓNICO 10 PARES ML 6,559 6,559 6,559 6,559 6,559 6,559 6,559 6,55921.41 CABLE TELEFÓNICO 20 PARES ML 8,780 8,780 8,780 8,780 8,780 8,780 8,780 8,78021.42 CABLE TELEFÓNICO 40 PARES ML 12,236 12,236 12,236 12,236 12,236 12,236 12,236 12,23621.43 CABLE TELEVISIÓN RG6 ML 1,666 1,666 1,666 1,666 1,666 1,666 1,666 1,66621.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,024 16,024 16,024 16,024 16,024 16,024 16,024 16,02421.45 ACOMETIDA TELEFÓNICA 1" ML 24,620 24,620 24,620 24,620 24,620 24,620 24,620 24,62021.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,219 13,219 13,219 13,219 13,219 13,219 13,219 13,21921.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 10,781 10,781 10,781 10,781 10,781 10,781 10,781 10,78121.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 481,953 481,953 481,953 481,953 481,953 481,953 481,953 481,953

Page 39: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,541 19,541 19,541 19,541 19,541 19,541 19,541 19,5411.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 64,957 64,957 64,957 64,957 64,957 64,957 64,957 64,9571.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 364,285 364,285 364,285 364,285 364,285 364,285 364,285 364,2851.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 777,396 777,396 777,396 777,396 777,396 777,396 777,396 777,3961.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 89,351 89,351 89,351 89,351 89,351 89,351 89,351 89,3511.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 542,543 542,543 542,543 542,543 542,543 542,543 542,543 542,5431.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,166,602 1,166,602 1,166,602 1,166,602 1,166,602 1,166,602 1,166,602 1,166,6021.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,643 9,643 9,643 9,643 9,643 9,643 9,643 9,6431.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,811 11,811 11,811 11,811 11,811 11,811 11,811 11,811

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,755 14,755 14,755 14,755 14,755 14,755 14,755 14,7551.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,103 16,103 16,103 16,103 16,103 16,103 16,103 16,1031.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 19,241 19,241 19,241 19,241 19,241 19,241 19,241 19,2411.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 19,241 19,241 19,241 19,241 19,241 19,241 19,241 19,2411.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 76,262 76,262 76,262 76,262 76,262 76,262 76,262 76,2621.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 88,373 88,373 88,373 88,373 88,373 88,373 88,373 88,3731.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 273,278 273,278 273,278 273,278 273,278 273,278 273,278 273,2781.17 TEE PVC UNIÓN MECÁNICA 2" UN 102,555 102,555 102,555 102,555 102,555 102,555 102,555 102,5551.18 TEE PVC UNIÓN MECÁNICA 4" UN 169,047 169,047 169,047 169,047 169,047 169,047 169,047 169,0471.19 TEE PVC UNIÓN MECÁNICA 8" UN 747,129 747,129 747,129 747,129 747,129 747,129 747,129 747,1291.20 TEE PVC UNIÓN MECÁNICA 10" UN 860,635 860,635 860,635 860,635 860,635 860,635 860,635 860,6351.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 10,010 10,010 10,010 10,010 10,010 10,010 10,010 10,0101.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,879 8,879 8,879 8,879 8,879 8,879 8,879 8,8791.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 21,011 21,011 21,011 21,011 21,011 21,011 21,011 21,0111.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 84,399 84,399 84,399 84,399 84,399 84,399 84,399 84,3991.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 125,016 125,016 125,016 125,016 125,016 125,016 125,016 125,0161.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 20,759 20,759 20,759 20,759 20,759 20,759 20,759 20,7591.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 70,974 70,974 70,974 70,974 70,974 70,974 70,974 70,9741.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 104,518 104,518 104,518 104,518 104,518 104,518 104,518 104,5181.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,722 21,722 21,722 21,722 21,722 21,722 21,722 21,7221.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 44,646 44,646 44,646 44,646 44,646 44,646 44,646 44,6461.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 178,971 178,971 178,971 178,971 178,971 178,971 178,971 178,9711.32 UNIÓN REPARACION PVC 4" UN 52,033 52,033 52,033 52,033 52,033 52,033 52,033 52,0331.33 UNIÓN REPARACIÓN PVC 8" UN 208,098 208,098 208,098 208,098 208,098 208,098 208,098 208,0981.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 125,767 125,767 125,767 125,767 125,767 125,767 125,767 125,7671.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 355,176 355,176 355,176 355,176 355,176 355,176 355,176 355,1761.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,046,888 1,046,888 1,046,888 1,046,888 1,046,888 1,046,888 1,046,888 1,046,8881.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,546,849 1,546,849 1,546,849 1,546,849 1,546,849 1,546,849 1,546,849 1,546,849

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,084 8,084 8,084 8,084 8,084 8,084 8,084 8,0842.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,575 18,575 18,575 18,575 18,575 18,575 18,575 18,5752.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 73,191 50,477 42,512 44,487 52,388 82,078 59,364 60,288

Page 40: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

2.5 RELLENO TIPO 2 "RECEBO" M3 51,693 38,318 57,721 73,243 40,905 63,334 40,051 62,0412.6 RELLENO TIPO 4 "SUBBASE B-200" M3 61,573 46,552 65,955 81,477 49,139 73,214 52,518 71,9212.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 64,012 54,788 41,810 43,860 46,934 73,235 56,838 55,1332.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 57,364 47,961 32,500 39,813 42,947 66,767 50,051 51,3052.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 65,384 55,457 42,780 48,042 53,281 74,833 45,411 56,414

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 81,273 81,273 81,273 81,273 81,273 81,273 81,273 81,2733.2 CODO 45 PVC ALCANTARILLADO 16" UN 847,029 847,029 847,029 847,029 847,029 847,029 847,029 847,0293.3 CODO 90 PVC ALCANTARILLADO 8" UN 106,210 106,210 106,210 106,210 106,210 106,210 106,210 106,2103.4 CODO 90 PVC ALCANTARILLADO 16" UN 980,743 980,743 980,743 980,743 980,743 980,743 980,743 980,7433.5 CODO 90 PVC ALCANTARILLADO 24" UN 683,376 683,376 683,376 683,376 683,376 683,376 683,376 683,3763.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,005 58,005 58,005 58,005 58,005 58,005 58,005 58,0053.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 80,992 80,992 80,992 80,992 80,992 80,992 80,992 80,9923.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 190,891 190,891 190,891 190,891 190,891 190,891 190,891 190,8913.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 190,889 190,889 190,889 190,889 190,889 190,889 190,889 190,889

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 306,392 306,392 306,392 306,392 306,392 306,392 306,392 306,3923.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 80,993 80,993 80,993 80,993 80,993 80,993 80,993 80,9933.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 80,992 80,992 80,992 80,992 80,992 80,992 80,992 80,9923.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 190,891 190,891 190,891 190,891 190,891 190,891 190,891 190,8913.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 190,891 190,891 190,891 190,891 190,891 190,891 190,891 190,8913.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 306,393 306,393 306,393 306,393 306,393 306,393 306,393 306,3933.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 281,814 281,814 281,814 281,814 281,814 281,814 281,814 281,8143.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 451,887 451,887 451,887 451,887 451,887 451,887 451,887 451,8873.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 721,744 721,744 721,744 721,744 721,744 721,744 721,744 721,7443.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 45,086 45,086 45,086 45,086 45,086 45,086 45,086 45,0863.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 237,573 237,573 237,573 237,573 237,573 237,573 237,573 237,5733.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 258,154 258,154 258,154 258,154 258,154 258,154 258,154 258,1543.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 756,584 756,584 756,584 756,584 756,584 756,584 756,584 756,5843.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 42,510 42,408 42,277 42,331 42,385 42,608 42,304 42,4183.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 215,831 215,831 215,831 215,831 215,831 215,831 215,831 215,8313.25 TUBERÍA PVC ALCANTARILLADO 8" ML 35,589 35,589 35,589 35,589 35,589 35,589 35,589 35,5893.26 TUBERÍA PVC ALCANTARILLADO 10" ML 50,236 50,236 50,236 50,236 50,236 50,236 50,236 50,2363.27 TUBERÍA PVC ALCANTARILLADO 12" ML 72,392 72,392 72,392 72,392 72,392 72,392 72,392 72,3923.28 TUBERÍA PVC ALCANTARILLADO 16" ML 111,043 111,043 111,043 111,043 111,043 111,043 111,043 111,0433.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 178,249 178,249 178,249 178,249 178,249 178,249 178,249 178,2493.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 261,849 261,849 261,849 261,849 261,849 261,849 261,849 261,8493.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 330,460 330,460 330,460 330,460 330,460 330,460 330,460 330,4603.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 434,133 434,133 434,133 434,133 434,133 434,133 434,133 434,1333.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 595,410 595,410 595,410 595,410 595,410 595,410 595,410 595,410

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 512,955 499,977 492,843 495,207 500,223 519,597 501,142 504,648

4.2 ML 496,255 490,968 484,215 487,018 489,808 501,287 485,617 491,477CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

Page 41: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

4.3 UN 508,085 499,433 494,676 496,253 499,597 512,513 500,209 502,546

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 609,570 593,348 584,429 587,385 593,655 617,873 594,803 599,186

4.5 ML 703,307 695,862 686,354 690,301 694,230 710,394 688,327 696,580

4.6 UN 593,300 581,404 574,864 577,031 581,629 599,389 582,471 585,685

4.7 SUMIDERO EN LADRILLO SL-100 UN 725,308 720,399 716,335 717,881 720,043 728,647 718,769 721,6714.8 SUMIDERO EN LADRILLO SL-250 UN 1,068,616 1,052,770 1,041,664 1,045,695 1,052,284 1,078,177 1,050,559 1,057,6054.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,509,962 1,476,557 1,457,293 1,463,809 1,476,895 1,527,601 1,478,191 1,488,252

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,036,048 1,980,521 1,948,498 1,959,330 1,981,083 2,065,368 1,983,235 1,999,9604.11 SUMIDERO PREFABRICADO SL-100 UN 960,039 960,039 960,039 960,039 960,039 960,039 960,039 960,0394.12 SUMIDERO PREFABRICADO SL-250 UN 2,247,899 2,247,899 2,247,899 2,247,899 2,247,899 2,247,899 2,247,899 2,247,899

4.13 UN 101,762 101,546 101,270 101,385 101,498 101,967 101,327 101,567

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 43,472 42,937 42,255 42,538 42,820 43,981 42,396 42,9895.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 50,232 49,697 49,015 49,298 49,580 50,741 49,156 49,7495.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 43,934 41,778 40,441 40,906 41,769 45,129 41,741 42,4995.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 47,780 45,508 44,260 44,674 45,551 48,942 45,712 46,3265.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 48,386 46,250 45,016 45,434 46,271 49,515 46,352 46,9975.6 BORDE SEPARADOR VERDE A-170 ML 194,197 193,981 193,705 193,820 193,933 194,402 193,762 194,0025.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,253 13,995 13,834 13,890 13,994 14,397 13,990 14,0815.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 31,554 30,035 29,092 29,421 30,029 32,397 30,009 30,5435.9 CAÑUELA PREFABRICADA TIPO A-120 ML 63,749 63,634 63,486 63,548 63,608 63,859 63,517 63,645

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 433,847 429,634 426,257 427,532 429,366 436,645 428,406 430,7665.11 LOSETA PREFABRICADA A-40 M2 45,966 45,472 44,841 45,103 45,364 46,436 44,972 45,5195.12 LOSETA PREFABRICADA A-60 M2 65,921 65,427 64,796 65,058 65,318 66,391 64,927 65,4745.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 26,210 25,302 24,802 24,968 25,319 26,675 25,383 25,6285.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 42,390 40,552 39,541 39,876 40,587 43,331 40,717 41,2145.15 SARDINEL PREFABRICADO A-10 ML 80,391 78,484 84,108 84,965 82,837 82,291 78,368 81,8785.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 44,428 44,129 43,748 43,906 44,064 44,713 43,827 44,158

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 112,734 111,652 111,057 111,255 111,673 113,287 111,749 112,0416.2 BANCA EN CONCRETO M-30 UN 475,577 474,063 473,231 473,507 474,092 476,352 474,199 474,6086.3 BOLARDO M-63 ALTO/HIERRO UN 172,532 172,310 172,184 172,226 172,313 172,648 172,324 172,3886.4 BOLARDO M-60 CONCRETO UN 109,315 108,017 107,304 107,540 108,042 109,979 108,134 108,4846.5 BOLARDO M-61 BAJO/CONCRETO UN 110,737 109,440 108,726 108,963 109,464 111,402 109,556 109,9076.6 BOLARDO M-62 BAJO/HIERRO UN 153,839 152,507 151,749 152,004 152,524 154,537 152,588 152,9776.7 BORDE CONTENEDOR DE RAICES A-70 ML 45,742 45,332 44,810 45,027 45,243 46,131 44,918 45,3726.8 BORDILLO PREFABRICADO A-80 ML 51,921 51,463 50,878 51,121 51,363 52,358 51,000 51,5076.9 CANECA M-120 UN 239,603 239,501 239,370 239,424 239,478 239,701 239,397 239,511

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 626,543 625,894 625,537 625,655 625,906 626,875 625,952 626,127

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 42: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,388,983 2,388,550 2,388,312 2,388,391 2,388,558 2,389,204 2,388,589 2,388,7066.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,813,757 2,813,324 2,813,086 2,813,165 2,813,332 2,813,978 2,813,363 2,813,4806.13 CICLOPARQUEADERO M100 TIPO 1 UN 392,883 392,439 392,187 392,272 392,445 393,116 392,466 392,5966.14 CICLOPARQUEADERO M101 TIPO 2 UN 520,267 518,490 517,480 517,820 518,513 521,197 518,599 519,1186.15 BANCA EN MADERA M-50 UN 356,273 356,273 356,273 356,273 356,273 356,273 356,273 356,2736.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 179,793 179,144 178,787 178,905 179,156 180,125 179,202 179,3776.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 427,971 427,715 427,388 427,524 427,659 428,214 427,456 427,7396.18 POSTE HISTÓRICO M-131 UN 3,603,940 3,600,695 3,598,912 3,599,503 3,600,757 3,605,600 3,600,986 3,601,863

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,447 1,447 1,447 1,447 1,447 1,447 1,447 1,4477.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,614 14,614 14,614 14,614 14,614 14,614 14,614 14,6147.3 SEÑAL DOBLE DE CICLORUTA UN 365,348 365,241 365,103 365,160 365,217 365,451 365,131 365,2517.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 421,574 420,685 420,180 420,350 420,696 422,038 420,739 420,9997.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 245,211 245,104 244,966 245,023 245,080 245,314 244,994 245,1147.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 288,697 288,590 288,452 288,509 288,566 288,800 288,480 288,6007.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 396,466 396,359 396,221 396,278 396,335 396,569 396,249 396,3697.8 TACHAS REFLECTIVAS UN 10,303 10,303 10,303 10,303 10,303 10,303 10,303 10,3037.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,873 10,873 10,873 10,873 10,873 10,873 10,873 10,873

7.10 UN 42,073 42,073 42,073 42,073 42,073 42,073 42,073 42,073TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 43: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,4722.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,702 28,702 28,702 28,702 28,702 28,702 28,702 28,702

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 47,156 47,156 47,156 47,156 47,156 47,156 47,156 47,156

2.11 600.3 M3 58,302 58,302 58,302 58,302 58,302 58,302 58,302 58,302

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 124,426 112,785 150,296 155,470 141,242 136,068 115,372 134,7743.3 330.1 BASE GRANULAR M3 133,975 122,333 159,845 165,019 150,790 145,616 122,333 144,323

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

Page 44: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,092 2,092 2,092 2,092 2,092 2,092 2,092 2,0923.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,053 1,053 1,053 1,053 1,053 1,053 1,053 1,0533.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 155,100 149,401 147,134 147,758 149,793 157,492 151,223 151,7653.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 55,145 54,300 53,379 53,752 54,167 55,854 53,684 54,4393.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 436,148 446,098 499,579 458,535 482,167 429,929 432,417 438,6353.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 468,398 478,348 531,829 490,785 514,417 462,179 464,667 470,885

3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 492,995 502,945 556,427 515,383 539,014 486,777 489,264 495,483

3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 483,898 493,848 547,329 506,285 529,917 477,679 480,167 486,3853.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 231,700 220,058 257,570 262,744 248,515 243,341 220,058 242,0483.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 221,453 209,811 247,323 252,497 238,268 233,094 212,398 231,8013.15 311.1 AFIRMADO M3 60,353 45,332 64,735 80,257 47,919 71,994 51,298 70,7013.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,604 11,171 11,020 11,057 11,208 11,773 11,341 11,3583.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,802 4,586 4,510 4,529 4,604 4,887 4,670 4,679

3.18 500.1 M3 502,472 483,366 471,514 475,640 483,286 513,066 483,038 489,753

3.19 500.1 M3 529,269 509,307 496,925 501,235 509,224 540,337 508,965 515,980

3.20 500.1 M3 546,933 526,520 513,749 518,209 526,399 558,317 526,005 533,304

3.21 *** ML 5,775 5,775 5,775 5,775 5,775 5,775 5,775 5,775

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 75,643 65,792 49,595 57,256 60,540 85,493 67,981 69,296

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 846,866 825,193 811,749 816,429 825,102 858,882 824,821 832,4384.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 745,648 724,334 711,113 715,716 724,245 757,465 723,968 731,4594.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 781,692 759,534 745,790 750,574 759,442 793,977 759,154 766,9424.4 630 P CONCRETOS f´c =3500 psi (bases) M3 469,977 449,428 437,563 441,579 449,631 480,836 450,410 456,6164.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 558,316 536,954 524,619 528,793 537,165 569,606 537,975 544,4274.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 464,142 442,296 430,286 434,266 442,710 475,323 444,256 450,1574.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 552,250 529,539 517,053 521,191 529,969 563,874 531,577 537,7124.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 691,614 669,768 657,758 661,738 670,182 702,795 671,728 677,6294.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 478,988 456,277 443,791 447,929 456,707 490,612 458,315 464,4504.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 725,518 702,807 690,321 694,459 703,237 737,142 704,845 710,980

4.11 650 P KG 8,370 8,370 8,370 8,370 8,370 8,370 8,370 8,370

4.12 650 P KG 11,260 11,260 11,260 11,260 11,260 11,260 11,260 11,260

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,239 1,239 1,239 1,239 1,239 1,239 1,239 1,239

4.14 621.1 ML 1,954,677 1,954,677 1,954,677 1,954,677 1,954,677 1,954,677 1,954,677 1,954,677

4.15 621.1 P ML 3,133,698 3,096,626 3,073,631 3,081,636 3,096,472 3,154,253 3,095,991 3,109,019

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,066,014 1,044,384 1,032,493 1,036,434 1,044,794 1,077,084 1,046,325 1,052,168

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

Page 45: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 69,813 69,813 69,813 69,813 69,813 69,813 69,813 69,8134.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 263,358 260,762 259,335 259,808 260,811 264,686 260,995 261,6964.19 632 P BARANDA METÁLICA ML 301,314 301,314 301,314 301,314 301,314 301,314 301,314 301,3144.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,271 12,271 12,271 12,271 12,271 12,271 12,271 12,2714.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 367,068 336,677 335,499 349,617 338,180 385,958 339,986 359,3574.22 673.1 MATERIAL GRANULAR FILTRANTE M3 71,253 61,403 47,543 49,732 53,015 81,104 63,592 61,7714.23 610.1 RELLENO PARA ESTRUCTURAS M3 47,727 35,381 53,291 67,619 37,769 58,473 36,981 57,2794.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 299,611 277,178 264,419 268,710 277,463 311,350 278,545 285,0964.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 295,823 278,915 265,445 270,780 277,174 306,379 280,522 284,8934.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 320,465 303,556 290,087 295,422 301,816 331,021 305,164 309,5344.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 307,586 291,684 278,153 283,599 289,723 317,998 292,269 297,0764.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 332,227 316,326 302,795 308,240 314,365 342,640 316,911 321,7184.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 422,750 402,013 389,149 393,627 401,926 434,248 401,657 408,9444.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 509,393 487,835 474,462 479,117 487,745 521,347 487,465 495,0414.31 681.1 GAVIÓN M3 145,388 135,986 120,524 127,838 130,972 154,791 138,075 139,3304.32 681.1 GAVIÓN MALLA PVC M3 151,962 142,560 127,098 134,412 137,546 161,365 144,649 145,904

4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 32,914 31,641 30,852 31,127 31,636 33,620 31,620 32,067

4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 12,800 12,163 11,769 11,906 12,161 13,153 12,152 12,376

4.35 *** M2 8,063 8,063 8,063 8,063 8,063 8,063 8,063 8,063

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,540 11,540 11,540 11,540 11,540 11,540 11,540 11,540

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,568 15,568 15,568 15,568 15,568 15,568 15,568 15,568

4.38 *** M2 18,682 18,682 18,682 18,682 18,682 18,682 18,682 18,682

4.39 *** M2 24,019 24,019 24,019 24,019 24,019 24,019 24,019 24,019

4.40 *** M2 5,548 5,548 5,548 5,548 5,548 5,548 5,548 5,548

4.41 *** M2 6,323 6,323 6,323 6,323 6,323 6,323 6,323 6,323

4.42 *** M2 6,570 6,570 6,570 6,570 6,570 6,570 6,570 6,570

4.43 *** M2 5,619 5,619 5,619 5,619 5,619 5,619 5,619 5,619

4.44 *** M2 7,179 7,179 7,179 7,179 7,179 7,179 7,179 7,179

4.45 *** M2 5,267 5,267 5,267 5,267 5,267 5,267 5,267 5,267

4.46 *** M2 7,082 7,082 7,082 7,082 7,082 7,082 7,082 7,082

4.47 *** M2 12,140 12,140 12,140 12,140 12,140 12,140 12,140 12,140

4.48 661.1 ML 315,762 315,595 315,381 315,469 315,558 315,922 315,425 315,611

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

Page 46: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ALTO MAGDALENA

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML 261,960 257,302 254,500 255,464 257,311 264,490 257,355 258,891

4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML 623,615 623,615 623,615 623,615 623,615 623,615 623,615 623,615

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 109,111 94,669 113,325 128,250 97,156 120,305 100,405 119,0614.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,257 3,257 3,257 3,257 3,257 3,257 3,257 3,257

4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 49,862 49,862 49,862 49,862 49,862 49,862 49,862 49,862

4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 80,305 80,305 80,305 80,305 80,305 80,305 80,305 80,305

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 411,690 390,132 376,759 381,414 390,041 423,644 389,762 397,3384.56 682.1 P COLCHONETA RENO M3 160,912 151,509 136,048 143,361 146,495 170,314 153,598 154,8534.57 *** TRINCHO EN MADERA M2 47,665 47,665 47,665 47,665 47,665 47,665 47,665 47,665

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,447 1,447 1,447 1,447 1,447 1,447 1,447 1,4475.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,614 14,614 14,614 14,614 14,614 14,614 14,614 14,6145.3 730.3 TOPE DEFENSA METÁLICA UN 67,494 67,494 67,494 67,494 67,494 67,494 67,494 67,4945.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 67,494 67,494 67,494 67,494 67,494 67,494 67,494 67,4945.5 730.1 DEFENSA METÁLICA ML 171,994 170,880 170,259 170,466 170,898 172,570 170,967 171,2785.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 10,303 10,303 10,303 10,303 10,303 10,303 10,303 10,303

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 567 567 567 567 567 567 567 567

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,2866.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,066 12,066 12,066 12,066 12,066 12,066 12,066 12,0666.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 32,584 32,584 32,584 32,584 32,584 32,584 32,584 32,5846.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,925 5,925 5,925 5,925 5,925 5,925 5,925 5,925

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 47: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,538,641 1,583,974 1,593,4691.2 CAMPAMENTO 9 M2 UN 895,147 917,813 922,5611.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,455 10,455 10,4551.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,778 11,778 11,7781.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,683 13,683 13,6831.6 CERCA EN TABLA H=2.30 M ML 51,327 51,327 51,3271.7 CERCA EN TEJA DE ZINC H=1.80 M ML 36,515 37,030 37,1371.8 CERCA EN TELA VERDE H = 2.10 M ML 16,031 16,547 16,6541.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 651,313 653,528 655,049

1.41 M2 7,563 7,563 7,563

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,410 2,410 2,410

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 48: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,201,807 1,201,807 1,201,8071.44 RED TELEFÓNICA PROVISIONAL UN 171,122 171,122 171,1221.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 99,313 51,843 63,2512.2 BASE ARENA CEMENTO 1:20 M3 129,204 165,660 185,1892.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,687 4,687 4,6872.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 510,186 560,102 570,4982.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 522,701 575,443 586,3912.8 ZAPATAS EN CONCRETO 3500 PSI M3 488,468 537,853 548,1052.9 PILOTE DE MADERA D=20 CM ML 36,714 36,714 36,714

2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 111,894 111,894 111,894

2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 136,093 136,093 136,093

2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 165,357 165,357 165,357

2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 204,751 204,751 204,751

2.14 PILOTE HINCADO 25X25 ML 91,080 94,774 95,5372.15 PILOTE HINCADO 30X30 ML 111,132 116,485 117,5912.16 DADOS EN CONCRETO 3500PSI M3 477,692 527,077 537,3292.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 119,775 119,775 119,775

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 28,956 29,182 29,3043.2 SIFÓN EN PVC 6" UN 151,334 151,560 151,6823.3 CAJA DE INSPECCIÓN DE 100X100 UN 373,913 366,461 375,6223.4 CAJA DE INSPECCIÓN DE 40X40 UN 182,863 186,258 188,1333.5 CAJA DE INSPECCIÓN DE 60X60 UN 203,521 209,176 212,4393.6 CAJA DE INSPECCIÓN DE 80X80 UN 268,176 280,022 285,2393.7 DUCTO ELÉCTRICO PVC 4" ML 76,424 76,130 76,1753.8 POZO SÉPTICO ETERNIT 1000 LT UN 1,010,052 1,007,113 1,007,5633.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 86,040 88,542 89,883

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 50,257 51,577 52,2843.11 TUBERÍA DRENAJE PVC 110 ML 21,301 22,011 22,1653.12 TUBERÍA DRENAJE PVC 160 ML 32,514 33,224 33,3783.13 TUBERÍA DRENAJE PVC 200 ML 44,708 45,702 45,9173.14 TUBERÍA DRENAJE PVC 250 ML 60,906 62,042 62,2883.15 TUBERÍA DRENAJE PVC 315 ML 84,094 85,088 85,3033.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 771,000 782,361 784,8223.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1,096,917 1,119,638 1,124,561

Page 49: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1,439,424 1,484,867 1,494,712

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 29,055 29,055 29,0554.2 CASETÓN DE LONA 0.80X0.70 M2 38,321 38,321 38,3214.3 COLUMNAS 3500 PSI M3 634,341 683,727 693,9784.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 207,124 252,142 261,459

4.5 M2 77,955 82,750 83,745

4.6 M2 91,932 97,685 98,880

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 102,212 109,883 111,4764.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 107,905 116,056 117,7484.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 124,214 134,283 136,373

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 138,426 149,934 152,3224.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 153,839 166,784 169,4724.12 ENTREPISO VIGUETA PLACA M2 76,456 77,187 77,4204.13 ESCALERA MACIZA 3500 PSI M3 747,300 796,685 806,9374.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 72,284 73,163 73,3394.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 62,308 67,246 68,2714.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 70,634 76,675 77,9294.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 82,819 90,394 91,9674.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 567,288 616,674 626,925

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 38,570 40,133 40,4564.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 224,298 246,353 250,932

4.21000000000001 ACERO FIGURADO 37000 PSI KG 3,302 3,302 3,3024.22 ACERO FIGURADO 60000 PSI KG 3,430 3,430 3,430

4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,663 4,663 4,6634.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 671,315 720,700 730,952

4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 619,687 673,711 684,9264.26 VIGA AÉREA 3500 PSI M3 672,073 721,458 731,710

4.27000000000001 VIGA CINTA 3500 PSI M3 656,749 706,134 716,3864.28 VIGA CANAL EN CONCRETO 3500 PSI M3 816,186 865,571 875,823

4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 259,016 310,896 321,763

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 22,882 24,150 24,4875.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,492 39,760 40,0975.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 25,045 25,271 25,3935.4 ARCOS EN LADRILLO PRENSADO ML 121,978 122,431 122,6745.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 34,530 36,092 36,4155.6 DINTELES EN BLOQUE 0.15 M ML 19,809 20,688 20,8645.7 ENCHAPES LADRILLO PRENSADO M2 69,004 69,910 70,3955.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 71,522 76,730 77,8065.9 MURO DRYWALL DOBLE CARA 0.12 M M2 55,176 55,176 55,176

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 50: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 33,623 33,623 33,6235.11 MURO DRYWALL DOBLE CARA 0.10 M M2 53,422 53,422 53,4225.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 32,746 32,746 32,7465.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 67,453 67,453 67,4535.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 40,768 40,768 40,7685.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 69,085 69,085 69,0855.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 41,584 41,584 41,5845.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,572 28,027 28,2715.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 17,071 17,299 17,421

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 39,074 39,377 39,5405.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 23,634 23,786 23,867

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 46,128 46,432 46,5945.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 27,674 27,826 27,907

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 82,437 83,954 84,7675.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 48,133 48,892 49,298

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 25,520 25,823 25,9855.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,792 15,943 16,025

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 49,060 49,667 49,9925.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 30,365 30,668 30,831

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 66,987 67,866 68,0425.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 40,606 41,045 41,133

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 123,999 126,123 127,2615.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 76,009 77,071 77,639

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 60,801 61,828 62,3775.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 37,513 38,026 38,301

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 36,363 37,043 37,4075.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 22,065 22,405 22,586

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 26,170 26,474 26,6365.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,907 16,059 16,140

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 39,675 40,282 40,6075.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 24,240 24,544 24,706

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 76,395 77,305 77,7935.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 46,383 46,838 47,082

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 55,900 56,507 56,8325.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 33,611 33,914 34,077

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 118,128 120,252 121,3905.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 71,495 72,557 73,126

5.47000000000002 REMATES LADRILLO PRENSADO ML 22,202 22,428 22,5495.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 27,783 28,521 28,917

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 47,081 48,066 48,5935.50 LAVADA DE FACHADA M2 4,032 4,032 4,032

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,662 39,930 40,2675.52 DOVELA, GROUTING 3000 PSI ML 7,666 7,666 7,666

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,256 10,256 10,2565.54 ANCLAJE 1/2" L=50CM UN 13,448 13,448 13,448

Page 51: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

5.55000000000003 ANCLAJE 5/8" L=70CM UN 18,910 18,910 18,9105.56 ANCLAJE 3/4" L=70CM UN 28,414 28,414 28,414

5.57000000000003 ANCLAJE 1" L= 70CM UN 3,945 4,307 4,382

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,935 11,935 11,9356.2 FILOS O DILATACIONES B/PLACA ML 4,361 4,588 4,7096.3 FILOS O DILATACIONES S/MURO ML 5,265 5,491 5,6126.4 GOTERA EN MORTERO 1:4 ML 6,409 6,636 6,7576.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,484 4,484 4,4846.6 MALLA BAJO ENTRAMADO M2 10,509 10,509 10,5096.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 18,728 19,446 19,8316.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,339 11,699 11,8916.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 16,550 17,187 17,528

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,014 10,333 10,5046.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 15,764 16,483 16,8676.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,621 9,981 10,1736.13 PAÑETE CULATAS 1:4, E=2 CM M2 16,550 17,187 17,5286.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,014 10,333 10,5046.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,264 16,776 17,0506.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,870 10,126 10,2646.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 13,738 14,224 14,4846.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,389 8,632 8,762

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,140 13,687 13,9806.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,090 8,363 8,510

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,143 17,780 18,1216.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,295 10,614 10,785

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,357 17,075 17,4606.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 9,903 10,262 10,454

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 13,605 14,152 14,4456.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,308 8,582 8,729

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,034 17,753 18,1376.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,549 10,908 11,101

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 21,103 22,013 22,5007.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 66,803 69,407 69,9467.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 41,814 41,814 41,8147.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,822 16,822 16,8227.5 ML 26,455 26,455 26,4557.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 62,395 62,395 62,3957.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 44,555 44,555 44,5557.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 26,601 26,601 26,6017.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 60,716 60,716 60,716

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 78,519 78,519 78,519

BAJANTE PVC AGUAS LLUVIAS D=4"

Page 52: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 102,278 102,278 102,2787.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 44,599 44,599 44,5997.13 CANAL PVC AMAZONAS ML 64,488 64,488 64,4887.14 CANAL PVC RAINGO ML 56,872 56,872 56,8727.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 91,001 91,001 91,0017.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 52,712 52,712 52,7127.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 43,223 43,223 43,2237.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 24,368 24,368 24,368

7.19000000000001 TEJA DE BARRO M2 46,433 47,565 48,1727.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 36,033 36,033 36,033

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 33,040 33,040 33,0407.22 TEJA FIBROCEMENTO Nº4 M2 27,738 27,738 27,738

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 26,958 26,958 26,9587.24 TEJA FIBROCEMENTO No. 8 M2 27,754 27,754 27,754

7.25000000000001 TEJA TERMOACÚSTICA M2 38,723 38,723 38,7237.26 TEJA PLÁSTICA No.6 M2 34,072 34,072 34,072

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 62,889 62,889 62,8897.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 114,800 114,800 114,800

7.29000000000001 TEJA SIN TRASLAPO M2 51,494 51,494 51,4947.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 32,520 32,520 32,520

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 25,793 25,793 25,793

7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 41,797 41,797 41,797

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 15,149 15,149 15,1497.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 18,231 18,231 18,231

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,835 20,835 20,8357.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 26,944 26,944 26,944

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,715 16,715 16,7157.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 39,275 39,275 39,275

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 235,461 235,461 235,4617.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 294,251 294,251 294,251

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 190,482 190,482 190,4827.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 275,715 275,715 275,715

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 381,435 434,965 446,0268.2 CONCRETO 3500 PSI M3 332,163 380,110 390,0638.3 CONCRETO 3000 PSI M3 325,738 374,200 384,2938.4 CONCRETO 2500 PSI M3 286,046 338,128 348,8918.5 CONCRETO 2000 PSI M3 265,592 317,129 327,8388.6 CONCRETO 1500 PSI M3 239,963 290,332 300,8838.7 MORTERO SECO 1:10 M3 175,619 206,866 223,6058.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 364,739 395,080 411,3348.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 327,323 361,534 379,861

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 387,299 419,294 436,435

Page 53: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 522,579 554,574 571,715

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 93,048 93,048 93,0489.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,750 2,977 3,0989.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 104,456 104,456 104,4569.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 127,724 127,724 127,7249.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 177,872 177,872 177,8729.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 198,728 198,728 198,7289.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 219,608 219,608 219,6089.8 HOJA PUERTA FORTEC 0.81 UN 156,003 156,003 156,0039.9 HOJA PUERTA FORTEC 0.91 UN 172,364 172,364 172,364

9.10 HOJA PUERTA FORTEC 1.50 UN 255,795 255,795 255,7959.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 96,490 96,490 96,4909.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 128,231 128,231 128,2319.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 142,081 142,081 142,0819.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 361,956 361,956 361,9569.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 31,549 31,549 31,5499.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,886 19,886 19,8869.17 VENTANERÍA EN MADERA CEDRO MACHO M2 73,457 73,457 73,4579.18 CERRADURA DE ENTRADA PRINCIPAL UN 92,661 92,661 92,6619.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 72,001 72,001 72,0019.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 22,371 22,371 22,3719.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 22,371 22,371 22,3719.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 21,216 21,216 21,2169.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 79,279 79,279 79,2799.24 ESPEJO BISELADO INCOLORO 4 MM M2 102,594 102,594 102,5949.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 46,638 46,638 46,6389.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 55,965 55,965 55,9659.27 VIDRIO TEMPLADO PULIDO 10 MM M2 226,429 226,429 226,4299.28 VIDRIO TEMPLADO PULIDO 8 MM M2 203,114 203,114 203,1149.29 VIDRIO TRANSPARENTE 3 MM M2 50,136 50,136 50,1369.30 VIDRIO TRANSPARENTE 4 MM M2 58,296 58,296 58,2969.31 VIDRIO TRANSPARENTE 5 MM M2 65,291 65,291 65,2919.32 VIDRIO TRANSPARENTE 6 MM M2 69,487 69,487 69,487

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 58,030 58,030 58,03010.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 170,231 170,231 170,23110.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML 84,666 84,666 84,66610.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 109,003 109,003 109,00310.5 MARCO TAPA CAJA DE INSPECCIÓN UN 105,159 105,159 105,15910.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 73,463 73,463 73,46310.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 156,516 156,516 156,51610.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 83,525 83,525 83,525

Page 54: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 5,013 5,013 5,013

10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 76,024 76,024 76,024

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 31,891 31,891 31,89110.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 411,921 411,921 411,92110.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 148,299 148,299 148,29910.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 162,590 162,590 162,59010.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 375,643 375,643 375,64310.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 97,116 97,116 97,11610.17 PUERTA CORTINA INCLUYE ESMALTE M2 300,414 300,414 300,41410.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,670 4,670 4,67010.19 VENTANA EN ALUMINIO CORREDIZA M2 211,365 211,365 211,36510.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 93,021 93,021 93,02110.21 REJILLA PISO 0.30 M M2 66,510 66,510 66,51010.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 68,024 68,024 68,024

10.23 KG 7,683 7,683 7,683

10.24 KG 8,552 8,552 8,552

10.25 KG 6,659 6,659 6,659

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 172,046 172,046 172,04611.2 ACOMETIDA EN PVC 3/4" 5M UN 205,778 205,778 205,77811.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,822 16,822 16,82211.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 26,455 26,455 26,45511.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 25,490 25,490 25,49011.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 32,660 32,660 32,66011.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 67,276 67,276 67,27611.8 CONEXIÓN TANQUE ELEVADO PVC UN 172,087 172,087 172,08711.9 INSTALACIÓN APARATO SANITARIO UN 33,424 33,424 33,424

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 24,194 24,194 24,19411.13 NIPLE PASAMURO 2" UN 51,276 51,276 51,27611.14 NIPLE PASAMURO 4" UN 76,733 76,733 76,73311.15 PUNTO AGUA CALIENTE CPVC UN 64,269 64,269 64,26911.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 46,639 46,639 46,63911.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 49,567 49,567 49,56711.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 62,600 62,600 62,600

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 55: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 50,016 50,016 50,01611.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 62,577 62,577 62,57711.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 66,952 66,952 66,95211.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 56,456 56,456 56,45611.23 RED SUMINISTRO CPVC 1/2" ML 9,535 9,535 9,53511.24 RED SUMINISTRO CPVC 3/4" ML 13,423 13,423 13,42311.25 RED SUMINISTRO PVC 1 1/2" ML 17,236 17,236 17,23611.26 RED SUMINISTRO PVC 1" ML 10,642 10,642 10,64211.27 RED SUMINISTRO PVC 1/2" ML 6,378 6,378 6,37811.28 RED SUMINISTRO PVC 2 1/2" ML 43,681 43,681 43,68111.29 RED SUMINISTRO PVC 2" ML 25,011 25,011 25,01111.30 RED SUMINISTRO PVC 3/4" ML 7,979 7,979 7,97911.31 RED SANITARIA PVC-S 2" ML 18,944 18,944 18,94411.32 RED SANITARIA PVC-S 3" ML 26,312 26,312 26,31211.33 RED SANITARIA PVC-S 4" ML 35,644 35,644 35,64411.34 RED SANITARIA PVC-S 6" ML 66,918 66,918 66,91811.35 REGISTRO 1" UN 87,047 87,047 87,04711.36 REGISTRO 1/2" UN 49,791 49,791 49,79111.37 REGISTRO 3/4" UN 61,117 61,117 61,11711.38 REGISTRO 1 1/2" UN 113,871 113,871 113,87111.39 REGISTRO 2 1/2" UN 295,005 295,005 295,00511.40 REGISTRO 2" UN 219,623 219,623 219,62311.41 REVENTILACIÓN 2" ML 13,197 13,197 13,19711.42 REVENTILACIÓN 3" ML 16,675 16,675 16,67511.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 132,255 132,255 132,25511.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 215,198 215,198 215,19811.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 354,537 354,537 354,53711.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 36,145 36,145 36,14511.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 41,969 41,969 41,96911.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 68,720 68,720 68,72011.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 54,882 54,882 54,88211.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 78,142 78,142 78,14211.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 81,247 81,247 81,24711.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 185,172 185,172 185,17211.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 36,508 36,508 36,50811.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 36,658 36,658 36,65811.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 29,937 29,937 29,93711.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 33,951 33,951 33,95111.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 3,088 3,088 3,08811.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,816 4,816 4,81611.59 GABINETE TIPO III UN 1,075,901 1,075,901 1,075,90111.60 GABINETE TIPO I UN 847,599 847,599 847,59911.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,346,009 1,346,009 1,346,00911.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,285,760 1,285,760 1,285,76011.63 VÁLVULA MARIPOSA 3" UN 695,188 695,188 695,188

Page 56: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

11.64 VÁLVULA MARIPOSA 4" UN 794,357 794,357 794,35711.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 343,791 343,791 343,791

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 237,140 237,140 237,14012.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 34,447 34,447 34,44712.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 42,540 42,540 42,54012.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 46,119 46,119 46,11912.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 56,403 56,403 56,40312.6 SALIDA TELÉFONO PVC COMPLETA UN 37,611 37,611 37,61112.7 SALIDA TIMBRE PVC COMPLETA UN 37,617 37,617 37,61712.8 STRIP TELEFÓNICO 10 PARES UN 112,879 112,879 112,87912.9 SALIDA TOMA DOBLE PVC COMPLETA UN 32,542 32,542 32,542

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 76,674 76,674 76,67412.11 SALIDA T.V PVC COMPLETA. UN 50,461 50,461 50,46112.12 SALIDA BIFÁSICA C.N. UN 29,645 29,645 29,64512.13 TABLERO PARCIAL 4 CIRCUITOS UN 85,300 85,300 85,30012.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 351,125 351,125 351,12512.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 473,015 473,015 473,01512.16 TUBERÍA PVC CONDUIT 1/2" ML 2,749 2,749 2,74912.17 TUBERÍA PVC CONDUIT 3/4" ML 3,576 3,576 3,57612.18 TUBERÍA PVC CONDUIT 1" ML 5,506 5,506 5,50612.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,886 9,886 9,88612.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 190,192 190,192 190,19212.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 60,142 60,142 60,14212.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 81,564 81,564 81,56412.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 28,609 28,609 28,60912.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,093,198 1,093,198 1,093,19812.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 808,870 808,870 808,87012.26 POSTE METÁLICO 6M UN 1,020,893 1,020,893 1,020,89312.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 465,528 465,528 465,52812.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 79,910 79,910 79,91012.29 LUMINARIA 70W SODIO UN 205,849 205,849 205,84912.30 LUMINARIA 150W SODIO UN 242,783 242,783 242,78312.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,313,240 1,313,240 1,313,24012.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 966,980 966,980 966,980

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 34,160 35,391 36,05013.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 29,079 30,310 30,96913.3 ALISTADO PARA LISTÓN M2 11,210 11,456 11,58813.4 ALISTADO PISOS 1:3, E=0.04 M2 21,557 24,018 25,33613.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 61,987 64,449 65,76713.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,679 21,710 21,92413.7 CONCRETO BASE GRADAS 2500 PSI M2 46,017 51,225 52,302

Page 57: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 64,063 72,396 74,11813.9 MANTO FIBERGLASS 600X1 M2 23,306 23,306 23,306

13.10 PEGANTE MORTERO-CONCRETO M2 19,813 19,813 19,81313.11 PERMA PLY 2 CAPAS M2 20,473 20,473 20,47313.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 37,569 42,256 43,22513.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 44,083 49,812 50,99613.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 64,085 72,938 74,76813.15 TRITURADO FINO 1/2 M3 74,392 103,646 109,98413.16 TRITURADO GRUESO 3/4 M3 86,298 99,536 106,751

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,923 38,416 38,67914.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 23,281 23,527 23,65914.3 ADOQUÍN CONCRETO 6CM M2 49,228 50,458 51,11714.4 ADOQUÍN CONCRETO 8CM M2 59,028 60,258 60,91714.5 ADOQUÍN GRES PEATONAL M2 48,051 49,282 49,94114.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 53,693 54,186 54,44914.7 GRAVILLA PARA GRADAS ML 28,917 29,467 29,66514.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 107,785 110,000 111,18714.9 ACABADO EN GRAVILLA LAVADA M2 35,930 37,276 37,803

14.10 GUARDAESCOBA EN GRANITO ML 30,131 30,131 30,13114.11 GUARDAESCOBA EN GRAVILLA ML 7,795 8,345 8,54314.12 GUARDAESCOBA PVC CARAMELO ML 7,662 7,662 7,66214.13 GUARDAESCOBA PVC CEDRO ML 9,722 9,722 9,72214.14 GUARDAESCOBA PINO CARIBE ML 7,985 7,985 7,98514.15 GUARDAESCOBA CEDRO BLANCO ML 7,973 7,973 7,97314.16 GUARDAESCOBA EN MADERA SAPAN ML 12,724 12,724 12,72414.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,930 6,930 6,93014.18 LISTÓN M.H. AMARILLO M2 56,632 56,632 56,63214.19 PASO ESCALERA GRANITO ML 81,714 83,437 84,36014.20 PIRLANES ALUMINIO ML 5,785 5,785 5,78514.21 PIRLANES LADRILLO ML 24,748 25,200 25,44314.22 PISO VINILO TRÁFICO RESIDENCIAL M2 32,648 32,648 32,64814.23 PISO VINILO TRÁFICO PESADO M2 43,792 43,792 43,79214.24 PULIDA LACADA PISO MADERA M2 42,898 42,898 42,89814.25 TABLETA DE GRES 25X25 M2 37,725 38,217 38,48114.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 38,438 38,930 39,19414.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,265 8,265 8,26514.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,638 35,317 35,68114.29 JABONERA PORCELANA ACUARIO UN 14,830 14,830 14,83014.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN 103,548 103,548 103,54814.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,781 7,781 7,78114.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 16,313 16,313 16,31314.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,879 10,879 10,87914.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,342 10,342 10,342

Page 58: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

14.35 REMATES BOCEL ALUMINIO ML 6,482 6,482 6,48214.36 REMATES BOCEL PORCELANA ML 6,597 6,597 6,59714.37 TAPA REGISTRO 20X20 UN 15,265 15,265 15,26514.38 TAPA REGISTRO 6X6 UN 13,418 13,418 13,41814.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 15,120 15,120 15,12014.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 17,544 17,544 17,54414.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 49,052 49,544 49,80814.42 MEDIA CAÑA EN GRANITO ML 60,405 60,405 60,40514.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,381 26,381 26,38114.44 PINTURA ACRÍLICA PARA PISOS M2 10,745 10,745 10,74514.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 12,415 12,415 12,41514.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 87,186 87,186 87,186

15 CIELO RASO15.1 APLIQUE YESO ML 60,010 60,010 60,01015.2 ARMADURA MADERA Y MALLA M2 27,127 27,127 27,12715.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53,772 53,772 53,77215.4 CIELO RASO DURACUSTIC M2 53,075 53,075 53,07515.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 49,196 49,196 49,19615.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 69,922 69,922 69,92215.7 CORNISAS YESO ML 37,565 37,565 37,56515.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 77,996 77,996 77,99615.9 MALLA CON VENA M2 10,453 10,453 10,453

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 80,788 42,581 48,43116.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 82,624 116,053 123,295

16.10 M3 125,408 155,158 168,093

16.11 AFRIMADO (NORMA INVIAS 311) M3 94,913 47,444 58,85116.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 116,412 146,162 159,09716.13 BASE GRANULAR (NORMA INVIAS 330) M3 126,049 155,799 168,734

17 APARATOS SANITARIOS17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 229,218 229,218 229,218

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

Page 59: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 727,737 727,737 727,73717.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 410,485 410,485 410,48517.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 130,288 130,288 130,28817.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 162,282 162,282 162,28217.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 192,426 192,426 192,42617.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 298,526 298,526 298,52617.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 787,201 787,201 787,20117.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 244,307 244,307 244,307

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 116,033 116,033 116,03317.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 65,060 65,060 65,060

17.12 UN 194,159 194,159 194,159

17.13 UN 311,772 311,772 311,772

18 PINTURAS18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,527 4,527 4,52718.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,297 2,297 2,29718.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,543 8,543 8,54318.4 BARNIZ SOBRE MUEBLES M2 33,033 33,033 33,03318.5 CARBURO SOBRE PAÑETES M2 4,398 4,398 4,39818.6 COLORPLAST FACHADA SOBRE FACHADA M2 11,014 11,014 11,01418.7 DEMARCACIÓN CON MARMOLINA ML 2,732 2,732 2,73218.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,986 1,986 1,98618.9 ESMALTE SOBRE LÁMINA LLENA M2 10,256 10,256 10,256

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,092 3,092 3,09218.11 ESMALTE SOBRE MADERA LLENA M2 11,415 11,415 11,41518.12 ESMALTE SOBRE MARCOS LÁMINA M2 4,096 4,096 4,09618.13 ESMALTE SOBRE MARCOS MADERA M2 4,871 4,871 4,87118.14 ESTUCO M2 5,987 5,987 5,98718.15 ESTUCO (LINEAL) ML 3,675 3,675 3,67518.16 ESTUCO Y VINILO 3 MANOS M2 12,577 12,577 12,57718.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,719 7,719 7,71918.18 LACA PISOS MADERA M2 18,374 18,374 18,37418.19 LÍNEAS TRÁFICO 0.10 ML 2,124 2,124 2,12418.20 MARMOLINA SOBRE PAÑETE M2 9,113 9,113 9,11318.21 TINTILLA SOBRE MADERA LINEAL ML 2,655 2,655 2,65518.22 TINTILLA SOBRE MADERA LLENA M2 10,030 10,030 10,03018.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,483 5,483 5,48318.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,443 3,443 3,44318.25 WASH-PRIMER SOBRE ALUMNIO M2 16,991 16,991 16,99118.26 PINTURA EPÓXICA M2 10,320 10,320 10,32018.27 PINTURA EPÓXICA (LINEAL) ML 6,310 6,310 6,310

19 DOTACIONES DEPORTIVAS

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 60: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,964,137 3,964,137 3,964,137

19.2 UN 6,958,334 6,958,334 6,958,334

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 2,087,356 2,087,356 2,087,35619.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,849,898 5,849,898 5,849,89819.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,825,410 5,825,410 5,825,41019.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,124 2,124 2,12419.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 2,082,516 2,082,516 2,082,51619.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 66,828 66,828 66,82819.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,174,075 1,174,610 1,174,720

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 590,796 602,911 605,435

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,991 23,991 23,99120.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 35,742 35,742 35,74220.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 44,205 44,205 44,20520.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 26,053 26,053 26,05320.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 29,889 29,889 29,88920.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 43,763 43,763 43,76320.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 20,233 20,233 20,23320.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 21,352 21,352 21,35220.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 26,486 26,486 26,486

20.10 VÁLVULA DE BOLA GAS 1/2" UN 12,246 12,246 12,24620.11 VÁLVULA DE BOLA GAS 3/4" UN 19,177 19,177 19,17720.12 VÁLVULA DE BOLA GAS 1" UN 28,779 28,779 28,77920.13 VÁLVULA POLIETILENO GAS 1/2" UN 171,528 171,528 171,52820.14 VÁLVULA POLIETILENO GAS 3/4" UN 176,433 176,433 176,43320.15 VÁLVULA POLIETILENO GAS 1" UN 286,103 286,103 286,10320.16 ACOMETIDA GAS 1/2" ML 235,716 235,716 235,716

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 103,760 103,760 103,76021.2 CABLE DETECTOR LINEAL DE CALOR ML 26,055 26,055 26,05521.3 SIRENA DE 110 V UN 73,249 73,249 73,24921.4 CÁMARA CCTV UN 211,553 211,553 211,55321.5 PARLANTE-CIELO FALSO UN 41,452 41,452 41,45221.6 AMPLIFICADOR 100W UN 451,379 451,379 451,37921.7 AMPLIFICADOR 300W UN 1,124,154 1,124,154 1,124,15421.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,913 32,913 32,91321.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 179,745 179,745 179,745

21.10 TOMA PARA MICRÓFONO UN 34,913 34,913 34,91321.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,725 2,725 2,72521.12 SPLITERS UN 4,428 4,428 4,42821.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,459 14,459 14,45921.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 19,073 19,073 19,073

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 61: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 26,379 26,379 26,37921.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 99,947 99,947 99,94721.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 26,267 26,267 26,26721.18 BANDEJA PORTACABLES PARA RACK UN 86,342 86,342 86,34221.19 RACK 2' X 24" UN 135,128 135,128 135,12821.20 RACK 3' X 24" UN 165,137 165,137 165,13721.21 RACK 5' X 24" UN 260,978 260,978 260,97821.22 RACK 7' X 24" UN 339,464 339,464 339,46421.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 380,429 380,429 380,42921.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 227,550 227,550 227,55021.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 56,213 56,213 56,21321.26 PATCH CORD 2M CATEGORÍA 6A UN 5,865 5,865 5,86521.27 PATCH CORD 5M CATEGORÍA 6A UN 14,948 14,948 14,94821.28 CABLE UTP CATEGORÍA 6A ML 2,678 2,678 2,67821.29 CANALETA METÁLICA 4X6 CMS ML 26,958 26,958 26,95821.30 CANALETA METÁLICA 4X10 CMS ML 28,170 28,170 28,17021.31 CANALETA METÁLICA 6X10 CMS ML 28,775 28,775 28,77521.32 CANALETA PLÁSTICA 13X7 MM ML 15,926 15,926 15,92621.33 CANALETA PLÁSTICA 20X12 MM ML 17,879 17,879 17,87921.34 CANALETA PLÁSTICA 32X12 MM ML 17,804 17,804 17,80421.35 CANALETA PLÁSTICA 40X60 MM ML 28,792 28,792 28,79221.36 SWITCH 10/100/1000 24 PUERTOS UN 391,361 391,361 391,36121.37 SWITCH 10/100/1000 16 PUERTOS UN 247,063 247,063 247,06321.38 SWITCH 10/100/1000 8 PUERTOS UN 64,679 64,679 64,67921.39 CABLE TELEFÓNICO 2 PARES ML 1,403 1,403 1,40321.40 CABLE TELEFÓNICO 10 PARES ML 6,823 6,823 6,82321.41 CABLE TELEFÓNICO 20 PARES ML 9,175 9,175 9,17521.42 CABLE TELEFÓNICO 40 PARES ML 12,795 12,795 12,79521.43 CABLE TELEVISIÓN RG6 ML 1,709 1,709 1,70921.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,216 16,216 16,21621.45 ACOMETIDA TELEFÓNICA 1" ML 25,145 25,145 25,14521.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,558 13,558 13,55821.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 11,210 11,210 11,21021.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 510,211 510,211 510,211

Page 62: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 20,566 20,566 20,5661.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 68,680 68,680 68,6801.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 386,309 386,309 386,3091.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 824,482 824,482 824,4821.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 94,590 94,590 94,5901.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 575,657 575,657 575,6571.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,238,540 1,238,540 1,238,5401.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,988 9,988 9,9881.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 12,291 12,291 12,291

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 15,417 15,417 15,4171.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,850 16,850 16,8501.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 20,183 20,183 20,1831.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 20,183 20,183 20,1831.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 80,815 80,815 80,8151.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 93,615 93,615 93,6151.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 289,640 289,640 289,6401.17 TEE PVC UNIÓN MECÁNICA 2" UN 108,744 108,744 108,7441.18 TEE PVC UNIÓN MECÁNICA 4" UN 179,245 179,245 179,2451.19 TEE PVC UNIÓN MECÁNICA 8" UN 792,971 792,971 792,9711.20 TEE PVC UNIÓN MECÁNICA 10" UN 913,538 913,538 913,5381.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 10,441 10,441 10,4411.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 9,241 9,241 9,2411.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 22,294 22,294 22,2941.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 89,011 89,011 89,0111.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 132,155 132,155 132,1551.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 21,794 21,794 21,7941.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 74,751 74,751 74,7511.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 110,381 110,381 110,3811.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 22,882 22,882 22,8821.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 47,105 47,105 47,1051.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 189,467 189,467 189,4671.32 UNIÓN REPARACION PVC 4" UN 54,952 54,952 54,9521.33 UNIÓN REPARACIÓN PVC 8" UN 220,405 220,405 220,4051.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 132,442 132,442 132,4421.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 376,137 376,137 376,1371.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,111,659 1,111,659 1,111,6591.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,642,674 1,642,674 1,642,674

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,255 8,255 8,2552.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,924 18,924 18,9242.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592

Page 63: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

2.4 RELLENO TIPO 1 "GRAVILLA" M3 71,723 103,632 110,5452.5 RELLENO TIPO 2 "RECEBO" M3 77,608 39,401 45,2512.6 RELLENO TIPO 4 "SUBBASE B-200" M3 96,133 48,664 60,0712.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 64,305 93,799 100,9732.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 50,245 86,533 93,8462.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 42,473 71,909 87,678

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 86,138 86,138 86,1383.2 CODO 45 PVC ALCANTARILLADO 16" UN 899,470 899,470 899,4703.3 CODO 90 PVC ALCANTARILLADO 8" UN 112,626 112,626 112,6263.4 CODO 90 PVC ALCANTARILLADO 16" UN 1,041,503 1,041,503 1,041,5033.5 CODO 90 PVC ALCANTARILLADO 24" UN 725,571 725,571 725,5713.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,574 58,574 58,5743.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 85,839 85,839 85,8393.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 202,511 202,511 202,5113.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 202,510 202,510 202,510

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 325,133 325,133 325,1333.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 85,840 85,840 85,8403.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 85,839 85,839 85,8393.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 202,511 202,511 202,5113.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 202,511 202,511 202,5113.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 325,135 325,135 325,1353.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 297,234 297,234 297,2343.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 477,887 477,887 477,8873.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 763,738 763,738 763,7383.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 47,690 47,690 47,6903.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 250,241 250,241 250,2413.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 273,574 273,574 273,5743.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 800,909 800,909 800,9093.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 44,638 44,941 45,1043.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 227,146 227,146 227,1463.25 TUBERÍA PVC ALCANTARILLADO 8" ML 37,617 37,617 37,6173.26 TUBERÍA PVC ALCANTARILLADO 10" ML 53,172 53,172 53,1723.27 TUBERÍA PVC ALCANTARILLADO 12" ML 76,704 76,704 76,7043.28 TUBERÍA PVC ALCANTARILLADO 16" ML 117,696 117,696 117,6963.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 189,083 189,083 189,0833.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 276,768 276,768 276,7683.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 349,585 349,585 349,5853.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 459,369 459,369 459,3693.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 630,679 630,679 630,679

4 ALCANTARILLADO - SUMIDEROS Y POZOS4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 528,743 557,820 563,876

Page 64: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML 504,314 519,991 528,391

4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 527,099 546,484 550,5214.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 629,053 665,400 672,970

4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML 717,602 739,678 751,506

4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 615,405 642,059 647,610

4.7 SUMIDERO EN LADRILLO SL-100 UN 735,857 748,404 752,7594.8 SUMIDERO EN LADRILLO SL-250 UN 1,083,537 1,122,210 1,133,1244.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,552,995 1,631,615 1,647,937

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,083,128 2,213,819 2,240,9504.11 SUMIDERO PREFABRICADO SL-100 UN 1,008,704 1,008,704 1,008,7044.12 SUMIDERO PREFABRICADO SL-250 UN 2,372,747 2,372,747 2,372,747

4.13 UN 104,249 104,889 105,232

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 43,798 45,383 46,2325.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 50,974 52,559 53,4085.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 44,538 50,006 51,1365.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 48,705 53,794 54,8535.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 49,380 54,414 55,4595.6 BORDE SEPARADOR VERDE A-170 ML 205,061 205,701 206,0445.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,387 15,043 15,1795.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 31,950 35,804 36,6015.9 CAÑUELA PREFABRICADA TIPO A-120 ML 66,479 66,821 67,004

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 445,220 454,338 458,2535.11 LOSETA PREFABRICADA A-40 M2 46,562 48,026 48,8115.12 LOSETA PREFABRICADA A-60 M2 68,012 69,476 70,2615.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 26,706 28,741 29,1655.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 43,202 47,321 48,1795.15 SARDINEL PREFABRICADO A-10 ML 82,209 87,128 89,3015.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 45,556 46,442 46,917

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 117,649 120,073 120,5776.2 BANCA EN CONCRETO M-30 UN 501,969 505,361 506,0686.3 BOLARDO M-63 ALTO/HIERRO UN 181,367 181,882 181,9896.4 BOLARDO M-60 CONCRETO UN 113,598 116,506 117,1126.5 BOLARDO M-61 BAJO/CONCRETO UN 115,021 117,929 118,5346.6 BOLARDO M-62 BAJO/HIERRO UN 160,867 163,959 164,6016.7 BORDE CONTENEDOR DE RAICES A-70 ML 46,215 47,429 48,0796.8 BORDILLO PREFABRICADO A-80 ML 53,404 54,763 55,4906.9 CANECA M-120 UN 253,242 253,545 253,708

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 65: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 662,050 663,504 663,8076.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,533,494 2,534,463 2,534,6656.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,984,694 2,985,663 2,985,8656.13 CICLOPARQUEADERO M100 TIPO 1 UN 416,084 417,115 417,3296.14 CICLOPARQUEADERO M101 TIPO 2 UN 550,339 554,462 555,3196.15 BANCA EN MADERA M-50 UN 376,888 376,888 376,8886.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 188,247 189,701 190,0036.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 452,853 453,611 454,0186.18 POSTE HISTÓRICO M-131 UN 3,819,468 3,826,737 3,828,251

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,528 1,528 1,5287.2 MARCA VIAL CON PINTURA EN FRÍO M2 15,164 15,164 15,1647.3 SEÑAL DOBLE DE CICLORUTA UN 386,469 386,789 386,9607.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 445,072 447,134 447,5627.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 258,099 258,419 258,5917.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 304,290 304,610 304,7827.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 418,764 419,084 419,2567.8 TACHAS REFLECTIVAS UN 10,855 10,855 10,8557.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 11,462 11,462 11,462

7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN 44,349 44,349 44,349

Page 66: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085

1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 33,343 33,343 33,343

1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656

1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,472 7,4722.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 29,278 29,278 29,2782.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 6,753 6,753 6,7532.4 220.1 TERRAPLENES M3 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341 341

2.8 230.2 M3 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449

2.10 600.2 M3 47,874 47,874 47,874

2.11 600.3 M3 59,020 59,020 59,020

2.12 600.4 M3 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 116,412 146,162 159,0973.3 330.1 BASE GRANULAR M3 126,049 155,799 168,734

3.4 365.1 M3 72,536 72,536 72,536

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

Page 67: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,205 2,205 2,2053.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,100 1,100 1,1003.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 159,629 168,764 170,7183.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 56,134 58,496 59,5923.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 432,417 474,704 507,0423.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 464,667 506,954 539,2923.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 490,928 533,216 565,5533.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 480,167 522,454 554,7923.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 230,192 259,942 272,8773.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 219,631 249,381 262,3163.15 311.1 AFIRMADO M3 94,913 47,444 58,8513.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 12,033 12,641 12,7733.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,985 5,289 5,355

3.18 500.1 M3 513,435 561,901 571,916

3.19 500.1 M3 541,420 592,056 602,519

3.20 500.1 M3 559,804 612,042 622,831

3.21 *** ML 5,940 5,940 5,940

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 68,185 106,201 113,862

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 857,869 912,845 924,2064.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 755,554 809,619 820,7914.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 791,706 847,913 859,5274.4 630 P CONCRETOS f´c =3500 psi (bases) M3 478,317 526,744 536,7964.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 566,976 617,321 627,7714.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 471,828 520,775 530,9694.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 560,230 611,115 621,7134.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 699,300 748,247 758,4414.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 486,694 537,580 548,1774.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 733,224 784,109 794,7074.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 8,583 8,583 8,5834.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG 11,643 11,643 11,6434.13 641.1 ACERO DE PREESFUERZO TON-M 1,275 1,275 1,275

4.14 621.1 ML 2,031,782 2,031,782 2,031,782

4.15 621.1 P ML 3,181,746 3,275,784 3,295,217

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,080,755 1,129,217 1,139,3104.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 73,419 73,419 73,4194.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 271,079 276,894 278,1054.19 632 P BARANDA METÁLICA ML 312,240 312,240 312,2404.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,849 12,849 12,849

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

Page 68: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 392,745 417,177 435,2834.22 673.1 MATERIAL GRANULAR FILTRANTE M3 71,567 103,065 110,7274.23 610.1 RELLENO PARA ESTRUCTURAS M3 71,691 36,423 41,8234.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 303,067 355,120 365,9364.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 295,164 339,911 349,1224.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 319,806 364,552 373,7644.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 307,437 352,510 361,7544.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 332,079 377,152 386,3964.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 427,065 479,668 490,5384.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 513,879 568,565 579,8664.31 681.1 GAVIÓN M3 140,562 176,850 184,1634.32 681.1 GAVIÓN MALLA PVC M3 147,545 183,833 191,1464.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 33,259 36,488 37,1564.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 13,012 14,627 14,9604.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 8,453 8,453 8,453

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 12,145 12,145 12,145

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 16,423 16,423 16,423

4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 19,732 19,732 19,732

4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 25,402 25,402 25,402

4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,813 5,813 5,813

4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,637 6,637 6,637

4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,898 6,898 6,898

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,889 5,889 5,889

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 7,546 7,546 7,546

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,515 5,515 5,515

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 7,443 7,443 7,443

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 12,815 12,815 12,815

4.48 661.1 ML 331,659 332,547 332,725

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML 274,305 285,252 287,7364.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML 658,884 658,884 658,8844.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 142,403 96,759 107,7284.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,430 3,430 3,4304.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 52,705 52,705 52,7054.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 84,960 84,960 84,9604.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 417,697 472,383 483,684

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

Page 69: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Puerto_Salgar Guaduas Caparrapí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: BAJO MAGDALENA

4.56 682.1 P COLCHONETA RENO M3 156,494 192,782 200,0954.57 *** TRINCHO EN MADERA M2 50,354 50,354 50,354

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,528 1,528 1,5285.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 15,164 15,164 15,1645.3 730.3 TOPE DEFENSA METÁLICA UN 71,428 71,428 71,4285.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 71,428 71,428 71,4285.5 730.1 DEFENSA METÁLICA ML 181,315 183,848 184,3765.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 10,855 10,855 10,855

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 575 575 575

6.2 801.6 UN 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,2866.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,652 12,652 12,6526.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 34,443 34,443 34,4436.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 6,075 6,075 6,075

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 70: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,535,629 1,551,604 1,529,695 1,538,943 1,531,315 1,527,078 1,523,762 1,525,883 1,543,935 1,538,944 1,552,010 1,520,6551.2 CAMPAMENTO 9 M2 UN 891,701 899,688 888,734 893,358 889,544 887,425 885,767 886,828 895,854 893,358 899,891 884,2141.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,248 10,248 10,248 10,248 10,248 10,248 10,248 10,248 10,248 10,248 10,248 10,2481.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,541 11,541 11,541 11,541 11,541 11,541 11,541 11,541 11,541 11,541 11,541 11,5411.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,418 13,418 13,418 13,418 13,418 13,418 13,418 13,418 13,418 13,418 13,418 13,4181.6 CERCA EN TABLA H=2.30 M ML 49,505 49,505 49,505 49,505 49,505 49,505 49,505 49,505 49,505 49,505 49,505 49,5051.7 CERCA EN TEJA DE ZINC H=1.80 M ML 35,751 35,944 35,686 35,815 35,719 35,690 35,621 35,666 35,841 35,819 35,958 35,6151.8 CERCA EN TELA VERDE H = 2.10 M ML 16,053 16,246 15,988 16,117 16,021 15,992 15,923 15,968 16,143 16,121 16,260 15,9171.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 631,516 633,754 629,974 631,168 629,912 628,918 628,149 628,776 630,345 631,105 632,307 628,166

1.41 M2 7,344 7,344 7,344 7,344 7,344 7,344 7,344 7,344 7,344 7,344 7,344 7,344

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329 2,329

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE PRESICIÓN

Page 71: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,160,311 1,160,311 1,160,311 1,160,311 1,160,311 1,160,311 1,160,311 1,160,311 1,160,311 1,160,311 1,160,311 1,160,3111.44 RED TELEFÓNICA PROVISIONAL UN 165,478 165,478 165,478 165,478 165,478 165,478 165,478 165,478 165,478 165,478 165,478 165,478

1.45 M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 77,756 81,637 66,115 64,821 60,941 51,886 43,265 53,180 49,732 63,528 60,080 51,8862.2 BASE ARENA CEMENTO 1:20 M3 194,205 225,832 187,694 200,714 200,714 207,597 181,185 198,458 203,319 220,617 232,378 196,8212.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,624 4,624 4,624 4,624 4,624 4,624 4,624 4,624 4,624 4,624 4,624 4,6242.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 543,346 561,782 537,009 548,851 539,834 536,430 530,671 534,393 552,219 549,105 562,811 529,2132.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 557,805 577,811 551,230 564,774 554,862 552,050 544,655 549,447 567,010 565,200 579,258 544,3332.8 ZAPATAS EN CONCRETO 3500 PSI M3 521,853 540,585 515,696 528,378 519,096 516,464 509,539 514,027 530,472 528,777 541,941 509,2382.9 PILOTE DE MADERA D=20 CM ML 36,421 36,421 36,421 36,421 36,421 36,421 36,421 36,421 36,421 36,421 36,421 36,421

2.10 ML 111,102 111,102 111,102 111,102 111,102 111,102 111,102 111,102 111,102 111,102 111,102 111,102

2.11 ML 134,327 134,327 134,327 134,327 134,327 134,327 134,327 134,327 134,327 134,327 134,327 134,327

2.12 ML 162,414 162,414 162,414 162,414 162,414 162,414 162,414 162,414 162,414 162,414 162,414 162,414

2.13 ML 200,223 200,223 200,223 200,223 200,223 200,223 200,223 200,223 200,223 200,223 200,223 200,223

2.14 PILOTE HINCADO 25X25 ML 92,830 94,281 92,381 93,428 92,697 92,576 91,932 92,350 93,458 93,473 94,417 92,0262.15 PILOTE HINCADO 30X30 ML 113,668 115,771 113,018 114,535 113,476 113,299 112,367 112,973 114,579 114,600 115,968 112,5042.16 DADOS EN CONCRETO 3500PSI M3 511,076 529,809 504,920 517,602 508,320 505,688 498,763 503,251 519,696 518,001 531,165 498,462

2.17 ML 119,308 119,308 119,308 119,308 119,308 119,308 119,308 119,308 119,308 119,308 119,308 119,308

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 28,546 28,742 28,505 28,586 28,586 28,629 28,465 28,572 28,603 28,710 28,783 28,5623.2 SIFÓN EN PVC 6" UN 145,818 146,014 145,777 145,858 145,858 145,901 145,737 145,844 145,874 145,982 146,055 145,8343.3 CAJA DE INSPECCIÓN DE 100X100 UN 379,382 390,308 369,361 372,001 367,945 361,526 356,983 361,009 365,783 374,135 378,033 358,3303.4 CAJA DE INSPECCIÓN DE 40X40 UN 184,312 186,848 182,860 183,644 182,891 181,901 181,209 181,746 184,014 184,178 185,846 180,9793.5 CAJA DE INSPECCIÓN DE 60X60 UN 209,013 213,542 206,660 208,139 207,009 205,689 203,995 205,236 208,645 209,410 212,124 204,0703.6 CAJA DE INSPECCIÓN DE 80X80 UN 279,540 287,036 276,230 278,826 277,152 275,470 272,608 274,606 280,512 281,104 285,854 272,7103.7 DUCTO ELÉCTRICO PVC 4" ML 75,504 75,534 75,415 75,405 75,375 75,305 75,297 75,315 75,297 75,395 75,376 75,3053.8 POZO SÉPTICO ETERNIT 1000 LT UN 968,574 968,872 967,678 967,579 967,280 966,584 966,499 966,683 966,499 967,479 967,295 966,5843.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 88,375 90,546 87,929 88,822 88,822 89,295 87,482 88,667 89,001 90,188 90,995 88,555

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 51,142 52,288 50,907 51,378 51,378 51,627 50,671 51,296 51,472 52,099 52,525 51,2373.11 TUBERÍA DRENAJE PVC 110 ML 21,482 21,659 21,373 21,374 21,308 21,132 21,263 21,176 21,636 21,352 21,615 21,0443.12 TUBERÍA DRENAJE PVC 160 ML 32,243 32,420 32,133 32,134 32,068 31,892 32,023 31,936 32,397 32,112 32,376 31,8043.13 TUBERÍA DRENAJE PVC 200 ML 44,270 44,517 44,116 44,117 44,025 43,779 43,962 43,841 44,485 44,087 44,456 43,6563.14 TUBERÍA DRENAJE PVC 250 ML 59,949 60,232 59,773 59,775 59,670 59,388 59,598 59,459 60,195 59,740 60,162 59,2483.15 TUBERÍA DRENAJE PVC 315 ML 81,972 82,219 81,818 81,819 81,727 81,481 81,664 81,542 82,187 81,788 82,158 81,358

RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE)

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 72: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

3.16 UN 753,377 756,207 751,619 751,636 750,581 747,768 749,861 748,471 755,838 751,284 755,503 746,362

3.17 UN 1,077,902 1,083,561 1,074,386 1,074,420 1,072,310 1,066,685 1,070,870 1,068,091 1,082,825 1,073,717 1,082,155 1,063,872

3.18 UN 1,431,054 1,442,372 1,424,022 1,424,089 1,419,870 1,408,618 1,416,990 1,411,431 1,440,898 1,422,682 1,439,559 1,402,993

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 28,100 28,100 28,100 28,100 28,100 28,100 28,100 28,100 28,100 28,100 28,100 28,1004.2 CASETÓN DE LONA 0.80X0.70 M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9624.3 COLUMNAS 3500 PSI M3 665,030 683,763 658,874 671,555 662,274 659,641 652,717 657,204 673,649 671,955 685,118 652,4164.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 242,424 256,142 236,335 242,156 235,791 229,971 230,247 229,610 250,948 241,731 255,560 225,655

4.5 M2 79,823 81,642 79,226 80,457 79,556 79,300 78,628 79,064 80,660 80,496 81,774 78,599

4.6 M2 94,140 96,323 93,423 94,901 93,819 93,513 92,706 93,229 95,145 94,947 96,481 92,671

4.7 M2 106,809 109,718 105,852 107,822 106,380 105,971 104,896 105,593 108,147 107,884 109,929 104,849

4.8 M2 112,792 115,884 111,776 113,869 112,337 111,903 110,760 111,501 114,215 113,935 116,108 110,710

4.9 M2 130,358 134,177 129,103 131,688 129,796 129,259 127,847 128,762 132,115 131,770 134,454 127,786

4.10 M2 145,489 149,854 144,054 147,009 144,846 144,233 142,620 143,665 147,497 147,102 150,169 142,549

4.11 M2 161,832 166,742 160,218 163,542 161,109 160,419 158,604 159,781 164,091 163,647 167,098 158,525

4.12 ENTREPISO VIGUETA PLACA M2 74,920 75,312 74,814 75,017 74,930 74,943 74,709 74,862 75,067 75,154 75,366 74,8004.13 ESCALERA MACIZA 3500 PSI M3 774,018 792,751 767,862 780,543 771,262 768,629 761,704 766,192 782,637 780,943 794,106 761,4044.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 70,395 70,822 70,307 70,716 70,483 70,576 70,219 70,452 70,518 70,751 70,910 70,4314.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 65,316 67,189 64,700 65,968 65,040 64,777 64,084 64,533 66,178 66,008 67,324 64,0544.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 74,399 76,691 73,646 75,198 74,062 73,740 72,893 73,442 75,454 75,247 76,857 72,8564.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 87,639 90,513 86,695 88,640 87,216 86,813 85,750 86,439 88,961 88,702 90,721 85,704

4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 599,762 618,495 593,606 606,287 597,006 594,373 587,448 591,936 608,381 606,687 619,850 587,148

4.19 UN 39,331 39,945 39,142 39,585 39,275 39,224 38,952 39,129 39,597 39,604 40,003 38,992

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 239,335 247,701 236,586 242,249 238,104 236,929 233,836 235,840 243,185 242,428 248,307 233,7024.21 ACERO FIGURADO 37000 PSI KG 3,178 3,178 3,178 3,178 3,178 3,178 3,178 3,178 3,178 3,178 3,178 3,1784.22 ACERO FIGURADO 60000 PSI KG 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,3024.23 REFUERZO MALLA ELECTROSOLDADA KG 4,537 4,537 4,537 4,537 4,537 4,537 4,537 4,537 4,537 4,537 4,537 4,5374.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 703,310 722,043 697,154 709,835 700,554 697,921 690,996 695,484 711,929 710,235 723,398 690,6964.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 655,963 676,441 649,225 663,070 652,927 650,026 642,486 647,373 665,396 663,503 677,914 642,1254.26 VIGA AÉREA 3500 PSI M3 703,361 722,094 697,205 709,886 700,605 697,972 691,048 695,535 711,980 710,286 723,449 690,7474.27 VIGA CINTA 3500 PSI M3 688,024 706,757 681,868 694,549 685,268 682,635 675,711 680,198 696,643 694,949 708,112 675,4104.28 VIGA CANAL EN CONCRETO 3500 PSI M3 847,179 865,911 841,022 853,704 844,422 841,790 834,865 839,353 855,798 854,103 867,267 834,564

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO)

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO)

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO)

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO)

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO)

PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M)

Page 73: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

4.29 BASE EN CONCRETO POBRE 1500 PSI M3 301,194 319,477 294,403 304,988 296,257 291,408 287,614 290,041 310,700 304,989 319,942 284,058

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 23,928 24,534 23,761 24,137 23,931 23,940 23,594 23,819 24,162 24,274 24,613 23,7185.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 39,494 40,100 39,327 39,703 39,497 39,506 39,160 39,385 39,728 39,840 40,179 39,2845.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 25,057 25,254 25,017 25,098 25,098 25,140 24,976 25,084 25,114 25,221 25,294 25,0735.4 ARCOS EN LADRILLO PRENSADO ML 120,644 121,037 120,563 120,725 120,725 120,810 120,482 120,697 120,757 120,972 121,118 120,6765.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 35,316 35,930 35,127 35,570 35,260 35,209 34,937 35,114 35,582 35,589 35,988 34,9775.6 DINTELES EN BLOQUE 0.15 M ML 20,121 20,548 20,033 20,442 20,209 20,302 19,945 20,178 20,244 20,478 20,636 20,1575.7 ENCHAPES LADRILLO PRENSADO M2 68,405 69,190 68,243 68,566 68,566 68,737 68,081 68,510 68,631 69,061 69,353 68,470

5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 74,235 76,282 73,602 75,079 74,048 73,876 72,969 73,559 75,121 75,142 76,473 73,102

5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,926 53,926 53,926 53,926 53,926 53,926 53,926 53,926 53,926 53,926 53,926 53,9265.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,998 32,998 32,998 32,998 32,998 32,998 32,998 32,998 32,998 32,998 32,998 32,9985.11 MURO DRYWALL DOBLE CARA 0.10 M M2 52,248 52,248 52,248 52,248 52,248 52,248 52,248 52,248 52,248 52,248 52,248 52,2485.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 32,159 32,159 32,159 32,159 32,159 32,159 32,159 32,159 32,159 32,159 32,159 32,1595.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 65,545 65,545 65,545 65,545 65,545 65,545 65,545 65,545 65,545 65,545 65,545 65,5455.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,814 39,814 39,814 39,814 39,814 39,814 39,814 39,814 39,814 39,814 39,814 39,8145.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 67,107 67,107 67,107 67,107 67,107 67,107 67,107 67,107 67,107 67,107 67,107 67,1075.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 40,595 40,595 40,595 40,595 40,595 40,595 40,595 40,595 40,595 40,595 40,595 40,5955.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,760 28,155 27,679 27,841 27,841 27,927 27,597 27,813 27,874 28,090 28,236 27,7935.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 17,165 17,363 17,125 17,206 17,206 17,249 17,084 17,192 17,222 17,330 17,404 17,1825.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 38,441 38,704 38,387 38,495 38,495 38,553 38,333 38,476 38,517 38,661 38,759 38,4635.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 23,317 23,449 23,290 23,345 23,345 23,373 23,263 23,335 23,355 23,427 23,476 23,3285.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 45,257 45,520 45,203 45,311 45,311 45,368 45,148 45,292 45,333 45,477 45,574 45,2785.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 27,238 27,370 27,211 27,265 27,265 27,294 27,184 27,256 27,276 27,348 27,397 27,2495.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 82,692 84,008 82,421 82,963 82,963 83,249 82,150 82,869 83,071 83,791 84,280 82,8015.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 48,261 48,919 48,125 48,396 48,396 48,539 47,990 48,349 48,450 48,810 49,055 48,3155.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 25,499 25,762 25,445 25,553 25,553 25,611 25,391 25,534 25,575 25,719 25,817 25,5215.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,781 15,913 15,754 15,808 15,808 15,837 15,727 15,799 15,819 15,891 15,940 15,7925.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 48,932 49,458 48,823 49,040 49,040 49,155 48,715 49,003 49,084 49,371 49,567 48,9755.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 30,301 30,564 30,247 30,355 30,355 30,412 30,192 30,336 30,377 30,521 30,618 30,3235.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 65,430 65,857 65,342 65,752 65,518 65,611 65,254 65,488 65,553 65,787 65,946 65,4665.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,827 40,041 39,783 39,988 39,871 39,918 39,740 39,856 39,889 40,006 40,085 39,8455.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 123,947 125,789 123,567 124,326 124,326 124,727 123,188 124,195 124,478 125,486 126,171 124,099

5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 75,982 76,904 75,793 76,172 76,172 76,373 75,603 76,106 76,248 76,752 77,094 76,059

5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 60,846 61,737 60,663 61,029 61,029 61,223 60,480 60,966 61,103 61,590 61,921 60,920

5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 37,535 37,981 37,444 37,627 37,627 37,724 37,352 37,595 37,664 37,907 38,073 37,572

5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 36,607 37,196 36,486 36,728 36,728 36,856 36,364 36,686 36,777 37,099 37,318 36,6565.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 22,187 22,481 22,126 22,247 22,247 22,311 22,065 22,226 22,271 22,433 22,542 22,2115.37 MURO TOLETE COMÚN 0.06 M M2 26,075 26,338 26,021 26,129 26,129 26,186 25,966 26,110 26,151 26,295 26,392 26,0975.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,860 15,991 15,833 15,887 15,887 15,915 15,806 15,877 15,898 15,970 16,019 15,8715.39 MURO TOLETE COMÚN 0.12 M M2 39,596 40,122 39,488 39,704 39,704 39,819 39,379 39,667 39,748 40,036 40,231 39,639

Page 74: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 24,201 24,464 24,147 24,255 24,255 24,312 24,092 24,236 24,277 24,421 24,518 24,2235.41 MURO TOLETE COMÚN 0.25 M M2 75,637 76,427 75,474 75,799 75,799 75,971 75,312 75,743 75,865 76,296 76,590 75,7025.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 46,004 46,399 45,923 46,086 46,086 46,172 45,842 46,058 46,118 46,334 46,481 46,037

5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 55,294 55,820 55,186 55,402 55,402 55,517 55,077 55,365 55,446 55,734 55,929 55,337

5.44 ML 33,290 33,554 33,236 33,344 33,344 33,402 33,182 33,326 33,366 33,510 33,608 33,312

5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 118,276 120,119 117,897 118,655 118,655 119,056 117,517 118,524 118,807 119,815 120,500 118,428

5.46 ML 71,544 72,465 71,354 71,733 71,733 71,934 71,165 71,668 71,809 72,313 72,656 71,620

5.47 REMATES LADRILLO PRENSADO ML 22,114 22,311 22,074 22,155 22,155 22,198 22,034 22,141 22,171 22,279 22,352 22,1315.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 28,437 29,078 28,305 28,569 28,569 28,709 28,174 28,523 28,622 28,972 29,210 28,4905.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 47,702 48,556 47,527 47,878 47,878 48,064 47,351 47,817 47,948 48,416 48,733 47,7735.50 LAVADA DE FACHADA M2 4,010 4,010 4,010 4,010 4,010 4,010 4,010 4,010 4,010 4,010 4,010 4,0105.51 PASAMANOS EN CONCRETO 2500 PSI ML 39,664 40,270 39,497 39,873 39,667 39,675 39,330 39,555 39,898 40,009 40,349 39,4535.52 DOVELA, GROUTING 3000 PSI ML 7,627 7,627 7,627 7,627 7,627 7,627 7,627 7,627 7,627 7,627 7,627 7,6275.53 ANCLAJE 3/8" L=30CM UN 10,136 10,136 10,136 10,136 10,136 10,136 10,136 10,136 10,136 10,136 10,136 10,1365.54 ANCLAJE 1/2" L=50CM UN 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,2695.55 ANCLAJE 5/8" L=70CM UN 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,5505.56 ANCLAJE 3/4" L=70CM UN 27,723 27,723 27,723 27,723 27,723 27,723 27,723 27,723 27,723 27,723 27,723 27,7235.57 ANCLAJE 1" L= 70CM UN 4,203 4,336 4,157 4,243 4,177 4,153 4,111 4,138 4,267 4,245 4,344 4,100

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,841 11,841 11,841 11,841 11,841 11,841 11,841 11,841 11,841 11,841 11,841 11,8416.2 FILOS O DILATACIONES B/PLACA ML 4,744 4,941 4,704 4,785 4,785 4,827 4,663 4,771 4,801 4,908 4,981 4,7616.3 FILOS O DILATACIONES S/MURO ML 5,647 5,844 5,607 5,688 5,688 5,731 5,567 5,674 5,704 5,811 5,885 5,6646.4 GOTERA EN MORTERO 1:4 ML 6,753 6,950 6,713 6,794 6,794 6,836 6,672 6,780 6,810 6,917 6,990 6,7696.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,366 4,366 4,366 4,366 4,366 4,366 4,366 4,366 4,366 4,366 4,366 4,3666.6 MALLA BAJO ENTRAMADO M2 10,362 10,362 10,362 10,362 10,362 10,362 10,362 10,362 10,362 10,362 10,362 10,3626.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,874 20,497 19,746 20,002 20,002 20,138 19,618 19,958 20,054 20,395 20,626 19,9266.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,913 12,224 11,849 11,977 11,977 12,045 11,784 11,955 12,002 12,173 12,289 11,9386.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 17,506 18,059 17,392 17,620 17,620 17,740 17,279 17,580 17,665 17,968 18,173 17,552

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,492 10,769 10,436 10,549 10,549 10,610 10,379 10,530 10,572 10,723 10,826 10,5156.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,911 17,534 16,782 17,039 17,039 17,175 16,654 16,995 17,090 17,431 17,663 16,9626.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 10,195 10,506 10,131 10,259 10,259 10,327 10,066 10,237 10,285 10,455 10,571 10,2216.13 PAÑETE CULATAS 1:4, E=2 CM M2 17,506 18,059 17,392 17,620 17,620 17,740 17,279 17,580 17,665 17,968 18,173 17,5526.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,492 10,769 10,436 10,549 10,549 10,610 10,379 10,530 10,572 10,723 10,826 10,5156.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,933 17,378 16,842 17,025 17,025 17,122 16,751 16,993 17,061 17,304 17,470 16,970

6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 10,205 10,427 10,160 10,251 10,251 10,299 10,114 10,235 10,269 10,391 10,473 10,224

6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 14,467 14,888 14,380 14,554 14,554 14,645 14,294 14,524 14,588 14,819 14,975 14,5026.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,753 8,964 8,710 8,797 8,797 8,842 8,666 8,782 8,814 8,929 9,007 8,7716.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 14,013 14,488 13,916 14,111 14,111 14,214 13,818 14,077 14,150 14,410 14,586 14,0536.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,526 8,764 8,477 8,575 8,575 8,627 8,429 8,558 8,595 8,725 8,813 8,546

MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL)

MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL)

Page 75: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 18,099 18,652 17,985 18,213 18,213 18,333 17,871 18,173 18,258 18,560 18,766 18,1456.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,774 11,050 10,717 10,830 10,830 10,891 10,660 10,811 10,853 11,004 11,107 10,7966.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 17,503 18,127 17,375 17,632 17,632 17,767 17,247 17,587 17,683 18,024 18,256 17,5556.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,476 10,788 10,412 10,540 10,540 10,608 10,348 10,518 10,566 10,736 10,852 10,5026.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 14,478 14,953 14,380 14,576 14,576 14,679 14,283 14,542 14,615 14,875 15,051 14,5176.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,745 8,983 8,696 8,794 8,794 8,846 8,647 8,777 8,814 8,943 9,032 8,7656.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 18,181 18,804 18,052 18,309 18,309 18,445 17,924 18,265 18,360 18,701 18,933 18,2326.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 11,122 11,434 11,058 11,187 11,187 11,254 10,994 11,164 11,212 11,383 11,499 11,148

7 CUBIERTAS

7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 22,469 23,258 22,306 22,631 22,631 22,803 22,144 22,575 22,696 23,128 23,422 22,534

7.2 M2 67,050 68,073 66,733 67,471 66,956 66,870 66,417 66,711 67,493 67,503 68,169 66,483

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 40,342 40,342 40,342 40,342 40,342 40,342 40,342 40,342 40,342 40,342 40,342 40,3427.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,3647.5 ML 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,6847.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 60,070 60,070 60,070 60,070 60,070 60,070 60,070 60,070 60,070 60,070 60,070 60,070

7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 43,007 43,007 43,007 43,007 43,007 43,007 43,007 43,007 43,007 43,007 43,007 43,007

7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,830 25,830 25,830 25,830 25,830 25,830 25,830 25,830 25,830 25,830 25,830 25,830

7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 58,464 58,464 58,464 58,464 58,464 58,464 58,464 58,464 58,464 58,464 58,464 58,464

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 75,498 75,498 75,498 75,498 75,498 75,498 75,498 75,498 75,498 75,498 75,498 75,4987.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 98,227 98,227 98,227 98,227 98,227 98,227 98,227 98,227 98,227 98,227 98,227 98,2277.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 43,101 43,101 43,101 43,101 43,101 43,101 43,101 43,101 43,101 43,101 43,101 43,1017.13 CANAL PVC AMAZONAS ML 62,462 62,462 62,462 62,462 62,462 62,462 62,462 62,462 62,462 62,462 62,462 62,4627.14 CANAL PVC RAINGO ML 55,173 55,173 55,173 55,173 55,173 55,173 55,173 55,173 55,173 55,173 55,173 55,1737.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 87,737 87,737 87,737 87,737 87,737 87,737 87,737 87,737 87,737 87,737 87,737 87,7377.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 50,733 50,733 50,733 50,733 50,733 50,733 50,733 50,733 50,733 50,733 50,733 50,7337.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 41,656 41,656 41,656 41,656 41,656 41,656 41,656 41,656 41,656 41,656 41,656 41,6567.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,805 23,805 23,805 23,805 23,805 23,805 23,805 23,805 23,805 23,805 23,805 23,8057.19 TEJA DE BARRO M2 47,480 48,462 47,278 47,682 47,682 47,896 47,076 47,612 47,763 48,300 48,665 47,5617.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 34,715 34,715 34,715 34,715 34,715 34,715 34,715 34,715 34,715 34,715 34,715 34,7157.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,852 31,852 31,852 31,852 31,852 31,852 31,852 31,852 31,852 31,852 31,852 31,8527.22 TEJA FIBROCEMENTO Nº4 M2 26,975 26,975 26,975 26,975 26,975 26,975 26,975 26,975 26,975 26,975 26,975 26,9757.23 TEJA FIBROCEMENTO No. 6 M2 26,199 26,199 26,199 26,199 26,199 26,199 26,199 26,199 26,199 26,199 26,199 26,1997.24 TEJA FIBROCEMENTO No. 8 M2 26,961 26,961 26,961 26,961 26,961 26,961 26,961 26,961 26,961 26,961 26,961 26,9617.25 TEJA TERMOACÚSTICA M2 37,427 37,427 37,427 37,427 37,427 37,427 37,427 37,427 37,427 37,427 37,427 37,4277.26 TEJA PLÁSTICA No.6 M2 32,978 32,978 32,978 32,978 32,978 32,978 32,978 32,978 32,978 32,978 32,978 32,9787.27 TEJA ESPAÑOLA ETERNIT M2 60,601 60,601 60,601 60,601 60,601 60,601 60,601 60,601 60,601 60,601 60,601 60,601

7.28 M2 110,299 110,299 110,299 110,299 110,299 110,299 110,299 110,299 110,299 110,299 110,299 110,299

7.29 TEJA SIN TRASLAPO M2 49,599 49,599 49,599 49,599 49,599 49,599 49,599 49,599 49,599 49,599 49,599 49,5997.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,879 31,879 31,879 31,879 31,879 31,879 31,879 31,879 31,879 31,879 31,879 31,879

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM

Page 76: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 25,186 25,186 25,186 25,186 25,186 25,186 25,186 25,186 25,186 25,186 25,186 25,186

7.32 M2 40,496 40,496 40,496 40,496 40,496 40,496 40,496 40,496 40,496 40,496 40,496 40,496

7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,881 14,881 14,881 14,881 14,881 14,881 14,881 14,881 14,881 14,881 14,881 14,8817.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,830 17,830 17,830 17,830 17,830 17,830 17,830 17,830 17,830 17,830 17,830 17,830

7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,293 20,293 20,293 20,293 20,293 20,293 20,293 20,293 20,293 20,293 20,293 20,293

7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 26,137 26,137 26,137 26,137 26,137 26,137 26,137 26,137 26,137 26,137 26,137 26,137

7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,327 16,327 16,327 16,327 16,327 16,327 16,327 16,327 16,327 16,327 16,327 16,3277.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 38,311 38,311 38,311 38,311 38,311 38,311 38,311 38,311 38,311 38,311 38,311 38,3117.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 225,639 225,639 225,639 225,639 225,639 225,639 225,639 225,639 225,639 225,639 225,639 225,6397.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 288,418 288,418 288,418 288,418 288,418 288,418 288,418 288,418 288,418 288,418 288,418 288,4187.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 183,937 183,937 183,937 183,937 183,937 183,937 183,937 183,937 183,937 183,937 183,937 183,9377.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 265,176 265,176 265,176 265,176 265,176 265,176 265,176 265,176 265,176 265,176 265,176 265,176

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 416,728 437,763 410,224 425,400 414,808 413,043 403,719 409,778 425,835 426,052 439,733 405,0848.2 CONCRETO 3500 PSI M3 365,117 383,304 359,140 371,452 362,441 359,885 353,162 357,519 373,485 371,840 384,620 352,8708.3 CONCRETO 3000 PSI M3 360,232 378,131 354,079 365,576 356,822 353,517 347,926 351,539 368,846 365,823 379,130 346,5108.4 CONCRETO 2500 PSI M3 324,117 344,584 317,788 332,555 322,249 320,531 311,459 317,355 332,977 333,189 346,500 312,7888.5 CONCRETO 2000 PSI M3 305,085 324,479 298,624 311,554 301,982 299,003 292,164 296,593 314,130 311,924 325,787 291,4898.6 CONCRETO 1500 PSI M3 280,913 298,663 274,320 284,596 276,120 271,412 267,728 270,085 290,142 284,597 299,115 264,2768.7 MORTERO SECO 1:10 M3 229,245 256,354 223,664 234,824 234,824 240,724 218,085 232,891 237,057 251,884 261,965 231,4878.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 410,275 436,598 404,856 415,693 415,693 421,421 399,439 413,816 417,861 432,258 442,047 412,4538.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 381,921 411,600 375,812 388,030 388,030 394,489 369,703 385,913 390,473 406,707 417,744 384,377

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 435,035 462,793 429,322 440,749 440,749 446,790 423,608 438,769 443,034 458,217 468,539 437,332

8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 564,435 592,193 558,722 570,149 570,149 576,190 553,008 568,169 572,434 587,617 597,939 566,732

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 90,068 90,068 90,068 90,068 90,068 90,068 90,068 90,068 90,068 90,068 90,068 90,0689.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 3,116 3,313 3,076 3,157 3,157 3,199 3,035 3,143 3,173 3,280 3,353 3,1329.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 101,403 101,403 101,403 101,403 101,403 101,403 101,403 101,403 101,403 101,403 101,403 101,4039.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 123,662 123,662 123,662 123,662 123,662 123,662 123,662 123,662 123,662 123,662 123,662 123,6629.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 171,030 171,030 171,030 171,030 171,030 171,030 171,030 171,030 171,030 171,030 171,030 171,0309.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 191,002 191,002 191,002 191,002 191,002 191,002 191,002 191,002 191,002 191,002 191,002 191,0029.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 210,998 210,998 210,998 210,998 210,998 210,998 210,998 210,998 210,998 210,998 210,998 210,9989.8 HOJA PUERTA FORTEC 0.81 UN 149,662 149,662 149,662 149,662 149,662 149,662 149,662 149,662 149,662 149,662 149,662 149,6629.9 HOJA PUERTA FORTEC 0.91 UN 165,313 165,313 165,313 165,313 165,313 165,313 165,313 165,313 165,313 165,313 165,313 165,313

9.10 HOJA PUERTA FORTEC 1.50 UN 245,123 245,123 245,123 245,123 245,123 245,123 245,123 245,123 245,123 245,123 245,123 245,123

9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 92,733 92,733 92,733 92,733 92,733 92,733 92,733 92,733 92,733 92,733 92,733 92,733

9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 123,095 123,095 123,095 123,095 123,095 123,095 123,095 123,095 123,095 123,095 123,095 123,095

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 77: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 136,344 136,344 136,344 136,344 136,344 136,344 136,344 136,344 136,344 136,344 136,344 136,3449.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 346,676 346,676 346,676 346,676 346,676 346,676 346,676 346,676 346,676 346,676 346,676 346,676

9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,642 30,642 30,642 30,642 30,642 30,642 30,642 30,642 30,642 30,642 30,642 30,642

9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,486 19,486 19,486 19,486 19,486 19,486 19,486 19,486 19,486 19,486 19,486 19,4869.17 VENTANERÍA EN MADERA CEDRO MACHO M2 71,392 71,392 71,392 71,392 71,392 71,392 71,392 71,392 71,392 71,392 71,392 71,3929.18 CERRADURA DE ENTRADA PRINCIPAL UN 88,864 88,864 88,864 88,864 88,864 88,864 88,864 88,864 88,864 88,864 88,864 88,8649.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 69,100 69,100 69,100 69,100 69,100 69,100 69,100 69,100 69,100 69,100 69,100 69,100

9.20 UN 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624

9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624 21,624

9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,520 20,520 20,520 20,520 20,520 20,520 20,520 20,520 20,520 20,520 20,520 20,520

9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 76,243 76,243 76,243 76,243 76,243 76,243 76,243 76,243 76,243 76,243 76,243 76,2439.24 ESPEJO BISELADO INCOLORO 4 MM M2 98,546 98,546 98,546 98,546 98,546 98,546 98,546 98,546 98,546 98,546 98,546 98,5469.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 45,019 45,019 45,019 45,019 45,019 45,019 45,019 45,019 45,019 45,019 45,019 45,0199.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 53,940 53,940 53,940 53,940 53,940 53,940 53,940 53,940 53,940 53,940 53,940 53,9409.27 VIDRIO TEMPLADO PULIDO 10 MM M2 217,321 217,321 217,321 217,321 217,321 217,321 217,321 217,321 217,321 217,321 217,321 217,3219.28 VIDRIO TEMPLADO PULIDO 8 MM M2 195,018 195,018 195,018 195,018 195,018 195,018 195,018 195,018 195,018 195,018 195,018 195,0189.29 VIDRIO TRANSPARENTE 3 MM M2 48,365 48,365 48,365 48,365 48,365 48,365 48,365 48,365 48,365 48,365 48,365 48,3659.30 VIDRIO TRANSPARENTE 4 MM M2 56,171 56,171 56,171 56,171 56,171 56,171 56,171 56,171 56,171 56,171 56,171 56,1719.31 VIDRIO TRANSPARENTE 5 MM M2 62,862 62,862 62,862 62,862 62,862 62,862 62,862 62,862 62,862 62,862 62,862 62,8629.32 VIDRIO TRANSPARENTE 6 MM M2 66,877 66,877 66,877 66,877 66,877 66,877 66,877 66,877 66,877 66,877 66,877 66,877

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 56,251 56,251 56,251 56,251 56,251 56,251 56,251 56,251 56,251 56,251 56,251 56,25110.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 163,583 163,583 163,583 163,583 163,583 163,583 163,583 163,583 163,583 163,583 163,583 163,583

10.3 ML 81,978 81,978 81,978 81,978 81,978 81,978 81,978 81,978 81,978 81,978 81,978 81,978

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 106,739 106,739 106,739 106,739 106,739 106,739 106,739 106,739 106,739 106,739 106,739 106,73910.5 MARCO TAPA CAJA DE INSPECCIÓN UN 102,079 102,079 102,079 102,079 102,079 102,079 102,079 102,079 102,079 102,079 102,079 102,07910.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 71,262 71,262 71,262 71,262 71,262 71,262 71,262 71,262 71,262 71,262 71,262 71,26210.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 151,671 151,671 151,671 151,671 151,671 151,671 151,671 151,671 151,671 151,671 151,671 151,671

10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 81,135 81,135 81,135 81,135 81,135 81,135 81,135 81,135 81,135 81,135 81,135 81,135

10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,882 4,882 4,882 4,882 4,882 4,882 4,882 4,882 4,882 4,882 4,882 4,882

10.10 M2 74,578 74,578 74,578 74,578 74,578 74,578 74,578 74,578 74,578 74,578 74,578 74,578

10.11 ML 31,247 31,247 31,247 31,247 31,247 31,247 31,247 31,247 31,247 31,247 31,247 31,247

10.12 M2 395,388 395,388 395,388 395,388 395,388 395,388 395,388 395,388 395,388 395,388 395,388 395,388

10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 142,788 142,788 142,788 142,788 142,788 142,788 142,788 142,788 142,788 142,788 142,788 142,788

SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO

DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM

Page 78: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

10.14 M2 157,384 157,384 157,384 157,384 157,384 157,384 157,384 157,384 157,384 157,384 157,384 157,384

10.15 M2 361,067 361,067 361,067 361,067 361,067 361,067 361,067 361,067 361,067 361,067 361,067 361,067

10.16 M2 95,017 95,017 95,017 95,017 95,017 95,017 95,017 95,017 95,017 95,017 95,017 95,017

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 288,115 288,115 288,115 288,115 288,115 288,115 288,115 288,115 288,115 288,115 288,115 288,115

10.18 ML 4,542 4,542 4,542 4,542 4,542 4,542 4,542 4,542 4,542 4,542 4,542 4,542

10.19 VENTANA EN ALUMINIO CORREDIZA M2 203,249 203,249 203,249 203,249 203,249 203,249 203,249 203,249 203,249 203,249 203,249 203,24910.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 90,834 90,834 90,834 90,834 90,834 90,834 90,834 90,834 90,834 90,834 90,834 90,83410.21 REJILLA PISO 0.30 M M2 64,401 64,401 64,401 64,401 64,401 64,401 64,401 64,401 64,401 64,401 64,401 64,40110.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 65,997 65,997 65,997 65,997 65,997 65,997 65,997 65,997 65,997 65,997 65,997 65,997

10.23 KG 7,518 7,518 7,518 7,518 7,518 7,518 7,518 7,518 7,518 7,518 7,518 7,518

10.24 KG 8,349 8,349 8,349 8,349 8,349 8,349 8,349 8,349 8,349 8,349 8,349 8,349

10.25 KG 6,540 6,540 6,540 6,540 6,540 6,540 6,540 6,540 6,540 6,540 6,540 6,540

11

11.1 ACOMETIDA EN PVC 1/2" 5M UN 168,147 168,147 168,147 168,147 168,147 168,147 168,147 168,147 168,147 168,147 168,147 168,14711.2 ACOMETIDA EN PVC 3/4" 5M UN 200,410 200,410 200,410 200,410 200,410 200,410 200,410 200,410 200,410 200,410 200,410 200,41011.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,364 16,36411.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,684 25,68411.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,829 24,829 24,829 24,829 24,829 24,829 24,829 24,829 24,829 24,829 24,829 24,82911.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,734 31,734 31,734 31,734 31,734 31,734 31,734 31,734 31,734 31,734 31,734 31,73411.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 65,148 65,148 65,148 65,148 65,148 65,148 65,148 65,148 65,148 65,148 65,148 65,14811.8 CONEXIÓN TANQUE ELEVADO PVC UN 168,183 168,183 168,183 168,183 168,183 168,183 168,183 168,183 168,183 168,183 168,183 168,18311.9 INSTALACIÓN APARATO SANITARIO UN 33,399 33,399 33,399 33,399 33,399 33,399 33,399 33,399 33,399 33,399 33,399 33,399

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,738 23,738 23,738 23,738 23,738 23,738 23,738 23,738 23,738 23,738 23,738 23,73811.13 NIPLE PASAMURO 2" UN 50,476 50,476 50,476 50,476 50,476 50,476 50,476 50,476 50,476 50,476 50,476 50,476

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO

SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

Page 79: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

11.14 NIPLE PASAMURO 4" UN 75,440 75,440 75,440 75,440 75,440 75,440 75,440 75,440 75,440 75,440 75,440 75,44011.15 PUNTO AGUA CALIENTE CPVC UN 62,907 62,907 62,907 62,907 62,907 62,907 62,907 62,907 62,907 62,907 62,907 62,90711.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 46,041 46,041 46,041 46,041 46,041 46,041 46,041 46,041 46,041 46,041 46,041 46,04111.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,840 48,840 48,840 48,840 48,840 48,840 48,840 48,840 48,840 48,840 48,840 48,84011.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 61,665 61,665 61,665 61,665 61,665 61,665 61,665 61,665 61,665 61,665 61,665 61,66511.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 49,035 49,035 49,035 49,035 49,035 49,035 49,035 49,035 49,035 49,035 49,035 49,03511.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 61,050 61,050 61,050 61,050 61,050 61,050 61,050 61,050 61,050 61,050 61,050 61,05011.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 65,234 65,234 65,234 65,234 65,234 65,234 65,234 65,234 65,234 65,234 65,234 65,23411.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 54,654 54,654 54,654 54,654 54,654 54,654 54,654 54,654 54,654 54,654 54,654 54,65411.23 RED SUMINISTRO CPVC 1/2" ML 9,263 9,263 9,263 9,263 9,263 9,263 9,263 9,263 9,263 9,263 9,263 9,26311.24 RED SUMINISTRO CPVC 3/4" ML 12,984 12,984 12,984 12,984 12,984 12,984 12,984 12,984 12,984 12,984 12,984 12,98411.25 RED SUMINISTRO PVC 1 1/2" ML 16,686 16,686 16,686 16,686 16,686 16,686 16,686 16,686 16,686 16,686 16,686 16,68611.26 RED SUMINISTRO PVC 1" ML 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,33911.27 RED SUMINISTRO PVC 1/2" ML 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,22111.28 RED SUMINISTRO PVC 2 1/2" ML 42,082 42,082 42,082 42,082 42,082 42,082 42,082 42,082 42,082 42,082 42,082 42,08211.29 RED SUMINISTRO PVC 2" ML 24,164 24,164 24,164 24,164 24,164 24,164 24,164 24,164 24,164 24,164 24,164 24,16411.30 RED SUMINISTRO PVC 3/4" ML 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,76411.31 RED SANITARIA PVC-S 2" ML 18,359 18,359 18,359 18,359 18,359 18,359 18,359 18,359 18,359 18,359 18,359 18,35911.32 RED SANITARIA PVC-S 3" ML 25,455 25,455 25,455 25,455 25,455 25,455 25,455 25,455 25,455 25,455 25,455 25,45511.33 RED SANITARIA PVC-S 4" ML 34,453 34,453 34,453 34,453 34,453 34,453 34,453 34,453 34,453 34,453 34,453 34,45311.34 RED SANITARIA PVC-S 6" ML 64,370 64,370 64,370 64,370 64,370 64,370 64,370 64,370 64,370 64,370 64,370 64,37011.35 REGISTRO 1" UN 83,981 83,981 83,981 83,981 83,981 83,981 83,981 83,981 83,981 83,981 83,981 83,98111.36 REGISTRO 1/2" UN 48,076 48,076 48,076 48,076 48,076 48,076 48,076 48,076 48,076 48,076 48,076 48,07611.37 REGISTRO 3/4" UN 58,910 58,910 58,910 58,910 58,910 58,910 58,910 58,910 58,910 58,910 58,910 58,91011.38 REGISTRO 1 1/2" UN 109,641 109,641 109,641 109,641 109,641 109,641 109,641 109,641 109,641 109,641 109,641 109,64111.39 REGISTRO 2 1/2" UN 283,091 283,091 283,091 283,091 283,091 283,091 283,091 283,091 283,091 283,091 283,091 283,09111.40 REGISTRO 2" UN 210,982 210,982 210,982 210,982 210,982 210,982 210,982 210,982 210,982 210,982 210,982 210,98211.41 REVENTILACIÓN 2" ML 12,822 12,822 12,822 12,822 12,822 12,822 12,822 12,822 12,822 12,822 12,822 12,82211.42 REVENTILACIÓN 3" ML 16,190 16,190 16,190 16,190 16,190 16,190 16,190 16,190 16,190 16,190 16,190 16,190

11.43 UN 128,297 128,297 128,297 128,297 128,297 128,297 128,297 128,297 128,297 128,297 128,297 128,297

11.44 UN 208,234 208,234 208,234 208,234 208,234 208,234 208,234 208,234 208,234 208,234 208,234 208,234

11.45 UN 342,714 342,714 342,714 342,714 342,714 342,714 342,714 342,714 342,714 342,714 342,714 342,714

11.46 ML 35,567 35,567 35,567 35,567 35,567 35,567 35,567 35,567 35,567 35,567 35,567 35,567

11.47 ML 41,171 41,171 41,171 41,171 41,171 41,171 41,171 41,171 41,171 41,171 41,171 41,171

11.48 ML 67,520 67,520 67,520 67,520 67,520 67,520 67,520 67,520 67,520 67,520 67,520 67,520

11.49 ML 53,050 53,050 53,050 53,050 53,050 53,050 53,050 53,050 53,050 53,050 53,050 53,050

11.50 ML 75,415 75,415 75,415 75,415 75,415 75,415 75,415 75,415 75,415 75,415 75,415 75,415

TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN)

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

Page 80: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

11.51 ML 78,952 78,952 78,952 78,952 78,952 78,952 78,952 78,952 78,952 78,952 78,952 78,952

11.52 ML 181,957 181,957 181,957 181,957 181,957 181,957 181,957 181,957 181,957 181,957 181,957 181,957

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,854 35,854 35,854 35,854 35,854 35,854 35,854 35,854 35,854 35,854 35,854 35,854

11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,997 35,997 35,997 35,997 35,997 35,997 35,997 35,997 35,997 35,997 35,997 35,997

11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 29,085 29,085 29,085 29,085 29,085 29,085 29,085 29,085 29,085 29,085 29,085 29,08511.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,925 32,925 32,925 32,925 32,925 32,925 32,925 32,925 32,925 32,925 32,925 32,925

11.57 ML 2,981 2,981 2,981 2,981 2,981 2,981 2,981 2,981 2,981 2,981 2,981 2,981

11.58 ML 4,634 4,634 4,634 4,634 4,634 4,634 4,634 4,634 4,634 4,634 4,634 4,634

11.59 GABINETE TIPO III UN 1,035,245 1,035,245 1,035,245 1,035,245 1,035,245 1,035,245 1,035,245 1,035,245 1,035,245 1,035,245 1,035,245 1,035,24511.60 GABINETE TIPO I UN 816,853 816,853 816,853 816,853 816,853 816,853 816,853 816,853 816,853 816,853 816,853 816,85311.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,292,156 1,292,156 1,292,156 1,292,156 1,292,156 1,292,156 1,292,156 1,292,156 1,292,156 1,292,156 1,292,156 1,292,15611.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,234,522 1,234,522 1,234,522 1,234,522 1,234,522 1,234,522 1,234,522 1,234,522 1,234,522 1,234,522 1,234,522 1,234,52211.63 VÁLVULA MARIPOSA 3" UN 669,717 669,717 669,717 669,717 669,717 669,717 669,717 669,717 669,717 669,717 669,717 669,71711.64 VÁLVULA MARIPOSA 4" UN 764,582 764,582 764,582 764,582 764,582 764,582 764,582 764,582 764,582 764,582 764,582 764,58211.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 329,262 329,262 329,262 329,262 329,262 329,262 329,262 329,262 329,262 329,262 329,262 329,262

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 229,030 229,030 229,030 229,030 229,030 229,030 229,030 229,030 229,030 229,030 229,030 229,03012.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 33,290 33,290 33,290 33,290 33,290 33,290 33,290 33,290 33,290 33,290 33,290 33,29012.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 41,036 41,036 41,036 41,036 41,036 41,036 41,036 41,036 41,036 41,036 41,036 41,03612.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 44,573 44,573 44,573 44,573 44,573 44,573 44,573 44,573 44,573 44,573 44,573 44,57312.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 54,415 54,415 54,415 54,415 54,415 54,415 54,415 54,415 54,415 54,415 54,415 54,41512.6 SALIDA TELÉFONO PVC COMPLETA UN 36,336 36,336 36,336 36,336 36,336 36,336 36,336 36,336 36,336 36,336 36,336 36,33612.7 SALIDA TIMBRE PVC COMPLETA UN 36,357 36,357 36,357 36,357 36,357 36,357 36,357 36,357 36,357 36,357 36,357 36,35712.8 STRIP TELEFÓNICO 10 PARES UN 109,262 109,262 109,262 109,262 109,262 109,262 109,262 109,262 109,262 109,262 109,262 109,26212.9 SALIDA TOMA DOBLE PVC COMPLETA UN 31,468 31,468 31,468 31,468 31,468 31,468 31,468 31,468 31,468 31,468 31,468 31,468

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 74,035 74,035 74,035 74,035 74,035 74,035 74,035 74,035 74,035 74,035 74,035 74,03512.11 SALIDA T.V PVC COMPLETA. UN 48,753 48,753 48,753 48,753 48,753 48,753 48,753 48,753 48,753 48,753 48,753 48,75312.12 SALIDA BIFÁSICA C.N. UN 28,633 28,633 28,633 28,633 28,633 28,633 28,633 28,633 28,633 28,633 28,633 28,63312.13 TABLERO PARCIAL 4 CIRCUITOS UN 82,373 82,373 82,373 82,373 82,373 82,373 82,373 82,373 82,373 82,373 82,373 82,373

12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 339,378 339,378 339,378 339,378 339,378 339,378 339,378 339,378 339,378 339,378 339,378 339,378

12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 456,744 456,744 456,744 456,744 456,744 456,744 456,744 456,744 456,744 456,744 456,744 456,744

12.16 TUBERÍA PVC CONDUIT 1/2" ML 2,655 2,655 2,655 2,655 2,655 2,655 2,655 2,655 2,655 2,655 2,655 2,65512.17 TUBERÍA PVC CONDUIT 3/4" ML 3,457 3,457 3,457 3,457 3,457 3,457 3,457 3,457 3,457 3,457 3,457 3,45712.18 TUBERÍA PVC CONDUIT 1" ML 5,318 5,318 5,318 5,318 5,318 5,318 5,318 5,318 5,318 5,318 5,318 5,31812.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,553 9,553 9,553 9,553 9,553 9,553 9,553 9,553 9,553 9,553 9,553 9,553

12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 183,748 183,748 183,748 183,748 183,748 183,748 183,748 183,748 183,748 183,748 183,748 183,748

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2"

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2"

Page 81: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 58,178 58,178 58,178 58,178 58,178 58,178 58,178 58,178 58,178 58,178 58,178 58,178

12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 78,670 78,670 78,670 78,670 78,670 78,670 78,670 78,670 78,670 78,670 78,670 78,670

12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 28,014 28,014 28,014 28,014 28,014 28,014 28,014 28,014 28,014 28,014 28,014 28,01412.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,058,329 1,058,329 1,058,329 1,058,329 1,058,329 1,058,329 1,058,329 1,058,329 1,058,329 1,058,329 1,058,329 1,058,32912.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 783,299 783,299 783,299 783,299 783,299 783,299 783,299 783,299 783,299 783,299 783,299 783,29912.26 POSTE METÁLICO 6M UN 981,906 981,906 981,906 981,906 981,906 981,906 981,906 981,906 981,906 981,906 981,906 981,906

12.27 UN 446,509 446,509 446,509 446,509 446,509 446,509 446,509 446,509 446,509 446,509 446,509 446,509

12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 77,155 77,155 77,155 77,155 77,155 77,155 77,155 77,155 77,155 77,155 77,155 77,15512.29 LUMINARIA 70W SODIO UN 197,763 197,763 197,763 197,763 197,763 197,763 197,763 197,763 197,763 197,763 197,763 197,76312.30 LUMINARIA 150W SODIO UN 233,094 233,094 233,094 233,094 233,094 233,094 233,094 233,094 233,094 233,094 233,094 233,09412.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,257,128 1,257,128 1,257,128 1,257,128 1,257,128 1,257,128 1,257,128 1,257,128 1,257,128 1,257,128 1,257,128 1,257,12812.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 925,900 925,900 925,900 925,900 925,900 925,900 925,900 925,900 925,900 925,900 925,900 925,900

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 35,578 36,645 35,358 35,797 35,797 36,030 35,138 35,721 35,885 36,469 36,866 35,66613.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 30,527 31,595 30,308 30,747 30,747 30,979 30,088 30,671 30,835 31,419 31,816 30,61613.3 ALISTADO PARA LISTÓN M2 11,505 11,719 11,461 11,549 11,549 11,596 11,417 11,534 11,567 11,684 11,763 11,52313.4 ALISTADO PISOS 1:3, E=0.04 M2 25,661 27,796 25,222 26,101 26,101 26,565 24,782 25,948 26,276 27,444 28,238 25,83813.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 64,490 66,625 64,050 64,929 64,929 65,394 63,611 64,777 65,105 66,273 67,067 64,66613.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 21,419 21,807 21,290 21,549 21,357 21,298 21,161 21,249 21,600 21,556 21,833 21,14713.7 CONCRETO BASE GRADAS 2500 PSI M2 49,748 51,795 49,115 50,592 49,561 49,389 48,482 49,072 50,634 50,655 51,986 48,61513.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 70,039 73,314 69,027 71,389 69,741 69,466 68,014 68,957 71,457 71,491 73,621 68,22713.9 MANTO FIBERGLASS 600X1 M2 22,575 22,575 22,575 22,575 22,575 22,575 22,575 22,575 22,575 22,575 22,575 22,575

13.10 PEGANTE MORTERO-CONCRETO M2 19,339 19,339 19,339 19,339 19,339 19,339 19,339 19,339 19,339 19,339 19,339 19,33913.11 PERMA PLY 2 CAPAS M2 20,093 20,093 20,093 20,093 20,093 20,093 20,093 20,093 20,093 20,093 20,093 20,09313.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 40,957 42,799 40,387 41,716 40,789 40,634 39,818 40,348 41,754 41,774 42,972 39,93713.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 48,233 50,484 47,536 49,161 48,027 47,838 46,840 47,489 49,207 49,231 50,695 46,98613.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 70,480 73,960 69,404 71,915 70,163 69,871 68,328 69,331 71,986 72,022 74,285 68,55413.15 TRITURADO FINO 1/2 M3 104,610 111,897 100,083 100,127 97,411 90,168 95,557 91,978 110,948 99,221 110,086 86,54613.16 TRITURADO GRUESO 3/4 M3 108,326 115,745 100,877 100,516 97,001 88,027 92,291 89,972 105,441 99,344 107,888 84,933

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS

14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,880 38,307 37,792 37,968 37,968 38,061 37,704 37,937 38,003 38,236 38,395 37,915

14.2 ML 23,258 23,471 23,214 23,302 23,302 23,348 23,170 23,287 23,319 23,436 23,516 23,276

14.3 ADOQUÍN CONCRETO 6CM M2 50,231 51,299 50,011 50,451 50,451 50,683 49,792 50,375 50,539 51,123 51,520 50,31914.4 ADOQUÍN CONCRETO 8CM M2 59,631 60,699 59,411 59,851 59,851 60,083 59,192 59,775 59,939 60,523 60,920 59,71914.5 ADOQUÍN GRES PEATONAL M2 49,143 50,211 48,923 49,363 49,363 49,595 48,704 49,287 49,451 50,035 50,432 49,232

14.6 M2 52,926 53,353 52,838 53,014 53,014 53,107 52,750 52,984 53,049 53,283 53,442 52,962

14.7 GRAVILLA PARA GRADAS ML 29,599 29,888 29,508 29,596 29,568 29,539 29,417 29,496 29,726 29,721 29,913 29,429

FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA)

BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL)

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

Page 82: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

14.8 M2 108,526 110,447 108,130 108,921 108,921 109,339 107,735 108,784 109,079 110,131 110,845 108,685

14.9 ACABADO EN GRAVILLA LAVADA M2 37,708 38,499 37,482 37,746 37,690 37,679 37,256 37,531 38,024 38,131 38,594 37,38514.10 GUARDAESCOBA EN GRANITO ML 29,750 29,750 29,750 29,750 29,750 29,750 29,750 29,750 29,750 29,750 29,750 29,75014.11 GUARDAESCOBA EN GRAVILLA ML 8,552 8,842 8,461 8,550 8,521 8,493 8,370 8,450 8,680 8,675 8,867 8,38214.12 GUARDAESCOBA PVC CARAMELO ML 7,373 7,373 7,373 7,373 7,373 7,373 7,373 7,373 7,373 7,373 7,373 7,37314.13 GUARDAESCOBA PVC CEDRO ML 9,343 9,343 9,343 9,343 9,343 9,343 9,343 9,343 9,343 9,343 9,343 9,34314.14 GUARDAESCOBA PINO CARIBE ML 7,793 7,793 7,793 7,793 7,793 7,793 7,793 7,793 7,793 7,793 7,793 7,79314.15 GUARDAESCOBA CEDRO BLANCO ML 7,781 7,781 7,781 7,781 7,781 7,781 7,781 7,781 7,781 7,781 7,781 7,78114.16 GUARDAESCOBA EN MADERA SAPAN ML 12,326 12,326 12,326 12,326 12,326 12,326 12,326 12,326 12,326 12,326 12,326 12,32614.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,876 6,876 6,876 6,876 6,876 6,876 6,876 6,876 6,876 6,876 6,876 6,87614.18 LISTÓN M.H. AMARILLO M2 55,100 55,100 55,100 55,100 55,100 55,100 55,100 55,100 55,100 55,100 55,100 55,10014.19 PASO ESCALERA GRANITO ML 83,197 84,692 82,889 83,505 83,505 83,830 82,582 83,398 83,628 84,445 85,001 83,32114.20 PIRLANES ALUMINIO ML 5,765 5,765 5,765 5,765 5,765 5,765 5,765 5,765 5,765 5,765 5,765 5,76514.21 PIRLANES LADRILLO ML 25,194 25,587 25,113 25,275 25,275 25,361 25,033 25,247 25,307 25,522 25,668 25,22714.22 PISO VINILO TRÁFICO RESIDENCIAL M2 31,571 31,571 31,571 31,571 31,571 31,571 31,571 31,571 31,571 31,571 31,571 31,57114.23 PISO VINILO TRÁFICO PESADO M2 42,214 42,214 42,214 42,214 42,214 42,214 42,214 42,214 42,214 42,214 42,214 42,21414.24 PULIDA LACADA PISO MADERA M2 41,782 41,782 41,782 41,782 41,782 41,782 41,782 41,782 41,782 41,782 41,782 41,78214.25 TABLETA DE GRES 25X25 M2 37,650 38,077 37,563 37,738 37,738 37,831 37,475 37,708 37,773 38,007 38,166 37,68614.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 38,333 38,760 38,245 38,421 38,421 38,514 38,158 38,391 38,456 38,690 38,849 38,369

14.27 ML 8,153 8,153 8,153 8,153 8,153 8,153 8,153 8,153 8,153 8,153 8,153 8,153

14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 35,059 35,649 34,938 35,181 35,181 35,309 34,817 35,139 35,229 35,552 35,771 35,10814.29 JABONERA PORCELANA ACUARIO UN 14,362 14,362 14,362 14,362 14,362 14,362 14,362 14,362 14,362 14,362 14,362 14,362

14.30 UN 99,825 99,825 99,825 99,825 99,825 99,825 99,825 99,825 99,825 99,825 99,825 99,825

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,675 7,675 7,675 7,675 7,675 7,675 7,675 7,675 7,675 7,675 7,675 7,67514.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,837 15,837 15,837 15,837 15,837 15,837 15,837 15,837 15,837 15,837 15,837 15,83714.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,638 10,638 10,638 10,638 10,638 10,638 10,638 10,638 10,638 10,638 10,638 10,63814.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,125 10,125 10,125 10,125 10,125 10,125 10,125 10,125 10,125 10,125 10,125 10,12514.35 REMATES BOCEL ALUMINIO ML 6,421 6,421 6,421 6,421 6,421 6,421 6,421 6,421 6,421 6,421 6,421 6,42114.36 REMATES BOCEL PORCELANA ML 6,531 6,531 6,531 6,531 6,531 6,531 6,531 6,531 6,531 6,531 6,531 6,53114.37 TAPA REGISTRO 20X20 UN 14,833 14,833 14,833 14,833 14,833 14,833 14,833 14,833 14,833 14,833 14,833 14,83314.38 TAPA REGISTRO 6X6 UN 13,067 13,067 13,067 13,067 13,067 13,067 13,067 13,067 13,067 13,067 13,067 13,067

14.39 M2 14,464 14,464 14,464 14,464 14,464 14,464 14,464 14,464 14,464 14,464 14,464 14,464

14.40 M2 16,782 16,782 16,782 16,782 16,782 16,782 16,782 16,782 16,782 16,782 16,782 16,782

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 48,383 48,810 48,295 48,471 48,471 48,564 48,207 48,440 48,506 48,740 48,898 48,418

14.42 MEDIA CAÑA EN GRANITO ML 58,030 58,030 58,030 58,030 58,030 58,030 58,030 58,030 58,030 58,030 58,030 58,03014.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,265 26,265 26,265 26,265 26,265 26,265 26,265 26,265 26,265 26,265 26,265 26,26514.44 PINTURA ACRÍLICA PARA PISOS M2 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457

14.45 M2 11,953 11,953 11,953 11,953 11,953 11,953 11,953 11,953 11,953 11,953 11,953 11,953

14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 83,716 83,716 83,716 83,716 83,716 83,716 83,716 83,716 83,716 83,716 83,716 83,716

ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA)

GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS

Page 83: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

15 CIELO RASO15.1 APLIQUE YESO ML 57,670 57,670 57,670 57,670 57,670 57,670 57,670 57,670 57,670 57,670 57,670 57,67015.2 ARMADURA MADERA Y MALLA M2 26,798 26,798 26,798 26,798 26,798 26,798 26,798 26,798 26,798 26,798 26,798 26,79815.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 52,186 52,186 52,186 52,186 52,186 52,186 52,186 52,186 52,186 52,186 52,186 52,18615.4 CIELO RASO DURACUSTIC M2 51,519 51,519 51,519 51,519 51,519 51,519 51,519 51,519 51,519 51,519 51,519 51,51915.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 47,685 47,685 47,685 47,685 47,685 47,685 47,685 47,685 47,685 47,685 47,685 47,68515.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 67,732 67,732 67,732 67,732 67,732 67,732 67,732 67,732 67,732 67,732 67,732 67,73215.7 CORNISAS YESO ML 36,067 36,067 36,067 36,067 36,067 36,067 36,067 36,067 36,067 36,067 36,067 36,067

15.8 M2 75,383 75,383 75,383 75,383 75,383 75,383 75,383 75,383 75,383 75,383 75,383 75,383

15.9 MALLA CON VENA M2 10,309 10,309 10,309 10,309 10,309 10,309 10,309 10,309 10,309 10,309 10,309 10,309

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704

16.7 M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592

16.8 M3 68,473 72,354 56,832 55,538 51,658 42,603 41,498 43,897 41,498 54,245 51,846 42,603

16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 117,155 125,481 111,982 112,031 108,928 100,651 106,810 102,720 124,398 110,997 123,412 96,513

16.10 M3 125,345 133,106 118,878 116,291 112,410 103,356 112,410 104,649 130,795 114,997 130,519 103,356

16.11 AFRIMADO (NORMA INVIAS 311) M3 73,356 77,237 61,715 60,421 56,541 47,486 38,865 48,780 45,332 59,128 55,680 47,48616.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 117,874 125,635 111,407 108,820 104,939 95,885 104,939 97,178 122,086 107,526 123,048 95,88516.13 BASE GRANULAR (NORMA INVIAS 330) M3 125,986 133,747 119,519 116,932 113,051 103,997 113,051 105,290 131,436 115,638 131,160 103,997

17 APARATOS SANITARIOS

17.1 UN 220,694 220,694 220,694 220,694 220,694 220,694 220,694 220,694 220,694 220,694 220,694 220,694

17.2 UN 697,732 697,732 697,732 697,732 697,732 697,732 697,732 697,732 697,732 697,732 697,732 697,732

17.3 UN 394,093 394,093 394,093 394,093 394,093 394,093 394,093 394,093 394,093 394,093 394,093 394,093

LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO)

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS)

RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE

RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA)SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA)SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA)

Page 84: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

17.4 UN 126,217 126,217 126,217 126,217 126,217 126,217 126,217 126,217 126,217 126,217 126,217 126,217

17.5 UN 156,664 156,664 156,664 156,664 156,664 156,664 156,664 156,664 156,664 156,664 156,664 156,664

17.6 UN 185,500 185,500 185,500 185,500 185,500 185,500 185,500 185,500 185,500 185,500 185,500 185,500

17.7 UN 286,994 286,994 286,994 286,994 286,994 286,994 286,994 286,994 286,994 286,994 286,994 286,994

17.8 UN 754,616 754,616 754,616 754,616 754,616 754,616 754,616 754,616 754,616 754,616 754,616 754,616

17.9 UN 235,129 235,129 235,129 235,129 235,129 235,129 235,129 235,129 235,129 235,129 235,129 235,129

17.10 UN 112,581 112,581 112,581 112,581 112,581 112,581 112,581 112,581 112,581 112,581 112,581 112,581

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 63,662 63,662 63,662 63,662 63,662 63,662 63,662 63,662 63,662 63,662 63,662 63,662

17.12 UN 187,155 187,155 187,155 187,155 187,155 187,155 187,155 187,155 187,155 187,155 187,155 187,155

17.13 UN 299,663 299,663 299,663 299,663 299,663 299,663 299,663 299,663 299,663 299,663 299,663 299,663

18 PINTURAS

18.1 M2 4,485 4,485 4,485 4,485 4,485 4,485 4,485 4,485 4,485 4,485 4,485 4,485

18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,244 2,244 2,244 2,244 2,244 2,244 2,244 2,244 2,244 2,244 2,244 2,24418.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,435 8,435 8,435 8,435 8,435 8,435 8,435 8,435 8,435 8,435 8,435 8,43518.4 BARNIZ SOBRE MUEBLES M2 32,245 32,245 32,245 32,245 32,245 32,245 32,245 32,245 32,245 32,245 32,245 32,24518.5 CARBURO SOBRE PAÑETES M2 4,341 4,341 4,341 4,341 4,341 4,341 4,341 4,341 4,341 4,341 4,341 4,34118.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,714 10,714 10,714 10,714 10,714 10,714 10,714 10,714 10,714 10,714 10,714 10,71418.7 DEMARCACIÓN CON MARMOLINA ML 2,702 2,702 2,702 2,702 2,702 2,702 2,702 2,702 2,702 2,702 2,702 2,70218.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,946 1,946 1,946 1,946 1,946 1,946 1,946 1,946 1,946 1,946 1,946 1,94618.9 ESMALTE SOBRE LÁMINA LLENA M2 10,084 10,084 10,084 10,084 10,084 10,084 10,084 10,084 10,084 10,084 10,084 10,084

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,029 3,029 3,029 3,029 3,029 3,029 3,029 3,029 3,029 3,029 3,029 3,02918.11 ESMALTE SOBRE MADERA LLENA M2 11,204 11,204 11,204 11,204 11,204 11,204 11,204 11,204 11,204 11,204 11,204 11,20418.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,977 3,977 3,977 3,977 3,977 3,977 3,977 3,977 3,977 3,977 3,977 3,97718.13 ESMALTE SOBRE MARCOS MADERA M2 4,739 4,739 4,739 4,739 4,739 4,739 4,739 4,739 4,739 4,739 4,739 4,73918.14 ESTUCO M2 5,905 5,905 5,905 5,905 5,905 5,905 5,905 5,905 5,905 5,905 5,905 5,90518.15 ESTUCO (LINEAL) ML 3,634 3,634 3,634 3,634 3,634 3,634 3,634 3,634 3,634 3,634 3,634 3,63418.16 ESTUCO Y VINILO 3 MANOS M2 12,350 12,350 12,350 12,350 12,350 12,350 12,350 12,350 12,350 12,350 12,350 12,35018.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,60618.18 LACA PISOS MADERA M2 18,143 18,143 18,143 18,143 18,143 18,143 18,143 18,143 18,143 18,143 18,143 18,14318.19 LÍNEAS TRÁFICO 0.10 ML 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,09118.20 MARMOLINA SOBRE PAÑETE M2 8,860 8,860 8,860 8,860 8,860 8,860 8,860 8,860 8,860 8,860 8,860 8,86018.21 TINTILLA SOBRE MADERA LINEAL ML 2,582 2,582 2,582 2,582 2,582 2,582 2,582 2,582 2,582 2,582 2,582 2,58218.22 TINTILLA SOBRE MADERA LLENA M2 9,832 9,832 9,832 9,832 9,832 9,832 9,832 9,832 9,832 9,832 9,832 9,832

SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA)SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA)SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA)SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA)SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA)SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR

Page 85: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

18.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,387 5,387 5,387 5,387 5,387 5,387 5,387 5,387 5,387 5,387 5,387 5,38718.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,395 3,395 3,395 3,395 3,395 3,395 3,395 3,395 3,395 3,395 3,395 3,39518.25 WASH-PRIMER SOBRE ALUMNIO M2 16,537 16,537 16,537 16,537 16,537 16,537 16,537 16,537 16,537 16,537 16,537 16,53718.26 PINTURA EPÓXICA M2 10,156 10,156 10,156 10,156 10,156 10,156 10,156 10,156 10,156 10,156 10,156 10,15618.27 PINTURA EPÓXICA (LINEAL) ML 6,228 6,228 6,228 6,228 6,228 6,228 6,228 6,228 6,228 6,228 6,228 6,228

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,794,253 3,794,253 3,794,253 3,794,253 3,794,253 3,794,253 3,794,253 3,794,253 3,794,253 3,794,253 3,794,253 3,794,253

19.2 UN 6,660,194 6,660,194 6,660,194 6,660,194 6,660,194 6,660,194 6,660,194 6,660,194 6,660,194 6,660,194 6,660,194 6,660,194

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,997,932 1,997,932 1,997,932 1,997,932 1,997,932 1,997,932 1,997,932 1,997,932 1,997,932 1,997,932 1,997,932 1,997,932

19.4 UN 5,599,453 5,599,453 5,599,453 5,599,453 5,599,453 5,599,453 5,599,453 5,599,453 5,599,453 5,599,453 5,599,453 5,599,453

19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,574,965 5,574,965 5,574,965 5,574,965 5,574,965 5,574,965 5,574,965 5,574,965 5,574,965 5,574,965 5,574,965 5,574,96519.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,091 2,09119.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,993,338 1,993,338 1,993,338 1,993,338 1,993,338 1,993,338 1,993,338 1,993,338 1,993,338 1,993,338 1,993,338 1,993,33819.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 63,927 63,927 63,927 63,927 63,927 63,927 63,927 63,927 63,927 63,927 63,927 63,92719.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,124,451 1,124,662 1,124,386 1,124,538 1,124,432 1,124,415 1,124,321 1,124,382 1,124,543 1,124,545 1,124,681 1,124,335

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 581,532 586,007 579,994 582,868 580,680 579,853 578,456 579,359 583,686 582,930 586,257 578,102

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,341 23,341 23,341 23,341 23,341 23,341 23,341 23,341 23,341 23,341 23,341 23,34120.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 34,619 34,619 34,619 34,619 34,619 34,619 34,619 34,619 34,619 34,619 34,619 34,61920.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 42,764 42,764 42,764 42,764 42,764 42,764 42,764 42,764 42,764 42,764 42,764 42,764

20.4 ML 25,610 25,610 25,610 25,610 25,610 25,610 25,610 25,610 25,610 25,610 25,610 25,610

20.5 ML 29,298 29,298 29,298 29,298 29,298 29,298 29,298 29,298 29,298 29,298 29,298 29,298

20.6 ML 42,896 42,896 42,896 42,896 42,896 42,896 42,896 42,896 42,896 42,896 42,896 42,896

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,881 19,881 19,881 19,881 19,881 19,881 19,881 19,881 19,881 19,881 19,881 19,88120.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,970 20,970 20,970 20,970 20,970 20,970 20,970 20,970 20,970 20,970 20,970 20,97020.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,964 25,964 25,964 25,964 25,964 25,964 25,964 25,964 25,964 25,964 25,964 25,964

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,82720.11 VÁLVULA DE BOLA GAS 3/4" UN 18,468 18,468 18,468 18,468 18,468 18,468 18,468 18,468 18,468 18,468 18,468 18,46820.12 VÁLVULA DE BOLA GAS 1" UN 27,665 27,665 27,665 27,665 27,665 27,665 27,665 27,665 27,665 27,665 27,665 27,66520.13 VÁLVULA POLIETILENO GAS 1/2" UN 164,584 164,584 164,584 164,584 164,584 164,584 164,584 164,584 164,584 164,584 164,584 164,58420.14 VÁLVULA POLIETILENO GAS 3/4" UN 169,277 169,277 169,277 169,277 169,277 169,277 169,277 169,277 169,277 169,277 169,277 169,27720.15 VÁLVULA POLIETILENO GAS 1" UN 274,315 274,315 274,315 274,315 274,315 274,315 274,315 274,315 274,315 274,315 274,315 274,31520.16 ACOMETIDA GAS 1/2" ML 226,500 226,500 226,500 226,500 226,500 226,500 226,500 226,500 226,500 226,500 226,500 226,500

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 99,930 99,930 99,930 99,930 99,930 99,930 99,930 99,930 99,930 99,930 99,930 99,93021.2 CABLE DETECTOR LINEAL DE CALOR ML 24,950 24,950 24,950 24,950 24,950 24,950 24,950 24,950 24,950 24,950 24,950 24,95021.3 SIRENA DE 110 V UN 70,631 70,631 70,631 70,631 70,631 70,631 70,631 70,631 70,631 70,631 70,631 70,63121.4 CÁMARA CCTV UN 205,742 205,742 205,742 205,742 205,742 205,742 205,742 205,742 205,742 205,742 205,742 205,742

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR)

TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS)

TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS)

TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS)

Page 86: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

21.5 PARLANTE-CIELO FALSO UN 40,214 40,214 40,214 40,214 40,214 40,214 40,214 40,214 40,214 40,214 40,214 40,21421.6 AMPLIFICADOR 100W UN 434,596 434,596 434,596 434,596 434,596 434,596 434,596 434,596 434,596 434,596 434,596 434,59621.7 AMPLIFICADOR 300W UN 1,078,062 1,078,062 1,078,062 1,078,062 1,078,062 1,078,062 1,078,062 1,078,062 1,078,062 1,078,062 1,078,062 1,078,06221.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,780 32,780 32,780 32,780 32,780 32,780 32,780 32,780 32,780 32,780 32,780 32,78021.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 172,364 172,364 172,364 172,364 172,364 172,364 172,364 172,364 172,364 172,364 172,364 172,364

21.10 TOMA PARA MICRÓFONO UN 34,041 34,041 34,041 34,041 34,041 34,041 34,041 34,041 34,041 34,041 34,041 34,04121.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,634 2,634 2,634 2,634 2,634 2,634 2,634 2,634 2,634 2,634 2,634 2,63421.12 SPLITERS UN 4,252 4,252 4,252 4,252 4,252 4,252 4,252 4,252 4,252 4,252 4,252 4,25221.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,253 14,253 14,253 14,253 14,253 14,253 14,253 14,253 14,253 14,253 14,253 14,25321.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,765 18,765 18,765 18,765 18,765 18,765 18,765 18,765 18,765 18,765 18,765 18,76521.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,858 25,858 25,858 25,858 25,858 25,858 25,858 25,858 25,858 25,858 25,858 25,85821.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 96,105 96,105 96,105 96,105 96,105 96,105 96,105 96,105 96,105 96,105 96,105 96,105

21.17 ML 25,268 25,268 25,268 25,268 25,268 25,268 25,268 25,268 25,268 25,268 25,268 25,268

21.18 BANDEJA PORTACABLES PARA RACK UN 82,835 82,835 82,835 82,835 82,835 82,835 82,835 82,835 82,835 82,835 82,835 82,83521.19 RACK 2' X 24" UN 132,072 132,072 132,072 132,072 132,072 132,072 132,072 132,072 132,072 132,072 132,072 132,07221.20 RACK 3' X 24" UN 160,779 160,779 160,779 160,779 160,779 160,779 160,779 160,779 160,779 160,779 160,779 160,77921.21 RACK 5' X 24" UN 253,864 253,864 253,864 253,864 253,864 253,864 253,864 253,864 253,864 253,864 253,864 253,86421.22 RACK 7' X 24" UN 328,943 328,943 328,943 328,943 328,943 328,943 328,943 328,943 328,943 328,943 328,943 328,94321.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 372,344 372,344 372,344 372,344 372,344 372,344 372,344 372,344 372,344 372,344 372,344 372,34421.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 223,292 223,292 223,292 223,292 223,292 223,292 223,292 223,292 223,292 223,292 223,292 223,292

21.25 UN 54,213 54,213 54,213 54,213 54,213 54,213 54,213 54,213 54,213 54,213 54,213 54,213

21.26 PATCH CORD 2M CATEGORÍA 6A UN 5,635 5,635 5,635 5,635 5,635 5,635 5,635 5,635 5,635 5,635 5,635 5,63521.27 PATCH CORD 5M CATEGORÍA 6A UN 14,323 14,323 14,323 14,323 14,323 14,323 14,323 14,323 14,323 14,323 14,323 14,32321.28 CABLE UTP CATEGORÍA 6A ML 2,618 2,618 2,618 2,618 2,618 2,618 2,618 2,618 2,618 2,618 2,618 2,61821.29 CANALETA METÁLICA 4X6 CMS ML 26,288 26,288 26,288 26,288 26,288 26,288 26,288 26,288 26,288 26,288 26,288 26,28821.30 CANALETA METÁLICA 4X10 CMS ML 27,447 27,447 27,447 27,447 27,447 27,447 27,447 27,447 27,447 27,447 27,447 27,44721.31 CANALETA METÁLICA 6X10 CMS ML 28,026 28,026 28,026 28,026 28,026 28,026 28,026 28,026 28,026 28,026 28,026 28,02621.32 CANALETA PLÁSTICA 13X7 MM ML 15,573 15,573 15,573 15,573 15,573 15,573 15,573 15,573 15,573 15,573 15,573 15,57321.33 CANALETA PLÁSTICA 20X12 MM ML 17,443 17,443 17,443 17,443 17,443 17,443 17,443 17,443 17,443 17,443 17,443 17,44321.34 CANALETA PLÁSTICA 32X12 MM ML 17,371 17,371 17,371 17,371 17,371 17,371 17,371 17,371 17,371 17,371 17,371 17,37121.35 CANALETA PLÁSTICA 40X60 MM ML 27,881 27,881 27,881 27,881 27,881 27,881 27,881 27,881 27,881 27,881 27,881 27,88121.36 SWITCH 10/100/1000 24 PUERTOS UN 377,182 377,182 377,182 377,182 377,182 377,182 377,182 377,182 377,182 377,182 377,182 377,18221.37 SWITCH 10/100/1000 16 PUERTOS UN 238,446 238,446 238,446 238,446 238,446 238,446 238,446 238,446 238,446 238,446 238,446 238,44621.38 SWITCH 10/100/1000 8 PUERTOS UN 63,276 63,276 63,276 63,276 63,276 63,276 63,276 63,276 63,276 63,276 63,276 63,27621.39 CABLE TELEFÓNICO 2 PARES ML 1,366 1,366 1,366 1,366 1,366 1,366 1,366 1,366 1,366 1,366 1,366 1,36621.40 CABLE TELEFÓNICO 10 PARES ML 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,62721.41 CABLE TELEFÓNICO 20 PARES ML 8,882 8,882 8,882 8,882 8,882 8,882 8,882 8,882 8,882 8,882 8,882 8,88221.42 CABLE TELEFÓNICO 40 PARES ML 12,381 12,381 12,381 12,381 12,381 12,381 12,381 12,381 12,381 12,381 12,381 12,38121.43 CABLE TELEVISIÓN RG6 ML 1,676 1,676 1,676 1,676 1,676 1,676 1,676 1,676 1,676 1,676 1,676 1,67621.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,074 16,074 16,074 16,074 16,074 16,074 16,074 16,074 16,074 16,074 16,074 16,07421.45 ACOMETIDA TELEFÓNICA 1" ML 24,756 24,756 24,756 24,756 24,756 24,756 24,756 24,756 24,756 24,756 24,756 24,75621.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,307 13,307 13,307 13,307 13,307 13,307 13,307 13,307 13,307 13,307 13,307 13,307

TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120

SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN)

Page 87: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

21.47 ML 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 489,268 489,268 489,268 489,268 489,268 489,268 489,268 489,268 489,268 489,268 489,268 489,268

CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN)

Page 88: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,807 19,807 19,807 19,807 19,807 19,807 19,807 19,807 19,807 19,807 19,807 19,8071.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 65,922 65,922 65,922 65,922 65,922 65,922 65,922 65,922 65,922 65,922 65,922 65,9221.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 369,986 369,986 369,986 369,986 369,986 369,986 369,986 369,986 369,986 369,986 369,986 369,9861.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 789,586 789,586 789,586 789,586 789,586 789,586 789,586 789,586 789,586 789,586 789,586 789,5861.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 90,708 90,708 90,708 90,708 90,708 90,708 90,708 90,708 90,708 90,708 90,708 90,7081.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 551,115 551,115 551,115 551,115 551,115 551,115 551,115 551,115 551,115 551,115 551,115 551,1151.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,185,225 1,185,225 1,185,225 1,185,225 1,185,225 1,185,225 1,185,225 1,185,225 1,185,225 1,185,225 1,185,225 1,185,225

1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,732 9,732 9,732 9,732 9,732 9,732 9,732 9,732 9,732 9,732 9,732 9,732

1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,935 11,935 11,935 11,935 11,935 11,935 11,935 11,935 11,935 11,935 11,935 11,935

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,926 14,926 14,926 14,926 14,926 14,926 14,926 14,926 14,926 14,926 14,926 14,926

1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,296 16,296 16,296 16,296 16,296 16,296 16,296 16,296 16,296 16,296 16,296 16,296

1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485

1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,485 19,4851.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 77,441 77,441 77,441 77,441 77,441 77,441 77,441 77,441 77,441 77,441 77,441 77,4411.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 89,730 89,730 89,730 89,730 89,730 89,730 89,730 89,730 89,730 89,730 89,730 89,7301.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 277,513 277,513 277,513 277,513 277,513 277,513 277,513 277,513 277,513 277,513 277,513 277,5131.17 TEE PVC UNIÓN MECÁNICA 2" UN 104,158 104,158 104,158 104,158 104,158 104,158 104,158 104,158 104,158 104,158 104,158 104,1581.18 TEE PVC UNIÓN MECÁNICA 4" UN 171,688 171,688 171,688 171,688 171,688 171,688 171,688 171,688 171,688 171,688 171,688 171,6881.19 TEE PVC UNIÓN MECÁNICA 8" UN 758,996 758,996 758,996 758,996 758,996 758,996 758,996 758,996 758,996 758,996 758,996 758,9961.20 TEE PVC UNIÓN MECÁNICA 10" UN 874,330 874,330 874,330 874,330 874,330 874,330 874,330 874,330 874,330 874,330 874,330 874,3301.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 10,122 10,122 10,122 10,122 10,122 10,122 10,122 10,122 10,122 10,122 10,122 10,1221.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,973 8,973 8,973 8,973 8,973 8,973 8,973 8,973 8,973 8,973 8,973 8,9731.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 21,343 21,343 21,343 21,343 21,343 21,343 21,343 21,343 21,343 21,343 21,343 21,3431.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 85,593 85,593 85,593 85,593 85,593 85,593 85,593 85,593 85,593 85,593 85,593 85,5931.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 126,864 126,864 126,864 126,864 126,864 126,864 126,864 126,864 126,864 126,864 126,864 126,8641.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 21,027 21,027 21,027 21,027 21,027 21,027 21,027 21,027 21,027 21,027 21,027 21,0271.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 71,952 71,952 71,952 71,952 71,952 71,952 71,952 71,952 71,952 71,952 71,952 71,9521.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 106,035 106,035 106,035 106,035 106,035 106,035 106,035 106,035 106,035 106,035 106,035 106,0351.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 22,023 22,023 22,023 22,023 22,023 22,023 22,023 22,023 22,023 22,023 22,023 22,0231.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 45,282 45,282 45,282 45,282 45,282 45,282 45,282 45,282 45,282 45,282 45,282 45,2821.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 181,688 181,688 181,688 181,688 181,688 181,688 181,688 181,688 181,688 181,688 181,688 181,6881.32 UNIÓN REPARACION PVC 4" UN 52,790 52,790 52,790 52,790 52,790 52,790 52,790 52,790 52,790 52,790 52,790 52,7901.33 UNIÓN REPARACIÓN PVC 8" UN 211,284 211,284 211,284 211,284 211,284 211,284 211,284 211,284 211,284 211,284 211,284 211,2841.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 127,495 127,495 127,495 127,495 127,495 127,495 127,495 127,495 127,495 127,495 127,495 127,4951.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 360,602 360,602 360,602 360,602 360,602 360,602 360,602 360,602 360,602 360,602 360,602 360,6021.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,063,655 1,063,655 1,063,655 1,063,655 1,063,655 1,063,655 1,063,655 1,063,655 1,063,655 1,063,655 1,063,655 1,063,6551.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,571,656 1,571,656 1,571,656 1,571,656 1,571,656 1,571,656 1,571,656 1,571,656 1,571,656 1,571,656 1,571,656 1,571,656

Page 89: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,128 8,128 8,128 8,128 8,128 8,128 8,128 8,128 8,128 8,128 8,128 8,1282.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,666 18,666 18,666 18,666 18,666 18,666 18,666 18,666 18,666 18,666 18,666 18,6662.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 104,684 112,632 99,746 99,793 96,831 88,930 94,809 90,905 111,597 98,806 110,657 84,9802.5 RELLENO TIPO 2 "RECEBO" M3 65,293 69,174 53,652 52,358 48,478 39,423 38,318 40,717 38,318 51,065 48,666 39,4232.6 RELLENO TIPO 4 "SUBBASE B-200" M3 74,576 78,457 62,935 61,641 57,761 48,706 40,085 50,000 46,552 60,348 56,900 48,7062.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 90,380 98,086 85,255 84,763 81,688 74,514 80,131 75,539 97,554 83,738 96,036 74,5142.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 80,054 87,551 74,831 73,970 70,835 63,522 69,607 64,567 87,368 72,925 85,462 63,5222.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 97,710 123,247 92,453 102,966 102,966 108,523 87,197 101,145 105,069 119,036 128,533 99,822

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 82,533 82,533 82,533 82,533 82,533 82,533 82,533 82,533 82,533 82,533 82,533 82,5333.2 CODO 45 PVC ALCANTARILLADO 16" UN 860,605 860,605 860,605 860,605 860,605 860,605 860,605 860,605 860,605 860,605 860,605 860,6053.3 CODO 90 PVC ALCANTARILLADO 8" UN 107,870 107,870 107,870 107,870 107,870 107,870 107,870 107,870 107,870 107,870 107,870 107,8703.4 CODO 90 PVC ALCANTARILLADO 16" UN 996,472 996,472 996,472 996,472 996,472 996,472 996,472 996,472 996,472 996,472 996,472 996,4723.5 CODO 90 PVC ALCANTARILLADO 24" UN 694,299 694,299 694,299 694,299 694,299 694,299 694,299 694,299 694,299 694,299 694,299 694,2993.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,151 58,151 58,151 58,151 58,151 58,151 58,151 58,151 58,151 58,151 58,151 58,1513.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,2473.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,8983.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 193,897 193,897 193,897 193,897 193,897 193,897 193,897 193,897 193,897 193,897 193,897 193,897

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 311,243 311,243 311,243 311,243 311,243 311,243 311,243 311,243 311,243 311,243 311,243 311,2433.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 82,248 82,248 82,248 82,248 82,248 82,248 82,248 82,248 82,248 82,248 82,248 82,2483.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,247 82,2473.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,8983.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,898 193,8983.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 311,244 311,244 311,244 311,244 311,244 311,244 311,244 311,244 311,244 311,244 311,244 311,2443.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 285,806 285,806 285,806 285,806 285,806 285,806 285,806 285,806 285,806 285,806 285,806 285,8063.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 458,617 458,617 458,617 458,617 458,617 458,617 458,617 458,617 458,617 458,617 458,617 458,6173.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 732,615 732,615 732,615 732,615 732,615 732,615 732,615 732,615 732,615 732,615 732,615 732,6153.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 45,760 45,760 45,760 45,760 45,760 45,760 45,760 45,760 45,760 45,760 45,760 45,7603.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 240,853 240,853 240,853 240,853 240,853 240,853 240,853 240,853 240,853 240,853 240,853 240,8533.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 262,146 262,146 262,146 262,146 262,146 262,146 262,146 262,146 262,146 262,146 262,146 262,146

3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 768,059 768,059 768,059 768,059 768,059 768,059 768,059 768,059 768,059 768,059 768,059 768,059

3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 43,454 43,717 43,400 43,508 43,508 43,566 43,346 43,490 43,530 43,674 43,772 43,476

3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 218,760 218,760 218,760 218,760 218,760 218,760 218,760 218,760 218,760 218,760 218,760 218,7603.25 TUBERÍA PVC ALCANTARILLADO 8" ML 36,115 36,115 36,115 36,115 36,115 36,115 36,115 36,115 36,115 36,115 36,115 36,1153.26 TUBERÍA PVC ALCANTARILLADO 10" ML 50,996 50,996 50,996 50,996 50,996 50,996 50,996 50,996 50,996 50,996 50,996 50,9963.27 TUBERÍA PVC ALCANTARILLADO 12" ML 73,508 73,508 73,508 73,508 73,508 73,508 73,508 73,508 73,508 73,508 73,508 73,5083.28 TUBERÍA PVC ALCANTARILLADO 16" ML 112,765 112,765 112,765 112,765 112,765 112,765 112,765 112,765 112,765 112,765 112,765 112,7653.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 181,054 181,054 181,054 181,054 181,054 181,054 181,054 181,054 181,054 181,054 181,054 181,0543.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 265,712 265,712 265,712 265,712 265,712 265,712 265,712 265,712 265,712 265,712 265,712 265,7123.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 335,411 335,411 335,411 335,411 335,411 335,411 335,411 335,411 335,411 335,411 335,411 335,4113.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 440,666 440,666 440,666 440,666 440,666 440,666 440,666 440,666 440,666 440,666 440,666 440,666

Page 90: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 604,540 604,540 604,540 604,540 604,540 604,540 604,540 604,540 604,540 604,540 604,540 604,540

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 UN 541,016 551,755 537,324 544,222 538,970 536,987 533,632 535,800 546,184 544,371 552,355 532,783

4.2 ML 518,645 532,246 515,846 521,445 521,445 524,405 513,046 520,475 522,564 530,004 535,062 519,770

4.3 UN 528,987 536,147 526,526 531,125 527,623 526,301 524,065 525,510 532,433 531,223 536,546 523,498

4.4 UN 644,581 658,005 639,966 648,589 642,023 639,545 635,351 638,061 651,041 648,774 658,754 634,289

4.5 ML 735,600 754,753 731,658 739,543 739,543 743,711 727,715 738,176 741,119 751,596 758,718 737,185

4.6 UN 620,995 630,839 617,611 623,934 619,119 617,301 614,226 616,214 625,732 624,070 631,389 613,448

4.7 SUMIDERO EN LADRILLO SL-100 UN 740,779 748,117 738,924 742,635 741,295 741,886 737,065 740,213 743,379 745,600 749,258 739,2564.8 SUMIDERO EN LADRILLO SL-250 UN 1,108,148 1,127,011 1,102,836 1,113,466 1,107,914 1,107,847 1,097,517 1,104,249 1,115,591 1,118,479 1,129,347 1,100,8894.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,584,861 1,614,663 1,575,056 1,595,204 1,580,444 1,576,222 1,565,249 1,572,360 1,598,589 1,595,835 1,616,807 1,564,723

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,154,229 2,203,769 2,137,930 2,171,425 2,146,888 2,139,872 2,121,628 2,133,451 2,177,049 2,172,473 2,207,334 2,120,7574.11 SUMIDERO PREFABRICADO SL-100 UN 972,638 972,638 972,638 972,638 972,638 972,638 972,638 972,638 972,638 972,638 972,638 972,6384.12 SUMIDERO PREFABRICADO SL-250 UN 2,280,219 2,280,219 2,280,219 2,280,219 2,280,219 2,280,219 2,280,219 2,280,219 2,280,219 2,280,219 2,280,219 2,280,219

4.13 UN 103,235 103,790 103,121 103,349 103,349 103,470 103,007 103,310 103,395 103,699 103,905 103,281

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 45,628 47,004 45,345 45,911 45,911 46,211 45,062 45,813 46,025 46,777 47,288 45,7425.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 52,492 53,868 52,209 52,775 52,775 53,075 51,926 52,677 52,889 53,641 54,152 52,6065.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 48,420 50,569 47,755 49,306 48,224 48,043 47,091 47,710 49,350 49,372 50,770 47,2305.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 52,212 54,091 51,566 52,773 51,854 51,507 50,920 51,299 53,116 52,799 54,196 50,7715.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 52,725 54,634 52,097 53,390 52,444 52,175 51,469 51,927 53,603 53,431 54,773 51,4395.6 BORDE SEPARADOR VERDE A-170 ML 197,838 198,393 197,724 197,952 197,952 198,073 197,609 197,913 197,998 198,302 198,508 197,884

5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,807 15,065 14,727 14,913 14,783 14,762 14,647 14,722 14,919 14,921 15,089 14,664

5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 34,708 36,222 34,239 35,332 34,569 34,442 33,771 34,207 35,363 35,379 36,364 33,869

5.9 CAÑUELA PREFABRICADA TIPO A-120 ML 64,899 65,196 64,838 64,960 64,960 65,024 64,777 64,939 64,984 65,147 65,257 64,9235.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 447,660 453,691 446,104 448,280 447,998 448,393 444,549 447,057 449,838 451,505 454,595 446,2205.11 LOSETA PREFABRICADA A-40 M2 48,020 49,291 47,759 48,282 48,282 48,558 47,497 48,191 48,386 49,081 49,554 48,1255.12 LOSETA PREFABRICADA A-60 M2 68,363 69,633 68,102 68,625 68,625 68,901 67,840 68,534 68,729 69,424 69,896 68,468

5.13 ML 28,014 28,766 27,756 28,239 27,871 27,732 27,497 27,649 28,376 28,249 28,808 27,438

5.14 ML 45,993 47,515 45,470 46,448 45,703 45,423 44,947 45,254 46,726 46,469 47,600 44,827

5.15 SARDINEL PREFABRICADO A-10 ML 80,391 81,882 79,335 79,059 78,462 77,134 78,279 77,247 81,315 79,047 81,546 77,0335.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 45,868 46,637 45,710 46,026 46,026 46,193 45,551 45,971 46,089 46,510 46,796 45,931

PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI

SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI

Page 91: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 116,003 116,898 115,696 116,270 115,833 115,667 115,388 115,569 116,434 116,283 116,948 115,3176.2 BANCA EN CONCRETO M-30 UN 485,205 486,458 484,774 485,579 484,966 484,735 484,343 484,596 485,808 485,596 486,528 484,2446.3 BOLARDO M-63 ALTO/HIERRO UN 175,239 175,433 175,175 175,304 175,208 175,179 175,110 175,155 175,330 175,308 175,446 175,1046.4 BOLARDO M-60 CONCRETO UN 112,820 113,894 112,451 113,141 112,615 112,417 112,082 112,298 113,337 113,155 113,954 111,9976.5 BOLARDO M-61 BAJO/CONCRETO UN 114,242 115,316 113,873 114,563 114,038 113,840 113,504 113,721 114,759 114,578 115,376 113,4196.6 BOLARDO M-62 BAJO/HIERRO UN 158,180 159,344 157,793 158,568 157,994 157,815 157,405 157,671 158,723 158,591 159,422 157,3646.7 BORDE CONTENEDOR DE RAICES A-70 ML 47,436 48,489 47,219 47,652 47,652 47,882 47,002 47,577 47,739 48,315 48,707 47,5236.8 BORDILLO PREFABRICADO A-80 ML 54,071 55,249 53,828 54,313 54,313 54,570 53,585 54,229 54,410 55,055 55,493 54,1686.9 CANECA M-120 UN 243,526 243,789 243,472 243,580 243,580 243,638 243,418 243,562 243,602 243,746 243,844 243,548

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 636,933 637,470 636,748 637,093 636,831 636,731 636,564 636,672 637,191 637,101 637,500 636,5216.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,427,193 2,427,551 2,427,069 2,427,299 2,427,124 2,427,058 2,426,946 2,427,019 2,427,365 2,427,304 2,427,570 2,426,9186.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,858,808 2,859,166 2,858,684 2,858,914 2,858,739 2,858,673 2,858,561 2,858,634 2,858,980 2,858,919 2,859,185 2,858,5336.13 CICLOPARQUEADERO M100 TIPO 1 UN 399,730 400,118 399,601 399,859 399,668 399,608 399,471 399,560 399,911 399,867 400,144 399,4586.14 CICLOPARQUEADERO M101 TIPO 2 UN 531,415 532,966 530,898 531,932 531,166 530,928 530,381 530,735 532,138 531,962 533,071 530,3276.15 BANCA EN MADERA M-50 UN 361,610 361,610 361,610 361,610 361,610 361,610 361,610 361,610 361,610 361,610 361,610 361,6106.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 183,179 183,716 182,994 183,339 183,076 182,977 182,809 182,918 183,437 183,346 183,746 182,7676.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 435,394 436,052 435,259 435,530 435,530 435,673 435,123 435,483 435,584 435,944 436,188 435,4496.18 POSTE HISTÓRICO M-131 UN 3,665,725 3,668,410 3,664,802 3,666,526 3,665,213 3,664,718 3,663,879 3,664,421 3,667,017 3,666,563 3,668,559 3,663,666

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,4687.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,7567.3 SEÑAL DOBLE DE CICLORUTA UN 371,230 371,508 371,173 371,288 371,288 371,348 371,116 371,268 371,310 371,462 371,565 371,2537.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 429,338 430,114 429,080 429,597 429,214 429,095 428,821 428,998 429,700 429,612 430,166 428,7947.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 248,962 249,240 248,905 249,020 249,020 249,080 248,848 249,000 249,042 249,194 249,298 248,9857.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 293,148 293,426 293,091 293,206 293,206 293,266 293,034 293,186 293,228 293,380 293,484 293,1717.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 402,652 402,930 402,595 402,710 402,710 402,770 402,538 402,690 402,732 402,884 402,988 402,6757.8 TACHAS REFLECTIVAS UN 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446

7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 11,025 11,025 11,025 11,025 11,025 11,025 11,025 11,025 11,025 11,025 11,025 11,025

7.10 UN 42,662 42,662 42,662 42,662 42,662 42,662 42,662 42,662 42,662 42,662 42,662 42,662TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 92: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)

1 PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995 995 995 995 995

2 EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472

2.2 210.2.1 M3 28,850 28,850 28,850 28,850 28,850 28,850 28,850 28,850 28,850 28,850 28,850 28,850

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505

2.7 230.1 M2 341 341 341 341 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 47,341 47,341 47,341 47,341 47,341 47,341 47,341 47,341 47,341 47,341 47,341 47,341

2.11 600.3 M3 58,487 58,487 58,487 58,487 58,487 58,487 58,487 58,487 58,487 58,487 58,487 58,487

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

NORMA INV

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

NORMA INV

EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE MATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 93: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

3 ESTRUCTURA DE PAVIMENTO

3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 117,874 125,635 111,407 108,820 104,939 95,885 104,939 97,178 122,086 107,526 123,048 95,8853.3 330.1 BASE GRANULAR M3 125,986 133,747 119,519 116,932 113,051 103,997 113,051 105,290 131,436 115,638 131,160 103,997

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,121 2,121 2,121 2,121 2,121 2,121 2,121 2,121 2,121 2,121 2,121 2,1213.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,065 1,065 1,065 1,065 1,065 1,065 1,065 1,065 1,065 1,065 1,065 1,065

3.7 461.1 M3 164,849 167,489 163,520 164,247 163,133 161,415 162,190 161,669 166,711 164,074 167,173 160,221

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 58,225 60,021 57,831 58,620 58,524 58,843 57,437 58,356 58,777 59,631 60,365 58,222

3.9 450.1 P M3 506,035 538,373 491,110 514,742 515,985 537,129 484,892 520,960 506,035 550,810 519,717 523,448

3.10 450.2 P M3 513,285 545,623 498,360 521,992 523,235 544,379 492,142 528,210 513,285 558,060 526,967 530,698

3.11 450.9 P M3 538,312 570,649 523,387 547,018 548,262 569,406 517,168 553,237 538,312 583,087 551,993 555,724

3.12 450.3 P M3 520,535 552,873 505,610 529,242 530,485 551,629 499,392 535,460 520,535 565,310 534,217 537,948

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 225,358 233,119 218,891 216,304 212,423 203,369 212,423 204,662 230,808 215,010 230,532 203,369

3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 216,490 224,251 210,022 207,435 203,555 194,500 203,555 195,794 220,702 206,142 221,664 194,500

3.15 311.1 AFIRMADO M3 73,356 77,237 61,715 60,421 56,541 47,486 38,865 48,780 45,332 59,128 55,680 47,486

3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 12,322 12,473 12,228 12,229 12,172 12,022 12,134 12,059 12,454 12,210 12,436 11,947

3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 5,153 5,228 5,106 5,106 5,078 5,003 5,059 5,022 5,219 5,097 5,210 4,965

3.18 500.1 M3 543,670 562,716 537,781 551,522 541,932 540,334 531,892 537,378 551,915 552,112 564,499 533,128

3.19 500.1 M3 572,496 592,394 566,343 580,699 570,679 569,010 560,190 565,921 581,110 581,316 594,257 561,481

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

NORMA INV

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA

MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

Page 94: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

3.20 500.1 M3 591,485 612,094 585,156 600,127 589,730 588,130 578,827 584,874 600,345 600,787 614,073 580,349

3.21 *** ML 5,818 5,818 5,818 5,818 5,818 5,818 5,818 5,818 5,818 5,818 5,818 5,818

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 99,414 107,268 93,941 93,039 89,756 82,094 88,469 83,189 107,075 91,945 105,079 82,094

4 OBRAS DE ARTE

4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 893,211 914,815 886,531 902,118 891,239 889,427 879,851 886,073 902,564 902,787 916,838 881,2534.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 790,997 812,242 784,428 799,756 789,058 787,275 777,858 783,977 800,195 800,414 814,232 779,2374.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 828,764 850,851 821,935 837,869 826,748 824,895 815,104 821,466 838,326 838,554 852,919 816,5384.4 630 P CONCRETOS f´c =3500 psi (bases) M3 511,398 529,767 505,361 517,796 508,695 506,114 499,323 503,724 519,850 518,188 531,096 499,0284.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 601,375 620,471 595,099 608,027 598,565 595,881 588,822 593,397 610,161 608,434 621,853 588,5164.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 506,464 524,542 500,250 511,862 503,020 499,682 494,035 497,684 515,164 512,111 525,551 492,6054.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 596,246 615,040 589,785 601,857 592,665 589,195 583,325 587,118 605,291 602,116 616,089 581,8384.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 733,936 752,014 727,722 739,333 730,492 727,154 721,507 725,156 742,636 739,583 753,023 720,0774.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 522,913 541,707 516,452 528,524 519,333 515,862 509,992 513,785 531,958 528,784 542,756 508,5054.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 769,443 788,237 762,982 775,054 765,862 762,392 756,522 760,315 778,488 775,314 789,286 755,035

4.11 650 P KG 8,425 8,425 8,425 8,425 8,425 8,425 8,425 8,425 8,425 8,425 8,425 8,425

4.12 650 P KG 11,359 11,359 11,359 11,359 11,359 11,359 11,359 11,359 11,359 11,359 11,359 11,359

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,248 1,248 1,248 1,248 1,248 1,248 1,248 1,248 1,248 1,248 1,248 1,248

4.14 621.1 ML 1,974,667 1,974,667 1,974,667 1,974,667 1,974,667 1,974,667 1,974,667 1,974,667 1,974,667 1,974,667 1,974,667 1,974,667

4.15 621.1 P ML 3,220,624 3,257,578 3,209,197 3,235,859 3,217,250 3,214,150 3,197,770 3,208,414 3,236,622 3,237,004 3,261,038 3,200,168

4.16 621.2 M3 1,109,772 1,127,671 1,103,619 1,115,116 1,106,362 1,103,057 1,097,466 1,101,079 1,118,386 1,115,363 1,128,670 1,096,050

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 70,746 70,746 70,746 70,746 70,746 70,746 70,746 70,746 70,746 70,746 70,746 70,746

4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 270,133 272,281 269,394 270,774 269,724 269,327 268,656 269,090 271,167 270,804 272,401 268,486

4.19 632 P BARANDA METÁLICA ML 304,143 304,143 304,143 304,143 304,143 304,143 304,143 304,143 304,143 304,143 304,143 304,1434.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,421 12,421 12,421 12,421 12,421 12,421 12,421 12,421 12,421 12,421 12,421 12,421

4.21 671.1 M3 418,686 442,155 405,003 419,417 406,414 399,072 384,423 396,597 410,566 419,274 430,863 391,097

4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 99,413 107,643 93,941 93,415 90,131 82,470 88,468 83,564 107,075 92,320 105,454 82,4704.23 610.1 RELLENO PARA ESTRUCTURAS M3 60,281 63,863 49,535 48,341 44,759 36,401 35,381 37,595 35,381 47,147 44,933 36,401

4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 342,955 362,543 336,430 349,489 339,821 336,812 329,905 334,378 352,091 349,863 363,864 329,223

4.25 630.7 M3 330,216 344,709 324,350 331,780 324,842 320,269 318,484 319,221 338,429 331,604 344,697 315,761

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

NORMA INV

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO)

CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR

CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES

Page 95: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

4.26 630.7 M3 354,858 369,350 348,991 356,421 349,484 344,911 343,125 343,863 363,071 356,245 369,339 340,402

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 341,635 356,772 335,848 344,380 337,003 333,186 330,061 331,678 349,737 344,363 357,125 328,540

4.28 630 P M3 366,277 381,413 360,490 369,022 361,644 357,828 354,702 356,320 374,379 369,004 381,767 353,182

4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 465,516 486,188 459,124 474,039 463,630 461,895 452,732 458,687 474,465 474,679 488,123 454,0744.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 553,854 575,344 547,208 562,713 551,892 550,088 540,563 546,753 563,157 563,379 577,356 541,9584.31 681.1 GAVIÓN M3 168,672 176,169 163,448 162,587 159,453 152,140 158,224 153,184 175,985 161,542 174,079 152,1404.32 681.1 GAVIÓN MALLA PVC M3 175,352 182,849 170,128 169,267 166,133 158,820 164,904 159,864 182,665 168,222 180,759 158,820

4.33 672.1 ML 35,560 36,829 35,167 36,083 35,444 35,337 34,775 35,140 36,109 36,122 36,947 34,857

4.34 672.1 ML 14,132 14,767 13,936 14,394 14,075 14,021 13,740 13,923 14,407 14,414 14,826 13,781

4.35 *** M2 8,163 8,163 8,163 8,163 8,163 8,163 8,163 8,163 8,163 8,163 8,163 8,163

4.36 *** M2 11,697 11,697 11,697 11,697 11,697 11,697 11,697 11,697 11,697 11,697 11,697 11,697

4.37 *** M2 15,788 15,788 15,788 15,788 15,788 15,788 15,788 15,788 15,788 15,788 15,788 15,788

4.38 *** M2 18,953 18,953 18,953 18,953 18,953 18,953 18,953 18,953 18,953 18,953 18,953 18,953

4.39 *** M2 24,375 24,375 24,375 24,375 24,375 24,375 24,375 24,375 24,375 24,375 24,375 24,375

4.40 *** M2 5,616 5,616 5,616 5,616 5,616 5,616 5,616 5,616 5,616 5,616 5,616 5,616

4.41 *** M2 6,405 6,405 6,405 6,405 6,405 6,405 6,405 6,405 6,405 6,405 6,405 6,405

4.42 *** M2 6,654 6,654 6,654 6,654 6,654 6,654 6,654 6,654 6,654 6,654 6,654 6,654

4.43 *** M2 5,689 5,689 5,689 5,689 5,689 5,689 5,689 5,689 5,689 5,689 5,689 5,689

4.44 *** M2 7,274 7,274 7,274 7,274 7,274 7,274 7,274 7,274 7,274 7,274 7,274 7,274

4.45 *** M2 5,331 5,331 5,331 5,331 5,331 5,331 5,331 5,331 5,331 5,331 5,331 5,331

4.46 *** M2 7,176 7,176 7,176 7,176 7,176 7,176 7,176 7,176 7,176 7,176 7,176 7,176

4.47 *** M2 12,314 12,314 12,314 12,314 12,314 12,314 12,314 12,314 12,314 12,314 12,314 12,314

CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES

CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES

BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50

SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

Page 96: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

4.48 661.1 ML 320,459 320,891 320,370 320,784 320,548 320,642 320,282 320,517 320,583 320,819 320,980 320,496

4.49 660.3 ML 274,391 278,825 272,984 275,799 273,885 273,410 271,578 272,767 276,360 276,222 279,201 271,718

4.50 *** ML 632,746 632,746 632,746 632,746 632,746 632,746 632,746 632,746 632,746 632,746 632,746 632,746

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 121,615 125,346 110,421 109,178 105,446 96,740 88,450 97,984 94,669 107,934 104,619 96,740

4.52 640.1 KG 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302 3,302

4.53 *** ML 50,598 50,598 50,598 50,598 50,598 50,598 50,598 50,598 50,598 50,598 50,598 50,598

4.54 *** ML 81,509 81,509 81,509 81,509 81,509 81,509 81,509 81,509 81,509 81,509 81,509 81,509

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 456,544 478,034 449,898 465,403 454,582 452,778 443,253 449,443 465,847 466,069 480,046 444,6484.56 682.1 P COLCHONETA RENO M3 184,301 191,798 179,077 178,216 175,082 167,769 173,854 168,814 191,614 177,172 189,709 167,7694.57 *** TRINCHO EN MADERA M2 48,361 48,361 48,361 48,361 48,361 48,361 48,361 48,361 48,361 48,361 48,361 48,361

5 SEÑALIZACIÓN

5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,4685.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,7565.3 730.3 TOPE DEFENSA METÁLICA UN 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,5135.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,513 68,5135.5 730.1 DEFENSA METÁLICA ML 176,488 177,432 176,168 176,784 176,321 176,159 175,848 176,049 176,936 176,799 177,489 175,792

5.6 701.1 UN 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446 10,446

6 MANTENIMIENTO VIAL

6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 567 567 567 567 567 567 567 567 567 567 567 567

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286

6.5 801.1 HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,216 12,216 12,216 12,216 12,216 12,216 12,216 12,216 12,216 12,216 12,216 12,2166.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 33,065 33,065 33,065 33,065 33,065 33,065 33,065 33,065 33,065 33,065 33,065 33,0656.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,966 5,966 5,966 5,966 5,966 5,966 5,966 5,966 5,966 5,966 5,966 5,966

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MMSUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36"

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

NORMA INV

SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES

NORMA INV

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

Page 97: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Albán La_Peña La_Vega Nimaima Nocaima Quebradanegra San_Francisco Sasaima Supatá Útica Vergara Villeta

GOBERNACIÓN DE CUNDINAMARCALISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUALIVÁ

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 98: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,592,347 1,567,435 1,570,214 1,568,560 1,571,312 1,576,914 1,591,125 1,581,6531.2 CAMPAMENTO 9 M2 UN 921,705 909,249 910,639 909,812 911,188 913,988 921,094 916,3581.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,424 10,424 10,424 10,424 10,424 10,424 10,424 10,4241.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,743 11,743 11,743 11,743 11,743 11,743 11,743 11,7431.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,644 13,644 13,644 13,644 13,644 13,644 13,644 13,6441.6 CERCA EN TABLA H=2.30 M ML 51,052 51,052 51,052 51,052 51,052 51,052 51,052 51,0521.7 CERCA EN TEJA DE ZINC H=1.80 M ML 37,025 36,750 36,782 36,766 36,797 36,853 37,016 36,9051.8 CERCA EN TELA VERDE H = 2.10 M ML 16,659 16,384 16,415 16,399 16,431 16,487 16,649 16,5381.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 653,819 649,279 649,593 649,935 649,848 650,609 651,931 651,523

1.41 M2 7,530 7,530 7,530 7,530 7,530 7,530 7,530 7,530

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,398 2,398 2,398 2,398 2,398 2,398 2,398 2,3981.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,195,722 1,195,722 1,195,722 1,195,722 1,195,722 1,195,722 1,195,722 1,195,722

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 99: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

1.44 RED TELEFÓNICA PROVISIONAL UN 170,305 170,305 170,305 170,305 170,305 170,305 170,305 170,3051.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 81,464 58,181 58,181 67,131 60,716 62,061 58,181 67,2352.2 BASE ARENA CEMENTO 1:20 M3 232,138 200,891 206,098 156,624 160,530 206,098 157,925 219,1182.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,677 4,677 4,677 4,677 4,677 4,677 4,677 4,6772.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 575,084 548,221 551,268 549,663 552,684 558,343 574,024 563,4042.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 591,572 563,543 566,754 565,193 568,379 574,041 590,631 579,2922.8 ZAPATAS EN CONCRETO 3500 PSI M3 553,033 526,788 529,794 528,333 531,316 536,618 552,152 541,5342.9 PILOTE DE MADERA D=20 CM ML 36,670 36,670 36,670 36,670 36,670 36,670 36,670 36,670

2.10 ML 111,777 111,777 111,777 111,777 111,777 111,777 111,777 111,777

2.11 ML 135,832 135,832 135,832 135,832 135,832 135,832 135,832 135,832

2.12 ML 164,922 164,922 164,922 164,922 164,922 164,922 164,922 164,922

2.13 ML 204,082 204,082 204,082 204,082 204,082 204,082 204,082 204,082

2.14 PILOTE HINCADO 25X25 ML 95,820 93,891 94,115 94,018 94,241 94,607 95,771 94,9652.15 PILOTE HINCADO 30X30 ML 118,001 115,205 115,530 115,390 115,713 116,244 117,930 116,7632.16 DADOS EN CONCRETO 3500PSI M3 542,257 516,012 519,018 517,557 520,540 525,842 541,375 530,758

2.17 ML 119,706 119,706 119,706 119,706 119,706 119,706 119,706 119,706

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 29,475 29,281 29,314 29,006 29,031 29,314 29,015 29,3953.2 SIFÓN EN PVC 6" UN 151,100 150,905 150,938 150,630 150,655 150,938 150,639 151,0193.3 CAJA DE INSPECCIÓN DE 100X100 UN 396,197 369,987 371,494 367,426 365,415 375,795 369,357 382,3813.4 CAJA DE INSPECCIÓN DE 40X40 UN 190,622 185,840 186,278 184,745 184,857 187,193 186,672 188,3953.5 CAJA DE INSPECCIÓN DE 60X60 UN 217,657 209,751 210,522 207,087 207,317 211,880 209,899 213,9913.6 CAJA DE INSPECCIÓN DE 80X80 UN 293,176 281,109 282,423 276,104 276,804 284,487 281,219 287,7863.7 DUCTO ELÉCTRICO PVC 4" ML 76,212 76,033 76,033 76,083 76,043 76,063 76,033 76,1033.8 POZO SÉPTICO ETERNIT 1000 LT UN 1,003,167 1,001,376 1,001,376 1,001,875 1,001,476 1,001,675 1,001,376 1,002,0733.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 92,790 90,645 91,003 87,607 87,875 91,003 87,697 91,896

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 53,766 52,635 52,823 51,032 51,173 52,823 51,079 53,2953.11 TUBERÍA DRENAJE PVC 110 ML 22,150 21,710 21,755 21,710 21,754 21,886 22,106 21,9743.12 TUBERÍA DRENAJE PVC 160 ML 33,295 32,855 32,900 32,855 32,899 33,031 33,251 33,1193.13 TUBERÍA DRENAJE PVC 200 ML 45,793 45,178 45,241 45,178 45,240 45,424 45,732 45,5473.14 TUBERÍA DRENAJE PVC 250 ML 62,078 61,375 61,446 61,375 61,445 61,656 62,008 61,7973.15 TUBERÍA DRENAJE PVC 315 ML 84,930 84,315 84,377 84,315 84,376 84,561 84,868 84,684

3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 781,536 774,504 775,219 774,504 775,207 777,317 780,833 778,723

3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1,120,385 1,106,321 1,107,751 1,106,321 1,107,727 1,111,946 1,118,978 1,114,759

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 100: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1,490,742 1,462,614 1,465,475 1,462,614 1,465,427 1,473,865 1,487,929 1,479,491

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 28,912 28,912 28,912 28,912 28,912 28,912 28,912 28,9124.2 CASETÓN DE LONA 0.80X0.70 M2 38,118 38,118 38,118 38,118 38,118 38,118 38,118 38,1184.3 COLUMNAS 3500 PSI M3 698,505 672,259 675,266 673,804 676,787 682,090 697,623 687,0064.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 266,305 243,254 245,961 244,004 246,692 250,897 264,637 255,763

4.5 M2 84,022 81,474 81,766 81,624 81,914 82,429 83,937 82,906

4.6 M2 99,206 96,149 96,499 96,329 96,676 97,294 99,104 97,867

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 112,152 108,075 108,543 108,315 108,779 109,603 112,015 110,3664.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 118,467 114,136 114,632 114,391 114,883 115,758 118,322 116,5704.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 137,278 131,927 132,540 132,242 132,850 133,931 137,098 134,933

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 153,362 147,247 147,947 147,607 148,302 149,537 153,157 150,6834.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 170,649 163,769 164,557 164,174 164,956 166,346 170,418 167,6354.12 ENTREPISO VIGUETA PLACA M2 77,443 76,971 77,036 76,686 76,742 77,104 76,931 77,2414.13 ESCALERA MACIZA 3500 PSI M3 810,872 784,626 787,633 786,171 789,154 794,457 809,990 799,3734.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 73,109 72,705 72,757 72,755 72,807 72,845 73,125 72,9154.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 68,715 66,091 66,391 66,245 66,543 67,074 68,627 67,5654.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 78,485 75,274 75,642 75,463 75,828 76,477 78,377 77,0784.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 92,678 88,652 89,114 88,889 89,347 90,160 92,543 90,9154.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 631,719 605,473 608,480 607,018 610,001 615,304 630,837 620,220

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 40,579 39,763 39,858 39,817 39,911 40,066 40,558 40,2174.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 253,153 241,431 242,774 242,121 243,453 245,821 252,759 248,017

4.21000000000001 ACERO FIGURADO 37000 PSI KG 3,284 3,284 3,284 3,284 3,284 3,284 3,284 3,2844.22 ACERO FIGURADO 60000 PSI KG 3,411 3,411 3,411 3,411 3,411 3,411 3,411 3,411

4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,644 4,644 4,644 4,644 4,644 4,644 4,644 4,6444.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 735,668 709,423 712,429 710,968 713,951 719,253 734,787 724,169

4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 690,279 661,559 664,849 663,246 666,509 672,318 689,310 677,6994.26 VIGA AÉREA 3500 PSI M3 736,324 710,079 713,085 711,624 714,607 719,909 735,443 724,825

4.27000000000001 VIGA CINTA 3500 PSI M3 720,999 694,753 697,760 696,298 699,281 704,584 720,117 709,5004.28 VIGA CANAL EN CONCRETO 3500 PSI M3 880,392 854,147 857,153 855,692 858,675 863,977 879,511 868,893

4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 327,350 298,840 302,020 300,127 303,277 309,688 325,951 315,112

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 24,882 24,144 24,239 23,905 23,992 24,378 24,407 24,5605.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 40,485 39,747 39,843 39,508 39,595 39,982 40,011 40,1645.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 25,626 25,432 25,464 25,157 25,181 25,464 25,165 25,5455.4 ARCOS EN LADRILLO PRENSADO ML 122,943 122,555 122,620 122,005 122,054 122,620 122,022 122,7825.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 36,542 35,726 35,821 35,780 35,874 36,029 36,521 36,1815.6 DINTELES EN BLOQUE 0.15 M ML 20,960 20,556 20,608 20,606 20,658 20,696 20,976 20,7665.7 ENCHAPES LADRILLO PRENSADO M2 71,164 70,388 70,517 69,288 69,385 70,517 69,320 70,8405.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 78,243 75,523 75,839 75,703 76,016 76,533 78,174 77,0385.9 MURO DRYWALL DOBLE CARA 0.12 M M2 54,991 54,991 54,991 54,991 54,991 54,991 54,991 54,991

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 33,530 33,530 33,530 33,530 33,530 33,530 33,530 33,530

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 101: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 53,248 53,248 53,248 53,248 53,248 53,248 53,248 53,2485.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 32,658 32,658 32,658 32,658 32,658 32,658 32,658 32,6585.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 67,166 67,166 67,166 67,166 67,166 67,166 67,166 67,1665.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 40,624 40,624 40,624 40,624 40,624 40,624 40,624 40,6245.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 68,789 68,789 68,789 68,789 68,789 68,789 68,789 68,7895.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 41,436 41,436 41,436 41,436 41,436 41,436 41,436 41,4365.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 28,773 28,383 28,448 27,831 27,880 28,448 27,847 28,6115.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 17,672 17,477 17,510 17,201 17,225 17,510 17,209 17,591

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 39,758 39,498 39,541 39,129 39,162 39,541 39,140 39,6495.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 23,976 23,846 23,867 23,662 23,678 23,867 23,667 23,922

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 46,786 46,526 46,569 46,157 46,190 46,569 46,168 46,6775.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 28,003 27,873 27,894 27,688 27,705 27,894 27,694 27,949

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 86,355 85,054 85,271 83,212 83,375 85,271 83,266 85,8135.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 50,092 49,442 49,550 48,521 48,602 49,550 48,548 49,821

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 26,298 26,038 26,082 25,670 25,702 26,082 25,681 26,1905.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 16,181 16,051 16,073 15,867 15,883 16,073 15,872 16,127

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 50,614 50,094 50,180 49,357 49,422 50,180 49,378 50,3975.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 31,142 30,882 30,925 30,513 30,546 30,925 30,524 31,033

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 67,861 67,457 67,509 67,507 67,559 67,597 67,877 67,6675.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 41,043 40,841 40,867 40,866 40,892 40,911 41,051 40,946

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 129,422 127,601 127,905 125,022 125,250 127,905 125,098 128,6635.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 78,720 77,810 77,961 76,520 76,634 77,961 76,558 78,341

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 63,433 62,553 62,700 61,307 61,417 62,700 61,344 63,0665.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 38,829 38,389 38,462 37,766 37,821 38,462 37,784 38,645

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 38,136 37,553 37,650 36,728 36,801 37,650 36,753 37,8935.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 22,951 22,660 22,708 22,247 22,284 22,708 22,259 22,830

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 26,922 26,662 26,705 26,293 26,326 26,705 26,304 26,8135.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 16,283 16,153 16,175 15,969 15,985 16,175 15,974 16,229

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 41,197 40,676 40,763 39,940 40,005 40,763 39,961 40,9805.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 25,001 24,741 24,784 24,373 24,405 24,784 24,383 24,893

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 78,571 77,790 77,920 76,685 76,783 77,920 76,717 78,2455.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 47,471 47,081 47,146 46,528 46,577 47,146 46,545 47,309

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 57,354 56,833 56,920 56,097 56,162 56,920 56,118 57,1375.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 34,335 34,075 34,118 33,707 33,739 34,118 33,717 34,227

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 123,564 121,743 122,047 119,164 119,392 122,047 119,240 122,8055.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 74,209 73,299 73,450 72,009 72,123 73,450 72,047 73,830

5.47000000000002 REMATES LADRILLO PRENSADO ML 22,768 22,574 22,606 22,299 22,323 22,606 22,307 22,6875.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 29,768 29,135 29,240 28,238 28,317 29,240 28,265 29,504

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 49,690 48,846 48,986 47,650 47,756 48,986 47,685 49,3385.50 LAVADA DE FACHADA M2 4,027 4,027 4,027 4,027 4,027 4,027 4,027 4,027

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 40,655 39,917 40,012 39,678 39,765 40,151 40,180 40,3335.52 DOVELA, GROUTING 3000 PSI ML 7,660 7,660 7,660 7,660 7,660 7,660 7,660 7,660

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,239 10,239 10,239 10,239 10,239 10,239 10,239 10,2395.54 ANCLAJE 1/2" L=50CM UN 13,421 13,421 13,421 13,421 13,421 13,421 13,421 13,421

5.55000000000003 ANCLAJE 5/8" L=70CM UN 18,857 18,857 18,857 18,857 18,857 18,857 18,857 18,8575.56 ANCLAJE 3/4" L=70CM UN 28,312 28,312 28,312 28,312 28,312 28,312 28,312 28,312

Page 102: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

5.57000000000003 ANCLAJE 1" L= 70CM UN 4,418 4,224 4,246 4,234 4,256 4,297 4,411 4,334

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,920 11,920 11,920 11,920 11,920 11,920 11,920 11,9206.2 FILOS O DILATACIONES B/PLACA ML 4,997 4,803 4,836 4,528 4,553 4,836 4,537 4,9176.3 FILOS O DILATACIONES S/MURO ML 5,901 5,707 5,739 5,432 5,456 5,739 5,440 5,8206.4 GOTERA EN MORTERO 1:4 ML 7,039 6,845 6,878 6,570 6,594 6,878 6,578 6,9586.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,4666.6 MALLA BAJO ENTRAMADO M2 10,488 10,488 10,488 10,488 10,488 10,488 10,488 10,4886.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 20,735 20,119 20,222 19,247 19,324 20,222 19,272 20,4786.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 12,343 12,035 12,087 11,599 11,638 12,087 11,612 12,2156.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 18,321 17,774 17,865 17,001 17,069 17,865 17,024 18,093

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,900 10,627 10,672 10,240 10,274 10,672 10,251 10,7866.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 17,772 17,156 17,258 16,283 16,360 17,258 16,309 17,5156.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 10,625 10,317 10,369 9,881 9,920 10,369 9,894 10,4976.13 PAÑETE CULATAS 1:4, E=2 CM M2 18,321 17,774 17,865 17,001 17,069 17,865 17,024 18,0936.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,900 10,627 10,672 10,240 10,274 10,672 10,251 10,7866.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 17,672 17,233 17,306 16,611 16,666 17,306 16,630 17,4896.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 10,574 10,355 10,392 10,044 10,072 10,392 10,053 10,4836.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 15,087 14,671 14,741 14,082 14,134 14,741 14,099 14,9146.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 9,063 8,855 8,890 8,561 8,587 8,890 8,569 8,977

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 14,669 14,200 14,278 13,535 13,594 14,278 13,555 14,4746.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,854 8,620 8,659 8,287 8,317 8,659 8,297 8,757

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 18,913 18,367 18,458 17,593 17,662 18,458 17,616 18,6866.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 11,181 10,908 10,953 10,521 10,555 10,953 10,532 11,067

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 18,364 17,748 17,851 16,876 16,953 17,851 16,902 18,1086.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,906 10,598 10,650 10,162 10,201 10,650 10,175 10,778

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 15,134 14,665 14,743 14,000 14,059 14,743 14,020 14,9396.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 9,073 8,839 8,878 8,506 8,536 8,878 8,516 8,975

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 19,042 18,426 18,528 17,553 17,630 18,528 17,579 18,7856.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 11,553 11,245 11,296 10,809 10,847 11,296 10,822 11,425

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 23,632 22,852 22,982 21,747 21,844 22,982 21,779 23,307

7.2 M2 70,002 68,642 68,800 68,732 68,889 69,147 69,968 69,400

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 41,597 41,597 41,597 41,597 41,597 41,597 41,597 41,5977.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,755 16,755 16,755 16,755 16,755 16,755 16,755 16,7557.5 ML 26,341 26,341 26,341 26,341 26,341 26,341 26,341 26,3417.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 62,053 62,053 62,053 62,053 62,053 62,053 62,053 62,0537.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 44,326 44,326 44,326 44,326 44,326 44,326 44,326 44,3267.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 26,488 26,488 26,488 26,488 26,488 26,488 26,488 26,4887.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 60,383 60,383 60,383 60,383 60,383 60,383 60,383 60,383

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 78,074 78,074 78,074 78,074 78,074 78,074 78,074 78,0747.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 101,681 101,681 101,681 101,681 101,681 101,681 101,681 101,6817.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 44,376 44,376 44,376 44,376 44,376 44,376 44,376 44,376

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

Page 103: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

7.13 CANAL PVC AMAZONAS ML 64,190 64,190 64,190 64,190 64,190 64,190 64,190 64,1907.14 CANAL PVC RAINGO ML 56,620 56,620 56,620 56,620 56,620 56,620 56,620 56,6207.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 90,519 90,519 90,519 90,519 90,519 90,519 90,519 90,5197.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 52,420 52,420 52,420 52,420 52,420 52,420 52,420 52,4207.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 42,992 42,992 42,992 42,992 42,992 42,992 42,992 42,9927.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 24,285 24,285 24,285 24,285 24,285 24,285 24,285 24,285

7.19000000000001 TEJA DE BARRO M2 49,491 48,521 48,683 47,146 47,267 48,683 47,187 49,0877.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 35,837 35,837 35,837 35,837 35,837 35,837 35,837 35,837

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 32,864 32,864 32,864 32,864 32,864 32,864 32,864 32,8647.22 TEJA FIBROCEMENTO Nº4 M2 27,624 27,624 27,624 27,624 27,624 27,624 27,624 27,624

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 26,845 26,845 26,845 26,845 26,845 26,845 26,845 26,8457.24 TEJA FIBROCEMENTO No. 8 M2 27,637 27,637 27,637 27,637 27,637 27,637 27,637 27,637

7.25000000000001 TEJA TERMOACÚSTICA M2 38,531 38,531 38,531 38,531 38,531 38,531 38,531 38,5317.26 TEJA PLÁSTICA No.6 M2 33,910 33,910 33,910 33,910 33,910 33,910 33,910 33,910

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 62,551 62,551 62,551 62,551 62,551 62,551 62,551 62,5517.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 114,134 114,134 114,134 114,134 114,134 114,134 114,134 114,134

7.29000000000001 TEJA SIN TRASLAPO M2 51,213 51,213 51,213 51,213 51,213 51,213 51,213 51,2137.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 32,425 32,425 32,425 32,425 32,425 32,425 32,425 32,425

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 25,702 25,702 25,702 25,702 25,702 25,702 25,702 25,702

7.32 M2 41,605 41,605 41,605 41,605 41,605 41,605 41,605 41,605

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 15,109 15,109 15,109 15,109 15,109 15,109 15,109 15,1097.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 18,172 18,172 18,172 18,172 18,172 18,172 18,172 18,172

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,756 20,756 20,756 20,756 20,756 20,756 20,756 20,7567.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 26,827 26,827 26,827 26,827 26,827 26,827 26,827 26,827

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,658 16,658 16,658 16,658 16,658 16,658 16,658 16,6587.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 39,133 39,133 39,133 39,133 39,133 39,133 39,133 39,133

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 234,008 234,008 234,008 234,008 234,008 234,008 234,008 234,0087.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 293,388 293,388 293,388 293,388 293,388 293,388 293,388 293,388

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 189,513 189,513 189,513 189,513 189,513 189,513 189,513 189,5137.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 274,150 274,150 274,150 274,150 274,150 274,150 274,150 274,150

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 451,599 423,641 426,888 425,491 428,716 434,025 450,890 439,2178.2 CONCRETO 3500 PSI M3 394,930 369,449 372,368 370,949 373,845 378,993 394,074 383,7668.3 CONCRETO 3000 PSI M3 389,089 363,009 365,967 364,409 367,342 372,836 388,060 377,7508.4 CONCRETO 2500 PSI M3 354,903 327,702 330,861 329,502 332,639 337,805 354,213 342,8568.5 CONCRETO 2000 PSI M3 333,638 306,144 309,284 307,719 310,834 316,461 332,665 321,6208.6 CONCRETO 1500 PSI M3 306,307 278,627 281,715 279,877 282,935 289,159 304,949 294,4258.7 MORTERO SECO 1:10 M3 263,506 236,723 241,185 198,779 202,127 241,185 199,894 252,3458.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 449,061 423,054 427,388 386,211 389,462 427,388 387,294 438,2248.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 422,914 393,590 398,478 352,049 355,714 398,478 353,271 410,696

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 476,177 448,752 453,323 409,900 413,328 453,323 411,043 464,7508.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 610,577 583,152 587,723 544,300 547,728 587,723 545,443 599,150

9 CARPINTERÍA EN MADERA

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 104: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

9.1 BARANDA EN MADERA CEDRO MACHO ML 92,609 92,609 92,609 92,609 92,609 92,609 92,609 92,6099.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 3,384 3,190 3,223 2,915 2,940 3,223 2,923 3,3039.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 104,004 104,004 104,004 104,004 104,004 104,004 104,004 104,0049.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 127,124 127,124 127,124 127,124 127,124 127,124 127,124 127,1249.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 176,859 176,859 176,859 176,859 176,859 176,859 176,859 176,8599.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 197,584 197,584 197,584 197,584 197,584 197,584 197,584 197,5849.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 218,334 218,334 218,334 218,334 218,334 218,334 218,334 218,3349.8 HOJA PUERTA FORTEC 0.81 UN 155,066 155,066 155,066 155,066 155,066 155,066 155,066 155,0669.9 HOJA PUERTA FORTEC 0.91 UN 171,322 171,322 171,322 171,322 171,322 171,322 171,322 171,322

9.10 HOJA PUERTA FORTEC 1.50 UN 254,219 254,219 254,219 254,219 254,219 254,219 254,219 254,2199.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 95,935 95,935 95,935 95,935 95,935 95,935 95,935 95,9359.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 127,472 127,472 127,472 127,472 127,472 127,472 127,472 127,4729.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 141,234 141,234 141,234 141,234 141,234 141,234 141,234 141,2349.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 359,699 359,699 359,699 359,699 359,699 359,699 359,699 359,6999.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 31,414 31,414 31,414 31,414 31,414 31,414 31,414 31,4149.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,827 19,827 19,827 19,827 19,827 19,827 19,827 19,8279.17 VENTANERÍA EN MADERA CEDRO MACHO M2 73,154 73,154 73,154 73,154 73,154 73,154 73,154 73,1549.18 CERRADURA DE ENTRADA PRINCIPAL UN 92,100 92,100 92,100 92,100 92,100 92,100 92,100 92,1009.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 71,573 71,573 71,573 71,573 71,573 71,573 71,573 71,5739.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 22,260 22,260 22,260 22,260 22,260 22,260 22,260 22,2609.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 22,260 22,260 22,260 22,260 22,260 22,260 22,260 22,2609.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 21,114 21,114 21,114 21,114 21,114 21,114 21,114 21,1149.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 78,831 78,831 78,831 78,831 78,831 78,831 78,831 78,8319.24 ESPEJO BISELADO INCOLORO 4 MM M2 101,996 101,996 101,996 101,996 101,996 101,996 101,996 101,9969.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 46,400 46,400 46,400 46,400 46,400 46,400 46,400 46,4009.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 55,666 55,666 55,666 55,666 55,666 55,666 55,666 55,6669.27 VIDRIO TEMPLADO PULIDO 10 MM M2 225,084 225,084 225,084 225,084 225,084 225,084 225,084 225,0849.28 VIDRIO TEMPLADO PULIDO 8 MM M2 201,918 201,918 201,918 201,918 201,918 201,918 201,918 201,9189.29 VIDRIO TRANSPARENTE 3 MM M2 49,874 49,874 49,874 49,874 49,874 49,874 49,874 49,8749.30 VIDRIO TRANSPARENTE 4 MM M2 57,983 57,983 57,983 57,983 57,983 57,983 57,983 57,9839.31 VIDRIO TRANSPARENTE 5 MM M2 64,931 64,931 64,931 64,931 64,931 64,931 64,931 64,9319.32 VIDRIO TRANSPARENTE 6 MM M2 69,102 69,102 69,102 69,102 69,102 69,102 69,102 69,102

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 57,767 57,767 57,767 57,767 57,767 57,767 57,767 57,76710.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 169,249 169,249 169,249 169,249 169,249 169,249 169,249 169,249

10.3 ML 84,268 84,268 84,268 84,268 84,268 84,268 84,268 84,268

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 108,667 108,667 108,667 108,667 108,667 108,667 108,667 108,66710.5 MARCO TAPA CAJA DE INSPECCIÓN UN 104,705 104,705 104,705 104,705 104,705 104,705 104,705 104,70510.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 73,138 73,138 73,138 73,138 73,138 73,138 73,138 73,13810.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 155,800 155,800 155,800 155,800 155,800 155,800 155,800 155,80010.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 83,172 83,172 83,172 83,172 83,172 83,172 83,172 83,17210.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,993 4,993 4,993 4,993 4,993 4,993 4,993 4,993

10.10 M2 75,810 75,810 75,810 75,810 75,810 75,810 75,810 75,810

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

Page 105: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 31,799 31,799 31,799 31,799 31,799 31,799 31,799 31,79910.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 409,479 409,479 409,479 409,479 409,479 409,479 409,479 409,47910.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 147,485 147,485 147,485 147,485 147,485 147,485 147,485 147,485

10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 161,824 161,824 161,824 161,824 161,824 161,824 161,824 161,824

10.15 M2 373,490 373,490 373,490 373,490 373,490 373,490 373,490 373,490

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 96,806 96,806 96,806 96,806 96,806 96,806 96,806 96,80610.17 PUERTA CORTINA INCLUYE ESMALTE M2 298,597 298,597 298,597 298,597 298,597 298,597 298,597 298,59710.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,651 4,651 4,651 4,651 4,651 4,651 4,651 4,65110.19 VENTANA EN ALUMINIO CORREDIZA M2 210,167 210,167 210,167 210,167 210,167 210,167 210,167 210,16710.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 92,698 92,698 92,698 92,698 92,698 92,698 92,698 92,69810.21 REJILLA PISO 0.30 M M2 66,196 66,196 66,196 66,196 66,196 66,196 66,196 66,19610.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 67,725 67,725 67,725 67,725 67,725 67,725 67,725 67,725

10.23 KG 7,659 7,659 7,659 7,659 7,659 7,659 7,659 7,659

10.24 KG 8,522 8,522 8,522 8,522 8,522 8,522 8,522 8,522

10.25 KG 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11.1 ACOMETIDA EN PVC 1/2" 5M UN 171,475 171,475 171,475 171,475 171,475 171,475 171,475 171,47511.2 ACOMETIDA EN PVC 3/4" 5M UN 204,985 204,985 204,985 204,985 204,985 204,985 204,985 204,98511.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,755 16,755 16,755 16,755 16,755 16,755 16,755 16,75511.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 26,341 26,341 26,341 26,341 26,341 26,341 26,341 26,34111.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 25,392 25,392 25,392 25,392 25,392 25,392 25,392 25,39211.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 32,523 32,523 32,523 32,523 32,523 32,523 32,523 32,52311.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 66,962 66,962 66,962 66,962 66,962 66,962 66,962 66,96211.8 CONEXIÓN TANQUE ELEVADO PVC UN 171,512 171,512 171,512 171,512 171,512 171,512 171,512 171,51211.9 INSTALACIÓN APARATO SANITARIO UN 33,420 33,420 33,420 33,420 33,420 33,420 33,420 33,420

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 24,127 24,127 24,127 24,127 24,127 24,127 24,127 24,12711.13 NIPLE PASAMURO 2" UN 51,157 51,157 51,157 51,157 51,157 51,157 51,157 51,15711.14 NIPLE PASAMURO 4" UN 76,542 76,542 76,542 76,542 76,542 76,542 76,542 76,54211.15 PUNTO AGUA CALIENTE CPVC UN 64,067 64,067 64,067 64,067 64,067 64,067 64,067 64,06711.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 46,552 46,552 46,552 46,552 46,552 46,552 46,552 46,55211.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 49,459 49,459 49,459 49,459 49,459 49,459 49,459 49,45911.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 62,462 62,462 62,462 62,462 62,462 62,462 62,462 62,462

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 106: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 49,870 49,870 49,870 49,870 49,870 49,870 49,870 49,87011.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 62,350 62,350 62,350 62,350 62,350 62,350 62,350 62,35011.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 66,697 66,697 66,697 66,697 66,697 66,697 66,697 66,69711.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 56,188 56,188 56,188 56,188 56,188 56,188 56,188 56,18811.23 RED SUMINISTRO CPVC 1/2" ML 9,494 9,494 9,494 9,494 9,494 9,494 9,494 9,49411.24 RED SUMINISTRO CPVC 3/4" ML 13,358 13,358 13,358 13,358 13,358 13,358 13,358 13,35811.25 RED SUMINISTRO PVC 1 1/2" ML 17,155 17,155 17,155 17,155 17,155 17,155 17,155 17,15511.26 RED SUMINISTRO PVC 1" ML 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,59811.27 RED SUMINISTRO PVC 1/2" ML 6,356 6,356 6,356 6,356 6,356 6,356 6,356 6,35611.28 RED SUMINISTRO PVC 2 1/2" ML 43,445 43,445 43,445 43,445 43,445 43,445 43,445 43,44511.29 RED SUMINISTRO PVC 2" ML 24,886 24,886 24,886 24,886 24,886 24,886 24,886 24,88611.30 RED SUMINISTRO PVC 3/4" ML 7,947 7,947 7,947 7,947 7,947 7,947 7,947 7,94711.31 RED SANITARIA PVC-S 2" ML 18,857 18,857 18,857 18,857 18,857 18,857 18,857 18,85711.32 RED SANITARIA PVC-S 3" ML 26,185 26,185 26,185 26,185 26,185 26,185 26,185 26,18511.33 RED SANITARIA PVC-S 4" ML 35,468 35,468 35,468 35,468 35,468 35,468 35,468 35,46811.34 RED SANITARIA PVC-S 6" ML 66,541 66,541 66,541 66,541 66,541 66,541 66,541 66,54111.35 REGISTRO 1" UN 86,593 86,593 86,593 86,593 86,593 86,593 86,593 86,59311.36 REGISTRO 1/2" UN 49,538 49,538 49,538 49,538 49,538 49,538 49,538 49,53811.37 REGISTRO 3/4" UN 60,790 60,790 60,790 60,790 60,790 60,790 60,790 60,79011.38 REGISTRO 1 1/2" UN 113,246 113,246 113,246 113,246 113,246 113,246 113,246 113,24611.39 REGISTRO 2 1/2" UN 293,245 293,245 293,245 293,245 293,245 293,245 293,245 293,24511.40 REGISTRO 2" UN 218,347 218,347 218,347 218,347 218,347 218,347 218,347 218,34711.41 REVENTILACIÓN 2" ML 13,142 13,142 13,142 13,142 13,142 13,142 13,142 13,14211.42 REVENTILACIÓN 3" ML 16,604 16,604 16,604 16,604 16,604 16,604 16,604 16,60411.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 131,670 131,670 131,670 131,670 131,670 131,670 131,670 131,67011.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 214,169 214,169 214,169 214,169 214,169 214,169 214,169 214,16911.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 352,791 352,791 352,791 352,791 352,791 352,791 352,791 352,791

11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 36,060 36,060 36,060 36,060 36,060 36,060 36,060 36,060

11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 41,852 41,852 41,852 41,852 41,852 41,852 41,852 41,852

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 68,544 68,544 68,544 68,544 68,544 68,544 68,544 68,544

11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 54,612 54,612 54,612 54,612 54,612 54,612 54,612 54,612

11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 77,739 77,739 77,739 77,739 77,739 77,739 77,739 77,739

11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 80,908 80,908 80,908 80,908 80,908 80,908 80,908 80,908

11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 184,697 184,697 184,697 184,697 184,697 184,697 184,697 184,697

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 36,412 36,412 36,412 36,412 36,412 36,412 36,412 36,41211.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 36,561 36,561 36,561 36,561 36,561 36,561 36,561 36,56111.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 29,811 29,811 29,811 29,811 29,811 29,811 29,811 29,81111.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 33,799 33,799 33,799 33,799 33,799 33,799 33,799 33,79911.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 3,072 3,072 3,072 3,072 3,072 3,072 3,072 3,07211.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,789 4,789 4,789 4,789 4,789 4,789 4,789 4,789

Page 107: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

11.59 GABINETE TIPO III UN 1,069,896 1,069,896 1,069,896 1,069,896 1,069,896 1,069,896 1,069,896 1,069,89611.60 GABINETE TIPO I UN 843,058 843,058 843,058 843,058 843,058 843,058 843,058 843,05811.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,338,055 1,338,055 1,338,055 1,338,055 1,338,055 1,338,055 1,338,055 1,338,05511.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,278,192 1,278,192 1,278,192 1,278,192 1,278,192 1,278,192 1,278,192 1,278,19211.63 VÁLVULA MARIPOSA 3" UN 691,426 691,426 691,426 691,426 691,426 691,426 691,426 691,42611.64 VÁLVULA MARIPOSA 4" UN 789,959 789,959 789,959 789,959 789,959 789,959 789,959 789,95911.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 341,645 341,645 341,645 341,645 341,645 341,645 341,645 341,645

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 235,915 235,915 235,915 235,915 235,915 235,915 235,915 235,91512.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 34,271 34,271 34,271 34,271 34,271 34,271 34,271 34,27112.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 42,317 42,317 42,317 42,317 42,317 42,317 42,317 42,31712.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 45,892 45,892 45,892 45,892 45,892 45,892 45,892 45,89212.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 56,115 56,115 56,115 56,115 56,115 56,115 56,115 56,11512.6 SALIDA TELÉFONO PVC COMPLETA UN 37,421 37,421 37,421 37,421 37,421 37,421 37,421 37,42112.7 SALIDA TIMBRE PVC COMPLETA UN 37,422 37,422 37,422 37,422 37,422 37,422 37,422 37,42212.8 STRIP TELEFÓNICO 10 PARES UN 112,348 112,348 112,348 112,348 112,348 112,348 112,348 112,34812.9 SALIDA TOMA DOBLE PVC COMPLETA UN 32,379 32,379 32,379 32,379 32,379 32,379 32,379 32,379

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 76,270 76,270 76,270 76,270 76,270 76,270 76,270 76,27012.11 SALIDA T.V PVC COMPLETA. UN 50,207 50,207 50,207 50,207 50,207 50,207 50,207 50,20712.12 SALIDA BIFÁSICA C.N. UN 29,488 29,488 29,488 29,488 29,488 29,488 29,488 29,48812.13 TABLERO PARCIAL 4 CIRCUITOS UN 84,869 84,869 84,869 84,869 84,869 84,869 84,869 84,86912.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 349,395 349,395 349,395 349,395 349,395 349,395 349,395 349,39512.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 470,619 470,619 470,619 470,619 470,619 470,619 470,619 470,61912.16 TUBERÍA PVC CONDUIT 1/2" ML 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,73512.17 TUBERÍA PVC CONDUIT 3/4" ML 3,558 3,558 3,558 3,558 3,558 3,558 3,558 3,55812.18 TUBERÍA PVC CONDUIT 1" ML 5,479 5,479 5,479 5,479 5,479 5,479 5,479 5,47912.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,836 9,836 9,836 9,836 9,836 9,836 9,836 9,83612.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 189,240 189,240 189,240 189,240 189,240 189,240 189,240 189,24012.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 59,851 59,851 59,851 59,851 59,851 59,851 59,851 59,85112.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 81,136 81,136 81,136 81,136 81,136 81,136 81,136 81,13612.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 28,521 28,521 28,521 28,521 28,521 28,521 28,521 28,52112.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,088,048 1,088,048 1,088,048 1,088,048 1,088,048 1,088,048 1,088,048 1,088,04812.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 805,093 805,093 805,093 805,093 805,093 805,093 805,093 805,09312.26 POSTE METÁLICO 6M UN 1,015,134 1,015,134 1,015,134 1,015,134 1,015,134 1,015,134 1,015,134 1,015,13412.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 462,719 462,719 462,719 462,719 462,719 462,719 462,719 462,71912.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 79,503 79,503 79,503 79,503 79,503 79,503 79,503 79,50312.29 LUMINARIA 70W SODIO UN 204,650 204,650 204,650 204,650 204,650 204,650 204,650 204,65012.30 LUMINARIA 150W SODIO UN 241,348 241,348 241,348 241,348 241,348 241,348 241,348 241,34812.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,304,952 1,304,952 1,304,952 1,304,952 1,304,952 1,304,952 1,304,952 1,304,95212.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 960,912 960,912 960,912 960,912 960,912 960,912 960,912 960,912

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 37,516 36,461 36,637 34,967 35,099 36,637 35,011 37,07713.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 32,439 31,384 31,560 29,890 30,022 31,560 29,934 31,99913.3 ALISTADO PARA LISTÓN M2 11,885 11,674 11,709 11,375 11,401 11,709 11,384 11,797

Page 108: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

13.4 ALISTADO PISOS 1:3, E=0.04 M2 28,466 26,357 26,708 23,368 23,632 26,708 23,456 27,58713.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 68,654 66,545 66,896 63,556 63,820 66,896 63,644 67,77513.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 22,033 21,483 21,545 21,514 21,576 21,689 22,013 21,79213.7 CONCRETO BASE GRADAS 2500 PSI M2 52,892 50,172 50,487 50,352 50,665 51,182 52,823 51,68713.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 75,063 70,711 71,216 70,999 71,501 72,327 74,953 73,13613.9 MANTO FIBERGLASS 600X1 M2 23,198 23,198 23,198 23,198 23,198 23,198 23,198 23,198

13.10 PEGANTE MORTERO-CONCRETO M2 19,743 19,743 19,743 19,743 19,743 19,743 19,743 19,74313.11 PERMA PLY 2 CAPAS M2 20,419 20,419 20,419 20,419 20,419 20,419 20,419 20,41913.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 43,760 41,312 41,597 41,474 41,757 42,222 43,698 42,67613.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 51,652 48,660 49,007 48,858 49,203 49,771 51,576 50,32713.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 75,779 71,155 71,692 71,461 71,994 72,872 75,662 73,73113.15 TRITURADO FINO 1/2 M3 112,688 94,580 96,422 94,580 96,391 101,823 110,877 105,44513.16 TRITURADO GRUESO 3/4 M3 115,425 92,790 94,364 94,784 94,737 100,172 106,713 104,858

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 39,177 38,755 38,825 38,157 38,210 38,825 38,175 39,00114.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 23,907 23,696 23,731 23,397 23,424 23,731 23,406 23,81914.3 ADOQUÍN CONCRETO 6CM M2 52,523 51,468 51,644 49,973 50,105 51,644 50,017 52,08314.4 ADOQUÍN CONCRETO 8CM M2 62,273 61,218 61,394 59,723 59,855 61,394 59,767 61,83314.5 ADOQUÍN GRES PEATONAL M2 51,368 50,313 50,489 48,819 48,951 50,489 48,863 50,928

14.6 M2 54,840 54,418 54,488 53,820 53,873 54,488 53,838 54,664

14.7 GRAVILLA PARA GRADAS ML 29,999 29,600 29,654 29,301 29,346 29,710 29,479 29,83614.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 113,573 111,674 111,991 108,984 109,222 111,991 109,063 112,78214.9 ACABADO EN GRAVILLA LAVADA M2 38,786 37,777 37,921 36,880 36,997 38,033 37,245 38,372

14.10 GUARDAESCOBA EN GRANITO ML 30,076 30,076 30,076 30,076 30,076 30,076 30,076 30,07614.11 GUARDAESCOBA EN GRAVILLA ML 8,890 8,491 8,545 8,192 8,237 8,601 8,370 8,72714.12 GUARDAESCOBA PVC CARAMELO ML 7,619 7,619 7,619 7,619 7,619 7,619 7,619 7,61914.13 GUARDAESCOBA PVC CEDRO ML 9,667 9,667 9,667 9,667 9,667 9,667 9,667 9,66714.14 GUARDAESCOBA PINO CARIBE ML 7,956 7,956 7,956 7,956 7,956 7,956 7,956 7,95614.15 GUARDAESCOBA CEDRO BLANCO ML 7,944 7,944 7,944 7,944 7,944 7,944 7,944 7,94414.16 GUARDAESCOBA EN MADERA SAPAN ML 12,664 12,664 12,664 12,664 12,664 12,664 12,664 12,66414.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,922 6,922 6,922 6,922 6,922 6,922 6,922 6,92214.18 LISTÓN M.H. AMARILLO M2 56,406 56,406 56,406 56,406 56,406 56,406 56,406 56,40614.19 PASO ESCALERA GRANITO ML 86,351 84,874 85,120 82,782 82,966 85,120 82,843 85,73514.20 PIRLANES ALUMINIO ML 5,783 5,783 5,783 5,783 5,783 5,783 5,783 5,78314.21 PIRLANES LADRILLO ML 25,974 25,586 25,651 25,036 25,084 25,651 25,052 25,81214.22 PISO VINILO TRÁFICO RESIDENCIAL M2 32,489 32,489 32,489 32,489 32,489 32,489 32,489 32,48914.23 PISO VINILO TRÁFICO PESADO M2 43,559 43,559 43,559 43,559 43,559 43,559 43,559 43,55914.24 PULIDA LACADA PISO MADERA M2 42,733 42,733 42,733 42,733 42,733 42,733 42,733 42,73314.25 TABLETA DE GRES 25X25 M2 38,973 38,551 38,622 37,954 38,006 38,622 37,971 38,79714.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 39,682 39,260 39,330 38,662 38,715 39,330 38,680 39,50614.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,248 8,248 8,248 8,248 8,248 8,248 8,248 8,24814.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 36,441 35,859 35,956 35,034 35,107 35,956 35,059 36,19914.29 JABONERA PORCELANA ACUARIO UN 14,761 14,761 14,761 14,761 14,761 14,761 14,761 14,761

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

Page 109: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

14.30 UN 102,999 102,999 102,999 102,999 102,999 102,999 102,999 102,999

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,765 7,765 7,765 7,765 7,765 7,765 7,765 7,76514.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 16,243 16,243 16,243 16,243 16,243 16,243 16,243 16,24314.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,843 10,843 10,843 10,843 10,843 10,843 10,843 10,84314.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,310 10,310 10,310 10,310 10,310 10,310 10,310 10,31014.35 REMATES BOCEL ALUMINIO ML 6,473 6,473 6,473 6,473 6,473 6,473 6,473 6,47314.36 REMATES BOCEL PORCELANA ML 6,587 6,587 6,587 6,587 6,587 6,587 6,587 6,58714.37 TAPA REGISTRO 20X20 UN 15,201 15,201 15,201 15,201 15,201 15,201 15,201 15,20114.38 TAPA REGISTRO 6X6 UN 13,366 13,366 13,366 13,366 13,366 13,366 13,366 13,36614.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 15,023 15,023 15,023 15,023 15,023 15,023 15,023 15,023

14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 17,431 17,431 17,431 17,431 17,431 17,431 17,431 17,431

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 50,213 49,791 49,861 49,193 49,246 49,861 49,211 50,03714.42 MEDIA CAÑA EN GRANITO ML 60,053 60,053 60,053 60,053 60,053 60,053 60,053 60,05314.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,364 26,364 26,364 26,364 26,364 26,364 26,364 26,36414.44 PINTURA ACRÍLICA PARA PISOS M2 10,702 10,702 10,702 10,702 10,702 10,702 10,702 10,70214.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 12,346 12,346 12,346 12,346 12,346 12,346 12,346 12,34614.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 86,673 86,673 86,673 86,673 86,673 86,673 86,673 86,673

15 CIELO RASO15.1 APLIQUE YESO ML 59,665 59,665 59,665 59,665 59,665 59,665 59,665 59,66515.2 ARMADURA MADERA Y MALLA M2 27,078 27,078 27,078 27,078 27,078 27,078 27,078 27,07815.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53,537 53,537 53,537 53,537 53,537 53,537 53,537 53,53715.4 CIELO RASO DURACUSTIC M2 52,846 52,846 52,846 52,846 52,846 52,846 52,846 52,84615.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 48,972 48,972 48,972 48,972 48,972 48,972 48,972 48,97215.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 69,596 69,596 69,596 69,596 69,596 69,596 69,596 69,59615.7 CORNISAS YESO ML 37,343 37,343 37,343 37,343 37,343 37,343 37,343 37,34315.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 77,608 77,608 77,608 77,608 77,608 77,608 77,608 77,60815.9 MALLA CON VENA M2 10,433 10,433 10,433 10,433 10,433 10,433 10,433 10,433

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 69,114 45,831 45,831 52,311 47,131 49,711 45,831 54,88516.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 126,385 105,693 107,797 105,693 107,762 113,971 124,316 118,109

16.10 M3 133,691 110,408 112,995 110,655 114,536 114,289 111,949 119,463

16.11 AFRIMADO (NORMA INVIAS 311) M3 77,064 53,781 53,781 62,732 56,316 57,662 53,781 62,836

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

Page 110: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 125,668 102,385 104,972 104,842 108,722 106,265 106,135 111,43916.13 BASE GRANULAR (NORMA INVIAS 330) M3 134,332 111,049 113,636 111,296 115,177 114,930 112,590 120,104

17 APARATOS SANITARIOS17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 227,959 227,959 227,959 227,959 227,959 227,959 227,959 227,95917.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 723,305 723,305 723,305 723,305 723,305 723,305 723,305 723,30517.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 408,063 408,063 408,063 408,063 408,063 408,063 408,063 408,06317.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 129,687 129,687 129,687 129,687 129,687 129,687 129,687 129,68717.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 161,452 161,452 161,452 161,452 161,452 161,452 161,452 161,45217.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 191,403 191,403 191,403 191,403 191,403 191,403 191,403 191,40317.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 296,823 296,823 296,823 296,823 296,823 296,823 296,823 296,82317.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 782,388 782,388 782,388 782,388 782,388 782,388 782,388 782,38817.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 242,952 242,952 242,952 242,952 242,952 242,952 242,952 242,952

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 115,524 115,524 115,524 115,524 115,524 115,524 115,524 115,52417.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 64,854 64,854 64,854 64,854 64,854 64,854 64,854 64,854

17.12 UN 193,123 193,123 193,123 193,123 193,123 193,123 193,123 193,123

17.13 UN 309,982 309,982 309,982 309,982 309,982 309,982 309,982 309,982

18 PINTURAS18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,521 4,521 4,521 4,521 4,521 4,521 4,521 4,52118.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,289 2,289 2,289 2,289 2,289 2,289 2,289 2,28918.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,526 8,526 8,526 8,526 8,526 8,526 8,526 8,52618.4 BARNIZ SOBRE MUEBLES M2 32,915 32,915 32,915 32,915 32,915 32,915 32,915 32,91518.5 CARBURO SOBRE PAÑETES M2 4,391 4,391 4,391 4,391 4,391 4,391 4,391 4,39118.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,972 10,972 10,972 10,972 10,972 10,972 10,972 10,97218.7 DEMARCACIÓN CON MARMOLINA ML 2,727 2,727 2,727 2,727 2,727 2,727 2,727 2,72718.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,980 1,980 1,980 1,980 1,980 1,980 1,980 1,98018.9 ESMALTE SOBRE LÁMINA LLENA M2 10,231 10,231 10,231 10,231 10,231 10,231 10,231 10,231

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,083 3,083 3,083 3,083 3,083 3,083 3,083 3,08318.11 ESMALTE SOBRE MADERA LLENA M2 11,384 11,384 11,384 11,384 11,384 11,384 11,384 11,38418.12 ESMALTE SOBRE MARCOS LÁMINA M2 4,078 4,078 4,078 4,078 4,078 4,078 4,078 4,07818.13 ESMALTE SOBRE MARCOS MADERA M2 4,851 4,851 4,851 4,851 4,851 4,851 4,851 4,85118.14 ESTUCO M2 5,975 5,975 5,975 5,975 5,975 5,975 5,975 5,97518.15 ESTUCO (LINEAL) ML 3,669 3,669 3,669 3,669 3,669 3,669 3,669 3,66918.16 ESTUCO Y VINILO 3 MANOS M2 12,543 12,543 12,543 12,543 12,543 12,543 12,543 12,54318.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,703 7,703 7,703 7,703 7,703 7,703 7,703 7,70318.18 LACA PISOS MADERA M2 18,340 18,340 18,340 18,340 18,340 18,340 18,340 18,34018.19 LÍNEAS TRÁFICO 0.10 ML 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,11918.20 MARMOLINA SOBRE PAÑETE M2 9,076 9,076 9,076 9,076 9,076 9,076 9,076 9,07618.21 TINTILLA SOBRE MADERA LINEAL ML 2,645 2,645 2,645 2,645 2,645 2,645 2,645 2,64518.22 TINTILLA SOBRE MADERA LLENA M2 10,001 10,001 10,001 10,001 10,001 10,001 10,001 10,00118.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,469 5,469 5,469 5,469 5,469 5,469 5,469 5,46918.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,436 3,436 3,436 3,436 3,436 3,436 3,436 3,43618.25 WASH-PRIMER SOBRE ALUMNIO M2 16,923 16,923 16,923 16,923 16,923 16,923 16,923 16,923

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 111: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

18.26 PINTURA EPÓXICA M2 10,296 10,296 10,296 10,296 10,296 10,296 10,296 10,29618.27 PINTURA EPÓXICA (LINEAL) ML 6,298 6,298 6,298 6,298 6,298 6,298 6,298 6,298

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,939,044 3,939,044 3,939,044 3,939,044 3,939,044 3,939,044 3,939,044 3,939,044

19.2 UN 6,914,297 6,914,297 6,914,297 6,914,297 6,914,297 6,914,297 6,914,297 6,914,297

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 2,074,147 2,074,147 2,074,147 2,074,147 2,074,147 2,074,147 2,074,147 2,074,14719.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,812,907 5,812,907 5,812,907 5,812,907 5,812,907 5,812,907 5,812,907 5,812,90719.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,788,419 5,788,419 5,788,419 5,788,419 5,788,419 5,788,419 5,788,419 5,788,41919.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,11919.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 2,069,344 2,069,344 2,069,344 2,069,344 2,069,344 2,069,344 2,069,344 2,069,34419.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 66,400 66,400 66,400 66,400 66,400 66,400 66,400 66,40019.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,167,395 1,167,115 1,167,147 1,167,133 1,167,166 1,167,219 1,167,387 1,167,271

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 603,995 597,475 598,214 597,825 598,558 599,931 603,737 601,160

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,896 23,896 23,896 23,896 23,896 23,896 23,896 23,89620.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 35,576 35,576 35,576 35,576 35,576 35,576 35,576 35,57620.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 43,992 43,992 43,992 43,992 43,992 43,992 43,992 43,99220.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,987 25,987 25,987 25,987 25,987 25,987 25,987 25,98720.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 29,801 29,801 29,801 29,801 29,801 29,801 29,801 29,80120.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 43,636 43,636 43,636 43,636 43,636 43,636 43,636 43,63620.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 20,182 20,182 20,182 20,182 20,182 20,182 20,182 20,18220.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 21,296 21,296 21,296 21,296 21,296 21,296 21,296 21,29620.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 26,409 26,409 26,409 26,409 26,409 26,409 26,409 26,409

20.10 VÁLVULA DE BOLA GAS 1/2" UN 12,184 12,184 12,184 12,184 12,184 12,184 12,184 12,18420.11 VÁLVULA DE BOLA GAS 3/4" UN 19,073 19,073 19,073 19,073 19,073 19,073 19,073 19,07320.12 VÁLVULA DE BOLA GAS 1" UN 28,615 28,615 28,615 28,615 28,615 28,615 28,615 28,61520.13 VÁLVULA POLIETILENO GAS 1/2" UN 170,502 170,502 170,502 170,502 170,502 170,502 170,502 170,50220.14 VÁLVULA POLIETILENO GAS 3/4" UN 175,376 175,376 175,376 175,376 175,376 175,376 175,376 175,37620.15 VÁLVULA POLIETILENO GAS 1" UN 284,362 284,362 284,362 284,362 284,362 284,362 284,362 284,36220.16 ACOMETIDA GAS 1/2" ML 234,354 234,354 234,354 234,354 234,354 234,354 234,354 234,354

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 103,194 103,194 103,194 103,194 103,194 103,194 103,194 103,19421.2 CABLE DETECTOR LINEAL DE CALOR ML 25,891 25,891 25,891 25,891 25,891 25,891 25,891 25,89121.3 SIRENA DE 110 V UN 72,862 72,862 72,862 72,862 72,862 72,862 72,862 72,86221.4 CÁMARA CCTV UN 210,695 210,695 210,695 210,695 210,695 210,695 210,695 210,69521.5 PARLANTE-CIELO FALSO UN 41,269 41,269 41,269 41,269 41,269 41,269 41,269 41,26921.6 AMPLIFICADOR 100W UN 448,900 448,900 448,900 448,900 448,900 448,900 448,900 448,90021.7 AMPLIFICADOR 300W UN 1,117,346 1,117,346 1,117,346 1,117,346 1,117,346 1,117,346 1,117,346 1,117,34621.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,892 32,892 32,892 32,892 32,892 32,892 32,892 32,89221.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 178,655 178,655 178,655 178,655 178,655 178,655 178,655 178,655

21.10 TOMA PARA MICRÓFONO UN 34,784 34,784 34,784 34,784 34,784 34,784 34,784 34,78421.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,711 2,711 2,711 2,711 2,711 2,711 2,711 2,711

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 112: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

21.12 SPLITERS UN 4,402 4,402 4,402 4,402 4,402 4,402 4,402 4,40221.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,429 14,429 14,429 14,429 14,429 14,429 14,429 14,42921.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 19,028 19,028 19,028 19,028 19,028 19,028 19,028 19,02821.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 26,301 26,301 26,301 26,301 26,301 26,301 26,301 26,30121.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 99,379 99,379 99,379 99,379 99,379 99,379 99,379 99,37921.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 26,122 26,122 26,122 26,122 26,122 26,122 26,122 26,12221.18 BANDEJA PORTACABLES PARA RACK UN 85,824 85,824 85,824 85,824 85,824 85,824 85,824 85,82421.19 RACK 2' X 24" UN 134,677 134,677 134,677 134,677 134,677 134,677 134,677 134,67721.20 RACK 3' X 24" UN 164,494 164,494 164,494 164,494 164,494 164,494 164,494 164,49421.21 RACK 5' X 24" UN 259,928 259,928 259,928 259,928 259,928 259,928 259,928 259,92821.22 RACK 7' X 24" UN 337,910 337,910 337,910 337,910 337,910 337,910 337,910 337,91021.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 379,234 379,234 379,234 379,234 379,234 379,234 379,234 379,23421.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 226,921 226,921 226,921 226,921 226,921 226,921 226,921 226,92121.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 55,910 55,910 55,910 55,910 55,910 55,910 55,910 55,91021.26 PATCH CORD 2M CATEGORÍA 6A UN 5,831 5,831 5,831 5,831 5,831 5,831 5,831 5,83121.27 PATCH CORD 5M CATEGORÍA 6A UN 14,856 14,856 14,856 14,856 14,856 14,856 14,856 14,85621.28 CABLE UTP CATEGORÍA 6A ML 2,669 2,669 2,669 2,669 2,669 2,669 2,669 2,66921.29 CANALETA METÁLICA 4X6 CMS ML 26,860 26,860 26,860 26,860 26,860 26,860 26,860 26,86021.30 CANALETA METÁLICA 4X10 CMS ML 28,065 28,065 28,065 28,065 28,065 28,065 28,065 28,06521.31 CANALETA METÁLICA 6X10 CMS ML 28,666 28,666 28,666 28,666 28,666 28,666 28,666 28,66621.32 CANALETA PLÁSTICA 13X7 MM ML 15,875 15,875 15,875 15,875 15,875 15,875 15,875 15,87521.33 CANALETA PLÁSTICA 20X12 MM ML 17,817 17,817 17,817 17,817 17,817 17,817 17,817 17,81721.34 CANALETA PLÁSTICA 32X12 MM ML 17,742 17,742 17,742 17,742 17,742 17,742 17,742 17,74221.35 CANALETA PLÁSTICA 40X60 MM ML 28,659 28,659 28,659 28,659 28,659 28,659 28,659 28,65921.36 SWITCH 10/100/1000 24 PUERTOS UN 389,266 389,266 389,266 389,266 389,266 389,266 389,266 389,26621.37 SWITCH 10/100/1000 16 PUERTOS UN 245,791 245,791 245,791 245,791 245,791 245,791 245,791 245,79121.38 SWITCH 10/100/1000 8 PUERTOS UN 64,471 64,471 64,471 64,471 64,471 64,471 64,471 64,47121.39 CABLE TELEFÓNICO 2 PARES ML 1,398 1,398 1,398 1,398 1,398 1,398 1,398 1,39821.40 CABLE TELEFÓNICO 10 PARES ML 6,794 6,794 6,794 6,794 6,794 6,794 6,794 6,79421.41 CABLE TELEFÓNICO 20 PARES ML 9,131 9,131 9,131 9,131 9,131 9,131 9,131 9,13121.42 CABLE TELEFÓNICO 40 PARES ML 12,734 12,734 12,734 12,734 12,734 12,734 12,734 12,73421.43 CABLE TELEVISIÓN RG6 ML 1,704 1,704 1,704 1,704 1,704 1,704 1,704 1,70421.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,195 16,195 16,195 16,195 16,195 16,195 16,195 16,19521.45 ACOMETIDA TELEFÓNICA 1" ML 25,088 25,088 25,088 25,088 25,088 25,088 25,088 25,08821.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,521 13,521 13,521 13,521 13,521 13,521 13,521 13,52121.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 11,162 11,162 11,162 11,162 11,162 11,162 11,162 11,16221.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 507,118 507,118 507,118 507,118 507,118 507,118 507,118 507,118

Page 113: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 20,453 20,453 20,453 20,453 20,453 20,453 20,453 20,4531.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 68,272 68,272 68,272 68,272 68,272 68,272 68,272 68,2721.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 383,898 383,898 383,898 383,898 383,898 383,898 383,898 383,8981.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 819,327 819,327 819,327 819,327 819,327 819,327 819,327 819,3271.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 94,017 94,017 94,017 94,017 94,017 94,017 94,017 94,0171.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 572,032 572,032 572,032 572,032 572,032 572,032 572,032 572,0321.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,230,665 1,230,665 1,230,665 1,230,665 1,230,665 1,230,665 1,230,665 1,230,6651.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,950 9,950 9,950 9,950 9,950 9,950 9,950 9,9501.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 12,238 12,238 12,238 12,238 12,238 12,238 12,238 12,238

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 15,345 15,345 15,345 15,345 15,345 15,345 15,345 15,3451.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,768 16,768 16,768 16,768 16,768 16,768 16,768 16,7681.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 20,080 20,080 20,080 20,080 20,080 20,080 20,080 20,0801.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 20,080 20,080 20,080 20,080 20,080 20,080 20,080 20,0801.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 80,316 80,316 80,316 80,316 80,316 80,316 80,316 80,3161.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 93,041 93,041 93,041 93,041 93,041 93,041 93,041 93,0411.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 287,849 287,849 287,849 287,849 287,849 287,849 287,849 287,8491.17 TEE PVC UNIÓN MECÁNICA 2" UN 108,067 108,067 108,067 108,067 108,067 108,067 108,067 108,0671.18 TEE PVC UNIÓN MECÁNICA 4" UN 178,129 178,129 178,129 178,129 178,129 178,129 178,129 178,1291.19 TEE PVC UNIÓN MECÁNICA 8" UN 787,952 787,952 787,952 787,952 787,952 787,952 787,952 787,9521.20 TEE PVC UNIÓN MECÁNICA 10" UN 907,747 907,747 907,747 907,747 907,747 907,747 907,747 907,7471.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 10,394 10,394 10,394 10,394 10,394 10,394 10,394 10,3941.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 9,201 9,201 9,201 9,201 9,201 9,201 9,201 9,2011.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 22,153 22,153 22,153 22,153 22,153 22,153 22,153 22,1531.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 88,506 88,506 88,506 88,506 88,506 88,506 88,506 88,5061.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 131,374 131,374 131,374 131,374 131,374 131,374 131,374 131,3741.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 21,681 21,681 21,681 21,681 21,681 21,681 21,681 21,6811.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 74,338 74,338 74,338 74,338 74,338 74,338 74,338 74,3381.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 109,739 109,739 109,739 109,739 109,739 109,739 109,739 109,7391.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 22,755 22,755 22,755 22,755 22,755 22,755 22,755 22,7551.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 46,836 46,836 46,836 46,836 46,836 46,836 46,836 46,8361.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 188,318 188,318 188,318 188,318 188,318 188,318 188,318 188,3181.32 UNIÓN REPARACION PVC 4" UN 54,632 54,632 54,632 54,632 54,632 54,632 54,632 54,6321.33 UNIÓN REPARACIÓN PVC 8" UN 219,058 219,058 219,058 219,058 219,058 219,058 219,058 219,0581.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 131,711 131,711 131,711 131,711 131,711 131,711 131,711 131,7111.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 373,842 373,842 373,842 373,842 373,842 373,842 373,842 373,8421.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,104,569 1,104,569 1,104,569 1,104,569 1,104,569 1,104,569 1,104,569 1,104,5691.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,632,184 1,632,184 1,632,184 1,632,184 1,632,184 1,632,184 1,632,184 1,632,184

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,236 8,236 8,236 8,236 8,236 8,236 8,236 8,2362.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,886 18,886 18,886 18,886 18,886 18,886 18,886 18,8862.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 113,495 93,743 95,752 93,743 95,718 101,644 111,520 105,5952.5 RELLENO TIPO 2 "RECEBO" M3 65,934 42,651 42,651 49,132 43,951 46,532 42,651 51,706

Page 114: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 78,284 55,001 55,001 63,952 57,536 58,882 55,001 64,0562.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 96,636 81,263 83,313 81,263 83,313 84,338 94,586 88,4372.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 98,402 82,731 84,820 82,731 84,820 85,865 96,313 90,0442.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 126,141 100,911 105,115 65,167 68,321 105,115 66,217 115,628

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 85,606 85,606 85,606 85,606 85,606 85,606 85,606 85,6063.2 CODO 45 PVC ALCANTARILLADO 16" UN 893,729 893,729 893,729 893,729 893,729 893,729 893,729 893,7293.3 CODO 90 PVC ALCANTARILLADO 8" UN 111,923 111,923 111,923 111,923 111,923 111,923 111,923 111,9233.4 CODO 90 PVC ALCANTARILLADO 16" UN 1,034,851 1,034,851 1,034,851 1,034,851 1,034,851 1,034,851 1,034,851 1,034,8513.5 CODO 90 PVC ALCANTARILLADO 24" UN 720,951 720,951 720,951 720,951 720,951 720,951 720,951 720,9513.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,510 58,510 58,510 58,510 58,510 58,510 58,510 58,5103.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 85,308 85,308 85,308 85,308 85,308 85,308 85,308 85,3083.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 201,237 201,237 201,237 201,237 201,237 201,237 201,237 201,2373.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 201,236 201,236 201,236 201,236 201,236 201,236 201,236 201,236

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 323,081 323,081 323,081 323,081 323,081 323,081 323,081 323,0813.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 85,309 85,309 85,309 85,309 85,309 85,309 85,309 85,3093.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 85,308 85,308 85,308 85,308 85,308 85,308 85,308 85,3083.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 201,237 201,237 201,237 201,237 201,237 201,237 201,237 201,2373.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 201,237 201,237 201,237 201,237 201,237 201,237 201,237 201,2373.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 323,082 323,082 323,082 323,082 323,082 323,082 323,082 323,0823.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 295,547 295,547 295,547 295,547 295,547 295,547 295,547 295,5473.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 475,041 475,041 475,041 475,041 475,041 475,041 475,041 475,0413.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 759,141 759,141 759,141 759,141 759,141 759,141 759,141 759,1413.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 47,405 47,405 47,405 47,405 47,405 47,405 47,405 47,4053.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 248,855 248,855 248,855 248,855 248,855 248,855 248,855 248,8553.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 271,886 271,886 271,886 271,886 271,886 271,886 271,886 271,8863.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 796,057 796,057 796,057 796,057 796,057 796,057 796,057 796,0573.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 45,239 44,979 45,022 44,610 44,643 45,022 44,621 45,1313.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 225,908 225,908 225,908 225,908 225,908 225,908 225,908 225,9083.25 TUBERÍA PVC ALCANTARILLADO 8" ML 37,396 37,396 37,396 37,396 37,396 37,396 37,396 37,3963.26 TUBERÍA PVC ALCANTARILLADO 10" ML 52,850 52,850 52,850 52,850 52,850 52,850 52,850 52,8503.27 TUBERÍA PVC ALCANTARILLADO 12" ML 76,231 76,231 76,231 76,231 76,231 76,231 76,231 76,2313.28 TUBERÍA PVC ALCANTARILLADO 16" ML 116,967 116,967 116,967 116,967 116,967 116,967 116,967 116,9673.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 187,897 187,897 187,897 187,897 187,897 187,897 187,897 187,8973.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 275,135 275,135 275,135 275,135 275,135 275,135 275,135 275,1353.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 347,491 347,491 347,491 347,491 347,491 347,491 347,491 347,4913.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 456,606 456,606 456,606 456,606 456,606 456,606 456,606 456,6063.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 626,818 626,818 626,818 626,818 626,818 626,818 626,818 626,818

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 565,503 549,855 551,630 550,695 552,455 555,751 564,885 558,699

4.2 ML 546,506 533,067 535,307 514,030 515,710 535,307 514,590 540,907

4.3 UN 550,677 540,245 541,428 540,805 541,978 544,176 550,265 546,141

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

Page 115: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 675,031 655,471 657,690 656,521 658,721 662,841 674,259 666,527

4.5 ML 776,687 757,764 760,918 730,956 733,321 760,918 731,745 768,803

4.6 UN 648,267 633,923 635,550 634,693 636,306 639,328 647,701 642,030

4.7 SUMIDERO EN LADRILLO SL-100 UN 758,853 750,431 751,633 744,181 745,188 752,638 747,861 755,2664.8 SUMIDERO EN LADRILLO SL-250 UN 1,145,589 1,122,111 1,125,188 1,112,368 1,115,116 1,129,351 1,127,146 1,135,4814.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,652,647 1,610,851 1,615,638 1,613,306 1,618,055 1,626,508 1,651,236 1,634,338

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,251,444 2,181,968 2,189,925 2,186,049 2,193,943 2,207,995 2,249,100 2,221,0114.11 SUMIDERO PREFABRICADO SL-100 UN 1,003,377 1,003,377 1,003,377 1,003,377 1,003,377 1,003,377 1,003,377 1,003,3774.12 SUMIDERO PREFABRICADO SL-250 UN 2,359,080 2,359,080 2,359,080 2,359,080 2,359,080 2,359,080 2,359,080 2,359,080

4.13 UN 105,732 105,183 105,275 104,406 104,475 105,275 104,429 105,503

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 48,147 46,789 47,015 44,864 45,034 47,015 44,921 47,5815.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 55,271 53,913 54,139 51,988 52,158 54,139 52,045 54,7055.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 51,750 48,894 49,226 49,083 49,412 49,955 51,678 50,4855.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 55,340 52,601 52,912 52,748 53,056 53,633 55,232 54,1495.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 55,953 53,278 53,584 53,435 53,739 54,280 55,863 54,7815.6 BORDE SEPARADOR VERDE A-170 ML 205,631 205,082 205,174 204,305 204,374 205,174 204,328 205,4025.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 15,245 14,902 14,942 14,925 14,964 15,029 15,236 15,0935.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 37,036 35,023 35,257 35,156 35,388 35,771 36,985 36,1445.9 CAÑUELA PREFABRICADA TIPO A-120 ML 67,121 66,828 66,877 66,413 66,449 66,877 66,425 66,999

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 464,579 457,487 458,547 450,105 450,944 459,108 452,015 461,6555.11 LOSETA PREFABRICADA A-40 M2 50,530 49,275 49,484 47,497 47,654 49,484 47,549 50,0075.12 LOSETA PREFABRICADA A-60 M2 71,816 70,561 70,770 68,783 68,940 70,770 68,835 71,2935.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 29,343 28,248 28,372 28,307 28,430 28,661 29,300 28,8675.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 48,563 46,347 46,598 46,466 46,715 47,182 48,476 47,6005.15 SARDINEL PREFABRICADO A-10 ML 84,092 80,216 80,663 79,839 80,473 80,862 80,050 81,7805.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 47,870 47,111 47,238 46,035 46,130 47,238 46,067 47,554

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 120,319 119,015 119,163 119,085 119,232 119,506 120,268 119,7526.2 BANCA EN CONCRETO M-30 UN 503,571 501,745 501,952 501,843 502,048 502,433 503,499 502,7776.3 BOLARDO M-63 ALTO/HIERRO UN 181,084 180,809 180,840 180,824 180,856 180,912 181,074 180,9636.4 BOLARDO M-60 CONCRETO UN 116,978 115,414 115,591 115,498 115,674 116,003 116,917 116,2986.5 BOLARDO M-61 BAJO/CONCRETO UN 118,401 116,836 117,014 116,920 117,096 117,426 118,339 117,7216.6 BOLARDO M-62 BAJO/HIERRO UN 164,202 162,553 162,741 162,647 162,834 163,172 164,144 163,4816.7 BORDE CONTENEDOR DE RAICES A-70 ML 49,499 48,459 48,632 46,985 47,115 48,632 47,028 49,0666.8 BORDILLO PREFABRICADO A-80 ML 56,986 55,821 56,015 54,172 54,317 56,015 54,220 56,5016.9 CANECA M-120 UN 252,582 252,322 252,365 251,953 251,986 252,365 251,964 252,474

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 660,089 659,306 659,395 659,348 659,436 659,601 660,058 659,7486.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,518,958 2,518,436 2,518,495 2,518,464 2,518,523 2,518,633 2,518,937 2,518,7316.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,967,265 2,966,743 2,966,802 2,966,771 2,966,830 2,966,940 2,967,244 2,967,0386.13 CICLOPARQUEADERO M100 TIPO 1 UN 414,913 414,363 414,426 414,394 414,457 414,569 414,893 414,672

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 116: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

6.14 CICLOPARQUEADERO M101 TIPO 2 UN 552,521 550,321 550,572 550,447 550,696 551,147 552,443 551,5596.15 BANCA EN MADERA M-50 UN 374,631 374,631 374,631 374,631 374,631 374,631 374,631 374,6316.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 189,245 188,463 188,552 188,505 188,593 188,758 189,215 188,9056.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 452,214 451,564 451,672 450,642 450,724 451,672 450,670 451,9436.18 POSTE HISTÓRICO M-131 UN 3,805,498 3,801,586 3,802,030 3,801,796 3,802,236 3,803,060 3,805,344 3,803,797

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,520 1,520 1,520 1,520 1,520 1,520 1,520 1,5207.2 MARCA VIAL CON PINTURA EN FRÍO M2 15,103 15,103 15,103 15,103 15,103 15,103 15,103 15,1037.3 SEÑAL DOBLE DE CICLORUTA UN 385,037 384,763 384,809 384,374 384,409 384,809 384,386 384,9237.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 445,236 444,136 444,262 444,199 444,324 444,549 445,197 444,7567.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 257,568 257,294 257,340 256,905 256,940 257,340 256,917 257,4547.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 303,462 303,188 303,234 302,799 302,834 303,234 302,811 303,3487.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 417,202 416,928 416,974 416,539 416,574 416,974 416,551 417,0887.8 TACHAS REFLECTIVAS UN 10,795 10,795 10,795 10,795 10,795 10,795 10,795 10,7957.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 11,398 11,398 11,398 11,398 11,398 11,398 11,398 11,398

7.10 UN 44,100 44,100 44,100 44,100 44,100 44,100 44,100 44,100TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 117: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,4722.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 29,213 29,213 29,213 29,213 29,213 29,213 29,213 29,213

2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 47,794 47,794 47,794 47,794 47,794 47,794 47,794 47,794

2.11 600.3 M3 58,940 58,940 58,940 58,940 58,940 58,940 58,940 58,940

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 125,668 102,385 104,972 104,842 108,722 106,265 106,135 111,4393.3 330.1 BASE GRANULAR M3 134,332 111,049 113,636 111,296 115,177 114,930 112,590 120,104

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,192 2,192 2,192 2,192 2,192 2,192 2,192 2,192

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

Page 118: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,0953.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 171,069 165,659 166,228 165,746 166,308 167,785 170,626 168,8483.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 61,802 59,945 60,240 57,719 57,948 60,311 58,034 61,0223.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 441,514 521,114 537,283 466,389 470,120 533,552 476,339 549,7203.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 473,370 552,970 569,139 498,245 501,977 565,408 508,195 581,5773.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 499,450 579,050 595,219 524,325 528,056 591,487 534,275 607,6563.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 508,888 588,488 604,657 533,763 537,494 600,925 543,713 617,0943.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 237,737 214,454 217,041 214,701 218,582 218,335 215,995 223,5093.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 228,174 204,891 207,478 207,348 211,229 208,772 208,642 213,9463.15 311.1 AFIRMADO M3 77,064 53,781 53,781 62,732 56,316 57,662 53,781 62,8363.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 12,779 12,403 12,441 12,403 12,440 12,553 12,741 12,6283.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 5,361 5,173 5,192 5,173 5,192 5,249 5,343 5,286

3.18 500.1 M3 576,717 551,404 554,344 553,079 555,999 560,806 576,075 565,506

3.19 500.1 M3 607,463 581,017 584,088 582,767 585,817 590,839 606,792 595,750

3.20 500.1 M3 627,896 600,668 603,836 602,493 605,640 610,771 627,232 615,823

3.21 *** ML 5,922 5,922 5,922 5,922 5,922 5,922 5,922 5,922

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 118,635 102,217 104,406 102,217 104,406 105,501 116,446 109,879

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 929,780 901,067 904,402 902,967 906,279 911,731 929,052 917,0644.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 826,390 798,152 801,432 800,021 803,278 808,640 825,674 813,8844.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 865,378 836,022 839,432 837,965 841,351 846,926 864,634 852,3774.4 630 P CONCRETOS f´c =3500 psi (bases) M3 541,682 515,946 518,895 517,461 520,386 525,586 540,818 530,4074.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 632,852 606,097 609,162 607,672 610,713 616,118 631,953 621,1304.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 535,783 509,442 512,430 510,856 513,818 519,367 534,743 524,3304.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 626,719 599,335 602,441 600,805 603,884 609,653 625,638 614,8134.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 763,255 736,914 739,901 738,328 741,290 746,839 762,215 751,8024.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 553,213 525,829 528,935 527,299 530,379 536,147 552,133 541,3074.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 799,743 772,359 775,465 773,829 776,908 782,677 798,662 787,837

4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 8,560 8,560 8,560 8,560 8,560 8,560 8,560 8,560

4.12 650 P KG 11,600 11,600 11,600 11,600 11,600 11,600 11,600 11,600

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,271 1,271 1,271 1,271 1,271 1,271 1,271 1,271

4.14 621.1 ML 2,023,331 2,023,331 2,023,331 2,023,331 2,023,331 2,023,331 2,023,331 2,023,331

4.15 621.1 P ML 3,301,632 3,252,518 3,258,222 3,255,768 3,261,433 3,270,759 3,300,386 3,279,880

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,143,293 1,117,213 1,120,171 1,118,613 1,121,546 1,127,040 1,142,264 1,131,9544.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 73,024 73,024 73,024 73,024 73,024 73,024 73,024 73,0244.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 277,916 274,786 275,141 274,954 275,306 275,965 277,792 276,5554.19 632 P BARANDA METÁLICA ML 311,041 311,041 311,041 311,041 311,041 311,041 311,041 311,041

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

Page 119: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,786 12,786 12,786 12,786 12,786 12,786 12,786 12,7864.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 452,683 410,338 413,591 417,700 416,983 423,132 437,644 431,5184.22 673.1 MATERIAL GRANULAR FILTRANTE M3 106,095 89,677 91,866 89,677 91,866 92,961 103,906 97,3394.23 610.1 RELLENO PARA ESTRUCTURAS M3 60,894 39,402 39,402 45,384 40,602 42,984 39,402 47,7604.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 371,794 344,025 347,196 345,616 348,762 354,445 370,811 359,6564.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 354,338 331,871 334,551 332,816 335,481 339,255 352,958 343,9434.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 378,979 356,513 359,193 357,458 360,123 363,897 377,600 368,5854.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 367,097 344,806 347,497 345,886 348,564 352,062 365,887 356,6844.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 391,738 369,448 372,139 370,528 373,206 376,704 390,528 381,3264.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 496,610 469,137 472,328 470,955 474,124 479,341 495,913 484,4434.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 586,179 557,618 560,935 559,508 562,802 568,226 585,454 573,5304.31 681.1 GAVIÓN M3 188,468 172,797 174,886 172,797 174,886 175,931 186,379 180,1104.32 681.1 GAVIÓN MALLA PVC M3 195,406 179,735 181,824 179,735 181,824 182,869 193,317 187,0484.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 37,518 35,832 36,028 35,943 36,138 36,458 37,476 36,771

4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 15,137 14,294 14,392 14,349 14,447 14,607 15,115 14,763

4.35 *** M2 8,410 8,410 8,410 8,410 8,410 8,410 8,410 8,410

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 12,079 12,079 12,079 12,079 12,079 12,079 12,079 12,0794.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 16,330 16,330 16,330 16,330 16,330 16,330 16,330 16,330

4.38 *** M2 19,616 19,616 19,616 19,616 19,616 19,616 19,616 19,616

4.39 *** M2 25,250 25,250 25,250 25,250 25,250 25,250 25,250 25,250

4.40 *** M2 5,784 5,784 5,784 5,784 5,784 5,784 5,784 5,784

4.41 *** M2 6,603 6,603 6,603 6,603 6,603 6,603 6,603 6,603

4.42 *** M2 6,862 6,862 6,862 6,862 6,862 6,862 6,862 6,862

4.43 *** M2 5,860 5,860 5,860 5,860 5,860 5,860 5,860 5,860

4.44 *** M2 7,506 7,506 7,506 7,506 7,506 7,506 7,506 7,506

4.45 *** M2 5,487 5,487 5,487 5,487 5,487 5,487 5,487 5,487

4.46 *** M2 7,403 7,403 7,403 7,403 7,403 7,403 7,403 7,403

4.47 *** M2 12,742 12,742 12,742 12,742 12,742 12,742 12,742 12,742

4.48 661.1 ML 331,113 330,705 330,758 330,755 330,808 330,846 331,129 330,917

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML 288,396 282,349 283,068 281,887 282,579 284,504 286,899 285,764

4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML 655,024 655,024 655,024 655,024 655,024 655,024 655,024 655,024

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 125,210 102,823 102,823 111,429 105,260 106,554 102,823 111,5294.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,411 3,411 3,411 3,411 3,411 3,411 3,411 3,411

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

Page 120: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: GUAVIO

4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 52,394 52,394 52,394 52,394 52,394 52,394 52,394 52,394

4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 84,451 84,451 84,451 84,451 84,451 84,451 84,451 84,451

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 489,830 461,269 464,586 463,159 466,453 471,877 489,105 477,1804.56 682.1 P COLCHONETA RENO M3 204,355 188,684 190,773 188,684 190,773 191,818 202,266 195,9974.57 *** TRINCHO EN MADERA M2 50,059 50,059 50,059 50,059 50,059 50,059 50,059 50,059

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,519 1,519 1,519 1,519 1,519 1,519 1,519 1,5195.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 15,103 15,103 15,103 15,103 15,103 15,103 15,103 15,1035.3 730.3 TOPE DEFENSA METÁLICA UN 70,998 70,998 70,998 70,998 70,998 70,998 70,998 70,9985.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 70,998 70,998 70,998 70,998 70,998 70,998 70,998 70,9985.5 730.1 DEFENSA METÁLICA ML 183,657 182,298 182,453 182,373 182,526 182,809 183,605 183,0655.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 10,795 10,795 10,795 10,795 10,795 10,795 10,795 10,795

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 571 571 571 571 571 571 571 571

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,2866.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,587 12,587 12,587 12,587 12,587 12,587 12,587 12,5876.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 34,240 34,240 34,240 34,240 34,240 34,240 34,240 34,2406.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 6,060 6,060 6,060 6,060 6,060 6,060 6,060 6,060

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 121: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,526,377 1,538,055 1,539,638 1,543,586 1,551,135 1,534,102 1,536,4711.2 CAMPAMENTO 9 M2 UN 888,773 894,612 895,403 897,377 901,152 892,635 893,8201.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,429 10,429 10,429 10,429 10,429 10,429 10,4291.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,749 11,749 11,749 11,749 11,749 11,749 11,7491.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,650 13,650 13,650 13,650 13,650 13,650 13,6501.6 CERCA EN TABLA H=2.30 M ML 51,100 51,100 51,100 51,100 51,100 51,100 51,1001.7 CERCA EN TEJA DE ZINC H=1.80 M ML 36,299 36,462 36,481 36,544 36,568 36,400 36,4401.8 CERCA EN TELA VERDE H = 2.10 M ML 15,911 16,075 16,093 16,156 16,181 16,012 16,0531.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 647,751 647,444 654,976 648,108 650,442 646,570 646,180

1.41 M2 7,533 7,533 7,533 7,533 7,533 7,533 7,533

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,399 2,399 2,399 2,399 2,399 2,399 2,399

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 122: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,196,783 1,196,783 1,196,783 1,196,783 1,196,783 1,196,783 1,196,7831.44 RED TELEFÓNICA PROVISIONAL UN 170,461 170,461 170,461 170,461 170,461 170,461 170,4611.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 95,588 64,778 72,539 68,425 95,588 67,131 56,7832.2 BASE ARENA CEMENTO 1:20 M3 142,046 180,483 183,089 201,294 168,855 162,264 175,2702.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,679 4,679 4,679 4,679 4,679 4,679 4,6792.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 501,850 516,818 518,594 524,162 528,262 511,245 514,7882.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 514,429 531,556 533,452 540,094 541,806 524,907 529,2332.8 ZAPATAS EN CONCRETO 3500 PSI M3 480,787 496,825 498,600 504,819 506,422 490,599 494,6492.9 PILOTE DE MADERA D=20 CM ML 36,678 36,678 36,678 36,678 36,678 36,678 36,678

2.10 ML 111,798 111,798 111,798 111,798 111,798 111,798 111,798

2.11 ML 135,879 135,879 135,879 135,879 135,879 135,879 135,879

2.12 ML 165,000 165,000 165,000 165,000 165,000 165,000 165,000

2.13 ML 204,202 204,202 204,202 204,202 204,202 204,202 204,202

2.14 PILOTE HINCADO 25X25 ML 90,455 91,780 91,915 92,453 92,322 91,242 91,6012.15 PILOTE HINCADO 30X30 ML 110,227 112,147 112,342 113,122 112,932 111,367 111,8872.16 DADOS EN CONCRETO 3500PSI M3 470,011 486,048 487,824 494,043 495,646 479,823 483,873

2.17 ML 119,718 119,718 119,718 119,718 119,718 119,718 119,718

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 28,938 29,176 29,193 29,306 29,104 29,063 29,1443.2 SIFÓN EN PVC 6" UN 150,694 150,932 150,949 151,062 150,860 150,819 150,9003.3 CAJA DE INSPECCIÓN DE 100X100 UN 373,104 364,767 426,529 367,508 383,867 359,539 355,0583.4 CAJA DE INSPECCIÓN DE 40X40 UN 182,047 182,503 187,873 183,280 185,486 181,677 181,5273.5 CAJA DE INSPECCIÓN DE 60X60 UN 202,866 204,362 212,841 206,017 208,560 202,670 202,7233.6 CAJA DE INSPECCIÓN DE 80X80 UN 267,247 271,338 280,096 274,295 276,924 268,623 269,3473.7 DUCTO ELÉCTRICO PVC 4" ML 76,324 76,129 76,864 76,115 76,324 76,105 76,0253.8 POZO SÉPTICO ETERNIT 1000 LT UN 1,005,116 1,003,173 1,010,520 1,003,026 1,005,116 1,002,927 1,002,1313.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 86,663 89,301 89,480 90,730 88,503 88,051 88,944

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 50,543 51,934 52,029 52,688 51,513 51,275 51,7463.11 TUBERÍA DRENAJE PVC 110 ML 21,079 21,079 21,101 21,057 21,540 21,123 21,0793.12 TUBERÍA DRENAJE PVC 160 ML 32,236 32,236 32,258 32,214 32,697 32,280 32,2363.13 TUBERÍA DRENAJE PVC 200 ML 44,313 44,313 44,343 44,282 44,959 44,374 44,3133.14 TUBERÍA DRENAJE PVC 250 ML 60,397 60,397 60,432 60,362 61,136 60,468 60,3973.15 TUBERÍA DRENAJE PVC 315 ML 83,493 83,493 83,524 83,463 84,139 83,555 83,493

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 123: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

3.16 UN 764,942 764,942 765,293 764,590 772,325 765,645 764,942

3.17 UN 1,086,776 1,086,776 1,087,479 1,086,073 1,101,543 1,088,182 1,086,776

3.18 UN 1,422,753 1,422,753 1,424,159 1,421,346 1,452,287 1,425,566 1,422,753

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 28,933 28,933 28,933 28,933 28,933 28,933 28,9334.2 CASETÓN DE LONA 0.80X0.70 M2 38,148 38,148 38,148 38,148 38,148 38,148 38,1484.3 COLUMNAS 3500 PSI M3 626,326 642,363 644,139 650,358 651,960 636,138 640,1874.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 204,856 212,641 214,123 215,902 230,320 210,859 211,585

4.5 M2 77,043 78,600 78,773 79,377 79,532 77,996 78,389

4.6 M2 90,833 92,701 92,908 93,633 93,820 91,976 92,448

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 100,945 103,437 103,713 104,679 104,928 102,470 103,099

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 106,560 109,207 109,500 110,526 110,791 108,179 108,8484.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 122,566 125,835 126,197 127,465 127,792 124,566 125,392

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 136,547 140,284 140,698 142,147 142,521 138,834 139,777

4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 151,731 155,935 156,400 158,031 158,451 154,303 155,365

4.12 ENTREPISO VIGUETA PLACA M2 76,183 76,588 76,623 76,800 76,621 76,411 76,5334.13 ESCALERA MACIZA 3500 PSI M3 738,796 754,833 756,609 762,828 764,430 748,608 752,6574.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 71,916 72,435 72,470 72,716 72,278 72,189 72,3644.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 61,499 63,103 63,280 63,902 64,063 62,480 62,8854.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 69,655 71,617 71,834 72,595 72,791 70,855 71,3514.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 81,604 84,064 84,336 85,290 85,536 83,109 83,7304.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 559,495 575,532 577,308 583,527 585,130 569,307 573,357

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 38,308 38,869 38,926 39,153 39,098 38,641 38,793

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 220,883 228,046 228,839 231,616 232,332 225,265 227,0744.21000000000001 ACERO FIGURADO 37000 PSI KG 3,288 3,288 3,288 3,288 3,288 3,288 3,288

4.22 ACERO FIGURADO 60000 PSI KG 3,414 3,414 3,414 3,414 3,414 3,414 3,4144.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,647 4,647 4,647 4,647 4,647 4,647 4,647

4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 663,458 679,495 681,270 687,490 689,092 673,269 677,3194.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 611,244 628,752 630,694 637,477 639,300 621,962 626,377

4.26 VIGA AÉREA 3500 PSI M3 664,130 680,167 681,943 688,162 689,765 673,942 677,9924.27000000000001 VIGA CINTA 3500 PSI M3 648,805 664,842 666,618 672,837 674,440 658,617 662,667

4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 808,205 824,242 826,018 832,237 833,840 818,017 822,0674.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 250,636 264,000 265,812 270,330 278,970 259,476 262,187

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 22,805 23,417 23,472 23,736 23,498 23,152 23,3345.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,410 39,022 39,076 39,341 39,103 38,757 38,939

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 124: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 25,081 25,320 25,336 25,449 25,247 25,206 25,2875.4 ARCOS EN LADRILLO PRENSADO ML 121,883 122,361 122,393 122,619 122,216 122,134 122,2965.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 34,271 34,832 34,889 35,116 35,061 34,604 34,7565.6 DINTELES EN BLOQUE 0.15 M ML 19,719 20,238 20,273 20,519 20,081 19,992 20,1685.7 ENCHAPES LADRILLO PRENSADO M2 68,989 69,944 70,009 70,461 69,655 69,491 69,8145.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 70,670 72,539 72,729 73,487 73,303 71,780 72,2855.9 MURO DRYWALL DOBLE CARA 0.12 M M2 55,025 55,025 55,025 55,025 55,025 55,025 55,025

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 33,547 33,547 33,547 33,547 33,547 33,547 33,5475.11 MURO DRYWALL DOBLE CARA 0.10 M M2 53,279 53,279 53,279 53,279 53,279 53,279 53,2795.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 32,674 32,674 32,674 32,674 32,674 32,674 32,6745.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 67,218 67,218 67,218 67,218 67,218 67,218 67,2185.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 40,650 40,650 40,650 40,650 40,650 40,650 40,6505.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 68,842 68,842 68,842 68,842 68,842 68,842 68,8425.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 41,462 41,462 41,462 41,462 41,462 41,462 41,4625.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,666 28,146 28,179 28,406 28,001 27,919 28,0815.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 17,119 17,358 17,375 17,488 17,286 17,245 17,326

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 39,038 39,358 39,379 39,531 39,261 39,206 39,3145.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 23,616 23,776 23,787 23,862 23,727 23,700 23,754

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 46,066 46,386 46,407 46,559 46,289 46,234 46,3425.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 27,643 27,803 27,813 27,889 27,754 27,727 27,781

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 82,668 84,267 84,376 85,133 83,783 83,509 84,0505.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 48,249 49,048 49,103 49,481 48,806 48,669 48,940

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 25,565 25,885 25,906 26,058 25,788 25,733 25,8415.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,814 15,974 15,985 16,061 15,926 15,898 15,952

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 49,147 49,787 49,830 50,133 49,593 49,484 49,7005.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 30,408 30,728 30,750 30,902 30,632 30,577 30,685

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 66,661 67,180 67,215 67,461 67,023 66,934 67,1095.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 40,443 40,702 40,720 40,843 40,624 40,579 40,667

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 124,316 126,555 126,707 127,768 125,878 125,494 126,2515.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 76,167 77,287 77,363 77,893 76,948 76,756 77,135

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 60,963 62,045 62,118 62,631 61,718 61,532 61,8985.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 37,594 38,135 38,171 38,428 37,971 37,878 38,061

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 36,462 37,179 37,227 37,566 36,962 36,839 37,0825.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 22,114 22,472 22,497 22,666 22,364 22,303 22,424

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 26,206 26,526 26,547 26,699 26,429 26,374 26,4825.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,925 16,085 16,096 16,172 16,037 16,009 16,063

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 39,758 40,398 40,442 40,745 40,205 40,095 40,3125.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 24,282 24,602 24,624 24,775 24,505 24,450 24,559

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 76,449 77,409 77,474 77,928 77,118 76,954 77,2785.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 46,410 46,890 46,923 47,150 46,745 46,663 46,825

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 55,918 56,558 56,602 56,905 56,365 56,255 56,4715.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 33,618 33,938 33,959 34,111 33,841 33,786 33,894

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 118,454 120,693 120,845 121,906 120,016 119,632 120,3905.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 71,655 72,775 72,850 73,381 72,436 72,244 72,623

5.47000000000002 REMATES LADRILLO PRENSADO ML 22,226 22,465 22,481 22,594 22,393 22,352 22,433

Page 125: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 27,957 28,736 28,788 29,157 28,500 28,367 28,6305.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 47,278 48,316 48,387 48,878 48,002 47,824 48,175

5.50 LAVADA DE FACHADA M2 4,028 4,028 4,028 4,028 4,028 4,028 4,0285.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,580 39,192 39,246 39,511 39,272 38,927 39,109

5.52 DOVELA, GROUTING 3000 PSI ML 7,661 7,661 7,661 7,661 7,661 7,661 7,6615.53000000000003 ANCLAJE 3/8" L=30CM UN 10,241 10,241 10,241 10,241 10,241 10,241 10,241

5.54 ANCLAJE 1/2" L=50CM UN 13,425 13,425 13,425 13,425 13,425 13,425 13,4255.55000000000003 ANCLAJE 5/8" L=70CM UN 18,866 18,866 18,866 18,866 18,866 18,866 18,866

5.56 ANCLAJE 3/4" L=70CM UN 28,329 28,329 28,329 28,329 28,329 28,329 28,3295.57000000000003 ANCLAJE 1" L= 70CM UN 3,887 3,996 4,008 4,049 4,078 3,955 3,981

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,923 11,923 11,923 11,923 11,923 11,923 11,9236.2 FILOS O DILATACIONES B/PLACA ML 4,439 4,677 4,694 4,807 4,605 4,564 4,6456.3 FILOS O DILATACIONES S/MURO ML 5,342 5,581 5,597 5,710 5,508 5,467 5,5486.4 GOTERA EN MORTERO 1:4 ML 6,482 6,721 6,737 6,850 6,648 6,608 6,6886.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,469 4,469 4,469 4,469 4,469 4,469 4,4696.6 MALLA BAJO ENTRAMADO M2 10,491 10,491 10,491 10,491 10,491 10,491 10,4916.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 18,965 19,722 19,774 20,132 19,493 19,363 19,6196.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,458 11,837 11,862 12,042 11,722 11,657 11,7856.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 16,753 17,425 17,470 17,788 17,221 17,106 17,334

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,116 10,452 10,475 10,634 10,350 10,293 10,4066.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,001 16,759 16,810 17,169 16,530 16,400 16,6566.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,740 10,119 10,144 10,324 10,004 9,939 10,0676.13 PAÑETE CULATAS 1:4, E=2 CM M2 16,753 17,425 17,470 17,788 17,221 17,106 17,3346.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,116 10,452 10,475 10,634 10,350 10,293 10,4066.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,415 16,955 16,991 17,247 16,791 16,699 16,8816.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,946 10,216 10,234 10,362 10,134 10,088 10,1796.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 13,893 14,405 14,440 14,682 14,250 14,162 14,3356.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,466 8,722 8,739 8,861 8,645 8,601 8,687

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,320 13,897 13,937 14,210 13,723 13,624 13,8196.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,180 8,468 8,488 8,625 8,381 8,332 8,429

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,346 18,017 18,063 18,381 17,814 17,699 17,9266.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,397 10,733 10,756 10,915 10,631 10,574 10,687

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,594 17,351 17,403 17,761 17,122 16,992 17,2496.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,021 10,400 10,426 10,605 10,285 10,220 10,348

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 13,785 14,362 14,401 14,675 14,188 14,089 14,2846.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,399 8,687 8,707 8,844 8,600 8,551 8,648

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,271 18,029 18,080 18,439 17,800 17,670 17,9266.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,668 11,046 11,072 11,252 10,932 10,867 10,995

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 21,393 22,352 22,417 22,872 22,062 21,897 22,222

7.2 M2 66,241 67,176 67,271 67,650 67,558 66,796 67,049AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

Page 126: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 41,633 41,633 41,633 41,633 41,633 41,633 41,6337.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,766 16,766 16,766 16,766 16,766 16,766 16,7667.5 ML 26,361 26,361 26,361 26,361 26,361 26,361 26,3617.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 62,112 62,112 62,112 62,112 62,112 62,112 62,1127.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 44,367 44,367 44,367 44,367 44,367 44,367 44,3677.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 26,506 26,506 26,506 26,506 26,506 26,506 26,5067.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 60,440 60,440 60,440 60,440 60,440 60,440 60,440

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 78,151 78,151 78,151 78,151 78,151 78,151 78,1517.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 101,785 101,785 101,785 101,785 101,785 101,785 101,7857.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 44,414 44,414 44,414 44,414 44,414 44,414 44,4147.13 CANAL PVC AMAZONAS ML 64,242 64,242 64,242 64,242 64,242 64,242 64,2427.14 CANAL PVC RAINGO ML 56,664 56,664 56,664 56,664 56,664 56,664 56,6647.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 90,604 90,604 90,604 90,604 90,604 90,604 90,6047.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 52,471 52,471 52,471 52,471 52,471 52,471 52,4717.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 43,032 43,032 43,032 43,032 43,032 43,032 43,0327.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 24,300 24,300 24,300 24,300 24,300 24,300 24,300

7.19000000000001 TEJA DE BARRO M2 46,722 47,915 47,996 48,562 47,554 47,350 47,7537.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 35,872 35,872 35,872 35,872 35,872 35,872 35,872

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 32,895 32,895 32,895 32,895 32,895 32,895 32,8957.22 TEJA FIBROCEMENTO Nº4 M2 27,645 27,645 27,645 27,645 27,645 27,645 27,645

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 26,865 26,865 26,865 26,865 26,865 26,865 26,8657.24 TEJA FIBROCEMENTO No. 8 M2 27,658 27,658 27,658 27,658 27,658 27,658 27,658

7.25000000000001 TEJA TERMOACÚSTICA M2 38,564 38,564 38,564 38,564 38,564 38,564 38,5647.26 TEJA PLÁSTICA No.6 M2 33,938 33,938 33,938 33,938 33,938 33,938 33,938

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 62,611 62,611 62,611 62,611 62,611 62,611 62,611

7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 114,251 114,251 114,251 114,251 114,251 114,251 114,251

7.29000000000001 TEJA SIN TRASLAPO M2 51,263 51,263 51,263 51,263 51,263 51,263 51,2637.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 32,440 32,440 32,440 32,440 32,440 32,440 32,440

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 25,717 25,717 25,717 25,717 25,717 25,717 25,717

7.32 M2 41,640 41,640 41,640 41,640 41,640 41,640 41,640

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 15,116 15,116 15,116 15,116 15,116 15,116 15,1167.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 18,182 18,182 18,182 18,182 18,182 18,182 18,182

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,770 20,770 20,770 20,770 20,770 20,770 20,7707.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 26,848 26,848 26,848 26,848 26,848 26,848 26,848

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,668 16,668 16,668 16,668 16,668 16,668 16,6687.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 39,158 39,158 39,158 39,158 39,158 39,158 39,158

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 234,261 234,261 234,261 234,261 234,261 234,261 234,2617.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 293,539 293,539 293,539 293,539 293,539 293,539 293,539

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 189,680 189,680 189,680 189,680 189,680 189,680 189,6807.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 274,435 274,435 274,435 274,435 274,435 274,435 274,435

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 373,620 392,823 394,776 402,569 400,674 385,022 390,218

BAJANTE PVC AGUAS LLUVIAS D=4"

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 127: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

8.2 CONCRETO 3500 PSI M3 324,774 340,344 342,068 348,106 349,662 334,300 338,2328.3 CONCRETO 3000 PSI M3 317,935 332,467 334,191 339,597 343,577 327,056 330,4968.4 CONCRETO 2500 PSI M3 278,890 297,574 299,474 307,057 305,213 289,984 295,0408.5 CONCRETO 2000 PSI M3 258,012 274,360 276,208 282,474 284,921 268,088 272,1438.6 CONCRETO 1500 PSI M3 231,827 244,802 246,561 250,948 259,336 240,410 243,0428.7 MORTERO SECO 1:10 M3 186,362 219,308 221,542 237,146 209,342 203,692 214,8408.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 374,404 406,395 408,564 423,716 396,717 391,231 402,0568.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 338,613 374,683 377,130 394,213 363,772 357,586 369,790

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 397,461 431,196 433,484 449,461 420,991 415,206 426,6208.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 532,021 565,756 568,044 584,021 555,551 549,766 561,180

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 92,686 92,686 92,686 92,686 92,686 92,686 92,6869.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,826 3,065 3,081 3,194 2,993 2,952 3,0339.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 104,084 104,084 104,084 104,084 104,084 104,084 104,0849.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 127,229 127,229 127,229 127,229 127,229 127,229 127,2299.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 177,036 177,036 177,036 177,036 177,036 177,036 177,0369.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 197,784 197,784 197,784 197,784 197,784 197,784 197,7849.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 218,556 218,556 218,556 218,556 218,556 218,556 218,5569.8 HOJA PUERTA FORTEC 0.81 UN 155,231 155,231 155,231 155,231 155,231 155,231 155,2319.9 HOJA PUERTA FORTEC 0.91 UN 171,505 171,505 171,505 171,505 171,505 171,505 171,505

9.10 HOJA PUERTA FORTEC 1.50 UN 254,495 254,495 254,495 254,495 254,495 254,495 254,4959.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 96,033 96,033 96,033 96,033 96,033 96,033 96,0339.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 127,605 127,605 127,605 127,605 127,605 127,605 127,6059.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 141,382 141,382 141,382 141,382 141,382 141,382 141,3829.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 360,096 360,096 360,096 360,096 360,096 360,096 360,0969.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 31,437 31,437 31,437 31,437 31,437 31,437 31,4379.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,838 19,838 19,838 19,838 19,838 19,838 19,8389.17 VENTANERÍA EN MADERA CEDRO MACHO M2 73,206 73,206 73,206 73,206 73,206 73,206 73,2069.18 CERRADURA DE ENTRADA PRINCIPAL UN 92,199 92,199 92,199 92,199 92,199 92,199 92,1999.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 71,648 71,648 71,648 71,648 71,648 71,648 71,6489.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 22,280 22,280 22,280 22,280 22,280 22,280 22,2809.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 22,280 22,280 22,280 22,280 22,280 22,280 22,2809.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 21,132 21,132 21,132 21,132 21,132 21,132 21,1329.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 78,910 78,910 78,910 78,910 78,910 78,910 78,9109.24 ESPEJO BISELADO INCOLORO 4 MM M2 102,101 102,101 102,101 102,101 102,101 102,101 102,1019.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 46,441 46,441 46,441 46,441 46,441 46,441 46,4419.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 55,718 55,718 55,718 55,718 55,718 55,718 55,7189.27 VIDRIO TEMPLADO PULIDO 10 MM M2 225,320 225,320 225,320 225,320 225,320 225,320 225,3209.28 VIDRIO TEMPLADO PULIDO 8 MM M2 202,128 202,128 202,128 202,128 202,128 202,128 202,1289.29 VIDRIO TRANSPARENTE 3 MM M2 49,921 49,921 49,921 49,921 49,921 49,921 49,9219.30 VIDRIO TRANSPARENTE 4 MM M2 58,037 58,037 58,037 58,037 58,037 58,037 58,0379.31 VIDRIO TRANSPARENTE 5 MM M2 64,995 64,995 64,995 64,995 64,995 64,995 64,9959.32 VIDRIO TRANSPARENTE 6 MM M2 69,169 69,169 69,169 69,169 69,169 69,169 69,169

Page 128: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 57,813 57,813 57,813 57,813 57,813 57,813 57,81310.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 169,422 169,422 169,422 169,422 169,422 169,422 169,422

10.3 ML 84,338 84,338 84,338 84,338 84,338 84,338 84,338

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 108,725 108,725 108,725 108,725 108,725 108,725 108,72510.5 MARCO TAPA CAJA DE INSPECCIÓN UN 104,788 104,788 104,788 104,788 104,788 104,788 104,78810.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 73,195 73,195 73,195 73,195 73,195 73,195 73,19510.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 155,925 155,925 155,925 155,925 155,925 155,925 155,92510.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 83,234 83,234 83,234 83,234 83,234 83,234 83,23410.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,997 4,997 4,997 4,997 4,997 4,997 4,997

10.10 M2 75,848 75,848 75,848 75,848 75,848 75,848 75,848

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 31,817 31,817 31,817 31,817 31,817 31,817 31,81710.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 409,908 409,908 409,908 409,908 409,908 409,908 409,90810.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 147,628 147,628 147,628 147,628 147,628 147,628 147,628

10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 161,959 161,959 161,959 161,959 161,959 161,959 161,959

10.15 M2 373,869 373,869 373,869 373,869 373,869 373,869 373,869

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 96,861 96,861 96,861 96,861 96,861 96,861 96,86110.17 PUERTA CORTINA INCLUYE ESMALTE M2 298,916 298,916 298,916 298,916 298,916 298,916 298,91610.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,655 4,655 4,655 4,655 4,655 4,655 4,65510.19 VENTANA EN ALUMINIO CORREDIZA M2 210,377 210,377 210,377 210,377 210,377 210,377 210,37710.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 92,754 92,754 92,754 92,754 92,754 92,754 92,75410.21 REJILLA PISO 0.30 M M2 66,251 66,251 66,251 66,251 66,251 66,251 66,25110.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 67,777 67,777 67,777 67,777 67,777 67,777 67,777

10.23 KG 7,662 7,662 7,662 7,662 7,662 7,662 7,662

10.24 KG 8,527 8,527 8,527 8,527 8,527 8,527 8,527

10.25 KG 6,645 6,645 6,645 6,645 6,645 6,645 6,645

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 171,573 171,573 171,573 171,573 171,573 171,573 171,57311.2 ACOMETIDA EN PVC 3/4" 5M UN 205,122 205,122 205,122 205,122 205,122 205,122 205,12211.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,766 16,766 16,766 16,766 16,766 16,766 16,766

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 129: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 26,361 26,361 26,361 26,361 26,361 26,361 26,36111.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 25,409 25,409 25,409 25,409 25,409 25,409 25,40911.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 32,547 32,547 32,547 32,547 32,547 32,547 32,54711.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 67,017 67,017 67,017 67,017 67,017 67,017 67,01711.8 CONEXIÓN TANQUE ELEVADO PVC UN 171,611 171,611 171,611 171,611 171,611 171,611 171,61111.9 INSTALACIÓN APARATO SANITARIO UN 33,421 33,421 33,421 33,421 33,421 33,421 33,421

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 24,139 24,139 24,139 24,139 24,139 24,139 24,13911.13 NIPLE PASAMURO 2" UN 51,178 51,178 51,178 51,178 51,178 51,178 51,17811.14 NIPLE PASAMURO 4" UN 76,576 76,576 76,576 76,576 76,576 76,576 76,57611.15 PUNTO AGUA CALIENTE CPVC UN 64,104 64,104 64,104 64,104 64,104 64,104 64,10411.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 46,565 46,565 46,565 46,565 46,565 46,565 46,56511.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 49,475 49,475 49,475 49,475 49,475 49,475 49,47511.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 62,486 62,486 62,486 62,486 62,486 62,486 62,48611.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 49,897 49,897 49,897 49,897 49,897 49,897 49,89711.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 62,392 62,392 62,392 62,392 62,392 62,392 62,39211.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 66,742 66,742 66,742 66,742 66,742 66,742 66,74211.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 56,235 56,235 56,235 56,235 56,235 56,235 56,23511.23 RED SUMINISTRO CPVC 1/2" ML 9,502 9,502 9,502 9,502 9,502 9,502 9,50211.24 RED SUMINISTRO CPVC 3/4" ML 13,369 13,369 13,369 13,369 13,369 13,369 13,36911.25 RED SUMINISTRO PVC 1 1/2" ML 17,169 17,169 17,169 17,169 17,169 17,169 17,16911.26 RED SUMINISTRO PVC 1" ML 10,605 10,605 10,605 10,605 10,605 10,605 10,60511.27 RED SUMINISTRO PVC 1/2" ML 6,360 6,360 6,360 6,360 6,360 6,360 6,36011.28 RED SUMINISTRO PVC 2 1/2" ML 43,486 43,486 43,486 43,486 43,486 43,486 43,48611.29 RED SUMINISTRO PVC 2" ML 24,908 24,908 24,908 24,908 24,908 24,908 24,90811.30 RED SUMINISTRO PVC 3/4" ML 7,952 7,952 7,952 7,952 7,952 7,952 7,95211.31 RED SANITARIA PVC-S 2" ML 18,873 18,873 18,873 18,873 18,873 18,873 18,87311.32 RED SANITARIA PVC-S 3" ML 26,208 26,208 26,208 26,208 26,208 26,208 26,20811.33 RED SANITARIA PVC-S 4" ML 35,498 35,498 35,498 35,498 35,498 35,498 35,49811.34 RED SANITARIA PVC-S 6" ML 66,608 66,608 66,608 66,608 66,608 66,608 66,60811.35 REGISTRO 1" UN 86,674 86,674 86,674 86,674 86,674 86,674 86,67411.36 REGISTRO 1/2" UN 49,582 49,582 49,582 49,582 49,582 49,582 49,58211.37 REGISTRO 3/4" UN 60,847 60,847 60,847 60,847 60,847 60,847 60,84711.38 REGISTRO 1 1/2" UN 113,357 113,357 113,357 113,357 113,357 113,357 113,35711.39 REGISTRO 2 1/2" UN 293,554 293,554 293,554 293,554 293,554 293,554 293,55411.40 REGISTRO 2" UN 218,572 218,572 218,572 218,572 218,572 218,572 218,57211.41 REVENTILACIÓN 2" ML 13,151 13,151 13,151 13,151 13,151 13,151 13,15111.42 REVENTILACIÓN 3" ML 16,616 16,616 16,616 16,616 16,616 16,616 16,616

11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 131,773 131,773 131,773 131,773 131,773 131,773 131,773

11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 214,350 214,350 214,350 214,350 214,350 214,350 214,350

Page 130: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 353,098 353,098 353,098 353,098 353,098 353,098 353,098

11.46 ML 36,074 36,074 36,074 36,074 36,074 36,074 36,074

11.47 ML 41,872 41,872 41,872 41,872 41,872 41,872 41,872

11.48 ML 68,574 68,574 68,574 68,574 68,574 68,574 68,574

11.49 ML 54,659 54,659 54,659 54,659 54,659 54,659 54,659

11.50 ML 77,812 77,812 77,812 77,812 77,812 77,812 77,812

11.51 ML 80,967 80,967 80,967 80,967 80,967 80,967 80,967

11.52 ML 184,780 184,780 184,780 184,780 184,780 184,780 184,780

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 36,427 36,427 36,427 36,427 36,427 36,427 36,42711.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 36,576 36,576 36,576 36,576 36,576 36,576 36,57611.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 29,832 29,832 29,832 29,832 29,832 29,832 29,83211.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 33,825 33,825 33,825 33,825 33,825 33,825 33,825

11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 3,075 3,075 3,075 3,075 3,075 3,075 3,075

11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,793 4,793 4,793 4,793 4,793 4,793 4,793

11.59 GABINETE TIPO III UN 1,070,951 1,070,951 1,070,951 1,070,951 1,070,951 1,070,951 1,070,95111.60 GABINETE TIPO I UN 843,856 843,856 843,856 843,856 843,856 843,856 843,85611.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,339,452 1,339,452 1,339,452 1,339,452 1,339,452 1,339,452 1,339,45211.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,279,521 1,279,521 1,279,521 1,279,521 1,279,521 1,279,521 1,279,52111.63 VÁLVULA MARIPOSA 3" UN 692,087 692,087 692,087 692,087 692,087 692,087 692,08711.64 VÁLVULA MARIPOSA 4" UN 790,732 790,732 790,732 790,732 790,732 790,732 790,73211.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 342,022 342,022 342,022 342,022 342,022 342,022 342,022

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 236,147 236,147 236,147 236,147 236,147 236,147 236,14712.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 34,303 34,303 34,303 34,303 34,303 34,303 34,30312.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 42,359 42,359 42,359 42,359 42,359 42,359 42,35912.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 45,933 45,933 45,933 45,933 45,933 45,933 45,93312.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 56,168 56,168 56,168 56,168 56,168 56,168 56,16812.6 SALIDA TELÉFONO PVC COMPLETA UN 37,457 37,457 37,457 37,457 37,457 37,457 37,45712.7 SALIDA TIMBRE PVC COMPLETA UN 37,459 37,459 37,459 37,459 37,459 37,459 37,45912.8 STRIP TELEFÓNICO 10 PARES UN 112,442 112,442 112,442 112,442 112,442 112,442 112,44212.9 SALIDA TOMA DOBLE PVC COMPLETA UN 32,408 32,408 32,408 32,408 32,408 32,408 32,408

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 76,349 76,349 76,349 76,349 76,349 76,349 76,34912.11 SALIDA T.V PVC COMPLETA. UN 50,252 50,252 50,252 50,252 50,252 50,252 50,25212.12 SALIDA BIFÁSICA C.N. UN 29,516 29,516 29,516 29,516 29,516 29,516 29,516

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

Page 131: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

12.13 TABLERO PARCIAL 4 CIRCUITOS UN 84,944 84,944 84,944 84,944 84,944 84,944 84,94412.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 349,697 349,697 349,697 349,697 349,697 349,697 349,69712.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 471,038 471,038 471,038 471,038 471,038 471,038 471,03812.16 TUBERÍA PVC CONDUIT 1/2" ML 2,737 2,737 2,737 2,737 2,737 2,737 2,73712.17 TUBERÍA PVC CONDUIT 3/4" ML 3,562 3,562 3,562 3,562 3,562 3,562 3,56212.18 TUBERÍA PVC CONDUIT 1" ML 5,484 5,484 5,484 5,484 5,484 5,484 5,48412.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,846 9,846 9,846 9,846 9,846 9,846 9,84612.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 189,408 189,408 189,408 189,408 189,408 189,408 189,40812.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 59,903 59,903 59,903 59,903 59,903 59,903 59,90312.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 81,212 81,212 81,212 81,212 81,212 81,212 81,21212.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 28,537 28,537 28,537 28,537 28,537 28,537 28,53712.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,088,953 1,088,953 1,088,953 1,088,953 1,088,953 1,088,953 1,088,95312.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 805,756 805,756 805,756 805,756 805,756 805,756 805,75612.26 POSTE METÁLICO 6M UN 1,016,146 1,016,146 1,016,146 1,016,146 1,016,146 1,016,146 1,016,14612.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 463,212 463,212 463,212 463,212 463,212 463,212 463,21212.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 79,575 79,575 79,575 79,575 79,575 79,575 79,57512.29 LUMINARIA 70W SODIO UN 204,863 204,863 204,863 204,863 204,863 204,863 204,86312.30 LUMINARIA 150W SODIO UN 241,602 241,602 241,602 241,602 241,602 241,602 241,60212.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,306,408 1,306,408 1,306,408 1,306,408 1,306,408 1,306,408 1,306,40812.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 961,980 961,980 961,980 961,980 961,980 961,980 961,980

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 34,501 35,798 35,886 36,501 35,406 35,183 35,62213.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 29,422 30,720 30,808 31,422 30,327 30,105 30,54413.3 ALISTADO PARA LISTÓN M2 11,280 11,539 11,557 11,680 11,461 11,416 11,50413.4 ALISTADO PISOS 1:3, E=0.04 M2 22,395 24,990 25,166 26,395 24,205 23,760 24,63813.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 62,631 65,226 65,402 66,631 64,441 63,996 64,87413.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,521 20,848 20,885 21,011 21,059 20,723 20,80413.7 CONCRETO BASE GRADAS 2500 PSI M2 45,292 47,161 47,351 48,109 47,925 46,402 46,90713.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 62,904 65,893 66,197 67,411 67,116 64,679 65,48813.9 MANTO FIBERGLASS 600X1 M2 23,217 23,217 23,217 23,217 23,217 23,217 23,217

13.10 PEGANTE MORTERO-CONCRETO M2 19,756 19,756 19,756 19,756 19,756 19,756 19,75613.11 PERMA PLY 2 CAPAS M2 20,428 20,428 20,428 20,428 20,428 20,428 20,42813.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 36,920 38,602 38,773 39,455 39,289 37,919 38,37413.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 43,291 45,347 45,556 46,390 46,187 44,512 45,06813.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 62,859 66,035 66,358 67,647 67,334 64,745 65,60413.15 TRITURADO FINO 1/2 M3 67,996 67,996 68,901 67,091 87,009 69,807 67,99613.16 TRITURADO GRUESO 3/4 M3 80,827 73,057 103,219 71,696 97,071 73,618 68,887

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,986 38,505 38,540 38,786 38,348 38,259 38,43514.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 23,312 23,571 23,589 23,712 23,493 23,448 23,53614.3 ADOQUÍN CONCRETO 6CM M2 49,528 50,825 50,913 51,528 50,433 50,210 50,64914.4 ADOQUÍN CONCRETO 8CM M2 59,278 60,575 60,663 61,278 60,183 59,960 60,39914.5 ADOQUÍN GRES PEATONAL M2 48,355 49,652 49,740 50,355 49,260 49,037 49,476

Page 132: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

14.6 M2 53,667 54,186 54,222 54,467 54,029 53,940 54,116

14.7 GRAVILLA PARA GRADAS ML 28,929 29,188 29,215 29,320 29,307 29,084 29,15314.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 108,181 110,517 110,675 111,781 109,810 109,410 110,20014.9 ACABADO EN GRAVILLA LAVADA M2 36,039 36,818 36,889 37,220 36,977 36,486 36,712

14.10 GUARDAESCOBA EN GRANITO ML 30,085 30,085 30,085 30,085 30,085 30,085 30,08514.11 GUARDAESCOBA EN GRAVILLA ML 7,817 8,077 8,104 8,208 8,196 7,972 8,04114.12 GUARDAESCOBA PVC CARAMELO ML 7,627 7,627 7,627 7,627 7,627 7,627 7,62714.13 GUARDAESCOBA PVC CEDRO ML 9,677 9,677 9,677 9,677 9,677 9,677 9,67714.14 GUARDAESCOBA PINO CARIBE ML 7,961 7,961 7,961 7,961 7,961 7,961 7,96114.15 GUARDAESCOBA CEDRO BLANCO ML 7,949 7,949 7,949 7,949 7,949 7,949 7,94914.16 GUARDAESCOBA EN MADERA SAPAN ML 12,675 12,675 12,675 12,675 12,675 12,675 12,67514.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,923 6,923 6,923 6,923 6,923 6,923 6,92314.18 LISTÓN M.H. AMARILLO M2 56,445 56,445 56,445 56,445 56,445 56,445 56,44514.19 PASO ESCALERA GRANITO ML 82,134 83,950 84,073 84,934 83,401 83,089 83,70414.20 PIRLANES ALUMINIO ML 5,783 5,783 5,783 5,783 5,783 5,783 5,78314.21 PIRLANES LADRILLO ML 24,857 25,334 25,367 25,593 25,190 25,108 25,26914.22 PISO VINILO TRÁFICO RESIDENCIAL M2 32,517 32,517 32,517 32,517 32,517 32,517 32,51714.23 PISO VINILO TRÁFICO PESADO M2 43,600 43,600 43,600 43,600 43,600 43,600 43,60014.24 PULIDA LACADA PISO MADERA M2 42,762 42,762 42,762 42,762 42,762 42,762 42,76214.25 TABLETA DE GRES 25X25 M2 37,783 38,302 38,338 38,583 38,145 38,056 38,23214.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 38,493 39,012 39,047 39,293 38,855 38,766 38,94214.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,252 8,252 8,252 8,252 8,252 8,252 8,25214.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,785 35,501 35,550 35,889 35,284 35,162 35,40414.29 JABONERA PORCELANA ACUARIO UN 14,773 14,773 14,773 14,773 14,773 14,773 14,773

14.30 UN 103,095 103,095 103,095 103,095 103,095 103,095 103,095

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,768 7,768 7,768 7,768 7,768 7,768 7,76814.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 16,255 16,255 16,255 16,255 16,255 16,255 16,25514.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,850 10,850 10,850 10,850 10,850 10,850 10,85014.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,316 10,316 10,316 10,316 10,316 10,316 10,31614.35 REMATES BOCEL ALUMINIO ML 6,475 6,475 6,475 6,475 6,475 6,475 6,47514.36 REMATES BOCEL PORCELANA ML 6,589 6,589 6,589 6,589 6,589 6,589 6,58914.37 TAPA REGISTRO 20X20 UN 15,212 15,212 15,212 15,212 15,212 15,212 15,21214.38 TAPA REGISTRO 6X6 UN 13,376 13,376 13,376 13,376 13,376 13,376 13,37614.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 15,040 15,040 15,040 15,040 15,040 15,040 15,040

14.40 M2 17,451 17,451 17,451 17,451 17,451 17,451 17,451

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 49,038 49,557 49,592 49,838 49,400 49,311 49,48714.42 MEDIA CAÑA EN GRANITO ML 60,115 60,115 60,115 60,115 60,115 60,115 60,11514.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,367 26,367 26,367 26,367 26,367 26,367 26,36714.44 PINTURA ACRÍLICA PARA PISOS M2 10,710 10,710 10,710 10,710 10,710 10,710 10,71014.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 12,358 12,358 12,358 12,358 12,358 12,358 12,35814.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 86,766 86,766 86,766 86,766 86,766 86,766 86,766

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

Page 133: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

15 CIELO RASO15.1 APLIQUE YESO ML 59,725 59,725 59,725 59,725 59,725 59,725 59,72515.2 ARMADURA MADERA Y MALLA M2 27,086 27,086 27,086 27,086 27,086 27,086 27,08615.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53,576 53,576 53,576 53,576 53,576 53,576 53,57615.4 CIELO RASO DURACUSTIC M2 52,882 52,882 52,882 52,882 52,882 52,882 52,88215.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 49,009 49,009 49,009 49,009 49,009 49,009 49,00915.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 69,652 69,652 69,652 69,652 69,652 69,652 69,65215.7 CORNISAS YESO ML 37,382 37,382 37,382 37,382 37,382 37,382 37,38215.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 77,675 77,675 77,675 77,675 77,675 77,675 77,67515.9 MALLA CON VENA M2 10,436 10,436 10,436 10,436 10,436 10,436 10,436

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 80,768 55,516 151,027 53,605 80,768 52,311 41,96316.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 75,316 75,316 76,350 74,280 97,042 77,385 75,316

16.10 M3 129,288 129,288 130,582 127,995 156,452 149,984 129,288

16.11 AFRIMADO (NORMA INVIAS 311) M3 91,189 60,379 68,140 64,025 91,189 62,732 52,38416.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 120,292 120,292 121,586 118,999 147,456 140,988 120,29216.13 BASE GRANULAR (NORMA INVIAS 330) M3 129,929 129,929 131,223 128,636 157,093 150,625 129,929

17 APARATOS SANITARIOS17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 228,180 228,180 228,180 228,180 228,180 228,180 228,180

17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 724,084 724,084 724,084 724,084 724,084 724,084 724,084

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 408,489 408,489 408,489 408,489 408,489 408,489 408,489

17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 129,792 129,792 129,792 129,792 129,792 129,792 129,792

17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 161,598 161,598 161,598 161,598 161,598 161,598 161,598

17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 191,583 191,583 191,583 191,583 191,583 191,583 191,583

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 297,122 297,122 297,122 297,122 297,122 297,122 297,122

17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 783,233 783,233 783,233 783,233 783,233 783,233 783,233

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 243,190 243,190 243,190 243,190 243,190 243,190 243,190

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

Page 134: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 115,613 115,613 115,613 115,613 115,613 115,613 115,613

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 64,890 64,890 64,890 64,890 64,890 64,890 64,890

17.12 UN 193,304 193,304 193,304 193,304 193,304 193,304 193,304

17.13 UN 310,296 310,296 310,296 310,296 310,296 310,296 310,296

18 PINTURAS18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,522 4,522 4,522 4,522 4,522 4,522 4,52218.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,291 2,291 2,291 2,291 2,291 2,291 2,29118.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,529 8,529 8,529 8,529 8,529 8,529 8,52918.4 BARNIZ SOBRE MUEBLES M2 32,936 32,936 32,936 32,936 32,936 32,936 32,93618.5 CARBURO SOBRE PAÑETES M2 4,392 4,392 4,392 4,392 4,392 4,392 4,39218.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,978 10,978 10,978 10,978 10,978 10,978 10,97818.7 DEMARCACIÓN CON MARMOLINA ML 2,728 2,728 2,728 2,728 2,728 2,728 2,72818.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,981 1,981 1,981 1,981 1,981 1,981 1,98118.9 ESMALTE SOBRE LÁMINA LLENA M2 10,235 10,235 10,235 10,235 10,235 10,235 10,235

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,085 3,085 3,085 3,085 3,085 3,085 3,08518.11 ESMALTE SOBRE MADERA LLENA M2 11,389 11,389 11,389 11,389 11,389 11,389 11,38918.12 ESMALTE SOBRE MARCOS LÁMINA M2 4,081 4,081 4,081 4,081 4,081 4,081 4,08118.13 ESMALTE SOBRE MARCOS MADERA M2 4,855 4,855 4,855 4,855 4,855 4,855 4,85518.14 ESTUCO M2 5,977 5,977 5,977 5,977 5,977 5,977 5,97718.15 ESTUCO (LINEAL) ML 3,670 3,670 3,670 3,670 3,670 3,670 3,67018.16 ESTUCO Y VINILO 3 MANOS M2 12,549 12,549 12,549 12,549 12,549 12,549 12,54918.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,706 7,706 7,706 7,706 7,706 7,706 7,70618.18 LACA PISOS MADERA M2 18,346 18,346 18,346 18,346 18,346 18,346 18,34618.19 LÍNEAS TRÁFICO 0.10 ML 2,120 2,120 2,120 2,120 2,120 2,120 2,12018.20 MARMOLINA SOBRE PAÑETE M2 9,082 9,082 9,082 9,082 9,082 9,082 9,08218.21 TINTILLA SOBRE MADERA LINEAL ML 2,646 2,646 2,646 2,646 2,646 2,646 2,64618.22 TINTILLA SOBRE MADERA LLENA M2 10,006 10,006 10,006 10,006 10,006 10,006 10,00618.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,471 5,471 5,471 5,471 5,471 5,471 5,47118.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,437 3,437 3,437 3,437 3,437 3,437 3,43718.25 WASH-PRIMER SOBRE ALUMNIO M2 16,935 16,935 16,935 16,935 16,935 16,935 16,93518.26 PINTURA EPÓXICA M2 10,300 10,300 10,300 10,300 10,300 10,300 10,30018.27 PINTURA EPÓXICA (LINEAL) ML 6,300 6,300 6,300 6,300 6,300 6,300 6,300

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,943,452 3,943,452 3,943,452 3,943,452 3,943,452 3,943,452 3,943,452

19.2 UN 6,922,033 6,922,033 6,922,033 6,922,033 6,922,033 6,922,033 6,922,033

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 2,076,468 2,076,468 2,076,468 2,076,468 2,076,468 2,076,468 2,076,46819.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,819,405 5,819,405 5,819,405 5,819,405 5,819,405 5,819,405 5,819,40519.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,794,917 5,794,917 5,794,917 5,794,917 5,794,917 5,794,917 5,794,91719.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,120 2,120 2,120 2,120 2,120 2,120 2,120

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 135: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 2,071,658 2,071,658 2,071,658 2,071,658 2,071,658 2,071,658 2,071,65819.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 66,475 66,475 66,475 66,475 66,475 66,475 66,47519.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,167,911 1,168,103 1,168,122 1,168,200 1,168,181 1,168,025 1,168,077

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 586,646 590,279 590,710 592,062 593,057 588,927 589,787

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,913 23,913 23,913 23,913 23,913 23,913 23,91320.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 35,606 35,606 35,606 35,606 35,606 35,606 35,60620.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 44,029 44,029 44,029 44,029 44,029 44,029 44,02920.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,998 25,998 25,998 25,998 25,998 25,998 25,99820.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 29,816 29,816 29,816 29,816 29,816 29,816 29,81620.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 43,657 43,657 43,657 43,657 43,657 43,657 43,65720.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 20,191 20,191 20,191 20,191 20,191 20,191 20,19120.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 21,306 21,306 21,306 21,306 21,306 21,306 21,30620.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 26,422 26,422 26,422 26,422 26,422 26,422 26,422

20.10 VÁLVULA DE BOLA GAS 1/2" UN 12,194 12,194 12,194 12,194 12,194 12,194 12,19420.11 VÁLVULA DE BOLA GAS 3/4" UN 19,090 19,090 19,090 19,090 19,090 19,090 19,09020.12 VÁLVULA DE BOLA GAS 1" UN 28,642 28,642 28,642 28,642 28,642 28,642 28,64220.13 VÁLVULA POLIETILENO GAS 1/2" UN 170,683 170,683 170,683 170,683 170,683 170,683 170,68320.14 VÁLVULA POLIETILENO GAS 3/4" UN 175,562 175,562 175,562 175,562 175,562 175,562 175,56220.15 VÁLVULA POLIETILENO GAS 1" UN 284,668 284,668 284,668 284,668 284,668 284,668 284,66820.16 ACOMETIDA GAS 1/2" ML 234,591 234,591 234,591 234,591 234,591 234,591 234,591

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 103,294 103,294 103,294 103,294 103,294 103,294 103,29421.2 CABLE DETECTOR LINEAL DE CALOR ML 25,920 25,920 25,920 25,920 25,920 25,920 25,92021.3 SIRENA DE 110 V UN 72,930 72,930 72,930 72,930 72,930 72,930 72,93021.4 CÁMARA CCTV UN 210,846 210,846 210,846 210,846 210,846 210,846 210,84621.5 PARLANTE-CIELO FALSO UN 41,301 41,301 41,301 41,301 41,301 41,301 41,30121.6 AMPLIFICADOR 100W UN 449,336 449,336 449,336 449,336 449,336 449,336 449,33621.7 AMPLIFICADOR 300W UN 1,118,542 1,118,542 1,118,542 1,118,542 1,118,542 1,118,542 1,118,54221.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,896 32,896 32,896 32,896 32,896 32,896 32,89621.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 178,846 178,846 178,846 178,846 178,846 178,846 178,846

21.10 TOMA PARA MICRÓFONO UN 34,807 34,807 34,807 34,807 34,807 34,807 34,80721.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,714 2,714 2,714 2,714 2,714 2,714 2,71421.12 SPLITERS UN 4,406 4,406 4,406 4,406 4,406 4,406 4,40621.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,435 14,435 14,435 14,435 14,435 14,435 14,43521.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 19,036 19,036 19,036 19,036 19,036 19,036 19,03621.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 26,315 26,315 26,315 26,315 26,315 26,315 26,31521.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 99,480 99,480 99,480 99,480 99,480 99,480 99,48021.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 26,146 26,146 26,146 26,146 26,146 26,146 26,14621.18 BANDEJA PORTACABLES PARA RACK UN 85,915 85,915 85,915 85,915 85,915 85,915 85,91521.19 RACK 2' X 24" UN 134,756 134,756 134,756 134,756 134,756 134,756 134,75621.20 RACK 3' X 24" UN 164,607 164,607 164,607 164,607 164,607 164,607 164,60721.21 RACK 5' X 24" UN 260,112 260,112 260,112 260,112 260,112 260,112 260,112

Page 136: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

21.22 RACK 7' X 24" UN 338,183 338,183 338,183 338,183 338,183 338,183 338,18321.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 379,444 379,444 379,444 379,444 379,444 379,444 379,44421.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 227,032 227,032 227,032 227,032 227,032 227,032 227,03221.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 55,966 55,966 55,966 55,966 55,966 55,966 55,96621.26 PATCH CORD 2M CATEGORÍA 6A UN 5,837 5,837 5,837 5,837 5,837 5,837 5,83721.27 PATCH CORD 5M CATEGORÍA 6A UN 14,872 14,872 14,872 14,872 14,872 14,872 14,87221.28 CABLE UTP CATEGORÍA 6A ML 2,671 2,671 2,671 2,671 2,671 2,671 2,67121.29 CANALETA METÁLICA 4X6 CMS ML 26,877 26,877 26,877 26,877 26,877 26,877 26,87721.30 CANALETA METÁLICA 4X10 CMS ML 28,082 28,082 28,082 28,082 28,082 28,082 28,08221.31 CANALETA METÁLICA 6X10 CMS ML 28,685 28,685 28,685 28,685 28,685 28,685 28,68521.32 CANALETA PLÁSTICA 13X7 MM ML 15,884 15,884 15,884 15,884 15,884 15,884 15,88421.33 CANALETA PLÁSTICA 20X12 MM ML 17,827 17,827 17,827 17,827 17,827 17,827 17,82721.34 CANALETA PLÁSTICA 32X12 MM ML 17,752 17,752 17,752 17,752 17,752 17,752 17,75221.35 CANALETA PLÁSTICA 40X60 MM ML 28,682 28,682 28,682 28,682 28,682 28,682 28,68221.36 SWITCH 10/100/1000 24 PUERTOS UN 389,634 389,634 389,634 389,634 389,634 389,634 389,63421.37 SWITCH 10/100/1000 16 PUERTOS UN 246,014 246,014 246,014 246,014 246,014 246,014 246,01421.38 SWITCH 10/100/1000 8 PUERTOS UN 64,508 64,508 64,508 64,508 64,508 64,508 64,50821.39 CABLE TELEFÓNICO 2 PARES ML 1,399 1,399 1,399 1,399 1,399 1,399 1,39921.40 CABLE TELEFÓNICO 10 PARES ML 6,800 6,800 6,800 6,800 6,800 6,800 6,80021.41 CABLE TELEFÓNICO 20 PARES ML 9,140 9,140 9,140 9,140 9,140 9,140 9,14021.42 CABLE TELEFÓNICO 40 PARES ML 12,745 12,745 12,745 12,745 12,745 12,745 12,74521.43 CABLE TELEVISIÓN RG6 ML 1,705 1,705 1,705 1,705 1,705 1,705 1,70521.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,198 16,198 16,198 16,198 16,198 16,198 16,19821.45 ACOMETIDA TELEFÓNICA 1" ML 25,098 25,098 25,098 25,098 25,098 25,098 25,09821.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,528 13,528 13,528 13,528 13,528 13,528 13,528

21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 11,170 11,170 11,170 11,170 11,170 11,170 11,170

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 507,661 507,661 507,661 507,661 507,661 507,661 507,661

Page 137: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 20,473 20,473 20,473 20,473 20,473 20,473 20,4731.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 68,344 68,344 68,344 68,344 68,344 68,344 68,3441.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 384,321 384,321 384,321 384,321 384,321 384,321 384,3211.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 820,233 820,233 820,233 820,233 820,233 820,233 820,2331.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 94,118 94,118 94,118 94,118 94,118 94,118 94,1181.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 572,668 572,668 572,668 572,668 572,668 572,668 572,6681.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,232,048 1,232,048 1,232,048 1,232,048 1,232,048 1,232,048 1,232,0481.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,956 9,956 9,956 9,956 9,956 9,956 9,9561.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 12,247 12,247 12,247 12,247 12,247 12,247 12,247

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 15,357 15,357 15,357 15,357 15,357 15,357 15,3571.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,782 16,782 16,782 16,782 16,782 16,782 16,7821.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 20,098 20,098 20,098 20,098 20,098 20,098 20,0981.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 20,098 20,098 20,098 20,098 20,098 20,098 20,0981.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 80,404 80,404 80,404 80,404 80,404 80,404 80,4041.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 93,143 93,143 93,143 93,143 93,143 93,143 93,1431.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 288,163 288,163 288,163 288,163 288,163 288,163 288,1631.17 TEE PVC UNIÓN MECÁNICA 2" UN 108,185 108,185 108,185 108,185 108,185 108,185 108,1851.18 TEE PVC UNIÓN MECÁNICA 4" UN 178,325 178,325 178,325 178,325 178,325 178,325 178,3251.19 TEE PVC UNIÓN MECÁNICA 8" UN 788,833 788,833 788,833 788,833 788,833 788,833 788,8331.20 TEE PVC UNIÓN MECÁNICA 10" UN 908,764 908,764 908,764 908,764 908,764 908,764 908,7641.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 10,402 10,402 10,402 10,402 10,402 10,402 10,4021.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 9,208 9,208 9,208 9,208 9,208 9,208 9,2081.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 22,177 22,177 22,177 22,177 22,177 22,177 22,1771.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 88,595 88,595 88,595 88,595 88,595 88,595 88,5951.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 131,511 131,511 131,511 131,511 131,511 131,511 131,5111.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 21,701 21,701 21,701 21,701 21,701 21,701 21,7011.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 74,410 74,410 74,410 74,410 74,410 74,410 74,4101.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 109,852 109,852 109,852 109,852 109,852 109,852 109,8521.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 22,777 22,777 22,777 22,777 22,777 22,777 22,7771.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 46,883 46,883 46,883 46,883 46,883 46,883 46,8831.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 188,520 188,520 188,520 188,520 188,520 188,520 188,5201.32 UNIÓN REPARACION PVC 4" UN 54,689 54,689 54,689 54,689 54,689 54,689 54,6891.33 UNIÓN REPARACIÓN PVC 8" UN 219,295 219,295 219,295 219,295 219,295 219,295 219,2951.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 131,840 131,840 131,840 131,840 131,840 131,840 131,8401.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 374,245 374,245 374,245 374,245 374,245 374,245 374,2451.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,105,814 1,105,814 1,105,814 1,105,814 1,105,814 1,105,814 1,105,8141.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,634,027 1,634,027 1,634,027 1,634,027 1,634,027 1,634,027 1,634,027

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,239 8,239 8,239 8,239 8,239 8,239 8,2392.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,892 18,892 18,892 18,892 18,892 18,892 18,8922.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592

Page 138: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

2.4 RELLENO TIPO 1 "GRAVILLA" M3 64,746 64,746 65,733 63,758 85,485 66,721 64,7462.5 RELLENO TIPO 2 "RECEBO" M3 77,589 52,336 147,847 50,425 77,589 49,132 38,7842.6 RELLENO TIPO 4 "SUBBASE B-200" M3 92,409 61,599 69,360 65,245 92,409 63,952 53,6042.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 56,451 56,451 57,476 55,427 77,973 58,501 56,4512.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 57,437 57,437 58,482 56,393 79,377 59,527 57,4372.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 53,305 84,341 86,445 101,145 74,952 69,630 80,131

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 85,699 85,699 85,699 85,699 85,699 85,699 85,6993.2 CODO 45 PVC ALCANTARILLADO 16" UN 894,738 894,738 894,738 894,738 894,738 894,738 894,7383.3 CODO 90 PVC ALCANTARILLADO 8" UN 112,047 112,047 112,047 112,047 112,047 112,047 112,0473.4 CODO 90 PVC ALCANTARILLADO 16" UN 1,036,020 1,036,020 1,036,020 1,036,020 1,036,020 1,036,020 1,036,0203.5 CODO 90 PVC ALCANTARILLADO 24" UN 721,763 721,763 721,763 721,763 721,763 721,763 721,7633.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,522 58,522 58,522 58,522 58,522 58,522 58,5223.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 85,402 85,402 85,402 85,402 85,402 85,402 85,4023.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 201,462 201,462 201,462 201,462 201,462 201,462 201,4623.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 201,461 201,461 201,461 201,461 201,461 201,461 201,461

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 323,442 323,442 323,442 323,442 323,442 323,442 323,4423.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 85,403 85,403 85,403 85,403 85,403 85,403 85,4033.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 85,402 85,402 85,402 85,402 85,402 85,402 85,4023.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 201,462 201,462 201,462 201,462 201,462 201,462 201,4623.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 201,462 201,462 201,462 201,462 201,462 201,462 201,4623.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 323,444 323,444 323,444 323,444 323,444 323,444 323,4443.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 295,843 295,843 295,843 295,843 295,843 295,843 295,8433.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 475,541 475,541 475,541 475,541 475,541 475,541 475,5413.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 759,948 759,948 759,948 759,948 759,948 759,948 759,9483.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 47,455 47,455 47,455 47,455 47,455 47,455 47,4553.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 249,098 249,098 249,098 249,098 249,098 249,098 249,0983.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 272,183 272,183 272,183 272,183 272,183 272,183 272,1833.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 796,909 796,909 796,909 796,909 796,909 796,909 796,9093.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 44,535 44,855 44,877 45,029 44,759 44,704 44,8123.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 226,125 226,125 226,125 226,125 226,125 226,125 226,1253.25 TUBERÍA PVC ALCANTARILLADO 8" ML 37,435 37,435 37,435 37,435 37,435 37,435 37,4353.26 TUBERÍA PVC ALCANTARILLADO 10" ML 52,906 52,906 52,906 52,906 52,906 52,906 52,9063.27 TUBERÍA PVC ALCANTARILLADO 12" ML 76,314 76,314 76,314 76,314 76,314 76,314 76,3143.28 TUBERÍA PVC ALCANTARILLADO 16" ML 117,095 117,095 117,095 117,095 117,095 117,095 117,0953.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 188,105 188,105 188,105 188,105 188,105 188,105 188,1053.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 275,422 275,422 275,422 275,422 275,422 275,422 275,4223.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 347,859 347,859 347,859 347,859 347,859 347,859 347,8593.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 457,092 457,092 457,092 457,092 457,092 457,092 457,0923.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 627,497 627,497 627,497 627,497 627,497 627,497 627,497

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 UN 523,008 531,727 532,762 536,005 538,393 528,481 530,545PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

Page 139: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

4.2 ML 507,955 524,485 525,606 533,435 519,484 516,650 522,243

4.3 UN 522,515 528,328 529,017 531,180 532,772 526,163 527,539

4.4 UN 621,908 632,807 634,100 638,155 641,140 628,749 631,329

4.5 ML 722,393 745,670 747,249 758,273 738,629 734,637 742,513

4.6 UN 609,466 617,459 618,407 621,380 623,569 614,483 616,375

4.7 SUMIDERO EN LADRILLO SL-100 UN 735,487 743,397 744,040 747,579 743,178 739,856 742,3284.8 SUMIDERO EN LADRILLO SL-250 UN 1,080,608 1,099,348 1,101,052 1,109,070 1,102,677 1,091,324 1,096,8124.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,538,176 1,563,656 1,566,482 1,576,354 1,579,006 1,553,775 1,560,200

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,060,693 2,103,051 2,107,749 2,124,160 2,128,564 2,086,624 2,097,3064.11 SUMIDERO PREFABRICADO SL-100 UN 1,004,313 1,004,313 1,004,313 1,004,313 1,004,313 1,004,313 1,004,3134.12 SUMIDERO PREFABRICADO SL-250 UN 2,361,481 2,361,481 2,361,481 2,361,481 2,361,481 2,361,481 2,361,481

4.13 UN 104,162 104,836 104,882 105,202 104,632 104,517 104,745

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 44,225 45,897 46,010 46,801 45,391 45,104 45,6705.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 51,401 53,073 53,186 53,977 52,567 52,280 52,8465.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 43,772 45,734 45,933 46,729 46,536 44,937 45,4685.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 47,872 49,397 49,578 50,146 50,564 48,829 49,1915.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 48,590 50,225 50,406 51,040 51,203 49,590 50,0035.6 BORDE SEPARADOR VERDE A-170 ML 204,270 204,944 204,990 205,310 204,740 204,624 204,8535.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,287 14,522 14,546 14,642 14,619 14,427 14,4915.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 31,411 32,794 32,934 33,495 33,359 32,232 32,6065.9 CAÑUELA PREFABRICADA TIPO A-120 ML 66,333 66,694 66,718 66,889 66,585 66,523 66,645

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 445,329 451,739 452,268 455,115 451,775 448,889 450,8705.11 LOSETA PREFABRICADA A-40 M2 46,942 48,486 48,591 49,322 48,019 47,755 48,2775.12 LOSETA PREFABRICADA A-60 M2 68,256 69,800 69,905 70,636 69,333 69,068 69,5915.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 26,355 26,966 27,038 27,265 27,432 26,739 26,8835.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 42,516 43,751 43,898 44,357 44,695 43,291 43,5845.15 SARDINEL PREFABRICADO A-10 ML 82,632 82,993 83,217 82,989 87,063 86,006 82,9445.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 45,716 46,650 46,714 47,156 46,368 46,207 46,524

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 116,848 117,575 117,661 117,931 118,130 117,304 117,4766.2 BANCA EN CONCRETO M-30 UN 499,088 500,105 500,226 500,604 500,883 499,726 499,9676.3 BOLARDO M-63 ALTO/HIERRO UN 180,496 180,660 180,678 180,741 180,765 180,597 180,6386.4 BOLARDO M-60 CONCRETO UN 112,783 113,655 113,759 114,083 114,322 113,330 113,5376.5 BOLARDO M-61 BAJO/CONCRETO UN 114,206 115,078 115,181 115,505 115,744 114,753 114,9596.6 BOLARDO M-62 BAJO/HIERRO UN 159,796 160,777 160,888 161,264 161,410 160,400 160,6446.7 BORDE CONTENEDOR DE RAICES A-70 ML 46,528 47,807 47,894 48,500 47,420 47,201 47,634

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 140: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

6.8 BORDILLO PREFABRICADO A-80 ML 53,676 55,108 55,205 55,884 54,675 54,429 54,9146.9 CANECA M-120 UN 252,099 252,419 252,441 252,593 252,323 252,268 252,376

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 658,632 659,068 659,120 659,282 659,401 658,906 659,0096.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,520,311 2,520,601 2,520,636 2,520,744 2,520,823 2,520,493 2,520,5626.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,969,127 2,969,417 2,969,452 2,969,560 2,969,639 2,969,309 2,969,3786.13 CICLOPARQUEADERO M100 TIPO 1 UN 413,845 414,172 414,209 414,335 414,383 414,047 414,1286.14 CICLOPARQUEADERO M101 TIPO 2 UN 547,044 548,352 548,499 549,001 549,196 547,850 548,1746.15 BANCA EN MADERA M-50 UN 375,028 375,028 375,028 375,028 375,028 375,028 375,0286.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 187,270 187,706 187,757 187,920 188,039 187,543 187,6476.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 450,830 451,630 451,684 452,063 451,388 451,251 451,5226.18 POSTE HISTÓRICO M-131 UN 3,798,948 3,801,128 3,801,387 3,802,198 3,802,795 3,800,316 3,800,832

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,521 1,521 1,521 1,521 1,521 1,521 1,5217.2 MARCA VIAL CON PINTURA EN FRÍO M2 15,114 15,114 15,114 15,114 15,114 15,114 15,1147.3 SEÑAL DOBLE DE CICLORUTA UN 384,658 384,995 385,018 385,178 384,893 384,835 384,9497.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 442,660 443,314 443,388 443,639 443,737 443,063 443,2257.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 257,030 257,367 257,390 257,550 257,265 257,207 257,3217.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 302,977 303,314 303,337 303,497 303,212 303,154 303,2687.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 416,846 417,183 417,206 417,366 417,081 417,023 417,1377.8 TACHAS REFLECTIVAS UN 10,806 10,806 10,806 10,806 10,806 10,806 10,8067.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 11,409 11,409 11,409 11,409 11,409 11,409 11,409

7.10 UN 44,144 44,144 44,144 44,144 44,144 44,144 44,144TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 141: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 29,226 29,226 29,226 29,226 29,226 29,226 29,226

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 47,811 47,811 47,811 47,811 47,811 47,811 47,811

2.11 600.3 M3 58,957 58,957 58,957 58,957 58,957 58,957 58,957

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 120,292 120,292 121,586 118,999 147,456 140,988 120,2923.3 330.1 BASE GRANULAR M3 129,929 129,929 131,223 128,636 157,093 150,625 129,929

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 142: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,195 2,195 2,195 2,195 2,195 2,195 2,1953.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,096 1,096 1,096 1,096 1,096 1,096 1,096

3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 157,406 158,314 158,611 158,571 162,977 158,354 158,191

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 56,530 58,640 58,790 59,775 58,156 57,654 58,353

3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 498,685 512,367 487,492 549,679 532,267 527,292 512,367

3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 505,935 519,617 494,742 556,929 539,517 534,542 519,617

3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 532,041 545,722 520,847 583,035 565,622 560,647 545,722

3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 556,685 570,367 545,492 607,679 590,267 585,292 570,367

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 233,504 233,504 234,798 232,211 260,668 254,200 233,5043.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 222,963 222,963 224,257 221,670 250,127 243,659 222,9633.15 311.1 AFIRMADO M3 91,189 60,379 68,140 64,025 91,189 62,732 52,3843.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,857 11,857 11,876 11,839 12,252 11,895 11,8573.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,900 4,900 4,910 4,891 5,098 4,919 4,900

3.18 500.1 M3 506,165 523,552 525,320 532,376 530,660 516,489 521,193

3.19 500.1 M3 533,770 551,935 553,783 561,155 559,362 544,556 549,471

3.20 500.1 M3 551,918 570,862 572,770 580,494 578,237 563,131 568,292

3.21 *** ML 5,927 5,927 5,927 5,927 5,927 5,927 5,927

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 75,720 75,720 76,814 74,625 98,704 77,909 75,720

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 849,728 869,450 871,455 879,460 877,512 861,438 866,7744.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 747,636 767,031 769,004 776,875 774,961 759,152 764,4004.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 783,500 803,664 805,714 813,897 811,907 795,472 800,9284.4 630 P CONCRETOS f´c =3500 psi (bases) M3 470,830 486,555 488,297 494,395 495,967 480,451 484,4224.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 559,193 575,542 577,352 583,692 585,326 569,195 573,3244.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 463,922 478,600 480,341 485,801 489,821 473,135 476,6094.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 552,012 567,271 569,081 574,757 578,936 561,589 565,2014.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 691,394 706,072 707,813 713,273 717,293 700,606 704,0814.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 478,501 493,760 495,570 501,246 505,425 488,078 491,6904.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 725,031 740,290 742,100 747,776 751,955 734,608 738,220

4.11 650 P KG 8,564 8,564 8,564 8,564 8,564 8,564 8,564

4.12 650 P KG 11,608 11,608 11,608 11,608 11,608 11,608 11,608

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,272 1,272 1,272 1,272 1,272 1,272 1,272

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

Page 143: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

4.14 621.1 ML 2,024,768 2,024,768 2,024,768 2,024,768 2,024,768 2,024,768 2,024,768

4.15 621.1 P ML 3,165,194 3,198,929 3,202,360 3,216,051 3,212,721 3,185,224 3,194,353

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,072,267 1,086,799 1,088,523 1,093,929 1,097,909 1,081,388 1,084,828

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 73,093 73,093 73,093 73,093 73,093 73,093 73,0934.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 269,512 271,256 271,463 272,112 272,589 270,607 271,0204.19 632 P BARANDA METÁLICA ML 311,251 311,251 311,251 311,251 311,251 311,251 311,2514.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,797 12,797 12,797 12,797 12,797 12,797 12,7974.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 383,081 383,366 390,099 395,377 410,194 376,996 375,8364.22 673.1 MATERIAL GRANULAR FILTRANTE M3 63,179 63,179 64,274 62,085 86,164 65,368 63,1794.23 610.1 RELLENO PARA ESTRUCTURAS M3 71,652 48,342 136,506 46,578 71,652 45,384 35,8324.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 295,412 311,923 313,789 320,118 322,590 305,588 309,6844.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 293,356 303,165 304,672 307,636 317,860 300,198 301,835

4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 317,998 327,807 329,314 332,277 342,502 324,840 326,477

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 305,883 317,094 318,632 322,385 330,035 313,336 315,5734.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 330,525 341,735 343,273 347,027 354,677 337,977 340,2154.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 419,837 438,708 440,627 448,286 446,423 431,042 436,1494.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 506,365 525,983 527,978 535,941 534,004 518,014 523,3234.31 681.1 GAVIÓN M3 147,547 147,547 148,592 146,503 169,487 149,637 147,5474.32 681.1 GAVIÓN MALLA PVC M3 154,493 154,493 155,538 153,449 176,433 156,583 154,493

4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 32,806 33,964 34,082 34,552 34,438 33,493 33,807

4.34 672.1 ML 12,780 13,360 13,419 13,654 13,596 13,124 13,281

4.35 *** M2 8,417 8,417 8,417 8,417 8,417 8,417 8,417

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 12,091 12,091 12,091 12,091 12,091 12,091 12,091

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 16,346 16,346 16,346 16,346 16,346 16,346 16,346

4.38 *** M2 19,637 19,637 19,637 19,637 19,637 19,637 19,637

4.39 *** M2 25,278 25,278 25,278 25,278 25,278 25,278 25,278

4.40 *** M2 5,790 5,790 5,790 5,790 5,790 5,790 5,790

4.41 *** M2 6,609 6,609 6,609 6,609 6,609 6,609 6,609

4.42 *** M2 6,869 6,869 6,869 6,869 6,869 6,869 6,869

4.43 *** M2 5,864 5,864 5,864 5,864 5,864 5,864 5,864

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

Page 144: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

4.44 *** M2 7,513 7,513 7,513 7,513 7,513 7,513 7,513SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

Page 145: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

4.45 *** M2 5,493 5,493 5,493 5,493 5,493 5,493 5,493

4.46 *** M2 7,411 7,411 7,411 7,411 7,411 7,411 7,411

4.47 *** M2 12,754 12,754 12,754 12,754 12,754 12,754 12,754

4.48 661.1 ML 330,160 330,684 330,719 330,968 330,525 330,435 330,613

4.49 660.3 ML 271,925 275,869 276,284 277,857 277,777 274,295 275,334

4.50 *** ML 655,702 655,702 655,702 655,702 655,702 655,702 655,702

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 138,791 109,166 116,629 112,673 138,791 111,429 101,479

4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,414 3,414 3,414 3,414 3,414 3,414 3,414

4.53 *** ML 52,449 52,449 52,449 52,449 52,449 52,449 52,449

4.54 *** ML 84,540 84,540 84,540 84,540 84,540 84,540 84,540

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 410,045 429,663 431,658 439,621 437,684 421,694 427,0034.56 682.1 P COLCHONETA RENO M3 163,443 163,443 164,487 162,398 185,382 165,532 163,4434.57 *** TRINCHO EN MADERA M2 50,111 50,111 50,111 50,111 50,111 50,111 50,111

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,521 1,521 1,521 1,521 1,521 1,521 1,5215.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 15,114 15,114 15,114 15,114 15,114 15,114 15,1145.3 730.3 TOPE DEFENSA METÁLICA UN 71,073 71,073 71,073 71,073 71,073 71,073 71,0735.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 71,073 71,073 71,073 71,073 71,073 71,073 71,0735.5 730.1 DEFENSA METÁLICA ML 180,110 180,889 180,979 181,273 181,443 180,595 180,783

5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 10,806 10,806 10,806 10,806 10,806 10,806 10,806

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 571 571 571 571 571 571 571

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,2866.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,597 12,597 12,597 12,597 12,597 12,597 12,5976.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 34,275 34,275 34,275 34,275 34,275 34,275 34,2756.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 6,064 6,064 6,064 6,064 6,064 6,064 6,064

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36"

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

Page 146: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MAGDALENA CENTRO

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 147: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,498,344 1,491,6741.2 CAMPAMENTO 9 M2 UN 872,310 868,9751.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,167 10,1671.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,448 11,4481.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,314 13,3141.6 CERCA EN TABLA H=2.30 M ML 48,803 48,8031.7 CERCA EN TEJA DE ZINC H=1.80 M ML 35,052 34,9801.8 CERCA EN TELA VERDE H = 2.10 M ML 15,660 15,5891.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 619,158 618,246

1.41 M2 7,261 7,261

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,299 2,299

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 148: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,144,060 1,144,0601.44 RED TELEFÓNICA PROVISIONAL UN 163,254 163,2541.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 69,718 67,1312.2 BASE ARENA CEMENTO 1:20 M3 169,214 162,8832.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,599 4,5992.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 517,295 510,2662.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 530,716 523,4852.8 ZAPATAS EN CONCRETO 3500 PSI M3 496,690 489,9202.9 PILOTE DE MADERA D=20 CM ML 36,308 36,308

2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 110,793 110,793

2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 133,639 133,639

2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 161,267 161,267

2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 198,459 198,459

2.14 PILOTE HINCADO 25X25 ML 90,698 90,2112.15 PILOTE HINCADO 30X30 ML 110,579 109,8722.16 DADOS EN CONCRETO 3500PSI M3 485,914 479,1442.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 119,126 119,126

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 28,073 28,0343.2 SIFÓN EN PVC 6" UN 143,358 143,3193.3 CAJA DE INSPECCIÓN DE 100X100 UN 358,873 354,4153.4 CAJA DE INSPECCIÓN DE 40X40 UN 179,218 178,1593.5 CAJA DE INSPECCIÓN DE 60X60 UN 201,565 199,8453.6 CAJA DE INSPECCIÓN DE 80X80 UN 268,107 265,3393.7 DUCTO ELÉCTRICO PVC 4" ML 75,079 75,0593.8 POZO SÉPTICO ETERNIT 1000 LT UN 951,754 951,5553.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 85,834 85,400

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 49,667 49,4373.11 TUBERÍA DRENAJE PVC 110 ML 20,914 20,7823.12 TUBERÍA DRENAJE PVC 160 ML 31,498 31,3663.13 TUBERÍA DRENAJE PVC 200 ML 43,204 43,0203.14 TUBERÍA DRENAJE PVC 250 ML 58,554 58,3433.15 TUBERÍA DRENAJE PVC 315 ML 80,250 80,0663.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 736,289 734,1793.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1,050,044 1,045,825

Page 149: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1,386,881 1,378,442

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 27,732 27,7324.2 CASETÓN DE LONA 0.80X0.70 M2 36,439 36,4394.3 COLUMNAS 3500 PSI M3 638,812 632,0424.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 226,199 219,611

4.5 M2 76,845 76,188

4.6 M2 90,553 89,765

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 102,669 101,6174.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 108,395 107,2784.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 124,968 123,588

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 139,344 137,7674.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 154,938 153,1644.12 ENTREPISO VIGUETA PLACA M2 73,603 73,4924.13 ESCALERA MACIZA 3500 PSI M3 746,248 739,4784.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 69,057 68,9714.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 62,670 61,9934.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 71,196 70,3684.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 83,661 82,6234.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 574,242 567,472

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 38,439 38,2334.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 228,146 225,123

4.21000000000001 ACERO FIGURADO 37000 PSI KG 3,130 3,1304.22 ACERO FIGURADO 60000 PSI KG 3,251 3,251

4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,488 4,4884.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 677,609 670,839

4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 628,320 620,9094.26 VIGA AÉREA 3500 PSI M3 677,378 670,608

4.27000000000001 VIGA CINTA 3500 PSI M3 662,036 655,2664.28 VIGA CANAL EN CONCRETO 3500 PSI M3 821,080 814,310

4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 276,158 268,525

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 23,230 23,0535.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,779 38,6025.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,756 24,7175.4 ARCOS EN LADRILLO PRENSADO ML 119,509 119,4305.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 34,434 34,2285.6 DINTELES EN BLOQUE 0.15 M ML 19,651 19,5665.7 ENCHAPES LADRILLO PRENSADO M2 67,015 66,8575.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 71,331 70,6435.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,410 53,410

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 150: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,740 32,7405.11 MURO DRYWALL DOBLE CARA 0.10 M M2 51,761 51,7615.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 31,915 31,9155.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 64,803 64,8035.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,443 39,4435.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 66,337 66,3375.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 40,210 40,2105.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,209 27,1295.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,890 16,850

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 37,776 37,7235.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 22,985 22,959

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 44,499 44,4465.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 26,859 26,833

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 80,708 80,4445.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 47,268 47,137

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 25,066 25,0135.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,565 15,538

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 48,051 47,9465.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 29,860 29,808

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 64,224 64,1385.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,224 39,181

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 121,063 120,6945.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 74,540 74,356

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 59,479 59,3015.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 36,852 36,763

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 35,757 35,6395.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 21,761 21,702

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 25,651 25,5985.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,648 15,621

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 38,785 38,6795.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 23,795 23,743

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 74,207 74,0495.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 45,290 45,210

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 54,229 54,1245.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 32,751 32,698

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 115,422 115,0545.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 70,107 69,923

5.47000000000002 REMATES LADRILLO PRENSADO ML 21,777 21,7385.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 27,672 27,544

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 46,583 46,4125.50 LAVADA DE FACHADA M2 4,003 4,003

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,948 38,7725.52 DOVELA, GROUTING 3000 PSI ML 7,612 7,612

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,089 10,0895.54 ANCLAJE 1/2" L=50CM UN 13,198 13,198

Page 151: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

5.55000000000003 ANCLAJE 5/8" L=70CM UN 18,407 18,4075.56 ANCLAJE 3/4" L=70CM UN 27,451 27,451

5.57000000000003 ANCLAJE 1" L= 70CM UN 4,021 3,970

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,804 11,8046.2 FILOS O DILATACIONES B/PLACA ML 4,581 4,5426.3 FILOS O DILATACIONES S/MURO ML 5,484 5,4456.4 GOTERA EN MORTERO 1:4 ML 6,575 6,5366.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,320 4,3206.6 MALLA BAJO ENTRAMADO M2 10,304 10,3046.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,330 19,2066.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,641 11,5786.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 17,001 16,890

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,240 10,1856.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,367 16,2426.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,923 9,8616.13 PAÑETE CULATAS 1:4, E=2 CM M2 17,001 16,8906.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,240 10,1856.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,489 16,4006.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,983 9,9396.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 14,082 13,9986.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,561 8,519

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,599 13,5046.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,319 8,272

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,594 17,4836.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,521 10,466

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,960 16,8356.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,204 10,142

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 14,064 13,9696.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,538 8,491

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,637 17,5126.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,851 10,788

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 21,747 21,5897.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 65,163 64,8197.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 39,769 39,7697.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,185 16,1857.5 ML 25,384 25,3847.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 59,168 59,1687.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 42,404 42,4047.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,533 25,5337.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 57,590 57,590

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 74,321 74,321

BAJANTE PVC AGUAS LLUVIAS D=4"

Page 152: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 96,648 96,6487.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 42,524 42,5247.13 CANAL PVC AMAZONAS ML 61,673 61,6737.14 CANAL PVC RAINGO ML 54,516 54,5167.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 86,467 86,4677.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 49,963 49,9637.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 41,046 41,0467.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,585 23,585

7.19000000000001 TEJA DE BARRO M2 46,323 46,1267.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 34,204 34,204

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,392 31,3927.22 TEJA FIBROCEMENTO Nº4 M2 26,678 26,678

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 25,903 25,9037.24 TEJA FIBROCEMENTO No. 8 M2 26,652 26,652

7.25000000000001 TEJA TERMOACÚSTICA M2 36,924 36,9247.26 TEJA PLÁSTICA No.6 M2 32,554 32,554

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 59,709 59,7097.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 108,546 108,546

7.29000000000001 TEJA SIN TRASLAPO M2 48,863 48,8637.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,630 31,630

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 24,951 24,951

7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 39,991 39,991

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,777 14,7777.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,674 17,674

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,082 20,0827.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 25,823 25,823

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,175 16,1757.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 37,936 37,936

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 221,830 221,8307.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 286,155 286,155

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 181,397 181,3977.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 261,083 261,083

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 389,795 382,7308.2 CONCRETO 3500 PSI M3 340,896 334,3238.3 CONCRETO 3000 PSI M3 335,823 328,9998.4 CONCRETO 2500 PSI M3 299,329 292,4558.5 CONCRETO 2000 PSI M3 280,448 273,3268.6 CONCRETO 1500 PSI M3 256,606 249,1958.7 MORTERO SECO 1:10 M3 207,043 201,6178.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 386,216 380,9488.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 356,031 350,090

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 409,555 403,999

Page 153: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 536,675 531,119

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 88,908 88,9089.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,944 2,9059.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 100,215 100,2159.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 122,080 122,0809.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 168,370 168,3709.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 187,998 187,9989.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 207,651 207,6519.8 HOJA PUERTA FORTEC 0.81 UN 147,194 147,1949.9 HOJA PUERTA FORTEC 0.91 UN 162,568 162,568

9.10 HOJA PUERTA FORTEC 1.50 UN 240,969 240,9699.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 91,270 91,2709.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 121,097 121,0979.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 134,112 134,1129.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 340,728 340,7289.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,289 30,2899.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,330 19,3309.17 VENTANERÍA EN MADERA CEDRO MACHO M2 70,587 70,5879.18 CERRADURA DE ENTRADA PRINCIPAL UN 87,386 87,3869.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 67,971 67,9719.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 21,334 21,3349.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,334 21,3349.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,249 20,2499.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 75,062 75,0629.24 ESPEJO BISELADO INCOLORO 4 MM M2 96,971 96,9719.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 44,389 44,3899.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 53,153 53,1539.27 VIDRIO TEMPLADO PULIDO 10 MM M2 213,776 213,7769.28 VIDRIO TEMPLADO PULIDO 8 MM M2 191,867 191,8679.29 VIDRIO TRANSPARENTE 3 MM M2 47,675 47,6759.30 VIDRIO TRANSPARENTE 4 MM M2 55,343 55,3439.31 VIDRIO TRANSPARENTE 5 MM M2 61,916 61,9169.32 VIDRIO TRANSPARENTE 6 MM M2 65,860 65,860

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 55,560 55,56010.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 160,995 160,99510.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML 80,934 80,93410.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 105,861 105,86110.5 MARCO TAPA CAJA DE INSPECCIÓN UN 100,882 100,88210.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 70,406 70,40610.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 149,786 149,78610.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 80,203 80,203

Page 154: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,832 4,832

10.10 M2 74,012 74,012

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 30,998 30,99810.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 388,953 388,95310.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 140,643 140,64310.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 155,360 155,36010.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 355,393 355,39310.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 94,201 94,20110.17 PUERTA CORTINA INCLUYE ESMALTE M2 283,328 283,32810.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,492 4,49210.19 VENTANA EN ALUMINIO CORREDIZA M2 200,090 200,09010.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 89,986 89,98610.21 REJILLA PISO 0.30 M M2 63,581 63,58110.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 65,209 65,209

10.23 KG 7,455 7,455

10.24 KG 8,271 8,271

10.25 KG 6,493 6,493

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 166,627 166,62711.2 ACOMETIDA EN PVC 3/4" 5M UN 198,322 198,32211.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,185 16,18511.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,384 25,38411.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,571 24,57111.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,373 31,37311.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 64,321 64,32111.8 CONEXIÓN TANQUE ELEVADO PVC UN 166,668 166,66811.9 INSTALACIÓN APARATO SANITARIO UN 33,390 33,390

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,42211.12 LLAVE MANGUERA UN 23,561 23,56111.13 NIPLE PASAMURO 2" UN 50,165 50,16511.14 NIPLE PASAMURO 4" UN 74,937 74,93711.15 PUNTO AGUA CALIENTE CPVC UN 62,376 62,37611.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 45,808 45,80811.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,559 48,55911.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 61,302 61,302

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 155: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 48,651 48,65111.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 60,454 60,45411.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 64,565 64,56511.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 53,951 53,95111.23 RED SUMINISTRO CPVC 1/2" ML 9,158 9,15811.24 RED SUMINISTRO CPVC 3/4" ML 12,813 12,81311.25 RED SUMINISTRO PVC 1 1/2" ML 16,472 16,47211.26 RED SUMINISTRO PVC 1" ML 10,221 10,22111.27 RED SUMINISTRO PVC 1/2" ML 6,159 6,15911.28 RED SUMINISTRO PVC 2 1/2" ML 41,460 41,46011.29 RED SUMINISTRO PVC 2" ML 23,833 23,83311.30 RED SUMINISTRO PVC 3/4" ML 7,681 7,68111.31 RED SANITARIA PVC-S 2" ML 18,132 18,13211.32 RED SANITARIA PVC-S 3" ML 25,121 25,12111.33 RED SANITARIA PVC-S 4" ML 33,989 33,98911.34 RED SANITARIA PVC-S 6" ML 63,378 63,37811.35 REGISTRO 1" UN 82,789 82,78911.36 REGISTRO 1/2" UN 47,408 47,40811.37 REGISTRO 3/4" UN 58,051 58,05111.38 REGISTRO 1 1/2" UN 107,996 107,99611.39 REGISTRO 2 1/2" UN 278,454 278,45411.40 REGISTRO 2" UN 207,619 207,61911.41 REVENTILACIÓN 2" ML 12,676 12,67611.42 REVENTILACIÓN 3" ML 16,000 16,00011.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 126,756 126,75611.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 205,523 205,52311.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 338,112 338,11211.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 35,343 35,34311.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 40,860 40,86011.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 67,052 67,05211.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 52,337 52,33711.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 74,353 74,35311.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 78,057 78,05711.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 180,703 180,70311.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,601 35,60111.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,742 35,74211.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,754 28,75411.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,526 32,52611.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 2,939 2,93911.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,564 4,56411.59 GABINETE TIPO III UN 1,019,419 1,019,41911.60 GABINETE TIPO I UN 804,884 804,88411.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,271,194 1,271,19411.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,214,578 1,214,57811.63 VÁLVULA MARIPOSA 3" UN 659,804 659,804

Page 156: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

11.64 VÁLVULA MARIPOSA 4" UN 752,992 752,99211.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 323,607 323,607

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 225,861 225,86112.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 32,839 32,83912.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 40,451 40,45112.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 43,968 43,96812.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 53,639 53,63912.6 SALIDA TELÉFONO PVC COMPLETA UN 35,840 35,84012.7 SALIDA TIMBRE PVC COMPLETA UN 35,871 35,87112.8 STRIP TELEFÓNICO 10 PARES UN 107,853 107,85312.9 SALIDA TOMA DOBLE PVC COMPLETA UN 31,049 31,049

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 73,002 73,00212.11 SALIDA T.V PVC COMPLETA. UN 48,085 48,08512.12 SALIDA BIFÁSICA C.N. UN 28,238 28,23812.13 TABLERO PARCIAL 4 CIRCUITOS UN 81,229 81,22912.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 334,793 334,79312.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 450,392 450,39212.16 TUBERÍA PVC CONDUIT 1/2" ML 2,619 2,61912.17 TUBERÍA PVC CONDUIT 3/4" ML 3,411 3,41112.18 TUBERÍA PVC CONDUIT 1" ML 5,244 5,24412.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,423 9,42312.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 181,240 181,24012.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 57,414 57,41412.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 77,545 77,54512.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,783 27,78312.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,044,757 1,044,75712.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 773,346 773,34612.26 POSTE METÁLICO 6M UN 966,731 966,73112.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 439,107 439,10712.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 76,082 76,08212.29 LUMINARIA 70W SODIO UN 194,613 194,61312.30 LUMINARIA 150W SODIO UN 229,320 229,32012.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,235,288 1,235,28812.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 909,908 909,908

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 34,435 34,22113.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 29,397 29,18413.3 ALISTADO PARA LISTÓN M2 11,280 11,23713.4 ALISTADO PISOS 1:3, E=0.04 M2 23,860 23,43313.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 62,072 61,64513.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,907 20,76513.7 CONCRETO BASE GRADAS 2500 PSI M2 47,239 46,552

Page 157: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 66,028 64,92913.9 MANTO FIBERGLASS 600X1 M2 22,290 22,290

13.10 PEGANTE MORTERO-CONCRETO M2 19,155 19,15513.11 PERMA PLY 2 CAPAS M2 19,945 19,94513.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 38,711 38,09313.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 45,491 44,73513.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 66,237 65,06813.15 TRITURADO FINO 1/2 M3 90,033 84,60113.16 TRITURADO GRUESO 3/4 M3 91,695 86,258

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,184 37,09814.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 22,910 22,86714.3 ADOQUÍN CONCRETO 6CM M2 48,926 48,71214.4 ADOQUÍN CONCRETO 8CM M2 58,126 57,91214.5 ADOQUÍN GRES PEATONAL M2 47,865 47,65114.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 51,949 51,86414.7 GRAVILLA PARA GRADAS ML 29,251 29,15214.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 105,755 105,37014.9 ACABADO EN GRAVILLA LAVADA M2 36,832 36,591

14.10 GUARDAESCOBA EN GRANITO ML 29,602 29,60214.11 GUARDAESCOBA EN GRAVILLA ML 8,233 8,13414.12 GUARDAESCOBA PVC CARAMELO ML 7,259 7,25914.13 GUARDAESCOBA PVC CEDRO ML 9,195 9,19514.14 GUARDAESCOBA PINO CARIBE ML 7,716 7,71614.15 GUARDAESCOBA CEDRO BLANCO ML 7,704 7,70414.16 GUARDAESCOBA EN MADERA SAPAN ML 12,169 12,16914.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,855 6,85514.18 LISTÓN M.H. AMARILLO M2 54,504 54,50414.19 PASO ESCALERA GRANITO ML 81,393 81,09314.20 PIRLANES ALUMINIO ML 5,759 5,75914.21 PIRLANES LADRILLO ML 24,738 24,65914.22 PISO VINILO TRÁFICO RESIDENCIAL M2 31,152 31,15214.23 PISO VINILO TRÁFICO PESADO M2 41,600 41,60014.24 PULIDA LACADA PISO MADERA M2 41,347 41,34714.25 TABLETA DE GRES 25X25 M2 36,943 36,85814.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 37,614 37,52814.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,110 8,11014.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,284 34,16614.29 JABONERA PORCELANA ACUARIO UN 14,181 14,18114.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN 98,377 98,37714.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,634 7,63414.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,651 15,65114.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,545 10,54514.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,040 10,040

Page 158: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

14.35 REMATES BOCEL ALUMINIO ML 6,397 6,39714.36 REMATES BOCEL PORCELANA ML 6,506 6,50614.37 TAPA REGISTRO 20X20 UN 14,665 14,66514.38 TAPA REGISTRO 6X6 UN 12,931 12,93114.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 14,208 14,20814.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 16,486 16,48614.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 47,445 47,35914.42 MEDIA CAÑA EN GRANITO ML 57,106 57,10614.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,219 26,21914.44 PINTURA ACRÍLICA PARA PISOS M2 10,346 10,34614.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,774 11,77414.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 82,356 82,356

15 CIELO RASO15.1 APLIQUE YESO ML 56,760 56,76015.2 ARMADURA MADERA Y MALLA M2 26,670 26,67015.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51,568 51,56815.4 CIELO RASO DURACUSTIC M2 50,913 50,91315.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 47,096 47,09615.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 66,878 66,87815.7 CORNISAS YESO ML 35,484 35,48415.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 74,363 74,36315.9 MALLA CON VENA M2 10,252 10,252

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120

16.2 M3 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730

16.4 M3 34,829 34,829

16.5 M3 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 54,898 52,31116.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 100,497 94,289

16.10 M3 129,570 126,983

16.11 AFRIMADO (NORMA INVIAS 311) M3 65,319 62,73216.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 120,552 117,96516.13 BASE GRANULAR (NORMA INVIAS 330) M3 130,211 127,624

17 APARATOS SANITARIOS17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 217,377 217,377

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

Page 159: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 686,055 686,05517.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 387,713 387,71317.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 124,633 124,63317.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 154,478 154,47817.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 182,804 182,80417.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 282,506 282,50617.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 741,933 741,93317.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 231,557 231,557

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 111,238 111,23817.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 63,118 63,118

17.12 UN 184,432 184,432

17.13 UN 294,953 294,953

18 PINTURAS18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,468 4,46818.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,222 2,22218.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,392 8,39218.4 BARNIZ SOBRE MUEBLES M2 31,937 31,93718.5 CARBURO SOBRE PAÑETES M2 4,320 4,32018.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,597 10,59718.7 DEMARCACIÓN CON MARMOLINA ML 2,690 2,69018.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,930 1,93018.9 ESMALTE SOBRE LÁMINA LLENA M2 10,017 10,017

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,005 3,00518.11 ESMALTE SOBRE MADERA LLENA M2 11,121 11,12118.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,931 3,93118.13 ESMALTE SOBRE MARCOS MADERA M2 4,687 4,68718.14 ESTUCO M2 5,873 5,87318.15 ESTUCO (LINEAL) ML 3,618 3,61818.16 ESTUCO Y VINILO 3 MANOS M2 12,262 12,26218.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,562 7,56218.18 LACA PISOS MADERA M2 18,053 18,05318.19 LÍNEAS TRÁFICO 0.10 ML 2,078 2,07818.20 MARMOLINA SOBRE PAÑETE M2 8,761 8,76118.21 TINTILLA SOBRE MADERA LINEAL ML 2,554 2,55418.22 TINTILLA SOBRE MADERA LLENA M2 9,754 9,75418.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,350 5,35018.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,376 3,37618.25 WASH-PRIMER SOBRE ALUMNIO M2 16,360 16,36018.26 PINTURA EPÓXICA M2 10,093 10,09318.27 PINTURA EPÓXICA (LINEAL) ML 6,196 6,196

19 DOTACIONES DEPORTIVAS

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 160: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,728,130 3,728,130

19.2 UN 6,544,151 6,544,151

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,963,127 1,963,12719.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,501,975 5,501,97519.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,477,487 5,477,48719.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,078 2,07819.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,958,628 1,958,62819.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 62,798 62,79819.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,104,730 1,104,660

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 568,434 566,728

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,088 23,08820.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 34,183 34,18320.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 42,204 42,20420.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,439 25,43920.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 29,069 29,06920.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,560 42,56020.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,744 19,74420.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,822 20,82220.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,760 25,760

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,665 11,66520.11 VÁLVULA DE BOLA GAS 3/4" UN 18,193 18,19320.12 VÁLVULA DE BOLA GAS 1" UN 27,233 27,23320.13 VÁLVULA POLIETILENO GAS 1/2" UN 161,882 161,88220.14 VÁLVULA POLIETILENO GAS 3/4" UN 166,491 166,49120.15 VÁLVULA POLIETILENO GAS 1" UN 269,726 269,72620.16 ACOMETIDA GAS 1/2" ML 222,915 222,915

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 98,440 98,44021.2 CABLE DETECTOR LINEAL DE CALOR ML 24,521 24,52121.3 SIRENA DE 110 V UN 69,612 69,61221.4 CÁMARA CCTV UN 203,480 203,48021.5 PARLANTE-CIELO FALSO UN 39,733 39,73321.6 AMPLIFICADOR 100W UN 428,063 428,06321.7 AMPLIFICADOR 300W UN 1,060,122 1,060,12221.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,730 32,73021.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 169,492 169,492

21.10 TOMA PARA MICRÓFONO UN 33,702 33,70221.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,599 2,59921.12 SPLITERS UN 4,184 4,18421.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,173 14,17321.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,645 18,645

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 161: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,655 25,65521.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 94,608 94,60821.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 24,881 24,88121.18 BANDEJA PORTACABLES PARA RACK UN 81,470 81,47021.19 RACK 2' X 24" UN 130,883 130,88321.20 RACK 3' X 24" UN 159,082 159,08221.21 RACK 5' X 24" UN 251,095 251,09521.22 RACK 7' X 24" UN 324,848 324,84821.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 369,197 369,19721.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 221,634 221,63421.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 53,431 53,43121.26 PATCH CORD 2M CATEGORÍA 6A UN 5,545 5,54521.27 PATCH CORD 5M CATEGORÍA 6A UN 14,080 14,08021.28 CABLE UTP CATEGORÍA 6A ML 2,594 2,59421.29 CANALETA METÁLICA 4X6 CMS ML 26,026 26,02621.30 CANALETA METÁLICA 4X10 CMS ML 27,165 27,16521.31 CANALETA METÁLICA 6X10 CMS ML 27,734 27,73421.32 CANALETA PLÁSTICA 13X7 MM ML 15,436 15,43621.33 CANALETA PLÁSTICA 20X12 MM ML 17,273 17,27321.34 CANALETA PLÁSTICA 32X12 MM ML 17,201 17,20121.35 CANALETA PLÁSTICA 40X60 MM ML 27,527 27,52721.36 SWITCH 10/100/1000 24 PUERTOS UN 371,664 371,66421.37 SWITCH 10/100/1000 16 PUERTOS UN 235,092 235,09221.38 SWITCH 10/100/1000 8 PUERTOS UN 62,730 62,73021.39 CABLE TELEFÓNICO 2 PARES ML 1,352 1,35221.40 CABLE TELEFÓNICO 10 PARES ML 6,552 6,55221.41 CABLE TELEFÓNICO 20 PARES ML 8,768 8,76821.42 CABLE TELEFÓNICO 40 PARES ML 12,219 12,21921.43 CABLE TELEVISIÓN RG6 ML 1,665 1,66521.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,019 16,01921.45 ACOMETIDA TELEFÓNICA 1" ML 24,604 24,60421.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,208 13,20821.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 10,767 10,76721.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 481,117 481,117

Page 162: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,511 19,5111.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 64,847 64,8471.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 363,633 363,6331.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 776,003 776,0031.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 89,196 89,1961.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 541,563 541,5631.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,164,474 1,164,4741.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,634 9,6341.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,798 11,798

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,736 14,7361.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,082 16,0821.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 19,214 19,2141.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 19,214 19,2141.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 76,128 76,1281.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 88,218 88,2181.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 272,794 272,7941.17 TEE PVC UNIÓN MECÁNICA 2" UN 102,373 102,3731.18 TEE PVC UNIÓN MECÁNICA 4" UN 168,746 168,7461.19 TEE PVC UNIÓN MECÁNICA 8" UN 745,772 745,7721.20 TEE PVC UNIÓN MECÁNICA 10" UN 859,070 859,0701.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 9,997 9,9971.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,869 8,8691.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 20,974 20,9741.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 84,263 84,2631.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 124,805 124,8051.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 20,728 20,7281.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 70,863 70,8631.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 104,344 104,3441.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,688 21,6881.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 44,573 44,5731.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 178,661 178,6611.32 UNIÓN REPARACION PVC 4" UN 51,947 51,9471.33 UNIÓN REPARACIÓN PVC 8" UN 207,734 207,7341.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 125,570 125,5701.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 354,556 354,5561.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,044,971 1,044,9711.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,544,014 1,544,014

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,079 8,0792.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,565 18,5652.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 88,783 82,858

Page 163: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

2.5 RELLENO TIPO 2 "RECEBO" M3 51,719 49,1322.6 RELLENO TIPO 4 "SUBBASE B-200" M3 66,539 63,9522.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 76,284 73,2092.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 77,655 72,4312.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 78,444 73,332

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 81,129 81,1293.2 CODO 45 PVC ALCANTARILLADO 16" UN 845,478 845,4783.3 CODO 90 PVC ALCANTARILLADO 8" UN 106,020 106,0203.4 CODO 90 PVC ALCANTARILLADO 16" UN 978,945 978,9453.5 CODO 90 PVC ALCANTARILLADO 24" UN 682,127 682,1273.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 57,988 57,9883.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 80,849 80,8493.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 190,547 190,5473.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 190,546 190,546

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 305,837 305,8373.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 80,850 80,8503.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 80,849 80,8493.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 190,547 190,5473.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 190,547 190,5473.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 305,838 305,8383.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 281,358 281,3583.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 451,117 451,1173.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 720,501 720,5013.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 45,009 45,0093.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 237,199 237,1993.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 257,698 257,6983.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 755,273 755,2733.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 42,576 42,5233.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 215,496 215,4963.25 TUBERÍA PVC ALCANTARILLADO 8" ML 35,530 35,5303.26 TUBERÍA PVC ALCANTARILLADO 10" ML 50,149 50,1493.27 TUBERÍA PVC ALCANTARILLADO 12" ML 72,264 72,2643.28 TUBERÍA PVC ALCANTARILLADO 16" ML 110,846 110,8463.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 177,928 177,9283.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 261,408 261,4083.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 329,894 329,8943.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 433,387 433,3873.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 594,366 594,366

4 ALCANTARILLADO - SUMIDEROS Y POZOS4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 523,015 518,921

4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML 502,543 499,820

Page 164: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 514,552 511,822

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 622,154 617,036

4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML 712,050 708,216

4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 602,312 598,558

4.7 SUMIDERO EN LADRILLO SL-100 UN 729,976 728,0514.8 SUMIDERO EN LADRILLO SL-250 UN 1,082,796 1,077,1364.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,536,505 1,525,719

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,080,893 2,062,9654.11 SUMIDERO PREFABRICADO SL-100 UN 958,600 958,6004.12 SUMIDERO PREFABRICADO SL-250 UN 2,244,205 2,244,205

4.13 UN 101,940 101,828

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 44,123 43,8485.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 50,883 50,6085.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 45,772 45,0505.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 49,604 48,8875.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 50,137 49,4465.6 BORDE SEPARADOR VERDE A-170 ML 194,144 194,0335.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,475 14,3885.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 32,853 32,3455.9 CAÑUELA PREFABRICADA TIPO A-120 ML 63,812 63,753

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 437,687 436,0675.11 LOSETA PREFABRICADA A-40 M2 46,564 46,3095.12 LOSETA PREFABRICADA A-60 M2 66,476 66,2215.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 26,941 26,6545.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 43,871 43,2915.15 SARDINEL PREFABRICADO A-10 ML 79,866 79,4095.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 44,767 44,613

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 113,471 113,1306.2 BANCA EN CONCRETO M-30 UN 476,032 475,5546.3 BOLARDO M-63 ALTO/HIERRO UN 172,454 172,3836.4 BOLARDO M-60 CONCRETO UN 110,247 109,8386.5 BOLARDO M-61 BAJO/CONCRETO UN 111,670 111,2606.6 BOLARDO M-62 BAJO/HIERRO UN 154,734 154,3076.7 BORDE CONTENEDOR DE RAICES A-70 ML 46,239 46,0296.8 BORDILLO PREFABRICADO A-80 ML 52,449 52,2136.9 CANECA M-120 UN 239,328 239,275

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 626,022 625,817

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 165: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,385,060 2,384,9246.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,809,052 2,808,9166.13 CICLOPARQUEADERO M100 TIPO 1 UN 392,564 392,4226.14 CICLOPARQUEADERO M101 TIPO 2 UN 520,849 520,2796.15 BANCA EN MADERA M-50 UN 355,663 355,6636.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 180,071 179,8676.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 427,555 427,4236.18 POSTE HISTÓRICO M-131 UN 3,600,209 3,599,186

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,444 1,4447.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,597 14,5977.3 SEÑAL DOBLE DE CICLORUTA UN 364,859 364,8037.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 421,614 421,3297.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 244,965 244,9097.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 288,371 288,3157.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 395,942 395,8867.8 TACHAS REFLECTIVAS UN 10,287 10,2877.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,856 10,856

7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN 42,005 42,005

Page 166: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085

1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656

1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 56,744 56,744

1.6 *** M3-KM 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,4722.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,685 28,6852.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 6,753 6,7532.4 220.1 TERRAPLENES M3 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341

2.8 230.2 M3 9,096 9,096

2.9 600.1 M3 17,449 17,449

2.10 600.2 M3 47,136 47,136

2.11 600.3 M3 58,282 58,282

2.12 600.4 M3 10,594 10,594

2.13 600.4 P M3 25,966 25,966

2.14 600.5 M3 21,078 21,078

2.15 600.5 P M3 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 120,552 117,9653.3 330.1 BASE GRANULAR M3 130,211 127,624

3.4 365.1 M3 72,536 72,536

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

Page 167: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,089 2,0893.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,051 1,0513.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 159,060 157,4993.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 56,043 55,6513.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 466,367 460,1483.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 555,117 548,8983.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 579,662 573,4433.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 637,617 631,3983.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 227,766 225,1793.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 217,414 214,8273.15 311.1 AFIRMADO M3 65,319 62,7323.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,887 11,7743.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,944 4,888

3.18 500.1 M3 518,604 512,206

3.19 500.1 M3 546,102 539,418

3.20 500.1 M3 564,206 557,342

3.21 *** ML 5,771 5,771

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 96,900 91,428

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 865,213 857,9564.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 763,716 756,5804.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 800,484 793,0664.4 630 P CONCRETOS f´c =3500 psi (bases) M3 486,856 480,2174.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 575,864 568,9624.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 481,732 474,8404.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 570,537 563,3724.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 709,204 702,3124.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 497,284 490,1184.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 743,814 736,6484.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 8,364 8,3644.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG 11,249 11,2494.13 641.1 ACERO DE PREESFUERZO TON-M 1,237 1,237

4.14 621.1 ML 1,952,272 1,952,272

4.15 621.1 P ML 3,164,085 3,151,672

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,083,181 1,076,3574.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 69,706 69,7064.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 265,224 264,4054.19 632 P BARANDA METÁLICA ML 300,992 300,9924.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,254 12,254

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

Page 168: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 388,206 379,5334.22 673.1 MATERIAL GRANULAR FILTRANTE M3 84,360 81,0764.23 610.1 RELLENO PARA ESTRUCTURAS M3 47,751 45,3634.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 318,072 310,8794.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 314,520 308,2574.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 339,162 332,8994.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 325,849 319,7344.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 350,490 344,3764.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 440,481 433,5384.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 527,826 520,6084.31 681.1 GAVIÓN M3 165,612 160,3884.32 681.1 GAVIÓN MALLA PVC M3 172,174 166,9504.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 34,003 33,5774.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 13,344 13,1314.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 8,051 8,051

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,523 11,523

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,542 15,542

4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 18,651 18,651

4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 23,978 23,978

4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,540 5,540

4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,315 6,315

4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,560 6,560

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,612 5,612

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 7,169 7,169

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,260 5,260

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 7,072 7,072

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 12,120 12,120

4.48 661.1 ML 315,509 315,422

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML 265,541 264,0054.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML 622,572 622,5724.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 113,886 111,3994.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,251 3,2514.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 49,777 49,7774.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 80,167 80,167

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

Page 169: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Medina Paratebueno

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: MEDINA

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 430,078 422,8604.56 682.1 P COLCHONETA RENO M3 181,123 175,8994.57 *** TRINCHO EN MADERA M2 47,586 47,586

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,444 1,4445.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,597 14,5975.3 730.3 TOPE DEFENSA METÁLICA UN 67,378 67,3785.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 67,378 67,3785.5 730.1 DEFENSA METÁLICA ML 172,632 172,2785.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 10,287 10,287

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 567 567

6.2 801.6 UN 100,510 100,510

6.3 801.7 ML 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,2866.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240

6.6 801.4 M2 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,046 12,0466.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 32,529 32,5296.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,919 5,919

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 170: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,477,610 1,486,312 1,485,256 1,488,420 1,470,766 1,463,646 1,489,584 1,455,962 1,480,509 1,485,9931.2 CAMPAMENTO 9 M2 UN 861,314 865,665 865,137 866,719 857,892 854,332 867,301 850,490 862,763 865,5051.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,099 10,099 10,099 10,099 10,099 10,099 10,099 10,099 10,099 10,0991.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,371 11,371 11,371 11,371 11,371 11,371 11,371 11,371 11,371 11,3711.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,228 13,228 13,228 13,228 13,228 13,228 13,228 13,228 13,228 13,2281.6 CERCA EN TABLA H=2.30 M ML 48,209 48,209 48,209 48,209 48,209 48,209 48,209 48,209 48,209 48,2091.7 CERCA EN TEJA DE ZINC H=1.80 M ML 34,608 34,708 34,691 34,732 34,567 34,460 34,739 34,379 34,640 34,6991.8 CERCA EN TELA VERDE H = 2.10 M ML 15,472 15,572 15,556 15,596 15,432 15,325 15,603 15,243 15,504 15,5641.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 610,917 611,715 611,251 611,856 611,902 611,130 613,912 610,213 611,033 612,626

1.41 M2 7,194 7,194 7,194 7,194 7,194 7,194 7,194 7,194 7,194 7,194

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,274 2,274 2,274 2,274 2,274 2,274 2,274 2,274 2,274 2,274

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 171: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,130,548 1,130,548 1,130,548 1,130,548 1,130,548 1,130,548 1,130,548 1,130,548 1,130,548 1,130,5481.44 RED TELEFÓNICA PROVISIONAL UN 161,433 161,433 161,433 161,433 161,433 161,433 161,433 161,433 161,433 161,433

1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 67,131 64,544 58,181 60,768 85,240 89,121 89,121 87,827 62,061 77,4792.2 BASE ARENA CEMENTO 1:20 M3 178,103 191,124 186,487 194,297 194,401 165,758 191,241 158,692 181,277 205,4462.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,579 4,579 4,579 4,579 4,579 4,579 4,579 4,579 4,579 4,5792.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 508,415 518,048 516,582 520,384 503,423 493,790 521,206 485,715 511,512 517,3702.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 522,727 532,938 531,200 535,415 519,034 507,740 535,997 499,448 525,939 532,0182.8 ZAPATAS EN CONCRETO 3500 PSI M3 489,372 498,933 497,305 501,252 485,914 475,339 501,797 467,574 492,380 498,0722.9 PILOTE DE MADERA D=20 CM ML 36,213 36,213 36,213 36,213 36,213 36,213 36,213 36,213 36,213 36,213

2.10 ML 110,537 110,537 110,537 110,537 110,537 110,537 110,537 110,537 110,537 110,537

2.11 ML 133,068 133,068 133,068 133,068 133,068 133,068 133,068 133,068 133,068 133,068

2.12 ML 160,316 160,316 160,316 160,316 160,316 160,316 160,316 160,316 160,316 160,316

2.13 ML 196,995 196,995 196,995 196,995 196,995 196,995 196,995 196,995 196,995 196,995

2.14 PILOTE HINCADO 25X25 ML 90,038 90,756 90,616 90,930 89,930 89,033 90,944 88,475 90,257 90,6722.15 PILOTE HINCADO 30X30 ML 109,622 110,662 110,460 110,915 109,466 108,165 110,934 107,357 109,939 110,5412.16 DADOS EN CONCRETO 3500PSI M3 478,596 488,157 486,529 490,476 475,137 464,562 491,021 456,798 481,604 487,296

2.17 ML 118,975 118,975 118,975 118,975 118,975 118,975 118,975 118,975 118,975 118,975

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 27,866 27,947 27,918 27,967 27,967 27,789 27,948 27,745 27,886 28,0363.2 SIFÓN EN PVC 6" UN 141,500 141,581 141,552 141,600 141,601 141,423 141,581 141,379 141,519 141,6703.3 CAJA DE INSPECCIÓN DE 100X100 UN 353,657 356,166 352,855 356,342 364,734 361,918 372,920 357,884 353,262 369,7703.4 CAJA DE INSPECCIÓN DE 40X40 UN 176,963 178,060 177,677 178,289 177,166 176,228 179,812 175,100 177,226 180,5333.5 CAJA DE INSPECCIÓN DE 60X60 UN 199,051 200,966 200,265 201,373 199,880 197,802 203,672 195,971 199,499 205,0033.6 CAJA DE INSPECCIÓN DE 80X80 UN 264,438 267,852 266,885 268,623 264,825 261,020 270,990 257,988 265,353 273,9563.7 DUCTO ELÉCTRICO PVC 4" ML 74,791 74,772 74,742 74,761 74,931 74,961 74,961 74,951 74,771 74,8713.8 POZO SÉPTICO ETERNIT 1000 LT UN 938,450 938,251 937,951 938,150 939,843 940,141 940,141 940,042 938,250 939,2463.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 85,758 86,652 86,333 86,869 86,876 84,911 86,660 84,426 85,976 87,635

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 49,514 49,986 49,818 50,101 50,104 49,067 49,990 48,811 49,629 50,5043.11 TUBERÍA DRENAJE PVC 110 ML 20,481 20,613 20,623 20,645 20,153 20,197 20,703 20,044 20,535 20,8993.12 TUBERÍA DRENAJE PVC 160 ML 30,918 31,050 31,060 31,082 30,591 30,635 31,140 30,481 30,972 31,3363.13 TUBERÍA DRENAJE PVC 200 ML 42,374 42,559 42,572 42,603 41,915 41,977 42,684 41,761 42,449 42,9593.14 TUBERÍA DRENAJE PVC 250 ML 57,458 57,669 57,684 57,719 56,933 57,004 57,812 56,758 57,544 58,1263.15 TUBERÍA DRENAJE PVC 315 ML 78,876 79,060 79,074 79,105 78,417 78,479 79,186 78,263 78,951 79,460

3.16 UN 722,721 724,830 724,987 725,339 717,479 718,182 726,269 715,721 723,581 729,401

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE)

Page 172: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

3.17 UN 1,028,158 1,032,377 1,032,691 1,033,394 1,017,674 1,019,080 1,035,254 1,014,158 1,029,878 1,041,519

3.18 UN 1,352,701 1,361,139 1,361,766 1,363,173 1,331,733 1,334,546 1,366,893 1,324,701 1,356,141 1,379,422

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 27,420 27,420 27,420 27,420 27,420 27,420 27,420 27,420 27,420 27,4204.2 CASETÓN DE LONA 0.80X0.70 M2 35,996 35,996 35,996 35,996 35,996 35,996 35,996 35,996 35,996 35,9964.3 COLUMNAS 3500 PSI M3 630,624 640,184 638,557 642,504 627,165 616,590 643,049 608,826 633,631 639,3234.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 217,300 223,571 224,466 225,330 207,270 212,153 217,107 196,521 220,013 235,199

4.5 M2 75,692 76,620 76,462 76,846 75,356 74,330 76,899 73,576 75,984 76,537

4.6 M2 89,160 90,274 90,084 90,544 88,757 87,525 90,607 86,620 89,510 90,173

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 101,341 102,827 102,574 103,187 100,804 99,161 103,271 97,955 101,809 102,693

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 106,986 108,564 108,295 108,947 106,415 104,670 109,037 103,388 107,482 108,422

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 123,262 125,211 124,879 125,684 122,556 120,400 125,795 118,817 123,875 125,035

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 137,408 139,635 139,256 140,176 136,602 134,138 140,303 132,329 138,109 139,435

4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 152,775 155,281 154,855 155,889 151,868 149,096 156,032 147,061 153,564 155,056

4.12 ENTREPISO VIGUETA PLACA M2 72,835 73,016 72,971 73,060 72,896 72,609 73,048 72,483 72,886 73,1064.13 ESCALERA MACIZA 3500 PSI M3 736,783 746,343 744,716 748,663 733,324 722,749 749,208 714,985 739,791 745,4824.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 68,381 68,557 68,494 68,599 68,601 68,214 68,558 68,119 68,424 68,5054.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 61,831 62,787 62,624 63,019 61,485 60,428 63,073 59,651 62,132 62,7014.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 70,198 71,368 71,169 71,652 69,775 68,482 71,718 67,532 70,566 71,2634.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 82,441 83,908 83,658 84,264 81,911 80,289 84,347 79,098 82,903 83,7764.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 566,633 576,193 574,566 578,513 563,174 552,599 579,058 544,835 569,640 575,332

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 38,166 38,470 38,411 38,544 38,121 37,741 38,549 37,505 38,259 38,434

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 224,920 229,189 228,462 230,225 223,375 218,652 230,468 215,185 226,263 228,8054.21000000000001 ACERO FIGURADO 37000 PSI KG 3,090 3,090 3,090 3,090 3,090 3,090 3,090 3,090 3,090 3,090

4.22 ACERO FIGURADO 60000 PSI KG 3,210 3,210 3,210 3,210 3,210 3,210 3,210 3,210 3,210 3,2104.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,448 4,448 4,448 4,448 4,448 4,448 4,448 4,448 4,448 4,448

4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 669,843 679,403 677,776 681,723 666,384 655,809 682,268 648,045 672,851 678,5424.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 620,197 630,655 628,879 633,192 616,371 604,833 633,795 596,333 623,489 629,718

4.26 VIGA AÉREA 3500 PSI M3 669,390 678,951 677,323 681,270 665,932 655,357 681,815 647,592 672,398 678,0904.27000000000001 VIGA CINTA 3500 PSI M3 654,044 663,604 661,977 665,924 650,585 640,010 666,469 632,246 657,052 662,743

4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 812,997 822,557 820,930 824,877 809,538 798,963 825,422 791,199 816,004 821,6964.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 267,222 277,181 275,973 279,593 259,390 251,241 280,926 242,447 270,539 276,816

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 23,146 23,430 23,362 23,499 23,217 22,786 23,484 22,585 23,228 23,495

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 173: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,681 38,964 38,896 39,033 38,752 38,321 39,018 38,120 38,763 39,0305.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,682 24,763 24,734 24,783 24,784 24,606 24,764 24,562 24,702 24,8525.4 ARCOS EN LADRILLO PRENSADO ML 118,922 119,083 119,026 119,123 119,124 118,768 119,085 118,680 118,961 119,2615.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 34,169 34,473 34,414 34,547 34,124 33,744 34,553 33,508 34,262 34,4385.6 DINTELES EN BLOQUE 0.15 M ML 19,661 19,837 19,774 19,880 19,881 19,494 19,839 19,399 19,704 19,7855.7 ENCHAPES LADRILLO PRENSADO M2 66,479 66,802 66,687 66,881 66,884 66,172 66,805 65,996 66,558 67,1585.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 70,476 71,488 71,291 71,734 70,324 69,059 71,753 68,272 70,785 71,3705.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,006 53,006 53,006 53,006 53,006 53,006 53,006 53,006 53,006 53,006

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,537 32,537 32,537 32,537 32,537 32,537 32,537 32,537 32,537 32,5375.11 MURO DRYWALL DOBLE CARA 0.10 M M2 51,381 51,381 51,381 51,381 51,381 51,381 51,381 51,381 51,381 51,3815.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 31,725 31,725 31,725 31,725 31,725 31,725 31,725 31,725 31,725 31,7255.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 64,185 64,185 64,185 64,185 64,185 64,185 64,185 64,185 64,185 64,1855.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,134 39,134 39,134 39,134 39,134 39,134 39,134 39,134 39,134 39,1345.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 65,698 65,698 65,698 65,698 65,698 65,698 65,698 65,698 65,698 65,6985.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 39,890 39,890 39,890 39,890 39,890 39,890 39,890 39,890 39,890 39,8905.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,115 27,277 27,219 27,317 27,318 26,960 27,279 26,872 27,154 27,4565.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,843 16,924 16,895 16,944 16,944 16,766 16,925 16,722 16,863 17,013

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 37,465 37,573 37,535 37,600 37,601 37,362 37,574 37,303 37,491 37,6935.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 22,829 22,884 22,864 22,897 22,897 22,778 22,884 22,749 22,843 22,943

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 44,121 44,230 44,191 44,256 44,257 44,019 44,231 43,960 44,148 44,3495.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 26,671 26,725 26,705 26,738 26,738 26,619 26,725 26,590 26,684 26,784

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 80,290 80,832 80,639 80,964 80,968 79,776 80,837 79,482 80,422 81,4285.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 47,060 47,331 47,234 47,397 47,399 46,803 47,333 46,656 47,126 47,629

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 24,959 25,067 25,029 25,094 25,094 24,856 25,068 24,797 24,985 25,1865.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,511 15,565 15,546 15,579 15,579 15,460 15,566 15,430 15,524 15,625

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 47,799 48,016 47,939 48,069 48,071 47,594 48,018 47,476 47,852 48,2555.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 29,735 29,843 29,804 29,869 29,870 29,632 29,844 29,573 29,761 29,962

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 63,652 63,827 63,765 63,870 63,872 63,485 63,829 63,390 63,694 63,7765.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 38,938 39,026 38,995 39,047 39,048 38,855 39,027 38,807 38,960 39,000

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 120,315 121,074 120,803 121,258 121,265 119,596 121,080 119,184 120,500 121,9085.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 74,167 74,546 74,411 74,638 74,641 73,807 74,549 73,601 74,259 74,963

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 59,139 59,506 59,375 59,595 59,598 58,792 59,509 58,593 59,229 59,9095.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 36,682 36,865 36,800 36,910 36,911 36,508 36,867 36,409 36,727 37,067

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 35,590 35,832 35,746 35,891 35,893 35,360 35,834 35,228 35,649 36,0995.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 21,678 21,799 21,756 21,829 21,830 21,563 21,800 21,497 21,708 21,933

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 25,514 25,623 25,584 25,649 25,650 25,412 25,624 25,353 25,541 25,7425.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,580 15,634 15,614 15,647 15,647 15,528 15,634 15,499 15,593 15,693

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 38,550 38,766 38,689 38,819 38,821 38,344 38,768 38,227 38,602 39,0055.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 23,678 23,786 23,747 23,812 23,813 23,575 23,787 23,516 23,704 23,905

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 73,642 73,967 73,851 74,046 74,049 73,333 73,970 73,157 73,721 74,3245.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 45,007 45,169 45,111 45,209 45,210 44,853 45,171 44,764 45,046 45,348

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 53,857 54,073 53,996 54,126 54,128 53,651 54,075 53,534 53,910 54,3125.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 32,559 32,668 32,629 32,694 32,695 32,456 32,669 32,398 32,586 32,787

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 114,818 115,577 115,307 115,762 115,768 114,099 115,584 113,687 115,003 116,4115.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 69,797 70,176 70,041 70,269 70,272 69,438 70,180 69,232 69,890 70,594

5.47000000000002 REMATES LADRILLO PRENSADO ML 21,670 21,751 21,722 21,770 21,771 21,593 21,751 21,549 21,690 21,840

Page 174: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 27,635 27,899 27,805 27,963 27,965 27,385 27,901 27,242 27,700 28,1895.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 46,449 46,801 46,675 46,886 46,889 46,116 46,804 45,925 46,535 47,187

5.50 LAVADA DE FACHADA M2 3,995 3,995 3,995 3,995 3,995 3,995 3,995 3,995 3,995 3,9955.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,851 39,134 39,066 39,203 38,922 38,491 39,188 38,289 38,932 39,199

5.52 DOVELA, GROUTING 3000 PSI ML 7,600 7,600 7,600 7,600 7,600 7,600 7,600 7,600 7,600 7,6005.53000000000003 ANCLAJE 3/8" L=30CM UN 10,050 10,050 10,050 10,050 10,050 10,050 10,050 10,050 10,050 10,050

5.54 ANCLAJE 1/2" L=50CM UN 13,141 13,141 13,141 13,141 13,141 13,141 13,141 13,141 13,141 13,1415.55000000000003 ANCLAJE 5/8" L=70CM UN 18,291 18,291 18,291 18,291 18,291 18,291 18,291 18,291 18,291 18,291

5.56 ANCLAJE 3/4" L=70CM UN 27,228 27,228 27,228 27,228 27,228 27,228 27,228 27,228 27,228 27,2285.57000000000003 ANCLAJE 1" L= 70CM UN 3,962 4,032 4,021 4,049 3,926 3,856 4,055 3,797 3,984 4,027

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,774 11,774 11,774 11,774 11,774 11,774 11,774 11,774 11,774 11,7746.2 FILOS O DILATACIONES B/PLACA ML 4,630 4,711 4,682 4,730 4,731 4,553 4,711 4,509 4,650 4,8006.3 FILOS O DILATACIONES S/MURO ML 5,533 5,614 5,585 5,634 5,634 5,456 5,615 5,412 5,553 5,7036.4 GOTERA EN MORTERO 1:4 ML 6,612 6,693 6,664 6,712 6,713 6,535 6,693 6,491 6,631 6,7826.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,282 4,282 4,282 4,282 4,282 4,282 4,282 4,282 4,282 4,2826.6 MALLA BAJO ENTRAMADO M2 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,2576.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,464 19,721 19,629 19,783 19,785 19,221 19,723 19,081 19,527 20,0036.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,708 11,836 11,790 11,867 11,868 11,586 11,837 11,516 11,739 11,9776.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 17,101 17,328 17,247 17,384 17,385 16,885 17,330 16,761 17,156 17,578

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,290 10,403 10,363 10,431 10,432 10,182 10,405 10,120 10,317 10,5296.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,501 16,757 16,666 16,820 16,822 16,257 16,759 16,118 16,563 17,0396.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,990 10,118 10,072 10,149 10,150 9,868 10,119 9,798 10,021 10,2596.13 PAÑETE CULATAS 1:4, E=2 CM M2 17,101 17,328 17,247 17,384 17,385 16,885 17,330 16,761 17,156 17,5786.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,290 10,403 10,363 10,431 10,432 10,182 10,405 10,120 10,317 10,5296.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,538 16,720 16,655 16,765 16,766 16,364 16,722 16,265 16,582 16,9226.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 10,007 10,099 10,066 10,121 10,122 9,921 10,100 9,871 10,030 10,1996.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 14,158 14,331 14,270 14,374 14,375 13,994 14,333 13,899 14,200 14,5226.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,599 8,685 8,655 8,707 8,707 8,516 8,686 8,469 8,620 8,781

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,701 13,896 13,827 13,944 13,945 13,515 13,898 13,409 13,748 14,1116.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,370 8,468 8,433 8,492 8,492 8,277 8,469 8,224 8,394 8,575

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,693 17,921 17,840 17,976 17,978 17,477 17,923 17,354 17,749 18,1716.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,571 10,685 10,644 10,712 10,713 10,463 10,686 10,401 10,599 10,810

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 17,093 17,350 17,258 17,412 17,414 16,850 17,352 16,711 17,156 17,6326.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,271 10,399 10,353 10,430 10,431 10,149 10,400 10,080 10,302 10,540

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 14,166 14,361 14,292 14,409 14,410 13,980 14,363 13,874 14,213 14,5766.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,589 8,687 8,652 8,711 8,711 8,496 8,688 8,443 8,613 8,794

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,771 18,027 17,936 18,090 18,092 17,527 18,030 17,388 17,833 18,3096.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,917 11,046 11,000 11,077 11,078 10,796 11,047 10,726 10,949 11,187

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 21,889 22,214 22,099 22,294 22,296 21,581 22,217 21,405 21,969 22,572

7.2 M2 64,367 64,873 64,775 64,996 64,291 63,658 65,006 63,265 64,521 64,814

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 39,292 39,292 39,292 39,292 39,292 39,292 39,292 39,292 39,292 39,292

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

Page 175: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,037 16,037 16,037 16,037 16,037 16,037 16,037 16,037 16,037 16,0377.5 ML 25,134 25,134 25,134 25,134 25,134 25,134 25,134 25,134 25,134 25,1347.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 58,418 58,418 58,418 58,418 58,418 58,418 58,418 58,418 58,418 58,4187.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 41,903 41,903 41,903 41,903 41,903 41,903 41,903 41,903 41,903 41,9037.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,283 25,283 25,283 25,283 25,283 25,283 25,283 25,283 25,283 25,2837.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 56,862 56,862 56,862 56,862 56,862 56,862 56,862 56,862 56,862 56,862

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 73,344 73,344 73,344 73,344 73,344 73,344 73,344 73,344 73,344 73,3447.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 95,337 95,337 95,337 95,337 95,337 95,337 95,337 95,337 95,337 95,3377.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 42,037 42,037 42,037 42,037 42,037 42,037 42,037 42,037 42,037 42,0377.13 CANAL PVC AMAZONAS ML 61,015 61,015 61,015 61,015 61,015 61,015 61,015 61,015 61,015 61,0157.14 CANAL PVC RAINGO ML 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,9657.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 85,411 85,411 85,411 85,411 85,411 85,411 85,411 85,411 85,411 85,4117.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 49,323 49,323 49,323 49,323 49,323 49,323 49,323 49,323 49,323 49,3237.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 40,539 40,539 40,539 40,539 40,539 40,539 40,539 40,539 40,539 40,5397.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,403 23,403 23,403 23,403 23,403 23,403 23,403 23,403 23,403 23,403

7.19000000000001 TEJA DE BARRO M2 46,292 46,697 46,553 46,795 46,799 45,909 46,700 45,690 46,391 47,1427.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 33,777 33,777 33,777 33,777 33,777 33,777 33,777 33,777 33,777 33,777

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,007 31,007 31,007 31,007 31,007 31,007 31,007 31,007 31,007 31,0077.22 TEJA FIBROCEMENTO Nº4 M2 26,431 26,431 26,431 26,431 26,431 26,431 26,431 26,431 26,431 26,431

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 25,658 25,658 25,658 25,658 25,658 25,658 25,658 25,658 25,658 25,6587.24 TEJA FIBROCEMENTO No. 8 M2 26,396 26,396 26,396 26,396 26,396 26,396 26,396 26,396 26,396 26,396

7.25000000000001 TEJA TERMOACÚSTICA M2 36,505 36,505 36,505 36,505 36,505 36,505 36,505 36,505 36,505 36,5057.26 TEJA PLÁSTICA No.6 M2 32,199 32,199 32,199 32,199 32,199 32,199 32,199 32,199 32,199 32,199

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 58,968 58,968 58,968 58,968 58,968 58,968 58,968 58,968 58,968 58,968

7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 107,089 107,089 107,089 107,089 107,089 107,089 107,089 107,089 107,089 107,089

7.29000000000001 TEJA SIN TRASLAPO M2 48,250 48,250 48,250 48,250 48,250 48,250 48,250 48,250 48,250 48,2507.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,425 31,425 31,425 31,425 31,425 31,425 31,425 31,425 31,425 31,425

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 24,757 24,757 24,757 24,757 24,757 24,757 24,757 24,757 24,757 24,757

7.32 M2 39,570 39,570 39,570 39,570 39,570 39,570 39,570 39,570 39,570 39,570

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,691 14,691 14,691 14,691 14,691 14,691 14,691 14,691 14,691 14,6917.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,544 17,544 17,544 17,544 17,544 17,544 17,544 17,544 17,544 17,544

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 19,908 19,908 19,908 19,908 19,908 19,908 19,908 19,908 19,908 19,9087.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 25,564 25,564 25,564 25,564 25,564 25,564 25,564 25,564 25,564 25,564

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,049 16,049 16,049 16,049 16,049 16,049 16,049 16,049 16,049 16,0497.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 37,624 37,624 37,624 37,624 37,624 37,624 37,624 37,624 37,624 37,624

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 218,649 218,649 218,649 218,649 218,649 218,649 218,649 218,649 218,649 218,6497.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 284,268 284,268 284,268 284,268 284,268 284,268 284,268 284,268 284,268 284,268

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 179,280 179,280 179,280 179,280 179,280 179,280 179,280 179,280 179,280 179,2807.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 257,691 257,691 257,691 257,691 257,691 257,691 257,691 257,691 257,691 257,691

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 383,406 393,813 391,787 396,340 381,850 368,841 396,534 360,758 386,583 392,5978.2 CONCRETO 3500 PSI M3 333,967 343,249 341,669 345,501 330,609 320,342 346,030 312,804 336,887 342,413

BAJANTE PVC AGUAS LLUVIAS D=4"

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 176: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

8.3 CONCRETO 3000 PSI M3 327,954 337,306 335,883 339,574 323,107 313,755 340,372 305,915 330,960 336,6488.4 CONCRETO 2500 PSI M3 294,270 304,396 302,425 306,855 292,757 280,099 307,043 272,235 297,361 303,2138.5 CONCRETO 2000 PSI M3 273,880 283,848 282,205 286,266 269,804 259,098 286,919 250,924 277,036 283,0098.6 CONCRETO 1500 PSI M3 247,930 257,599 256,426 259,941 240,326 232,415 261,235 223,877 251,151 257,2458.7 MORTERO SECO 1:10 M3 214,009 225,169 221,195 227,889 227,979 203,428 225,270 197,371 216,729 237,4468.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 390,963 401,800 397,941 404,441 404,528 380,688 401,898 374,807 393,604 413,7218.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 362,391 374,609 370,258 377,588 377,685 350,805 374,720 344,175 365,370 388,050

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 414,474 425,901 421,832 428,687 428,778 403,638 426,005 397,437 417,260 438,4728.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 539,694 551,121 547,052 553,907 553,998 528,858 551,225 522,657 542,480 563,692

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 87,944 87,944 87,944 87,944 87,944 87,944 87,944 87,944 87,944 87,9449.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,987 3,068 3,039 3,088 3,088 2,910 3,069 2,867 3,007 3,1579.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 99,229 99,229 99,229 99,229 99,229 99,229 99,229 99,229 99,229 99,2299.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 120,768 120,768 120,768 120,768 120,768 120,768 120,768 120,768 120,768 120,7689.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 166,156 166,156 166,156 166,156 166,156 166,156 166,156 166,156 166,156 166,1569.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 185,498 185,498 185,498 185,498 185,498 185,498 185,498 185,498 185,498 185,4989.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 204,865 204,865 204,865 204,865 204,865 204,865 204,865 204,865 204,865 204,8659.8 HOJA PUERTA FORTEC 0.81 UN 145,144 145,144 145,144 145,144 145,144 145,144 145,144 145,144 145,144 145,1449.9 HOJA PUERTA FORTEC 0.91 UN 160,288 160,288 160,288 160,288 160,288 160,288 160,288 160,288 160,288 160,288

9.10 HOJA PUERTA FORTEC 1.50 UN 237,517 237,517 237,517 237,517 237,517 237,517 237,517 237,517 237,517 237,5179.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 90,055 90,055 90,055 90,055 90,055 90,055 90,055 90,055 90,055 90,0559.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 119,436 119,436 119,436 119,436 119,436 119,436 119,436 119,436 119,436 119,4369.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 132,257 132,257 132,257 132,257 132,257 132,257 132,257 132,257 132,257 132,2579.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 335,787 335,787 335,787 335,787 335,787 335,787 335,787 335,787 335,787 335,7879.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 29,995 29,995 29,995 29,995 29,995 29,995 29,995 29,995 29,995 29,9959.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,200 19,200 19,200 19,200 19,200 19,200 19,200 19,200 19,200 19,2009.17 VENTANERÍA EN MADERA CEDRO MACHO M2 69,918 69,918 69,918 69,918 69,918 69,918 69,918 69,918 69,918 69,9189.18 CERRADURA DE ENTRADA PRINCIPAL UN 86,158 86,158 86,158 86,158 86,158 86,158 86,158 86,158 86,158 86,1589.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 67,033 67,033 67,033 67,033 67,033 67,033 67,033 67,033 67,033 67,0339.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 21,092 21,092 21,092 21,092 21,092 21,092 21,092 21,092 21,092 21,0929.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,092 21,092 21,092 21,092 21,092 21,092 21,092 21,092 21,092 21,0929.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,024 20,024 20,024 20,024 20,024 20,024 20,024 20,024 20,024 20,0249.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 74,080 74,080 74,080 74,080 74,080 74,080 74,080 74,080 74,080 74,0809.24 ESPEJO BISELADO INCOLORO 4 MM M2 95,662 95,662 95,662 95,662 95,662 95,662 95,662 95,662 95,662 95,6629.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 43,866 43,866 43,866 43,866 43,866 43,866 43,866 43,866 43,866 43,8669.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 52,498 52,498 52,498 52,498 52,498 52,498 52,498 52,498 52,498 52,4989.27 VIDRIO TEMPLADO PULIDO 10 MM M2 210,830 210,830 210,830 210,830 210,830 210,830 210,830 210,830 210,830 210,8309.28 VIDRIO TEMPLADO PULIDO 8 MM M2 189,249 189,249 189,249 189,249 189,249 189,249 189,249 189,249 189,249 189,2499.29 VIDRIO TRANSPARENTE 3 MM M2 47,103 47,103 47,103 47,103 47,103 47,103 47,103 47,103 47,103 47,1039.30 VIDRIO TRANSPARENTE 4 MM M2 54,657 54,657 54,657 54,657 54,657 54,657 54,657 54,657 54,657 54,6579.31 VIDRIO TRANSPARENTE 5 MM M2 61,131 61,131 61,131 61,131 61,131 61,131 61,131 61,131 61,131 61,1319.32 VIDRIO TRANSPARENTE 6 MM M2 65,015 65,015 65,015 65,015 65,015 65,015 65,015 65,015 65,015 65,015

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 54,985 54,985 54,985 54,985 54,985 54,985 54,985 54,985 54,985 54,985

Page 177: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 158,846 158,846 158,846 158,846 158,846 158,846 158,846 158,846 158,846 158,846

10.3 ML 80,061 80,061 80,061 80,061 80,061 80,061 80,061 80,061 80,061 80,061

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 105,128 105,128 105,128 105,128 105,128 105,128 105,128 105,128 105,128 105,12810.5 MARCO TAPA CAJA DE INSPECCIÓN UN 99,883 99,883 99,883 99,883 99,883 99,883 99,883 99,883 99,883 99,88310.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 69,694 69,694 69,694 69,694 69,694 69,694 69,694 69,694 69,694 69,69410.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 148,220 148,220 148,220 148,220 148,220 148,220 148,220 148,220 148,220 148,22010.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 79,431 79,431 79,431 79,431 79,431 79,431 79,431 79,431 79,431 79,43110.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,790 4,790 4,790 4,790 4,790 4,790 4,790 4,790 4,790 4,790

10.10 M2 73,545 73,545 73,545 73,545 73,545 73,545 73,545 73,545 73,545 73,545

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 30,791 30,791 30,791 30,791 30,791 30,791 30,791 30,791 30,791 30,791

10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 383,607 383,607 383,607 383,607 383,607 383,607 383,607 383,607 383,607 383,607

10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 138,861 138,861 138,861 138,861 138,861 138,861 138,861 138,861 138,861 138,861

10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 153,679 153,679 153,679 153,679 153,679 153,679 153,679 153,679 153,679 153,679

10.15 M2 350,680 350,680 350,680 350,680 350,680 350,680 350,680 350,680 350,680 350,680

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 93,523 93,523 93,523 93,523 93,523 93,523 93,523 93,523 93,523 93,523

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 279,351 279,351 279,351 279,351 279,351 279,351 279,351 279,351 279,351 279,351

10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,451 4,451 4,451 4,451 4,451 4,451 4,451 4,451 4,451 4,451

10.19 VENTANA EN ALUMINIO CORREDIZA M2 197,466 197,466 197,466 197,466 197,466 197,466 197,466 197,466 197,466 197,46610.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 89,279 89,279 89,279 89,279 89,279 89,279 89,279 89,279 89,279 89,27910.21 REJILLA PISO 0.30 M M2 62,906 62,906 62,906 62,906 62,906 62,906 62,906 62,906 62,906 62,90610.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 64,554 64,554 64,554 64,554 64,554 64,554 64,554 64,554 64,554 64,554

10.23 KG 7,401 7,401 7,401 7,401 7,401 7,401 7,401 7,401 7,401 7,401

10.24 KG 8,206 8,206 8,206 8,206 8,206 8,206 8,206 8,206 8,206 8,206

10.25 KG 6,455 6,455 6,455 6,455 6,455 6,455 6,455 6,455 6,455 6,455

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 165,366 165,366 165,366 165,366 165,366 165,366 165,366 165,366 165,366 165,36611.2 ACOMETIDA EN PVC 3/4" 5M UN 196,586 196,586 196,586 196,586 196,586 196,586 196,586 196,586 196,586 196,58611.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,037 16,037 16,037 16,037 16,037 16,037 16,037 16,037 16,037 16,037

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 178: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,134 25,134 25,134 25,134 25,134 25,134 25,134 25,134 25,134 25,13411.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,358 24,358 24,358 24,358 24,358 24,358 24,358 24,358 24,358 24,35811.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,074 31,074 31,074 31,074 31,074 31,074 31,074 31,074 31,074 31,07411.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 63,632 63,632 63,632 63,632 63,632 63,632 63,632 63,632 63,632 63,63211.8 CONEXIÓN TANQUE ELEVADO PVC UN 165,402 165,402 165,402 165,402 165,402 165,402 165,402 165,402 165,402 165,40211.9 INSTALACIÓN APARATO SANITARIO UN 33,382 33,382 33,382 33,382 33,382 33,382 33,382 33,382 33,382 33,382

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,413 23,413 23,413 23,413 23,413 23,413 23,413 23,413 23,413 23,41311.13 NIPLE PASAMURO 2" UN 49,906 49,906 49,906 49,906 49,906 49,906 49,906 49,906 49,906 49,90611.14 NIPLE PASAMURO 4" UN 74,519 74,519 74,519 74,519 74,519 74,519 74,519 74,519 74,519 74,51911.15 PUNTO AGUA CALIENTE CPVC UN 61,933 61,933 61,933 61,933 61,933 61,933 61,933 61,933 61,933 61,93311.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 45,614 45,614 45,614 45,614 45,614 45,614 45,614 45,614 45,614 45,61411.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,323 48,323 48,323 48,323 48,323 48,323 48,323 48,323 48,323 48,32311.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 60,999 60,999 60,999 60,999 60,999 60,999 60,999 60,999 60,999 60,99911.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 48,333 48,333 48,333 48,333 48,333 48,333 48,333 48,333 48,333 48,33311.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 59,961 59,961 59,961 59,961 59,961 59,961 59,961 59,961 59,961 59,96111.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 64,010 64,010 64,010 64,010 64,010 64,010 64,010 64,010 64,010 64,01011.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 53,369 53,369 53,369 53,369 53,369 53,369 53,369 53,369 53,369 53,36911.23 RED SUMINISTRO CPVC 1/2" ML 9,070 9,070 9,070 9,070 9,070 9,070 9,070 9,070 9,070 9,07011.24 RED SUMINISTRO CPVC 3/4" ML 12,669 12,669 12,669 12,669 12,669 12,669 12,669 12,669 12,669 12,66911.25 RED SUMINISTRO PVC 1 1/2" ML 16,294 16,294 16,294 16,294 16,294 16,294 16,294 16,294 16,294 16,29411.26 RED SUMINISTRO PVC 1" ML 10,123 10,123 10,123 10,123 10,123 10,123 10,123 10,123 10,123 10,12311.27 RED SUMINISTRO PVC 1/2" ML 6,108 6,108 6,108 6,108 6,108 6,108 6,108 6,108 6,108 6,10811.28 RED SUMINISTRO PVC 2 1/2" ML 40,943 40,943 40,943 40,943 40,943 40,943 40,943 40,943 40,943 40,94311.29 RED SUMINISTRO PVC 2" ML 23,559 23,559 23,559 23,559 23,559 23,559 23,559 23,559 23,559 23,55911.30 RED SUMINISTRO PVC 3/4" ML 7,612 7,612 7,612 7,612 7,612 7,612 7,612 7,612 7,612 7,61211.31 RED SANITARIA PVC-S 2" ML 17,943 17,943 17,943 17,943 17,943 17,943 17,943 17,943 17,943 17,94311.32 RED SANITARIA PVC-S 3" ML 24,845 24,845 24,845 24,845 24,845 24,845 24,845 24,845 24,845 24,84511.33 RED SANITARIA PVC-S 4" ML 33,604 33,604 33,604 33,604 33,604 33,604 33,604 33,604 33,604 33,60411.34 RED SANITARIA PVC-S 6" ML 62,554 62,554 62,554 62,554 62,554 62,554 62,554 62,554 62,554 62,55411.35 REGISTRO 1" UN 81,797 81,797 81,797 81,797 81,797 81,797 81,797 81,797 81,797 81,79711.36 REGISTRO 1/2" UN 46,853 46,853 46,853 46,853 46,853 46,853 46,853 46,853 46,853 46,85311.37 REGISTRO 3/4" UN 57,336 57,336 57,336 57,336 57,336 57,336 57,336 57,336 57,336 57,33611.38 REGISTRO 1 1/2" UN 106,627 106,627 106,627 106,627 106,627 106,627 106,627 106,627 106,627 106,62711.39 REGISTRO 2 1/2" UN 274,602 274,602 274,602 274,602 274,602 274,602 274,602 274,602 274,602 274,60211.40 REGISTRO 2" UN 204,825 204,825 204,825 204,825 204,825 204,825 204,825 204,825 204,825 204,82511.41 REVENTILACIÓN 2" ML 12,555 12,555 12,555 12,555 12,555 12,555 12,555 12,555 12,555 12,55511.42 REVENTILACIÓN 3" ML 15,843 15,843 15,843 15,843 15,843 15,843 15,843 15,843 15,843 15,843

11.43 UN 125,477 125,477 125,477 125,477 125,477 125,477 125,477 125,477 125,477 125,477

11.44 UN 203,272 203,272 203,272 203,272 203,272 203,272 203,272 203,272 203,272 203,272

11.45 UN 334,288 334,288 334,288 334,288 334,288 334,288 334,288 334,288 334,288 334,288

11.46 ML 35,156 35,156 35,156 35,156 35,156 35,156 35,156 35,156 35,156 35,156

TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN)

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

Page 179: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

11.47 ML 40,602 40,602 40,602 40,602 40,602 40,602 40,602 40,602 40,602 40,602

11.48 ML 66,665 66,665 66,665 66,665 66,665 66,665 66,665 66,665 66,665 66,665

11.49 ML 51,745 51,745 51,745 51,745 51,745 51,745 51,745 51,745 51,745 51,745

11.50 ML 73,470 73,470 73,470 73,470 73,470 73,470 73,470 73,470 73,470 73,470

11.51 ML 77,315 77,315 77,315 77,315 77,315 77,315 77,315 77,315 77,315 77,315

11.52 ML 179,665 179,665 179,665 179,665 179,665 179,665 179,665 179,665 179,665 179,665

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,390 35,390 35,390 35,390 35,390 35,390 35,390 35,390 35,390 35,39011.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,528 35,528 35,528 35,528 35,528 35,528 35,528 35,528 35,528 35,52811.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,479 28,479 28,479 28,479 28,479 28,479 28,479 28,479 28,479 28,47911.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,195 32,195 32,195 32,195 32,195 32,195 32,195 32,195 32,195 32,195

11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 2,905 2,905 2,905 2,905 2,905 2,905 2,905 2,905 2,905 2,905

11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,505 4,505 4,505 4,505 4,505 4,505 4,505 4,505 4,505 4,505

11.59 GABINETE TIPO III UN 1,006,273 1,006,273 1,006,273 1,006,273 1,006,273 1,006,273 1,006,273 1,006,273 1,006,273 1,006,27311.60 GABINETE TIPO I UN 794,942 794,942 794,942 794,942 794,942 794,942 794,942 794,942 794,942 794,94211.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,253,781 1,253,781 1,253,781 1,253,781 1,253,781 1,253,781 1,253,781 1,253,781 1,253,781 1,253,78111.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,198,010 1,198,010 1,198,010 1,198,010 1,198,010 1,198,010 1,198,010 1,198,010 1,198,010 1,198,01011.63 VÁLVULA MARIPOSA 3" UN 651,568 651,568 651,568 651,568 651,568 651,568 651,568 651,568 651,568 651,56811.64 VÁLVULA MARIPOSA 4" UN 743,364 743,364 743,364 743,364 743,364 743,364 743,364 743,364 743,364 743,36411.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 318,909 318,909 318,909 318,909 318,909 318,909 318,909 318,909 318,909 318,909

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 223,246 223,246 223,246 223,246 223,246 223,246 223,246 223,246 223,246 223,24612.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 32,465 32,465 32,465 32,465 32,465 32,465 32,465 32,465 32,465 32,46512.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 39,962 39,962 39,962 39,962 39,962 39,962 39,962 39,962 39,962 39,96212.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 43,471 43,471 43,471 43,471 43,471 43,471 43,471 43,471 43,471 43,47112.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 52,997 52,997 52,997 52,997 52,997 52,997 52,997 52,997 52,997 52,99712.6 SALIDA TELÉFONO PVC COMPLETA UN 35,432 35,432 35,432 35,432 35,432 35,432 35,432 35,432 35,432 35,43212.7 SALIDA TIMBRE PVC COMPLETA UN 35,466 35,466 35,466 35,466 35,466 35,466 35,466 35,466 35,466 35,46612.8 STRIP TELEFÓNICO 10 PARES UN 106,683 106,683 106,683 106,683 106,683 106,683 106,683 106,683 106,683 106,68312.9 SALIDA TOMA DOBLE PVC COMPLETA UN 30,702 30,702 30,702 30,702 30,702 30,702 30,702 30,702 30,702 30,702

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 72,152 72,152 72,152 72,152 72,152 72,152 72,152 72,152 72,152 72,15212.11 SALIDA T.V PVC COMPLETA. UN 47,541 47,541 47,541 47,541 47,541 47,541 47,541 47,541 47,541 47,54112.12 SALIDA BIFÁSICA C.N. UN 27,910 27,910 27,910 27,910 27,910 27,910 27,910 27,910 27,910 27,91012.13 TABLERO PARCIAL 4 CIRCUITOS UN 80,283 80,283 80,283 80,283 80,283 80,283 80,283 80,283 80,283 80,28312.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 330,994 330,994 330,994 330,994 330,994 330,994 330,994 330,994 330,994 330,99412.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 445,131 445,131 445,131 445,131 445,131 445,131 445,131 445,131 445,131 445,13112.16 TUBERÍA PVC CONDUIT 1/2" ML 2,589 2,589 2,589 2,589 2,589 2,589 2,589 2,589 2,589 2,58912.17 TUBERÍA PVC CONDUIT 3/4" ML 3,373 3,373 3,373 3,373 3,373 3,373 3,373 3,373 3,373 3,37312.18 TUBERÍA PVC CONDUIT 1" ML 5,183 5,183 5,183 5,183 5,183 5,183 5,183 5,183 5,183 5,183

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

Page 180: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

12.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,315 9,315 9,315 9,315 9,315 9,315 9,315 9,315 9,315 9,31512.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 179,156 179,156 179,156 179,156 179,156 179,156 179,156 179,156 179,156 179,15612.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 56,777 56,777 56,777 56,777 56,777 56,777 56,777 56,777 56,777 56,77712.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 76,607 76,607 76,607 76,607 76,607 76,607 76,607 76,607 76,607 76,60712.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,588 27,588 27,588 27,588 27,588 27,588 27,588 27,588 27,588 27,58812.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,033,481 1,033,481 1,033,481 1,033,481 1,033,481 1,033,481 1,033,481 1,033,481 1,033,481 1,033,48112.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 765,077 765,077 765,077 765,077 765,077 765,077 765,077 765,077 765,077 765,07712.26 POSTE METÁLICO 6M UN 954,124 954,124 954,124 954,124 954,124 954,124 954,124 954,124 954,124 954,12412.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 432,957 432,957 432,957 432,957 432,957 432,957 432,957 432,957 432,957 432,95712.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 75,191 75,191 75,191 75,191 75,191 75,191 75,191 75,191 75,191 75,19112.29 LUMINARIA 70W SODIO UN 191,998 191,998 191,998 191,998 191,998 191,998 191,998 191,998 191,998 191,99812.30 LUMINARIA 150W SODIO UN 226,187 226,187 226,187 226,187 226,187 226,187 226,187 226,187 226,187 226,18712.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,217,144 1,217,144 1,217,144 1,217,144 1,217,144 1,217,144 1,217,144 1,217,144 1,217,144 1,217,14412.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 896,624 896,624 896,624 896,624 896,624 896,624 896,624 896,624 896,624 896,624

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 34,489 34,929 34,772 35,036 35,039 34,072 34,933 33,834 34,596 35,41213.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 29,462 29,901 29,745 30,008 30,012 29,045 29,905 28,807 29,569 30,38513.3 ALISTADO PARA LISTÓN M2 11,295 11,383 11,351 11,404 11,405 11,211 11,383 11,164 11,316 11,47913.4 ALISTADO PISOS 1:3, E=0.04 M2 24,375 25,254 24,941 25,469 25,476 23,542 25,262 23,065 24,590 26,22113.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 62,073 62,952 62,639 63,166 63,173 61,240 62,960 60,763 62,287 63,91913.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,760 20,959 20,926 21,008 20,678 20,464 21,021 20,301 20,823 20,94213.7 CONCRETO BASE GRADAS 2500 PSI M2 46,709 47,722 47,525 47,968 46,558 45,292 47,986 44,506 47,018 47,60313.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 65,182 66,802 66,487 67,196 64,940 62,915 67,226 61,657 65,677 66,61313.9 MANTO FIBERGLASS 600X1 M2 22,054 22,054 22,054 22,054 22,054 22,054 22,054 22,054 22,054 22,054

13.10 PEGANTE MORTERO-CONCRETO M2 19,002 19,002 19,002 19,002 19,002 19,002 19,002 19,002 19,002 19,00213.11 PERMA PLY 2 CAPAS M2 19,824 19,824 19,824 19,824 19,824 19,824 19,824 19,824 19,824 19,82413.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 38,244 39,155 38,978 39,376 38,108 36,968 39,393 36,261 38,522 39,04913.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 44,922 46,036 45,820 46,307 44,756 43,364 46,328 42,499 45,262 45,90613.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 65,352 67,073 66,738 67,492 65,095 62,943 67,523 61,606 65,878 66,87213.15 TRITURADO FINO 1/2 M3 79,542 84,974 85,378 86,284 66,044 67,855 88,678 61,517 81,757 96,74413.16 TRITURADO GRUESO 3/4 M3 81,936 85,781 84,928 86,498 75,976 78,717 96,508 72,904 83,028 99,817

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,007 37,183 37,121 37,226 37,228 36,841 37,185 36,745 37,050 37,377

14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 22,821 22,909 22,878 22,930 22,931 22,738 22,910 22,690 22,842 23,006

14.3 ADOQUÍN CONCRETO 6CM M2 48,861 49,301 49,144 49,408 49,412 48,445 49,305 48,206 48,969 49,78414.4 ADOQUÍN CONCRETO 8CM M2 57,911 58,351 58,194 58,458 58,462 57,495 58,355 57,256 58,019 58,83414.5 ADOQUÍN GRES PEATONAL M2 47,809 48,249 48,092 48,356 48,359 47,393 48,253 47,154 47,916 48,732

14.6 M2 51,539 51,715 51,652 51,757 51,759 51,372 51,716 51,277 51,582 51,908

14.7 GRAVILLA PARA GRADAS ML 29,180 29,324 29,297 29,359 29,150 28,975 29,364 28,862 29,225 29,543

14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 105,263 106,054 105,772 106,247 106,253 104,513 106,061 104,083 105,456 106,924

14.9 ACABADO EN GRAVILLA LAVADA M2 36,743 37,120 37,034 37,211 36,793 36,250 37,199 35,976 36,854 37,655

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

Page 181: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

14.10 GUARDAESCOBA EN GRANITO ML 29,478 29,478 29,478 29,478 29,478 29,478 29,478 29,478 29,478 29,47814.11 GUARDAESCOBA EN GRAVILLA ML 8,186 8,330 8,303 8,365 8,155 7,981 8,369 7,867 8,230 8,54914.12 GUARDAESCOBA PVC CARAMELO ML 7,166 7,166 7,166 7,166 7,166 7,166 7,166 7,166 7,166 7,16614.13 GUARDAESCOBA PVC CEDRO ML 9,073 9,073 9,073 9,073 9,073 9,073 9,073 9,073 9,073 9,07314.14 GUARDAESCOBA PINO CARIBE ML 7,655 7,655 7,655 7,655 7,655 7,655 7,655 7,655 7,655 7,65514.15 GUARDAESCOBA CEDRO BLANCO ML 7,643 7,643 7,643 7,643 7,643 7,643 7,643 7,643 7,643 7,64314.16 GUARDAESCOBA EN MADERA SAPAN ML 12,041 12,041 12,041 12,041 12,041 12,041 12,041 12,041 12,041 12,04114.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,838 6,838 6,838 6,838 6,838 6,838 6,838 6,838 6,838 6,83814.18 LISTÓN M.H. AMARILLO M2 54,009 54,009 54,009 54,009 54,009 54,009 54,009 54,009 54,009 54,00914.19 PASO ESCALERA GRANITO ML 81,304 81,919 81,700 82,069 82,074 80,720 81,925 80,386 81,454 82,59614.20 PIRLANES ALUMINIO ML 5,750 5,750 5,750 5,750 5,750 5,750 5,750 5,750 5,750 5,75014.21 PIRLANES LADRILLO ML 24,725 24,887 24,829 24,926 24,928 24,572 24,888 24,484 24,765 25,06514.22 PISO VINILO TRÁFICO RESIDENCIAL M2 30,804 30,804 30,804 30,804 30,804 30,804 30,804 30,804 30,804 30,80414.23 PISO VINILO TRÁFICO PESADO M2 41,090 41,090 41,090 41,090 41,090 41,090 41,090 41,090 41,090 41,09014.24 PULIDA LACADA PISO MADERA M2 40,986 40,986 40,986 40,986 40,986 40,986 40,986 40,986 40,986 40,98614.25 TABLETA DE GRES 25X25 M2 36,758 36,934 36,871 36,977 36,978 36,591 36,935 36,496 36,801 37,12714.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 37,418 37,594 37,531 37,637 37,638 37,252 37,596 37,156 37,461 37,78714.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,074 8,074 8,074 8,074 8,074 8,074 8,074 8,074 8,074 8,07414.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,197 34,439 34,353 34,499 34,501 33,967 34,442 33,835 34,256 34,70614.29 JABONERA PORCELANA ACUARIO UN 14,030 14,030 14,030 14,030 14,030 14,030 14,030 14,030 14,030 14,030

14.30 UN 97,173 97,173 97,173 97,173 97,173 97,173 97,173 97,173 97,173 97,173

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,599 7,599 7,599 7,599 7,599 7,599 7,599 7,599 7,599 7,59914.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,497 15,497 15,497 15,497 15,497 15,497 15,497 15,497 15,497 15,49714.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,466 10,466 10,466 10,466 10,466 10,466 10,466 10,466 10,466 10,46614.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 9,970 9,970 9,970 9,970 9,970 9,970 9,970 9,970 9,970 9,97014.35 REMATES BOCEL ALUMINIO ML 6,377 6,377 6,377 6,377 6,377 6,377 6,377 6,377 6,377 6,37714.36 REMATES BOCEL PORCELANA ML 6,484 6,484 6,484 6,484 6,484 6,484 6,484 6,484 6,484 6,48414.37 TAPA REGISTRO 20X20 UN 14,526 14,526 14,526 14,526 14,526 14,526 14,526 14,526 14,526 14,52614.38 TAPA REGISTRO 6X6 UN 12,817 12,817 12,817 12,817 12,817 12,817 12,817 12,817 12,817 12,817

14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 13,996 13,996 13,996 13,996 13,996 13,996 13,996 13,996 13,996 13,996

14.40 M2 16,240 16,240 16,240 16,240 16,240 16,240 16,240 16,240 16,240 16,240

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 47,067 47,242 47,180 47,285 47,287 46,900 47,244 46,805 47,109 47,43614.42 MEDIA CAÑA EN GRANITO ML 56,338 56,338 56,338 56,338 56,338 56,338 56,338 56,338 56,338 56,33814.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,182 26,182 26,182 26,182 26,182 26,182 26,182 26,182 26,182 26,18214.44 PINTURA ACRÍLICA PARA PISOS M2 10,253 10,253 10,253 10,253 10,253 10,253 10,253 10,253 10,253 10,25314.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,626 11,626 11,626 11,626 11,626 11,626 11,626 11,626 11,626 11,62614.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 81,237 81,237 81,237 81,237 81,237 81,237 81,237 81,237 81,237 81,237

15 CIELO RASO15.1 APLIQUE YESO ML 56,003 56,003 56,003 56,003 56,003 56,003 56,003 56,003 56,003 56,00315.2 ARMADURA MADERA Y MALLA M2 26,564 26,564 26,564 26,564 26,564 26,564 26,564 26,564 26,564 26,56415.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51,055 51,055 51,055 51,055 51,055 51,055 51,055 51,055 51,055 51,05515.4 CIELO RASO DURACUSTIC M2 50,411 50,411 50,411 50,411 50,411 50,411 50,411 50,411 50,411 50,411

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

Page 182: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 46,608 46,608 46,608 46,608 46,608 46,608 46,608 46,608 46,608 46,60815.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 66,170 66,170 66,170 66,170 66,170 66,170 66,170 66,170 66,170 66,17015.7 CORNISAS YESO ML 34,999 34,999 34,999 34,999 34,999 34,999 34,999 34,999 34,999 34,99915.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 73,518 73,518 73,518 73,518 73,518 73,518 73,518 73,518 73,518 73,51815.9 MALLA CON VENA M2 10,205 10,205 10,205 10,205 10,205 10,205 10,205 10,205 10,205 10,205

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 52,311 49,724 45,831 48,418 70,420 74,301 74,301 73,007 49,711 62,65916.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 88,509 94,716 95,178 96,212 73,085 75,154 98,949 67,911 91,040 108,166

16.10 M3 155,949 147,054 175,351 143,014 114,557 175,351 179,232 172,764 162,416 162,576

16.11 AFRIMADO (NORMA INVIAS 311) M3 62,732 60,145 53,781 56,368 80,841 84,721 84,721 83,428 57,662 73,08016.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 149,627 138,187 169,029 136,692 108,235 169,029 172,910 166,442 156,094 153,70916.13 BASE GRANULAR (NORMA INVIAS 330) M3 156,590 147,695 175,992 143,655 115,198 175,992 179,873 173,405 163,057 163,217

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 214,621 214,621 214,621 214,621 214,621 214,621 214,621 214,621 214,621 214,621

17.2 UN 676,353 676,353 676,353 676,353 676,353 676,353 676,353 676,353 676,353 676,353

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 382,413 382,413 382,413 382,413 382,413 382,413 382,413 382,413 382,413 382,413

17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 123,317 123,317 123,317 123,317 123,317 123,317 123,317 123,317 123,317 123,317

17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 152,661 152,661 152,661 152,661 152,661 152,661 152,661 152,661 152,661 152,661

17.6 UN 180,564 180,564 180,564 180,564 180,564 180,564 180,564 180,564 180,564 180,564

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 278,777 278,777 278,777 278,777 278,777 278,777 278,777 278,777 278,777 278,777

17.8 UN 731,396 731,396 731,396 731,396 731,396 731,396 731,396 731,396 731,396 731,396

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 228,589 228,589 228,589 228,589 228,589 228,589 228,589 228,589 228,589 228,589

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 110,122 110,122 110,122 110,122 110,122 110,122 110,122 110,122 110,122 110,122

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 62,666 62,666 62,666 62,666 62,666 62,666 62,666 62,666 62,666 62,666

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA)

Page 183: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

17.12 UN 182,167 182,167 182,167 182,167 182,167 182,167 182,167 182,167 182,167 182,167

17.13 UN 291,037 291,037 291,037 291,037 291,037 291,037 291,037 291,037 291,037 291,037

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,454 4,454 4,454 4,454 4,454 4,454 4,454 4,454 4,454 4,454

18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,20518.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,358 8,358 8,358 8,358 8,358 8,358 8,358 8,358 8,358 8,35818.4 BARNIZ SOBRE MUEBLES M2 31,684 31,684 31,684 31,684 31,684 31,684 31,684 31,684 31,684 31,68418.5 CARBURO SOBRE PAÑETES M2 4,302 4,302 4,302 4,302 4,302 4,302 4,302 4,302 4,302 4,30218.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,501 10,501 10,501 10,501 10,501 10,501 10,501 10,501 10,501 10,50118.7 DEMARCACIÓN CON MARMOLINA ML 2,680 2,680 2,680 2,680 2,680 2,680 2,680 2,680 2,680 2,68018.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,917 1,917 1,917 1,917 1,917 1,917 1,917 1,917 1,917 1,91718.9 ESMALTE SOBRE LÁMINA LLENA M2 9,962 9,962 9,962 9,962 9,962 9,962 9,962 9,962 9,962 9,962

18.10 ESMALTE SOBRE MADERA LINEAL ML 2,984 2,984 2,984 2,984 2,984 2,984 2,984 2,984 2,984 2,98418.11 ESMALTE SOBRE MADERA LLENA M2 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,053 11,05318.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,893 3,893 3,893 3,893 3,893 3,893 3,893 3,893 3,893 3,89318.13 ESMALTE SOBRE MARCOS MADERA M2 4,644 4,644 4,644 4,644 4,644 4,644 4,644 4,644 4,644 4,64418.14 ESTUCO M2 5,846 5,846 5,846 5,846 5,846 5,846 5,846 5,846 5,846 5,84618.15 ESTUCO (LINEAL) ML 3,605 3,605 3,605 3,605 3,605 3,605 3,605 3,605 3,605 3,60518.16 ESTUCO Y VINILO 3 MANOS M2 12,189 12,189 12,189 12,189 12,189 12,189 12,189 12,189 12,189 12,18918.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,526 7,526 7,526 7,526 7,526 7,526 7,526 7,526 7,526 7,52618.18 LACA PISOS MADERA M2 17,978 17,978 17,978 17,978 17,978 17,978 17,978 17,978 17,978 17,97818.19 LÍNEAS TRÁFICO 0.10 ML 2,067 2,067 2,067 2,067 2,067 2,067 2,067 2,067 2,067 2,06718.20 MARMOLINA SOBRE PAÑETE M2 8,679 8,679 8,679 8,679 8,679 8,679 8,679 8,679 8,679 8,67918.21 TINTILLA SOBRE MADERA LINEAL ML 2,530 2,530 2,530 2,530 2,530 2,530 2,530 2,530 2,530 2,53018.22 TINTILLA SOBRE MADERA LLENA M2 9,690 9,690 9,690 9,690 9,690 9,690 9,690 9,690 9,690 9,69018.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,319 5,319 5,319 5,319 5,319 5,319 5,319 5,319 5,319 5,31918.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,360 3,360 3,360 3,360 3,360 3,360 3,360 3,360 3,360 3,36018.25 WASH-PRIMER SOBRE ALUMNIO M2 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,21418.26 PINTURA EPÓXICA M2 10,040 10,040 10,040 10,040 10,040 10,040 10,040 10,040 10,040 10,04018.27 PINTURA EPÓXICA (LINEAL) ML 6,169 6,169 6,169 6,169 6,169 6,169 6,169 6,169 6,169 6,169

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,673,198 3,673,198 3,673,198 3,673,198 3,673,198 3,673,198 3,673,198 3,673,198 3,673,198 3,673,198

19.2 UN 6,447,747 6,447,747 6,447,747 6,447,747 6,447,747 6,447,747 6,447,747 6,447,747 6,447,747 6,447,747

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,934,211 1,934,211 1,934,211 1,934,211 1,934,211 1,934,211 1,934,211 1,934,211 1,934,211 1,934,21119.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,420,993 5,420,993 5,420,993 5,420,993 5,420,993 5,420,993 5,420,993 5,420,993 5,420,993 5,420,99319.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,396,505 5,396,505 5,396,505 5,396,505 5,396,505 5,396,505 5,396,505 5,396,505 5,396,505 5,396,50519.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,067 2,067 2,067 2,067 2,067 2,067 2,067 2,067 2,067 2,06719.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,929,792 1,929,792 1,929,792 1,929,792 1,929,792 1,929,792 1,929,792 1,929,792 1,929,792 1,929,79219.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 61,860 61,860 61,860 61,860 61,860 61,860 61,860 61,860 61,860 61,860

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 184: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,088,506 1,088,610 1,088,590 1,088,635 1,088,490 1,088,360 1,088,637 1,088,279 1,088,538 1,088,59819.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 560,698 563,036 562,681 563,603 559,487 557,149 563,803 555,189 561,450 562,872

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,87720.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 33,820 33,820 33,820 33,820 33,820 33,820 33,820 33,820 33,820 33,82020.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 41,738 41,738 41,738 41,738 41,738 41,738 41,738 41,738 41,738 41,738

20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,296 25,296 25,296 25,296 25,296 25,296 25,296 25,296 25,296 25,296

20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 28,879 28,879 28,879 28,879 28,879 28,879 28,879 28,879 28,879 28,879

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,280 42,280 42,280 42,280 42,280 42,280 42,280 42,280 42,280 42,280

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,630 19,630 19,630 19,630 19,630 19,630 19,630 19,630 19,630 19,63020.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,698 20,698 20,698 20,698 20,698 20,698 20,698 20,698 20,698 20,69820.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,591 25,591 25,591 25,591 25,591 25,591 25,591 25,591 25,591 25,591

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,530 11,530 11,530 11,530 11,530 11,530 11,530 11,530 11,530 11,53020.11 VÁLVULA DE BOLA GAS 3/4" UN 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,964 17,96420.12 VÁLVULA DE BOLA GAS 1" UN 26,873 26,873 26,873 26,873 26,873 26,873 26,873 26,873 26,873 26,87320.13 VÁLVULA POLIETILENO GAS 1/2" UN 159,636 159,636 159,636 159,636 159,636 159,636 159,636 159,636 159,636 159,63620.14 VÁLVULA POLIETILENO GAS 3/4" UN 164,177 164,177 164,177 164,177 164,177 164,177 164,177 164,177 164,177 164,17720.15 VÁLVULA POLIETILENO GAS 1" UN 265,915 265,915 265,915 265,915 265,915 265,915 265,915 265,915 265,915 265,91520.16 ACOMETIDA GAS 1/2" ML 219,937 219,937 219,937 219,937 219,937 219,937 219,937 219,937 219,937 219,937

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 97,201 97,201 97,201 97,201 97,201 97,201 97,201 97,201 97,201 97,20121.2 CABLE DETECTOR LINEAL DE CALOR ML 24,164 24,164 24,164 24,164 24,164 24,164 24,164 24,164 24,164 24,16421.3 SIRENA DE 110 V UN 68,766 68,766 68,766 68,766 68,766 68,766 68,766 68,766 68,766 68,76621.4 CÁMARA CCTV UN 201,600 201,600 201,600 201,600 201,600 201,600 201,600 201,600 201,600 201,60021.5 PARLANTE-CIELO FALSO UN 39,332 39,332 39,332 39,332 39,332 39,332 39,332 39,332 39,332 39,33221.6 AMPLIFICADOR 100W UN 422,636 422,636 422,636 422,636 422,636 422,636 422,636 422,636 422,636 422,63621.7 AMPLIFICADOR 300W UN 1,045,218 1,045,218 1,045,218 1,045,218 1,045,218 1,045,218 1,045,218 1,045,218 1,045,218 1,045,21821.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,687 32,687 32,687 32,687 32,687 32,687 32,687 32,687 32,687 32,68721.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 167,105 167,105 167,105 167,105 167,105 167,105 167,105 167,105 167,105 167,105

21.10 TOMA PARA MICRÓFONO UN 33,420 33,420 33,420 33,420 33,420 33,420 33,420 33,420 33,420 33,42021.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,570 2,570 2,570 2,570 2,570 2,570 2,570 2,570 2,570 2,57021.12 SPLITERS UN 4,127 4,127 4,127 4,127 4,127 4,127 4,127 4,127 4,127 4,12721.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,107 14,107 14,107 14,107 14,107 14,107 14,107 14,107 14,107 14,10721.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,545 18,545 18,545 18,545 18,545 18,545 18,545 18,545 18,545 18,54521.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,487 25,487 25,487 25,487 25,487 25,487 25,487 25,487 25,487 25,48721.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 93,365 93,365 93,365 93,365 93,365 93,365 93,365 93,365 93,365 93,36521.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 24,556 24,556 24,556 24,556 24,556 24,556 24,556 24,556 24,556 24,55621.18 BANDEJA PORTACABLES PARA RACK UN 80,336 80,336 80,336 80,336 80,336 80,336 80,336 80,336 80,336 80,33621.19 RACK 2' X 24" UN 129,894 129,894 129,894 129,894 129,894 129,894 129,894 129,894 129,894 129,89421.20 RACK 3' X 24" UN 157,673 157,673 157,673 157,673 157,673 157,673 157,673 157,673 157,673 157,67321.21 RACK 5' X 24" UN 248,795 248,795 248,795 248,795 248,795 248,795 248,795 248,795 248,795 248,795

Page 185: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

21.22 RACK 7' X 24" UN 321,446 321,446 321,446 321,446 321,446 321,446 321,446 321,446 321,446 321,44621.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 366,582 366,582 366,582 366,582 366,582 366,582 366,582 366,582 366,582 366,58221.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 220,257 220,257 220,257 220,257 220,257 220,257 220,257 220,257 220,257 220,25721.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 52,790 52,790 52,790 52,790 52,790 52,790 52,790 52,790 52,790 52,79021.26 PATCH CORD 2M CATEGORÍA 6A UN 5,471 5,471 5,471 5,471 5,471 5,471 5,471 5,471 5,471 5,47121.27 PATCH CORD 5M CATEGORÍA 6A UN 13,878 13,878 13,878 13,878 13,878 13,878 13,878 13,878 13,878 13,87821.28 CABLE UTP CATEGORÍA 6A ML 2,575 2,575 2,575 2,575 2,575 2,575 2,575 2,575 2,575 2,57521.29 CANALETA METÁLICA 4X6 CMS ML 25,810 25,810 25,810 25,810 25,810 25,810 25,810 25,810 25,810 25,81021.30 CANALETA METÁLICA 4X10 CMS ML 26,932 26,932 26,932 26,932 26,932 26,932 26,932 26,932 26,932 26,93221.31 CANALETA METÁLICA 6X10 CMS ML 27,493 27,493 27,493 27,493 27,493 27,493 27,493 27,493 27,493 27,49321.32 CANALETA PLÁSTICA 13X7 MM ML 15,321 15,321 15,321 15,321 15,321 15,321 15,321 15,321 15,321 15,32121.33 CANALETA PLÁSTICA 20X12 MM ML 17,130 17,130 17,130 17,130 17,130 17,130 17,130 17,130 17,130 17,13021.34 CANALETA PLÁSTICA 32X12 MM ML 17,060 17,060 17,060 17,060 17,060 17,060 17,060 17,060 17,060 17,06021.35 CANALETA PLÁSTICA 40X60 MM ML 27,232 27,232 27,232 27,232 27,232 27,232 27,232 27,232 27,232 27,23221.36 SWITCH 10/100/1000 24 PUERTOS UN 367,079 367,079 367,079 367,079 367,079 367,079 367,079 367,079 367,079 367,07921.37 SWITCH 10/100/1000 16 PUERTOS UN 232,306 232,306 232,306 232,306 232,306 232,306 232,306 232,306 232,306 232,30621.38 SWITCH 10/100/1000 8 PUERTOS UN 62,276 62,276 62,276 62,276 62,276 62,276 62,276 62,276 62,276 62,27621.39 CABLE TELEFÓNICO 2 PARES ML 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,34021.40 CABLE TELEFÓNICO 10 PARES ML 6,489 6,489 6,489 6,489 6,489 6,489 6,489 6,489 6,489 6,48921.41 CABLE TELEFÓNICO 20 PARES ML 8,674 8,674 8,674 8,674 8,674 8,674 8,674 8,674 8,674 8,67421.42 CABLE TELEFÓNICO 40 PARES ML 12,085 12,085 12,085 12,085 12,085 12,085 12,085 12,085 12,085 12,08521.43 CABLE TELEVISIÓN RG6 ML 1,654 1,654 1,654 1,654 1,654 1,654 1,654 1,654 1,654 1,65421.44 ACOMETIDA TELEFÓNICA 1/2" ML 15,973 15,973 15,973 15,973 15,973 15,973 15,973 15,973 15,973 15,97321.45 ACOMETIDA TELEFÓNICA 1" ML 24,478 24,478 24,478 24,478 24,478 24,478 24,478 24,478 24,478 24,47821.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,127 13,127 13,127 13,127 13,127 13,127 13,127 13,127 13,127 13,127

21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 10,665 10,665 10,665 10,665 10,665 10,665 10,665 10,665 10,665 10,665

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 474,345 474,345 474,345 474,345 474,345 474,345 474,345 474,345 474,345 474,345

Page 186: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,266 19,266 19,266 19,266 19,266 19,266 19,266 19,266 19,266 19,2661.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 63,956 63,956 63,956 63,956 63,956 63,956 63,956 63,956 63,956 63,9561.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 358,355 358,355 358,355 358,355 358,355 358,355 358,355 358,355 358,355 358,3551.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 764,719 764,719 764,719 764,719 764,719 764,719 764,719 764,719 764,719 764,7191.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 87,941 87,941 87,941 87,941 87,941 87,941 87,941 87,941 87,941 87,9411.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 533,627 533,627 533,627 533,627 533,627 533,627 533,627 533,627 533,627 533,6271.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,147,234 1,147,234 1,147,234 1,147,234 1,147,234 1,147,234 1,147,234 1,147,234 1,147,234 1,147,2341.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,551 9,551 9,551 9,551 9,551 9,551 9,551 9,551 9,551 9,5511.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,682 11,682 11,682 11,682 11,682 11,682 11,682 11,682 11,682 11,682

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,576 14,576 14,576 14,576 14,576 14,576 14,576 14,576 14,576 14,5761.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 15,902 15,902 15,902 15,902 15,902 15,902 15,902 15,902 15,902 15,9021.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 18,988 18,988 18,988 18,988 18,988 18,988 18,988 18,988 18,988 18,9881.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 18,988 18,988 18,988 18,988 18,988 18,988 18,988 18,988 18,988 18,9881.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 75,037 75,037 75,037 75,037 75,037 75,037 75,037 75,037 75,037 75,0371.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 86,962 86,962 86,962 86,962 86,962 86,962 86,962 86,962 86,962 86,9621.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 268,872 268,872 268,872 268,872 268,872 268,872 268,872 268,872 268,872 268,8721.17 TEE PVC UNIÓN MECÁNICA 2" UN 100,890 100,890 100,890 100,890 100,890 100,890 100,890 100,890 100,890 100,8901.18 TEE PVC UNIÓN MECÁNICA 4" UN 166,302 166,302 166,302 166,302 166,302 166,302 166,302 166,302 166,302 166,3021.19 TEE PVC UNIÓN MECÁNICA 8" UN 734,787 734,787 734,787 734,787 734,787 734,787 734,787 734,787 734,787 734,7871.20 TEE PVC UNIÓN MECÁNICA 10" UN 846,392 846,392 846,392 846,392 846,392 846,392 846,392 846,392 846,392 846,3921.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 9,893 9,893 9,893 9,893 9,893 9,893 9,893 9,893 9,893 9,8931.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,782 8,782 8,782 8,782 8,782 8,782 8,782 8,782 8,782 8,7821.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 20,667 20,667 20,667 20,667 20,667 20,667 20,667 20,667 20,667 20,6671.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 83,158 83,158 83,158 83,158 83,158 83,158 83,158 83,158 83,158 83,1581.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 123,095 123,095 123,095 123,095 123,095 123,095 123,095 123,095 123,095 123,0951.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 20,479 20,479 20,479 20,479 20,479 20,479 20,479 20,479 20,479 20,4791.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 69,958 69,958 69,958 69,958 69,958 69,958 69,958 69,958 69,958 69,9581.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 102,939 102,939 102,939 102,939 102,939 102,939 102,939 102,939 102,939 102,9391.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,410 21,410 21,410 21,410 21,410 21,410 21,410 21,410 21,410 21,4101.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 43,984 43,984 43,984 43,984 43,984 43,984 43,984 43,984 43,984 43,9841.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 176,146 176,146 176,146 176,146 176,146 176,146 176,146 176,146 176,146 176,1461.32 UNIÓN REPARACION PVC 4" UN 51,248 51,248 51,248 51,248 51,248 51,248 51,248 51,248 51,248 51,2481.33 UNIÓN REPARACIÓN PVC 8" UN 204,784 204,784 204,784 204,784 204,784 204,784 204,784 204,784 204,784 204,7841.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 123,970 123,970 123,970 123,970 123,970 123,970 123,970 123,970 123,970 123,9701.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 349,533 349,533 349,533 349,533 349,533 349,533 349,533 349,533 349,533 349,5331.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,029,449 1,029,449 1,029,449 1,029,449 1,029,449 1,029,449 1,029,449 1,029,449 1,029,449 1,029,4491.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,521,050 1,521,050 1,521,050 1,521,050 1,521,050 1,521,050 1,521,050 1,521,050 1,521,050 1,521,050

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,038 8,038 8,038 8,038 8,038 8,038 8,038 8,038 8,038 8,0382.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,482 18,482 18,482 18,482 18,482 18,482 18,482 18,482 18,482 18,4822.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 77,340 83,265 83,706 84,693 62,617 64,592 87,306 57,679 79,756 96,104

Page 187: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

2.5 RELLENO TIPO 2 "RECEBO" M3 49,132 46,545 42,651 45,238 67,241 71,121 71,121 69,828 46,532 59,4802.6 RELLENO TIPO 4 "SUBBASE B-200" M3 63,952 61,365 55,001 57,588 82,061 85,941 85,941 84,648 58,882 74,3002.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 68,631 71,706 73,566 70,491 55,540 79,111 53,490 53,490 70,491 78,8802.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 69,854 70,898 74,884 71,750 56,508 80,537 49,195 54,419 71,750 84,4802.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 86,542 97,055 93,311 99,617 99,702 76,573 97,150 70,868 89,104 108,620

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 79,964 79,964 79,964 79,964 79,964 79,964 79,964 79,964 79,964 79,9643.2 CODO 45 PVC ALCANTARILLADO 16" UN 832,911 832,911 832,911 832,911 832,911 832,911 832,911 832,911 832,911 832,9113.3 CODO 90 PVC ALCANTARILLADO 8" UN 104,482 104,482 104,482 104,482 104,482 104,482 104,482 104,482 104,482 104,4823.4 CODO 90 PVC ALCANTARILLADO 16" UN 964,385 964,385 964,385 964,385 964,385 964,385 964,385 964,385 964,385 964,3853.5 CODO 90 PVC ALCANTARILLADO 24" UN 672,016 672,016 672,016 672,016 672,016 672,016 672,016 672,016 672,016 672,0163.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 57,851 57,851 57,851 57,851 57,851 57,851 57,851 57,851 57,851 57,8513.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 79,688 79,688 79,688 79,688 79,688 79,688 79,688 79,688 79,688 79,6883.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,7623.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 187,761 187,761 187,761 187,761 187,761 187,761 187,761 187,761 187,761 187,761

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 301,345 301,345 301,345 301,345 301,345 301,345 301,345 301,345 301,345 301,3453.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 79,689 79,689 79,689 79,689 79,689 79,689 79,689 79,689 79,689 79,6893.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 79,688 79,688 79,688 79,688 79,688 79,688 79,688 79,688 79,688 79,6883.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,7623.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,762 187,7623.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 301,346 301,346 301,346 301,346 301,346 301,346 301,346 301,346 301,346 301,3463.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 277,663 277,663 277,663 277,663 277,663 277,663 277,663 277,663 277,663 277,6633.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 444,887 444,887 444,887 444,887 444,887 444,887 444,887 444,887 444,887 444,8873.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 710,438 710,438 710,438 710,438 710,438 710,438 710,438 710,438 710,438 710,4383.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 44,384 44,384 44,384 44,384 44,384 44,384 44,384 44,384 44,384 44,3843.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 234,163 234,163 234,163 234,163 234,163 234,163 234,163 234,163 234,163 234,1633.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 254,002 254,002 254,002 254,002 254,002 254,002 254,002 254,002 254,002 254,0023.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 744,650 744,650 744,650 744,650 744,650 744,650 744,650 744,650 744,650 744,6503.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 42,093 42,201 42,163 42,228 42,229 41,990 42,202 41,931 42,119 42,3213.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 212,785 212,785 212,785 212,785 212,785 212,785 212,785 212,785 212,785 212,7853.25 TUBERÍA PVC ALCANTARILLADO 8" ML 35,044 35,044 35,044 35,044 35,044 35,044 35,044 35,044 35,044 35,0443.26 TUBERÍA PVC ALCANTARILLADO 10" ML 49,445 49,445 49,445 49,445 49,445 49,445 49,445 49,445 49,445 49,4453.27 TUBERÍA PVC ALCANTARILLADO 12" ML 71,230 71,230 71,230 71,230 71,230 71,230 71,230 71,230 71,230 71,2303.28 TUBERÍA PVC ALCANTARILLADO 16" ML 109,252 109,252 109,252 109,252 109,252 109,252 109,252 109,252 109,252 109,2523.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 175,332 175,332 175,332 175,332 175,332 175,332 175,332 175,332 175,332 175,3323.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 257,832 257,832 257,832 257,832 257,832 257,832 257,832 257,832 257,832 257,8323.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 325,312 325,312 325,312 325,312 325,312 325,312 325,312 325,312 325,312 325,3123.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 427,339 427,339 427,339 427,339 427,339 427,339 427,339 427,339 427,339 427,3393.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 585,914 585,914 585,914 585,914 585,914 585,914 585,914 585,914 585,914 585,914

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 UN 515,596 521,207 520,353 522,568 512,687 507,076 523,046 502,372 517,399 520,812

4.2 ML 501,803 507,402 505,409 508,768 508,812 496,494 507,453 493,455 503,168 513,562

PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

Page 188: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

4.3 UN 507,564 511,305 510,736 512,212 505,626 501,885 512,532 498,749 508,767 511,042

4.4 UN 612,939 619,953 618,885 621,654 609,303 602,289 622,252 596,409 615,193 619,459

4.5 ML 710,236 718,121 715,313 720,043 720,106 702,759 718,192 698,481 712,158 726,795

4.6 UN 593,672 598,816 598,033 600,063 591,007 585,863 600,502 581,551 595,326 598,454

4.7 SUMIDERO EN LADRILLO SL-100 UN 727,068 730,364 729,457 731,168 728,879 723,191 730,812 721,016 727,970 732,3444.8 SUMIDERO EN LADRILLO SL-250 UN 1,076,587 1,085,499 1,083,431 1,087,667 1,078,146 1,065,036 1,087,309 1,058,598 1,079,176 1,088,4664.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,517,935 1,533,154 1,530,571 1,536,847 1,512,368 1,495,576 1,537,725 1,483,207 1,522,726 1,531,791

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,055,896 2,081,194 2,076,899 2,087,332 2,046,645 2,018,729 2,088,792 1,998,168 2,063,859 2,078,9284.11 SUMIDERO PREFABRICADO SL-100 UN 946,937 946,937 946,937 946,937 946,937 946,937 946,937 946,937 946,937 946,9374.12 SUMIDERO PREFABRICADO SL-250 UN 2,214,286 2,214,286 2,214,286 2,214,286 2,214,286 2,214,286 2,214,286 2,214,286 2,214,286 2,214,286

4.13 UN 101,354 101,582 101,501 101,638 101,640 101,137 101,584 101,013 101,409 101,833

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 44,195 44,761 44,560 44,899 44,904 43,658 44,766 43,351 44,333 45,3845.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 50,851 51,417 51,216 51,555 51,560 50,314 51,422 50,007 50,989 52,0405.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 45,204 46,267 46,060 46,526 45,045 43,716 46,545 42,891 45,529 46,1435.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 48,741 49,723 49,574 49,961 48,232 47,250 50,045 46,427 49,057 49,6545.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 49,372 50,347 50,181 50,583 49,020 47,942 50,639 47,150 49,679 50,2595.6 BORDE SEPARADOR VERDE A-170 ML 191,598 191,826 191,745 191,882 191,884 191,381 191,828 191,257 191,654 192,0785.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,391 14,518 14,494 14,549 14,372 14,212 14,552 14,113 14,430 14,5045.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 32,459 33,208 33,062 33,390 32,347 31,410 33,404 30,828 32,688 33,1215.9 CAÑUELA PREFABRICADA TIPO A-120 ML 63,188 63,311 63,267 63,340 63,341 63,073 63,312 63,006 63,218 63,445

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 434,336 437,072 436,341 437,737 435,652 431,064 437,476 429,227 435,096 440,6835.11 LOSETA PREFABRICADA A-40 M2 46,551 47,074 46,888 47,202 47,206 46,055 47,079 45,771 46,679 47,6505.12 LOSETA PREFABRICADA A-60 M2 66,104 66,627 66,441 66,755 66,759 65,608 66,632 65,324 66,232 67,202

5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 26,564 26,957 26,897 27,052 26,360 25,968 27,085 25,638 26,690 26,929

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 43,155 43,950 43,829 44,143 42,743 41,948 44,211 41,282 43,411 43,8945.15 SARDINEL PREFABRICADO A-10 ML 83,225 81,979 86,289 81,387 77,010 86,095 86,931 85,630 84,250 84,5025.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 44,576 44,893 44,780 44,970 44,972 44,276 44,896 44,104 44,653 45,241

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 111,987 112,455 112,384 112,568 111,745 111,277 112,608 110,885 112,138 112,4226.2 BANCA EN CONCRETO M-30 UN 469,280 469,935 469,835 470,094 468,941 468,286 470,149 467,737 469,491 469,8896.3 BOLARDO M-63 ALTO/HIERRO UN 170,280 170,379 170,363 170,403 170,239 170,132 170,410 170,050 170,311 170,3716.4 BOLARDO M-60 CONCRETO UN 108,854 109,415 109,330 109,552 108,564 108,002 109,599 107,532 109,035 109,3766.5 BOLARDO M-61 BAJO/CONCRETO UN 110,277 110,838 110,753 110,974 109,986 109,425 111,022 108,954 110,457 110,7986.6 BOLARDO M-62 BAJO/HIERRO UN 152,705 153,303 153,204 153,448 152,460 151,818 153,487 151,328 152,894 153,2536.7 BORDE CONTENEDOR DE RAICES A-70 ML 46,234 46,668 46,513 46,773 46,777 45,823 46,672 45,588 46,340 47,1456.8 BORDILLO PREFABRICADO A-80 ML 52,217 52,702 52,529 52,820 52,824 51,757 52,707 51,494 52,335 53,2366.9 CANECA M-120 UN 236,086 236,194 236,156 236,221 236,222 235,983 236,195 235,924 236,112 236,314

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 189: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 617,330 617,610 617,567 617,678 617,184 616,904 617,702 616,668 617,420 617,5906.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,350,307 2,350,494 2,350,466 2,350,539 2,350,210 2,350,023 2,350,555 2,349,866 2,350,367 2,350,4816.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,767,966 2,768,153 2,768,125 2,768,198 2,767,869 2,767,682 2,768,214 2,767,525 2,768,026 2,768,1406.13 CICLOPARQUEADERO M100 TIPO 1 UN 386,889 387,088 387,055 387,136 386,807 386,593 387,149 386,430 386,952 387,0716.14 CICLOPARQUEADERO M101 TIPO 2 UN 513,182 513,980 513,848 514,173 512,856 512,000 514,225 511,346 513,435 513,9126.15 BANCA EN MADERA M-50 UN 350,722 350,722 350,722 350,722 350,722 350,722 350,722 350,722 350,722 350,7226.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 177,862 178,143 178,100 178,211 177,717 177,436 178,235 177,201 177,953 178,1236.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 421,659 421,930 421,834 421,996 421,998 421,402 421,933 421,255 421,725 422,2286.18 POSTE HISTÓRICO M-131 UN 3,547,643 3,549,046 3,548,832 3,549,386 3,546,916 3,545,513 3,549,506 3,544,337 3,548,094 3,548,947

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,425 1,425 1,425 1,425 1,425 1,425 1,425 1,425 1,425 1,4257.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,466 14,466 14,466 14,466 14,466 14,466 14,466 14,466 14,466 14,4667.3 SEÑAL DOBLE DE CICLORUTA UN 359,826 359,940 359,899 359,968 359,969 359,718 359,941 359,656 359,854 360,0667.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 415,752 416,151 416,085 416,247 415,589 415,161 416,273 414,834 415,878 416,1177.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 241,906 242,020 241,980 242,048 242,049 241,798 242,021 241,736 241,934 242,1467.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 284,663 284,777 284,737 284,805 284,806 284,555 284,778 284,493 284,691 284,9037.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 390,627 390,741 390,701 390,769 390,770 390,519 390,742 390,457 390,655 390,8677.8 TACHAS REFLECTIVAS UN 10,154 10,154 10,154 10,154 10,154 10,154 10,154 10,154 10,154 10,1547.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,714 10,714 10,714 10,714 10,714 10,714 10,714 10,714 10,714 10,714

7.10 UN 41,459 41,459 41,459 41,459 41,459 41,459 41,459 41,459 41,459 41,459TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 190: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,547 28,547 28,547 28,547 28,547 28,547 28,547 28,547 28,547 28,547

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 46,963 46,963 46,963 46,963 46,963 46,963 46,963 46,963 46,963 46,963

2.11 600.3 M3 58,110 58,110 58,110 58,110 58,110 58,110 58,110 58,110 58,110 58,110

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 191: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 149,627 138,187 169,029 136,692 108,235 169,029 172,910 166,442 156,094 153,7093.3 330.1 BASE GRANULAR M3 156,590 147,695 175,992 143,655 115,198 175,992 179,873 173,405 163,057 163,217

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,062 2,062 2,062 2,062 2,062 2,062 2,062 2,062 2,062 2,0623.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,040 1,040 1,040 1,040 1,040 1,040 1,040 1,040 1,040 1,040

3.7 461.1 M3 155,322 157,040 157,036 157,455 152,202 151,995 158,005 150,182 155,972 160,007

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 55,913 56,672 56,421 56,857 56,697 55,140 56,708 54,700 56,105 57,389

3.9 450.1 P M3 528,817 506,429 554,935 557,423 549,960 568,617 573,592 552,448 544,985 521,354

3.10 450.2 P M3 594,067 571,679 620,185 622,673 615,210 633,867 638,842 617,698 610,235 586,604

3.11 450.9 P M3 618,209 595,822 644,328 646,815 639,353 658,009 662,984 641,840 634,378 610,747

3.12 450.3 P M3 615,817 593,429 641,935 644,423 636,960 655,617 660,592 639,448 631,985 608,354

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 252,610 243,716 272,013 239,675 211,218 272,013 275,893 269,426 259,078 259,2383.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 245,009 233,569 264,412 232,074 203,617 264,412 268,292 261,825 251,477 249,0913.15 311.1 AFIRMADO M3 62,732 60,145 53,781 56,368 80,841 84,721 84,721 83,428 57,662 73,0803.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,558 11,671 11,679 11,698 11,278 11,315 11,748 11,184 11,604 11,9163.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,788 4,844 4,848 4,858 4,647 4,666 4,883 4,600 4,811 4,966

3.18 500.1 M3 512,276 521,699 519,864 523,986 510,868 499,089 524,162 491,771 515,152 520,597

3.19 500.1 M3 539,334 549,179 547,262 551,569 537,863 525,557 551,752 517,911 542,339 548,028

3.20 500.1 M3 557,302 567,463 565,457 569,930 556,029 543,161 570,075 535,310 560,393 566,244

3.21 *** ML 5,731 5,731 5,731 5,731 5,731 5,731 5,731 5,731 5,731 5,731

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 88,727 89,822 93,997 90,714 74,746 99,920 67,085 72,557 90,714 104,050

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 858,368 869,056 866,975 871,651 856,770 843,409 871,850 835,108 861,630 867,8074.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 757,197 767,708 765,662 770,261 755,626 742,487 770,456 734,323 760,406 766,4804.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 793,776 804,703 802,576 807,356 792,142 778,482 807,560 769,995 797,112 803,4264.4 630 P CONCRETOS f´c =3500 psi (bases) M3 479,792 489,167 487,571 491,441 476,400 466,031 491,975 458,417 482,741 488,3224.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 568,523 578,269 576,610 580,634 564,997 554,217 581,189 546,302 571,589 577,3914.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 473,719 483,164 481,727 485,455 468,823 459,378 486,261 451,459 476,755 482,5004.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 562,209 572,029 570,535 574,410 557,120 547,300 575,248 539,068 565,366 571,3384.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 701,191 710,636 709,199 712,927 696,295 686,850 713,733 678,931 704,227 709,9724.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 489,021 498,841 497,347 501,222 483,932 474,112 502,060 465,880 492,178 498,1504.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 735,551 745,371 743,877 747,752 730,462 720,642 748,590 712,410 738,707 744,680

4.11 650 P KG 8,313 8,313 8,313 8,313 8,313 8,313 8,313 8,313 8,313 8,313

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA

MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

Page 192: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

4.12 650 P KG 11,158 11,158 11,158 11,158 11,158 11,158 11,158 11,158 11,158 11,158

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,229 1,229 1,229 1,229 1,229 1,229 1,229 1,229 1,229 1,229

4.14 621.1 ML 1,933,859 1,933,859 1,933,859 1,933,859 1,933,859 1,933,859 1,933,859 1,933,859 1,933,859 1,933,859

4.15 621.1 P ML 3,145,456 3,163,739 3,160,180 3,168,177 3,142,723 3,119,869 3,168,518 3,105,670 3,151,037 3,161,602

4.16 621.2 M3 1,073,557 1,082,909 1,081,486 1,085,177 1,068,710 1,059,358 1,085,975 1,051,518 1,076,563 1,082,251

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 68,842 68,842 68,842 68,842 68,842 68,842 68,842 68,842 68,842 68,8424.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 262,659 263,782 263,611 264,054 262,078 260,956 264,150 260,015 263,020 263,7034.19 632 P BARANDA METÁLICA ML 298,374 298,374 298,374 298,374 298,374 298,374 298,374 298,374 298,374 298,3744.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,115 12,115 12,115 12,115 12,115 12,115 12,115 12,115 12,115 12,1154.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 381,401 390,239 384,292 390,447 390,986 380,337 408,089 371,441 381,465 396,9804.22 673.1 MATERIAL GRANULAR FILTRANTE M3 76,187 79,470 81,457 78,173 62,206 87,379 60,017 60,017 78,173 87,1324.23 610.1 RELLENO PARA ESTRUCTURAS M3 45,342 42,954 39,360 41,748 62,058 65,640 65,640 64,446 42,942 54,8944.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 311,438 321,506 319,846 323,948 307,321 296,508 324,608 288,253 314,626 320,6584.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 307,607 313,986 314,519 315,761 300,078 302,808 307,561 287,954 310,223 318,657

4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 332,249 338,628 339,160 340,403 324,719 327,450 332,202 312,595 334,865 343,298

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 319,841 326,315 326,651 328,115 313,849 315,409 319,635 300,740 322,418 330,7794.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 344,483 350,957 351,292 352,756 338,491 340,050 344,277 325,382 347,060 355,4214.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 435,371 445,598 443,608 448,082 433,843 421,058 448,272 413,116 438,493 444,4034.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 522,514 533,147 531,077 535,728 520,926 507,635 535,926 499,377 525,760 531,9044.31 681.1 GAVIÓN M3 157,261 158,306 162,292 159,157 143,916 167,945 136,602 141,826 159,157 171,8884.32 681.1 GAVIÓN MALLA PVC M3 163,725 164,769 168,755 165,621 150,379 174,408 143,066 148,290 165,621 178,351

4.33 672.1 ML 33,669 34,297 34,175 34,449 33,575 32,790 34,461 32,303 33,861 34,224

4.34 672.1 ML 13,167 13,481 13,420 13,557 13,120 12,728 13,563 12,484 13,263 13,444

4.35 *** M2 7,959 7,959 7,959 7,959 7,959 7,959 7,959 7,959 7,959 7,959

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,378 11,378 11,378 11,378 11,378 11,378 11,378 11,378 11,378 11,378

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,338 15,338 15,338 15,338 15,338 15,338 15,338 15,338 15,338 15,338

4.38 *** M2 18,400 18,400 18,400 18,400 18,400 18,400 18,400 18,400 18,400 18,400

4.39 *** M2 23,648 23,648 23,648 23,648 23,648 23,648 23,648 23,648 23,648 23,648

4.40 *** M2 5,477 5,477 5,477 5,477 5,477 5,477 5,477 5,477 5,477 5,477

4.41 *** M2 6,240 6,240 6,240 6,240 6,240 6,240 6,240 6,240 6,240 6,240

4.42 *** M2 6,482 6,482 6,482 6,482 6,482 6,482 6,482 6,482 6,482 6,482

4.43 *** M2 5,548 5,548 5,548 5,548 5,548 5,548 5,548 5,548 5,548 5,548

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO)

BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

Page 193: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

4.44 *** M2 7,081 7,081 7,081 7,081 7,081 7,081 7,081 7,081 7,081 7,081

4.45 *** M2 5,201 5,201 5,201 5,201 5,201 5,201 5,201 5,201 5,201 5,201

4.46 *** M2 6,987 6,987 6,987 6,987 6,987 6,987 6,987 6,987 6,987 6,987

4.47 *** M2 11,959 11,959 11,959 11,959 11,959 11,959 11,959 11,959 11,959 11,959

4.48 661.1 ML 311,797 311,974 311,911 312,018 312,019 311,628 311,976 311,532 311,840 311,922

4.49 660.3 ML 261,491 263,713 263,303 264,252 260,962 258,318 264,329 256,559 262,178 263,796

4.50 *** ML 614,120 614,120 614,120 614,120 614,120 614,120 614,120 614,120 614,120 614,120

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 111,369 108,881 102,763 105,250 128,781 132,513 132,513 131,269 106,494 121,319

4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,210 3,210 3,210 3,210 3,210 3,210 3,210 3,210 3,210 3,210

4.53 *** ML 49,096 49,096 49,096 49,096 49,096 49,096 49,096 49,096 49,096 49,096

4.54 *** ML 79,051 79,051 79,051 79,051 79,051 79,051 79,051 79,051 79,051 79,051

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 424,401 435,033 432,964 437,615 422,813 409,522 437,813 401,264 427,647 433,7914.56 682.1 P COLCHONETA RENO M3 172,674 173,719 177,704 174,570 159,328 183,358 152,015 157,239 174,570 187,3004.57 *** TRINCHO EN MADERA M2 46,941 46,941 46,941 46,941 46,941 46,941 46,941 46,941 46,941 46,941

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,425 1,425 1,425 1,425 1,425 1,425 1,425 1,425 1,425 1,4255.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,466 14,466 14,466 14,466 14,466 14,466 14,466 14,466 14,466 14,4665.3 730.3 TOPE DEFENSA METÁLICA UN 66,435 66,435 66,435 66,435 66,435 66,435 66,435 66,435 66,435 66,4355.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 66,435 66,435 66,435 66,435 66,435 66,435 66,435 66,435 66,435 66,4355.5 730.1 DEFENSA METÁLICA ML 170,096 170,586 170,508 170,704 169,865 169,360 170,742 168,954 170,252 170,997

5.6 701.1 UN 10,154 10,154 10,154 10,154 10,154 10,154 10,154 10,154 10,154 10,154

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 563 563 563 563 563 563 563 563 563 563

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286

6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 11,906 11,906 11,906 11,906 11,906 11,906 11,906 11,906 11,906 11,906

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36"

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

Page 194: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutiérrez Quetame Ubaque Une

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: ORIENTE

6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 32,083 32,083 32,083 32,083 32,083 32,083 32,083 32,083 32,083 32,0836.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,884 5,884 5,884 5,884 5,884 5,884 5,884 5,884 5,884 5,884

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 195: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,624,225 1,635,106 1,618,740 1,628,451 1,632,595 1,634,206 1,618,740 1,655,4281.2 CAMPAMENTO 9 M2 UN 939,662 945,102 936,919 941,774 943,847 944,652 936,919 955,2631.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,640 10,640 10,640 10,640 10,640 10,640 10,640 10,6401.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,990 11,990 11,990 11,990 11,990 11,990 11,990 11,9901.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,920 13,920 13,920 13,920 13,920 13,920 13,920 13,9201.6 CERCA EN TABLA H=2.30 M ML 52,947 52,947 52,947 52,947 52,947 52,947 52,947 52,9471.7 CERCA EN TEJA DE ZINC H=1.80 M ML 38,144 38,260 38,086 38,185 38,262 38,247 38,086 38,4711.8 CERCA EN TELA VERDE H = 2.10 M ML 16,960 17,075 16,902 17,001 17,077 17,063 16,902 17,2861.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 675,356 675,812 673,977 676,060 675,532 677,678 674,972 678,217

1.41 M2 7,754 7,754 7,754 7,754 7,754 7,754 7,754 7,754

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,481 2,481 2,481 2,481 2,481 2,481 2,481 2,481

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 196: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,238,956 1,238,956 1,238,956 1,238,956 1,238,956 1,238,956 1,238,956 1,238,9561.44 RED TELEFÓNICA PROVISIONAL UN 176,156 176,156 176,156 176,156 176,156 176,156 176,156 176,1561.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 67,131 53,111 63,251 68,529 58,181 83,947 69,718 56,9912.2 BASE ARENA CEMENTO 1:20 M3 223,069 232,845 218,033 223,958 250,619 229,883 218,033 247,6572.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,744 4,744 4,744 4,744 4,744 4,744 4,744 4,7442.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 571,984 583,395 566,220 576,132 582,712 582,242 566,220 604,3732.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 588,081 599,785 582,163 592,151 600,357 598,465 582,163 621,0822.8 ZAPATAS EN CONCRETO 3500 PSI M3 549,230 560,189 543,688 553,041 560,725 558,953 543,688 580,1312.9 PILOTE DE MADERA D=20 CM ML 36,974 36,974 36,974 36,974 36,974 36,974 36,974 36,974

2.10 ML 112,601 112,601 112,601 112,601 112,601 112,601 112,601 112,601

2.11 ML 137,668 137,668 137,668 137,668 137,668 137,668 137,668 137,668

2.12 ML 167,982 167,982 167,982 167,982 167,982 167,982 167,982 167,982

2.13 ML 208,790 208,790 208,790 208,790 208,790 208,790 208,790 208,790

2.14 PILOTE HINCADO 25X25 ML 96,307 97,093 95,909 96,562 97,257 96,991 95,909 98,5012.15 PILOTE HINCADO 30X30 ML 118,708 119,846 118,131 119,077 120,084 119,698 118,131 121,8872.16 DADOS EN CONCRETO 3500PSI M3 538,454 549,413 532,912 542,265 549,948 548,177 532,912 569,355

2.17 ML 120,191 120,191 120,191 120,191 120,191 120,191 120,191 120,191

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 30,266 30,327 30,235 30,271 30,437 30,308 30,235 30,4193.2 SIFÓN EN PVC 6" UN 157,200 157,260 157,168 157,205 157,371 157,242 157,168 157,3523.3 CAJA DE INSPECCIÓN DE 100X100 UN 388,060 386,782 379,164 391,979 385,374 402,716 387,422 397,3393.4 CAJA DE INSPECCIÓN DE 40X40 UN 192,275 193,282 190,962 193,042 192,880 194,537 191,659 196,2613.5 CAJA DE INSPECCIÓN DE 60X60 UN 217,855 219,516 215,751 219,019 219,364 221,427 216,846 224,2543.6 CAJA DE INSPECCIÓN DE 80X80 UN 293,193 296,548 290,232 294,934 296,561 298,259 291,326 304,3553.7 DUCTO ELÉCTRICO PVC 4" ML 76,941 76,871 76,862 76,971 76,842 77,071 76,961 76,9013.8 POZO SÉPTICO ETERNIT 1000 LT UN 1,044,024 1,043,325 1,043,228 1,044,321 1,043,028 1,045,317 1,044,223 1,043,6243.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 94,378 95,049 94,032 94,439 96,269 94,846 94,032 96,066

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 54,964 55,318 54,782 54,996 55,962 55,211 54,782 55,8543.11 TUBERÍA DRENAJE PVC 110 ML 22,434 22,653 22,324 22,543 22,434 22,653 22,324 23,0933.12 TUBERÍA DRENAJE PVC 160 ML 34,050 34,270 33,940 34,160 34,050 34,270 33,940 34,7093.13 TUBERÍA DRENAJE PVC 200 ML 46,911 47,219 46,757 47,065 46,911 47,219 46,757 47,8343.14 TUBERÍA DRENAJE PVC 250 ML 63,829 64,180 63,653 64,005 63,829 64,180 63,653 64,8843.15 TUBERÍA DRENAJE PVC 315 ML 87,799 88,107 87,645 87,953 87,799 88,107 87,645 88,722

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 197: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 807,426 810,942 805,668 809,184 807,426 810,942 805,668 817,974

3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1,155,286 1,162,318 1,151,770 1,158,802 1,155,286 1,162,318 1,151,770 1,176,382

3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1,529,701 1,543,765 1,522,669 1,536,733 1,529,701 1,543,765 1,522,669 1,571,893

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 29,900 29,900 29,900 29,900 29,900 29,900 29,900 29,9004.2 CASETÓN DE LONA 0.80X0.70 M2 39,524 39,524 39,524 39,524 39,524 39,524 39,524 39,5244.3 COLUMNAS 3500 PSI M3 697,502 708,461 691,961 701,313 708,997 707,225 691,961 728,4034.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 257,254 268,774 251,464 262,204 262,834 268,174 251,464 290,854

4.5 M2 85,080 86,144 84,542 85,450 86,196 86,024 84,542 88,080

4.6 M2 100,510 101,786 99,864 100,954 101,849 101,642 99,864 104,110

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 112,174 113,877 111,313 112,766 113,960 113,685 111,313 116,9744.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 118,487 120,296 117,573 119,116 120,384 120,092 117,573 123,587

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 137,191 139,425 136,061 137,968 139,534 139,173 136,061 143,491

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 153,221 155,774 151,929 154,109 155,899 155,486 151,929 160,4214.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 170,440 173,313 168,987 171,439 173,453 172,989 168,987 178,5404.12 ENTREPISO VIGUETA PLACA M2 79,740 79,916 79,650 79,786 80,030 79,885 79,650 80,2204.13 ESCALERA MACIZA 3500 PSI M3 814,010 824,970 808,469 817,821 825,505 823,734 808,469 844,9114.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 75,599 75,731 75,531 75,611 75,971 75,691 75,531 75,9314.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 68,679 69,775 68,125 69,060 69,829 69,652 68,125 71,7694.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 78,351 79,692 77,673 78,817 79,757 79,540 77,673 82,1314.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 92,409 94,090 91,559 92,993 94,172 93,900 91,559 97,1494.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 628,863 639,822 623,321 632,674 640,358 638,586 623,321 659,764

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 40,761 41,093 40,592 40,868 41,162 41,050 40,592 41,6894.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 251,321 256,215 248,846 253,023 256,455 255,663 248,846 265,121

4.21000000000001 ACERO FIGURADO 37000 PSI KG 3,414 3,414 3,414 3,414 3,414 3,414 3,414 3,4144.22 ACERO FIGURADO 60000 PSI KG 3,546 3,546 3,546 3,546 3,546 3,546 3,546 3,546

4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,774 4,774 4,774 4,774 4,774 4,774 4,774 4,7744.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 733,308 744,267 727,767 737,119 744,803 743,031 727,767 764,209

4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 686,380 698,378 680,314 690,557 698,930 697,029 680,314 720,2164.26 VIGA AÉREA 3500 PSI M3 734,700 745,659 729,159 738,511 746,195 744,423 729,159 765,601

4.27000000000001 VIGA CINTA 3500 PSI M3 719,388 730,348 713,847 723,199 730,883 729,112 713,847 750,2904.28 VIGA CANAL EN CONCRETO 3500 PSI M3 879,075 890,034 873,534 882,886 890,570 888,798 873,534 909,976

4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 316,393 328,846 310,115 321,229 325,972 327,816 310,115 352,103

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 24,805 25,088 24,662 24,883 25,244 25,041 24,662 25,5775.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 40,455 40,738 40,312 40,533 40,894 40,690 40,312 41,2275.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 25,975 26,036 25,944 25,981 26,147 26,018 25,944 26,1285.4 ARCOS EN LADRILLO PRENSADO ML 125,055 125,177 124,993 125,066 125,398 125,140 124,993 125,361

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 198: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 36,697 37,029 36,529 36,805 37,099 36,986 36,529 37,6255.6 DINTELES EN BLOQUE 0.15 M ML 21,157 21,289 21,089 21,169 21,529 21,249 21,089 21,4895.7 ENCHAPES LADRILLO PRENSADO M2 73,231 73,474 73,106 73,253 73,915 73,400 73,106 73,8425.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 78,664 79,772 78,103 79,024 80,004 79,628 78,103 81,7585.9 MURO DRYWALL DOBLE CARA 0.12 M M2 56,323 56,323 56,323 56,323 56,323 56,323 56,323 56,323

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 34,196 34,196 34,196 34,196 34,196 34,196 34,196 34,1965.11 MURO DRYWALL DOBLE CARA 0.10 M M2 54,501 54,501 54,501 54,501 54,501 54,501 54,501 54,5015.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 33,285 33,285 33,285 33,285 33,285 33,285 33,285 33,2855.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 69,163 69,163 69,163 69,163 69,163 69,163 69,163 69,1635.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 41,622 41,622 41,622 41,622 41,622 41,622 41,622 41,6225.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 70,858 70,858 70,858 70,858 70,858 70,858 70,858 70,8585.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 42,470 42,470 42,470 42,470 42,470 42,470 42,470 42,4705.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 29,302 29,424 29,239 29,313 29,646 29,387 29,239 29,6095.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 17,936 17,997 17,905 17,942 18,108 17,979 17,905 18,090

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 40,912 40,994 40,871 40,920 41,142 40,969 40,871 41,1175.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 24,553 24,594 24,532 24,557 24,668 24,582 24,532 24,655

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 48,179 48,261 48,137 48,187 48,409 48,236 48,137 48,3845.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 28,699 28,740 28,678 28,703 28,814 28,728 28,678 28,802

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 88,513 88,920 88,303 88,550 89,659 88,796 88,303 89,5365.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 51,171 51,375 51,066 51,190 51,744 51,313 51,066 51,683

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 26,813 26,895 26,771 26,821 27,043 26,870 26,771 27,0185.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 16,439 16,479 16,418 16,442 16,553 16,467 16,418 16,541

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 51,706 51,869 51,623 51,721 52,165 51,820 51,623 52,1165.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 31,688 31,769 31,646 31,695 31,917 31,745 31,646 31,893

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 70,005 70,137 69,937 70,017 70,377 70,097 69,937 70,3375.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 42,115 42,181 42,081 42,121 42,301 42,161 42,081 42,281

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 132,876 133,445 132,582 132,928 134,481 133,273 132,582 134,3085.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 80,447 80,732 80,300 80,473 81,249 80,645 80,300 81,163

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 65,029 65,304 64,887 65,054 65,805 65,221 64,887 65,7215.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 39,627 39,764 39,556 39,639 40,015 39,723 39,556 39,973

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 38,981 39,163 38,887 38,998 39,494 39,108 38,887 39,4395.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 23,374 23,465 23,327 23,382 23,630 23,437 23,327 23,603

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 27,516 27,598 27,474 27,524 27,746 27,573 27,474 27,7215.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 16,581 16,621 16,560 16,584 16,695 16,609 16,560 16,683

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 42,268 42,431 42,185 42,283 42,727 42,382 42,185 42,6785.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 25,537 25,618 25,495 25,544 25,766 25,594 25,495 25,742

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 80,853 81,097 80,727 80,875 81,541 81,023 80,727 81,4675.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 48,612 48,734 48,549 48,623 48,956 48,697 48,549 48,919

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 58,899 59,062 58,815 58,914 59,357 59,012 58,815 59,3085.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 35,126 35,207 35,084 35,133 35,355 35,183 35,084 35,331

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 126,700 127,269 126,406 126,751 128,305 127,097 126,406 128,1325.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 75,803 76,088 75,656 75,829 76,606 76,002 75,656 76,519

5.47000000000002 REMATES LADRILLO PRENSADO ML 23,220 23,281 23,189 23,226 23,391 23,263 23,189 23,3735.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 30,274 30,472 30,172 30,292 30,832 30,412 30,172 30,772

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 50,629 50,893 50,493 50,653 51,373 50,813 50,493 51,293

Page 199: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

5.50 LAVADA DE FACHADA M2 4,050 4,050 4,050 4,050 4,050 4,050 4,050 4,0505.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 40,625 40,907 40,481 40,702 41,064 40,860 40,481 41,396

5.52 DOVELA, GROUTING 3000 PSI ML 7,701 7,701 7,701 7,701 7,701 7,701 7,701 7,7015.53000000000003 ANCLAJE 3/8" L=30CM UN 10,365 10,365 10,365 10,365 10,365 10,365 10,365 10,365

5.54 ANCLAJE 1/2" L=50CM UN 13,609 13,609 13,609 13,609 13,609 13,609 13,609 13,6095.55000000000003 ANCLAJE 5/8" L=70CM UN 19,235 19,235 19,235 19,235 19,235 19,235 19,235 19,235

5.56 ANCLAJE 3/4" L=70CM UN 29,035 29,035 29,035 29,035 29,035 29,035 29,035 29,0355.57000000000003 ANCLAJE 1" L= 70CM UN 4,378 4,461 4,336 4,408 4,456 4,452 4,336 4,613

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 12,017 12,017 12,017 12,017 12,017 12,017 12,017 12,0176.2 FILOS O DILATACIONES B/PLACA ML 4,963 5,024 4,932 4,968 5,134 5,005 4,932 5,1166.3 FILOS O DILATACIONES S/MURO ML 5,866 5,927 5,835 5,871 6,037 5,908 5,835 6,0196.4 GOTERA EN MORTERO 1:4 ML 7,045 7,106 7,014 7,050 7,216 7,087 7,014 7,1986.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,588 4,588 4,588 4,588 4,588 4,588 4,588 4,5886.6 MALLA BAJO ENTRAMADO M2 10,641 10,641 10,641 10,641 10,641 10,641 10,641 10,6416.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 20,696 20,888 20,597 20,713 21,239 20,830 20,597 21,1806.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 12,324 12,420 12,274 12,332 12,595 12,391 12,274 12,5666.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 18,349 18,520 18,261 18,364 18,830 18,468 18,261 18,779

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,914 10,999 10,870 10,922 11,155 10,973 10,870 11,1296.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 17,732 17,925 17,633 17,750 18,275 17,867 17,633 18,2176.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 10,606 10,702 10,556 10,614 10,877 10,673 10,556 10,8486.13 PAÑETE CULATAS 1:4, E=2 CM M2 18,349 18,520 18,261 18,364 18,830 18,468 18,261 18,7796.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,914 10,999 10,870 10,922 11,155 10,973 10,870 11,1296.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 17,797 17,934 17,726 17,809 18,184 17,893 17,726 18,1426.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 10,637 10,706 10,602 10,643 10,830 10,685 10,602 10,8106.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 15,109 15,239 15,042 15,121 15,476 15,200 15,042 15,4366.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 9,074 9,139 9,041 9,080 9,258 9,120 9,041 9,238

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 14,639 14,786 14,564 14,653 15,053 14,742 14,564 15,0086.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,839 8,913 8,802 8,846 9,046 8,891 8,802 9,024

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 18,941 19,112 18,853 18,957 19,423 19,061 18,853 19,3716.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 11,195 11,280 11,151 11,203 11,436 11,254 11,151 11,410

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 18,325 18,518 18,226 18,343 18,868 18,459 18,226 18,8106.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,887 10,983 10,837 10,895 11,158 10,954 10,837 11,129

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 15,104 15,251 15,029 15,118 15,518 15,206 15,029 15,4736.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 9,058 9,132 9,020 9,065 9,265 9,109 9,020 9,243

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 19,002 19,195 18,903 19,020 19,545 19,137 18,903 19,4876.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 11,533 11,630 11,484 11,542 11,805 11,600 11,484 11,776

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 23,672 23,917 23,547 23,695 24,360 23,843 23,547 24,286

7.2 M2 71,370 71,924 71,090 71,550 72,040 71,852 71,090 72,917

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 43,127 43,127 43,127 43,127 43,127 43,127 43,127 43,1277.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 17,231 17,231 17,231 17,231 17,231 17,231 17,231 17,231

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

Page 200: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

7.5 ML 27,142 27,142 27,142 27,142 27,142 27,142 27,142 27,1427.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 64,466 64,466 64,466 64,466 64,466 64,466 64,466 64,4667.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 45,935 45,935 45,935 45,935 45,935 45,935 45,935 45,9357.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 27,286 27,286 27,286 27,286 27,286 27,286 27,286 27,2867.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 62,722 62,722 62,722 62,722 62,722 62,722 62,722 62,722

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 81,217 81,217 81,217 81,217 81,217 81,217 81,217 81,2177.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 105,896 105,896 105,896 105,896 105,896 105,896 105,896 105,8967.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 45,933 45,933 45,933 45,933 45,933 45,933 45,933 45,9337.13 CANAL PVC AMAZONAS ML 66,299 66,299 66,299 66,299 66,299 66,299 66,299 66,2997.14 CANAL PVC RAINGO ML 58,386 58,386 58,386 58,386 58,386 58,386 58,386 58,3867.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 93,914 93,914 93,914 93,914 93,914 93,914 93,914 93,9147.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 54,478 54,478 54,478 54,478 54,478 54,478 54,478 54,4787.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 44,622 44,622 44,622 44,622 44,622 44,622 44,622 44,6227.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 24,871 24,871 24,871 24,871 24,871 24,871 24,871 24,871

7.19000000000001 TEJA DE BARRO M2 50,221 50,524 50,064 50,248 51,076 50,432 50,064 50,9847.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 37,208 37,208 37,208 37,208 37,208 37,208 37,208 37,208

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 34,099 34,099 34,099 34,099 34,099 34,099 34,099 34,0997.22 TEJA FIBROCEMENTO Nº4 M2 28,418 28,418 28,418 28,418 28,418 28,418 28,418 28,418

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 27,634 27,634 27,634 27,634 27,634 27,634 27,634 27,6347.24 TEJA FIBROCEMENTO No. 8 M2 28,461 28,461 28,461 28,461 28,461 28,461 28,461 28,461

7.25000000000001 TEJA TERMOACÚSTICA M2 39,878 39,878 39,878 39,878 39,878 39,878 39,878 39,8787.26 TEJA PLÁSTICA No.6 M2 35,047 35,047 35,047 35,047 35,047 35,047 35,047 35,047

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 64,931 64,931 64,931 64,931 64,931 64,931 64,931 64,9317.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 118,818 118,818 118,818 118,818 118,818 118,818 118,818 118,818

7.29000000000001 TEJA SIN TRASLAPO M2 53,184 53,184 53,184 53,184 53,184 53,184 53,184 53,1847.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 33,091 33,091 33,091 33,091 33,091 33,091 33,091 33,091

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 26,333 26,333 26,333 26,333 26,333 26,333 26,333 26,333

7.32 M2 42,956 42,956 42,956 42,956 42,956 42,956 42,956 42,956

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 15,388 15,388 15,388 15,388 15,388 15,388 15,388 15,3887.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 18,589 18,589 18,589 18,589 18,589 18,589 18,589 18,589

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 21,317 21,317 21,317 21,317 21,317 21,317 21,317 21,3177.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 27,663 27,663 27,663 27,663 27,663 27,663 27,663 27,663

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 17,062 17,062 17,062 17,062 17,062 17,062 17,062 17,0627.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 40,135 40,135 40,135 40,135 40,135 40,135 40,135 40,135

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 244,217 244,217 244,217 244,217 244,217 244,217 244,217 244,2177.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 299,453 299,453 299,453 299,453 299,453 299,453 299,453 299,453

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 196,313 196,313 196,313 196,313 196,313 196,313 196,313 196,3137.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 285,105 285,105 285,105 285,105 285,105 285,105 285,105 285,105

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 448,185 459,573 442,416 451,881 461,949 458,093 442,416 479,9828.2 CONCRETO 3500 PSI M3 390,674 401,314 385,294 394,374 401,834 400,114 385,294 420,6758.3 CONCRETO 3000 PSI M3 383,693 394,772 378,097 387,720 394,109 393,652 378,097 415,1398.4 CONCRETO 2500 PSI M3 347,707 358,788 342,095 351,304 361,099 357,348 342,095 378,646

BAJANTE PVC AGUAS LLUVIAS D=4"

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 201: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

8.5 CONCRETO 2000 PSI M3 324,884 336,425 319,050 328,953 336,602 335,165 319,050 357,4928.6 CONCRETO 1500 PSI M3 295,669 307,759 289,574 300,364 304,969 306,759 289,574 330,3398.7 MORTERO SECO 1:10 M3 257,899 266,278 253,582 258,661 281,514 263,739 253,582 278,9748.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 450,402 458,539 446,211 451,142 473,332 456,073 446,211 470,8678.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 421,049 430,223 416,323 421,883 446,903 427,443 416,323 444,123

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 477,885 486,465 473,465 478,665 502,065 483,865 473,465 499,4658.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 618,405 626,985 613,985 619,185 642,585 624,385 613,985 639,985

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 95,708 95,708 95,708 95,708 95,708 95,708 95,708 95,7089.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 3,369 3,429 3,337 3,374 3,540 3,411 3,337 3,5219.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 107,179 107,179 107,179 107,179 107,179 107,179 107,179 107,1799.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 131,349 131,349 131,349 131,349 131,349 131,349 131,349 131,3499.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 183,972 183,972 183,972 183,972 183,972 183,972 183,972 183,9729.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 205,616 205,616 205,616 205,616 205,616 205,616 205,616 205,6169.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 227,285 227,285 227,285 227,285 227,285 227,285 227,285 227,2859.8 HOJA PUERTA FORTEC 0.81 UN 161,660 161,660 161,660 161,660 161,660 161,660 161,660 161,6609.9 HOJA PUERTA FORTEC 0.91 UN 178,655 178,655 178,655 178,655 178,655 178,655 178,655 178,655

9.10 HOJA PUERTA FORTEC 1.50 UN 265,317 265,317 265,317 265,317 265,317 265,317 265,317 265,3179.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 99,843 99,843 99,843 99,843 99,843 99,843 99,843 99,8439.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 132,812 132,812 132,812 132,812 132,812 132,812 132,812 132,8129.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 147,199 147,199 147,199 147,199 147,199 147,199 147,199 147,1999.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 375,590 375,590 375,590 375,590 375,590 375,590 375,590 375,5909.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 32,357 32,357 32,357 32,357 32,357 32,357 32,357 32,3579.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 20,243 20,243 20,243 20,243 20,243 20,243 20,243 20,2439.17 VENTANERÍA EN MADERA CEDRO MACHO M2 75,300 75,300 75,300 75,300 75,300 75,300 75,300 75,3009.18 CERRADURA DE ENTRADA PRINCIPAL UN 96,050 96,050 96,050 96,050 96,050 96,050 96,050 96,0509.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 74,589 74,589 74,589 74,589 74,589 74,589 74,589 74,5899.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 23,037 23,037 23,037 23,037 23,037 23,037 23,037 23,0379.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 23,037 23,037 23,037 23,037 23,037 23,037 23,037 23,0379.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 21,838 21,838 21,838 21,838 21,838 21,838 21,838 21,8389.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 81,988 81,988 81,988 81,988 81,988 81,988 81,988 81,9889.24 ESPEJO BISELADO INCOLORO 4 MM M2 106,206 106,206 106,206 106,206 106,206 106,206 106,206 106,2069.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 48,084 48,084 48,084 48,084 48,084 48,084 48,084 48,0849.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 57,770 57,770 57,770 57,770 57,770 57,770 57,770 57,7709.27 VIDRIO TEMPLADO PULIDO 10 MM M2 234,555 234,555 234,555 234,555 234,555 234,555 234,555 234,5559.28 VIDRIO TEMPLADO PULIDO 8 MM M2 210,338 210,338 210,338 210,338 210,338 210,338 210,338 210,3389.29 VIDRIO TRANSPARENTE 3 MM M2 51,716 51,716 51,716 51,716 51,716 51,716 51,716 51,7169.30 VIDRIO TRANSPARENTE 4 MM M2 60,192 60,192 60,192 60,192 60,192 60,192 60,192 60,1929.31 VIDRIO TRANSPARENTE 5 MM M2 67,457 67,457 67,457 67,457 67,457 67,457 67,457 67,4579.32 VIDRIO TRANSPARENTE 6 MM M2 71,816 71,816 71,816 71,816 71,816 71,816 71,816 71,816

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 59,616 59,616 59,616 59,616 59,616 59,616 59,616 59,61610.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 176,163 176,163 176,163 176,163 176,163 176,163 176,163 176,163

Page 202: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

10.3 ML 87,062 87,062 87,062 87,062 87,062 87,062 87,062 87,062

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 111,019 111,019 111,019 111,019 111,019 111,019 111,019 111,01910.5 MARCO TAPA CAJA DE INSPECCIÓN UN 107,914 107,914 107,914 107,914 107,914 107,914 107,914 107,91410.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 75,427 75,427 75,427 75,427 75,427 75,427 75,427 75,42710.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 160,838 160,838 160,838 160,838 160,838 160,838 160,838 160,83810.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 85,658 85,658 85,658 85,658 85,658 85,658 85,658 85,65810.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 5,129 5,129 5,129 5,129 5,129 5,129 5,129 5,129

10.10 M2 77,315 77,315 77,315 77,315 77,315 77,315 77,315 77,315

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 32,466 32,466 32,466 32,466 32,466 32,466 32,466 32,46610.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 426,672 426,672 426,672 426,672 426,672 426,672 426,672 426,67210.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 153,216 153,216 153,216 153,216 153,216 153,216 153,216 153,21610.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 167,239 167,239 167,239 167,239 167,239 167,239 167,239 167,239

10.15 M2 388,649 388,649 388,649 388,649 388,649 388,649 388,649 388,649

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 98,990 98,990 98,990 98,990 98,990 98,990 98,990 98,99010.17 PUERTA CORTINA INCLUYE ESMALTE M2 311,388 311,388 311,388 311,388 311,388 311,388 311,388 311,38810.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,785 4,785 4,785 4,785 4,785 4,785 4,785 4,78510.19 VENTANA EN ALUMINIO CORREDIZA M2 218,607 218,607 218,607 218,607 218,607 218,607 218,607 218,60710.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 94,970 94,970 94,970 94,970 94,970 94,970 94,970 94,97010.21 REJILLA PISO 0.30 M M2 68,395 68,395 68,395 68,395 68,395 68,395 68,395 68,39510.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 69,832 69,832 69,832 69,832 69,832 69,832 69,832 69,832

10.23 KG 7,829 7,829 7,829 7,829 7,829 7,829 7,829 7,829

10.24 KG 8,732 8,732 8,732 8,732 8,732 8,732 8,732 8,732

10.25 KG 6,766 6,766 6,766 6,766 6,766 6,766 6,766 6,766

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 175,530 175,530 175,530 175,530 175,530 175,530 175,530 175,53011.2 ACOMETIDA EN PVC 3/4" 5M UN 210,563 210,563 210,563 210,563 210,563 210,563 210,563 210,56311.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 17,231 17,231 17,231 17,231 17,231 17,231 17,231 17,23111.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 27,142 27,142 27,142 27,142 27,142 27,142 27,142 27,14211.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 26,079 26,079 26,079 26,079 26,079 26,079 26,079 26,07911.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 33,486 33,486 33,486 33,486 33,486 33,486 33,486 33,48611.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 69,175 69,175 69,175 69,175 69,175 69,175 69,175 69,17511.8 CONEXIÓN TANQUE ELEVADO PVC UN 175,569 175,569 175,569 175,569 175,569 175,569 175,569 175,56911.9 INSTALACIÓN APARATO SANITARIO UN 33,446 33,446 33,446 33,446 33,446 33,446 33,446 33,446

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 203: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 24,601 24,601 24,601 24,601 24,601 24,601 24,601 24,60111.13 NIPLE PASAMURO 2" UN 51,989 51,989 51,989 51,989 51,989 51,989 51,989 51,98911.14 NIPLE PASAMURO 4" UN 77,887 77,887 77,887 77,887 77,887 77,887 77,887 77,88711.15 PUNTO AGUA CALIENTE CPVC UN 65,486 65,486 65,486 65,486 65,486 65,486 65,486 65,48611.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 47,172 47,172 47,172 47,172 47,172 47,172 47,172 47,17211.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 50,211 50,211 50,211 50,211 50,211 50,211 50,211 50,21111.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 63,435 63,435 63,435 63,435 63,435 63,435 63,435 63,43511.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 50,893 50,893 50,893 50,893 50,893 50,893 50,893 50,89311.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 63,939 63,939 63,939 63,939 63,939 63,939 63,939 63,93911.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 68,484 68,484 68,484 68,484 68,484 68,484 68,484 68,48411.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 58,061 58,061 58,061 58,061 58,061 58,061 58,061 58,06111.23 RED SUMINISTRO CPVC 1/2" ML 9,777 9,777 9,777 9,777 9,777 9,777 9,777 9,77711.24 RED SUMINISTRO CPVC 3/4" ML 13,815 13,815 13,815 13,815 13,815 13,815 13,815 13,81511.25 RED SUMINISTRO PVC 1 1/2" ML 17,727 17,727 17,727 17,727 17,727 17,727 17,727 17,72711.26 RED SUMINISTRO PVC 1" ML 10,913 10,913 10,913 10,913 10,913 10,913 10,913 10,91311.27 RED SUMINISTRO PVC 1/2" ML 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,52011.28 RED SUMINISTRO PVC 2 1/2" ML 45,108 45,108 45,108 45,108 45,108 45,108 45,108 45,10811.29 RED SUMINISTRO PVC 2" ML 25,767 25,767 25,767 25,767 25,767 25,767 25,767 25,76711.30 RED SUMINISTRO PVC 3/4" ML 8,169 8,169 8,169 8,169 8,169 8,169 8,169 8,16911.31 RED SANITARIA PVC-S 2" ML 19,466 19,466 19,466 19,466 19,466 19,466 19,466 19,46611.32 RED SANITARIA PVC-S 3" ML 27,076 27,076 27,076 27,076 27,076 27,076 27,076 27,07611.33 RED SANITARIA PVC-S 4" ML 36,705 36,705 36,705 36,705 36,705 36,705 36,705 36,70511.34 RED SANITARIA PVC-S 6" ML 69,191 69,191 69,191 69,191 69,191 69,191 69,191 69,19111.35 REGISTRO 1" UN 89,782 89,782 89,782 89,782 89,782 89,782 89,782 89,78211.36 REGISTRO 1/2" UN 51,322 51,322 51,322 51,322 51,322 51,322 51,322 51,32211.37 REGISTRO 3/4" UN 63,085 63,085 63,085 63,085 63,085 63,085 63,085 63,08511.38 REGISTRO 1 1/2" UN 117,645 117,645 117,645 117,645 117,645 117,645 117,645 117,64511.39 REGISTRO 2 1/2" UN 305,634 305,634 305,634 305,634 305,634 305,634 305,634 305,63411.40 REGISTRO 2" UN 227,335 227,335 227,335 227,335 227,335 227,335 227,335 227,33511.41 REVENTILACIÓN 2" ML 13,531 13,531 13,531 13,531 13,531 13,531 13,531 13,53111.42 REVENTILACIÓN 3" ML 17,109 17,109 17,109 17,109 17,109 17,109 17,109 17,10911.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 135,786 135,786 135,786 135,786 135,786 135,786 135,786 135,78611.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 221,411 221,411 221,411 221,411 221,411 221,411 221,411 221,41111.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 365,086 365,086 365,086 365,086 365,086 365,086 365,086 365,086

11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 36,659 36,659 36,659 36,659 36,659 36,659 36,659 36,659

11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 42,681 42,681 42,681 42,681 42,681 42,681 42,681 42,681

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 69,791 69,791 69,791 69,791 69,791 69,791 69,791 69,791

11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 56,516 56,516 56,516 56,516 56,516 56,516 56,516 56,516

11.50 ML 80,577 80,577 80,577 80,577 80,577 80,577 80,577 80,577TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

Page 204: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 83,295 83,295 83,295 83,295 83,295 83,295 83,295 83,295

11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 188,040 188,040 188,040 188,040 188,040 188,040 188,040 188,040

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 37,089 37,089 37,089 37,089 37,089 37,089 37,089 37,08911.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 37,245 37,245 37,245 37,245 37,245 37,245 37,245 37,24511.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 30,696 30,696 30,696 30,696 30,696 30,696 30,696 30,69611.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 34,865 34,865 34,865 34,865 34,865 34,865 34,865 34,86511.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 3,183 3,183 3,183 3,183 3,183 3,183 3,183 3,18311.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,977 4,977 4,977 4,977 4,977 4,977 4,977 4,97711.59 GABINETE TIPO III UN 1,112,176 1,112,176 1,112,176 1,112,176 1,112,176 1,112,176 1,112,176 1,112,17611.60 GABINETE TIPO I UN 875,032 875,032 875,032 875,032 875,032 875,032 875,032 875,03211.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,394,059 1,394,059 1,394,059 1,394,059 1,394,059 1,394,059 1,394,059 1,394,05911.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,331,477 1,331,477 1,331,477 1,331,477 1,331,477 1,331,477 1,331,477 1,331,47711.63 VÁLVULA MARIPOSA 3" UN 717,914 717,914 717,914 717,914 717,914 717,914 717,914 717,91411.64 VÁLVULA MARIPOSA 4" UN 820,923 820,923 820,923 820,923 820,923 820,923 820,923 820,92311.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 356,754 356,754 356,754 356,754 356,754 356,754 356,754 356,754

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 244,359 244,359 244,359 244,359 244,359 244,359 244,359 244,35912.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 35,478 35,478 35,478 35,478 35,478 35,478 35,478 35,47812.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 43,887 43,887 43,887 43,887 43,887 43,887 43,887 43,88712.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 47,507 47,507 47,507 47,507 47,507 47,507 47,507 47,50712.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 58,191 58,191 58,191 58,191 58,191 58,191 58,191 58,19112.6 SALIDA TELÉFONO PVC COMPLETA UN 38,756 38,756 38,756 38,756 38,756 38,756 38,756 38,75612.7 SALIDA TIMBRE PVC COMPLETA UN 38,733 38,733 38,733 38,733 38,733 38,733 38,733 38,73312.8 STRIP TELEFÓNICO 10 PARES UN 116,109 116,109 116,109 116,109 116,109 116,109 116,109 116,10912.9 SALIDA TOMA DOBLE PVC COMPLETA UN 33,499 33,499 33,499 33,499 33,499 33,499 33,499 33,499

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 79,020 79,020 79,020 79,020 79,020 79,020 79,020 79,02012.11 SALIDA T.V PVC COMPLETA. UN 51,976 51,976 51,976 51,976 51,976 51,976 51,976 51,97612.12 SALIDA BIFÁSICA C.N. UN 30,543 30,543 30,543 30,543 30,543 30,543 30,543 30,54312.13 TABLERO PARCIAL 4 CIRCUITOS UN 87,918 87,918 87,918 87,918 87,918 87,918 87,918 87,91812.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 361,626 361,626 361,626 361,626 361,626 361,626 361,626 361,62612.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 487,562 487,562 487,562 487,562 487,562 487,562 487,562 487,56212.16 TUBERÍA PVC CONDUIT 1/2" ML 2,832 2,832 2,832 2,832 2,832 2,832 2,832 2,83212.17 TUBERÍA PVC CONDUIT 3/4" ML 3,682 3,682 3,682 3,682 3,682 3,682 3,682 3,68212.18 TUBERÍA PVC CONDUIT 1" ML 5,675 5,675 5,675 5,675 5,675 5,675 5,675 5,67512.19 TUBERÍA PVC CONDUIT 1 1/2" ML 10,184 10,184 10,184 10,184 10,184 10,184 10,184 10,18412.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 195,942 195,942 195,942 195,942 195,942 195,942 195,942 195,94212.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 61,897 61,897 61,897 61,897 61,897 61,897 61,897 61,89712.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 84,149 84,149 84,149 84,149 84,149 84,149 84,149 84,14912.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 29,143 29,143 29,143 29,143 29,143 29,143 29,143 29,14312.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,124,309 1,124,309 1,124,309 1,124,309 1,124,309 1,124,309 1,124,309 1,124,30912.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 831,685 831,685 831,685 831,685 831,685 831,685 831,685 831,68512.26 POSTE METÁLICO 6M UN 1,055,678 1,055,678 1,055,678 1,055,678 1,055,678 1,055,678 1,055,678 1,055,678

Page 205: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 482,496 482,496 482,496 482,496 482,496 482,496 482,496 482,49612.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 82,369 82,369 82,369 82,369 82,369 82,369 82,369 82,36912.29 LUMINARIA 70W SODIO UN 213,062 213,062 213,062 213,062 213,062 213,062 213,062 213,06212.30 LUMINARIA 150W SODIO UN 251,427 251,427 251,427 251,427 251,427 251,427 251,427 251,42712.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,363,304 1,363,304 1,363,304 1,363,304 1,363,304 1,363,304 1,363,304 1,363,30412.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1,003,636 1,003,636 1,003,636 1,003,636 1,003,636 1,003,636 1,003,636 1,003,636

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 38,016 38,346 37,846 38,046 38,946 38,246 37,846 38,84613.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 32,908 33,238 32,738 32,938 33,838 33,138 32,738 33,73813.3 ALISTADO PARA LISTÓN M2 11,973 12,039 11,939 11,979 12,159 12,019 11,939 12,13913.4 ALISTADO PISOS 1:3, E=0.04 M2 28,149 28,809 27,809 28,209 30,009 28,609 27,809 29,80913.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 70,002 70,662 69,662 70,062 71,862 70,462 69,662 71,66213.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 21,909 22,140 21,793 21,991 22,144 22,115 21,793 22,56113.7 CONCRETO BASE GRADAS 2500 PSI M2 52,252 53,360 51,690 52,611 53,591 53,216 51,690 55,34613.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 74,031 75,804 73,133 74,607 76,174 75,574 73,133 78,98113.9 MANTO FIBERGLASS 600X1 M2 23,958 23,958 23,958 23,958 23,958 23,958 23,958 23,958

13.10 PEGANTE MORTERO-CONCRETO M2 20,236 20,236 20,236 20,236 20,236 20,236 20,236 20,23613.11 PERMA PLY 2 CAPAS M2 20,811 20,811 20,811 20,811 20,811 20,811 20,811 20,81113.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 43,153 44,150 42,647 43,476 44,358 44,020 42,647 45,93713.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 50,900 52,119 50,283 51,296 52,373 51,961 50,283 54,30313.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 74,635 76,519 73,681 75,247 76,912 76,274 73,681 79,89513.15 TRITURADO FINO 1/2 M3 100,740 109,793 96,213 105,266 100,740 109,793 96,213 127,90113.16 TRITURADO GRUESO 3/4 M3 100,047 104,988 92,995 105,104 96,063 112,956 96,975 121,652

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 40,013 40,145 39,945 40,025 40,385 40,105 39,945 40,34514.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 24,326 24,392 24,292 24,332 24,512 24,372 24,292 24,49214.3 ADOQUÍN CONCRETO 6CM M2 53,453 53,783 53,283 53,483 54,383 53,683 53,283 54,28314.4 ADOQUÍN CONCRETO 8CM M2 63,653 63,983 63,483 63,683 64,583 63,883 63,483 64,48314.5 ADOQUÍN GRES PEATONAL M2 52,209 52,539 52,039 52,239 53,139 52,439 52,039 53,039

14.6 M2 56,428 56,560 56,360 56,440 56,800 56,520 56,360 56,760

14.7 GRAVILLA PARA GRADAS ML 29,887 30,047 29,806 29,940 30,073 30,027 29,806 30,33514.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 116,360 116,954 116,054 116,414 118,034 116,774 116,054 117,85414.9 ACABADO EN GRAVILLA LAVADA M2 38,528 38,914 38,332 38,640 39,086 38,854 38,332 39,590

14.10 GUARDAESCOBA EN GRANITO ML 30,473 30,473 30,473 30,473 30,473 30,473 30,473 30,47314.11 GUARDAESCOBA EN GRAVILLA ML 8,700 8,860 8,619 8,753 8,886 8,840 8,619 9,14814.12 GUARDAESCOBA PVC CARAMELO ML 7,921 7,921 7,921 7,921 7,921 7,921 7,921 7,92114.13 GUARDAESCOBA PVC CEDRO ML 10,061 10,061 10,061 10,061 10,061 10,061 10,061 10,06114.14 GUARDAESCOBA PINO CARIBE ML 8,155 8,155 8,155 8,155 8,155 8,155 8,155 8,15514.15 GUARDAESCOBA CEDRO BLANCO ML 8,142 8,142 8,142 8,142 8,142 8,142 8,142 8,14214.16 GUARDAESCOBA EN MADERA SAPAN ML 13,077 13,077 13,077 13,077 13,077 13,077 13,077 13,07714.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,978 6,978 6,978 6,978 6,978 6,978 6,978 6,97814.18 LISTÓN M.H. AMARILLO M2 57,999 57,999 57,999 57,999 57,999 57,999 57,999 57,999

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

Page 206: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

14.19 PASO ESCALERA GRANITO ML 87,575 88,037 87,337 87,617 88,877 87,897 87,337 88,73714.20 PIRLANES ALUMINIO ML 5,803 5,803 5,803 5,803 5,803 5,803 5,803 5,80314.21 PIRLANES LADRILLO ML 26,240 26,361 26,177 26,251 26,582 26,325 26,177 26,54514.22 PISO VINILO TRÁFICO RESIDENCIAL M2 33,609 33,609 33,609 33,609 33,609 33,609 33,609 33,60914.23 PISO VINILO TRÁFICO PESADO M2 45,200 45,200 45,200 45,200 45,200 45,200 45,200 45,20014.24 PULIDA LACADA PISO MADERA M2 43,894 43,894 43,894 43,894 43,894 43,894 43,894 43,89414.25 TABLETA DE GRES 25X25 M2 39,841 39,973 39,773 39,853 40,213 39,933 39,773 40,17314.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 40,582 40,714 40,514 40,594 40,954 40,674 40,514 40,91414.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,365 8,365 8,365 8,365 8,365 8,365 8,365 8,36514.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 37,094 37,276 37,000 37,111 37,608 37,221 37,000 37,55214.29 JABONERA PORCELANA ACUARIO UN 15,247 15,247 15,247 15,247 15,247 15,247 15,247 15,247

14.30 UN 106,870 106,870 106,870 106,870 106,870 106,870 106,870 106,870

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,876 7,876 7,876 7,876 7,876 7,876 7,876 7,87614.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 16,738 16,738 16,738 16,738 16,738 16,738 16,738 16,73814.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 11,094 11,094 11,094 11,094 11,094 11,094 11,094 11,09414.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,536 10,536 10,536 10,536 10,536 10,536 10,536 10,53614.35 REMATES BOCEL ALUMINIO ML 6,536 6,536 6,536 6,536 6,536 6,536 6,536 6,53614.36 REMATES BOCEL PORCELANA ML 6,656 6,656 6,656 6,656 6,656 6,656 6,656 6,65614.37 TAPA REGISTRO 20X20 UN 15,649 15,649 15,649 15,649 15,649 15,649 15,649 15,64914.38 TAPA REGISTRO 6X6 UN 13,731 13,731 13,731 13,731 13,731 13,731 13,731 13,73114.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 15,706 15,706 15,706 15,706 15,706 15,706 15,706 15,706

14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 18,223 18,223 18,223 18,223 18,223 18,223 18,223 18,223

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 51,698 51,830 51,630 51,710 52,070 51,790 51,630 52,03014.42 MEDIA CAÑA EN GRANITO ML 62,524 62,524 62,524 62,524 62,524 62,524 62,524 62,52414.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,484 26,484 26,484 26,484 26,484 26,484 26,484 26,48414.44 PINTURA ACRÍLICA PARA PISOS M2 11,001 11,001 11,001 11,001 11,001 11,001 11,001 11,00114.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 12,826 12,826 12,826 12,826 12,826 12,826 12,826 12,82614.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 90,289 90,289 90,289 90,289 90,289 90,289 90,289 90,289

15 CIELO RASO15.1 APLIQUE YESO ML 62,098 62,098 62,098 62,098 62,098 62,098 62,098 62,09815.2 ARMADURA MADERA Y MALLA M2 27,419 27,419 27,419 27,419 27,419 27,419 27,419 27,41915.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 55,185 55,185 55,185 55,185 55,185 55,185 55,185 55,18515.4 CIELO RASO DURACUSTIC M2 54,461 54,461 54,461 54,461 54,461 54,461 54,461 54,46115.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 50,541 50,541 50,541 50,541 50,541 50,541 50,541 50,54115.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 71,873 71,873 71,873 71,873 71,873 71,873 71,873 71,87315.7 CORNISAS YESO ML 38,901 38,901 38,901 38,901 38,901 38,901 38,901 38,90115.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 80,326 80,326 80,326 80,326 80,326 80,326 80,326 80,32615.9 MALLA CON VENA M2 10,583 10,583 10,583 10,583 10,583 10,583 10,583 10,583

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

Page 207: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 52,311 43,231 41,963 56,179 39,363 69,127 54,898 47,11116.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 112,732 123,078 107,559 117,905 112,732 123,078 107,559 143,770

16.10 M3 114,289 142,746 110,408 137,572 155,681 131,104 116,876 162,148

16.11 AFRIMADO (NORMA INVIAS 311) M3 62,732 48,711 58,851 64,129 53,781 79,547 65,319 52,59216.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 106,265 134,722 102,385 129,548 147,657 123,081 108,852 154,12516.13 BASE GRANULAR (NORMA INVIAS 330) M3 114,930 143,387 111,049 138,213 156,322 131,745 117,517 162,789

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 236,823 236,823 236,823 236,823 236,823 236,823 236,823 236,82317.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 754,507 754,507 754,507 754,507 754,507 754,507 754,507 754,50717.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 425,109 425,109 425,109 425,109 425,109 425,109 425,109 425,10917.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 133,920 133,920 133,920 133,920 133,920 133,920 133,920 133,92017.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 167,295 167,295 167,295 167,295 167,295 167,295 167,295 167,29517.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 198,606 198,606 198,606 198,606 198,606 198,606 198,606 198,60617.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 308,815 308,815 308,815 308,815 308,815 308,815 308,815 308,81517.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 816,274 816,274 816,274 816,274 816,274 816,274 816,274 816,27417.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 252,496 252,496 252,496 252,496 252,496 252,496 252,496 252,496

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 119,113 119,113 119,113 119,113 119,113 119,113 119,113 119,11317.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 66,307 66,307 66,307 66,307 66,307 66,307 66,307 66,307

17.12 UN 200,404 200,404 200,404 200,404 200,404 200,404 200,404 200,404

17.13 UN 322,572 322,572 322,572 322,572 322,572 322,572 322,572 322,572

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,565 4,565 4,565 4,565 4,565 4,565 4,565 4,56518.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,345 2,345 2,345 2,345 2,345 2,345 2,345 2,34518.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,639 8,639 8,639 8,639 8,639 8,639 8,639 8,63918.4 BARNIZ SOBRE MUEBLES M2 33,736 33,736 33,736 33,736 33,736 33,736 33,736 33,73618.5 CARBURO SOBRE PAÑETES M2 4,450 4,450 4,450 4,450 4,450 4,450 4,450 4,45018.6 COLORPLAST FACHADA SOBRE FACHADA M2 11,284 11,284 11,284 11,284 11,284 11,284 11,284 11,28418.7 DEMARCACIÓN CON MARMOLINA ML 2,758 2,758 2,758 2,758 2,758 2,758 2,758 2,75818.8 ESMALTE SOBRE LÁMINA LINEAL ML 2,022 2,022 2,022 2,022 2,022 2,022 2,022 2,02218.9 ESMALTE SOBRE LÁMINA LLENA M2 10,410 10,410 10,410 10,410 10,410 10,410 10,410 10,410

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,149 3,149 3,149 3,149 3,149 3,149 3,149 3,149

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 208: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

18.11 ESMALTE SOBRE MADERA LLENA M2 11,604 11,604 11,604 11,604 11,604 11,604 11,604 11,60418.12 ESMALTE SOBRE MARCOS LÁMINA M2 4,202 4,202 4,202 4,202 4,202 4,202 4,202 4,20218.13 ESMALTE SOBRE MARCOS MADERA M2 4,989 4,989 4,989 4,989 4,989 4,989 4,989 4,98918.14 ESTUCO M2 6,061 6,061 6,061 6,061 6,061 6,061 6,061 6,06118.15 ESTUCO (LINEAL) ML 3,712 3,712 3,712 3,712 3,712 3,712 3,712 3,71218.16 ESTUCO Y VINILO 3 MANOS M2 12,779 12,779 12,779 12,779 12,779 12,779 12,779 12,77918.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,820 7,820 7,820 7,820 7,820 7,820 7,820 7,82018.18 LACA PISOS MADERA M2 18,581 18,581 18,581 18,581 18,581 18,581 18,581 18,58118.19 LÍNEAS TRÁFICO 0.10 ML 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,15318.20 MARMOLINA SOBRE PAÑETE M2 9,340 9,340 9,340 9,340 9,340 9,340 9,340 9,34018.21 TINTILLA SOBRE MADERA LINEAL ML 2,721 2,721 2,721 2,721 2,721 2,721 2,721 2,72118.22 TINTILLA SOBRE MADERA LLENA M2 10,208 10,208 10,208 10,208 10,208 10,208 10,208 10,20818.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,569 5,569 5,569 5,569 5,569 5,569 5,569 5,56918.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,485 3,485 3,485 3,485 3,485 3,485 3,485 3,48518.25 WASH-PRIMER SOBRE ALUMNIO M2 17,395 17,395 17,395 17,395 17,395 17,395 17,395 17,39518.26 PINTURA EPÓXICA M2 10,467 10,467 10,467 10,467 10,467 10,467 10,467 10,46718.27 PINTURA EPÓXICA (LINEAL) ML 6,383 6,383 6,383 6,383 6,383 6,383 6,383 6,383

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 4,115,710 4,115,710 4,115,710 4,115,710 4,115,710 4,115,710 4,115,710 4,115,710

19.2 UN 7,224,339 7,224,339 7,224,339 7,224,339 7,224,339 7,224,339 7,224,339 7,224,339

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 2,167,141 2,167,141 2,167,141 2,167,141 2,167,141 2,167,141 2,167,141 2,167,14119.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 6,073,349 6,073,349 6,073,349 6,073,349 6,073,349 6,073,349 6,073,349 6,073,34919.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 6,048,861 6,048,861 6,048,861 6,048,861 6,048,861 6,048,861 6,048,861 6,048,86119.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,15319.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 2,162,082 2,162,082 2,162,082 2,162,082 2,162,082 2,162,082 2,162,082 2,162,08219.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 69,416 69,416 69,416 69,416 69,416 69,416 69,416 69,41619.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,219,332 1,219,446 1,219,274 1,219,369 1,219,470 1,219,431 1,219,274 1,219,650

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 621,281 624,051 619,882 622,288 623,885 623,771 619,882 629,143

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 24,571 24,571 24,571 24,571 24,571 24,571 24,571 24,57120.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 36,743 36,743 36,743 36,743 36,743 36,743 36,743 36,74320.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 45,490 45,490 45,490 45,490 45,490 45,490 45,490 45,49020.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 26,447 26,447 26,447 26,447 26,447 26,447 26,447 26,44720.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 30,414 30,414 30,414 30,414 30,414 30,414 30,414 30,41420.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 44,536 44,536 44,536 44,536 44,536 44,536 44,536 44,53620.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 20,547 20,547 20,547 20,547 20,547 20,547 20,547 20,54720.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 21,694 21,694 21,694 21,694 21,694 21,694 21,694 21,69420.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 26,953 26,953 26,953 26,953 26,953 26,953 26,953 26,953

20.10 VÁLVULA DE BOLA GAS 1/2" UN 12,618 12,618 12,618 12,618 12,618 12,618 12,618 12,61820.11 VÁLVULA DE BOLA GAS 3/4" UN 19,809 19,809 19,809 19,809 19,809 19,809 19,809 19,80920.12 VÁLVULA DE BOLA GAS 1" UN 29,771 29,771 29,771 29,771 29,771 29,771 29,771 29,77120.13 VÁLVULA POLIETILENO GAS 1/2" UN 177,724 177,724 177,724 177,724 177,724 177,724 177,724 177,724

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 209: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

20.14 VÁLVULA POLIETILENO GAS 3/4" UN 182,819 182,819 182,819 182,819 182,819 182,819 182,819 182,81920.15 VÁLVULA POLIETILENO GAS 1" UN 296,621 296,621 296,621 296,621 296,621 296,621 296,621 296,62120.16 ACOMETIDA GAS 1/2" ML 243,934 243,934 243,934 243,934 243,934 243,934 243,934 243,934

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 107,177 107,177 107,177 107,177 107,177 107,177 107,177 107,17721.2 CABLE DETECTOR LINEAL DE CALOR ML 27,040 27,040 27,040 27,040 27,040 27,040 27,040 27,04021.3 SIRENA DE 110 V UN 75,585 75,585 75,585 75,585 75,585 75,585 75,585 75,58521.4 CÁMARA CCTV UN 216,738 216,738 216,738 216,738 216,738 216,738 216,738 216,73821.5 PARLANTE-CIELO FALSO UN 42,556 42,556 42,556 42,556 42,556 42,556 42,556 42,55621.6 AMPLIFICADOR 100W UN 466,354 466,354 466,354 466,354 466,354 466,354 466,354 466,35421.7 AMPLIFICADOR 300W UN 1,165,278 1,165,278 1,165,278 1,165,278 1,165,278 1,165,278 1,165,278 1,165,27821.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 33,030 33,030 33,030 33,030 33,030 33,030 33,030 33,03021.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 186,330 186,330 186,330 186,330 186,330 186,330 186,330 186,330

21.10 TOMA PARA MICRÓFONO UN 35,691 35,691 35,691 35,691 35,691 35,691 35,691 35,69121.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,805 2,805 2,805 2,805 2,805 2,805 2,805 2,80521.12 SPLITERS UN 4,584 4,584 4,584 4,584 4,584 4,584 4,584 4,58421.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,643 14,643 14,643 14,643 14,643 14,643 14,643 14,64321.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 19,349 19,349 19,349 19,349 19,349 19,349 19,349 19,34921.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 26,843 26,843 26,843 26,843 26,843 26,843 26,843 26,84321.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 103,376 103,376 103,376 103,376 103,376 103,376 103,376 103,37621.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 27,159 27,159 27,159 27,159 27,159 27,159 27,159 27,15921.18 BANDEJA PORTACABLES PARA RACK UN 89,471 89,471 89,471 89,471 89,471 89,471 89,471 89,47121.19 RACK 2' X 24" UN 137,855 137,855 137,855 137,855 137,855 137,855 137,855 137,85521.20 RACK 3' X 24" UN 169,026 169,026 169,026 169,026 169,026 169,026 169,026 169,02621.21 RACK 5' X 24" UN 267,326 267,326 267,326 267,326 267,326 267,326 267,326 267,32621.22 RACK 7' X 24" UN 348,851 348,851 348,851 348,851 348,851 348,851 348,851 348,85121.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 387,642 387,642 387,642 387,642 387,642 387,642 387,642 387,64221.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 231,350 231,350 231,350 231,350 231,350 231,350 231,350 231,35021.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 57,985 57,985 57,985 57,985 57,985 57,985 57,985 57,98521.26 PATCH CORD 2M CATEGORÍA 6A UN 6,071 6,071 6,071 6,071 6,071 6,071 6,071 6,07121.27 PATCH CORD 5M CATEGORÍA 6A UN 15,505 15,505 15,505 15,505 15,505 15,505 15,505 15,50521.28 CABLE UTP CATEGORÍA 6A ML 2,731 2,731 2,731 2,731 2,731 2,731 2,731 2,73121.29 CANALETA METÁLICA 4X6 CMS ML 27,553 27,553 27,553 27,553 27,553 27,553 27,553 27,55321.30 CANALETA METÁLICA 4X10 CMS ML 28,812 28,812 28,812 28,812 28,812 28,812 28,812 28,81221.31 CANALETA METÁLICA 6X10 CMS ML 29,442 29,442 29,442 29,442 29,442 29,442 29,442 29,44221.32 CANALETA PLÁSTICA 13X7 MM ML 16,242 16,242 16,242 16,242 16,242 16,242 16,242 16,24221.33 CANALETA PLÁSTICA 20X12 MM ML 18,272 18,272 18,272 18,272 18,272 18,272 18,272 18,27221.34 CANALETA PLÁSTICA 32X12 MM ML 18,194 18,194 18,194 18,194 18,194 18,194 18,194 18,19421.35 CANALETA PLÁSTICA 40X60 MM ML 29,607 29,607 29,607 29,607 29,607 29,607 29,607 29,60721.36 SWITCH 10/100/1000 24 PUERTOS UN 404,011 404,011 404,011 404,011 404,011 404,011 404,011 404,01121.37 SWITCH 10/100/1000 16 PUERTOS UN 254,752 254,752 254,752 254,752 254,752 254,752 254,752 254,75221.38 SWITCH 10/100/1000 8 PUERTOS UN 65,930 65,930 65,930 65,930 65,930 65,930 65,930 65,93021.39 CABLE TELEFÓNICO 2 PARES ML 1,436 1,436 1,436 1,436 1,436 1,436 1,436 1,43621.40 CABLE TELEFÓNICO 10 PARES ML 6,997 6,997 6,997 6,997 6,997 6,997 6,997 6,997

Page 210: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

21.41 CABLE TELEFÓNICO 20 PARES ML 9,436 9,436 9,436 9,436 9,436 9,436 9,436 9,43621.42 CABLE TELEFÓNICO 40 PARES ML 13,166 13,166 13,166 13,166 13,166 13,166 13,166 13,16621.43 CABLE TELEVISIÓN RG6 ML 1,737 1,737 1,737 1,737 1,737 1,737 1,737 1,73721.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,343 16,343 16,343 16,343 16,343 16,343 16,343 16,34321.45 ACOMETIDA TELEFÓNICA 1" ML 25,493 25,493 25,493 25,493 25,493 25,493 25,493 25,49321.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,782 13,782 13,782 13,782 13,782 13,782 13,782 13,78221.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 11,494 11,494 11,494 11,494 11,494 11,494 11,494 11,49421.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 528,896 528,896 528,896 528,896 528,896 528,896 528,896 528,896

Page 211: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 21,243 21,243 21,243 21,243 21,243 21,243 21,243 21,2431.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 71,140 71,140 71,140 71,140 71,140 71,140 71,140 71,1401.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 400,873 400,873 400,873 400,873 400,873 400,873 400,873 400,8731.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 855,617 855,617 855,617 855,617 855,617 855,617 855,617 855,6171.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 98,055 98,055 98,055 98,055 98,055 98,055 98,055 98,0551.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 597,553 597,553 597,553 597,553 597,553 597,553 597,553 597,5531.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,286,109 1,286,109 1,286,109 1,286,109 1,286,109 1,286,109 1,286,109 1,286,1091.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 10,215 10,215 10,215 10,215 10,215 10,215 10,215 10,2151.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 12,607 12,607 12,607 12,607 12,607 12,607 12,607 12,607

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 15,855 15,855 15,855 15,855 15,855 15,855 15,855 15,8551.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 17,343 17,343 17,343 17,343 17,343 17,343 17,343 17,3431.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 20,805 20,805 20,805 20,805 20,805 20,805 20,805 20,8051.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 20,805 20,805 20,805 20,805 20,805 20,805 20,805 20,8051.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 83,826 83,826 83,826 83,826 83,826 83,826 83,826 83,8261.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 97,082 97,082 97,082 97,082 97,082 97,082 97,082 97,0821.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 300,460 300,460 300,460 300,460 300,460 300,460 300,460 300,4601.17 TEE PVC UNIÓN MECÁNICA 2" UN 112,837 112,837 112,837 112,837 112,837 112,837 112,837 112,8371.18 TEE PVC UNIÓN MECÁNICA 4" UN 185,988 185,988 185,988 185,988 185,988 185,988 185,988 185,9881.19 TEE PVC UNIÓN MECÁNICA 8" UN 823,283 823,283 823,283 823,283 823,283 823,283 823,283 823,2831.20 TEE PVC UNIÓN MECÁNICA 10" UN 948,520 948,520 948,520 948,520 948,520 948,520 948,520 948,5201.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 10,726 10,726 10,726 10,726 10,726 10,726 10,726 10,7261.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 9,479 9,479 9,479 9,479 9,479 9,479 9,479 9,4791.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 23,141 23,141 23,141 23,141 23,141 23,141 23,141 23,1411.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 92,061 92,061 92,061 92,061 92,061 92,061 92,061 92,0611.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 136,876 136,876 136,876 136,876 136,876 136,876 136,876 136,8761.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 22,480 22,480 22,480 22,480 22,480 22,480 22,480 22,4801.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 77,249 77,249 77,249 77,249 77,249 77,249 77,249 77,2491.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 114,259 114,259 114,259 114,259 114,259 114,259 114,259 114,2591.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 23,649 23,649 23,649 23,649 23,649 23,649 23,649 23,6491.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 48,729 48,729 48,729 48,729 48,729 48,729 48,729 48,7291.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 196,407 196,407 196,407 196,407 196,407 196,407 196,407 196,4071.32 UNIÓN REPARACION PVC 4" UN 56,881 56,881 56,881 56,881 56,881 56,881 56,881 56,8811.33 UNIÓN REPARACIÓN PVC 8" UN 228,543 228,543 228,543 228,543 228,543 228,543 228,543 228,5431.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 136,855 136,855 136,855 136,855 136,855 136,855 136,855 136,8551.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 389,997 389,997 389,997 389,997 389,997 389,997 389,997 389,9971.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,154,489 1,154,489 1,154,489 1,154,489 1,154,489 1,154,489 1,154,489 1,154,4891.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,706,037 1,706,037 1,706,037 1,706,037 1,706,037 1,706,037 1,706,037 1,706,037

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,368 8,368 8,368 8,368 8,368 8,368 8,368 8,3682.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 19,154 19,154 19,154 19,154 19,154 19,154 19,154 19,1542.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592

Page 212: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

2.4 RELLENO TIPO 1 "GRAVILLA" M3 100,462 110,337 95,524 105,400 100,462 110,337 95,524 130,0892.5 RELLENO TIPO 2 "RECEBO" M3 49,132 40,051 38,784 52,999 36,184 65,947 51,719 43,9322.6 RELLENO TIPO 4 "SUBBASE B-200" M3 63,952 49,931 60,071 65,349 55,001 80,767 66,539 53,8122.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 86,599 96,848 81,475 91,724 86,599 96,848 81,475 117,3452.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 88,171 98,618 82,947 93,395 88,171 98,618 82,947 119,5132.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 115,975 123,869 111,909 116,693 138,221 121,477 111,909 135,829

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 89,355 89,355 89,355 89,355 89,355 89,355 89,355 89,3553.2 CODO 45 PVC ALCANTARILLADO 16" UN 934,145 934,145 934,145 934,145 934,145 934,145 934,145 934,1453.3 CODO 90 PVC ALCANTARILLADO 8" UN 116,868 116,868 116,868 116,868 116,868 116,868 116,868 116,8683.4 CODO 90 PVC ALCANTARILLADO 16" UN 1,081,679 1,081,679 1,081,679 1,081,679 1,081,679 1,081,679 1,081,679 1,081,6793.5 CODO 90 PVC ALCANTARILLADO 24" UN 753,472 753,472 753,472 753,472 753,472 753,472 753,472 753,4723.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,950 58,950 58,950 58,950 58,950 58,950 58,950 58,9503.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 89,044 89,044 89,044 89,044 89,044 89,044 89,044 89,0443.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 210,193 210,193 210,193 210,193 210,193 210,193 210,193 210,1933.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 210,192 210,192 210,192 210,192 210,192 210,192 210,192 210,192

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 337,525 337,525 337,525 337,525 337,525 337,525 337,525 337,5253.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 89,045 89,045 89,045 89,045 89,045 89,045 89,045 89,0453.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 89,044 89,044 89,044 89,044 89,044 89,044 89,044 89,0443.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 210,193 210,193 210,193 210,193 210,193 210,193 210,193 210,1933.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 210,193 210,193 210,193 210,193 210,193 210,193 210,193 210,1933.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 337,527 337,527 337,527 337,527 337,527 337,527 337,527 337,5273.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 307,431 307,431 307,431 307,431 307,431 307,431 307,431 307,4313.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 495,080 495,080 495,080 495,080 495,080 495,080 495,080 495,0803.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 791,506 791,506 791,506 791,506 791,506 791,506 791,506 791,5063.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 49,412 49,412 49,412 49,412 49,412 49,412 49,412 49,4123.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 258,618 258,618 258,618 258,618 258,618 258,618 258,618 258,6183.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 283,770 283,770 283,770 283,770 283,770 283,770 283,770 283,7703.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 830,219 830,219 830,219 830,219 830,219 830,219 830,219 830,2193.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 46,957 47,039 46,915 46,965 47,187 47,014 46,915 47,1623.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 234,628 234,628 234,628 234,628 234,628 234,628 234,628 234,6283.25 TUBERÍA PVC ALCANTARILLADO 8" ML 38,958 38,958 38,958 38,958 38,958 38,958 38,958 38,9583.26 TUBERÍA PVC ALCANTARILLADO 10" ML 55,113 55,113 55,113 55,113 55,113 55,113 55,113 55,1133.27 TUBERÍA PVC ALCANTARILLADO 12" ML 79,555 79,555 79,555 79,555 79,555 79,555 79,555 79,5553.28 TUBERÍA PVC ALCANTARILLADO 16" ML 122,095 122,095 122,095 122,095 122,095 122,095 122,095 122,0953.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 196,247 196,247 196,247 196,247 196,247 196,247 196,247 196,2473.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 286,634 286,634 286,634 286,634 286,634 286,634 286,634 286,6343.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 362,230 362,230 362,230 362,230 362,230 362,230 362,230 362,2303.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 476,056 476,056 476,056 476,056 476,056 476,056 476,056 476,0563.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 654,000 654,000 654,000 654,000 654,000 654,000 654,000 654,000

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 571,148 577,795 567,790 573,564 577,397 577,123 567,790 590,015

Page 213: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

4.2 ML 556,851 561,056 554,686 557,234 568,700 559,782 554,686 567,426

4.3 UN 560,962 565,394 558,724 562,573 565,129 564,946 558,724 573,541

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 681,892 690,201 677,695 684,912 689,704 689,361 677,695 705,476

4.5 ML 793,548 799,469 790,499 794,087 810,233 797,675 790,499 808,439

4.6 UN 659,295 665,389 656,217 661,510 665,024 664,773 656,217 676,591

4.7 SUMIDERO EN LADRILLO SL-100 UN 766,876 769,922 765,326 767,576 772,547 769,314 765,326 775,0404.8 SUMIDERO EN LADRILLO SL-250 UN 1,152,929 1,161,979 1,148,337 1,155,504 1,166,363 1,160,536 1,148,337 1,177,7684.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,668,768 1,686,228 1,659,940 1,674,847 1,687,031 1,684,265 1,659,940 1,718,009

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,259,398 2,288,422 2,244,723 2,269,502 2,289,759 2,285,157 2,244,723 2,341,2484.11 SUMIDERO PREFABRICADO SL-100 UN 1,040,883 1,040,883 1,040,883 1,040,883 1,040,883 1,040,883 1,040,883 1,040,8834.12 SUMIDERO PREFABRICADO SL-250 UN 2,455,302 2,455,302 2,455,302 2,455,302 2,455,302 2,455,302 2,455,302 2,455,302

4.13 UN 107,832 108,004 107,744 107,848 108,316 107,952 107,744 108,264

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 48,796 49,221 48,577 48,835 49,994 49,092 48,577 49,8655.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 56,232 56,657 56,013 56,271 57,430 56,528 56,013 57,3015.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 51,114 52,277 50,525 51,492 52,520 52,126 50,525 54,3635.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 54,892 56,056 54,305 55,315 55,986 55,938 54,305 58,1945.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 55,625 56,743 55,061 56,014 56,797 56,617 55,061 58,7765.6 BORDE SEPARADOR VERDE A-170 ML 214,171 214,343 214,083 214,187 214,655 214,291 214,083 214,6035.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 15,214 15,354 15,143 15,259 15,383 15,336 15,143 15,6045.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 36,563 37,383 36,148 36,830 37,554 37,277 36,148 38,8535.9 CAÑUELA PREFABRICADA TIPO A-120 ML 69,314 69,406 69,267 69,322 69,572 69,378 69,267 69,545

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 473,874 476,445 472,564 474,492 478,468 475,951 472,564 480,7965.11 LOSETA PREFABRICADA A-40 M2 51,365 51,758 51,163 51,401 52,472 51,639 51,163 52,3535.12 LOSETA PREFABRICADA A-60 M2 73,802 74,194 73,599 73,837 74,908 74,075 73,599 74,7895.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 29,258 29,723 29,023 29,427 29,695 29,676 29,023 30,5795.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 48,246 49,188 47,770 48,588 49,131 49,092 47,770 50,9195.15 SARDINEL PREFABRICADO A-10 ML 83,537 88,006 82,892 87,127 90,163 86,188 83,887 91,1305.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 48,969 49,206 48,846 48,990 49,638 49,134 48,846 49,566

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 123,554 124,108 123,274 123,756 124,075 124,052 123,274 125,1276.2 BANCA EN CONCRETO M-30 UN 523,137 523,912 522,745 523,419 523,866 523,834 522,745 525,3386.3 BOLARDO M-63 ALTO/HIERRO UN 187,779 187,894 187,721 187,820 187,896 187,882 187,721 188,1056.4 BOLARDO M-60 CONCRETO UN 119,616 120,280 119,280 119,857 120,241 120,213 119,280 121,5026.5 BOLARDO M-61 BAJO/CONCRETO UN 121,038 121,703 120,702 121,280 121,663 121,636 120,702 122,9256.6 BOLARDO M-62 BAJO/HIERRO UN 168,935 169,628 168,585 169,179 169,638 169,552 168,585 170,8926.7 BORDE CONTENEDOR DE RAICES A-70 ML 50,178 50,503 50,010 50,207 51,095 50,405 50,010 50,996

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 214: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

6.8 BORDILLO PREFABRICADO A-80 ML 58,475 58,839 58,287 58,508 59,501 58,729 58,287 59,3916.9 CANECA M-120 UN 263,172 263,254 263,130 263,180 263,402 263,229 263,130 263,377

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 687,123 687,455 686,955 687,243 687,435 687,421 686,955 688,0666.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,630,113 2,630,334 2,630,001 2,630,193 2,630,321 2,630,312 2,630,001 2,630,7426.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 3,098,787 3,099,008 3,098,675 3,098,867 3,098,995 3,098,986 3,098,675 3,099,4166.13 CICLOPARQUEADERO M100 TIPO 1 UN 432,567 432,798 432,450 432,648 432,801 432,772 432,450 433,2196.14 CICLOPARQUEADERO M101 TIPO 2 UN 574,786 575,710 574,320 575,112 575,724 575,609 574,320 577,3956.15 BANCA EN MADERA M-50 UN 390,519 390,519 390,519 390,519 390,519 390,519 390,519 390,5196.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 195,429 195,762 195,262 195,550 195,742 195,728 195,262 196,3736.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 471,587 471,791 471,482 471,606 472,161 471,729 471,482 472,0996.18 POSTE HISTÓRICO M-131 UN 3,969,950 3,971,612 3,969,111 3,970,554 3,971,512 3,971,444 3,969,111 3,974,667

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,582 1,582 1,582 1,582 1,582 1,582 1,582 1,5827.2 MARCA VIAL CON PINTURA EN FRÍO M2 15,527 15,527 15,527 15,527 15,527 15,527 15,527 15,5277.3 SEÑAL DOBLE DE CICLORUTA UN 401,397 401,483 401,353 401,405 401,639 401,457 401,353 401,6137.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 462,891 463,353 462,658 463,054 463,360 463,302 462,658 464,1957.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 267,582 267,668 267,538 267,590 267,824 267,642 267,538 267,7987.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 315,562 315,648 315,518 315,570 315,804 315,622 315,518 315,7787.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 434,469 434,555 434,425 434,477 434,711 434,529 434,425 434,6857.8 TACHAS REFLECTIVAS UN 11,220 11,220 11,220 11,220 11,220 11,220 11,220 11,2207.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 11,852 11,852 11,852 11,852 11,852 11,852 11,852 11,852

7.10 UN 45,855 45,855 45,855 45,855 45,855 45,855 45,855 45,855TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 215: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,4722.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 29,659 29,659 29,659 29,659 29,659 29,659 29,659 29,659

2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 48,349 48,349 48,349 48,349 48,349 48,349 48,349 48,349

2.11 600.3 M3 59,495 59,495 59,495 59,495 59,495 59,495 59,495 59,495

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 106,265 134,722 102,385 129,548 147,657 123,081 108,852 154,1253.3 330.1 BASE GRANULAR M3 114,930 143,387 111,049 138,213 156,322 131,745 117,517 162,789

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 216: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,279 2,279 2,279 2,279 2,279 2,279 2,279 2,2793.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,131 1,131 1,131 1,131 1,131 1,131 1,131 1,1313.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 171,594 174,176 170,299 172,790 172,245 174,106 170,299 179,2293.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 62,949 63,559 62,635 63,034 64,461 63,396 62,635 64,5203.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 476,398 501,273 470,179 496,298 519,929 490,079 482,617 528,6353.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 498,148 523,023 491,929 518,048 541,679 511,829 504,367 550,3853.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 525,501 550,376 519,283 545,401 569,033 539,183 531,720 577,7393.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 548,898 573,773 542,679 568,798 592,429 562,579 555,117 601,1353.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 223,276 251,733 219,396 246,559 264,668 240,092 225,863 271,1363.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 213,539 241,996 209,659 236,822 254,931 230,355 216,126 261,3993.15 311.1 AFIRMADO M3 62,732 48,711 58,851 64,129 53,781 79,547 65,319 52,5923.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 12,880 13,069 12,786 12,974 12,880 13,069 12,786 13,4453.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 5,388 5,482 5,341 5,435 5,388 5,482 5,341 5,670

3.18 500.1 M3 575,418 585,729 570,195 578,765 587,880 584,389 570,195 604,208

3.19 500.1 M3 606,639 617,412 601,182 610,135 619,659 616,012 601,182 636,718

3.20 500.1 M3 627,412 638,471 621,810 630,971 640,990 637,011 621,810 658,253

3.21 *** ML 6,049 6,049 6,049 6,049 6,049 6,049 6,049 6,049

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 107,917 118,862 102,444 113,389 107,917 118,862 102,444 140,752

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 927,212 938,908 921,288 931,008 941,348 937,388 921,288 959,8694.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 823,153 834,654 817,326 826,886 837,054 833,160 817,326 855,2684.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 861,794 873,751 855,736 865,674 876,246 872,197 855,736 895,1804.4 630 P CONCRETOS f´c =3500 psi (bases) M3 537,595 548,341 532,161 541,332 548,866 547,129 532,161 567,8964.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 628,594 639,766 622,945 632,479 640,312 638,506 622,945 660,0954.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 530,544 541,733 524,892 534,611 541,064 540,602 524,892 562,3044.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 621,264 632,897 615,388 625,492 632,201 631,721 615,388 654,2824.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 758,016 769,205 752,364 762,083 768,536 768,074 752,364 789,7764.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 547,547 559,180 541,671 551,776 558,484 558,004 541,671 580,5654.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 794,077 805,710 788,201 798,305 805,014 804,534 788,201 827,095

4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 8,724 8,724 8,724 8,724 8,724 8,724 8,724 8,724

4.12 650 P KG 11,895 11,895 11,895 11,895 11,895 11,895 11,895 11,895

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300

4.14 621.1 ML 2,082,990 2,082,990 2,082,990 2,082,990 2,082,990 2,082,990 2,082,990 2,082,990

4.15 621.1 P ML 3,319,949 3,339,956 3,309,816 3,326,443 3,344,129 3,337,356 3,309,816 3,375,810

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

Page 217: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,143,672 1,154,751 1,138,076 1,147,699 1,154,088 1,153,631 1,138,076 1,175,1184.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 75,803 75,803 75,803 75,803 75,803 75,803 75,803 75,8034.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 282,578 283,908 281,907 283,061 283,828 283,773 281,907 286,3524.19 632 P BARANDA METÁLICA ML 319,463 319,463 319,463 319,463 319,463 319,463 319,463 319,4634.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 13,231 13,231 13,231 13,231 13,231 13,231 13,231 13,2314.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 436,457 439,243 428,289 441,022 444,743 456,735 432,269 462,0844.22 673.1 MATERIAL GRANULAR FILTRANTE M3 95,376 106,321 89,904 100,849 95,376 106,321 89,904 128,2114.23 610.1 RELLENO PARA ESTRUCTURAS M3 45,426 37,044 35,874 48,996 33,474 60,948 47,814 40,6264.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 362,952 374,609 357,060 367,062 374,787 373,336 357,060 395,8864.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 345,188 356,092 339,697 349,619 352,218 355,336 339,697 376,6924.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 369,829 380,734 364,339 374,261 376,860 379,978 364,339 401,3344.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 358,881 369,510 353,524 363,030 366,917 368,646 353,524 389,3854.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 383,523 394,152 378,166 387,671 391,558 393,288 378,166 414,0274.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 489,342 500,534 483,674 492,975 502,868 499,080 483,674 520,5914.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 578,623 590,258 572,730 582,400 592,685 588,746 572,730 611,1094.31 681.1 GAVIÓN M3 180,004 190,451 174,780 185,228 180,004 190,451 174,780 211,3464.32 681.1 GAVIÓN MALLA PVC M3 187,257 197,704 182,033 192,481 187,257 197,704 182,033 218,5994.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 37,132 37,819 36,784 37,355 37,962 37,730 36,784 39,050

4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 14,974 15,317 14,800 15,085 15,389 15,273 14,800 15,933

4.35 *** M2 8,708 8,708 8,708 8,708 8,708 8,708 8,708 8,708

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 12,545 12,545 12,545 12,545 12,545 12,545 12,545 12,545

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 16,987 16,987 16,987 16,987 16,987 16,987 16,987 16,987

4.38 *** M2 20,425 20,425 20,425 20,425 20,425 20,425 20,425 20,425

4.39 *** M2 26,313 26,313 26,313 26,313 26,313 26,313 26,313 26,313

4.40 *** M2 5,987 5,987 5,987 5,987 5,987 5,987 5,987 5,987

4.41 *** M2 6,842 6,842 6,842 6,842 6,842 6,842 6,842 6,842

4.42 *** M2 7,114 7,114 7,114 7,114 7,114 7,114 7,114 7,114

4.43 *** M2 6,066 6,066 6,066 6,066 6,066 6,066 6,066 6,066

4.44 *** M2 7,787 7,787 7,787 7,787 7,787 7,787 7,787 7,787

4.45 *** M2 5,676 5,676 5,676 5,676 5,676 5,676 5,676 5,676

4.46 *** M2 7,679 7,679 7,679 7,679 7,679 7,679 7,679 7,679

4.47 *** M2 13,260 13,260 13,260 13,260 13,260 13,260 13,260 13,260

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

Page 218: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD El_Peñón La_Palma Pacho Paime San_Cayetano Topaipí Villagómez Yacopí

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: RIONEGRO

4.48 661.1 ML 343,287 343,420 343,218 343,299 343,663 343,380 343,218 343,622

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML 295,798 298,277 294,542 296,627 298,625 297,973 294,542 302,751

4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML 682,206 682,206 682,206 682,206 682,206 682,206 682,206 682,206

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 111,489 98,008 107,758 112,833 102,883 127,658 113,976 101,7394.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,546 3,546 3,546 3,546 3,546 3,546 3,546 3,546

4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 54,585 54,585 54,585 54,585 54,585 54,585 54,585 54,585

4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 88,039 88,039 88,039 88,039 88,039 88,039 88,039 88,039

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 483,446 495,081 477,553 487,223 497,508 493,569 477,553 515,9324.56 682.1 P COLCHONETA RENO M3 196,206 206,654 190,982 201,430 196,206 206,654 190,982 227,5494.57 *** TRINCHO EN MADERA M2 52,132 52,132 52,132 52,132 52,132 52,132 52,132 52,132

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,582 1,582 1,582 1,582 1,582 1,582 1,582 1,5825.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 15,527 15,527 15,527 15,527 15,527 15,527 15,527 15,5275.3 730.3 TOPE DEFENSA METÁLICA UN 74,030 74,030 74,030 74,030 74,030 74,030 74,030 74,0305.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 74,030 74,030 74,030 74,030 74,030 74,030 74,030 74,0305.5 730.1 DEFENSA METÁLICA ML 190,268 190,842 189,978 190,474 190,826 190,782 189,978 191,8945.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 11,220 11,220 11,220 11,220 11,220 11,220 11,220 11,220

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 579 579 579 579 579 579 579 579

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,2866.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 13,039 13,039 13,039 13,039 13,039 13,039 13,039 13,0396.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 35,673 35,673 35,673 35,673 35,673 35,673 35,673 35,6736.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 6,179 6,179 6,179 6,179 6,179 6,179 6,179 6,179

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 219: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,442,232 1,452,063 1,453,307 1,458,449 1,466,360 1,455,285 1,448,165 1,454,890 1,446,9791.2 CAMPAMENTO 9 M2 UN 843,355 848,270 848,892 851,463 855,419 849,881 846,321 849,684 845,7281.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,069 10,069 10,069 10,069 10,069 10,069 10,069 10,069 10,0691.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,337 11,337 11,337 11,337 11,337 11,337 11,337 11,337 11,3371.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,190 13,190 13,190 13,190 13,190 13,190 13,190 13,190 13,1901.6 CERCA EN TABLA H=2.30 M ML 47,954 47,954 47,954 47,954 47,954 47,954 47,954 47,954 47,9541.7 CERCA EN TEJA DE ZINC H=1.80 M ML 34,127 34,205 34,263 34,306 34,405 34,261 34,187 34,259 34,1931.8 CERCA EN TELA VERDE H = 2.10 M ML 15,102 15,181 15,239 15,281 15,381 15,237 15,163 15,235 15,1681.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 604,319 605,006 605,735 606,009 607,205 606,164 604,430 605,548 605,033

1.41 M2 7,161 7,161 7,161 7,161 7,161 7,161 7,161 7,161 7,161

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,262 2,262 2,262 2,262 2,262 2,262 2,262 2,262 2,262

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 220: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,124,678 1,124,678 1,124,678 1,124,678 1,124,678 1,124,678 1,124,678 1,124,678 1,124,6781.44 RED TELEFÓNICA PROVISIONAL UN 160,621 160,621 160,621 160,621 160,621 160,621 160,621 160,621 160,6211.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 65,786 60,768 67,053 63,251 65,838 72,253 59,318 59,370 67,0532.2 BASE ARENA CEMENTO 1:20 M3 125,139 122,536 144,669 140,763 158,991 130,348 126,442 130,167 136,8572.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,570 4,570 4,570 4,570 4,570 4,570 4,570 4,570 4,5702.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 476,368 484,931 489,297 493,859 503,239 489,803 482,452 489,550 482,4522.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 489,948 497,591 504,064 508,202 518,529 503,562 496,097 503,406 496,9102.8 ZAPATAS EN CONCRETO 3500 PSI M3 458,755 465,911 471,973 475,848 485,517 471,502 464,512 471,357 465,2742.9 PILOTE DE MADERA D=20 CM ML 36,171 36,171 36,171 36,171 36,171 36,171 36,171 36,171 36,171

2.10 ML 110,424 110,424 110,424 110,424 110,424 110,424 110,424 110,424 110,424

2.11 ML 132,817 132,817 132,817 132,817 132,817 132,817 132,817 132,817 132,817

2.12 ML 159,897 159,897 159,897 159,897 159,897 159,897 159,897 159,897 159,897

2.13 ML 196,351 196,351 196,351 196,351 196,351 196,351 196,351 196,351 196,351

2.14 PILOTE HINCADO 25X25 ML 87,749 88,150 88,781 89,006 89,769 88,647 88,153 88,647 88,2882.15 PILOTE HINCADO 30X30 ML 106,304 106,885 107,800 108,126 109,231 107,605 106,890 107,605 107,0852.16 DADOS EN CONCRETO 3500PSI M3 447,979 455,135 461,197 465,071 474,741 460,726 453,736 460,581 454,497

2.17 ML 118,909 118,909 118,909 118,909 118,909 118,909 118,909 118,909 118,909

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 27,421 27,405 27,542 27,518 27,631 27,453 27,429 27,452 27,4943.2 SIFÓN EN PVC 6" UN 140,322 140,306 140,443 140,419 140,532 140,354 140,330 140,353 140,3953.3 CAJA DE INSPECCIÓN DE 100X100 UN 334,451 336,822 340,276 340,271 346,376 343,121 332,232 337,941 337,4243.4 CAJA DE INSPECCIÓN DE 40X40 UN 171,202 172,569 172,730 173,269 174,580 173,195 171,572 172,684 171,8443.5 CAJA DE INSPECCIÓN DE 60X60 UN 189,582 191,490 192,314 192,984 195,377 192,657 190,113 191,862 190,8233.6 CAJA DE INSPECCIÓN DE 80X80 UN 248,661 251,953 253,282 254,516 258,450 253,486 249,936 252,595 250,7473.7 DUCTO ELÉCTRICO PVC 4" ML 74,654 74,644 74,659 74,644 74,664 74,704 74,604 74,644 74,6593.8 POZO SÉPTICO ETERNIT 1000 LT UN 932,443 932,342 932,493 932,343 932,542 932,941 931,946 932,343 932,4933.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 81,818 81,639 83,158 82,890 84,141 82,176 81,907 82,163 82,622

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 47,386 47,292 48,093 47,952 48,612 47,575 47,433 47,568 47,8113.11 TUBERÍA DRENAJE PVC 110 ML 19,802 20,152 19,912 20,088 20,154 20,088 19,934 20,066 19,8023.12 TUBERÍA DRENAJE PVC 160 ML 30,174 30,524 30,284 30,460 30,526 30,460 30,306 30,438 30,1743.13 TUBERÍA DRENAJE PVC 200 ML 41,324 41,814 41,478 41,724 41,816 41,724 41,509 41,693 41,3243.14 TUBERÍA DRENAJE PVC 250 ML 56,193 56,753 56,368 56,650 56,755 56,650 56,404 56,615 56,1933.15 TUBERÍA DRENAJE PVC 315 ML 77,584 78,074 77,738 77,984 78,076 77,984 77,768 77,953 77,584

3.16 UN 708,915 714,515 710,673 713,486 714,540 713,486 711,024 713,134 708,915

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE)

Page 221: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

3.17 UN 1,002,871 1,014,071 1,006,387 1,012,012 1,014,122 1,012,012 1,007,090 1,011,309 1,002,871

3.18 UN 1,306,376 1,328,776 1,313,408 1,324,659 1,328,878 1,324,659 1,314,814 1,323,253 1,306,376

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 27,286 27,286 27,286 27,286 27,286 27,286 27,286 27,286 27,2864.2 CASETÓN DE LONA 0.80X0.70 M2 35,806 35,806 35,806 35,806 35,806 35,806 35,806 35,806 35,8064.3 COLUMNAS 3500 PSI M3 599,618 606,775 612,836 616,711 626,381 612,366 605,376 612,221 606,1374.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 188,530 200,162 196,793 202,798 209,352 200,688 192,955 199,998 191,694

4.5 M2 72,522 73,216 73,805 74,181 75,120 73,759 73,081 73,745 73,155

4.6 M2 85,350 86,183 86,890 87,341 88,468 86,835 86,021 86,818 86,109

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 96,502 97,614 98,556 99,157 100,660 98,482 97,397 98,460 97,5154.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 101,845 103,026 104,026 104,666 106,262 103,949 102,795 103,925 102,9214.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 116,926 118,385 119,621 120,411 122,382 119,525 118,100 119,495 118,255

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 130,173 131,840 133,252 134,155 136,408 133,143 131,514 133,109 131,6924.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 144,642 146,518 148,107 149,123 151,658 147,984 146,152 147,946 146,3514.12 ENTREPISO VIGUETA PLACA M2 71,838 71,903 72,095 72,113 72,327 72,003 71,905 72,000 71,9764.13 ESCALERA MACIZA 3500 PSI M3 705,211 712,368 718,429 722,304 731,974 717,959 710,969 717,813 711,7304.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 67,673 67,550 67,990 67,937 68,183 67,796 67,726 67,814 67,8844.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 58,722 59,438 60,044 60,431 61,398 59,997 59,298 59,982 59,3744.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 66,407 67,283 68,024 68,498 69,681 67,967 67,112 67,949 67,2054.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 77,702 78,799 79,729 80,324 81,807 79,657 78,585 79,635 78,7024.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 535,882 543,039 549,100 552,975 562,645 548,629 541,640 548,484 542,401

4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 37,202 37,371 37,638 37,733 38,056 37,581 37,373 37,581 37,429

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 211,263 214,459 217,166 218,897 223,215 216,956 213,834 216,891 214,1744.21 ACERO FIGURADO 37000 PSI KG 3,072 3,072 3,072 3,072 3,072 3,072 3,072 3,072 3,0724.22 ACERO FIGURADO 60000 PSI KG 3,192 3,192 3,192 3,192 3,192 3,192 3,192 3,192 3,1924.23 REFUERZO MALLA ELECTROSOLDADA KG 4,430 4,430 4,430 4,430 4,430 4,430 4,430 4,430 4,4304.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 639,030 646,186 652,248 656,123 665,792 651,777 644,787 651,632 645,5494.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 586,641 594,507 601,088 605,345 615,912 600,601 592,947 600,439 593,7584.26 VIGA AÉREA 3500 PSI M3 638,471 645,627 651,689 655,564 665,233 651,218 644,229 651,073 644,9904.27 VIGA CINTA 3500 PSI M3 623,122 630,279 636,340 640,215 649,885 635,870 628,880 635,725 629,6414.28 VIGA CANAL EN CONCRETO 3500 PSI M3 782,035 789,191 795,253 799,128 808,797 794,782 787,792 794,637 788,5544.29 BASE EN CONCRETO POBRE 1500 PSI M3 233,147 244,398 245,822 251,707 260,760 248,085 239,937 247,633 238,579

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 22,193 22,290 22,606 22,645 22,973 22,479 22,315 22,478 22,4185.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 37,721 37,818 38,134 38,173 38,501 38,007 37,843 38,006 37,9465.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,295 24,279 24,416 24,392 24,505 24,327 24,303 24,326 24,3685.4 ARCOS EN LADRILLO PRENSADO ML 117,952 117,920 118,195 118,147 118,373 118,017 117,969 118,015 118,0985.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 33,209 33,378 33,645 33,740 34,063 33,588 33,379 33,588 33,4365.6 DINTELES EN BLOQUE 0.15 M ML 19,278 19,155 19,595 19,542 19,788 19,401 19,331 19,419 19,489

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

Page 222: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

5.7 ENCHAPES LADRILLO PRENSADO M2 64,868 64,803 65,353 65,256 65,709 64,997 64,900 64,993 65,1595.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 67,286 67,851 68,742 69,058 70,134 68,552 67,856 68,552 68,0455.9 MURO DRYWALL DOBLE CARA 0.12 M M2 52,825 52,825 52,825 52,825 52,825 52,825 52,825 52,825 52,825

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,447 32,447 32,447 32,447 32,447 32,447 32,447 32,447 32,4475.11 MURO DRYWALL DOBLE CARA 0.10 M M2 51,212 51,212 51,212 51,212 51,212 51,212 51,212 51,212 51,2125.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 31,641 31,641 31,641 31,641 31,641 31,641 31,641 31,641 31,6415.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 63,907 63,907 63,907 63,907 63,907 63,907 63,907 63,907 63,9075.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 38,995 38,995 38,995 38,995 38,995 38,995 38,995 38,995 38,9955.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 65,408 65,408 65,408 65,408 65,408 65,408 65,408 65,408 65,4085.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 39,745 39,745 39,745 39,745 39,745 39,745 39,745 39,745 39,7455.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 26,370 26,338 26,614 26,565 26,793 26,435 26,387 26,433 26,5175.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,471 16,454 16,592 16,568 16,682 16,503 16,479 16,502 16,5445.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 36,852 36,830 37,014 36,982 37,134 36,895 36,863 36,894 36,9495.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 22,523 22,512 22,604 22,588 22,664 22,545 22,528 22,544 22,5725.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 43,469 43,447 43,631 43,599 43,750 43,512 43,479 43,510 43,5665.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 26,344 26,333 26,425 26,409 26,485 26,366 26,349 26,365 26,3935.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 77,733 77,625 78,546 78,384 79,142 77,950 77,788 77,943 78,2215.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 45,781 45,727 46,188 46,106 46,486 45,890 45,809 45,886 46,0255.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 24,428 24,406 24,590 24,558 24,709 24,471 24,439 24,470 24,5255.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,246 15,235 15,327 15,311 15,387 15,267 15,251 15,267 15,2945.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 46,758 46,715 47,084 47,018 47,322 46,845 46,780 46,842 46,9535.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 29,214 29,192 29,377 29,344 29,496 29,257 29,225 29,256 29,3125.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 62,993 62,870 63,309 63,256 63,502 63,116 63,045 63,133 63,2045.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 38,609 38,547 38,767 38,740 38,864 38,670 38,635 38,679 38,7145.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 116,658 116,506 117,796 117,568 118,630 116,961 116,734 116,951 117,3415.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 72,338 72,262 72,907 72,793 73,324 72,490 72,376 72,485 72,6795.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 57,383 57,310 57,933 57,823 58,336 57,530 57,420 57,525 57,7135.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 35,804 35,767 36,079 36,024 36,280 35,877 35,822 35,875 35,9695.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 34,457 34,409 34,821 34,748 35,088 34,554 34,481 34,551 34,6755.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 21,112 21,087 21,294 21,257 21,427 21,160 21,124 21,159 21,2215.37 MURO TOLETE COMÚN 0.06 M M2 24,969 24,947 25,131 25,099 25,251 25,012 24,980 25,011 25,0665.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,307 15,296 15,388 15,372 15,448 15,328 15,312 15,328 15,3555.39 MURO TOLETE COMÚN 0.12 M M2 37,477 37,434 37,802 37,737 38,040 37,564 37,499 37,561 37,6725.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 23,141 23,120 23,304 23,271 23,423 23,185 23,152 23,183 23,2395.41 MURO TOLETE COMÚN 0.25 M M2 71,926 71,861 72,414 72,316 72,771 72,056 71,959 72,052 72,2195.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 44,149 44,116 44,393 44,344 44,572 44,214 44,165 44,212 44,2955.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 52,716 52,673 53,041 52,976 53,279 52,803 52,738 52,800 52,9115.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 31,986 31,965 32,149 32,116 32,268 32,030 31,997 32,028 32,0845.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 111,174 111,023 112,312 112,084 113,147 111,478 111,250 111,467 111,8575.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 67,972 67,896 68,540 68,427 68,958 68,123 68,009 68,118 68,3135.47 REMATES LADRILLO PRENSADO ML 21,268 21,252 21,389 21,365 21,478 21,300 21,276 21,299 21,3415.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 26,464 26,411 26,859 26,780 27,149 26,569 26,490 26,565 26,7015.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 44,849 44,779 45,376 45,271 45,763 44,990 44,884 44,985 45,1655.50 LAVADA DE FACHADA M2 3,992 3,992 3,992 3,992 3,992 3,992 3,992 3,992 3,9925.51 PASAMANOS EN CONCRETO 2500 PSI ML 37,891 37,988 38,303 38,343 38,671 38,177 38,013 38,175 38,1165.52 DOVELA, GROUTING 3000 PSI ML 7,594 7,594 7,594 7,594 7,594 7,594 7,594 7,594 7,594

Page 223: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

5.53 ANCLAJE 3/8" L=30CM UN 10,033 10,033 10,033 10,033 10,033 10,033 10,033 10,033 10,0335.54 ANCLAJE 1/2" L=50CM UN 13,116 13,116 13,116 13,116 13,116 13,116 13,116 13,116 13,1165.55 ANCLAJE 5/8" L=70CM UN 18,240 18,240 18,240 18,240 18,240 18,240 18,240 18,240 18,2405.56 ANCLAJE 3/4" L=70CM UN 27,130 27,130 27,130 27,130 27,130 27,130 27,130 27,130 27,1305.57 ANCLAJE 1" L= 70CM UN 3,732 3,794 3,826 3,859 3,927 3,829 3,776 3,827 3,776

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,761 11,761 11,761 11,761 11,761 11,761 11,761 11,761 11,7616.2 FILOS O DILATACIONES B/PLACA ML 4,298 4,282 4,419 4,395 4,508 4,330 4,306 4,329 4,3706.3 FILOS O DILATACIONES S/MURO ML 5,201 5,185 5,322 5,298 5,411 5,233 5,209 5,232 5,2746.4 GOTERA EN MORTERO 1:4 ML 6,274 6,257 6,395 6,371 6,484 6,306 6,282 6,305 6,3466.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,266 4,266 4,266 4,266 4,266 4,266 4,266 4,266 4,2666.6 MALLA BAJO ENTRAMADO M2 10,236 10,236 10,236 10,236 10,236 10,236 10,236 10,236 10,2366.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 18,400 18,348 18,785 18,708 19,067 18,502 18,425 18,499 18,6316.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,176 11,150 11,368 11,329 11,509 11,227 11,188 11,225 11,2916.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 16,147 16,102 16,489 16,421 16,739 16,239 16,170 16,235 16,352

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 9,813 9,790 9,984 9,950 10,109 9,859 9,825 9,857 9,9166.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 15,436 15,385 15,821 15,744 16,103 15,539 15,462 15,535 15,6676.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,458 9,432 9,650 9,612 9,791 9,509 9,470 9,507 9,5736.13 PAÑETE CULATAS 1:4, E=2 CM M2 16,147 16,102 16,489 16,421 16,739 16,239 16,170 16,235 16,3526.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 9,813 9,790 9,984 9,950 10,109 9,859 9,825 9,857 9,9166.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 15,758 15,721 16,032 15,977 16,233 15,831 15,776 15,828 15,9226.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,617 9,599 9,755 9,727 9,855 9,654 9,627 9,653 9,7006.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 13,432 13,397 13,692 13,640 13,883 13,501 13,449 13,499 13,5886.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,236 8,218 8,366 8,340 8,461 8,270 8,244 8,269 8,3146.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 12,890 12,851 13,183 13,125 13,398 12,968 12,909 12,965 13,0666.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 7,965 7,945 8,111 8,082 8,219 8,004 7,974 8,002 8,0536.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 16,740 16,695 17,081 17,013 17,332 16,831 16,763 16,828 16,9456.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,094 10,072 10,265 10,231 10,390 10,140 10,106 10,138 10,1976.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,029 15,978 16,414 16,337 16,696 16,132 16,055 16,128 16,2606.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 9,739 9,713 9,931 9,893 10,072 9,790 9,752 9,788 9,8546.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 13,355 13,316 13,648 13,589 13,863 13,433 13,374 13,430 13,5316.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,184 8,164 8,330 8,301 8,438 8,223 8,193 8,221 8,2716.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 16,706 16,655 17,091 17,014 17,373 16,809 16,732 16,805 16,9376.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,385 10,360 10,578 10,539 10,719 10,437 10,398 10,435 10,501

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 20,528 20,463 21,015 20,918 21,373 20,658 20,560 20,653 20,820

7.2 M2 62,613 62,895 63,341 63,499 64,037 63,246 62,898 63,246 62,993

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 39,080 39,080 39,080 39,080 39,080 39,080 39,080 39,080 39,0807.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 15,972 15,972 15,972 15,972 15,972 15,972 15,972 15,972 15,9727.5 ML 25,023 25,023 25,023 25,023 25,023 25,023 25,023 25,023 25,0237.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 58,083 58,083 58,083 58,083 58,083 58,083 58,083 58,083 58,0837.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 41,683 41,683 41,683 41,683 41,683 41,683 41,683 41,683 41,6837.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,174 25,174 25,174 25,174 25,174 25,174 25,174 25,174 25,174

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

Page 224: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 56,540 56,540 56,540 56,540 56,540 56,540 56,540 56,540 56,5407.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 72,911 72,911 72,911 72,911 72,911 72,911 72,911 72,911 72,9117.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 94,756 94,756 94,756 94,756 94,756 94,756 94,756 94,756 94,7567.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 41,827 41,827 41,827 41,827 41,827 41,827 41,827 41,827 41,8277.13 CANAL PVC AMAZONAS ML 60,727 60,727 60,727 60,727 60,727 60,727 60,727 60,727 60,7277.14 CANAL PVC RAINGO ML 53,721 53,721 53,721 53,721 53,721 53,721 53,721 53,721 53,7217.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 84,943 84,943 84,943 84,943 84,943 84,943 84,943 84,943 84,9437.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 49,039 49,039 49,039 49,039 49,039 49,039 49,039 49,039 49,0397.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 40,314 40,314 40,314 40,314 40,314 40,314 40,314 40,314 40,3147.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,322 23,322 23,322 23,322 23,322 23,322 23,322 23,322 23,3227.19 TEJA DE BARRO M2 44,502 44,421 45,108 44,987 45,553 44,664 44,542 44,658 44,8667.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 33,589 33,589 33,589 33,589 33,589 33,589 33,589 33,589 33,5897.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 30,838 30,838 30,838 30,838 30,838 30,838 30,838 30,838 30,8387.22 TEJA FIBROCEMENTO Nº4 M2 26,322 26,322 26,322 26,322 26,322 26,322 26,322 26,322 26,3227.23 TEJA FIBROCEMENTO No. 6 M2 25,550 25,550 25,550 25,550 25,550 25,550 25,550 25,550 25,5507.24 TEJA FIBROCEMENTO No. 8 M2 26,283 26,283 26,283 26,283 26,283 26,283 26,283 26,283 26,2837.25 TEJA TERMOACÚSTICA M2 36,320 36,320 36,320 36,320 36,320 36,320 36,320 36,320 36,3207.26 TEJA PLÁSTICA No.6 M2 32,044 32,044 32,044 32,044 32,044 32,044 32,044 32,044 32,0447.27 TEJA ESPAÑOLA ETERNIT M2 58,642 58,642 58,642 58,642 58,642 58,642 58,642 58,642 58,6427.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 106,443 106,443 106,443 106,443 106,443 106,443 106,443 106,443 106,4437.29 TEJA SIN TRASLAPO M2 47,978 47,978 47,978 47,978 47,978 47,978 47,978 47,978 47,9787.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,333 31,333 31,333 31,333 31,333 31,333 31,333 31,333 31,3337.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 24,670 24,670 24,670 24,670 24,670 24,670 24,670 24,670 24,670

7.32 M2 39,385 39,385 39,385 39,385 39,385 39,385 39,385 39,385 39,385

7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,652 14,652 14,652 14,652 14,652 14,652 14,652 14,652 14,6527.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,487 17,487 17,487 17,487 17,487 17,487 17,487 17,487 17,4877.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 19,831 19,831 19,831 19,831 19,831 19,831 19,831 19,831 19,8317.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 25,448 25,448 25,448 25,448 25,448 25,448 25,448 25,448 25,4487.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 15,994 15,994 15,994 15,994 15,994 15,994 15,994 15,994 15,9947.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 37,486 37,486 37,486 37,486 37,486 37,486 37,486 37,486 37,4867.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 217,251 217,251 217,251 217,251 217,251 217,251 217,251 217,251 217,2517.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 283,438 283,438 283,438 283,438 283,438 283,438 283,438 283,438 283,4387.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 178,348 178,348 178,348 178,348 178,348 178,348 178,348 178,348 178,3487.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 256,179 256,179 256,179 256,179 256,179 256,179 256,179 256,179 256,179

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 351,632 357,439 366,592 369,845 380,902 364,641 357,486 364,641 359,4378.2 CONCRETO 3500 PSI M3 304,317 311,265 317,150 320,912 330,300 316,693 309,907 316,552 310,6468.3 CONCRETO 3000 PSI M3 297,163 305,477 309,715 314,145 323,251 310,207 303,070 309,961 303,0708.4 CONCRETO 2500 PSI M3 263,922 269,572 278,478 281,643 292,401 276,579 269,618 276,579 271,5168.5 CONCRETO 2000 PSI M3 242,295 250,179 255,955 260,200 270,168 255,770 248,387 255,586 248,9408.6 CONCRETO 1500 PSI M3 214,848 225,771 227,154 232,867 241,657 229,351 221,440 228,912 220,1228.7 MORTERO SECO 1:10 M3 168,299 166,068 185,039 181,691 197,315 172,764 169,416 172,609 178,3438.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 345,578 343,411 361,832 358,581 373,753 349,913 346,662 349,763 355,3308.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 311,713 309,269 330,040 326,374 343,480 316,600 312,934 316,432 322,709

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 225: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 366,570 364,285 383,711 380,283 396,280 371,141 367,713 370,984 376,8548.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 490,950 488,665 508,091 504,663 520,660 495,521 492,093 495,364 501,234

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 87,518 87,518 87,518 87,518 87,518 87,518 87,518 87,518 87,5189.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,652 2,636 2,774 2,749 2,863 2,685 2,660 2,684 2,7259.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 98,791 98,791 98,791 98,791 98,791 98,791 98,791 98,791 98,7919.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 120,186 120,186 120,186 120,186 120,186 120,186 120,186 120,186 120,1869.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 165,181 165,181 165,181 165,181 165,181 165,181 165,181 165,181 165,1819.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 184,397 184,397 184,397 184,397 184,397 184,397 184,397 184,397 184,3979.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 203,637 203,637 203,637 203,637 203,637 203,637 203,637 203,637 203,6379.8 HOJA PUERTA FORTEC 0.81 UN 144,235 144,235 144,235 144,235 144,235 144,235 144,235 144,235 144,2359.9 HOJA PUERTA FORTEC 0.91 UN 159,278 159,278 159,278 159,278 159,278 159,278 159,278 159,278 159,278

9.10 HOJA PUERTA FORTEC 1.50 UN 235,989 235,989 235,989 235,989 235,989 235,989 235,989 235,989 235,9899.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 89,517 89,517 89,517 89,517 89,517 89,517 89,517 89,517 89,5179.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 118,700 118,700 118,700 118,700 118,700 118,700 118,700 118,700 118,7009.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 131,435 131,435 131,435 131,435 131,435 131,435 131,435 131,435 131,4359.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 333,598 333,598 333,598 333,598 333,598 333,598 333,598 333,598 333,5989.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 29,867 29,867 29,867 29,867 29,867 29,867 29,867 29,867 29,8679.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,144 19,144 19,144 19,144 19,144 19,144 19,144 19,144 19,1449.17 VENTANERÍA EN MADERA CEDRO MACHO M2 69,624 69,624 69,624 69,624 69,624 69,624 69,624 69,624 69,6249.18 CERRADURA DE ENTRADA PRINCIPAL UN 85,614 85,614 85,614 85,614 85,614 85,614 85,614 85,614 85,6149.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 66,618 66,618 66,618 66,618 66,618 66,618 66,618 66,618 66,6189.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 20,985 20,985 20,985 20,985 20,985 20,985 20,985 20,985 20,9859.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 20,985 20,985 20,985 20,985 20,985 20,985 20,985 20,985 20,9859.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 19,924 19,924 19,924 19,924 19,924 19,924 19,924 19,924 19,9249.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 73,645 73,645 73,645 73,645 73,645 73,645 73,645 73,645 73,6459.24 ESPEJO BISELADO INCOLORO 4 MM M2 95,082 95,082 95,082 95,082 95,082 95,082 95,082 95,082 95,0829.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 43,633 43,633 43,633 43,633 43,633 43,633 43,633 43,633 43,6339.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 52,208 52,208 52,208 52,208 52,208 52,208 52,208 52,208 52,2089.27 VIDRIO TEMPLADO PULIDO 10 MM M2 209,525 209,525 209,525 209,525 209,525 209,525 209,525 209,525 209,5259.28 VIDRIO TEMPLADO PULIDO 8 MM M2 188,088 188,088 188,088 188,088 188,088 188,088 188,088 188,088 188,0889.29 VIDRIO TRANSPARENTE 3 MM M2 46,849 46,849 46,849 46,849 46,849 46,849 46,849 46,849 46,8499.30 VIDRIO TRANSPARENTE 4 MM M2 54,352 54,352 54,352 54,352 54,352 54,352 54,352 54,352 54,3529.31 VIDRIO TRANSPARENTE 5 MM M2 60,783 60,783 60,783 60,783 60,783 60,783 60,783 60,783 60,7839.32 VIDRIO TRANSPARENTE 6 MM M2 64,641 64,641 64,641 64,641 64,641 64,641 64,641 64,641 64,641

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 54,730 54,730 54,730 54,730 54,730 54,730 54,730 54,730 54,73010.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 157,893 157,893 157,893 157,893 157,893 157,893 157,893 157,893 157,893

10.3 ML 79,678 79,678 79,678 79,678 79,678 79,678 79,678 79,678 79,678

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 104,804 104,804 104,804 104,804 104,804 104,804 104,804 104,804 104,80410.5 MARCO TAPA CAJA DE INSPECCIÓN UN 99,440 99,440 99,440 99,440 99,440 99,440 99,440 99,440 99,44010.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 69,379 69,379 69,379 69,379 69,379 69,379 69,379 69,379 69,37910.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 147,526 147,526 147,526 147,526 147,526 147,526 147,526 147,526 147,526

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

Page 226: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 79,089 79,089 79,089 79,089 79,089 79,089 79,089 79,089 79,08910.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,771 4,771 4,771 4,771 4,771 4,771 4,771 4,771 4,771

10.10 M2 73,338 73,338 73,338 73,338 73,338 73,338 73,338 73,338 73,338

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 30,702 30,702 30,702 30,702 30,702 30,702 30,702 30,702 30,70210.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 381,238 381,238 381,238 381,238 381,238 381,238 381,238 381,238 381,23810.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 138,071 138,071 138,071 138,071 138,071 138,071 138,071 138,071 138,071

10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 152,933 152,933 152,933 152,933 152,933 152,933 152,933 152,933 152,933

10.15 M2 348,591 348,591 348,591 348,591 348,591 348,591 348,591 348,591 348,591

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 93,221 93,221 93,221 93,221 93,221 93,221 93,221 93,221 93,22110.17 PUERTA CORTINA INCLUYE ESMALTE M2 277,589 277,589 277,589 277,589 277,589 277,589 277,589 277,589 277,58910.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,433 4,433 4,433 4,433 4,433 4,433 4,433 4,433 4,43310.19 VENTANA EN ALUMINIO CORREDIZA M2 196,303 196,303 196,303 196,303 196,303 196,303 196,303 196,303 196,30310.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 88,965 88,965 88,965 88,965 88,965 88,965 88,965 88,965 88,96510.21 REJILLA PISO 0.30 M M2 62,604 62,604 62,604 62,604 62,604 62,604 62,604 62,604 62,60410.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 64,263 64,263 64,263 64,263 64,263 64,263 64,263 64,263 64,263

10.23 KG 7,378 7,378 7,378 7,378 7,378 7,378 7,378 7,378 7,378

10.24 KG 8,177 8,177 8,177 8,177 8,177 8,177 8,177 8,177 8,177

10.25 KG 6,437 6,437 6,437 6,437 6,437 6,437 6,437 6,437 6,437

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 164,808 164,808 164,808 164,808 164,808 164,808 164,808 164,808 164,80811.2 ACOMETIDA EN PVC 3/4" 5M UN 195,818 195,818 195,818 195,818 195,818 195,818 195,818 195,818 195,81811.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 15,972 15,972 15,972 15,972 15,972 15,972 15,972 15,972 15,97211.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,023 25,023 25,023 25,023 25,023 25,023 25,023 25,023 25,02311.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,263 24,263 24,263 24,263 24,263 24,263 24,263 24,263 24,26311.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 30,941 30,941 30,941 30,941 30,941 30,941 30,941 30,941 30,94111.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 63,327 63,327 63,327 63,327 63,327 63,327 63,327 63,327 63,32711.8 CONEXIÓN TANQUE ELEVADO PVC UN 164,844 164,844 164,844 164,844 164,844 164,844 164,844 164,844 164,84411.9 INSTALACIÓN APARATO SANITARIO UN 33,378 33,378 33,378 33,378 33,378 33,378 33,378 33,378 33,378

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,347 23,347 23,347 23,347 23,347 23,347 23,347 23,347 23,34711.13 NIPLE PASAMURO 2" UN 49,792 49,792 49,792 49,792 49,792 49,792 49,792 49,792 49,792

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 227: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

11.14 NIPLE PASAMURO 4" UN 74,333 74,333 74,333 74,333 74,333 74,333 74,333 74,333 74,33311.15 PUNTO AGUA CALIENTE CPVC UN 61,740 61,740 61,740 61,740 61,740 61,740 61,740 61,740 61,74011.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 45,530 45,530 45,530 45,530 45,530 45,530 45,530 45,530 45,53011.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,221 48,221 48,221 48,221 48,221 48,221 48,221 48,221 48,22111.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 60,866 60,866 60,866 60,866 60,866 60,866 60,866 60,866 60,86611.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 48,194 48,194 48,194 48,194 48,194 48,194 48,194 48,194 48,19411.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 59,740 59,740 59,740 59,740 59,740 59,740 59,740 59,740 59,74011.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 63,764 63,764 63,764 63,764 63,764 63,764 63,764 63,764 63,76411.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 53,110 53,110 53,110 53,110 53,110 53,110 53,110 53,110 53,11011.23 RED SUMINISTRO CPVC 1/2" ML 9,032 9,032 9,032 9,032 9,032 9,032 9,032 9,032 9,03211.24 RED SUMINISTRO CPVC 3/4" ML 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,60611.25 RED SUMINISTRO PVC 1 1/2" ML 16,216 16,216 16,216 16,216 16,216 16,216 16,216 16,216 16,21611.26 RED SUMINISTRO PVC 1" ML 10,079 10,079 10,079 10,079 10,079 10,079 10,079 10,079 10,07911.27 RED SUMINISTRO PVC 1/2" ML 6,086 6,086 6,086 6,086 6,086 6,086 6,086 6,086 6,08611.28 RED SUMINISTRO PVC 2 1/2" ML 40,713 40,713 40,713 40,713 40,713 40,713 40,713 40,713 40,71311.29 RED SUMINISTRO PVC 2" ML 23,437 23,437 23,437 23,437 23,437 23,437 23,437 23,437 23,43711.30 RED SUMINISTRO PVC 3/4" ML 7,581 7,581 7,581 7,581 7,581 7,581 7,581 7,581 7,58111.31 RED SANITARIA PVC-S 2" ML 17,859 17,859 17,859 17,859 17,859 17,859 17,859 17,859 17,85911.32 RED SANITARIA PVC-S 3" ML 24,721 24,721 24,721 24,721 24,721 24,721 24,721 24,721 24,72111.33 RED SANITARIA PVC-S 4" ML 33,434 33,434 33,434 33,434 33,434 33,434 33,434 33,434 33,43411.34 RED SANITARIA PVC-S 6" ML 62,189 62,189 62,189 62,189 62,189 62,189 62,189 62,189 62,18911.35 REGISTRO 1" UN 81,358 81,358 81,358 81,358 81,358 81,358 81,358 81,358 81,35811.36 REGISTRO 1/2" UN 46,607 46,607 46,607 46,607 46,607 46,607 46,607 46,607 46,60711.37 REGISTRO 3/4" UN 57,020 57,020 57,020 57,020 57,020 57,020 57,020 57,020 57,02011.38 REGISTRO 1 1/2" UN 106,022 106,022 106,022 106,022 106,022 106,022 106,022 106,022 106,02211.39 REGISTRO 2 1/2" UN 272,895 272,895 272,895 272,895 272,895 272,895 272,895 272,895 272,89511.40 REGISTRO 2" UN 203,586 203,586 203,586 203,586 203,586 203,586 203,586 203,586 203,58611.41 REVENTILACIÓN 2" ML 12,501 12,501 12,501 12,501 12,501 12,501 12,501 12,501 12,50111.42 REVENTILACIÓN 3" ML 15,774 15,774 15,774 15,774 15,774 15,774 15,774 15,774 15,774

11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 124,910 124,910 124,910 124,910 124,910 124,910 124,910 124,910 124,910

11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 202,274 202,274 202,274 202,274 202,274 202,274 202,274 202,274 202,274

11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 332,594 332,594 332,594 332,594 332,594 332,594 332,594 332,594 332,594

11.46 ML 35,073 35,073 35,073 35,073 35,073 35,073 35,073 35,073 35,073

11.47 ML 40,487 40,487 40,487 40,487 40,487 40,487 40,487 40,487 40,487

11.48 ML 66,494 66,494 66,494 66,494 66,494 66,494 66,494 66,494 66,494

11.49 ML 51,483 51,483 51,483 51,483 51,483 51,483 51,483 51,483 51,483

11.50 ML 73,081 73,081 73,081 73,081 73,081 73,081 73,081 73,081 73,081

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

Page 228: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

11.51 ML 76,988 76,988 76,988 76,988 76,988 76,988 76,988 76,988 76,988

11.52 ML 179,204 179,204 179,204 179,204 179,204 179,204 179,204 179,204 179,204

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,296 35,296 35,296 35,296 35,296 35,296 35,296 35,296 35,29611.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,434 35,434 35,434 35,434 35,434 35,434 35,434 35,434 35,43411.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,357 28,357 28,357 28,357 28,357 28,357 28,357 28,357 28,35711.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,048 32,048 32,048 32,048 32,048 32,048 32,048 32,048 32,048

11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 2,890 2,890 2,890 2,890 2,890 2,890 2,890 2,890 2,890

11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,479 4,479 4,479 4,479 4,479 4,479 4,479 4,479 4,479

11.59 GABINETE TIPO III UN 1,000,449 1,000,449 1,000,449 1,000,449 1,000,449 1,000,449 1,000,449 1,000,449 1,000,44911.60 GABINETE TIPO I UN 790,538 790,538 790,538 790,538 790,538 790,538 790,538 790,538 790,53811.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,246,065 1,246,065 1,246,065 1,246,065 1,246,065 1,246,065 1,246,065 1,246,065 1,246,06511.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,190,669 1,190,669 1,190,669 1,190,669 1,190,669 1,190,669 1,190,669 1,190,669 1,190,66911.63 VÁLVULA MARIPOSA 3" UN 647,918 647,918 647,918 647,918 647,918 647,918 647,918 647,918 647,91811.64 VÁLVULA MARIPOSA 4" UN 739,098 739,098 739,098 739,098 739,098 739,098 739,098 739,098 739,09811.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 316,827 316,827 316,827 316,827 316,827 316,827 316,827 316,827 316,827

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 222,075 222,075 222,075 222,075 222,075 222,075 222,075 222,075 222,07512.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 32,297 32,297 32,297 32,297 32,297 32,297 32,297 32,297 32,29712.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 39,743 39,743 39,743 39,743 39,743 39,743 39,743 39,743 39,74312.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 43,243 43,243 43,243 43,243 43,243 43,243 43,243 43,243 43,24312.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 52,704 52,704 52,704 52,704 52,704 52,704 52,704 52,704 52,70412.6 SALIDA TELÉFONO PVC COMPLETA UN 35,252 35,252 35,252 35,252 35,252 35,252 35,252 35,252 35,25212.7 SALIDA TIMBRE PVC COMPLETA UN 35,282 35,282 35,282 35,282 35,282 35,282 35,282 35,282 35,28212.8 STRIP TELEFÓNICO 10 PARES UN 106,165 106,165 106,165 106,165 106,165 106,165 106,165 106,165 106,16512.9 SALIDA TOMA DOBLE PVC COMPLETA UN 30,545 30,545 30,545 30,545 30,545 30,545 30,545 30,545 30,545

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 71,770 71,770 71,770 71,770 71,770 71,770 71,770 71,770 71,77012.11 SALIDA T.V PVC COMPLETA. UN 47,298 47,298 47,298 47,298 47,298 47,298 47,298 47,298 47,29812.12 SALIDA BIFÁSICA C.N. UN 27,765 27,765 27,765 27,765 27,765 27,765 27,765 27,765 27,76512.13 TABLERO PARCIAL 4 CIRCUITOS UN 79,861 79,861 79,861 79,861 79,861 79,861 79,861 79,861 79,86112.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 329,303 329,303 329,303 329,303 329,303 329,303 329,303 329,303 329,30312.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 442,787 442,787 442,787 442,787 442,787 442,787 442,787 442,787 442,78712.16 TUBERÍA PVC CONDUIT 1/2" ML 2,576 2,576 2,576 2,576 2,576 2,576 2,576 2,576 2,57612.17 TUBERÍA PVC CONDUIT 3/4" ML 3,355 3,355 3,355 3,355 3,355 3,355 3,355 3,355 3,35512.18 TUBERÍA PVC CONDUIT 1" ML 5,156 5,156 5,156 5,156 5,156 5,156 5,156 5,156 5,15612.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,267 9,267 9,267 9,267 9,267 9,267 9,267 9,267 9,26712.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 178,233 178,233 178,233 178,233 178,233 178,233 178,233 178,233 178,23312.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 56,495 56,495 56,495 56,495 56,495 56,495 56,495 56,495 56,49512.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 76,191 76,191 76,191 76,191 76,191 76,191 76,191 76,191 76,19112.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,502 27,502 27,502 27,502 27,502 27,502 27,502 27,502 27,50212.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,028,485 1,028,485 1,028,485 1,028,485 1,028,485 1,028,485 1,028,485 1,028,485 1,028,48512.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 761,414 761,414 761,414 761,414 761,414 761,414 761,414 761,414 761,41412.26 POSTE METÁLICO 6M UN 948,538 948,538 948,538 948,538 948,538 948,538 948,538 948,538 948,538

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

Page 229: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 430,232 430,232 430,232 430,232 430,232 430,232 430,232 430,232 430,23212.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 74,796 74,796 74,796 74,796 74,796 74,796 74,796 74,796 74,79612.29 LUMINARIA 70W SODIO UN 190,839 190,839 190,839 190,839 190,839 190,839 190,839 190,839 190,83912.30 LUMINARIA 150W SODIO UN 224,798 224,798 224,798 224,798 224,798 224,798 224,798 224,798 224,79812.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,209,104 1,209,104 1,209,104 1,209,104 1,209,104 1,209,104 1,209,104 1,209,104 1,209,10412.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 890,736 890,736 890,736 890,736 890,736 890,736 890,736 890,736 890,736

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 32,588 32,500 33,247 33,115 33,731 32,764 32,632 32,758 32,98413.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 27,564 27,476 28,223 28,091 28,706 27,739 27,608 27,733 27,95913.3 ALISTADO PARA LISTÓN M2 10,915 10,898 11,047 11,021 11,144 10,951 10,924 10,949 10,99513.4 ALISTADO PISOS 1:3, E=0.04 M2 20,754 20,578 22,073 21,809 23,039 21,106 20,842 21,094 21,54513.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 58,219 58,043 59,537 59,273 60,504 58,570 58,307 58,558 59,01013.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,121 20,279 20,394 20,479 20,679 20,391 20,243 20,387 20,25413.7 CONCRETO BASE GRADAS 2500 PSI M2 43,663 44,228 45,119 45,435 46,511 44,929 44,233 44,929 44,42213.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 60,310 61,214 62,639 63,146 64,867 62,335 61,222 62,335 61,52513.9 MANTO FIBERGLASS 600X1 M2 21,949 21,949 21,949 21,949 21,949 21,949 21,949 21,949 21,949

13.10 PEGANTE MORTERO-CONCRETO M2 18,934 18,934 18,934 18,934 18,934 18,934 18,934 18,934 18,93413.11 PERMA PLY 2 CAPAS M2 19,769 19,769 19,769 19,769 19,769 19,769 19,769 19,769 19,76913.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 35,507 36,015 36,817 37,102 38,070 36,646 36,019 36,646 36,19013.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 41,579 42,200 43,180 43,528 44,711 42,971 42,205 42,971 42,41413.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 60,182 61,142 62,656 63,194 65,023 62,333 61,150 62,333 61,47313.15 TRITURADO FINO 1/2 M3 54,822 69,242 59,349 66,592 69,308 66,592 60,254 65,687 54,82213.16 TRITURADO GRUESO 3/4 M3 60,022 71,938 64,090 69,678 72,794 72,068 62,673 68,904 60,222

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 36,159 36,123 36,422 36,369 36,616 36,229 36,176 36,226 36,31714.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 22,397 22,379 22,528 22,502 22,625 22,432 22,405 22,430 22,47614.3 ADOQUÍN CONCRETO 6CM M2 46,889 46,801 47,548 47,416 48,031 47,065 46,933 47,059 47,28414.4 ADOQUÍN CONCRETO 8CM M2 55,889 55,801 56,548 56,416 57,031 56,065 55,933 56,059 56,28414.5 ADOQUÍN GRES PEATONAL M2 45,863 45,775 46,522 46,390 47,005 46,038 45,907 46,032 46,258

14.6 M2 50,587 50,552 50,851 50,798 51,044 50,657 50,605 50,655 50,745

14.7 GRAVILLA PARA GRADAS ML 28,555 28,687 28,734 28,783 28,934 28,712 28,620 28,702 28,63414.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 101,579 101,421 102,766 102,529 103,636 101,896 101,658 101,885 102,29114.9 ACABADO EN GRAVILLA LAVADA M2 35,131 35,378 35,621 35,692 36,118 35,481 35,270 35,459 35,368

14.10 GUARDAESCOBA EN GRANITO ML 29,423 29,423 29,423 29,423 29,423 29,423 29,423 29,423 29,42314.11 GUARDAESCOBA EN GRAVILLA ML 7,571 7,704 7,750 7,799 7,951 7,729 7,637 7,718 7,65114.12 GUARDAESCOBA PVC CARAMELO ML 7,124 7,124 7,124 7,124 7,124 7,124 7,124 7,124 7,12414.13 GUARDAESCOBA PVC CEDRO ML 9,019 9,019 9,019 9,019 9,019 9,019 9,019 9,019 9,01914.14 GUARDAESCOBA PINO CARIBE ML 7,628 7,628 7,628 7,628 7,628 7,628 7,628 7,628 7,62814.15 GUARDAESCOBA CEDRO BLANCO ML 7,616 7,616 7,616 7,616 7,616 7,616 7,616 7,616 7,61614.16 GUARDAESCOBA EN MADERA SAPAN ML 11,984 11,984 11,984 11,984 11,984 11,984 11,984 11,984 11,98414.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,830 6,830 6,830 6,830 6,830 6,830 6,830 6,830 6,83014.18 LISTÓN M.H. AMARILLO M2 53,789 53,789 53,789 53,789 53,789 53,789 53,789 53,789 53,78914.19 PASO ESCALERA GRANITO ML 78,568 78,445 79,491 79,307 80,168 78,814 78,630 78,806 79,122

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

Page 230: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

14.20 PIRLANES ALUMINIO ML 5,748 5,748 5,748 5,748 5,748 5,748 5,748 5,748 5,74814.21 PIRLANES LADRILLO ML 24,012 23,980 24,255 24,206 24,432 24,077 24,028 24,074 24,15814.22 PISO VINILO TRÁFICO RESIDENCIAL M2 30,649 30,649 30,649 30,649 30,649 30,649 30,649 30,649 30,64914.23 PISO VINILO TRÁFICO PESADO M2 40,863 40,863 40,863 40,863 40,863 40,863 40,863 40,863 40,86314.24 PULIDA LACADA PISO MADERA M2 40,826 40,826 40,826 40,826 40,826 40,826 40,826 40,826 40,82614.25 TABLETA DE GRES 25X25 M2 35,904 35,869 36,168 36,115 36,361 35,974 35,922 35,972 36,06214.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 36,560 36,525 36,824 36,771 37,017 36,631 36,578 36,628 36,71914.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,058 8,058 8,058 8,058 8,058 8,058 8,058 8,058 8,05814.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 33,094 33,045 33,458 33,385 33,725 33,191 33,118 33,188 33,31214.29 JABONERA PORCELANA ACUARIO UN 13,962 13,962 13,962 13,962 13,962 13,962 13,962 13,962 13,962

14.30 UN 96,639 96,639 96,639 96,639 96,639 96,639 96,639 96,639 96,639

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,584 7,584 7,584 7,584 7,584 7,584 7,584 7,584 7,58414.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,428 15,428 15,428 15,428 15,428 15,428 15,428 15,428 15,42814.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,433 10,433 10,433 10,433 10,433 10,433 10,433 10,433 10,43314.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 9,939 9,939 9,939 9,939 9,939 9,939 9,939 9,939 9,93914.35 REMATES BOCEL ALUMINIO ML 6,369 6,369 6,369 6,369 6,369 6,369 6,369 6,369 6,36914.36 REMATES BOCEL PORCELANA ML 6,475 6,475 6,475 6,475 6,475 6,475 6,475 6,475 6,47514.37 TAPA REGISTRO 20X20 UN 14,464 14,464 14,464 14,464 14,464 14,464 14,464 14,464 14,46414.38 TAPA REGISTRO 6X6 UN 12,767 12,767 12,767 12,767 12,767 12,767 12,767 12,767 12,76714.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 13,902 13,902 13,902 13,902 13,902 13,902 13,902 13,902 13,902

14.40 M2 16,131 16,131 16,131 16,131 16,131 16,131 16,131 16,131 16,131

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 46,129 46,093 46,392 46,340 46,586 46,199 46,146 46,196 46,28714.42 MEDIA CAÑA EN GRANITO ML 55,998 55,998 55,998 55,998 55,998 55,998 55,998 55,998 55,99814.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,165 26,165 26,165 26,165 26,165 26,165 26,165 26,165 26,16514.44 PINTURA ACRÍLICA PARA PISOS M2 10,212 10,212 10,212 10,212 10,212 10,212 10,212 10,212 10,21214.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,559 11,559 11,559 11,559 11,559 11,559 11,559 11,559 11,55914.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 80,736 80,736 80,736 80,736 80,736 80,736 80,736 80,736 80,736

15 CIELO RASO15.1 APLIQUE YESO ML 55,668 55,668 55,668 55,668 55,668 55,668 55,668 55,668 55,66815.2 ARMADURA MADERA Y MALLA M2 26,517 26,517 26,517 26,517 26,517 26,517 26,517 26,517 26,51715.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 50,828 50,828 50,828 50,828 50,828 50,828 50,828 50,828 50,82815.4 CIELO RASO DURACUSTIC M2 50,189 50,189 50,189 50,189 50,189 50,189 50,189 50,189 50,18915.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 46,392 46,392 46,392 46,392 46,392 46,392 46,392 46,392 46,39215.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 65,857 65,857 65,857 65,857 65,857 65,857 65,857 65,857 65,85715.7 CORNISAS YESO ML 34,785 34,785 34,785 34,785 34,785 34,785 34,785 34,785 34,78515.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 73,143 73,143 73,143 73,143 73,143 73,143 73,143 73,143 73,14315.9 MALLA CON VENA M2 10,185 10,185 10,185 10,185 10,185 10,185 10,185 10,185 10,185

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 231: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 49,731 48,418 50,381 48,431 51,018 56,198 43,263 48,431 50,38116.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 60,261 76,739 65,434 73,711 76,815 73,711 66,468 72,677 60,261

16.10 M3 97,597 96,303 118,293 114,412 132,521 104,064 98,890 105,358 110,532

16.11 AFRIMADO (NORMA INVIAS 311) M3 61,386 56,368 62,654 58,851 61,438 67,854 54,919 54,971 62,65416.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 90,678 89,385 111,374 107,494 125,603 97,146 91,972 98,439 103,61316.13 BASE GRANULAR (NORMA INVIAS 330) M3 98,238 96,944 118,934 115,053 133,162 104,705 99,531 105,999 111,173

17 APARATOS SANITARIOS17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 213,399 213,399 213,399 213,399 213,399 213,399 213,399 213,399 213,399

17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 672,054 672,054 672,054 672,054 672,054 672,054 672,054 672,054 672,054

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 380,064 380,064 380,064 380,064 380,064 380,064 380,064 380,064 380,06417.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 122,733 122,733 122,733 122,733 122,733 122,733 122,733 122,733 122,733

17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 151,856 151,856 151,856 151,856 151,856 151,856 151,856 151,856 151,856

17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 179,572 179,572 179,572 179,572 179,572 179,572 179,572 179,572 179,572

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 277,125 277,125 277,125 277,125 277,125 277,125 277,125 277,125 277,125

17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 726,728 726,728 726,728 726,728 726,728 726,728 726,728 726,728 726,728

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 227,274 227,274 227,274 227,274 227,274 227,274 227,274 227,274 227,274

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 109,627 109,627 109,627 109,627 109,627 109,627 109,627 109,627 109,627

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 62,466 62,466 62,466 62,466 62,466 62,466 62,466 62,466 62,466

17.12 UN 181,164 181,164 181,164 181,164 181,164 181,164 181,164 181,164 181,164

17.13 UN 289,302 289,302 289,302 289,302 289,302 289,302 289,302 289,302 289,302

18 PINTURAS18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,448 4,448 4,448 4,448 4,448 4,448 4,448 4,448 4,44818.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,197 2,197 2,197 2,197 2,197 2,197 2,197 2,197 2,19718.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,342 8,342 8,342 8,342 8,342 8,342 8,342 8,342 8,34218.4 BARNIZ SOBRE MUEBLES M2 31,569 31,569 31,569 31,569 31,569 31,569 31,569 31,569 31,56918.5 CARBURO SOBRE PAÑETES M2 4,293 4,293 4,293 4,293 4,293 4,293 4,293 4,293 4,29318.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,456 10,456 10,456 10,456 10,456 10,456 10,456 10,456 10,45618.7 DEMARCACIÓN CON MARMOLINA ML 2,676 2,676 2,676 2,676 2,676 2,676 2,676 2,676 2,67618.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,911 1,911 1,911 1,911 1,911 1,911 1,911 1,911 1,91118.9 ESMALTE SOBRE LÁMINA LLENA M2 9,937 9,937 9,937 9,937 9,937 9,937 9,937 9,937 9,937

18.10 ESMALTE SOBRE MADERA LINEAL ML 2,975 2,975 2,975 2,975 2,975 2,975 2,975 2,975 2,975

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 232: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

18.11 ESMALTE SOBRE MADERA LLENA M2 11,023 11,023 11,023 11,023 11,023 11,023 11,023 11,023 11,02318.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,876 3,876 3,876 3,876 3,876 3,876 3,876 3,876 3,87618.13 ESMALTE SOBRE MARCOS MADERA M2 4,625 4,625 4,625 4,625 4,625 4,625 4,625 4,625 4,62518.14 ESTUCO M2 5,834 5,834 5,834 5,834 5,834 5,834 5,834 5,834 5,83418.15 ESTUCO (LINEAL) ML 3,599 3,599 3,599 3,599 3,599 3,599 3,599 3,599 3,59918.16 ESTUCO Y VINILO 3 MANOS M2 12,157 12,157 12,157 12,157 12,157 12,157 12,157 12,157 12,15718.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,509 7,509 7,509 7,509 7,509 7,509 7,509 7,509 7,50918.18 LACA PISOS MADERA M2 17,945 17,945 17,945 17,945 17,945 17,945 17,945 17,945 17,94518.19 LÍNEAS TRÁFICO 0.10 ML 2,063 2,063 2,063 2,063 2,063 2,063 2,063 2,063 2,06318.20 MARMOLINA SOBRE PAÑETE M2 8,642 8,642 8,642 8,642 8,642 8,642 8,642 8,642 8,64218.21 TINTILLA SOBRE MADERA LINEAL ML 2,519 2,519 2,519 2,519 2,519 2,519 2,519 2,519 2,51918.22 TINTILLA SOBRE MADERA LLENA M2 9,661 9,661 9,661 9,661 9,661 9,661 9,661 9,661 9,66118.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,305 5,305 5,305 5,305 5,305 5,305 5,305 5,305 5,30518.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,354 3,354 3,354 3,354 3,354 3,354 3,354 3,354 3,35418.25 WASH-PRIMER SOBRE ALUMNIO M2 16,149 16,149 16,149 16,149 16,149 16,149 16,149 16,149 16,14918.26 PINTURA EPÓXICA M2 10,016 10,016 10,016 10,016 10,016 10,016 10,016 10,016 10,01618.27 PINTURA EPÓXICA (LINEAL) ML 6,158 6,158 6,158 6,158 6,158 6,158 6,158 6,158 6,158

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,648,857 3,648,857 3,648,857 3,648,857 3,648,857 3,648,857 3,648,857 3,648,857 3,648,857

19.2 UN 6,405,030 6,405,030 6,405,030 6,405,030 6,405,030 6,405,030 6,405,030 6,405,030 6,405,030

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,921,399 1,921,399 1,921,399 1,921,399 1,921,399 1,921,399 1,921,399 1,921,399 1,921,39919.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,385,110 5,385,110 5,385,110 5,385,110 5,385,110 5,385,110 5,385,110 5,385,110 5,385,11019.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,360,622 5,360,622 5,360,622 5,360,622 5,360,622 5,360,622 5,360,622 5,360,622 5,360,62219.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,063 2,063 2,063 2,063 2,063 2,063 2,063 2,063 2,06319.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,917,015 1,917,015 1,917,015 1,917,015 1,917,015 1,917,015 1,917,015 1,917,015 1,917,01519.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 61,445 61,445 61,445 61,445 61,445 61,445 61,445 61,445 61,44519.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,081,028 1,081,086 1,081,178 1,081,210 1,081,321 1,081,158 1,081,087 1,081,158 1,081,106

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 550,460 552,539 553,598 554,706 556,982 553,721 551,937 553,660 551,937

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 22,785 22,785 22,785 22,785 22,785 22,785 22,785 22,785 22,78520.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 33,659 33,659 33,659 33,659 33,659 33,659 33,659 33,659 33,65920.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 41,532 41,532 41,532 41,532 41,532 41,532 41,532 41,532 41,53220.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,233 25,233 25,233 25,233 25,233 25,233 25,233 25,233 25,23320.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 28,794 28,794 28,794 28,794 28,794 28,794 28,794 28,794 28,79420.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,156 42,156 42,156 42,156 42,156 42,156 42,156 42,156 42,15620.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,579 19,579 19,579 19,579 19,579 19,579 19,579 19,579 19,57920.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,643 20,643 20,643 20,643 20,643 20,643 20,643 20,643 20,64320.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,517 25,517 25,517 25,517 25,517 25,517 25,517 25,517 25,517

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,470 11,470 11,470 11,470 11,470 11,470 11,470 11,470 11,47020.11 VÁLVULA DE BOLA GAS 3/4" UN 17,862 17,862 17,862 17,862 17,862 17,862 17,862 17,862 17,86220.12 VÁLVULA DE BOLA GAS 1" UN 26,713 26,713 26,713 26,713 26,713 26,713 26,713 26,713 26,71320.13 VÁLVULA POLIETILENO GAS 1/2" UN 158,641 158,641 158,641 158,641 158,641 158,641 158,641 158,641 158,641

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 233: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

20.14 VÁLVULA POLIETILENO GAS 3/4" UN 163,152 163,152 163,152 163,152 163,152 163,152 163,152 163,152 163,15220.15 VÁLVULA POLIETILENO GAS 1" UN 264,225 264,225 264,225 264,225 264,225 264,225 264,225 264,225 264,22520.16 ACOMETIDA GAS 1/2" ML 218,616 218,616 218,616 218,616 218,616 218,616 218,616 218,616 218,616

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 96,653 96,653 96,653 96,653 96,653 96,653 96,653 96,653 96,65321.2 CABLE DETECTOR LINEAL DE CALOR ML 24,005 24,005 24,005 24,005 24,005 24,005 24,005 24,005 24,00521.3 SIRENA DE 110 V UN 68,391 68,391 68,391 68,391 68,391 68,391 68,391 68,391 68,39121.4 CÁMARA CCTV UN 200,768 200,768 200,768 200,768 200,768 200,768 200,768 200,768 200,76821.5 PARLANTE-CIELO FALSO UN 39,155 39,155 39,155 39,155 39,155 39,155 39,155 39,155 39,15521.6 AMPLIFICADOR 100W UN 420,231 420,231 420,231 420,231 420,231 420,231 420,231 420,231 420,23121.7 AMPLIFICADOR 300W UN 1,038,614 1,038,614 1,038,614 1,038,614 1,038,614 1,038,614 1,038,614 1,038,614 1,038,61421.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,667 32,667 32,667 32,667 32,667 32,667 32,667 32,667 32,66721.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 166,047 166,047 166,047 166,047 166,047 166,047 166,047 166,047 166,047

21.10 TOMA PARA MICRÓFONO UN 33,295 33,295 33,295 33,295 33,295 33,295 33,295 33,295 33,29521.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,557 2,557 2,557 2,557 2,557 2,557 2,557 2,557 2,55721.12 SPLITERS UN 4,102 4,102 4,102 4,102 4,102 4,102 4,102 4,102 4,10221.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,077 14,077 14,077 14,077 14,077 14,077 14,077 14,077 14,07721.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,500 18,500 18,500 18,500 18,500 18,500 18,500 18,500 18,50021.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,412 25,412 25,412 25,412 25,412 25,412 25,412 25,412 25,41221.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 92,816 92,816 92,816 92,816 92,816 92,816 92,816 92,816 92,81621.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 24,414 24,414 24,414 24,414 24,414 24,414 24,414 24,414 24,41421.18 BANDEJA PORTACABLES PARA RACK UN 79,834 79,834 79,834 79,834 79,834 79,834 79,834 79,834 79,83421.19 RACK 2' X 24" UN 129,457 129,457 129,457 129,457 129,457 129,457 129,457 129,457 129,45721.20 RACK 3' X 24" UN 157,048 157,048 157,048 157,048 157,048 157,048 157,048 157,048 157,04821.21 RACK 5' X 24" UN 247,775 247,775 247,775 247,775 247,775 247,775 247,775 247,775 247,77521.22 RACK 7' X 24" UN 319,939 319,939 319,939 319,939 319,939 319,939 319,939 319,939 319,93921.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 365,424 365,424 365,424 365,424 365,424 365,424 365,424 365,424 365,42421.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 219,647 219,647 219,647 219,647 219,647 219,647 219,647 219,647 219,64721.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 52,501 52,501 52,501 52,501 52,501 52,501 52,501 52,501 52,50121.26 PATCH CORD 2M CATEGORÍA 6A UN 5,438 5,438 5,438 5,438 5,438 5,438 5,438 5,438 5,43821.27 PATCH CORD 5M CATEGORÍA 6A UN 13,788 13,788 13,788 13,788 13,788 13,788 13,788 13,788 13,78821.28 CABLE UTP CATEGORÍA 6A ML 2,566 2,566 2,566 2,566 2,566 2,566 2,566 2,566 2,56621.29 CANALETA METÁLICA 4X6 CMS ML 25,716 25,716 25,716 25,716 25,716 25,716 25,716 25,716 25,71621.30 CANALETA METÁLICA 4X10 CMS ML 26,830 26,830 26,830 26,830 26,830 26,830 26,830 26,830 26,83021.31 CANALETA METÁLICA 6X10 CMS ML 27,387 27,387 27,387 27,387 27,387 27,387 27,387 27,387 27,38721.32 CANALETA PLÁSTICA 13X7 MM ML 15,268 15,268 15,268 15,268 15,268 15,268 15,268 15,268 15,26821.33 CANALETA PLÁSTICA 20X12 MM ML 17,065 17,065 17,065 17,065 17,065 17,065 17,065 17,065 17,06521.34 CANALETA PLÁSTICA 32X12 MM ML 16,996 16,996 16,996 16,996 16,996 16,996 16,996 16,996 16,99621.35 CANALETA PLÁSTICA 40X60 MM ML 27,098 27,098 27,098 27,098 27,098 27,098 27,098 27,098 27,09821.36 SWITCH 10/100/1000 24 PUERTOS UN 365,048 365,048 365,048 365,048 365,048 365,048 365,048 365,048 365,04821.37 SWITCH 10/100/1000 16 PUERTOS UN 231,071 231,071 231,071 231,071 231,071 231,071 231,071 231,071 231,07121.38 SWITCH 10/100/1000 8 PUERTOS UN 62,075 62,075 62,075 62,075 62,075 62,075 62,075 62,075 62,07521.39 CABLE TELEFÓNICO 2 PARES ML 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,33521.40 CABLE TELEFÓNICO 10 PARES ML 6,460 6,460 6,460 6,460 6,460 6,460 6,460 6,460 6,46021.41 CABLE TELEFÓNICO 20 PARES ML 8,632 8,632 8,632 8,632 8,632 8,632 8,632 8,632 8,632

Page 234: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

21.42 CABLE TELEFÓNICO 40 PARES ML 12,026 12,026 12,026 12,026 12,026 12,026 12,026 12,026 12,02621.43 CABLE TELEVISIÓN RG6 ML 1,649 1,649 1,649 1,649 1,649 1,649 1,649 1,649 1,64921.44 ACOMETIDA TELEFÓNICA 1/2" ML 15,953 15,953 15,953 15,953 15,953 15,953 15,953 15,953 15,95321.45 ACOMETIDA TELEFÓNICA 1" ML 24,422 24,422 24,422 24,422 24,422 24,422 24,422 24,422 24,42221.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,091 13,091 13,091 13,091 13,091 13,091 13,091 13,091 13,091

21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 10,619 10,619 10,619 10,619 10,619 10,619 10,619 10,619 10,619

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 471,345 471,345 471,345 471,345 471,345 471,345 471,345 471,345 471,345

Page 235: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,157 19,157 19,157 19,157 19,157 19,157 19,157 19,157 19,1571.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 63,561 63,561 63,561 63,561 63,561 63,561 63,561 63,561 63,5611.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 356,016 356,016 356,016 356,016 356,016 356,016 356,016 356,016 356,0161.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 759,719 759,719 759,719 759,719 759,719 759,719 759,719 759,719 759,7191.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 87,384 87,384 87,384 87,384 87,384 87,384 87,384 87,384 87,3841.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 530,111 530,111 530,111 530,111 530,111 530,111 530,111 530,111 530,1111.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,139,595 1,139,595 1,139,595 1,139,595 1,139,595 1,139,595 1,139,595 1,139,595 1,139,5951.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,514 9,514 9,514 9,514 9,514 9,514 9,514 9,514 9,5141.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,631 11,631 11,631 11,631 11,631 11,631 11,631 11,631 11,631

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,506 14,506 14,506 14,506 14,506 14,506 14,506 14,506 14,5061.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 15,823 15,823 15,823 15,823 15,823 15,823 15,823 15,823 15,8231.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 18,888 18,888 18,888 18,888 18,888 18,888 18,888 18,888 18,8881.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 18,888 18,888 18,888 18,888 18,888 18,888 18,888 18,888 18,8881.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 74,553 74,553 74,553 74,553 74,553 74,553 74,553 74,553 74,5531.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 86,405 86,405 86,405 86,405 86,405 86,405 86,405 86,405 86,4051.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 267,134 267,134 267,134 267,134 267,134 267,134 267,134 267,134 267,1341.17 TEE PVC UNIÓN MECÁNICA 2" UN 100,233 100,233 100,233 100,233 100,233 100,233 100,233 100,233 100,2331.18 TEE PVC UNIÓN MECÁNICA 4" UN 165,219 165,219 165,219 165,219 165,219 165,219 165,219 165,219 165,2191.19 TEE PVC UNIÓN MECÁNICA 8" UN 729,918 729,918 729,918 729,918 729,918 729,918 729,918 729,918 729,9181.20 TEE PVC UNIÓN MECÁNICA 10" UN 840,774 840,774 840,774 840,774 840,774 840,774 840,774 840,774 840,7741.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 9,848 9,848 9,848 9,848 9,848 9,848 9,848 9,848 9,8481.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,745 8,745 8,745 8,745 8,745 8,745 8,745 8,745 8,7451.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 20,531 20,531 20,531 20,531 20,531 20,531 20,531 20,531 20,5311.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 82,668 82,668 82,668 82,668 82,668 82,668 82,668 82,668 82,6681.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 122,336 122,336 122,336 122,336 122,336 122,336 122,336 122,336 122,3361.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 20,369 20,369 20,369 20,369 20,369 20,369 20,369 20,369 20,3691.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 69,556 69,556 69,556 69,556 69,556 69,556 69,556 69,556 69,5561.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 102,316 102,316 102,316 102,316 102,316 102,316 102,316 102,316 102,3161.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,287 21,287 21,287 21,287 21,287 21,287 21,287 21,287 21,2871.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 43,723 43,723 43,723 43,723 43,723 43,723 43,723 43,723 43,7231.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 175,031 175,031 175,031 175,031 175,031 175,031 175,031 175,031 175,0311.32 UNIÓN REPARACION PVC 4" UN 50,938 50,938 50,938 50,938 50,938 50,938 50,938 50,938 50,9381.33 UNIÓN REPARACIÓN PVC 8" UN 203,477 203,477 203,477 203,477 203,477 203,477 203,477 203,477 203,4771.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 123,262 123,262 123,262 123,262 123,262 123,262 123,262 123,262 123,2621.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 347,307 347,307 347,307 347,307 347,307 347,307 347,307 347,307 347,3071.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,022,571 1,022,571 1,022,571 1,022,571 1,022,571 1,022,571 1,022,571 1,022,571 1,022,5711.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,510,875 1,510,875 1,510,875 1,510,875 1,510,875 1,510,875 1,510,875 1,510,875 1,510,875

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,020 8,020 8,020 8,020 8,020 8,020 8,020 8,020 8,0202.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,445 18,445 18,445 18,445 18,445 18,445 18,445 18,445 18,4452.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 50,376 66,105 55,314 63,214 66,178 63,214 56,301 62,227 50,376

Page 236: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

2.5 RELLENO TIPO 2 "RECEBO" M3 46,551 45,238 47,201 45,251 47,838 53,019 40,084 45,251 47,2012.6 RELLENO TIPO 4 "SUBBASE B-200" M3 62,606 57,588 63,874 60,071 62,658 69,074 56,139 56,191 63,8742.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 48,891 59,979 49,916 56,065 59,140 56,065 48,891 55,040 47,8662.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 48,686 61,034 50,775 57,044 60,178 57,044 49,730 55,999 48,6862.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 44,141 42,039 59,910 56,756 71,475 48,346 45,193 48,201 53,602

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 79,447 79,447 79,447 79,447 79,447 79,447 79,447 79,447 79,4473.2 CODO 45 PVC ALCANTARILLADO 16" UN 827,343 827,343 827,343 827,343 827,343 827,343 827,343 827,343 827,3433.3 CODO 90 PVC ALCANTARILLADO 8" UN 103,801 103,801 103,801 103,801 103,801 103,801 103,801 103,801 103,8013.4 CODO 90 PVC ALCANTARILLADO 16" UN 957,933 957,933 957,933 957,933 957,933 957,933 957,933 957,933 957,9333.5 CODO 90 PVC ALCANTARILLADO 24" UN 667,535 667,535 667,535 667,535 667,535 667,535 667,535 667,535 667,5353.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 57,790 57,790 57,790 57,790 57,790 57,790 57,790 57,790 57,7903.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 79,172 79,172 79,172 79,172 79,172 79,172 79,172 79,172 79,1723.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 186,527 186,527 186,527 186,527 186,527 186,527 186,527 186,527 186,5273.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 186,526 186,526 186,526 186,526 186,526 186,526 186,526 186,526 186,526

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 299,355 299,355 299,355 299,355 299,355 299,355 299,355 299,355 299,3553.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 79,173 79,173 79,173 79,173 79,173 79,173 79,173 79,173 79,1733.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 79,172 79,172 79,172 79,172 79,172 79,172 79,172 79,172 79,1723.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 186,527 186,527 186,527 186,527 186,527 186,527 186,527 186,527 186,5273.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 186,527 186,527 186,527 186,527 186,527 186,527 186,527 186,527 186,5273.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 299,356 299,356 299,356 299,356 299,356 299,356 299,356 299,356 299,3563.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 276,026 276,026 276,026 276,026 276,026 276,026 276,026 276,026 276,0263.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 442,125 442,125 442,125 442,125 442,125 442,125 442,125 442,125 442,1253.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 705,979 705,979 705,979 705,979 705,979 705,979 705,979 705,979 705,9793.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 44,108 44,108 44,108 44,108 44,108 44,108 44,108 44,108 44,1083.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 232,818 232,818 232,818 232,818 232,818 232,818 232,818 232,818 232,8183.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 252,365 252,365 252,365 252,365 252,365 252,365 252,365 252,365 252,3653.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 739,944 739,944 739,944 739,944 739,944 739,944 739,944 739,944 739,9443.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 41,404 41,382 41,567 41,534 41,686 41,447 41,415 41,446 41,5023.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 211,583 211,583 211,583 211,583 211,583 211,583 211,583 211,583 211,5833.25 TUBERÍA PVC ALCANTARILLADO 8" ML 34,828 34,828 34,828 34,828 34,828 34,828 34,828 34,828 34,8283.26 TUBERÍA PVC ALCANTARILLADO 10" ML 49,134 49,134 49,134 49,134 49,134 49,134 49,134 49,134 49,1343.27 TUBERÍA PVC ALCANTARILLADO 12" ML 70,773 70,773 70,773 70,773 70,773 70,773 70,773 70,773 70,7733.28 TUBERÍA PVC ALCANTARILLADO 16" ML 108,545 108,545 108,545 108,545 108,545 108,545 108,545 108,545 108,5453.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 174,181 174,181 174,181 174,181 174,181 174,181 174,181 174,181 174,1813.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 256,248 256,248 256,248 256,248 256,248 256,248 256,248 256,248 256,2483.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 323,280 323,280 323,280 323,280 323,280 323,280 323,280 323,280 323,2803.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 424,659 424,659 424,659 424,659 424,659 424,659 424,659 424,659 424,6593.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 582,169 582,169 582,169 582,169 582,169 582,169 582,169 582,169 582,169

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 UN 495,936 500,925 503,467 506,125 511,589 503,763 499,480 503,615 499,480

4.2 ML 476,977 475,858 485,376 483,697 491,535 479,217 477,537 479,140 482,016

PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

Page 237: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

4.3 UN 493,552 496,877 498,572 500,344 503,987 498,769 495,914 498,671 495,914

4.4 UN 588,391 594,626 597,805 601,127 607,957 598,174 592,821 597,989 592,821

4.5 ML 674,947 673,371 686,775 684,409 695,447 678,101 675,736 677,993 682,043

4.6 UN 574,834 579,407 581,738 584,174 589,183 582,008 578,083 581,873 578,083

4.7 SUMIDERO EN LADRILLO SL-100 UN 713,343 714,067 718,111 718,134 722,194 715,992 714,388 715,940 715,9874.8 SUMIDERO EN LADRILLO SL-250 UN 1,043,336 1,047,284 1,055,962 1,057,483 1,067,652 1,052,408 1,047,185 1,052,258 1,050,0124.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,466,111 1,477,558 1,487,136 1,493,331 1,508,709 1,486,427 1,475,288 1,486,191 1,476,468

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 1,972,342 1,991,367 2,007,293 2,017,589 2,043,153 2,006,112 1,987,596 2,005,720 1,989,5604.11 SUMIDERO PREFABRICADO SL-100 UN 941,770 941,770 941,770 941,770 941,770 941,770 941,770 941,770 941,7704.12 SUMIDERO PREFABRICADO SL-250 UN 2,201,028 2,201,028 2,201,028 2,201,028 2,201,028 2,201,028 2,201,028 2,201,028 2,201,028

4.13 UN 100,101 100,056 100,444 100,376 100,696 100,193 100,124 100,190 100,307

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 41,756 41,643 42,605 42,435 43,228 41,982 41,813 41,975 42,2655.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 48,360 48,247 49,209 49,039 49,832 48,586 48,417 48,579 48,8695.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 42,001 42,595 43,530 43,862 44,992 43,330 42,599 43,330 42,7995.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 45,492 46,365 46,810 47,275 48,231 46,861 46,112 46,835 46,1125.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 46,243 46,972 47,590 47,985 48,971 47,542 46,830 47,528 46,9075.6 BORDE SEPARADOR VERDE A-170 ML 189,469 189,423 189,812 189,743 190,063 189,560 189,492 189,557 189,6745.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,003 14,075 14,187 14,227 14,362 14,163 14,075 14,163 14,0995.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 30,208 30,626 31,285 31,520 32,316 31,145 30,630 31,145 30,7705.9 CAÑUELA PREFABRICADA TIPO A-120 ML 62,377 62,352 62,560 62,523 62,694 62,426 62,389 62,424 62,487

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 421,189 422,253 424,916 425,017 428,339 423,280 421,970 423,156 423,1435.11 LOSETA PREFABRICADA A-40 M2 44,257 44,152 45,041 44,884 45,616 44,466 44,309 44,459 44,7275.12 LOSETA PREFABRICADA A-60 M2 63,650 63,546 64,435 64,278 65,010 63,860 63,703 63,852 64,1215.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 25,258 25,607 25,785 25,971 26,354 25,806 25,506 25,795 25,5065.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 40,525 41,232 41,592 41,969 42,743 41,634 41,027 41,613 41,0275.15 SARDINEL PREFABRICADO A-10 ML 73,405 73,182 76,773 76,139 79,096 74,449 73,616 74,646 75,5055.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 43,106 43,042 43,580 43,485 43,928 43,232 43,137 43,228 43,390

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 109,965 110,380 110,592 110,814 111,269 110,617 110,260 110,605 110,2606.2 BANCA EN CONCRETO M-30 UN 464,377 464,959 465,255 465,566 466,203 465,290 464,790 465,273 464,7906.3 BOLARDO M-63 ALTO/HIERRO UN 169,030 169,109 169,166 169,209 169,308 169,164 169,091 169,163 169,0966.4 BOLARDO M-60 CONCRETO UN 106,599 107,098 107,352 107,618 108,164 107,382 106,953 107,367 106,9536.5 BOLARDO M-61 BAJO/CONCRETO UN 108,021 108,520 108,774 109,040 109,587 108,804 108,376 108,789 108,3766.6 BOLARDO M-62 BAJO/HIERRO UN 150,086 150,559 150,905 151,160 151,758 150,894 150,451 150,883 150,4846.7 BORDE CONTENEDOR DE RAICES A-70 ML 44,333 44,246 44,983 44,853 45,460 44,506 44,376 44,500 44,7236.8 BORDILLO PREFABRICADO A-80 ML 49,988 49,891 50,716 50,570 51,249 50,182 50,036 50,175 50,4246.9 CANECA M-120 UN 234,175 234,153 234,338 234,305 234,457 234,219 234,186 234,217 234,273

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 612,659 612,908 613,035 613,168 613,441 613,050 612,836 613,043 612,836

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 238: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,334,362 2,334,528 2,334,613 2,334,702 2,334,884 2,334,623 2,334,480 2,334,618 2,334,4806.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,749,215 2,749,381 2,749,466 2,749,555 2,749,737 2,749,476 2,749,333 2,749,471 2,749,3336.13 CICLOPARQUEADERO M100 TIPO 1 UN 383,801 383,959 384,074 384,159 384,358 384,070 383,923 384,067 383,9346.14 CICLOPARQUEADERO M101 TIPO 2 UN 507,491 508,122 508,584 508,924 509,721 508,569 507,979 508,555 508,0236.15 BANCA EN MADERA M-50 UN 348,533 348,533 348,533 348,533 348,533 348,533 348,533 348,533 348,5336.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 176,065 176,314 176,441 176,574 176,847 176,456 176,242 176,449 176,2426.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 417,861 417,806 418,267 418,186 418,565 417,969 417,888 417,965 418,1046.18 POSTE HISTÓRICO M-131 UN 3,520,255 3,521,503 3,522,138 3,522,803 3,524,169 3,522,212 3,521,141 3,522,175 3,521,141

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,416 1,416 1,416 1,416 1,416 1,416 1,416 1,416 1,4167.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,408 14,408 14,408 14,408 14,408 14,408 14,408 14,408 14,4087.3 SEÑAL DOBLE DE CICLORUTA UN 357,095 357,072 357,267 357,232 357,392 357,141 357,107 357,139 357,1987.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 412,008 412,323 412,554 412,724 413,122 412,547 412,251 412,539 412,2737.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 240,049 240,027 240,221 240,187 240,346 240,095 240,061 240,094 240,1527.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 282,519 282,497 282,691 282,657 282,816 282,565 282,531 282,564 282,6227.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 387,771 387,749 387,943 387,909 388,068 387,817 387,783 387,816 387,8747.8 TACHAS REFLECTIVAS UN 10,096 10,096 10,096 10,096 10,096 10,096 10,096 10,096 10,0967.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,652 10,652 10,652 10,652 10,652 10,652 10,652 10,652 10,652

7.10 UN 41,218 41,218 41,218 41,218 41,218 41,218 41,218 41,218 41,218TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 239: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,485 28,485 28,485 28,485 28,485 28,485 28,485 28,485 28,485

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 46,885 46,885 46,885 46,885 46,885 46,885 46,885 46,885 46,885

2.11 600.3 M3 58,031 58,031 58,031 58,031 58,031 58,031 58,031 58,031 58,031

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO

3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 90,678 89,385 111,374 107,494 125,603 97,146 91,972 98,439 103,6133.3 330.1 BASE GRANULAR M3 98,238 96,944 118,934 115,053 133,162 104,705 99,531 105,999 111,173

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 240: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,0503.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,035 1,035 1,035 1,035 1,035 1,035 1,035 1,035 1,035

3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 147,785 151,315 149,515 151,303 152,439 151,057 149,288 150,853 148,154

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 52,678 52,625 53,804 53,648 54,671 53,077 52,805 53,066 53,338

3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 436,539 440,270 441,514 457,683 452,708 442,758 439,027 444,002 437,783

3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 468,395 472,127 473,370 489,539 484,564 474,614 470,883 475,858 469,639

3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 492,369 496,100 497,344 513,513 508,538 498,588 494,856 499,831 493,613

3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 503,913 507,644 508,888 525,057 520,082 510,132 506,400 511,375 505,157

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 193,577 192,284 214,273 210,393 228,502 200,045 194,871 201,338 206,5123.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 185,403 184,110 206,099 202,219 220,328 191,871 186,697 193,164 198,3383.15 311.1 AFIRMADO M3 61,386 56,368 62,654 58,851 61,438 67,854 54,919 54,971 62,6543.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 10,998 11,298 11,092 11,243 11,299 11,243 11,111 11,224 10,9983.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,511 4,661 4,558 4,633 4,661 4,633 4,567 4,624 4,511

3.18 500.1 M3 483,257 488,515 496,803 499,747 509,759 495,036 488,558 495,036 490,324

3.19 500.1 M3 508,936 514,429 523,088 526,164 536,624 521,242 514,474 521,242 516,320

3.20 500.1 M3 526,065 531,513 540,736 543,803 554,659 538,670 531,735 538,687 533,765

3.21 *** ML 5,714 5,714 5,714 5,714 5,714 5,714 5,714 5,714 5,714

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 66,551 79,487 68,740 75,307 78,591 75,307 67,646 74,213 66,551

4 NORMA INV OBRAS DE ARTE

4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 825,600 831,563 840,965 844,305 855,662 838,961 831,612 838,961 833,6164.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 725,076 730,941 740,186 743,471 754,639 738,215 730,989 738,215 732,9594.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 760,413 766,510 776,121 779,537 791,146 774,072 766,560 774,072 768,6084.4 630 P CONCRETOS f´c =3500 psi (bases) M3 449,816 456,834 462,778 466,577 476,059 462,316 455,462 462,174 456,2094.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 537,361 544,657 550,836 554,786 564,644 550,356 543,231 550,208 544,0074.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 442,591 450,988 455,268 459,743 468,940 455,765 448,557 455,517 448,5574.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 529,850 538,579 543,029 547,681 557,242 543,546 536,052 543,288 536,0524.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 670,063 678,460 682,740 687,214 696,412 683,237 676,029 682,989 676,0294.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 456,691 465,420 469,870 474,522 484,083 470,387 462,893 470,129 462,8934.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 703,221 711,950 716,400 721,052 730,613 716,917 709,423 716,658 709,423

4.11 650 P KG 8,290 8,290 8,290 8,290 8,290 8,290 8,290 8,290 8,290

4.12 650 P KG 11,116 11,116 11,116 11,116 11,116 11,116 11,116 11,116 11,116

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,225 1,225 1,225 1,225 1,225 1,225 1,225 1,225 1,225

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

Page 241: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

4.14 621.1 ML 1,925,725 1,925,725 1,925,725 1,925,725 1,925,725 1,925,725 1,925,725 1,925,725 1,925,725

4.15 621.1 P ML 3,086,356 3,096,557 3,112,638 3,118,352 3,137,778 3,109,210 3,096,640 3,109,210 3,100,069

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,041,996 1,050,310 1,054,548 1,058,978 1,068,084 1,055,040 1,047,903 1,054,794 1,047,903

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 68,459 68,459 68,459 68,459 68,459 68,459 68,459 68,459 68,4594.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 258,245 259,242 259,751 260,282 261,375 259,810 258,953 259,780 258,9534.19 632 P BARANDA METÁLICA ML 297,214 297,214 297,214 297,214 297,214 297,214 297,214 297,214 297,2144.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,054 12,054 12,054 12,054 12,054 12,054 12,054 12,054 12,0544.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 349,313 352,045 365,086 366,006 378,679 366,330 351,200 358,402 357,9154.22 673.1 MATERIAL GRANULAR FILTRANTE M3 55,105 66,947 56,200 62,767 66,050 62,767 55,105 61,672 54,0114.23 610.1 RELLENO PARA ESTRUCTURAS M3 42,960 41,748 43,560 41,760 44,148 48,930 36,990 41,760 43,5604.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 279,537 287,500 293,334 297,621 307,689 293,147 285,690 292,961 286,2494.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 280,592 290,027 289,584 294,519 301,694 291,861 284,645 291,353 284,579

4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 305,234 314,668 314,226 319,161 326,336 316,503 309,287 315,995 309,221

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 293,568 301,662 303,098 307,385 315,034 304,347 297,384 303,949 298,1254.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 318,210 326,304 327,740 332,027 339,676 328,988 322,026 328,590 322,7674.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 404,719 410,426 419,421 422,618 433,483 417,503 410,472 417,503 412,3894.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 490,649 496,581 505,933 509,256 520,552 503,939 496,630 503,939 498,6234.31 681.1 GAVIÓN M3 135,849 148,197 137,939 144,207 147,341 144,207 136,894 143,162 135,8494.32 681.1 GAVIÓN MALLA PVC M3 142,270 154,618 144,359 150,628 153,762 150,628 143,314 149,583 142,270

4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 31,782 32,133 32,685 32,881 33,548 32,567 32,136 32,567 32,253

4.34 672.1 ML 12,221 12,397 12,673 12,771 13,104 12,614 12,398 12,614 12,457

4.35 *** M2 7,918 7,918 7,918 7,918 7,918 7,918 7,918 7,918 7,918

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,314 11,314 11,314 11,314 11,314 11,314 11,314 11,314 11,314

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,246 15,246 15,246 15,246 15,246 15,246 15,246 15,246 15,246

4.38 *** M2 18,289 18,289 18,289 18,289 18,289 18,289 18,289 18,289 18,289

4.39 *** M2 23,502 23,502 23,502 23,502 23,502 23,502 23,502 23,502 23,502

4.40 *** M2 5,449 5,449 5,449 5,449 5,449 5,449 5,449 5,449 5,449

4.41 *** M2 6,207 6,207 6,207 6,207 6,207 6,207 6,207 6,207 6,207

4.42 *** M2 6,448 6,448 6,448 6,448 6,448 6,448 6,448 6,448 6,448

4.43 *** M2 5,519 5,519 5,519 5,519 5,519 5,519 5,519 5,519 5,519

4.44 *** M2 7,043 7,043 7,043 7,043 7,043 7,043 7,043 7,043 7,043

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

Page 242: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

4.45 *** M2 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175

4.46 *** M2 6,948 6,948 6,948 6,948 6,948 6,948 6,948 6,948 6,948

4.47 *** M2 11,887 11,887 11,887 11,887 11,887 11,887 11,887 11,887 11,887

4.48 661.1 ML 309,757 309,633 310,077 310,024 310,272 309,882 309,811 309,899 309,970

4.49 660.3 ML 252,960 254,491 256,034 256,815 259,128 255,746 254,201 255,706 254,494

4.50 *** ML 610,375 610,375 610,375 610,375 610,375 610,375 610,375 610,375 610,375

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 110,075 105,250 111,294 107,638 110,125 116,294 103,856 103,906 111,2944.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,192 3,192 3,192 3,192 3,192 3,192 3,192 3,192 3,192

4.53 *** ML 48,794 48,794 48,794 48,794 48,794 48,794 48,794 48,794 48,794

4.54 *** ML 78,557 78,557 78,557 78,557 78,557 78,557 78,557 78,557 78,557

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 392,374 398,306 407,658 410,981 422,277 405,664 398,355 405,664 400,3474.56 682.1 P COLCHONETA RENO M3 151,219 163,567 153,308 159,577 162,711 159,577 152,264 158,532 151,2194.57 *** TRINCHO EN MADERA M2 46,655 46,655 46,655 46,655 46,655 46,655 46,655 46,655 46,655

5 NORMA INV SEÑALIZACIÓN

5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,416 1,416 1,416 1,416 1,416 1,416 1,416 1,416 1,4165.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,408 14,408 14,408 14,408 14,408 14,408 14,408 14,408 14,4085.3 730.3 TOPE DEFENSA METÁLICA UN 66,017 66,017 66,017 66,017 66,017 66,017 66,017 66,017 66,0175.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 66,017 66,017 66,017 66,017 66,017 66,017 66,017 66,017 66,0175.5 730.1 DEFENSA METÁLICA ML 167,552 167,966 168,215 168,436 168,919 168,226 167,857 168,214 167,868

5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 10,096 10,096 10,096 10,096 10,096 10,096 10,096 10,096 10,096

6 NORMA INV MANTENIMIENTO VIAL

6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 563 563 563 563 563 563 563 563 563

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286

6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 11,843 11,843 11,843 11,843 11,843 11,843 11,843 11,843 11,843

6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 31,885 31,885 31,885 31,885 31,885 31,885 31,885 31,885 31,8856.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,869 5,869 5,869 5,869 5,869 5,869 5,869 5,869 5,869

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36"

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

Page 243: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA CENTRO

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 244: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,486,322 1,485,136 1,479,436 1,484,422 1,470,896 1,473,664 1,468,522 1,489,603 1,484,857 1,480,2981.2 CAMPAMENTO 9 M2 UN 865,825 865,232 862,382 864,875 858,112 859,496 856,925 867,466 865,092 862,8131.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,116 10,116 10,116 10,116 10,116 10,116 10,116 10,116 10,116 10,1161.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,390 11,390 11,390 11,390 11,390 11,390 11,390 11,390 11,390 11,3901.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,249 13,249 13,249 13,249 13,249 13,249 13,249 13,249 13,249 13,2491.6 CERCA EN TABLA H=2.30 M ML 48,356 48,356 48,356 48,356 48,356 48,356 48,356 48,356 48,356 48,3561.7 CERCA EN TEJA DE ZINC H=1.80 M ML 34,761 34,748 34,686 34,735 34,593 34,625 34,567 34,800 34,749 34,7001.8 CERCA EN TELA VERDE H = 2.10 M ML 15,561 15,548 15,486 15,535 15,393 15,425 15,368 15,600 15,549 15,5001.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 613,780 613,552 612,571 613,514 611,106 611,419 610,847 613,908 613,093 612,864

1.41 M2 7,209 7,209 7,209 7,209 7,209 7,209 7,209 7,209 7,209 7,209

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 245: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,279 2,279 2,279 2,279 2,279 2,279 2,279 2,279 2,279 2,2791.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,134,017 1,134,017 1,134,017 1,134,017 1,134,017 1,134,017 1,134,017 1,134,017 1,134,017 1,134,0171.44 RED TELEFÓNICA PROVISIONAL UN 161,912 161,912 161,912 161,912 161,912 161,912 161,912 161,912 161,912 161,912

1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 68,581 67,287 70,856 68,581 55,646 55,646 55,646 70,960 70,960 64,7002.2 BASE ARENA CEMENTO 1:20 M3 174,839 164,424 176,142 177,444 157,913 160,518 155,310 186,557 172,236 186,5572.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,584 4,584 4,584 4,584 4,584 4,584 4,584 4,584 4,584 4,5842.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 514,599 513,331 507,243 512,163 498,121 501,163 495,587 518,327 513,256 508,4282.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 528,984 527,669 521,353 526,198 511,889 515,099 509,259 532,994 527,735 522,7512.8 ZAPATAS EN CONCRETO 3500 PSI M3 495,189 493,957 488,043 492,580 479,182 482,187 476,719 498,943 494,019 489,3522.9 PILOTE DE MADERA D=20 CM ML 36,236 36,236 36,236 36,236 36,236 36,236 36,236 36,236 36,236 36,236

2.10 ML 110,600 110,600 110,600 110,600 110,600 110,600 110,600 110,600 110,600 110,600

2.11 ML 133,209 133,209 133,209 133,209 133,209 133,209 133,209 133,209 133,209 133,209

2.12 ML 160,550 160,550 160,550 160,550 160,550 160,550 160,550 160,550 160,550 160,550

2.13 ML 197,356 197,356 197,356 197,356 197,356 197,356 197,356 197,356 197,356 197,356

2.14 PILOTE HINCADO 25X25 ML 90,504 90,414 89,983 90,288 89,337 89,561 89,157 90,792 90,432 90,0952.15 PILOTE HINCADO 30X30 ML 110,297 110,167 109,542 109,985 108,606 108,931 108,346 110,714 110,193 109,7042.16 DADOS EN CONCRETO 3500PSI M3 484,413 483,181 477,267 481,804 468,406 471,411 465,943 488,167 483,243 478,576

2.17 ML 119,012 119,012 119,012 119,012 119,012 119,012 119,012 119,012 119,012 119,012

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 27,911 27,846 27,919 27,927 27,806 27,822 27,790 27,984 27,895 27,9843.2 SIFÓN EN PVC 6" UN 141,952 141,888 141,961 141,969 141,847 141,864 141,831 142,025 141,936 142,0253.3 CAJA DE INSPECCIÓN DE 100X100 UN 358,962 356,204 353,516 359,071 343,974 345,071 342,939 359,364 353,401 356,5673.4 CAJA DE INSPECCIÓN DE 40X40 UN 178,044 177,502 177,064 178,048 175,203 175,551 174,873 178,531 177,355 177,5463.5 CAJA DE INSPECCIÓN DE 60X60 UN 200,443 199,383 199,008 200,510 195,793 196,366 195,246 201,428 199,329 199,9863.6 CAJA DE INSPECCIÓN DE 80X80 UN 266,357 264,614 264,289 266,480 259,219 260,192 258,289 268,249 264,892 265,8473.7 DUCTO ELÉCTRICO PVC 4" ML 74,904 74,894 74,858 74,904 74,805 74,805 74,805 74,878 74,848 74,8753.8 POZO SÉPTICO ETERNIT 1000 LT UN 942,147 942,048 941,687 942,147 941,152 941,152 941,152 941,885 941,587 941,8493.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 85,704 84,989 85,793 85,883 84,542 84,721 84,363 86,508 85,525 86,508

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 49,513 49,136 49,560 49,607 48,900 48,994 48,806 49,937 49,419 49,9373.11 TUBERÍA DRENAJE PVC 110 ML 20,640 20,618 20,512 20,640 20,354 20,398 20,310 20,681 20,593 20,5053.12 TUBERÍA DRENAJE PVC 160 ML 31,114 31,092 30,986 31,114 30,828 30,872 30,784 31,155 31,067 30,9803.13 TUBERÍA DRENAJE PVC 200 ML 42,651 42,621 42,473 42,651 42,252 42,313 42,190 42,709 42,586 42,4633.14 TUBERÍA DRENAJE PVC 250 ML 57,811 57,776 57,607 57,811 57,354 57,424 57,284 57,877 57,737 57,5963.15 TUBERÍA DRENAJE PVC 315 ML 79,287 79,256 79,109 79,287 78,887 78,949 78,826 79,345 79,222 79,099

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 246: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

3.16 UN 726,899 726,547 724,858 726,899 722,328 723,031 721,625 727,562 726,155 724,749

3.17 UN 1,035,218 1,034,515 1,031,137 1,035,218 1,026,076 1,027,483 1,024,670 1,036,543 1,033,731 1,030,918

3.18 UN 1,364,453 1,363,046 1,356,291 1,364,453 1,346,170 1,348,982 1,343,357 1,367,104 1,361,478 1,355,853

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 27,496 27,496 27,496 27,496 27,496 27,496 27,496 27,496 27,496 27,4964.2 CASETÓN DE LONA 0.80X0.70 M2 36,104 36,104 36,104 36,104 36,104 36,104 36,104 36,104 36,104 36,1044.3 COLUMNAS 3500 PSI M3 636,661 635,430 629,515 634,052 620,654 623,660 618,191 640,416 635,491 630,8244.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 222,281 221,063 217,553 221,014 208,540 210,403 206,105 226,162 222,963 219,889

4.5 M2 76,365 76,245 75,671 76,111 74,811 75,102 74,572 76,729 76,251 75,798

4.6 M2 89,969 89,826 89,137 89,665 88,104 88,455 87,818 90,407 89,833 89,289

4.7 M2 102,293 102,102 101,183 101,888 99,806 100,273 99,424 102,876 102,111 101,386

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 107,997 107,793 106,817 107,566 105,355 105,851 104,948 108,616 107,804 107,033

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 124,502 124,251 123,045 123,970 121,238 121,851 120,736 125,267 124,263 123,312

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 138,822 138,535 137,157 138,214 135,092 135,792 134,518 139,696 138,549 137,462

4.11 M2 154,362 154,039 152,489 153,678 150,166 150,954 149,520 155,346 154,055 152,832

4.12 ENTREPISO VIGUETA PLACA M2 73,056 72,974 72,994 73,050 72,782 72,829 72,740 73,172 73,026 73,0764.13 ESCALERA MACIZA 3500 PSI M3 743,138 741,906 735,992 740,529 727,131 730,136 724,668 746,893 741,968 737,3014.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 68,639 68,621 68,537 68,554 68,410 68,463 68,375 68,718 68,648 68,5864.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 62,439 62,316 61,725 62,178 60,839 61,139 60,592 62,815 62,322 61,8564.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 70,936 70,785 70,061 70,617 68,978 69,345 68,676 71,395 70,793 70,2224.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 83,358 83,169 82,262 82,958 80,903 81,364 80,525 83,934 83,179 82,4634.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 572,525 571,293 565,378 569,916 556,517 559,523 554,055 576,279 571,355 566,688

4.19000000000001 UN 38,362 38,325 38,142 38,271 37,869 37,964 37,793 38,484 38,332 38,189

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 227,508 226,957 224,316 226,342 220,359 221,701 219,259 229,184 226,985 224,9014.21000000000001 ACERO FIGURADO 37000 PSI KG 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100

4.22 ACERO FIGURADO 60000 PSI KG 3,220 3,220 3,220 3,220 3,220 3,220 3,220 3,220 3,220 3,2204.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,458 4,458 4,458 4,458 4,458 4,458 4,458 4,458 4,458 4,458

4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 675,772 674,540 668,626 673,163 659,765 662,770 657,302 679,526 674,602 669,9354.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 626,590 625,242 618,769 623,742 609,071 612,359 606,376 630,696 625,306 620,198

4.26 VIGA AÉREA 3500 PSI M3 675,378 674,147 668,232 672,770 659,371 662,377 656,909 679,133 674,208 669,5414.27000000000001 VIGA CINTA 3500 PSI M3 660,033 658,801 652,887 657,424 644,026 647,031 641,563 663,787 658,863 654,196

4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 819,009 817,777 811,863 816,400 803,002 806,008 800,539 822,764 817,839 813,1724.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 273,543 272,185 265,662 271,368 255,889 259,057 253,172 277,298 271,866 266,649

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO)

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO)

PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M)

Page 247: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 23,247 23,157 23,108 23,202 22,812 22,892 22,746 23,400 23,210 23,2045.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,785 38,695 38,646 38,740 38,350 38,430 38,284 38,939 38,748 38,7425.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,691 24,626 24,699 24,707 24,586 24,602 24,570 24,764 24,675 24,7645.4 ARCOS EN LADRILLO PRENSADO ML 119,050 118,920 119,066 119,082 118,840 118,872 118,807 119,195 119,017 119,1955.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 34,364 34,326 34,143 34,273 33,870 33,965 33,794 34,485 34,334 34,1915.6 DINTELES EN BLOQUE 0.15 M ML 19,736 19,719 19,634 19,652 19,508 19,560 19,473 19,816 19,745 19,6835.7 ENCHAPES LADRILLO PRENSADO M2 66,553 66,295 66,586 66,618 66,133 66,198 66,068 66,844 66,489 66,8445.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 71,116 70,990 70,382 70,812 69,471 69,787 69,218 71,522 71,016 70,5395.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,104 53,104 53,104 53,104 53,104 53,104 53,104 53,104 53,104 53,104

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,587 32,587 32,587 32,587 32,587 32,587 32,587 32,587 32,587 32,5875.11 MURO DRYWALL DOBLE CARA 0.10 M M2 51,474 51,474 51,474 51,474 51,474 51,474 51,474 51,474 51,474 51,4745.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 31,772 31,772 31,772 31,772 31,772 31,772 31,772 31,772 31,772 31,7725.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 64,333 64,333 64,333 64,333 64,333 64,333 64,333 64,333 64,333 64,3335.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,208 39,208 39,208 39,208 39,208 39,208 39,208 39,208 39,208 39,2085.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 65,852 65,852 65,852 65,852 65,852 65,852 65,852 65,852 65,852 65,8525.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 39,967 39,967 39,967 39,967 39,967 39,967 39,967 39,967 39,967 39,9675.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,122 26,992 27,138 27,154 26,910 26,943 26,878 27,268 27,089 27,2685.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,846 16,781 16,854 16,863 16,741 16,757 16,724 16,919 16,830 16,919

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 37,524 37,437 37,535 37,546 37,383 37,405 37,361 37,622 37,502 37,6225.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 22,859 22,816 22,864 22,870 22,788 22,799 22,778 22,908 22,848 22,908

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 44,207 44,120 44,218 44,229 44,066 44,088 44,044 44,304 44,185 44,3045.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 26,713 26,670 26,719 26,724 26,643 26,654 26,632 26,762 26,702 26,762

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 80,348 79,914 80,402 80,456 79,643 79,752 79,535 80,835 80,239 80,8355.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 47,088 46,872 47,116 47,143 46,736 46,791 46,682 47,332 47,034 47,332

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 24,977 24,890 24,987 24,998 24,836 24,857 24,814 25,074 24,955 25,0745.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,520 15,477 15,526 15,531 15,450 15,461 15,439 15,569 15,509 15,569

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 47,838 47,665 47,860 47,881 47,556 47,600 47,513 48,033 47,795 48,0335.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 29,754 29,667 29,765 29,776 29,613 29,635 29,591 29,851 29,732 29,851

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 63,882 63,864 63,780 63,797 63,653 63,706 63,618 63,961 63,891 63,8295.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,053 39,044 39,002 39,011 38,939 38,965 38,921 39,093 39,058 39,027

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 120,410 119,804 120,486 120,562 119,424 119,576 119,273 121,093 120,259 121,0935.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 74,214 73,911 74,252 74,290 73,721 73,797 73,645 74,556 74,138 74,556

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 59,180 58,887 59,217 59,253 58,704 58,777 58,630 59,510 59,107 59,5105.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 36,702 36,556 36,721 36,739 36,464 36,501 36,427 36,867 36,666 36,867

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 35,622 35,428 35,646 35,671 35,307 35,355 35,258 35,841 35,574 35,8415.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 21,694 21,597 21,706 21,718 21,537 21,561 21,512 21,803 21,670 21,803

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 25,524 25,438 25,535 25,546 25,383 25,405 25,362 25,622 25,503 25,6225.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,585 15,541 15,590 15,595 15,514 15,525 15,503 15,633 15,574 15,633

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 38,563 38,390 38,585 38,607 38,282 38,325 38,238 38,758 38,520 38,7585.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 23,685 23,598 23,695 23,706 23,544 23,565 23,522 23,782 23,663 23,782

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 73,698 73,438 73,730 73,763 73,275 73,340 73,210 73,990 73,633 73,9905.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 45,035 44,905 45,051 45,067 44,823 44,856 44,791 45,181 45,002 45,181

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 53,932 53,759 53,954 53,976 53,650 53,694 53,607 54,127 53,889 54,127

5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 32,598 32,512 32,609 32,620 32,457 32,479 32,436 32,696 32,577 32,696

Page 248: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 114,908 114,301 114,984 115,060 113,922 114,073 113,770 115,591 114,756 115,591

5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 69,844 69,541 69,882 69,920 69,351 69,427 69,275 70,185 69,768 70,185

5.47000000000002 REMATES LADRILLO PRENSADO ML 21,686 21,621 21,694 21,702 21,581 21,597 21,565 21,759 21,670 21,7595.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 27,626 27,415 27,653 27,679 27,283 27,336 27,231 27,864 27,573 27,864

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 46,460 46,179 46,495 46,530 46,003 46,073 45,933 46,776 46,390 46,7765.50 LAVADA DE FACHADA M2 3,996 3,996 3,996 3,996 3,996 3,996 3,996 3,996 3,996 3,996

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,954 38,864 38,816 38,910 38,520 38,600 38,453 39,108 38,918 38,9125.52 DOVELA, GROUTING 3000 PSI ML 7,603 7,603 7,603 7,603 7,603 7,603 7,603 7,603 7,603 7,603

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,0595.54 ANCLAJE 1/2" L=50CM UN 13,155 13,155 13,155 13,155 13,155 13,155 13,155 13,155 13,155 13,155

5.55000000000003 ANCLAJE 5/8" L=70CM UN 18,320 18,320 18,320 18,320 18,320 18,320 18,320 18,320 18,320 18,3205.56 ANCLAJE 3/4" L=70CM UN 27,283 27,283 27,283 27,283 27,283 27,283 27,283 27,283 27,283 27,283

5.57000000000003 ANCLAJE 1" L= 70CM UN 4,005 3,996 3,952 3,988 3,886 3,908 3,867 4,032 3,996 3,961

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,782 11,782 11,782 11,782 11,782 11,782 11,782 11,782 11,782 11,7826.2 FILOS O DILATACIONES B/PLACA ML 4,611 4,547 4,619 4,627 4,506 4,522 4,490 4,684 4,595 4,6846.3 FILOS O DILATACIONES S/MURO ML 5,514 5,450 5,522 5,531 5,409 5,425 5,393 5,587 5,498 5,5876.4 GOTERA EN MORTERO 1:4 ML 6,596 6,531 6,604 6,612 6,491 6,507 6,475 6,669 6,580 6,6696.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,292 4,292 4,292 4,292 4,292 4,292 4,292 4,292 4,292 4,2926.6 MALLA BAJO ENTRAMADO M2 10,268 10,268 10,268 10,268 10,268 10,268 10,268 10,268 10,268 10,2686.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,410 19,205 19,436 19,461 19,076 19,128 19,025 19,641 19,359 19,6416.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,681 11,578 11,693 11,706 11,514 11,539 11,488 11,796 11,655 11,7966.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 17,057 16,875 17,080 17,103 16,761 16,807 16,716 17,262 17,012 17,262

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,268 10,177 10,279 10,291 10,120 10,143 10,097 10,370 10,245 10,3706.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,446 16,241 16,472 16,498 16,113 16,164 16,062 16,677 16,395 16,6776.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,963 9,860 9,975 9,988 9,796 9,822 9,770 10,078 9,937 10,0786.13 PAÑETE CULATAS 1:4, E=2 CM M2 17,057 16,875 17,080 17,103 16,761 16,807 16,716 17,262 17,012 17,2626.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,268 10,177 10,279 10,291 10,120 10,143 10,097 10,370 10,245 10,3706.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,511 16,364 16,529 16,547 16,273 16,309 16,236 16,675 16,474 16,6756.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,994 9,921 10,003 10,012 9,875 9,893 9,857 10,076 9,976 10,0766.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 14,125 13,986 14,142 14,160 13,899 13,934 13,865 14,281 14,090 14,2816.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,582 8,513 8,591 8,600 8,469 8,487 8,452 8,660 8,565 8,660

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,660 13,503 13,679 13,699 13,405 13,445 13,366 13,836 13,620 13,8366.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,350 8,271 8,359 8,369 8,222 8,242 8,203 8,437 8,330 8,437

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,650 17,468 17,673 17,695 17,354 17,400 17,309 17,855 17,604 17,8556.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,549 10,458 10,561 10,572 10,401 10,424 10,378 10,652 10,526 10,652

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 17,039 16,834 17,065 17,090 16,706 16,757 16,654 17,270 16,988 17,2706.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,244 10,141 10,257 10,269 10,077 10,103 10,051 10,359 10,218 10,359

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 14,124 13,968 14,144 14,164 13,870 13,909 13,831 14,300 14,085 14,3006.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,568 8,490 8,578 8,588 8,441 8,461 8,422 8,656 8,549 8,656

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,717 17,511 17,742 17,768 17,383 17,434 17,332 17,947 17,665 17,9476.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,890 10,788 10,903 10,916 10,724 10,749 10,698 11,006 10,865 11,006

7 CUBIERTAS

Page 249: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 21,827 21,567 21,860 21,892 21,405 21,470 21,340 22,120 21,762 22,120

7.2 M2 64,778 64,715 64,411 64,626 63,955 64,114 63,829 64,981 64,728 64,490

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 39,408 39,408 39,408 39,408 39,408 39,408 39,408 39,408 39,408 39,4087.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,0737.5 ML 25,195 25,195 25,195 25,195 25,195 25,195 25,195 25,195 25,195 25,1957.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 58,601 58,601 58,601 58,601 58,601 58,601 58,601 58,601 58,601 58,6017.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 42,027 42,027 42,027 42,027 42,027 42,027 42,027 42,027 42,027 42,0277.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,345 25,345 25,345 25,345 25,345 25,345 25,345 25,345 25,345 25,3457.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 57,043 57,043 57,043 57,043 57,043 57,043 57,043 57,043 57,043 57,043

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 73,585 73,585 73,585 73,585 73,585 73,585 73,585 73,585 73,585 73,5857.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 95,660 95,660 95,660 95,660 95,660 95,660 95,660 95,660 95,660 95,6607.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 42,161 42,161 42,161 42,161 42,161 42,161 42,161 42,161 42,161 42,1617.13 CANAL PVC AMAZONAS ML 61,176 61,176 61,176 61,176 61,176 61,176 61,176 61,176 61,176 61,1767.14 CANAL PVC RAINGO ML 54,097 54,097 54,097 54,097 54,097 54,097 54,097 54,097 54,097 54,0977.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 85,672 85,672 85,672 85,672 85,672 85,672 85,672 85,672 85,672 85,6727.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 49,481 49,481 49,481 49,481 49,481 49,481 49,481 49,481 49,481 49,4817.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 40,664 40,664 40,664 40,664 40,664 40,664 40,664 40,664 40,664 40,6647.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,448 23,448 23,448 23,448 23,448 23,448 23,448 23,448 23,448 23,448

7.19000000000001 TEJA DE BARRO M2 46,269 45,946 46,310 46,350 45,744 45,825 45,663 46,633 46,189 46,6337.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 33,883 33,883 33,883 33,883 33,883 33,883 33,883 33,883 33,883 33,883

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,102 31,102 31,102 31,102 31,102 31,102 31,102 31,102 31,102 31,1027.22 TEJA FIBROCEMENTO Nº4 M2 26,491 26,491 26,491 26,491 26,491 26,491 26,491 26,491 26,491 26,491

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 25,719 25,719 25,719 25,719 25,719 25,719 25,719 25,719 25,719 25,7197.24 TEJA FIBROCEMENTO No. 8 M2 26,459 26,459 26,459 26,459 26,459 26,459 26,459 26,459 26,459 26,459

7.25000000000001 TEJA TERMOACÚSTICA M2 36,609 36,609 36,609 36,609 36,609 36,609 36,609 36,609 36,609 36,6097.26 TEJA PLÁSTICA No.6 M2 32,287 32,287 32,287 32,287 32,287 32,287 32,287 32,287 32,287 32,287

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 59,152 59,152 59,152 59,152 59,152 59,152 59,152 59,152 59,152 59,152

7.28 M2 107,449 107,449 107,449 107,449 107,449 107,449 107,449 107,449 107,449 107,449

7.29000000000001 TEJA SIN TRASLAPO M2 48,402 48,402 48,402 48,402 48,402 48,402 48,402 48,402 48,402 48,4027.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,476 31,476 31,476 31,476 31,476 31,476 31,476 31,476 31,476 31,476

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 24,806 24,806 24,806 24,806 24,806 24,806 24,806 24,806 24,806 24,806

7.32 M2 39,675 39,675 39,675 39,675 39,675 39,675 39,675 39,675 39,675 39,675

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,712 14,712 14,712 14,712 14,712 14,712 14,712 14,712 14,712 14,7127.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,576 17,576 17,576 17,576 17,576 17,576 17,576 17,576 17,576 17,576

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 19,951 19,951 19,951 19,951 19,951 19,951 19,951 19,951 19,951 19,9517.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 25,627 25,627 25,627 25,627 25,627 25,627 25,627 25,627 25,627 25,627

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,081 16,081 16,081 16,081 16,081 16,081 16,081 16,081 16,081 16,0817.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 37,701 37,701 37,701 37,701 37,701 37,701 37,701 37,701 37,701 37,701

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 219,441 219,441 219,441 219,441 219,441 219,441 219,441 219,441 219,441 219,4417.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 284,736 284,736 284,736 284,736 284,736 284,736 284,736 284,736 284,736 284,736

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 179,804 179,804 179,804 179,804 179,804 179,804 179,804 179,804 179,804 179,8047.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 258,526 258,526 258,526 258,526 258,526 258,526 258,526 258,526 258,526 258,526

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 250: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 389,383 388,082 381,833 386,259 372,471 375,723 369,869 393,552 388,348 383,4548.2 CONCRETO 3500 PSI M3 339,571 338,375 332,633 337,038 324,030 326,948 321,639 343,216 338,435 333,9048.3 CONCRETO 3000 PSI M3 333,774 332,543 326,632 331,409 317,776 320,729 315,315 337,393 332,470 327,7828.4 CONCRETO 2500 PSI M3 299,802 298,537 292,457 296,763 283,347 286,512 280,816 303,859 298,796 294,0348.5 CONCRETO 2000 PSI M3 279,678 278,386 272,180 277,019 262,881 266,019 260,296 283,576 278,407 273,5028.6 CONCRETO 1500 PSI M3 254,067 252,749 246,416 251,956 236,927 240,003 234,290 257,713 252,439 247,3748.7 MORTERO SECO 1:10 M3 211,368 202,440 212,484 213,600 196,860 199,092 194,628 221,411 209,136 221,4118.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 388,898 380,230 389,982 391,066 374,811 376,979 372,644 398,651 386,731 398,6518.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 359,816 350,041 361,038 362,260 343,932 346,376 341,489 370,812 357,372 370,812

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 412,319 403,177 413,462 414,604 397,464 399,749 395,178 422,603 410,034 422,6038.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 537,999 528,857 539,142 540,284 523,144 525,429 520,858 548,283 535,714 548,283

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 88,182 88,182 88,182 88,182 88,182 88,182 88,182 88,182 88,182 88,1829.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,971 2,906 2,979 2,987 2,866 2,882 2,850 3,044 2,955 3,0449.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 99,472 99,472 99,472 99,472 99,472 99,472 99,472 99,472 99,472 99,4729.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 121,092 121,092 121,092 121,092 121,092 121,092 121,092 121,092 121,092 121,0929.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 166,700 166,700 166,700 166,700 166,700 166,700 166,700 166,700 166,700 166,7009.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,1139.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 205,551 205,551 205,551 205,551 205,551 205,551 205,551 205,551 205,551 205,5519.8 HOJA PUERTA FORTEC 0.81 UN 145,650 145,650 145,650 145,650 145,650 145,650 145,650 145,650 145,650 145,6509.9 HOJA PUERTA FORTEC 0.91 UN 160,851 160,851 160,851 160,851 160,851 160,851 160,851 160,851 160,851 160,851

9.10 HOJA PUERTA FORTEC 1.50 UN 238,369 238,369 238,369 238,369 238,369 238,369 238,369 238,369 238,369 238,3699.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 90,355 90,355 90,355 90,355 90,355 90,355 90,355 90,355 90,355 90,3559.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 119,846 119,846 119,846 119,846 119,846 119,846 119,846 119,846 119,846 119,8469.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 132,715 132,715 132,715 132,715 132,715 132,715 132,715 132,715 132,715 132,7159.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 337,007 337,007 337,007 337,007 337,007 337,007 337,007 337,007 337,007 337,0079.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,067 30,067 30,067 30,067 30,067 30,067 30,067 30,067 30,067 30,0679.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,232 19,232 19,232 19,232 19,232 19,232 19,232 19,232 19,232 19,2329.17 VENTANERÍA EN MADERA CEDRO MACHO M2 70,082 70,082 70,082 70,082 70,082 70,082 70,082 70,082 70,082 70,0829.18 CERRADURA DE ENTRADA PRINCIPAL UN 86,461 86,461 86,461 86,461 86,461 86,461 86,461 86,461 86,461 86,4619.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 67,265 67,265 67,265 67,265 67,265 67,265 67,265 67,265 67,265 67,2659.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 21,152 21,152 21,152 21,152 21,152 21,152 21,152 21,152 21,152 21,1529.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,152 21,152 21,152 21,152 21,152 21,152 21,152 21,152 21,152 21,1529.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,079 20,079 20,079 20,079 20,079 20,079 20,079 20,079 20,079 20,0799.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 74,322 74,322 74,322 74,322 74,322 74,322 74,322 74,322 74,322 74,3229.24 ESPEJO BISELADO INCOLORO 4 MM M2 95,985 95,985 95,985 95,985 95,985 95,985 95,985 95,985 95,985 95,9859.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 43,995 43,995 43,995 43,995 43,995 43,995 43,995 43,995 43,995 43,9959.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 52,660 52,660 52,660 52,660 52,660 52,660 52,660 52,660 52,660 52,6609.27 VIDRIO TEMPLADO PULIDO 10 MM M2 211,558 211,558 211,558 211,558 211,558 211,558 211,558 211,558 211,558 211,5589.28 VIDRIO TEMPLADO PULIDO 8 MM M2 189,895 189,895 189,895 189,895 189,895 189,895 189,895 189,895 189,895 189,8959.29 VIDRIO TRANSPARENTE 3 MM M2 47,244 47,244 47,244 47,244 47,244 47,244 47,244 47,244 47,244 47,2449.30 VIDRIO TRANSPARENTE 4 MM M2 54,826 54,826 54,826 54,826 54,826 54,826 54,826 54,826 54,826 54,8269.31 VIDRIO TRANSPARENTE 5 MM M2 61,325 61,325 61,325 61,325 61,325 61,325 61,325 61,325 61,325 61,3259.32 VIDRIO TRANSPARENTE 6 MM M2 65,224 65,224 65,224 65,224 65,224 65,224 65,224 65,224 65,224 65,224

Page 251: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 55,127 55,127 55,127 55,127 55,127 55,127 55,127 55,127 55,127 55,12710.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 159,376 159,376 159,376 159,376 159,376 159,376 159,376 159,376 159,376 159,376

10.3 ML 80,278 80,278 80,278 80,278 80,278 80,278 80,278 80,278 80,278 80,278

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 105,309 105,309 105,309 105,309 105,309 105,309 105,309 105,309 105,309 105,30910.5 MARCO TAPA CAJA DE INSPECCIÓN UN 100,130 100,130 100,130 100,130 100,130 100,130 100,130 100,130 100,130 100,13010.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 69,870 69,870 69,870 69,870 69,870 69,870 69,870 69,870 69,870 69,87010.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 148,607 148,607 148,607 148,607 148,607 148,607 148,607 148,607 148,607 148,60710.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 79,622 79,622 79,622 79,622 79,622 79,622 79,622 79,622 79,622 79,62210.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800

10.10 M2 73,660 73,660 73,660 73,660 73,660 73,660 73,660 73,660 73,660 73,660

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 30,841 30,841 30,841 30,841 30,841 30,841 30,841 30,841 30,841 30,841

10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 384,927 384,927 384,927 384,927 384,927 384,927 384,927 384,927 384,927 384,927

10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 139,301 139,301 139,301 139,301 139,301 139,301 139,301 139,301 139,301 139,301

10.14 M2 154,093 154,093 154,093 154,093 154,093 154,093 154,093 154,093 154,093 154,093

10.15 M2 351,844 351,844 351,844 351,844 351,844 351,844 351,844 351,844 351,844 351,844

10.16 M2 93,690 93,690 93,690 93,690 93,690 93,690 93,690 93,690 93,690 93,690

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 280,333 280,333 280,333 280,333 280,333 280,333 280,333 280,333 280,333 280,333

10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,461 4,461 4,461 4,461 4,461 4,461 4,461 4,461 4,461 4,461

10.19 VENTANA EN ALUMINIO CORREDIZA M2 198,114 198,114 198,114 198,114 198,114 198,114 198,114 198,114 198,114 198,11410.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 89,454 89,454 89,454 89,454 89,454 89,454 89,454 89,454 89,454 89,45410.21 REJILLA PISO 0.30 M M2 63,074 63,074 63,074 63,074 63,074 63,074 63,074 63,074 63,074 63,07410.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 64,715 64,715 64,715 64,715 64,715 64,715 64,715 64,715 64,715 64,715

10.23 KG 7,414 7,414 7,414 7,414 7,414 7,414 7,414 7,414 7,414 7,414

10.24 KG 8,222 8,222 8,222 8,222 8,222 8,222 8,222 8,222 8,222 8,222

10.25 KG 6,464 6,464 6,464 6,464 6,464 6,464 6,464 6,464 6,464 6,464

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 252: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

11.1 ACOMETIDA EN PVC 1/2" 5M UN 165,675 165,675 165,675 165,675 165,675 165,675 165,675 165,675 165,675 165,67511.2 ACOMETIDA EN PVC 3/4" 5M UN 197,013 197,013 197,013 197,013 197,013 197,013 197,013 197,013 197,013 197,01311.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,07311.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,195 25,195 25,195 25,195 25,195 25,195 25,195 25,195 25,195 25,19511.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,411 24,411 24,411 24,411 24,411 24,411 24,411 24,411 24,411 24,41111.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,148 31,148 31,148 31,148 31,148 31,148 31,148 31,148 31,148 31,14811.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 63,802 63,802 63,802 63,802 63,802 63,802 63,802 63,802 63,802 63,80211.8 CONEXIÓN TANQUE ELEVADO PVC UN 165,712 165,712 165,712 165,712 165,712 165,712 165,712 165,712 165,712 165,71211.9 INSTALACIÓN APARATO SANITARIO UN 33,384 33,384 33,384 33,384 33,384 33,384 33,384 33,384 33,384 33,384

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,449 23,449 23,449 23,449 23,449 23,449 23,449 23,449 23,449 23,44911.13 NIPLE PASAMURO 2" UN 49,970 49,970 49,970 49,970 49,970 49,970 49,970 49,970 49,970 49,97011.14 NIPLE PASAMURO 4" UN 74,622 74,622 74,622 74,622 74,622 74,622 74,622 74,622 74,622 74,62211.15 PUNTO AGUA CALIENTE CPVC UN 62,043 62,043 62,043 62,043 62,043 62,043 62,043 62,043 62,043 62,04311.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 45,659 45,659 45,659 45,659 45,659 45,659 45,659 45,659 45,659 45,65911.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,377 48,377 48,377 48,377 48,377 48,377 48,377 48,377 48,377 48,37711.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 61,073 61,073 61,073 61,073 61,073 61,073 61,073 61,073 61,073 61,07311.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 48,412 48,412 48,412 48,412 48,412 48,412 48,412 48,412 48,412 48,41211.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 60,083 60,083 60,083 60,083 60,083 60,083 60,083 60,083 60,083 60,08311.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 64,147 64,147 64,147 64,147 64,147 64,147 64,147 64,147 64,147 64,14711.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 53,512 53,512 53,512 53,512 53,512 53,512 53,512 53,512 53,512 53,51211.23 RED SUMINISTRO CPVC 1/2" ML 9,092 9,092 9,092 9,092 9,092 9,092 9,092 9,092 9,092 9,09211.24 RED SUMINISTRO CPVC 3/4" ML 12,704 12,704 12,704 12,704 12,704 12,704 12,704 12,704 12,704 12,70411.25 RED SUMINISTRO PVC 1 1/2" ML 16,338 16,338 16,338 16,338 16,338 16,338 16,338 16,338 16,338 16,33811.26 RED SUMINISTRO PVC 1" ML 10,147 10,147 10,147 10,147 10,147 10,147 10,147 10,147 10,147 10,14711.27 RED SUMINISTRO PVC 1/2" ML 6,120 6,120 6,120 6,120 6,120 6,120 6,120 6,120 6,120 6,12011.28 RED SUMINISTRO PVC 2 1/2" ML 41,071 41,071 41,071 41,071 41,071 41,071 41,071 41,071 41,071 41,07111.29 RED SUMINISTRO PVC 2" ML 23,627 23,627 23,627 23,627 23,627 23,627 23,627 23,627 23,627 23,62711.30 RED SUMINISTRO PVC 3/4" ML 7,628 7,628 7,628 7,628 7,628 7,628 7,628 7,628 7,628 7,62811.31 RED SANITARIA PVC-S 2" ML 17,990 17,990 17,990 17,990 17,990 17,990 17,990 17,990 17,990 17,99011.32 RED SANITARIA PVC-S 3" ML 24,913 24,913 24,913 24,913 24,913 24,913 24,913 24,913 24,913 24,91311.33 RED SANITARIA PVC-S 4" ML 33,699 33,699 33,699 33,699 33,699 33,699 33,699 33,699 33,699 33,69911.34 RED SANITARIA PVC-S 6" ML 62,758 62,758 62,758 62,758 62,758 62,758 62,758 62,758 62,758 62,75811.35 REGISTRO 1" UN 82,042 82,042 82,042 82,042 82,042 82,042 82,042 82,042 82,042 82,04211.36 REGISTRO 1/2" UN 46,991 46,991 46,991 46,991 46,991 46,991 46,991 46,991 46,991 46,99111.37 REGISTRO 3/4" UN 57,513 57,513 57,513 57,513 57,513 57,513 57,513 57,513 57,513 57,51311.38 REGISTRO 1 1/2" UN 106,965 106,965 106,965 106,965 106,965 106,965 106,965 106,965 106,965 106,96511.39 REGISTRO 2 1/2" UN 275,553 275,553 275,553 275,553 275,553 275,553 275,553 275,553 275,553 275,55311.40 REGISTRO 2" UN 205,514 205,514 205,514 205,514 205,514 205,514 205,514 205,514 205,514 205,51411.41 REVENTILACIÓN 2" ML 12,585 12,585 12,585 12,585 12,585 12,585 12,585 12,585 12,585 12,58511.42 REVENTILACIÓN 3" ML 15,881 15,881 15,881 15,881 15,881 15,881 15,881 15,881 15,881 15,881

11.43 UN 125,793 125,793 125,793 125,793 125,793 125,793 125,793 125,793 125,793 125,793

11.44 UN 203,828 203,828 203,828 203,828 203,828 203,828 203,828 203,828 203,828 203,828

TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN)

Page 253: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

11.45 UN 335,232 335,232 335,232 335,232 335,232 335,232 335,232 335,232 335,232 335,232

11.46 ML 35,202 35,202 35,202 35,202 35,202 35,202 35,202 35,202 35,202 35,202

11.47 ML 40,666 40,666 40,666 40,666 40,666 40,666 40,666 40,666 40,666 40,666

11.48 ML 66,761 66,761 66,761 66,761 66,761 66,761 66,761 66,761 66,761 66,761

11.49 ML 51,891 51,891 51,891 51,891 51,891 51,891 51,891 51,891 51,891 51,891

11.50 ML 73,688 73,688 73,688 73,688 73,688 73,688 73,688 73,688 73,688 73,688

11.51 ML 77,499 77,499 77,499 77,499 77,499 77,499 77,499 77,499 77,499 77,499

11.52 ML 179,921 179,921 179,921 179,921 179,921 179,921 179,921 179,921 179,921 179,921

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,441 35,441 35,441 35,441 35,441 35,441 35,441 35,441 35,441 35,44111.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,580 35,580 35,580 35,580 35,580 35,580 35,580 35,580 35,580 35,58011.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,546 28,546 28,546 28,546 28,546 28,546 28,546 28,546 28,546 28,54611.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,276 32,276 32,276 32,276 32,276 32,276 32,276 32,276 32,276 32,276

11.57 ML 2,913 2,913 2,913 2,913 2,913 2,913 2,913 2,913 2,913 2,913

11.58 ML 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519

11.59 GABINETE TIPO III UN 1,009,519 1,009,519 1,009,519 1,009,519 1,009,519 1,009,519 1,009,519 1,009,519 1,009,519 1,009,51911.60 GABINETE TIPO I UN 797,397 797,397 797,397 797,397 797,397 797,397 797,397 797,397 797,397 797,39711.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,258,081 1,258,081 1,258,081 1,258,081 1,258,081 1,258,081 1,258,081 1,258,081 1,258,081 1,258,08111.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,202,101 1,202,101 1,202,101 1,202,101 1,202,101 1,202,101 1,202,101 1,202,101 1,202,101 1,202,10111.63 VÁLVULA MARIPOSA 3" UN 653,601 653,601 653,601 653,601 653,601 653,601 653,601 653,601 653,601 653,60111.64 VÁLVULA MARIPOSA 4" UN 745,742 745,742 745,742 745,742 745,742 745,742 745,742 745,742 745,742 745,74211.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 320,069 320,069 320,069 320,069 320,069 320,069 320,069 320,069 320,069 320,069

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 223,905 223,905 223,905 223,905 223,905 223,905 223,905 223,905 223,905 223,90512.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 32,560 32,560 32,560 32,560 32,560 32,560 32,560 32,560 32,560 32,56012.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 40,086 40,086 40,086 40,086 40,086 40,086 40,086 40,086 40,086 40,08612.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 43,596 43,596 43,596 43,596 43,596 43,596 43,596 43,596 43,596 43,59612.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 53,159 53,159 53,159 53,159 53,159 53,159 53,159 53,159 53,159 53,15912.6 SALIDA TELÉFONO PVC COMPLETA UN 35,534 35,534 35,534 35,534 35,534 35,534 35,534 35,534 35,534 35,53412.7 SALIDA TIMBRE PVC COMPLETA UN 35,560 35,560 35,560 35,560 35,560 35,560 35,560 35,560 35,560 35,56012.8 STRIP TELEFÓNICO 10 PARES UN 106,971 106,971 106,971 106,971 106,971 106,971 106,971 106,971 106,971 106,97112.9 SALIDA TOMA DOBLE PVC COMPLETA UN 30,790 30,790 30,790 30,790 30,790 30,790 30,790 30,790 30,790 30,790

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 72,368 72,368 72,368 72,368 72,368 72,368 72,368 72,368 72,368 72,36812.11 SALIDA T.V PVC COMPLETA. UN 47,678 47,678 47,678 47,678 47,678 47,678 47,678 47,678 47,678 47,67812.12 SALIDA BIFÁSICA C.N. UN 27,994 27,994 27,994 27,994 27,994 27,994 27,994 27,994 27,994 27,99412.13 TABLERO PARCIAL 4 CIRCUITOS UN 80,518 80,518 80,518 80,518 80,518 80,518 80,518 80,518 80,518 80,518

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2"

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2"

Page 254: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 331,938 331,938 331,938 331,938 331,938 331,938 331,938 331,938 331,938 331,93812.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 446,438 446,438 446,438 446,438 446,438 446,438 446,438 446,438 446,438 446,43812.16 TUBERÍA PVC CONDUIT 1/2" ML 2,596 2,596 2,596 2,596 2,596 2,596 2,596 2,596 2,596 2,59612.17 TUBERÍA PVC CONDUIT 3/4" ML 3,382 3,382 3,382 3,382 3,382 3,382 3,382 3,382 3,382 3,38212.18 TUBERÍA PVC CONDUIT 1" ML 5,199 5,199 5,199 5,199 5,199 5,199 5,199 5,199 5,199 5,19912.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,342 9,342 9,342 9,342 9,342 9,342 9,342 9,342 9,342 9,34212.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 179,670 179,670 179,670 179,670 179,670 179,670 179,670 179,670 179,670 179,67012.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 56,933 56,933 56,933 56,933 56,933 56,933 56,933 56,933 56,933 56,93312.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 76,837 76,837 76,837 76,837 76,837 76,837 76,837 76,837 76,837 76,83712.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,636 27,636 27,636 27,636 27,636 27,636 27,636 27,636 27,636 27,63612.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,036,265 1,036,265 1,036,265 1,036,265 1,036,265 1,036,265 1,036,265 1,036,265 1,036,265 1,036,26512.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 767,119 767,119 767,119 767,119 767,119 767,119 767,119 767,119 767,119 767,11912.26 POSTE METÁLICO 6M UN 957,237 957,237 957,237 957,237 957,237 957,237 957,237 957,237 957,237 957,237

12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 434,476 434,476 434,476 434,476 434,476 434,476 434,476 434,476 434,476 434,476

12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 75,411 75,411 75,411 75,411 75,411 75,411 75,411 75,411 75,411 75,41112.29 LUMINARIA 70W SODIO UN 192,646 192,646 192,646 192,646 192,646 192,646 192,646 192,646 192,646 192,64612.30 LUMINARIA 150W SODIO UN 226,963 226,963 226,963 226,963 226,963 226,963 226,963 226,963 226,963 226,96312.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,221,624 1,221,624 1,221,624 1,221,624 1,221,624 1,221,624 1,221,624 1,221,624 1,221,624 1,221,62412.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 899,904 899,904 899,904 899,904 899,904 899,904 899,904 899,904 899,904 899,904

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 34,441 34,089 34,485 34,529 33,870 33,957 33,782 34,836 34,353 34,83613.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 29,409 29,058 29,453 29,497 28,838 28,926 28,750 29,805 29,321 29,80513.3 ALISTADO PARA LISTÓN M2 11,284 11,214 11,293 11,302 11,170 11,187 11,152 11,363 11,267 11,36313.4 ALISTADO PISOS 1:3, E=0.04 M2 24,178 23,474 24,266 24,353 23,035 23,211 22,859 24,969 24,002 24,96913.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 62,001 61,298 62,089 62,177 60,858 61,034 60,683 62,792 61,825 62,79213.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,880 20,854 20,730 20,827 20,544 20,607 20,492 20,958 20,854 20,75613.7 CONCRETO BASE GRADAS 2500 PSI M2 47,268 47,142 46,534 46,964 45,623 45,939 45,370 47,674 47,168 46,69213.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 66,077 65,874 64,901 65,590 63,444 63,950 63,039 66,726 65,916 65,15413.9 MANTO FIBERGLASS 600X1 M2 22,112 22,112 22,112 22,112 22,112 22,112 22,112 22,112 22,112 22,112

13.10 PEGANTE MORTERO-CONCRETO M2 19,040 19,040 19,040 19,040 19,040 19,040 19,040 19,040 19,040 19,04013.11 PERMA PLY 2 CAPAS M2 19,853 19,853 19,853 19,853 19,853 19,853 19,853 19,853 19,853 19,85313.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 38,745 38,631 38,084 38,471 37,264 37,549 37,036 39,110 38,654 38,22613.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 45,534 45,395 44,726 45,200 43,724 44,072 43,446 45,980 45,423 44,90013.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 66,299 66,084 65,050 65,782 63,501 64,039 63,071 66,988 66,128 65,31813.15 TRITURADO FINO 1/2 M3 84,265 83,359 79,011 84,265 72,495 74,306 70,684 85,971 82,350 78,72813.16 TRITURADO GRUESO 3/4 M3 87,817 86,645 81,488 87,817 73,781 75,328 72,234 88,227 83,939 81,893

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,037 36,896 37,054 37,072 36,808 36,843 36,773 37,195 37,002 37,195

14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 22,836 22,765 22,845 22,853 22,721 22,739 22,704 22,915 22,818 22,915

14.3 ADOQUÍN CONCRETO 6CM M2 48,844 48,492 48,888 48,931 48,272 48,360 48,184 49,239 48,756 49,23914.4 ADOQUÍN CONCRETO 8CM M2 57,944 57,592 57,988 58,031 57,372 57,460 57,284 58,339 57,856 58,33914.5 ADOQUÍN GRES PEATONAL M2 47,788 47,437 47,832 47,876 47,217 47,305 47,129 48,184 47,700 48,184

Page 255: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

14.6 M2 51,626 51,485 51,643 51,661 51,397 51,433 51,362 51,784 51,591 51,784

14.7 GRAVILLA PARA GRADAS ML 29,213 29,133 29,167 29,230 28,976 29,012 28,940 29,309 29,175 29,234

14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 105,321 104,688 105,400 105,479 104,292 104,451 104,134 106,033 105,163 106,033

14.9 ACABADO EN GRAVILLA LAVADA M2 36,788 36,558 36,705 36,841 36,201 36,291 36,110 37,061 36,695 36,91014.10 GUARDAESCOBA EN GRANITO ML 29,509 29,509 29,509 29,509 29,509 29,509 29,509 29,509 29,509 29,50914.11 GUARDAESCOBA EN GRAVILLA ML 8,212 8,133 8,167 8,230 7,976 8,012 7,940 8,309 8,175 8,23414.12 GUARDAESCOBA PVC CARAMELO ML 7,189 7,189 7,189 7,189 7,189 7,189 7,189 7,189 7,189 7,18914.13 GUARDAESCOBA PVC CEDRO ML 9,103 9,103 9,103 9,103 9,103 9,103 9,103 9,103 9,103 9,10314.14 GUARDAESCOBA PINO CARIBE ML 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,67014.15 GUARDAESCOBA CEDRO BLANCO ML 7,660 7,660 7,660 7,660 7,660 7,660 7,660 7,660 7,660 7,66014.16 GUARDAESCOBA EN MADERA SAPAN ML 12,073 12,073 12,073 12,073 12,073 12,073 12,073 12,073 12,073 12,07314.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,842 6,842 6,842 6,842 6,842 6,842 6,842 6,842 6,842 6,84214.18 LISTÓN M.H. AMARILLO M2 54,131 54,131 54,131 54,131 54,131 54,131 54,131 54,131 54,131 54,13114.19 PASO ESCALERA GRANITO ML 81,277 80,785 81,338 81,400 80,477 80,600 80,354 81,831 81,154 81,83114.20 PIRLANES ALUMINIO ML 5,751 5,751 5,751 5,751 5,751 5,751 5,751 5,751 5,751 5,75114.21 PIRLANES LADRILLO ML 24,720 24,591 24,736 24,752 24,510 24,542 24,477 24,866 24,688 24,86614.22 PISO VINILO TRÁFICO RESIDENCIAL M2 30,890 30,890 30,890 30,890 30,890 30,890 30,890 30,890 30,890 30,89014.23 PISO VINILO TRÁFICO PESADO M2 41,216 41,216 41,216 41,216 41,216 41,216 41,216 41,216 41,216 41,21614.24 PULIDA LACADA PISO MADERA M2 41,075 41,075 41,075 41,075 41,075 41,075 41,075 41,075 41,075 41,07514.25 TABLETA DE GRES 25X25 M2 36,789 36,648 36,807 36,824 36,560 36,596 36,525 36,947 36,754 36,94714.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 37,452 37,312 37,470 37,487 37,224 37,259 37,189 37,611 37,417 37,611

14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,083 8,083 8,083 8,083 8,083 8,083 8,083 8,083 8,083 8,083

14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,199 34,005 34,223 34,247 33,883 33,932 33,835 34,417 34,150 34,41714.29 JABONERA PORCELANA ACUARIO UN 14,067 14,067 14,067 14,067 14,067 14,067 14,067 14,067 14,067 14,067

14.30 UN 97,470 97,470 97,470 97,470 97,470 97,470 97,470 97,470 97,470 97,470

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,608 7,608 7,608 7,608 7,608 7,608 7,608 7,608 7,608 7,60814.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,535 15,535 15,535 15,535 15,535 15,535 15,535 15,535 15,535 15,53514.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,486 10,486 10,486 10,486 10,486 10,486 10,486 10,486 10,486 10,48614.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 9,988 9,988 9,988 9,988 9,988 9,988 9,988 9,988 9,988 9,98814.35 REMATES BOCEL ALUMINIO ML 6,382 6,382 6,382 6,382 6,382 6,382 6,382 6,382 6,382 6,38214.36 REMATES BOCEL PORCELANA ML 6,489 6,489 6,489 6,489 6,489 6,489 6,489 6,489 6,489 6,48914.37 TAPA REGISTRO 20X20 UN 14,560 14,560 14,560 14,560 14,560 14,560 14,560 14,560 14,560 14,56014.38 TAPA REGISTRO 6X6 UN 12,846 12,846 12,846 12,846 12,846 12,846 12,846 12,846 12,846 12,846

14.39 M2 14,048 14,048 14,048 14,048 14,048 14,048 14,048 14,048 14,048 14,048

14.40 M2 16,300 16,300 16,300 16,300 16,300 16,300 16,300 16,300 16,300 16,300

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 47,146 47,005 47,164 47,181 46,918 46,953 46,882 47,304 47,111 47,30414.42 MEDIA CAÑA EN GRANITO ML 56,527 56,527 56,527 56,527 56,527 56,527 56,527 56,527 56,527 56,52714.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,191 26,191 26,191 26,191 26,191 26,191 26,191 26,191 26,191 26,19114.44 PINTURA ACRÍLICA PARA PISOS M2 10,276 10,276 10,276 10,276 10,276 10,276 10,276 10,276 10,276 10,276

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

Page 256: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,662 11,662 11,662 11,662 11,662 11,662 11,662 11,662 11,662 11,662

14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 81,519 81,519 81,519 81,519 81,519 81,519 81,519 81,519 81,519 81,519

15 CIELO RASO15.1 APLIQUE YESO ML 56,190 56,190 56,190 56,190 56,190 56,190 56,190 56,190 56,190 56,19015.2 ARMADURA MADERA Y MALLA M2 26,590 26,590 26,590 26,590 26,590 26,590 26,590 26,590 26,590 26,59015.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51,180 51,180 51,180 51,180 51,180 51,180 51,180 51,180 51,180 51,18015.4 CIELO RASO DURACUSTIC M2 50,534 50,534 50,534 50,534 50,534 50,534 50,534 50,534 50,534 50,53415.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 46,727 46,727 46,727 46,727 46,727 46,727 46,727 46,727 46,727 46,72715.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 66,347 66,347 66,347 66,347 66,347 66,347 66,347 66,347 66,347 66,34715.7 CORNISAS YESO ML 35,119 35,119 35,119 35,119 35,119 35,119 35,119 35,119 35,119 35,119

15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 73,728 73,728 73,728 73,728 73,728 73,728 73,728 73,728 73,728 73,728

15.9 MALLA CON VENA M2 10,217 10,217 10,217 10,217 10,217 10,217 10,217 10,217 10,217 10,217

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592

16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 58,311 57,017 52,331 58,311 45,376 45,376 45,376 54,905 51,024 54,43016.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 93,906 92,872 87,902 93,906 80,456 82,525 78,387 95,856 91,718 87,579

16.10 M3 126,890 140,189 117,835 113,955 128,547 132,428 128,547 119,129 139,825 125,596

16.11 AFRIMADO (NORMA INVIAS 311) M3 64,181 62,888 66,456 64,181 51,246 51,246 51,246 66,560 66,560 60,30116.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 118,791 130,744 105,856 105,856 119,103 119,103 119,103 111,030 131,726 117,49716.13 BASE GRANULAR (NORMA INVIAS 330) M3 127,531 140,830 118,476 114,596 129,188 133,069 129,188 119,770 140,466 126,237

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 215,302 215,302 215,302 215,302 215,302 215,302 215,302 215,302 215,302 215,302

17.2 UN 678,748 678,748 678,748 678,748 678,748 678,748 678,748 678,748 678,748 678,748

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 383,722 383,722 383,722 383,722 383,722 383,722 383,722 383,722 383,722 383,722

17.4 UN 123,642 123,642 123,642 123,642 123,642 123,642 123,642 123,642 123,642 123,642

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA)

Page 257: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

17.5 UN 153,110 153,110 153,110 153,110 153,110 153,110 153,110 153,110 153,110 153,110

17.6 UN 181,117 181,117 181,117 181,117 181,117 181,117 181,117 181,117 181,117 181,117

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 279,698 279,698 279,698 279,698 279,698 279,698 279,698 279,698 279,698 279,698

17.8 UN 733,998 733,998 733,998 733,998 733,998 733,998 733,998 733,998 733,998 733,998

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 229,322 229,322 229,322 229,322 229,322 229,322 229,322 229,322 229,322 229,322

17.10 UN 110,397 110,397 110,397 110,397 110,397 110,397 110,397 110,397 110,397 110,397

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 62,778 62,778 62,778 62,778 62,778 62,778 62,778 62,778 62,778 62,778

17.12 UN 182,726 182,726 182,726 182,726 182,726 182,726 182,726 182,726 182,726 182,726

17.13 UN 292,004 292,004 292,004 292,004 292,004 292,004 292,004 292,004 292,004 292,004

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,458 4,458 4,458 4,458 4,458 4,458 4,458 4,458 4,458 4,458

18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,209 2,209 2,209 2,209 2,209 2,209 2,209 2,209 2,209 2,20918.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,366 8,366 8,366 8,366 8,366 8,366 8,366 8,366 8,366 8,36618.4 BARNIZ SOBRE MUEBLES M2 31,745 31,745 31,745 31,745 31,745 31,745 31,745 31,745 31,745 31,74518.5 CARBURO SOBRE PAÑETES M2 4,306 4,306 4,306 4,306 4,306 4,306 4,306 4,306 4,306 4,30618.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,525 10,525 10,525 10,525 10,525 10,525 10,525 10,525 10,525 10,52518.7 DEMARCACIÓN CON MARMOLINA ML 2,683 2,683 2,683 2,683 2,683 2,683 2,683 2,683 2,683 2,68318.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,920 1,92018.9 ESMALTE SOBRE LÁMINA LLENA M2 9,975 9,975 9,975 9,975 9,975 9,975 9,975 9,975 9,975 9,975

18.10 ESMALTE SOBRE MADERA LINEAL ML 2,989 2,989 2,989 2,989 2,989 2,989 2,989 2,989 2,989 2,98918.11 ESMALTE SOBRE MADERA LLENA M2 11,070 11,070 11,070 11,070 11,070 11,070 11,070 11,070 11,070 11,07018.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,902 3,902 3,902 3,902 3,902 3,902 3,902 3,902 3,902 3,90218.13 ESMALTE SOBRE MARCOS MADERA M2 4,654 4,654 4,654 4,654 4,654 4,654 4,654 4,654 4,654 4,65418.14 ESTUCO M2 5,853 5,853 5,853 5,853 5,853 5,853 5,853 5,853 5,853 5,85318.15 ESTUCO (LINEAL) ML 3,608 3,608 3,608 3,608 3,608 3,608 3,608 3,608 3,608 3,60818.16 ESTUCO Y VINILO 3 MANOS M2 12,207 12,207 12,207 12,207 12,207 12,207 12,207 12,207 12,207 12,20718.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,535 7,535 7,535 7,535 7,535 7,535 7,535 7,535 7,535 7,53518.18 LACA PISOS MADERA M2 17,997 17,997 17,997 17,997 17,997 17,997 17,997 17,997 17,997 17,99718.19 LÍNEAS TRÁFICO 0.10 ML 2,070 2,070 2,070 2,070 2,070 2,070 2,070 2,070 2,070 2,07018.20 MARMOLINA SOBRE PAÑETE M2 8,699 8,699 8,699 8,699 8,699 8,699 8,699 8,699 8,699 8,69918.21 TINTILLA SOBRE MADERA LINEAL ML 2,536 2,536 2,536 2,536 2,536 2,536 2,536 2,536 2,536 2,53618.22 TINTILLA SOBRE MADERA LLENA M2 9,706 9,706 9,706 9,706 9,706 9,706 9,706 9,706 9,706 9,70618.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,326 5,326 5,326 5,326 5,326 5,326 5,326 5,326 5,326 5,32618.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,364 3,364 3,364 3,364 3,364 3,364 3,364 3,364 3,364 3,36418.25 WASH-PRIMER SOBRE ALUMNIO M2 16,250 16,250 16,250 16,250 16,250 16,250 16,250 16,250 16,250 16,25018.26 PINTURA EPÓXICA M2 10,053 10,053 10,053 10,053 10,053 10,053 10,053 10,053 10,053 10,053

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA)SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 258: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

18.27 PINTURA EPÓXICA (LINEAL) ML 6,176 6,176 6,176 6,176 6,176 6,176 6,176 6,176 6,176 6,176

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,686,761 3,686,761 3,686,761 3,686,761 3,686,761 3,686,761 3,686,761 3,686,761 3,686,761 3,686,761

19.2 UN 6,471,550 6,471,550 6,471,550 6,471,550 6,471,550 6,471,550 6,471,550 6,471,550 6,471,550 6,471,550

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,941,351 1,941,351 1,941,351 1,941,351 1,941,351 1,941,351 1,941,351 1,941,351 1,941,351 1,941,351

19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,440,988 5,440,988 5,440,988 5,440,988 5,440,988 5,440,988 5,440,988 5,440,988 5,440,988 5,440,988

19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,416,500 5,416,500 5,416,500 5,416,500 5,416,500 5,416,500 5,416,500 5,416,500 5,416,500 5,416,50019.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,070 2,070 2,070 2,070 2,070 2,070 2,070 2,070 2,070 2,07019.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,936,912 1,936,912 1,936,912 1,936,912 1,936,912 1,936,912 1,936,912 1,936,912 1,936,912 1,936,91219.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 62,092 62,092 62,092 62,092 62,092 62,092 62,092 62,092 62,092 62,09219.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,092,557 1,092,544 1,092,481 1,092,525 1,092,388 1,092,420 1,092,362 1,092,598 1,092,546 1,092,497

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 563,574 563,266 561,789 562,983 559,575 560,313 558,959 564,479 563,248 562,076

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 22,930 22,930 22,930 22,930 22,930 22,930 22,930 22,930 22,930 22,93020.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 33,909 33,909 33,909 33,909 33,909 33,909 33,909 33,909 33,909 33,90920.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 41,853 41,853 41,853 41,853 41,853 41,853 41,853 41,853 41,853 41,853

20.4 ML 25,331 25,331 25,331 25,331 25,331 25,331 25,331 25,331 25,331 25,331

20.5 ML 28,926 28,926 28,926 28,926 28,926 28,926 28,926 28,926 28,926 28,926

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,349 42,349 42,349 42,349 42,349 42,349 42,349 42,349 42,349 42,349

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,658 19,658 19,658 19,658 19,658 19,658 19,658 19,658 19,658 19,65820.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,729 20,729 20,729 20,729 20,729 20,729 20,729 20,729 20,729 20,72920.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,633 25,633 25,633 25,633 25,633 25,633 25,633 25,633 25,633 25,633

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,563 11,56320.11 VÁLVULA DE BOLA GAS 3/4" UN 18,020 18,020 18,020 18,020 18,020 18,020 18,020 18,020 18,020 18,02020.12 VÁLVULA DE BOLA GAS 1" UN 26,961 26,961 26,961 26,961 26,961 26,961 26,961 26,961 26,961 26,96120.13 VÁLVULA POLIETILENO GAS 1/2" UN 160,191 160,191 160,191 160,191 160,191 160,191 160,191 160,191 160,191 160,19120.14 VÁLVULA POLIETILENO GAS 3/4" UN 164,748 164,748 164,748 164,748 164,748 164,748 164,748 164,748 164,748 164,74820.15 VÁLVULA POLIETILENO GAS 1" UN 266,856 266,856 266,856 266,856 266,856 266,856 266,856 266,856 266,856 266,85620.16 ACOMETIDA GAS 1/2" ML 220,671 220,671 220,671 220,671 220,671 220,671 220,671 220,671 220,671 220,671

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 97,507 97,507 97,507 97,507 97,507 97,507 97,507 97,507 97,507 97,50721.2 CABLE DETECTOR LINEAL DE CALOR ML 24,252 24,252 24,252 24,252 24,252 24,252 24,252 24,252 24,252 24,25221.3 SIRENA DE 110 V UN 68,975 68,975 68,975 68,975 68,975 68,975 68,975 68,975 68,975 68,97521.4 CÁMARA CCTV UN 202,064 202,064 202,064 202,064 202,064 202,064 202,064 202,064 202,064 202,06421.5 PARLANTE-CIELO FALSO UN 39,431 39,431 39,431 39,431 39,431 39,431 39,431 39,431 39,431 39,43121.6 AMPLIFICADOR 100W UN 423,976 423,976 423,976 423,976 423,976 423,976 423,976 423,976 423,976 423,97621.7 AMPLIFICADOR 300W UN 1,048,898 1,048,898 1,048,898 1,048,898 1,048,898 1,048,898 1,048,898 1,048,898 1,048,898 1,048,89821.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,697 32,697 32,697 32,697 32,697 32,697 32,697 32,697 32,697 32,69721.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 167,694 167,694 167,694 167,694 167,694 167,694 167,694 167,694 167,694 167,694

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS)

TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS)

Page 259: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

21.10 TOMA PARA MICRÓFONO UN 33,490 33,490 33,490 33,490 33,490 33,490 33,490 33,490 33,490 33,49021.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,577 2,577 2,577 2,577 2,577 2,577 2,577 2,577 2,577 2,57721.12 SPLITERS UN 4,141 4,141 4,141 4,141 4,141 4,141 4,141 4,141 4,141 4,14121.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,123 14,123 14,123 14,123 14,123 14,123 14,123 14,123 14,123 14,12321.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,569 18,569 18,569 18,569 18,569 18,569 18,569 18,569 18,569 18,56921.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,529 25,529 25,529 25,529 25,529 25,529 25,529 25,529 25,529 25,52921.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 93,672 93,672 93,672 93,672 93,672 93,672 93,672 93,672 93,672 93,672

21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 24,635 24,635 24,635 24,635 24,635 24,635 24,635 24,635 24,635 24,635

21.18 BANDEJA PORTACABLES PARA RACK UN 80,616 80,616 80,616 80,616 80,616 80,616 80,616 80,616 80,616 80,61621.19 RACK 2' X 24" UN 130,138 130,138 130,138 130,138 130,138 130,138 130,138 130,138 130,138 130,13821.20 RACK 3' X 24" UN 158,021 158,021 158,021 158,021 158,021 158,021 158,021 158,021 158,021 158,02121.21 RACK 5' X 24" UN 249,363 249,363 249,363 249,363 249,363 249,363 249,363 249,363 249,363 249,36321.22 RACK 7' X 24" UN 322,286 322,286 322,286 322,286 322,286 322,286 322,286 322,286 322,286 322,28621.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 367,228 367,228 367,228 367,228 367,228 367,228 367,228 367,228 367,228 367,22821.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 220,597 220,597 220,597 220,597 220,597 220,597 220,597 220,597 220,597 220,597

21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 52,950 52,950 52,950 52,950 52,950 52,950 52,950 52,950 52,950 52,950

21.26 PATCH CORD 2M CATEGORÍA 6A UN 5,489 5,489 5,489 5,489 5,489 5,489 5,489 5,489 5,489 5,48921.27 PATCH CORD 5M CATEGORÍA 6A UN 13,928 13,928 13,928 13,928 13,928 13,928 13,928 13,928 13,928 13,92821.28 CABLE UTP CATEGORÍA 6A ML 2,580 2,580 2,580 2,580 2,580 2,580 2,580 2,580 2,580 2,58021.29 CANALETA METÁLICA 4X6 CMS ML 25,866 25,866 25,866 25,866 25,866 25,866 25,866 25,866 25,866 25,86621.30 CANALETA METÁLICA 4X10 CMS ML 26,991 26,991 26,991 26,991 26,991 26,991 26,991 26,991 26,991 26,99121.31 CANALETA METÁLICA 6X10 CMS ML 27,555 27,555 27,555 27,555 27,555 27,555 27,555 27,555 27,555 27,55521.32 CANALETA PLÁSTICA 13X7 MM ML 15,348 15,348 15,348 15,348 15,348 15,348 15,348 15,348 15,348 15,34821.33 CANALETA PLÁSTICA 20X12 MM ML 17,164 17,164 17,164 17,164 17,164 17,164 17,164 17,164 17,164 17,16421.34 CANALETA PLÁSTICA 32X12 MM ML 17,094 17,094 17,094 17,094 17,094 17,094 17,094 17,094 17,094 17,09421.35 CANALETA PLÁSTICA 40X60 MM ML 27,302 27,302 27,302 27,302 27,302 27,302 27,302 27,302 27,302 27,30221.36 SWITCH 10/100/1000 24 PUERTOS UN 368,211 368,211 368,211 368,211 368,211 368,211 368,211 368,211 368,211 368,21121.37 SWITCH 10/100/1000 16 PUERTOS UN 232,994 232,994 232,994 232,994 232,994 232,994 232,994 232,994 232,994 232,99421.38 SWITCH 10/100/1000 8 PUERTOS UN 62,388 62,388 62,388 62,388 62,388 62,388 62,388 62,388 62,388 62,38821.39 CABLE TELEFÓNICO 2 PARES ML 1,343 1,343 1,343 1,343 1,343 1,343 1,343 1,343 1,343 1,34321.40 CABLE TELEFÓNICO 10 PARES ML 6,505 6,505 6,505 6,505 6,505 6,505 6,505 6,505 6,505 6,50521.41 CABLE TELEFÓNICO 20 PARES ML 8,697 8,697 8,697 8,697 8,697 8,697 8,697 8,697 8,697 8,69721.42 CABLE TELEFÓNICO 40 PARES ML 12,118 12,118 12,118 12,118 12,118 12,118 12,118 12,118 12,118 12,11821.43 CABLE TELEVISIÓN RG6 ML 1,656 1,656 1,656 1,656 1,656 1,656 1,656 1,656 1,656 1,65621.44 ACOMETIDA TELEFÓNICA 1/2" ML 15,985 15,985 15,985 15,985 15,985 15,985 15,985 15,985 15,985 15,98521.45 ACOMETIDA TELEFÓNICA 1" ML 24,510 24,510 24,510 24,510 24,510 24,510 24,510 24,510 24,510 24,51021.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,148 13,148 13,148 13,148 13,148 13,148 13,148 13,148 13,148 13,148

21.47 ML 10,691 10,691 10,691 10,691 10,691 10,691 10,691 10,691 10,691 10,691

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 476,017 476,017 476,017 476,017 476,017 476,017 476,017 476,017 476,017 476,017

CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN)

Page 260: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,327 19,327 19,327 19,327 19,327 19,327 19,327 19,327 19,327 19,3271.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 64,176 64,176 64,176 64,176 64,176 64,176 64,176 64,176 64,176 64,1761.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 359,658 359,658 359,658 359,658 359,658 359,658 359,658 359,658 359,658 359,6581.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 767,505 767,505 767,505 767,505 767,505 767,505 767,505 767,505 767,505 767,5051.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 88,250 88,250 88,250 88,250 88,250 88,250 88,250 88,250 88,250 88,2501.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 535,586 535,586 535,586 535,586 535,586 535,586 535,586 535,586 535,586 535,5861.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,151,490 1,151,490 1,151,490 1,151,490 1,151,490 1,151,490 1,151,490 1,151,490 1,151,490 1,151,4901.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,571 9,571 9,571 9,571 9,571 9,571 9,571 9,571 9,571 9,5711.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,711 11,711 11,711 11,711 11,711 11,711 11,711 11,711 11,711 11,711

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,616 14,616 14,616 14,616 14,616 14,616 14,616 14,616 14,616 14,6161.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 15,947 15,947 15,947 15,947 15,947 15,947 15,947 15,947 15,947 15,9471.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 19,044 19,044 19,044 19,044 19,044 19,044 19,044 19,044 19,044 19,0441.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 19,044 19,044 19,044 19,044 19,044 19,044 19,044 19,044 19,044 19,0441.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 75,306 75,306 75,306 75,306 75,306 75,306 75,306 75,306 75,306 75,3061.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 87,272 87,272 87,272 87,272 87,272 87,272 87,272 87,272 87,272 87,2721.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 269,840 269,840 269,840 269,840 269,840 269,840 269,840 269,840 269,840 269,8401.17 TEE PVC UNIÓN MECÁNICA 2" UN 101,256 101,256 101,256 101,256 101,256 101,256 101,256 101,256 101,256 101,2561.18 TEE PVC UNIÓN MECÁNICA 4" UN 166,906 166,906 166,906 166,906 166,906 166,906 166,906 166,906 166,906 166,9061.19 TEE PVC UNIÓN MECÁNICA 8" UN 737,499 737,499 737,499 737,499 737,499 737,499 737,499 737,499 737,499 737,4991.20 TEE PVC UNIÓN MECÁNICA 10" UN 849,522 849,522 849,522 849,522 849,522 849,522 849,522 849,522 849,522 849,5221.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 9,919 9,919 9,919 9,919 9,919 9,919 9,919 9,919 9,919 9,9191.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,803 8,803 8,803 8,803 8,803 8,803 8,803 8,803 8,803 8,8031.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 20,743 20,743 20,743 20,743 20,743 20,743 20,743 20,743 20,743 20,7431.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 83,430 83,430 83,430 83,430 83,430 83,430 83,430 83,430 83,430 83,4301.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 123,517 123,517 123,517 123,517 123,517 123,517 123,517 123,517 123,517 123,5171.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 20,541 20,541 20,541 20,541 20,541 20,541 20,541 20,541 20,541 20,5411.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 70,181 70,181 70,181 70,181 70,181 70,181 70,181 70,181 70,181 70,1811.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 103,286 103,286 103,286 103,286 103,286 103,286 103,286 103,286 103,286 103,2861.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,478 21,478 21,478 21,478 21,478 21,478 21,478 21,478 21,478 21,4781.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 44,130 44,130 44,130 44,130 44,130 44,130 44,130 44,130 44,130 44,1301.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 176,767 176,767 176,767 176,767 176,767 176,767 176,767 176,767 176,767 176,7671.32 UNIÓN REPARACION PVC 4" UN 51,421 51,421 51,421 51,421 51,421 51,421 51,421 51,421 51,421 51,4211.33 UNIÓN REPARACIÓN PVC 8" UN 205,512 205,512 205,512 205,512 205,512 205,512 205,512 205,512 205,512 205,5121.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 124,365 124,365 124,365 124,365 124,365 124,365 124,365 124,365 124,365 124,3651.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 350,773 350,773 350,773 350,773 350,773 350,773 350,773 350,773 350,773 350,7731.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,033,282 1,033,282 1,033,282 1,033,282 1,033,282 1,033,282 1,033,282 1,033,282 1,033,282 1,033,2821.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,526,720 1,526,720 1,526,720 1,526,720 1,526,720 1,526,720 1,526,720 1,526,720 1,526,720 1,526,720

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,048 8,048 8,048 8,048 8,048 8,048 8,048 8,048 8,048 8,0482.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,503 18,503 18,503 18,503 18,503 18,503 18,503 18,503 18,503 18,5032.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 82,491 81,504 76,761 82,491 69,653 71,628 67,678 84,353 80,403 76,453

Page 261: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

2.5 RELLENO TIPO 2 "RECEBO" M3 55,131 53,838 49,151 55,131 42,196 42,196 42,196 51,725 47,845 51,2512.6 RELLENO TIPO 4 "SUBBASE B-200" M3 65,401 64,108 67,676 65,401 52,466 52,466 52,466 67,780 67,780 61,5212.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 71,439 70,414 62,003 71,439 63,240 63,240 61,190 75,553 75,553 75,5532.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 72,716 71,671 72,500 72,716 64,358 64,358 62,268 76,910 76,910 76,9102.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 83,723 75,314 84,775 85,827 70,056 72,160 67,954 93,185 81,621 93,185

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 80,251 80,251 80,251 80,251 80,251 80,251 80,251 80,251 80,251 80,2513.2 CODO 45 PVC ALCANTARILLADO 16" UN 836,014 836,014 836,014 836,014 836,014 836,014 836,014 836,014 836,014 836,0143.3 CODO 90 PVC ALCANTARILLADO 8" UN 104,862 104,862 104,862 104,862 104,862 104,862 104,862 104,862 104,862 104,8623.4 CODO 90 PVC ALCANTARILLADO 16" UN 967,981 967,981 967,981 967,981 967,981 967,981 967,981 967,981 967,981 967,9813.5 CODO 90 PVC ALCANTARILLADO 24" UN 674,512 674,512 674,512 674,512 674,512 674,512 674,512 674,512 674,512 674,5123.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,8853.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 79,975 79,975 79,975 79,975 79,975 79,975 79,975 79,975 79,975 79,9753.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,4503.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 188,449 188,449 188,449 188,449 188,449 188,449 188,449 188,449 188,449 188,449

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 302,455 302,455 302,455 302,455 302,455 302,455 302,455 302,455 302,455 302,4553.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 79,976 79,976 79,976 79,976 79,976 79,976 79,976 79,976 79,976 79,9763.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 79,975 79,975 79,975 79,975 79,975 79,975 79,975 79,975 79,975 79,9753.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,4503.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,450 188,4503.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 302,456 302,456 302,456 302,456 302,456 302,456 302,456 302,456 302,456 302,4563.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 278,575 278,575 278,575 278,575 278,575 278,575 278,575 278,575 278,575 278,5753.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 446,425 446,425 446,425 446,425 446,425 446,425 446,425 446,425 446,425 446,4253.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 712,922 712,922 712,922 712,922 712,922 712,922 712,922 712,922 712,922 712,9223.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 44,539 44,539 44,539 44,539 44,539 44,539 44,539 44,539 44,539 44,5393.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 234,913 234,913 234,913 234,913 234,913 234,913 234,913 234,913 234,913 234,9133.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 254,915 254,915 254,915 254,915 254,915 254,915 254,915 254,915 254,915 254,9153.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 747,273 747,273 747,273 747,273 747,273 747,273 747,273 747,273 747,273 747,2733.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 42,203 42,117 42,214 42,225 42,062 42,084 42,041 42,301 42,182 42,3013.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 213,454 213,454 213,454 213,454 213,454 213,454 213,454 213,454 213,454 213,4543.25 TUBERÍA PVC ALCANTARILLADO 8" ML 35,163 35,163 35,163 35,163 35,163 35,163 35,163 35,163 35,163 35,1633.26 TUBERÍA PVC ALCANTARILLADO 10" ML 49,619 49,619 49,619 49,619 49,619 49,619 49,619 49,619 49,619 49,6193.27 TUBERÍA PVC ALCANTARILLADO 12" ML 71,486 71,486 71,486 71,486 71,486 71,486 71,486 71,486 71,486 71,4863.28 TUBERÍA PVC ALCANTARILLADO 16" ML 109,645 109,645 109,645 109,645 109,645 109,645 109,645 109,645 109,645 109,6453.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 175,973 175,973 175,973 175,973 175,973 175,973 175,973 175,973 175,973 175,9733.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 258,715 258,715 258,715 258,715 258,715 258,715 258,715 258,715 258,715 258,7153.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 326,443 326,443 326,443 326,443 326,443 326,443 326,443 326,443 326,443 326,4433.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 428,832 428,832 428,832 428,832 428,832 428,832 428,832 428,832 428,832 428,8323.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 588,001 588,001 588,001 588,001 588,001 588,001 588,001 588,001 588,001 588,001

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 UN 519,746 519,007 515,461 518,327 510,147 511,919 508,670 521,917 518,963 516,151

4.2 ML 501,637 497,157 502,197 502,756 494,358 495,477 493,238 506,676 500,517 506,676

PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

Page 262: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

4.3 UN 510,837 510,345 507,980 509,891 504,438 505,619 503,453 512,285 510,315 508,440

4.4 UN 618,112 617,189 612,755 616,338 606,113 608,328 604,268 620,826 617,134 613,618

4.5 ML 710,227 703,919 711,015 711,803 699,977 701,553 698,399 717,322 708,650 717,322

4.6 UN 597,933 597,256 594,005 596,632 589,134 590,758 587,781 599,924 597,216 594,638

4.7 SUMIDERO EN LADRILLO SL-100 UN 728,103 726,401 727,245 728,115 723,280 724,098 722,534 730,362 727,546 728,9524.8 SUMIDERO EN LADRILLO SL-250 UN 1,080,104 1,076,849 1,076,071 1,079,194 1,066,291 1,068,735 1,064,160 1,085,187 1,078,742 1,079,3444.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,528,915 1,526,953 1,517,533 1,524,770 1,503,420 1,508,205 1,499,497 1,534,889 1,527,046 1,519,612

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,072,694 2,069,432 2,053,774 2,065,803 2,030,314 2,038,268 2,023,794 2,082,625 2,069,587 2,057,2294.11 SUMIDERO PREFABRICADO SL-100 UN 949,817 949,817 949,817 949,817 949,817 949,817 949,817 949,817 949,817 949,8174.12 SUMIDERO PREFABRICADO SL-250 UN 2,221,673 2,221,673 2,221,673 2,221,673 2,221,673 2,221,673 2,221,673 2,221,673 2,221,673 2,221,673

4.13 UN 101,504 101,321 101,526 101,549 101,207 101,252 101,161 101,709 101,458 101,709

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 44,147 43,694 44,204 44,261 43,411 43,525 43,298 44,657 44,034 44,6575.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 50,855 50,402 50,912 50,969 50,119 50,233 50,006 51,365 50,742 51,3655.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 45,794 45,661 45,023 45,475 44,066 44,399 43,801 46,220 45,689 45,1895.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 49,361 49,232 48,611 49,113 47,682 47,992 47,423 49,741 49,224 48,7325.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 49,970 49,844 49,242 49,704 48,338 48,645 48,087 50,353 49,851 49,3755.6 BORDE SEPARADOR VERDE A-170 ML 192,208 192,025 192,231 192,253 191,911 191,956 191,865 192,413 192,162 192,4135.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,466 14,450 14,373 14,427 14,258 14,298 14,226 14,517 14,453 14,3935.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 32,873 32,780 32,330 32,648 31,656 31,890 31,468 33,174 32,799 32,4475.9 CAÑUELA PREFABRICADA TIPO A-120 ML 63,333 63,235 63,345 63,357 63,174 63,198 63,149 63,443 63,308 63,443

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 435,117 433,286 434,789 435,551 431,072 431,694 430,450 437,248 434,484 436,4965.11 LOSETA PREFABRICADA A-40 M2 46,513 46,094 46,565 46,617 45,833 45,937 45,728 46,983 46,408 46,9835.12 LOSETA PREFABRICADA A-60 M2 66,155 65,736 66,207 66,259 65,475 65,579 65,370 66,625 66,050 66,625

5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 26,820 26,768 26,520 26,721 26,148 26,272 26,045 26,972 26,765 26,568

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 43,662 43,557 43,055 43,461 42,302 42,553 42,093 43,969 43,551 43,152

5.15 SARDINEL PREFABRICADO A-10 ML 78,918 80,866 77,537 76,952 79,014 79,635 78,990 77,834 80,883 78,8295.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 44,598 44,344 44,629 44,661 44,186 44,249 44,123 44,882 44,534 44,882

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 112,547 112,486 112,190 112,429 111,747 111,895 111,624 112,728 112,482 112,2486.2 BANCA EN CONCRETO M-30 UN 471,219 471,132 470,719 471,053 470,099 470,305 469,926 471,472 471,127 470,7996.3 BOLARDO M-63 ALTO/HIERRO UN 170,859 170,846 170,784 170,832 170,691 170,722 170,665 170,898 170,846 170,7976.4 BOLARDO M-60 CONCRETO UN 109,431 109,357 109,002 109,289 108,471 108,648 108,323 109,648 109,352 109,0716.5 BOLARDO M-61 BAJO/CONCRETO UN 110,853 110,779 110,424 110,711 109,893 110,070 109,745 111,070 110,775 110,4936.6 BOLARDO M-62 BAJO/HIERRO UN 153,457 153,379 153,007 153,297 152,449 152,637 152,294 153,691 153,381 153,0866.7 BORDE CONTENEDOR DE RAICES A-70 ML 46,200 45,853 46,243 46,286 45,636 45,723 45,549 46,590 46,113 46,5906.8 BORDILLO PREFABRICADO A-80 ML 52,236 51,848 52,285 52,333 51,605 51,702 51,508 52,673 52,139 52,6736.9 CANECA M-120 UN 236,877 236,791 236,888 236,899 236,736 236,758 236,715 236,975 236,856 236,975

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 263: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 619,592 619,555 619,378 619,521 619,112 619,201 619,038 619,701 619,553 619,4126.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,358,966 2,358,942 2,358,824 2,358,919 2,358,646 2,358,705 2,358,597 2,359,039 2,358,940 2,358,8476.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,778,188 2,778,164 2,778,046 2,778,141 2,777,868 2,777,927 2,777,819 2,778,261 2,778,162 2,778,0696.13 CICLOPARQUEADERO M100 TIPO 1 UN 388,374 388,348 388,224 388,320 388,038 388,100 387,986 388,452 388,348 388,2506.14 CICLOPARQUEADERO M101 TIPO 2 UN 515,409 515,306 514,809 515,196 514,065 514,316 513,858 515,721 515,307 514,9156.15 BANCA EN MADERA M-50 UN 351,943 351,943 351,943 351,943 351,943 351,943 351,943 351,943 351,943 351,9436.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 178,524 178,487 178,310 178,453 178,044 178,133 177,970 178,632 178,485 178,3446.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 423,093 422,876 423,120 423,147 422,740 422,795 422,686 423,336 423,038 423,3366.18 POSTE HISTÓRICO M-131 UN 3,561,204 3,561,019 3,560,133 3,560,849 3,558,804 3,559,247 3,558,435 3,561,747 3,561,008 3,560,305

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,430 1,430 1,430 1,430 1,430 1,430 1,430 1,430 1,430 1,4307.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,498 14,498 14,498 14,498 14,498 14,498 14,498 14,498 14,498 14,4987.3 SEÑAL DOBLE DE CICLORUTA UN 361,059 360,968 361,071 361,082 360,911 360,934 360,888 361,162 361,037 361,1627.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 417,366 417,314 417,066 417,259 416,694 416,819 416,591 417,522 417,315 417,1197.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 242,651 242,560 242,663 242,674 242,503 242,526 242,480 242,754 242,629 242,7547.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 285,569 285,478 285,581 285,592 285,421 285,444 285,398 285,672 285,547 285,6727.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 391,929 391,838 391,941 391,952 391,781 391,804 391,758 392,032 391,907 392,0327.8 TACHAS REFLECTIVAS UN 10,187 10,187 10,187 10,187 10,187 10,187 10,187 10,187 10,187 10,1877.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,749 10,749 10,749 10,749 10,749 10,749 10,749 10,749 10,749 10,749

7.10 UN 41,595 41,595 41,595 41,595 41,595 41,595 41,595 41,595 41,595 41,595TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 264: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,580 28,580 28,580 28,580 28,580 28,580 28,580 28,580 28,580 28,580

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505

2.7 230.1 M2 341 341 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 47,004 47,004 47,004 47,004 47,004 47,004 47,004 47,004 47,004 47,004

2.11 600.3 M3 58,151 58,151 58,151 58,151 58,151 58,151 58,151 58,151 58,151 58,151

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE MATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 265: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 118,791 130,744 105,856 105,856 119,103 119,103 119,103 111,030 131,726 117,4973.3 330.1 BASE GRANULAR M3 127,531 140,830 118,476 114,596 129,188 133,069 129,188 119,770 140,466 126,237

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,069 2,069 2,069 2,069 2,069 2,069 2,069 2,069 2,069 2,0693.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,043 1,043 1,043 1,043 1,043 1,043 1,043 1,043 1,043 1,043

3.7 461.1 M3 156,943 156,677 155,400 156,795 153,486 154,049 152,954 157,525 156,462 155,413

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 55,950 55,410 55,941 56,055 54,925 55,088 54,767 56,582 55,806 56,482

3.9 450.1 P M3 453,617 452,373 463,567 453,617 443,667 446,154 441,179 473,517 459,835 449,885

3.10 450.2 P M3 468,117 466,873 478,067 468,117 458,167 460,654 455,679 488,017 474,335 464,385

3.11 450.9 P M3 492,363 491,119 502,313 492,363 482,413 484,901 479,926 512,263 498,582 488,632

3.12 450.3 P M3 504,367 503,123 514,317 504,367 494,417 496,904 491,929 524,267 510,585 500,635

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 223,949 237,248 214,895 211,014 225,607 229,487 225,607 216,188 236,884 222,6563.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 214,557 226,510 201,622 201,622 214,869 214,869 214,869 206,796 227,492 213,2633.15 311.1 AFIRMADO M3 64,181 62,888 66,456 64,181 51,246 51,246 51,246 66,560 66,560 60,3013.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,685 11,666 11,576 11,685 11,440 11,478 11,403 11,720 11,645 11,5703.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,849 4,840 4,794 4,849 4,727 4,746 4,708 4,867 4,829 4,791

3.18 500.1 M3 517,829 516,651 510,993 515,000 502,516 505,461 500,161 521,603 516,892 512,461

3.19 500.1 M3 545,177 543,946 538,035 542,221 529,179 532,255 526,718 549,120 544,198 539,568

3.20 500.1 M3 563,310 562,044 555,965 560,228 546,855 550,028 544,324 567,390 562,327 557,569

3.21 *** ML 5,742 5,742 5,742 5,742 5,742 5,742 5,742 5,742 5,742 5,742

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 91,726 90,631 91,499 91,726 82,970 82,970 80,781 96,119 96,119 96,119

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 864,574 863,237 856,820 861,365 847,205 850,545 844,532 868,855 863,511 858,4844.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 763,250 761,936 755,625 760,095 746,169 749,454 743,541 767,461 762,205 757,2624.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 800,052 798,685 792,124 796,771 782,294 785,709 779,562 804,429 798,965 793,8264.4 630 P CONCRETOS f´c =3500 psi (bases) M3 485,468 484,260 478,461 482,910 469,772 472,719 467,357 489,150 484,321 479,7444.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 574,423 573,168 567,138 571,764 558,105 561,169 555,595 578,251 573,231 568,4734.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 479,613 478,370 472,400 477,224 463,455 466,438 460,970 483,268 478,296 473,5614.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 568,337 567,044 560,837 565,853 551,539 554,639 548,955 572,136 566,967 562,0454.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 707,085 705,842 699,872 704,696 690,927 693,910 688,441 710,740 705,768 701,0334.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 495,132 493,840 487,633 492,649 478,334 481,435 475,750 498,932 493,763 488,8414.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 741,662 740,370 734,163 739,179 724,864 727,965 722,280 745,462 740,293 735,370

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA

MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

Page 266: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

4.11 650 P KG 8,325 8,325 8,325 8,325 8,325 8,325 8,325 8,325 8,325 8,325

4.12 650 P KG 11,180 11,180 11,180 11,180 11,180 11,180 11,180 11,180 11,180 11,180

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,231 1,231 1,231 1,231 1,231 1,231 1,231 1,231 1,231 1,231

4.14 621.1 ML 1,938,389 1,938,389 1,938,389 1,938,389 1,938,389 1,938,389 1,938,389 1,938,389 1,938,389 1,938,389

4.15 621.1 P ML 3,157,786 3,155,501 3,144,524 3,152,298 3,128,076 3,133,790 3,123,505 3,165,111 3,155,969 3,147,371

4.16 621.2 M3 1,079,806 1,078,575 1,072,664 1,077,441 1,063,808 1,066,761 1,061,347 1,083,425 1,078,502 1,073,814

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 69,055 69,055 69,055 69,055 69,055 69,055 69,055 69,055 69,055 69,0554.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 263,763 263,615 262,906 263,479 261,843 262,197 261,548 264,197 263,606 263,0444.19 632 P BARANDA METÁLICA ML 299,020 299,020 299,020 299,020 299,020 299,020 299,020 299,020 299,020 299,0204.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,149 12,149 12,149 12,149 12,149 12,149 12,149 12,149 12,149 12,149

4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 387,991 385,892 381,826 384,861 363,083 366,343 360,476 393,634 388,419 379,662

4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 79,185 78,091 69,108 79,185 70,429 70,429 68,240 83,579 83,579 83,5794.23 610.1 RELLENO PARA ESTRUCTURAS M3 50,880 49,686 45,360 50,880 38,940 38,940 38,940 47,736 44,154 47,2984.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 317,294 315,989 309,721 314,609 300,329 303,499 297,718 321,231 316,010 311,056

4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 312,176 311,003 307,595 310,581 298,914 300,797 296,567 316,113 313,011 310,068

4.26 630.7 M3 336,818 335,645 332,237 335,223 323,556 325,439 321,209 340,755 337,653 334,710

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 324,251 323,094 319,761 322,427 311,194 313,093 308,879 328,283 325,245 322,388

4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 348,893 347,736 344,403 347,069 335,836 337,735 333,521 352,924 349,887 347,029

4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 440,958 439,681 433,540 437,889 424,339 427,535 421,782 445,056 439,942 435,1334.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 528,323 526,995 520,611 525,132 511,045 514,368 508,388 532,583 527,267 522,2664.31 681.1 GAVIÓN M3 160,259 159,214 160,043 160,259 151,901 151,901 149,811 164,453 164,453 164,4534.32 681.1 GAVIÓN MALLA PVC M3 166,747 165,702 166,531 166,747 158,389 158,389 156,299 170,941 170,941 170,941

4.33 672.1 ML 34,017 33,939 33,562 33,829 32,997 33,193 32,840 34,269 33,955 33,659

4.34 672.1 ML 13,344 13,305 13,116 13,250 12,834 12,932 12,755 13,469 13,313 13,165

4.35 *** M2 7,982 7,982 7,982 7,982 7,982 7,982 7,982 7,982 7,982 7,982

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,414 11,414 11,414 11,414 11,414 11,414 11,414 11,414 11,414 11,414

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,387 15,387 15,387 15,387 15,387 15,387 15,387 15,387 15,387 15,387

4.38 *** M2 18,462 18,462 18,462 18,462 18,462 18,462 18,462 18,462 18,462 18,462

4.39 *** M2 23,729 23,729 23,729 23,729 23,729 23,729 23,729 23,729 23,729 23,729

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO)

CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES

BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

Page 267: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

4.40 *** M2 5,493 5,493 5,493 5,493 5,493 5,493 5,493 5,493 5,493 5,493

4.41 *** M2 6,258 6,258 6,258 6,258 6,258 6,258 6,258 6,258 6,258 6,258

4.42 *** M2 6,502 6,502 6,502 6,502 6,502 6,502 6,502 6,502 6,502 6,502

4.43 *** M2 5,563 5,563 5,563 5,563 5,563 5,563 5,563 5,563 5,563 5,563

4.44 *** M2 7,103 7,103 7,103 7,103 7,103 7,103 7,103 7,103 7,103 7,103

4.45 *** M2 5,216 5,216 5,216 5,216 5,216 5,216 5,216 5,216 5,216 5,216

4.46 *** M2 7,008 7,008 7,008 7,008 7,008 7,008 7,008 7,008 7,008 7,008

4.47 *** M2 11,998 11,998 11,998 11,998 11,998 11,998 11,998 11,998 11,998 11,998

4.48 661.1 ML 312,791 312,773 312,688 312,705 312,560 312,613 312,524 312,871 312,800 312,737

4.49 660.3 ML 263,307 262,866 261,830 262,821 259,651 260,324 259,088 264,292 263,007 262,278

4.50 *** ML 616,207 616,207 616,207 616,207 616,207 616,207 616,207 616,207 616,207 616,207

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 112,763 111,519 114,950 112,763 100,325 100,325 100,325 115,050 115,050 109,031

4.52 640.1 KG 3,220 3,220 3,220 3,220 3,220 3,220 3,220 3,220 3,220 3,220

4.53 *** ML 49,264 49,264 49,264 49,264 49,264 49,264 49,264 49,264 49,264 49,264

4.54 *** ML 79,327 79,327 79,327 79,327 79,327 79,327 79,327 79,327 79,327 79,327

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 430,300 428,972 422,588 427,109 413,022 416,345 410,364 434,560 429,243 424,2434.56 682.1 P COLCHONETA RENO M3 175,696 174,651 175,480 175,696 167,338 167,338 165,249 179,890 179,890 179,8904.57 *** TRINCHO EN MADERA M2 47,100 47,100 47,100 47,100 47,100 47,100 47,100 47,100 47,100 47,100

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,429 1,429 1,429 1,429 1,429 1,429 1,429 1,429 1,429 1,4295.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,498 14,498 14,498 14,498 14,498 14,498 14,498 14,498 14,498 14,4985.3 730.3 TOPE DEFENSA METÁLICA UN 66,668 66,668 66,668 66,668 66,668 66,668 66,668 66,668 66,668 66,6685.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 66,668 66,668 66,668 66,668 66,668 66,668 66,668 66,668 66,668 66,6685.5 730.1 DEFENSA METÁLICA ML 170,927 170,863 170,556 170,800 170,095 170,250 169,967 171,117 170,861 170,618

5.6 701.1 UN 10,187 10,187 10,187 10,187 10,187 10,187 10,187 10,187 10,187 10,187

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 563 563 563 563 563 563 563 563 563 563

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36"

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

Page 268: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SABANA OCCIDENTE

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286

6.5 801.1 HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 11,940 11,940 11,940 11,940 11,940 11,940 11,940 11,940 11,940 11,9406.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 32,193 32,193 32,193 32,193 32,193 32,193 32,193 32,193 32,193 32,1936.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,894 5,894 5,894 5,894 5,894 5,894 5,894 5,894 5,894 5,894

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 269: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,412,830 1,406,8961.2 CAMPAMENTO 9 M2 UN 826,698 823,7311.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 9,860 9,8601.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,097 11,0971.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 12,922 12,9221.6 CERCA EN TABLA H=2.30 M ML 46,118 46,1181.7 CERCA EN TEJA DE ZINC H=1.80 M ML 33,019 32,9551.8 CERCA EN TELA VERDE H = 2.10 M ML 14,788 14,7231.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 581,273 580,826

1.41 M2 6,944 6,944

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 270: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,180 2,1801.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,082,741 1,082,7411.44 RED TELEFÓNICA PROVISIONAL UN 154,871 154,8711.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 48,041 50,6282.2 BASE ARENA CEMENTO 1:20 M3 142,240 135,7312.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,506 4,5062.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 478,438 472,1012.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 490,751 484,1772.8 ZAPATAS EN CONCRETO 3500 PSI M3 460,022 453,8662.9 PILOTE DE MADERA D=20 CM ML 35,877 35,877

2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 109,625 109,625

2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 131,036 131,036

2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 156,929 156,929

2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 191,784 191,784

2.14 PILOTE HINCADO 25X25 ML 86,946 86,4972.15 PILOTE HINCADO 30X30 ML 105,140 104,4892.16 DADOS EN CONCRETO 3500PSI M3 449,246 443,0902.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 118,439 118,439

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 26,706 26,6663.2 SIFÓN EN PVC 6" UN 134,459 134,4183.3 CAJA DE INSPECCIÓN DE 100X100 UN 329,523 328,5863.4 CAJA DE INSPECCIÓN DE 40X40 UN 169,528 168,8433.5 CAJA DE INSPECCIÓN DE 60X60 UN 189,313 188,1643.6 CAJA DE INSPECCIÓN DE 80X80 UN 249,942 247,8363.7 DUCTO ELÉCTRICO PVC 4" ML 73,752 73,7723.8 POZO SÉPTICO ETERNIT 1000 LT UN 890,871 891,0703.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 80,848 80,401

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 46,525 46,2903.11 TUBERÍA DRENAJE PVC 110 ML 19,775 19,6653.12 TUBERÍA DRENAJE PVC 160 ML 29,692 29,5823.13 TUBERÍA DRENAJE PVC 200 ML 40,588 40,4343.14 TUBERÍA DRENAJE PVC 250 ML 54,893 54,7173.15 TUBERÍA DRENAJE PVC 315 ML 75,151 74,9973.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 687,789 686,031

Page 271: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 976,989 973,4733.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1,284,520 1,277,488

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 26,322 26,3224.2 CASETÓN DE LONA 0.80X0.70 M2 34,435 34,4354.3 COLUMNAS 3500 PSI M3 598,172 592,0164.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 201,925 197,927

4.5 ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 71,260 70,662

4.6 ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 83,803 83,085

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 96,106 95,1504.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 101,427 100,4114.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 116,518 115,263

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 129,747 128,3134.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 144,212 142,5994.12 ENTREPISO VIGUETA PLACA M2 69,658 69,5524.13 ESCALERA MACIZA 3500 PSI M3 699,758 693,6014.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 64,905 64,8174.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 58,515 57,8994.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 66,241 65,4884.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 77,592 76,6484.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 536,233 530,077

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 36,884 36,6944.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 211,958 209,208

4.21000000000001 ACERO FIGURADO 37000 PSI KG 2,947 2,9474.22 ACERO FIGURADO 60000 PSI KG 3,062 3,062

4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,304 4,3044.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 638,901 632,745

4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 587,815 581,0774.26 VIGA AÉREA 3500 PSI M3 637,631 631,474

4.27000000000001 VIGA CINTA 3500 PSI M3 622,269 616,1134.28 VIGA CANAL EN CONCRETO 3500 PSI M3 780,898 774,742

4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 245,492 238,701

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 22,224 22,0575.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 37,707 37,5405.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,010 23,9705.4 ARCOS EN LADRILLO PRENSADO ML 116,007 115,9275.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 32,917 32,7275.6 DINTELES EN BLOQUE 0.15 M ML 18,752 18,6645.7 ENCHAPES LADRILLO PRENSADO M2 63,070 62,9085.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 66,405 65,772

Page 272: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 51,536 51,5365.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 31,803 31,8035.11 MURO DRYWALL DOBLE CARA 0.10 M M2 50,000 50,0005.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 31,035 31,0355.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 61,988 61,9885.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 38,035 38,0355.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 63,418 63,4185.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 38,750 38,7505.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 25,947 25,8665.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,259 16,218

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 35,807 35,7535.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 22,001 21,973

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 42,185 42,1315.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 25,702 25,675

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 75,983 75,7125.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 44,906 44,771

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 23,996 23,9425.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,030 15,003

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 45,806 45,6975.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 28,738 28,684

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 60,563 60,4755.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 37,394 37,350

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 113,815 113,4365.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 70,916 70,727

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 56,079 55,8965.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 35,152 35,060

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 33,808 33,6875.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 20,787 20,726

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 24,505 24,4515.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,075 15,048

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 36,655 36,5475.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 22,731 22,676

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 70,090 69,9285.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 43,231 43,150

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 51,312 51,2045.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 31,267 31,212

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 108,531 108,1515.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 66,624 66,435

5.47000000000002 REMATES LADRILLO PRENSADO ML 20,883 20,8435.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 26,147 26,015

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 44,174 43,9995.50 LAVADA DE FACHADA M2 3,970 3,970

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 37,877 37,7105.52 DOVELA, GROUTING 3000 PSI ML 7,555 7,555

5.53000000000003 ANCLAJE 3/8" L=30CM UN 9,911 9,911

Page 273: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

5.54 ANCLAJE 1/2" L=50CM UN 12,935 12,9355.55000000000003 ANCLAJE 5/8" L=70CM UN 17,875 17,875

5.56 ANCLAJE 3/4" L=70CM UN 26,431 26,4315.57000000000003 ANCLAJE 1" L= 70CM UN 3,764 3,718

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,667 11,6676.2 FILOS O DILATACIONES B/PLACA ML 4,383 4,3436.3 FILOS O DILATACIONES S/MURO ML 5,286 5,2466.4 GOTERA EN MORTERO 1:4 ML 6,320 6,2806.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,147 4,1476.6 MALLA BAJO ENTRAMADO M2 10,087 10,0876.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 18,602 18,4746.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,277 11,2136.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 16,267 16,153

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 9,873 9,8166.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 15,639 15,5116.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,559 9,4956.13 PAÑETE CULATAS 1:4, E=2 CM M2 16,267 16,1536.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 9,873 9,8166.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 15,754 15,6636.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,616 9,5706.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 13,522 13,4366.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,281 8,238

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,044 12,9476.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,042 7,993

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 16,859 16,7456.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,154 10,097

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,232 16,1036.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 9,840 9,776

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 13,509 13,4116.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,261 8,212

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 16,909 16,7816.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,487 10,422

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 20,698 20,5357.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 61,050 60,7347.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 37,595 37,5957.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 15,508 15,5087.5 ML 24,246 24,2467.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 55,741 55,7417.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 40,120 40,1207.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 24,398 24,3987.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 54,273 54,273

BAJANTE PVC AGUAS LLUVIAS D=4"

Page 274: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 69,862 69,8627.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 90,668 90,6687.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 40,317 40,3177.13 CANAL PVC AMAZONAS ML 58,679 58,6797.14 CANAL PVC RAINGO ML 52,010 52,0107.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 81,652 81,6527.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 47,043 47,0437.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 38,734 38,7347.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 22,753 22,753

7.19000000000001 TEJA DE BARRO M2 44,050 43,8487.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 32,260 32,260

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 29,639 29,6397.22 TEJA FIBROCEMENTO Nº4 M2 25,552 25,552

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 24,784 24,7847.24 TEJA FIBROCEMENTO No. 8 M2 25,482 25,482

7.25000000000001 TEJA TERMOACÚSTICA M2 35,014 35,0147.26 TEJA PLÁSTICA No.6 M2 30,941 30,941

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 56,333 56,3337.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 101,902 101,902

7.29000000000001 TEJA SIN TRASLAPO M2 46,069 46,0697.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 30,687 30,687

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 24,060 24,060

7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 38,074 38,074

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,382 14,3827.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,082 17,082

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 19,286 19,2867.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 24,637 24,637

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 15,602 15,6027.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 36,514 36,514

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 207,347 207,3477.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 277,557 277,557

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 171,750 171,7507.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 245,562 245,562

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 350,079 343,5748.2 CONCRETO 3500 PSI M3 306,093 300,1168.3 CONCRETO 3000 PSI M3 301,494 295,3418.4 CONCRETO 2500 PSI M3 266,143 259,8148.5 CONCRETO 2000 PSI M3 248,710 242,2498.6 CONCRETO 1500 PSI M3 226,833 220,2408.7 MORTERO SECO 1:10 M3 180,869 175,2908.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 351,248 345,8308.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 321,360 315,251

Page 275: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 372,267 366,5548.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 490,727 485,014

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 84,511 84,5119.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,721 2,6809.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 95,713 95,7139.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 116,089 116,0899.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 158,277 158,2779.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 176,601 176,6019.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 194,950 194,9509.8 HOJA PUERTA FORTEC 0.81 UN 137,841 137,8419.9 HOJA PUERTA FORTEC 0.91 UN 152,168 152,168

9.10 HOJA PUERTA FORTEC 1.50 UN 225,227 225,2279.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 85,728 85,7289.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 113,522 113,5229.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 125,650 125,6509.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 318,189 318,1899.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 28,951 28,9519.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 18,739 18,7399.17 VENTANERÍA EN MADERA CEDRO MACHO M2 67,537 67,5379.18 CERRADURA DE ENTRADA PRINCIPAL UN 81,784 81,7849.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 63,693 63,6939.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 20,232 20,2329.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 20,232 20,2329.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 19,222 19,2229.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 70,583 70,5839.24 ESPEJO BISELADO INCOLORO 4 MM M2 90,999 90,9999.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 42,000 42,0009.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 50,167 50,1679.27 VIDRIO TEMPLADO PULIDO 10 MM M2 200,341 200,3419.28 VIDRIO TEMPLADO PULIDO 8 MM M2 179,924 179,9249.29 VIDRIO TRANSPARENTE 3 MM M2 45,064 45,0649.30 VIDRIO TRANSPARENTE 4 MM M2 52,208 52,2089.31 VIDRIO TRANSPARENTE 5 MM M2 58,334 58,3349.32 VIDRIO TRANSPARENTE 6 MM M2 62,008 62,008

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 52,937 52,93710.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 151,189 151,18910.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML 76,969 76,96910.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 102,524 102,52410.5 MARCO TAPA CAJA DE INSPECCIÓN UN 96,332 96,33210.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 67,159 67,15910.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 142,641 142,641

Page 276: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 76,678 76,67810.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,639 4,639

10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 71,878 71,878

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 30,051 30,05110.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 364,566 364,56610.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 132,514 132,51410.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 147,684 147,68410.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 333,892 333,89210.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 91,105 91,10510.17 PUERTA CORTINA INCLUYE ESMALTE M2 265,186 265,18610.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,303 4,30310.19 VENTANA EN ALUMINIO CORREDIZA M2 188,118 188,11810.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 86,761 86,76110.21 REJILLA PISO 0.30 M M2 60,475 60,47510.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 62,219 62,219

10.23 KG 7,212 7,212

10.24 KG 7,973 7,973

10.25 KG 6,316 6,316

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 160,871 160,87111.2 ACOMETIDA EN PVC 3/4" 5M UN 190,403 190,40311.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 15,508 15,50811.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 24,246 24,24611.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 23,597 23,59711.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 30,008 30,00811.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 61,182 61,18211.8 CONEXIÓN TANQUE ELEVADO PVC UN 160,905 160,90511.9 INSTALACIÓN APARATO SANITARIO UN 33,353 33,353

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,42211.12 LLAVE MANGUERA UN 22,888 22,88811.13 NIPLE PASAMURO 2" UN 48,986 48,98611.14 NIPLE PASAMURO 4" UN 73,029 73,02911.15 PUNTO AGUA CALIENTE CPVC UN 60,364 60,36411.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 44,927 44,92711.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 47,489 47,489

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 277: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 59,926 59,92611.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 47,203 47,20311.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 58,201 58,20111.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 62,032 62,03211.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 51,293 51,29311.23 RED SUMINISTRO CPVC 1/2" ML 8,758 8,75811.24 RED SUMINISTRO CPVC 3/4" ML 12,162 12,16211.25 RED SUMINISTRO PVC 1 1/2" ML 15,660 15,66011.26 RED SUMINISTRO PVC 1" ML 9,773 9,77311.27 RED SUMINISTRO PVC 1/2" ML 5,926 5,92611.28 RED SUMINISTRO PVC 2 1/2" ML 39,101 39,10111.29 RED SUMINISTRO PVC 2" ML 22,583 22,58311.30 RED SUMINISTRO PVC 3/4" ML 7,364 7,36411.31 RED SANITARIA PVC-S 2" ML 17,270 17,27011.32 RED SANITARIA PVC-S 3" ML 23,857 23,85711.33 RED SANITARIA PVC-S 4" ML 32,233 32,23311.34 RED SANITARIA PVC-S 6" ML 59,619 59,61911.35 REGISTRO 1" UN 78,266 78,26611.36 REGISTRO 1/2" UN 44,877 44,87711.37 REGISTRO 3/4" UN 54,794 54,79411.38 REGISTRO 1 1/2" UN 101,756 101,75611.39 REGISTRO 2 1/2" UN 260,880 260,88011.40 REGISTRO 2" UN 194,871 194,87111.41 REVENTILACIÓN 2" ML 12,124 12,12411.42 REVENTILACIÓN 3" ML 15,283 15,28311.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 120,918 120,91811.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 195,251 195,25111.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 320,671 320,67111.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 34,491 34,49111.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 39,683 39,68311.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 65,282 65,28211.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 49,635 49,63511.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 70,327 70,32711.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 74,670 74,67011.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 175,960 175,96011.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 34,636 34,63611.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 34,768 34,76811.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 27,498 27,49811.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 31,013 31,01311.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 2,782 2,78211.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 4,296 4,29611.59 GABINETE TIPO III UN 959,450 959,45011.60 GABINETE TIPO I UN 759,533 759,53311.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,191,756 1,191,75611.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,138,998 1,138,998

Page 278: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

11.63 VÁLVULA MARIPOSA 3" UN 622,233 622,23311.64 VÁLVULA MARIPOSA 4" UN 709,072 709,07211.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 302,176 302,176

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 213,926 213,92612.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 31,136 31,13612.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 38,225 38,22512.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 41,684 41,68412.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 50,691 50,69112.6 SALIDA TELÉFONO PVC COMPLETA UN 33,967 33,96712.7 SALIDA TIMBRE PVC COMPLETA UN 34,023 34,02312.8 STRIP TELEFÓNICO 10 PARES UN 102,514 102,51412.9 SALIDA TOMA DOBLE PVC COMPLETA UN 29,469 29,469

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 69,123 69,12312.11 SALIDA T.V PVC COMPLETA. UN 45,571 45,57112.12 SALIDA BIFÁSICA C.N. UN 26,753 26,75312.13 TABLERO PARCIAL 4 CIRCUITOS UN 76,909 76,90912.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 317,456 317,45612.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 426,379 426,37912.16 TUBERÍA PVC CONDUIT 1/2" ML 2,482 2,48212.17 TUBERÍA PVC CONDUIT 3/4" ML 3,237 3,23712.18 TUBERÍA PVC CONDUIT 1" ML 4,966 4,96612.19 TUBERÍA PVC CONDUIT 1 1/2" ML 8,930 8,93012.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 171,733 171,73312.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 54,519 54,51912.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 73,278 73,27812.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 26,907 26,90712.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 993,322 993,32212.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 735,627 735,62712.26 POSTE METÁLICO 6M UN 909,223 909,22312.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 411,054 411,05412.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 72,018 72,01812.29 LUMINARIA 70W SODIO UN 182,687 182,68712.30 LUMINARIA 150W SODIO UN 215,029 215,02912.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,152,520 1,152,52012.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 849,312 849,312

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 32,385 32,16513.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 27,393 27,17313.3 ALISTADO PARA LISTÓN M2 10,887 10,84313.4 ALISTADO PISOS 1:3, E=0.04 M2 21,625 21,18513.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 57,478 57,03913.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,199 20,070

Page 279: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

13.7 CONCRETO BASE GRADAS 2500 PSI M2 43,808 43,17513.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 60,549 59,53713.9 MANTO FIBERGLASS 600X1 M2 21,212 21,212

13.10 PEGANTE MORTERO-CONCRETO M2 18,456 18,45613.11 PERMA PLY 2 CAPAS M2 19,388 19,38813.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 35,668 35,09813.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 41,784 41,08813.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 60,482 59,40613.15 TRITURADO FINO 1/2 M3 76,658 72,13113.16 TRITURADO GRUESO 3/4 M3 75,878 72,807

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 35,462 35,37414.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 22,047 22,00314.3 ADOQUÍN CONCRETO 6CM M2 46,275 46,05614.4 ADOQUÍN CONCRETO 8CM M2 54,825 54,60614.5 ADOQUÍN GRES PEATONAL M2 45,327 45,10714.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 49,159 49,07114.7 GRAVILLA PARA GRADAS ML 28,826 28,73514.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 99,372 98,97714.9 ACABADO EN GRAVILLA LAVADA M2 35,763 35,538

14.10 GUARDAESCOBA EN GRANITO ML 29,036 29,03614.11 GUARDAESCOBA EN GRAVILLA ML 7,918 7,82714.12 GUARDAESCOBA PVC CARAMELO ML 6,832 6,83214.13 GUARDAESCOBA PVC CEDRO ML 8,636 8,63614.14 GUARDAESCOBA PINO CARIBE ML 7,434 7,43414.15 GUARDAESCOBA CEDRO BLANCO ML 7,424 7,42414.16 GUARDAESCOBA EN MADERA SAPAN ML 11,584 11,58414.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,776 6,77614.18 LISTÓN M.H. AMARILLO M2 52,244 52,24414.19 PASO ESCALERA GRANITO ML 77,770 77,46214.20 PIRLANES ALUMINIO ML 5,728 5,72814.21 PIRLANES LADRILLO ML 23,864 23,78314.22 PISO VINILO TRÁFICO RESIDENCIAL M2 29,563 29,56314.23 PISO VINILO TRÁFICO PESADO M2 39,272 39,27214.24 PULIDA LACADA PISO MADERA M2 39,701 39,70114.25 TABLETA DE GRES 25X25 M2 35,177 35,08914.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 35,802 35,71414.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 7,945 7,94514.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 32,617 32,49614.29 JABONERA PORCELANA ACUARIO UN 13,491 13,49114.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN 92,884 92,88414.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,477 7,47714.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 14,948 14,94814.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,189 10,189

Page 280: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 9,719 9,71914.35 REMATES BOCEL ALUMINIO ML 6,307 6,30714.36 REMATES BOCEL PORCELANA ML 6,408 6,40814.37 TAPA REGISTRO 20X20 UN 14,030 14,03014.38 TAPA REGISTRO 6X6 UN 12,413 12,41314.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 13,240 13,24014.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 15,363 15,36314.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 44,801 44,71314.42 MEDIA CAÑA EN GRANITO ML 53,602 53,60214.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,048 26,04814.44 PINTURA ACRÍLICA PARA PISOS M2 9,922 9,92214.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,095 11,09514.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 77,242 77,242

15 CIELO RASO15.1 APLIQUE YESO ML 53,309 53,30915.2 ARMADURA MADERA Y MALLA M2 26,187 26,18715.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 49,232 49,23215.4 CIELO RASO DURACUSTIC M2 48,621 48,62115.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 44,871 44,87115.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 63,651 63,65115.7 CORNISAS YESO ML 33,274 33,27415.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 70,510 70,51015.9 MALLA CON VENA M2 10,038 10,038

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120

16.2 M3 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730

16.4 M3 34,829 34,829

16.5 M3 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,70416.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,59216.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 40,631 43,21816.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 85,213 80,041

16.10 M3 123,771 123,771

16.11 AFRIMADO (NORMA INVIAS 311) M3 43,641 46,22816.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 112,317 114,90416.13 BASE GRANULAR (NORMA INVIAS 330) M3 124,412 124,412

17 APARATOS SANITARIOS

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

Page 281: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 204,804 204,80417.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 641,797 641,79717.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 363,535 363,53517.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 118,628 118,62817.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 146,191 146,19117.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 172,587 172,58717.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 265,496 265,49617.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 693,868 693,86817.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 218,018 218,018

17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 106,146 106,14617.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 61,057 61,057

17.12 UN 174,104 174,104

17.13 UN 277,094 277,094

18 PINTURAS18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,405 4,40518.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,143 2,14318.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,234 8,23418.4 BARNIZ SOBRE MUEBLES M2 30,775 30,77518.5 CARBURO SOBRE PAÑETES M2 4,235 4,23518.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,153 10,15318.7 DEMARCACIÓN CON MARMOLINA ML 2,646 2,64618.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,871 1,87118.9 ESMALTE SOBRE LÁMINA LLENA M2 9,764 9,764

18.10 ESMALTE SOBRE MADERA LINEAL ML 2,911 2,91118.11 ESMALTE SOBRE MADERA LLENA M2 10,810 10,81018.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,756 3,75618.13 ESMALTE SOBRE MARCOS MADERA M2 4,492 4,49218.14 ESTUCO M2 5,751 5,75118.15 ESTUCO (LINEAL) ML 3,557 3,55718.16 ESTUCO Y VINILO 3 MANOS M2 11,929 11,92918.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,395 7,39518.18 LACA PISOS MADERA M2 17,712 17,71218.19 LÍNEAS TRÁFICO 0.10 ML 2,029 2,02918.20 MARMOLINA SOBRE PAÑETE M2 8,386 8,38618.21 TINTILLA SOBRE MADERA LINEAL ML 2,446 2,44618.22 TINTILLA SOBRE MADERA LLENA M2 9,461 9,46118.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,208 5,20818.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,305 3,30518.25 WASH-PRIMER SOBRE ALUMNIO M2 15,692 15,69218.26 PINTURA EPÓXICA M2 9,851 9,85118.27 PINTURA EPÓXICA (LINEAL) ML 6,075 6,075

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 282: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,477,543 3,477,543

19.2 UN 6,104,380 6,104,380

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,831,222 1,831,22219.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,132,556 5,132,55619.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,108,068 5,108,06819.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,029 2,02919.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,827,086 1,827,08619.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 58,520 58,52019.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,030,614 1,030,549

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 533,480 531,942

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 22,129 22,12920.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 32,527 32,52720.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 40,079 40,07920.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 24,786 24,78620.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 28,199 28,19920.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 41,282 41,28220.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,224 19,22420.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,257 20,25720.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 24,989 24,989

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,048 11,04820.11 VÁLVULA DE BOLA GAS 3/4" UN 17,147 17,14720.12 VÁLVULA DE BOLA GAS 1" UN 25,590 25,59020.13 VÁLVULA POLIETILENO GAS 1/2" UN 151,639 151,63920.14 VÁLVULA POLIETILENO GAS 3/4" UN 155,934 155,93420.15 VÁLVULA POLIETILENO GAS 1" UN 252,338 252,33820.16 ACOMETIDA GAS 1/2" ML 209,324 209,324

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 92,791 92,79121.2 CABLE DETECTOR LINEAL DE CALOR ML 22,892 22,89221.3 SIRENA DE 110 V UN 65,752 65,75221.4 CÁMARA CCTV UN 194,907 194,90721.5 PARLANTE-CIELO FALSO UN 37,907 37,90721.6 AMPLIFICADOR 100W UN 403,307 403,30721.7 AMPLIFICADOR 300W UN 992,134 992,13421.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,535 32,53521.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 158,605 158,605

21.10 TOMA PARA MICRÓFONO UN 32,416 32,41621.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,466 2,46621.12 SPLITERS UN 3,925 3,92521.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 13,869 13,869

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 283: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,191 18,19121.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 24,887 24,88721.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 88,941 88,94121.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 23,404 23,40421.18 BANDEJA PORTACABLES PARA RACK UN 76,297 76,29721.19 RACK 2' X 24" UN 126,375 126,37521.20 RACK 3' X 24" UN 152,653 152,65321.21 RACK 5' X 24" UN 240,601 240,60121.22 RACK 7' X 24" UN 309,329 309,32921.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 357,271 357,27121.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 215,353 215,35321.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 50,497 50,49721.26 PATCH CORD 2M CATEGORÍA 6A UN 5,205 5,20521.27 PATCH CORD 5M CATEGORÍA 6A UN 13,158 13,15821.28 CABLE UTP CATEGORÍA 6A ML 2,506 2,50621.29 CANALETA METÁLICA 4X6 CMS ML 25,041 25,04121.30 CANALETA METÁLICA 4X10 CMS ML 26,102 26,10221.31 CANALETA METÁLICA 6X10 CMS ML 26,633 26,63321.32 CANALETA PLÁSTICA 13X7 MM ML 14,913 14,91321.33 CANALETA PLÁSTICA 20X12 MM ML 16,623 16,62321.34 CANALETA PLÁSTICA 32X12 MM ML 16,557 16,55721.35 CANALETA PLÁSTICA 40X60 MM ML 26,179 26,17921.36 SWITCH 10/100/1000 24 PUERTOS UN 350,750 350,75021.37 SWITCH 10/100/1000 16 PUERTOS UN 222,381 222,38121.38 SWITCH 10/100/1000 8 PUERTOS UN 60,661 60,66121.39 CABLE TELEFÓNICO 2 PARES ML 1,297 1,29721.40 CABLE TELEFÓNICO 10 PARES ML 6,264 6,26421.41 CABLE TELEFÓNICO 20 PARES ML 8,336 8,33621.42 CABLE TELEFÓNICO 40 PARES ML 11,607 11,60721.43 CABLE TELEVISIÓN RG6 ML 1,618 1,61821.44 ACOMETIDA TELEFÓNICA 1/2" ML 15,810 15,81021.45 ACOMETIDA TELEFÓNICA 1" ML 24,031 24,03121.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 12,838 12,83821.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 10,299 10,29921.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 450,226 450,226

Page 284: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 18,391 18,3911.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 60,779 60,7791.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 339,556 339,5561.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 724,529 724,5291.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 83,469 83,4691.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 505,362 505,3621.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,085,830 1,085,8301.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,256 9,2561.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,273 11,273

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,011 14,0111.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 15,265 15,2651.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 18,184 18,1841.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 18,184 18,1841.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 71,150 71,1501.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 82,487 82,4871.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 254,906 254,9061.17 TEE PVC UNIÓN MECÁNICA 2" UN 95,607 95,6071.18 TEE PVC UNIÓN MECÁNICA 4" UN 157,598 157,5981.19 TEE PVC UNIÓN MECÁNICA 8" UN 695,658 695,6581.20 TEE PVC UNIÓN MECÁNICA 10" UN 801,236 801,2361.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 9,525 9,5251.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,474 8,4741.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 19,572 19,5721.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 79,221 79,2211.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 117,001 117,0011.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 19,595 19,5951.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 66,734 66,7341.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 97,934 97,9341.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 20,420 20,4201.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 41,886 41,8861.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 167,187 167,1871.32 UNIÓN REPARACION PVC 4" UN 48,758 48,7581.33 UNIÓN REPARACIÓN PVC 8" UN 194,279 194,2791.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 118,273 118,2731.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 331,642 331,6421.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 974,163 974,1631.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,439,259 1,439,259

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 7,892 7,8922.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,185 18,1852.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592

Page 285: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

2.4 RELLENO TIPO 1 "GRAVILLA" M3 74,194 69,2572.5 RELLENO TIPO 2 "RECEBO" M3 37,451 40,0382.6 RELLENO TIPO 4 "SUBBASE B-200" M3 44,861 47,4482.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 66,209 66,2092.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 67,384 67,3842.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 60,702 55,446

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 75,811 75,8113.2 CODO 45 PVC ALCANTARILLADO 16" UN 788,151 788,1513.3 CODO 90 PVC ALCANTARILLADO 8" UN 99,006 99,0063.4 CODO 90 PVC ALCANTARILLADO 16" UN 912,525 912,5253.5 CODO 90 PVC ALCANTARILLADO 24" UN 636,000 636,0003.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 57,366 57,3663.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 75,550 75,5503.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 177,843 177,8433.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 177,842 177,842

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 285,349 285,3493.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 75,551 75,5513.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 75,550 75,5503.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 177,843 177,8433.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 177,843 177,8433.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 285,350 285,3503.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 264,501 264,5013.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 422,694 422,6943.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 674,595 674,5953.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 42,162 42,1623.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 223,351 223,3513.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 240,841 240,8413.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 706,816 706,8163.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 39,808 39,7543.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 203,127 203,1273.25 TUBERÍA PVC ALCANTARILLADO 8" ML 33,313 33,3133.26 TUBERÍA PVC ALCANTARILLADO 10" ML 46,939 46,9393.27 TUBERÍA PVC ALCANTARILLADO 12" ML 67,550 67,5503.28 TUBERÍA PVC ALCANTARILLADO 16" ML 103,573 103,5733.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 166,085 166,0853.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 245,097 245,0973.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 308,988 308,9883.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 405,799 405,7993.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 555,811 555,811

4 ALCANTARILLADO - SUMIDEROS Y POZOS4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 489,981 486,289

Page 286: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML 470,702 467,903

4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 483,246 480,7854.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 581,135 576,520

4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML 663,931 659,989

4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 563,683 560,299

4.7 SUMIDERO EN LADRILLO SL-100 UN 706,811 704,9564.8 SUMIDERO EN LADRILLO SL-250 UN 1,037,542 1,032,2294.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,446,715 1,436,910

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 1,958,379 1,942,0794.11 SUMIDERO PREFABRICADO SL-100 UN 905,400 905,4004.12 SUMIDERO PREFABRICADO SL-250 UN 2,107,721 2,107,721

4.13 UN 98,245 98,131

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 41,504 41,2215.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 47,796 47,5135.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 42,118 41,4545.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 45,830 45,1845.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 46,313 45,6855.6 BORDE SEPARADOR VERDE A-170 ML 181,335 181,2205.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 13,971 13,8925.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 30,313 29,8445.9 CAÑUELA PREFABRICADA TIPO A-120 ML 60,329 60,268

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 414,902 413,3465.11 LOSETA PREFABRICADA A-40 M2 43,782 43,5205.12 LOSETA PREFABRICADA A-60 M2 62,059 61,7975.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 25,299 25,0415.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 40,753 40,2305.15 SARDINEL PREFABRICADO A-10 ML 75,154 75,0925.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 42,244 42,086

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 106,782 106,4756.2 BANCA EN CONCRETO M-30 UN 445,340 444,9096.3 BOLARDO M-63 ALTO/HIERRO UN 162,516 162,4526.4 BOLARDO M-60 CONCRETO UN 103,987 103,6186.5 BOLARDO M-61 BAJO/CONCRETO UN 105,409 105,0406.6 BOLARDO M-62 BAJO/HIERRO UN 145,372 144,9846.7 BORDE CONTENEDOR DE RAICES A-70 ML 43,954 43,7376.8 BORDILLO PREFABRICADO A-80 ML 48,856 48,6136.9 CANECA M-120 UN 223,976 223,922

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 287: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 586,416 586,2316.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,226,556 2,226,4336.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,621,659 2,621,5366.13 CICLOPARQUEADERO M100 TIPO 1 UN 366,641 366,5126.14 CICLOPARQUEADERO M101 TIPO 2 UN 485,735 485,2186.15 BANCA EN MADERA M-50 UN 333,127 333,1276.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 170,041 169,8566.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 399,248 399,1136.18 POSTE HISTÓRICO M-131 UN 3,360,649 3,359,726

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,355 1,3557.2 MARCA VIAL CON PINTURA EN FRÍO M2 13,997 13,9977.3 SEÑAL DOBLE DE CICLORUTA UN 341,303 341,2467.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 394,805 394,5477.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 230,411 230,3547.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 270,859 270,8027.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 371,100 371,0437.8 TACHAS REFLECTIVAS UN 9,683 9,6837.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,212 10,212

7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN 39,516 39,516

Page 288: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085

1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 33,343 33,343

1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656

1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 56,744 56,744

1.6 *** M3-KM 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 7,472 7,4722.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,053 28,0532.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 6,753 6,7532.4 220.1 TERRAPLENES M3 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 341 341

2.8 230.2 M3 9,096 9,096

2.9 600.1 M3 17,449 17,449

2.10 600.2 M3 46,348 46,348

2.11 600.3 M3 57,494 57,494

2.12 600.4 M3 10,594 10,594

2.13 600.4 P M3 25,966 25,966

2.14 600.5 M3 21,078 21,078

2.15 600.5 P M3 36,376 36,376

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 112,317 114,9043.3 330.1 BASE GRANULAR M3 124,412 124,412

3.4 365.1 M3 72,536 72,536

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

Page 289: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 1,966 1,9663.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,000 1,0003.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 149,371 148,0413.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 51,961 51,5673.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO) M3 440,148 433,9293.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO) M3 447,398 441,1793.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 470,123 463,9053.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO) M3 476,398 470,1793.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 214,980 214,9803.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 202,438 205,0253.15 311.1 AFIRMADO M3 43,641 46,2283.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,109 11,0153.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,590 4,543

3.18 500.1 M3 480,119 474,230

3.19 500.1 M3 505,143 498,990

3.20 500.1 M3 521,546 515,218

3.21 *** ML 5,592 5,592

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 86,140 86,140

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 823,100 816,4204.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 723,303 716,7334.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 758,782 751,9524.4 630 P CONCRETOS f´c =3500 psi (bases) M3 451,405 445,3694.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 539,022 532,7464.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 446,760 440,5464.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 534,193 527,7324.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 674,232 668,0184.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 461,238 454,7784.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 707,768 701,3074.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 8,130 8,1304.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG 10,831 10,8314.13 641.1 ACERO DE PREESFUERZO TON-M 1,197 1,197

4.14 621.1 ML 1,868,001 1,868,001

4.15 621.1 P ML 3,060,178 3,048,751

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1,040,765 1,034,6124.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 65,764 65,7644.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 253,634 252,8964.19 632 P BARANDA METÁLICA ML 289,048 289,0484.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 11,622 11,6224.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 340,675 335,748

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNCONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNSELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

Page 290: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 73,599 73,5994.23 610.1 RELLENO PARA ESTRUCTURAS M3 34,518 36,9064.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 286,017 279,4914.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 291,564 287,6884.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 316,206 312,3304.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 302,024 298,2274.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 326,666 322,8694.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 406,963 400,5704.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 492,981 486,3354.31 681.1 GAVIÓN M3 152,835 152,8354.32 681.1 GAVIÓN MALLA PVC M3 158,949 158,9494.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 31,860 31,4684.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 12,230 12,0344.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 7,627 7,6274.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 10,861 10,8614.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 14,606 14,606

4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 17,504 17,504

4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 22,467 22,467

4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,251 5,251

4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,973 5,973

4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,201 6,201

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,317 5,317

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,768 6,768

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 4,989 4,989

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,679 6,679

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 11,382 11,382

4.48 661.1 ML 297,618 297,529

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML 245,515 244,1094.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML 584,016 584,0164.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 92,953 95,4404.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,062 3,0624.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 46,668 46,6684.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 75,077 75,0774.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 393,570 386,9244.56 682.1 P COLCHONETA RENO M3 167,898 167,8984.57 *** TRINCHO EN MADERA M2 44,647 44,647

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

Page 291: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Sibaté Soacha

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SOACHA

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,355 1,3555.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 13,997 13,9975.3 730.3 TOPE DEFENSA METÁLICA UN 63,077 63,0775.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 63,077 63,0775.5 730.1 DEFENSA METÁLICA ML 161,070 160,7505.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 9,683 9,683

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 555 555

6.2 801.6 UN 100,510 100,510

6.3 801.7 ML 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,2866.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240

6.6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 11,407 11,4076.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 30,496 30,4966.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,754 5,754

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 292: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,524,675 1,547,111 1,508,337 1,519,232 1,533,346 1,519,533 1,540,466 1,507,365 1,522,001 1,546,0031.2 CAMPAMENTO 9 M2 UN 885,939 897,157 877,770 883,217 890,274 883,368 893,834 877,284 884,602 896,6031.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,216 10,216 10,216 10,216 10,216 10,216 10,216 10,216 10,216 10,2161.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,505 11,505 11,505 11,505 11,505 11,505 11,505 11,505 11,505 11,5051.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,377 13,377 13,377 13,377 13,377 13,377 13,377 13,377 13,377 13,3771.6 CERCA EN TABLA H=2.30 M ML 49,236 49,236 49,236 49,236 49,236 49,236 49,236 49,236 49,236 49,2361.7 CERCA EN TEJA DE ZINC H=1.80 M ML 35,525 35,780 35,351 35,459 35,594 35,478 35,682 35,322 35,494 35,7381.8 CERCA EN TELA VERDE H = 2.10 M ML 15,944 16,199 15,771 15,879 16,014 15,898 16,102 15,742 15,914 16,1571.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 625,875 631,410 624,239 627,307 627,961 626,407 629,842 624,548 624,673 630,495

1.41 M2 7,315 7,315 7,315 7,315 7,315 7,315 7,315 7,315 7,315 7,315

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,319 2,319 2,319 2,319 2,319 2,319 2,319 2,319 2,319 2,319

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 293: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,0191.44 RED TELEFÓNICA PROVISIONAL UN 164,636 164,636 164,636 164,636 164,636 164,636 164,636 164,636 164,636 164,636

1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 58,181 96,986 54,508 80,378 76,290 66,150 89,225 62,269 48,041 90,5182.2 BASE ARENA CEMENTO 1:20 M3 185,044 201,158 162,911 168,118 160,797 174,629 180,327 145,985 169,420 180,3272.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,615 4,615 4,615 4,615 4,615 4,615 4,615 4,615 4,615 4,6152.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 537,415 562,111 520,275 531,168 544,949 532,599 553,315 517,986 534,464 558,8912.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 551,957 578,047 534,374 545,198 558,667 547,393 567,832 531,198 548,834 573,4022.8 ZAPATAS EN CONCRETO 3500 PSI M3 516,453 540,883 499,990 510,125 522,736 512,180 531,318 497,015 513,529 536,5342.9 PILOTE DE MADERA D=20 CM ML 36,378 36,378 36,378 36,378 36,378 36,378 36,378 36,378 36,378 36,378

2.10 ML 110,984 110,984 110,984 110,984 110,984 110,984 110,984 110,984 110,984 110,984

2.11 ML 134,065 134,065 134,065 134,065 134,065 134,065 134,065 134,065 134,065 134,065

2.12 ML 161,976 161,976 161,976 161,976 161,976 161,976 161,976 161,976 161,976 161,976

2.13 ML 199,550 199,550 199,550 199,550 199,550 199,550 199,550 199,550 199,550 199,550

2.14 PILOTE HINCADO 25X25 ML 92,352 94,179 91,172 91,864 92,703 92,083 93,376 90,877 92,133 93,7352.15 PILOTE HINCADO 30X30 ML 112,976 115,624 111,265 112,268 113,484 112,586 114,459 110,837 112,659 114,9802.16 DADOS EN CONCRETO 3500PSI M3 505,677 530,106 489,213 499,349 511,960 501,403 520,542 486,239 502,753 525,758

2.17 ML 119,239 119,239 119,239 119,239 119,239 119,239 119,239 119,239 119,239 119,239

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 28,368 28,468 28,230 28,263 28,217 28,303 28,338 28,125 28,271 28,3383.2 SIFÓN EN PVC 6" UN 144,878 144,979 144,741 144,773 144,728 144,814 144,849 144,636 144,781 144,8493.3 CAJA DE INSPECCIÓN DE 100X100 UN 361,130 393,995 353,998 374,605 372,124 366,039 384,915 356,713 350,593 387,3883.4 CAJA DE INSPECCIÓN DE 40X40 UN 181,654 186,379 179,225 182,105 183,160 181,291 185,037 179,309 180,251 185,7633.5 CAJA DE INSPECCIÓN DE 60X60 UN 205,052 212,593 200,960 205,447 206,741 204,343 210,054 200,697 202,542 211,1193.6 CAJA DE INSPECCIÓN DE 80X80 UN 274,285 284,788 267,247 273,327 276,015 272,307 280,904 266,309 270,684 282,6253.7 DUCTO ELÉCTRICO PVC 4" ML 75,207 75,506 75,217 75,416 75,347 75,307 75,446 75,277 75,118 75,4563.8 POZO SÉPTICO ETERNIT 1000 LT UN 960,793 963,778 960,891 962,881 962,186 961,786 963,181 961,488 959,896 963,2813.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 87,430 88,536 85,911 86,268 85,765 86,715 87,106 84,749 86,357 87,106

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 50,591 51,175 49,790 49,978 49,713 50,214 50,421 49,177 50,026 50,4213.11 TUBERÍA DRENAJE PVC 110 ML 21,281 21,633 20,951 21,218 21,591 21,127 21,657 21,042 21,240 21,7893.12 TUBERÍA DRENAJE PVC 160 ML 31,974 32,326 31,645 31,911 32,285 31,821 32,351 31,735 31,933 32,4823.13 TUBERÍA DRENAJE PVC 200 ML 43,885 44,378 43,423 43,796 44,319 43,669 44,411 43,550 43,827 44,5963.14 TUBERÍA DRENAJE PVC 250 ML 59,440 60,003 58,913 59,339 59,937 59,194 60,042 59,058 59,374 60,2533.15 TUBERÍA DRENAJE PVC 315 ML 81,334 81,827 80,873 81,246 81,769 81,119 81,861 81,000 81,277 82,046

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 294: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

3.16 UN 747,092 752,725 741,818 746,080 752,057 744,631 753,112 743,267 746,431 755,221

3.17 UN 1,067,752 1,079,017 1,057,204 1,065,726 1,077,681 1,062,830 1,079,790 1,060,101 1,066,430 1,084,010

3.18 UN 1,415,174 1,437,704 1,394,078 1,411,123 1,435,032 1,405,329 1,439,251 1,399,872 1,412,529 1,447,689

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 27,959 27,959 27,959 27,959 27,959 27,959 27,959 27,959 27,959 27,9594.2 CASETÓN DE LONA 0.80X0.70 M2 36,763 36,763 36,763 36,763 36,763 36,763 36,763 36,763 36,763 36,7634.3 COLUMNAS 3500 PSI M3 659,223 683,653 642,760 652,895 665,506 654,950 674,088 639,785 656,299 679,3044.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 240,582 262,276 228,723 235,832 252,494 236,257 258,520 226,597 238,104 264,771

4.5 M2 79,095 81,467 77,497 78,481 79,705 78,680 80,539 77,208 78,811 81,045

4.6 M2 93,261 96,108 91,343 92,524 93,993 92,764 94,993 90,997 92,921 95,601

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 105,880 109,675 103,323 104,897 106,856 105,216 108,189 102,861 105,426 108,999

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 111,806 115,839 109,089 110,762 112,843 111,101 114,260 108,598 111,324 115,121

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 129,156 134,137 125,800 127,866 130,437 128,285 132,187 125,193 128,560 133,250

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 144,121 149,814 140,285 142,647 145,585 143,126 147,585 139,592 143,440 148,800

4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 160,301 166,705 155,985 158,642 161,948 159,181 164,198 155,205 159,534 165,565

4.12 ENTREPISO VIGUETA PLACA M2 74,458 74,807 74,142 74,283 74,368 74,341 74,581 74,006 74,324 74,6354.13 ESCALERA MACIZA 3500 PSI M3 767,632 792,061 751,168 761,303 773,915 763,358 782,497 748,193 764,707 787,7124.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 70,016 70,450 69,817 69,875 69,905 70,034 70,116 69,629 69,963 70,1514.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 64,726 67,169 63,080 64,094 65,355 64,299 66,213 62,783 64,434 66,7344.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 73,691 76,680 71,677 72,917 74,460 73,169 75,510 71,314 73,334 76,1484.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 86,766 90,513 84,241 85,795 87,730 86,110 89,046 83,784 86,317 89,8464.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 594,226 618,656 577,763 587,898 600,509 589,953 609,091 574,788 591,302 614,307

4.19000000000001 UN 39,135 39,907 38,635 38,928 39,283 39,021 39,567 38,510 39,042 39,719

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 236,942 247,853 229,590 234,116 239,748 235,034 243,581 228,261 235,636 245,9104.21000000000001 ACERO FIGURADO 37000 PSI KG 3,160 3,160 3,160 3,160 3,160 3,160 3,160 3,160 3,160 3,160

4.22 ACERO FIGURADO 60000 PSI KG 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,2824.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519

4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 697,705 722,135 681,241 691,377 703,988 693,432 712,570 678,267 694,781 717,7864.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 650,007 676,731 631,983 643,089 656,914 645,318 666,293 628,750 646,809 672,007

4.26 VIGA AÉREA 3500 PSI M3 697,650 722,080 681,187 691,322 703,933 693,377 712,515 678,212 694,726 717,7314.27000000000001 VIGA CINTA 3500 PSI M3 682,311 706,741 665,848 675,983 688,594 678,038 697,176 662,873 679,387 702,392

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M)

Page 295: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 841,422 865,852 824,959 835,094 847,705 837,149 856,287 821,984 838,498 861,5034.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 295,398 321,075 276,700 289,169 305,321 289,514 313,470 275,588 292,338 319,807

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 23,760 24,375 23,290 23,517 23,708 23,620 24,019 23,101 23,601 24,1215.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 39,319 39,935 38,849 39,076 39,267 39,179 39,579 38,661 39,160 39,6805.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,942 25,042 24,805 24,837 24,791 24,877 24,913 24,699 24,845 24,9135.4 ARCOS EN LADRILLO PRENSADO ML 120,212 120,412 119,937 120,001 119,910 120,082 120,153 119,726 120,018 120,1535.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 35,123 35,896 34,624 34,917 35,271 35,009 35,556 34,499 35,031 35,7085.6 DINTELES EN BLOQUE 0.15 M ML 20,062 20,496 19,863 19,922 19,951 20,080 20,162 19,675 20,009 20,1975.7 ENCHAPES LADRILLO PRENSADO M2 67,876 68,277 67,326 67,456 67,274 67,618 67,759 66,906 67,488 67,7595.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 73,606 76,181 71,941 72,917 74,099 73,226 75,049 71,525 73,297 75,5555.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,710 53,710 53,710 53,710 53,710 53,710 53,710 53,710 53,710 53,710

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,889 32,889 32,889 32,889 32,889 32,889 32,889 32,889 32,889 32,8895.11 MURO DRYWALL DOBLE CARA 0.10 M M2 52,043 52,043 52,043 52,043 52,043 52,043 52,043 52,043 52,043 52,0435.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 32,056 32,056 32,056 32,056 32,056 32,056 32,056 32,056 32,056 32,0565.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 65,260 65,260 65,260 65,260 65,260 65,260 65,260 65,260 65,260 65,2605.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,671 39,671 39,671 39,671 39,671 39,671 39,671 39,671 39,671 39,6715.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 66,812 66,812 66,812 66,812 66,812 66,812 66,812 66,812 66,812 66,8125.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 40,447 40,447 40,447 40,447 40,447 40,447 40,447 40,447 40,447 40,4475.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,550 27,751 27,273 27,338 27,247 27,420 27,491 27,062 27,355 27,4915.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 17,060 17,161 16,922 16,955 16,909 16,995 17,031 16,816 16,963 17,031

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 38,179 38,313 37,995 38,038 37,977 38,093 38,140 37,854 38,049 38,1405.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 23,187 23,254 23,094 23,116 23,086 23,143 23,167 23,024 23,122 23,167

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 44,968 45,102 44,784 44,827 44,767 44,882 44,929 44,643 44,838 44,9295.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 27,094 27,161 27,002 27,024 26,993 27,051 27,074 26,931 27,029 27,074

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 81,947 82,617 81,026 81,242 80,938 81,513 81,750 80,321 81,296 81,7505.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 47,888 48,223 47,428 47,536 47,384 47,671 47,790 47,075 47,563 47,790

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 25,333 25,467 25,148 25,192 25,131 25,246 25,293 25,008 25,203 25,2935.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,698 15,765 15,606 15,628 15,597 15,655 15,679 15,536 15,633 15,679

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 48,593 48,862 48,225 48,312 48,190 48,420 48,515 47,943 48,333 48,5155.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 30,132 30,266 29,947 29,991 29,930 30,045 30,092 29,806 30,002 30,092

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 65,100 65,534 64,901 64,959 64,989 65,118 65,200 64,713 65,047 65,2355.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,662 39,879 39,563 39,592 39,607 39,671 39,712 39,469 39,636 39,730

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 122,842 123,781 121,552 121,856 121,429 122,235 122,567 120,566 121,932 122,5675.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 75,430 75,899 74,785 74,937 74,724 75,127 75,293 74,292 74,975 75,293

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 60,323 60,777 59,700 59,846 59,640 60,030 60,190 59,223 59,883 60,1905.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 37,274 37,501 36,962 37,036 36,932 37,127 37,207 36,724 37,054 37,207

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 36,291 36,591 35,878 35,975 35,839 36,096 36,203 35,563 35,999 36,2035.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 22,028 22,179 21,822 21,871 21,803 21,931 21,984 21,665 21,883 21,984

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 25,924 26,058 25,740 25,783 25,722 25,838 25,885 25,599 25,794 25,8855.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,784 15,852 15,692 15,714 15,684 15,741 15,765 15,622 15,719 15,765

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 39,307 39,576 38,939 39,026 38,904 39,134 39,229 38,657 39,047 39,2295.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 24,056 24,191 23,872 23,916 23,855 23,970 24,017 23,731 23,926 24,017

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 75,133 75,535 74,580 74,710 74,528 74,873 75,015 74,158 74,743 75,015

Page 296: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 45,752 45,954 45,476 45,541 45,450 45,622 45,694 45,265 45,557 45,6945.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 54,882 55,150 54,514 54,600 54,479 54,709 54,804 54,232 54,622 54,804

5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 33,082 33,216 32,898 32,941 32,880 32,995 33,043 32,757 32,952 33,043

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 117,183 118,122 115,894 116,197 115,771 116,577 116,909 114,908 116,273 116,909

5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 70,994 71,463 70,349 70,501 70,288 70,690 70,856 69,856 70,539 70,856

5.47000000000002 REMATES LADRILLO PRENSADO ML 21,985 22,085 21,847 21,879 21,834 21,920 21,955 21,742 21,888 21,9555.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 28,152 28,478 27,703 27,809 27,661 27,941 28,056 27,361 27,835 28,056

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 47,284 47,719 46,686 46,827 46,629 47,002 47,156 46,229 46,862 47,1565.50 LAVADA DE FACHADA M2 4,007 4,007 4,007 4,007 4,007 4,007 4,007 4,007 4,007 4,007

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 39,489 40,104 39,019 39,246 39,437 39,348 39,748 38,830 39,330 39,8505.52 DOVELA, GROUTING 3000 PSI ML 7,621 7,621 7,621 7,621 7,621 7,621 7,621 7,621 7,621 7,621

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,118 10,118 10,118 10,118 10,118 10,118 10,118 10,118 10,118 10,1185.54 ANCLAJE 1/2" L=50CM UN 13,241 13,241 13,241 13,241 13,241 13,241 13,241 13,241 13,241 13,241

5.55000000000003 ANCLAJE 5/8" L=70CM UN 18,494 18,494 18,494 18,494 18,494 18,494 18,494 18,494 18,494 18,4945.56 ANCLAJE 3/4" L=70CM UN 27,618 27,618 27,618 27,618 27,618 27,618 27,618 27,618 27,618 27,618

5.57000000000003 ANCLAJE 1" L= 70CM UN 4,162 4,341 4,038 4,117 4,217 4,127 4,278 4,021 4,141 4,318

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,8276.2 FILOS O DILATACIONES B/PLACA ML 4,684 4,784 4,547 4,579 4,534 4,620 4,655 4,442 4,587 4,6556.3 FILOS O DILATACIONES S/MURO ML 5,587 5,687 5,450 5,482 5,437 5,523 5,558 5,345 5,490 5,5586.4 GOTERA EN MORTERO 1:4 ML 6,687 6,787 6,550 6,582 6,536 6,622 6,658 6,444 6,590 6,6586.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,348 4,348 4,348 4,348 4,348 4,348 4,348 4,348 4,348 4,3486.6 MALLA BAJO ENTRAMADO M2 10,340 10,340 10,340 10,340 10,340 10,340 10,340 10,340 10,340 10,3406.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,673 19,991 19,237 19,340 19,195 19,468 19,580 18,903 19,365 19,5806.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,812 11,971 11,594 11,645 11,573 11,710 11,766 11,427 11,658 11,7666.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 17,319 17,600 16,932 17,023 16,895 17,137 17,236 16,636 17,046 17,236

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,399 10,540 10,205 10,251 10,187 10,308 10,358 10,057 10,262 10,3586.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,710 17,027 16,273 16,376 16,232 16,504 16,617 15,940 16,402 16,6176.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 10,094 10,253 9,876 9,927 9,855 9,992 10,048 9,709 9,940 10,0486.13 PAÑETE CULATAS 1:4, E=2 CM M2 17,319 17,600 16,932 17,023 16,895 17,137 17,236 16,636 17,046 17,2366.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,399 10,540 10,205 10,251 10,187 10,308 10,358 10,057 10,262 10,3586.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,768 16,994 16,457 16,530 16,428 16,622 16,702 16,220 16,549 16,7026.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 10,123 10,236 9,967 10,004 9,952 10,049 10,089 9,848 10,013 10,0896.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 14,324 14,539 14,029 14,099 14,001 14,185 14,261 13,804 14,116 14,2616.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,682 8,789 8,534 8,569 8,520 8,612 8,650 8,422 8,578 8,650

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,860 14,102 13,528 13,606 13,496 13,704 13,789 13,274 13,626 13,7896.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,450 8,571 8,284 8,323 8,268 8,372 8,414 8,157 8,332 8,414

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,911 18,193 17,524 17,615 17,488 17,729 17,829 17,229 17,638 17,8296.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,680 10,821 10,486 10,532 10,468 10,589 10,639 10,339 10,543 10,639

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 17,302 17,620 16,866 16,969 16,825 17,097 17,209 16,533 16,994 17,2096.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,375 10,534 10,157 10,209 10,136 10,273 10,329 9,990 10,221 10,329

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 14,325 14,567 13,993 14,071 13,961 14,169 14,254 13,738 14,090 14,254

Page 297: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,669 8,790 8,502 8,542 8,487 8,590 8,633 8,375 8,551 8,6336.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,980 18,297 17,544 17,646 17,502 17,774 17,887 17,210 17,672 17,887

6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 11,022 11,181 10,804 10,855 10,783 10,919 10,975 10,637 10,868 10,975

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 22,201 22,603 21,648 21,778 21,595 21,941 22,083 21,226 21,811 22,083

7.2 M2 66,565 67,853 65,732 66,221 66,812 66,375 67,286 65,524 66,410 67,539

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 40,121 40,121 40,121 40,121 40,121 40,121 40,121 40,121 40,121 40,1217.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,2957.5 ML 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,5697.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 59,724 59,724 59,724 59,724 59,724 59,724 59,724 59,724 59,724 59,7247.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 42,776 42,776 42,776 42,776 42,776 42,776 42,776 42,776 42,776 42,7767.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,716 25,716 25,716 25,716 25,716 25,716 25,716 25,716 25,716 25,7167.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 58,129 58,129 58,129 58,129 58,129 58,129 58,129 58,129 58,129 58,129

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 75,047 75,047 75,047 75,047 75,047 75,047 75,047 75,047 75,047 75,0477.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 97,620 97,620 97,620 97,620 97,620 97,620 97,620 97,620 97,620 97,6207.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 42,883 42,883 42,883 42,883 42,883 42,883 42,883 42,883 42,883 42,8837.13 CANAL PVC AMAZONAS ML 62,161 62,161 62,161 62,161 62,161 62,161 62,161 62,161 62,161 62,1617.14 CANAL PVC RAINGO ML 54,923 54,923 54,923 54,923 54,923 54,923 54,923 54,923 54,923 54,9237.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 87,251 87,251 87,251 87,251 87,251 87,251 87,251 87,251 87,251 87,2517.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 50,438 50,438 50,438 50,438 50,438 50,438 50,438 50,438 50,438 50,4387.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 41,422 41,422 41,422 41,422 41,422 41,422 41,422 41,422 41,422 41,4227.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,721 23,721 23,721 23,721 23,721 23,721 23,721 23,721 23,721 23,721

7.19000000000001 TEJA DE BARRO M2 47,050 47,550 46,362 46,524 46,297 46,726 46,903 45,837 46,564 46,9037.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,676 31,676 31,676 31,676 31,676 31,676 31,676 31,676 31,676 31,6767.22 TEJA FIBROCEMENTO Nº4 M2 26,861 26,861 26,861 26,861 26,861 26,861 26,861 26,861 26,861 26,861

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 26,085 26,085 26,085 26,085 26,085 26,085 26,085 26,085 26,085 26,0857.24 TEJA FIBROCEMENTO No. 8 M2 26,842 26,842 26,842 26,842 26,842 26,842 26,842 26,842 26,842 26,842

7.25000000000001 TEJA TERMOACÚSTICA M2 37,235 37,235 37,235 37,235 37,235 37,235 37,235 37,235 37,235 37,2357.26 TEJA PLÁSTICA No.6 M2 32,816 32,816 32,816 32,816 32,816 32,816 32,816 32,816 32,816 32,816

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 60,260 60,260 60,260 60,260 60,260 60,260 60,260 60,260 60,260 60,260

7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 109,625 109,625 109,625 109,625 109,625 109,625 109,625 109,625 109,625 109,625

7.29000000000001 TEJA SIN TRASLAPO M2 49,318 49,318 49,318 49,318 49,318 49,318 49,318 49,318 49,318 49,3187.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,786 31,786 31,786 31,786 31,786 31,786 31,786 31,786 31,786 31,786

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 25,098 25,098 25,098 25,098 25,098 25,098 25,098 25,098 25,098 25,098

7.32 M2 40,304 40,304 40,304 40,304 40,304 40,304 40,304 40,304 40,304 40,304

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,841 14,841 14,841 14,841 14,841 14,841 14,841 14,841 14,841 14,8417.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,770 17,770 17,770 17,770 17,770 17,770 17,770 17,770 17,770 17,770

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,213 20,213 20,213 20,213 20,213 20,213 20,213 20,213 20,213 20,2137.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 26,018 26,018 26,018 26,018 26,018 26,018 26,018 26,018 26,018 26,018

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,269 16,269 16,269 16,269 16,269 16,269 16,269 16,269 16,269 16,269

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 298: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 38,168 38,168 38,168 38,168 38,168 38,168 38,168 38,168 38,168 38,1687.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 224,186 224,186 224,186 224,186 224,186 224,186 224,186 224,186 224,186 224,186

7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 287,556 287,556 287,556 287,556 287,556 287,556 287,556 287,556 287,556 287,5567.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 182,970 182,970 182,970 182,970 182,970 182,970 182,970 182,970 182,970 182,970

7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 263,613 263,613 263,613 263,613 263,613 263,613 263,613 263,613 263,613 263,613

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 411,361 437,835 394,250 404,284 416,435 407,458 426,192 389,973 408,186 431,3968.2 CONCRETO 3500 PSI M3 359,954 383,672 343,970 353,810 366,054 355,805 374,386 341,082 357,115 379,4508.3 CONCRETO 3000 PSI M3 354,808 378,785 338,167 348,743 362,123 350,132 370,245 335,945 351,943 375,6598.4 CONCRETO 2500 PSI M3 319,462 345,221 302,813 312,576 324,399 315,665 333,892 298,652 316,373 338,9558.5 CONCRETO 2000 PSI M3 300,019 325,515 282,683 293,462 306,945 295,404 315,806 279,802 296,969 321,3438.6 CONCRETO 1500 PSI M3 275,286 300,215 257,132 269,238 284,920 269,573 292,831 256,053 272,315 298,9848.7 MORTERO SECO 1:10 M3 221,081 234,893 202,110 206,573 200,298 212,153 217,037 187,602 207,689 217,0378.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 401,347 414,759 382,926 387,260 381,167 392,679 397,421 368,839 388,344 397,4218.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 372,349 387,471 351,578 356,465 349,595 362,574 367,922 335,695 357,687 367,922

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 425,576 439,719 406,151 410,721 404,295 416,435 421,436 391,295 411,864 421,4368.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 554,096 568,239 534,671 539,241 532,815 544,955 549,956 519,815 540,384 549,956

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 89,623 89,623 89,623 89,623 89,623 89,623 89,623 89,623 89,623 89,6239.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 3,052 3,152 2,915 2,947 2,902 2,988 3,023 2,810 2,955 3,0239.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 100,948 100,948 100,948 100,948 100,948 100,948 100,948 100,948 100,948 100,9489.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 123,056 123,056 123,056 123,056 123,056 123,056 123,056 123,056 123,056 123,0569.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 170,007 170,007 170,007 170,007 170,007 170,007 170,007 170,007 170,007 170,0079.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 189,847 189,847 189,847 189,847 189,847 189,847 189,847 189,847 189,847 189,8479.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 209,712 209,712 209,712 209,712 209,712 209,712 209,712 209,712 209,712 209,7129.8 HOJA PUERTA FORTEC 0.81 UN 148,717 148,717 148,717 148,717 148,717 148,717 148,717 148,717 148,717 148,7179.9 HOJA PUERTA FORTEC 0.91 UN 164,262 164,262 164,262 164,262 164,262 164,262 164,262 164,262 164,262 164,262

9.10 HOJA PUERTA FORTEC 1.50 UN 243,533 243,533 243,533 243,533 243,533 243,533 243,533 243,533 243,533 243,5339.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 92,173 92,173 92,173 92,173 92,173 92,173 92,173 92,173 92,173 92,1739.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 122,330 122,330 122,330 122,330 122,330 122,330 122,330 122,330 122,330 122,3309.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 135,490 135,490 135,490 135,490 135,490 135,490 135,490 135,490 135,490 135,4909.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 344,399 344,399 344,399 344,399 344,399 344,399 344,399 344,399 344,399 344,3999.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,506 30,506 30,506 30,506 30,506 30,506 30,506 30,506 30,506 30,5069.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,425 19,425 19,425 19,425 19,425 19,425 19,425 19,425 19,425 19,4259.17 VENTANERÍA EN MADERA CEDRO MACHO M2 71,080 71,080 71,080 71,080 71,080 71,080 71,080 71,080 71,080 71,0809.18 CERRADURA DE ENTRADA PRINCIPAL UN 88,298 88,298 88,298 88,298 88,298 88,298 88,298 88,298 88,298 88,2989.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 68,668 68,668 68,668 68,668 68,668 68,668 68,668 68,668 68,668 68,6689.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,5139.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,5139.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,416 20,416 20,416 20,416 20,416 20,416 20,416 20,416 20,416 20,4169.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 75,791 75,791 75,791 75,791 75,791 75,791 75,791 75,791 75,791 75,7919.24 ESPEJO BISELADO INCOLORO 4 MM M2 97,943 97,943 97,943 97,943 97,943 97,943 97,943 97,943 97,943 97,9439.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 44,778 44,778 44,778 44,778 44,778 44,778 44,778 44,778 44,778 44,778

Page 299: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 53,639 53,639 53,639 53,639 53,639 53,639 53,639 53,639 53,639 53,6399.27 VIDRIO TEMPLADO PULIDO 10 MM M2 215,963 215,963 215,963 215,963 215,963 215,963 215,963 215,963 215,963 215,9639.28 VIDRIO TEMPLADO PULIDO 8 MM M2 193,812 193,812 193,812 193,812 193,812 193,812 193,812 193,812 193,812 193,8129.29 VIDRIO TRANSPARENTE 3 MM M2 48,101 48,101 48,101 48,101 48,101 48,101 48,101 48,101 48,101 48,1019.30 VIDRIO TRANSPARENTE 4 MM M2 55,854 55,854 55,854 55,854 55,854 55,854 55,854 55,854 55,854 55,8549.31 VIDRIO TRANSPARENTE 5 MM M2 62,499 62,499 62,499 62,499 62,499 62,499 62,499 62,499 62,499 62,4999.32 VIDRIO TRANSPARENTE 6 MM M2 66,487 66,487 66,487 66,487 66,487 66,487 66,487 66,487 66,487 66,487

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 55,987 55,987 55,987 55,987 55,987 55,987 55,987 55,987 55,987 55,98710.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 162,592 162,592 162,592 162,592 162,592 162,592 162,592 162,592 162,592 162,592

10.3 ML 81,579 81,579 81,579 81,579 81,579 81,579 81,579 81,579 81,579 81,579

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 106,404 106,404 106,404 106,404 106,404 106,404 106,404 106,404 106,404 106,40410.5 MARCO TAPA CAJA DE INSPECCIÓN UN 101,625 101,625 101,625 101,625 101,625 101,625 101,625 101,625 101,625 101,62510.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 70,935 70,935 70,935 70,935 70,935 70,935 70,935 70,935 70,935 70,93510.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 150,949 150,949 150,949 150,949 150,949 150,949 150,949 150,949 150,949 150,94910.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 80,778 80,778 80,778 80,778 80,778 80,778 80,778 80,778 80,778 80,77810.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,863 4,863 4,863 4,863 4,863 4,863 4,863 4,863 4,863 4,863

10.10 M2 74,359 74,359 74,359 74,359 74,359 74,359 74,359 74,359 74,359 74,359

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 31,154 31,154 31,154 31,154 31,154 31,154 31,154 31,154 31,154 31,154

10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 392,925 392,925 392,925 392,925 392,925 392,925 392,925 392,925 392,925 392,925

10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 141,967 141,967 141,967 141,967 141,967 141,967 141,967 141,967 141,967 141,967

10.14 M2 156,613 156,613 156,613 156,613 156,613 156,613 156,613 156,613 156,613 156,613

10.15 M2 358,895 358,895 358,895 358,895 358,895 358,895 358,895 358,895 358,895 358,895

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 94,704 94,704 94,704 94,704 94,704 94,704 94,704 94,704 94,704 94,704

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 286,282 286,282 286,282 286,282 286,282 286,282 286,282 286,282 286,282 286,282

10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,523 4,523 4,523 4,523 4,523 4,523 4,523 4,523 4,523 4,523

10.19 VENTANA EN ALUMINIO CORREDIZA M2 202,040 202,040 202,040 202,040 202,040 202,040 202,040 202,040 202,040 202,04010.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 90,510 90,510 90,510 90,510 90,510 90,510 90,510 90,510 90,510 90,51010.21 REJILLA PISO 0.30 M M2 64,085 64,085 64,085 64,085 64,085 64,085 64,085 64,085 64,085 64,08510.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 65,695 65,695 65,695 65,695 65,695 65,695 65,695 65,695 65,695 65,695

10.23 KG 7,494 7,494 7,494 7,494 7,494 7,494 7,494 7,494 7,494 7,494

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 300: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

10.24 KG 8,319 8,319 8,319 8,319 8,319 8,319 8,319 8,319 8,319 8,319

10.25 KG 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 167,566 167,566 167,566 167,566 167,566 167,566 167,566 167,566 167,566 167,56611.2 ACOMETIDA EN PVC 3/4" 5M UN 199,611 199,611 199,611 199,611 199,611 199,611 199,611 199,611 199,611 199,61111.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,29511.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,56911.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,730 24,730 24,730 24,730 24,730 24,730 24,730 24,730 24,730 24,73011.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,596 31,596 31,596 31,596 31,596 31,596 31,596 31,596 31,596 31,59611.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 64,832 64,832 64,832 64,832 64,832 64,832 64,832 64,832 64,832 64,83211.8 CONEXIÓN TANQUE ELEVADO PVC UN 167,600 167,600 167,600 167,600 167,600 167,600 167,600 167,600 167,600 167,60011.9 INSTALACIÓN APARATO SANITARIO UN 33,396 33,396 33,396 33,396 33,396 33,396 33,396 33,396 33,396 33,396

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,670 23,670 23,670 23,670 23,670 23,670 23,670 23,670 23,670 23,67011.13 NIPLE PASAMURO 2" UN 50,357 50,357 50,357 50,357 50,357 50,357 50,357 50,357 50,357 50,35711.14 NIPLE PASAMURO 4" UN 75,247 75,247 75,247 75,247 75,247 75,247 75,247 75,247 75,247 75,24711.15 PUNTO AGUA CALIENTE CPVC UN 62,702 62,702 62,702 62,702 62,702 62,702 62,702 62,702 62,702 62,70211.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 45,953 45,953 45,953 45,953 45,953 45,953 45,953 45,953 45,953 45,95311.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,734 48,734 48,734 48,734 48,734 48,734 48,734 48,734 48,734 48,73411.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 61,528 61,528 61,528 61,528 61,528 61,528 61,528 61,528 61,528 61,52811.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 48,889 48,889 48,889 48,889 48,889 48,889 48,889 48,889 48,889 48,88911.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 60,820 60,820 60,820 60,820 60,820 60,820 60,820 60,820 60,820 60,82011.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 64,979 64,979 64,979 64,979 64,979 64,979 64,979 64,979 64,979 64,97911.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 54,384 54,384 54,384 54,384 54,384 54,384 54,384 54,384 54,384 54,38411.23 RED SUMINISTRO CPVC 1/2" ML 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,22211.24 RED SUMINISTRO CPVC 3/4" ML 12,918 12,918 12,918 12,918 12,918 12,918 12,918 12,918 12,918 12,91811.25 RED SUMINISTRO PVC 1 1/2" ML 16,605 16,605 16,605 16,605 16,605 16,605 16,605 16,605 16,605 16,60511.26 RED SUMINISTRO PVC 1" ML 10,294 10,294 10,294 10,294 10,294 10,294 10,294 10,294 10,294 10,29411.27 RED SUMINISTRO PVC 1/2" ML 6,197 6,197 6,197 6,197 6,197 6,197 6,197 6,197 6,197 6,19711.28 RED SUMINISTRO PVC 2 1/2" ML 41,844 41,844 41,844 41,844 41,844 41,844 41,844 41,844 41,844 41,84411.29 RED SUMINISTRO PVC 2" ML 24,037 24,037 24,037 24,037 24,037 24,037 24,037 24,037 24,037 24,03711.30 RED SUMINISTRO PVC 3/4" ML 7,733 7,733 7,733 7,733 7,733 7,733 7,733 7,733 7,733 7,73311.31 RED SANITARIA PVC-S 2" ML 18,272 18,272 18,272 18,272 18,272 18,272 18,272 18,272 18,272 18,27211.32 RED SANITARIA PVC-S 3" ML 25,327 25,327 25,327 25,327 25,327 25,327 25,327 25,327 25,327 25,32711.33 RED SANITARIA PVC-S 4" ML 34,276 34,276 34,276 34,276 34,276 34,276 34,276 34,276 34,276 34,276

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 301: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

11.34 RED SANITARIA PVC-S 6" ML 63,990 63,990 63,990 63,990 63,990 63,990 63,990 63,990 63,990 63,99011.35 REGISTRO 1" UN 83,524 83,524 83,524 83,524 83,524 83,524 83,524 83,524 83,524 83,52411.36 REGISTRO 1/2" UN 47,820 47,820 47,820 47,820 47,820 47,820 47,820 47,820 47,820 47,82011.37 REGISTRO 3/4" UN 58,581 58,581 58,581 58,581 58,581 58,581 58,581 58,581 58,581 58,58111.38 REGISTRO 1 1/2" UN 109,011 109,011 109,011 109,011 109,011 109,011 109,011 109,011 109,011 109,01111.39 REGISTRO 2 1/2" UN 281,316 281,316 281,316 281,316 281,316 281,316 281,316 281,316 281,316 281,31611.40 REGISTRO 2" UN 209,694 209,694 209,694 209,694 209,694 209,694 209,694 209,694 209,694 209,69411.41 REVENTILACIÓN 2" ML 12,767 12,767 12,767 12,767 12,767 12,767 12,767 12,767 12,767 12,76711.42 REVENTILACIÓN 3" ML 16,117 16,117 16,117 16,117 16,117 16,117 16,117 16,117 16,117 16,117

11.43 UN 127,707 127,707 127,707 127,707 127,707 127,707 127,707 127,707 127,707 127,707

11.44 UN 207,196 207,196 207,196 207,196 207,196 207,196 207,196 207,196 207,196 207,196

11.45 UN 340,952 340,952 340,952 340,952 340,952 340,952 340,952 340,952 340,952 340,952

11.46 ML 35,481 35,481 35,481 35,481 35,481 35,481 35,481 35,481 35,481 35,481

11.47 ML 41,051 41,051 41,051 41,051 41,051 41,051 41,051 41,051 41,051 41,051

11.48 ML 67,342 67,342 67,342 67,342 67,342 67,342 67,342 67,342 67,342 67,342

11.49 ML 52,778 52,778 52,778 52,778 52,778 52,778 52,778 52,778 52,778 52,778

11.50 ML 75,008 75,008 75,008 75,008 75,008 75,008 75,008 75,008 75,008 75,008

11.51 ML 78,611 78,611 78,611 78,611 78,611 78,611 78,611 78,611 78,611 78,611

11.52 ML 181,477 181,477 181,477 181,477 181,477 181,477 181,477 181,477 181,477 181,477

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,75611.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,898 35,898 35,898 35,898 35,898 35,898 35,898 35,898 35,898 35,89811.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,958 28,958 28,958 28,958 28,958 28,958 28,958 28,958 28,958 28,95811.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,772 32,772 32,772 32,772 32,772 32,772 32,772 32,772 32,772 32,772

11.57 ML 2,965 2,965 2,965 2,965 2,965 2,965 2,965 2,965 2,965 2,965

11.58 ML 4,607 4,607 4,607 4,607 4,607 4,607 4,607 4,607 4,607 4,607

11.59 GABINETE TIPO III UN 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,18611.60 GABINETE TIPO I UN 812,271 812,271 812,271 812,271 812,271 812,271 812,271 812,271 812,271 812,27111.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,13211.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,88711.63 VÁLVULA MARIPOSA 3" UN 665,922 665,922 665,922 665,922 665,922 665,922 665,922 665,922 665,922 665,92211.64 VÁLVULA MARIPOSA 4" UN 760,145 760,145 760,145 760,145 760,145 760,145 760,145 760,145 760,145 760,145

TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN)

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2"

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2"

Page 302: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 327,097 327,097 327,097 327,097 327,097 327,097 327,097 327,097 327,097 327,097

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 227,803 227,803 227,803 227,803 227,803 227,803 227,803 227,803 227,803 227,80312.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 33,115 33,115 33,115 33,115 33,115 33,115 33,115 33,115 33,115 33,11512.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 40,807 40,807 40,807 40,807 40,807 40,807 40,807 40,807 40,807 40,80712.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 44,338 44,338 44,338 44,338 44,338 44,338 44,338 44,338 44,338 44,33812.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 54,111 54,111 54,111 54,111 54,111 54,111 54,111 54,111 54,111 54,11112.6 SALIDA TELÉFONO PVC COMPLETA UN 36,146 36,146 36,146 36,146 36,146 36,146 36,146 36,146 36,146 36,14612.7 SALIDA TIMBRE PVC COMPLETA UN 36,174 36,174 36,174 36,174 36,174 36,174 36,174 36,174 36,174 36,17412.8 STRIP TELEFÓNICO 10 PARES UN 108,728 108,728 108,728 108,728 108,728 108,728 108,728 108,728 108,728 108,72812.9 SALIDA TOMA DOBLE PVC COMPLETA UN 31,305 31,305 31,305 31,305 31,305 31,305 31,305 31,305 31,305 31,305

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 73,634 73,634 73,634 73,634 73,634 73,634 73,634 73,634 73,634 73,63412.11 SALIDA T.V PVC COMPLETA. UN 48,509 48,509 48,509 48,509 48,509 48,509 48,509 48,509 48,509 48,50912.12 SALIDA BIFÁSICA C.N. UN 28,480 28,480 28,480 28,480 28,480 28,480 28,480 28,480 28,480 28,48012.13 TABLERO PARCIAL 4 CIRCUITOS UN 81,933 81,933 81,933 81,933 81,933 81,933 81,933 81,933 81,933 81,93312.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 337,616 337,616 337,616 337,616 337,616 337,616 337,616 337,616 337,616 337,61612.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 454,302 454,302 454,302 454,302 454,302 454,302 454,302 454,302 454,302 454,30212.16 TUBERÍA PVC CONDUIT 1/2" ML 2,642 2,642 2,642 2,642 2,642 2,642 2,642 2,642 2,642 2,64212.17 TUBERÍA PVC CONDUIT 3/4" ML 3,439 3,439 3,439 3,439 3,439 3,439 3,439 3,439 3,439 3,43912.18 TUBERÍA PVC CONDUIT 1" ML 5,290 5,290 5,290 5,290 5,290 5,290 5,290 5,290 5,290 5,29012.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,502 9,502 9,502 9,502 9,502 9,502 9,502 9,502 9,502 9,50212.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 182,788 182,788 182,788 182,788 182,788 182,788 182,788 182,788 182,788 182,78812.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,88512.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 78,239 78,239 78,239 78,239 78,239 78,239 78,239 78,239 78,239 78,23912.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,925 27,925 27,925 27,925 27,925 27,925 27,925 27,925 27,925 27,92512.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,13312.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 779,488 779,488 779,488 779,488 779,488 779,488 779,488 779,488 779,488 779,48812.26 POSTE METÁLICO 6M UN 976,096 976,096 976,096 976,096 976,096 976,096 976,096 976,096 976,096 976,09612.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 443,676 443,676 443,676 443,676 443,676 443,676 443,676 443,676 443,676 443,67612.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 76,744 76,744 76,744 76,744 76,744 76,744 76,744 76,744 76,744 76,74412.29 LUMINARIA 70W SODIO UN 196,555 196,555 196,555 196,555 196,555 196,555 196,555 196,555 196,555 196,55512.30 LUMINARIA 150W SODIO UN 231,647 231,647 231,647 231,647 231,647 231,647 231,647 231,647 231,647 231,64712.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,76812.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 919,776 919,776 919,776 919,776 919,776 919,776 919,776 919,776 919,776 919,776

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 35,152 35,696 34,404 34,580 34,333 34,800 34,992 33,833 34,624 34,99213.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 30,105 30,649 29,358 29,534 29,287 29,754 29,946 28,787 29,578 29,94613.3 ALISTADO PARA LISTÓN M2 11,422 11,531 11,272 11,307 11,258 11,351 11,390 11,158 11,316 11,39013.4 ALISTADO PISOS 1:3, E=0.04 M2 24,997 26,085 23,503 23,854 23,360 24,294 24,679 22,360 23,942 24,67913.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 63,586 64,674 62,092 62,443 61,949 62,883 63,267 60,949 62,531 63,26713.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 21,311 21,821 20,964 21,179 21,449 21,218 21,626 20,906 21,250 21,73713.7 CONCRETO BASE GRADAS 2500 PSI M2 49,271 51,847 47,606 48,582 49,765 48,891 50,714 47,190 48,962 51,22013.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 69,277 73,399 66,613 68,175 70,067 68,670 71,586 65,948 68,783 72,396

Page 303: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

13.9 MANTO FIBERGLASS 600X1 M2 22,466 22,466 22,466 22,466 22,466 22,466 22,466 22,466 22,466 22,46613.10 PEGANTE MORTERO-CONCRETO M2 19,268 19,268 19,268 19,268 19,268 19,268 19,268 19,268 19,268 19,26813.11 PERMA PLY 2 CAPAS M2 20,037 20,037 20,037 20,037 20,037 20,037 20,037 20,037 20,037 20,03713.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 40,532 42,851 39,034 39,913 40,977 40,191 41,831 38,660 40,254 42,28713.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 47,715 50,549 45,884 46,958 48,258 47,297 49,302 45,426 47,375 49,85913.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 69,678 74,057 66,847 68,507 70,517 69,032 72,131 66,140 69,152 72,99113.15 TRITURADO FINO 1/2 M3 99,693 114,197 86,113 97,085 112,476 93,356 115,193 89,842 97,991 120,62513.16 TRITURADO GRUESO 3/4 M3 97,158 121,490 85,946 103,280 113,652 95,716 119,953 91,520 92,114 124,992

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,618 37,836 37,319 37,390 37,291 37,478 37,555 37,091 37,407 37,555

14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 23,127 23,236 22,978 23,013 22,963 23,057 23,095 22,863 23,022 23,095

14.3 ADOQUÍN CONCRETO 6CM M2 49,737 50,281 48,990 49,166 48,919 49,386 49,578 48,419 49,210 49,57814.4 ADOQUÍN CONCRETO 8CM M2 59,087 59,631 58,340 58,516 58,269 58,736 58,928 57,769 58,560 58,92814.5 ADOQUÍN GRES PEATONAL M2 48,667 49,211 47,920 48,096 47,848 48,315 48,508 47,348 48,140 48,508

14.6 M2 52,557 52,774 52,258 52,328 52,229 52,416 52,493 52,029 52,346 52,493

14.7 GRAVILLA PARA GRADAS ML 29,475 29,734 29,184 29,333 29,444 29,338 29,604 29,109 29,351 29,660

14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 107,494 108,473 106,149 106,465 106,020 106,861 107,207 105,120 106,544 107,207

14.9 ACABADO EN GRAVILLA LAVADA M2 37,394 38,022 36,663 36,997 37,168 37,051 37,620 36,398 37,042 37,73314.10 GUARDAESCOBA EN GRANITO ML 29,694 29,694 29,694 29,694 29,694 29,694 29,694 29,694 29,694 29,69414.11 GUARDAESCOBA EN GRAVILLA ML 8,440 8,699 8,149 8,298 8,409 8,303 8,569 8,074 8,316 8,62514.12 GUARDAESCOBA PVC CARAMELO ML 7,329 7,329 7,329 7,329 7,329 7,329 7,329 7,329 7,329 7,32914.13 GUARDAESCOBA PVC CEDRO ML 9,286 9,286 9,286 9,286 9,286 9,286 9,286 9,286 9,286 9,28614.14 GUARDAESCOBA PINO CARIBE ML 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,76414.15 GUARDAESCOBA CEDRO BLANCO ML 7,752 7,752 7,752 7,752 7,752 7,752 7,752 7,752 7,752 7,75214.16 GUARDAESCOBA EN MADERA SAPAN ML 12,266 12,266 12,266 12,266 12,266 12,266 12,266 12,266 12,266 12,26614.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,86814.18 LISTÓN M.H. AMARILLO M2 54,872 54,872 54,872 54,872 54,872 54,872 54,872 54,872 54,872 54,87214.19 PASO ESCALERA GRANITO ML 82,527 83,289 81,481 81,727 81,381 82,035 82,304 80,681 81,789 82,30414.20 PIRLANES ALUMINIO ML 5,763 5,763 5,763 5,763 5,763 5,763 5,763 5,763 5,763 5,76314.21 PIRLANES LADRILLO ML 25,025 25,225 24,750 24,815 24,724 24,896 24,967 24,540 24,831 24,96714.22 PISO VINILO TRÁFICO RESIDENCIAL M2 31,411 31,411 31,411 31,411 31,411 31,411 31,411 31,411 31,411 31,41114.23 PISO VINILO TRÁFICO PESADO M2 41,979 41,979 41,979 41,979 41,979 41,979 41,979 41,979 41,979 41,97914.24 PULIDA LACADA PISO MADERA M2 41,615 41,615 41,615 41,615 41,615 41,615 41,615 41,615 41,615 41,61514.25 TABLETA DE GRES 25X25 M2 37,384 37,601 37,085 37,155 37,057 37,243 37,320 36,857 37,173 37,32014.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 38,062 38,279 37,763 37,833 37,734 37,921 37,998 37,534 37,851 37,998

14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,137 8,137 8,137 8,137 8,137 8,137 8,137 8,137 8,137 8,137

14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,769 35,069 34,357 34,454 34,317 34,575 34,681 34,041 34,478 34,68114.29 JABONERA PORCELANA ACUARIO UN 14,293 14,293 14,293 14,293 14,293 14,293 14,293 14,293 14,293 14,293

14.30 UN 99,271 99,271 99,271 99,271 99,271 99,271 99,271 99,271 99,271 99,271

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

Page 304: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,659 7,659 7,659 7,659 7,659 7,659 7,659 7,659 7,659 7,65914.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,765 15,765 15,765 15,765 15,765 15,765 15,765 15,765 15,765 15,76514.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,602 10,602 10,602 10,602 10,602 10,602 10,602 10,602 10,602 10,60214.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,092 10,092 10,092 10,092 10,092 10,092 10,092 10,092 10,092 10,09214.35 REMATES BOCEL ALUMINIO ML 6,412 6,412 6,412 6,412 6,412 6,412 6,412 6,412 6,412 6,41214.36 REMATES BOCEL PORCELANA ML 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,52214.37 TAPA REGISTRO 20X20 UN 14,769 14,769 14,769 14,769 14,769 14,769 14,769 14,769 14,769 14,76914.38 TAPA REGISTRO 6X6 UN 13,015 13,015 13,015 13,015 13,015 13,015 13,015 13,015 13,015 13,015

14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 14,366 14,366 14,366 14,366 14,366 14,366 14,366 14,366 14,366 14,366

14.40 M2 16,669 16,669 16,669 16,669 16,669 16,669 16,669 16,669 16,669 16,669

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 48,028 48,246 47,729 47,799 47,701 47,887 47,964 47,501 47,817 47,96414.42 MEDIA CAÑA EN GRANITO ML 57,676 57,676 57,676 57,676 57,676 57,676 57,676 57,676 57,676 57,67614.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,247 26,247 26,247 26,247 26,247 26,247 26,247 26,247 26,247 26,24714.44 PINTURA ACRÍLICA PARA PISOS M2 10,415 10,415 10,415 10,415 10,415 10,415 10,415 10,415 10,415 10,41514.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,885 11,885 11,885 11,885 11,885 11,885 11,885 11,885 11,885 11,88514.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 83,198 83,198 83,198 83,198 83,198 83,198 83,198 83,198 83,198 83,198

15 CIELO RASO15.1 APLIQUE YESO ML 57,322 57,322 57,322 57,322 57,322 57,322 57,322 57,322 57,322 57,32215.2 ARMADURA MADERA Y MALLA M2 26,749 26,749 26,749 26,749 26,749 26,749 26,749 26,749 26,749 26,74915.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,94815.4 CIELO RASO DURACUSTIC M2 51,286 51,286 51,286 51,286 51,286 51,286 51,286 51,286 51,286 51,28615.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 47,458 47,458 47,458 47,458 47,458 47,458 47,458 47,458 47,458 47,45815.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 67,404 67,404 67,404 67,404 67,404 67,404 67,404 67,404 67,404 67,40415.7 CORNISAS YESO ML 35,843 35,843 35,843 35,843 35,843 35,843 35,843 35,843 35,843 35,84315.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 74,990 74,990 74,990 74,990 74,990 74,990 74,990 74,990 74,990 74,99015.9 MALLA CON VENA M2 10,287 10,287 10,287 10,287 10,287 10,287 10,287 10,287 10,287 10,287

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 305: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 45,831 84,636 47,098 72,968 63,940 58,740 76,875 54,859 34,163 78,16816.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 111,536 128,109 96,018 108,556 126,144 104,294 129,247 100,279 109,590 135,455

16.10 M3 132,872 178,145 132,872 117,350 176,851 145,807 171,677 128,992 152,275 178,145

16.11 AFRIMADO (NORMA INVIAS 311) M3 53,781 92,586 50,109 75,979 71,890 61,750 84,825 57,870 43,641 86,11916.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 125,622 170,895 125,622 110,100 169,601 138,557 164,427 121,742 145,025 170,89516.13 BASE GRANULAR (NORMA INVIAS 330) M3 133,513 178,786 133,513 117,991 177,492 146,448 172,318 129,633 152,916 178,786

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 219,425 219,425 219,425 219,425 219,425 219,425 219,425 219,425 219,425 219,425

17.2 UN 693,262 693,262 693,262 693,262 693,262 693,262 693,262 693,262 693,262 693,262

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 391,651 391,651 391,651 391,651 391,651 391,651 391,651 391,651 391,651 391,651

17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 125,611 125,611 125,611 125,611 125,611 125,611 125,611 125,611 125,611 125,611

17.5 UN 155,828 155,828 155,828 155,828 155,828 155,828 155,828 155,828 155,828 155,828

17.6 UN 184,468 184,468 184,468 184,468 184,468 184,468 184,468 184,468 184,468 184,468

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 285,276 285,276 285,276 285,276 285,276 285,276 285,276 285,276 285,276 285,276

17.8 UN 749,760 749,760 749,760 749,760 749,760 749,760 749,760 749,760 749,760 749,760

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 233,762 233,762 233,762 233,762 233,762 233,762 233,762 233,762 233,762 233,762

17.10 UN 112,067 112,067 112,067 112,067 112,067 112,067 112,067 112,067 112,067 112,067

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 63,454 63,454 63,454 63,454 63,454 63,454 63,454 63,454 63,454 63,454

17.12 UN 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,113

17.13 UN 297,860 297,860 297,860 297,860 297,860 297,860 297,860 297,860 297,860 297,860

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478

18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,235 2,235 2,235 2,235 2,235 2,235 2,235 2,235 2,235 2,23518.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,419 8,419 8,419 8,419 8,419 8,419 8,419 8,419 8,419 8,41918.4 BARNIZ SOBRE MUEBLES M2 32,127 32,127 32,127 32,127 32,127 32,127 32,127 32,127 32,127 32,12718.5 CARBURO SOBRE PAÑETES M2 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,33418.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,669 10,669 10,669 10,669 10,669 10,669 10,669 10,669 10,669 10,66918.7 DEMARCACIÓN CON MARMOLINA ML 2,697 2,697 2,697 2,697 2,697 2,697 2,697 2,697 2,697 2,697

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 306: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

18.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,940 1,940 1,940 1,940 1,940 1,940 1,940 1,940 1,940 1,94018.9 ESMALTE SOBRE LÁMINA LLENA M2 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,059

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,020 3,020 3,020 3,020 3,020 3,020 3,020 3,020 3,020 3,02018.11 ESMALTE SOBRE MADERA LLENA M2 11,172 11,172 11,172 11,172 11,172 11,172 11,172 11,172 11,172 11,17218.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,959 3,959 3,959 3,959 3,959 3,959 3,959 3,959 3,959 3,95918.13 ESMALTE SOBRE MARCOS MADERA M2 4,719 4,719 4,719 4,719 4,719 4,719 4,719 4,719 4,719 4,71918.14 ESTUCO M2 5,893 5,893 5,893 5,893 5,893 5,893 5,893 5,893 5,893 5,89318.15 ESTUCO (LINEAL) ML 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,62818.16 ESTUCO Y VINILO 3 MANOS M2 12,317 12,317 12,317 12,317 12,317 12,317 12,317 12,317 12,317 12,31718.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,589 7,589 7,589 7,589 7,589 7,589 7,589 7,589 7,589 7,58918.18 LACA PISOS MADERA M2 18,109 18,109 18,109 18,109 18,109 18,109 18,109 18,109 18,109 18,10918.19 LÍNEAS TRÁFICO 0.10 ML 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,08618.20 MARMOLINA SOBRE PAÑETE M2 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,82218.21 TINTILLA SOBRE MADERA LINEAL ML 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,57118.22 TINTILLA SOBRE MADERA LLENA M2 9,802 9,802 9,802 9,802 9,802 9,802 9,802 9,802 9,802 9,80218.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,373 5,373 5,373 5,373 5,373 5,373 5,373 5,373 5,373 5,37318.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,387 3,387 3,387 3,387 3,387 3,387 3,387 3,387 3,387 3,38718.25 WASH-PRIMER SOBRE ALUMNIO M2 16,469 16,469 16,469 16,469 16,469 16,469 16,469 16,469 16,469 16,46918.26 PINTURA EPÓXICA M2 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,13218.27 PINTURA EPÓXICA (LINEAL) ML 6,215 6,215 6,215 6,215 6,215 6,215 6,215 6,215 6,215 6,215

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939

19.2 UN 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608

19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136

19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,64819.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,08619.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,05019.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 63,495 63,495 63,495 63,495 63,495 63,495 63,495 63,495 63,495 63,49519.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,116,950 1,117,215 1,116,779 1,116,879 1,117,001 1,116,911 1,117,098 1,116,736 1,116,918 1,117,150

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 577,495 583,489 573,335 575,979 579,324 576,326 581,354 572,779 576,779 582,708

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,244 23,244 23,244 23,244 23,244 23,244 23,244 23,244 23,244 23,24420.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 34,452 34,452 34,452 34,452 34,452 34,452 34,452 34,452 34,452 34,45220.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 42,549 42,549 42,549 42,549 42,549 42,549 42,549 42,549 42,549 42,549

20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,544 25,544 25,544 25,544 25,544 25,544 25,544 25,544 25,544 25,544

20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 29,210 29,210 29,210 29,210 29,210 29,210 29,210 29,210 29,210 29,210

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,767 42,767 42,767 42,767 42,767 42,767 42,767 42,767 42,767 42,767

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

Page 307: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,828 19,828 19,828 19,828 19,828 19,828 19,828 19,828 19,828 19,82820.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,913 20,913 20,913 20,913 20,913 20,913 20,913 20,913 20,913 20,91320.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,885 25,885 25,885 25,885 25,885 25,885 25,885 25,885 25,885 25,885

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,765 11,765 11,765 11,765 11,765 11,765 11,765 11,765 11,765 11,76520.11 VÁLVULA DE BOLA GAS 3/4" UN 18,362 18,362 18,362 18,362 18,362 18,362 18,362 18,362 18,362 18,36220.12 VÁLVULA DE BOLA GAS 1" UN 27,499 27,499 27,499 27,499 27,499 27,499 27,499 27,499 27,499 27,49920.13 VÁLVULA POLIETILENO GAS 1/2" UN 163,550 163,550 163,550 163,550 163,550 163,550 163,550 163,550 163,550 163,55020.14 VÁLVULA POLIETILENO GAS 3/4" UN 168,210 168,210 168,210 168,210 168,210 168,210 168,210 168,210 168,210 168,21020.15 VÁLVULA POLIETILENO GAS 1" UN 272,558 272,558 272,558 272,558 272,558 272,558 272,558 272,558 272,558 272,55820.16 ACOMETIDA GAS 1/2" ML 225,126 225,126 225,126 225,126 225,126 225,126 225,126 225,126 225,126 225,126

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 99,360 99,360 99,360 99,360 99,360 99,360 99,360 99,360 99,360 99,36021.2 CABLE DETECTOR LINEAL DE CALOR ML 24,786 24,786 24,786 24,786 24,786 24,786 24,786 24,786 24,786 24,78621.3 SIRENA DE 110 V UN 70,241 70,241 70,241 70,241 70,241 70,241 70,241 70,241 70,241 70,24121.4 CÁMARA CCTV UN 204,876 204,876 204,876 204,876 204,876 204,876 204,876 204,876 204,876 204,87621.5 PARLANTE-CIELO FALSO UN 40,030 40,030 40,030 40,030 40,030 40,030 40,030 40,030 40,030 40,03021.6 AMPLIFICADOR 100W UN 432,095 432,095 432,095 432,095 432,095 432,095 432,095 432,095 432,095 432,09521.7 AMPLIFICADOR 300W UN 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,19421.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,761 32,761 32,761 32,761 32,761 32,761 32,761 32,761 32,761 32,76121.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 171,265 171,265 171,265 171,265 171,265 171,265 171,265 171,265 171,265 171,265

21.10 TOMA PARA MICRÓFONO UN 33,911 33,911 33,911 33,911 33,911 33,911 33,911 33,911 33,911 33,91121.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,621 2,621 2,621 2,621 2,621 2,621 2,621 2,621 2,621 2,62121.12 SPLITERS UN 4,226 4,226 4,226 4,226 4,226 4,226 4,226 4,226 4,226 4,22621.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,222 14,222 14,222 14,222 14,222 14,222 14,222 14,222 14,222 14,22221.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,719 18,719 18,719 18,719 18,719 18,719 18,719 18,719 18,719 18,71921.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,780 25,780 25,780 25,780 25,780 25,780 25,780 25,780 25,780 25,78021.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 95,532 95,532 95,532 95,532 95,532 95,532 95,532 95,532 95,532 95,532

21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 25,118 25,118 25,118 25,118 25,118 25,118 25,118 25,118 25,118 25,118

21.18 BANDEJA PORTACABLES PARA RACK UN 82,312 82,312 82,312 82,312 82,312 82,312 82,312 82,312 82,312 82,31221.19 RACK 2' X 24" UN 131,617 131,617 131,617 131,617 131,617 131,617 131,617 131,617 131,617 131,61721.20 RACK 3' X 24" UN 160,129 160,129 160,129 160,129 160,129 160,129 160,129 160,129 160,129 160,12921.21 RACK 5' X 24" UN 252,804 252,804 252,804 252,804 252,804 252,804 252,804 252,804 252,804 252,80421.22 RACK 7' X 24" UN 327,375 327,375 327,375 327,375 327,375 327,375 327,375 327,375 327,375 327,37521.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 371,139 371,139 371,139 371,139 371,139 371,139 371,139 371,139 371,139 371,13921.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 222,657 222,657 222,657 222,657 222,657 222,657 222,657 222,657 222,657 222,65721.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 53,919 53,919 53,919 53,919 53,919 53,919 53,919 53,919 53,919 53,91921.26 PATCH CORD 2M CATEGORÍA 6A UN 5,601 5,601 5,601 5,601 5,601 5,601 5,601 5,601 5,601 5,60121.27 PATCH CORD 5M CATEGORÍA 6A UN 14,230 14,230 14,230 14,230 14,230 14,230 14,230 14,230 14,230 14,23021.28 CABLE UTP CATEGORÍA 6A ML 2,609 2,609 2,609 2,609 2,609 2,609 2,609 2,609 2,609 2,60921.29 CANALETA METÁLICA 4X6 CMS ML 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,18721.30 CANALETA METÁLICA 4X10 CMS ML 27,339 27,339 27,339 27,339 27,339 27,339 27,339 27,339 27,339 27,33921.31 CANALETA METÁLICA 6X10 CMS ML 27,914 27,914 27,914 27,914 27,914 27,914 27,914 27,914 27,914 27,91421.32 CANALETA PLÁSTICA 13X7 MM ML 15,520 15,520 15,520 15,520 15,520 15,520 15,520 15,520 15,520 15,520

Page 308: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

21.33 CANALETA PLÁSTICA 20X12 MM ML 17,377 17,377 17,377 17,377 17,377 17,377 17,377 17,377 17,377 17,37721.34 CANALETA PLÁSTICA 32X12 MM ML 17,306 17,306 17,306 17,306 17,306 17,306 17,306 17,306 17,306 17,30621.35 CANALETA PLÁSTICA 40X60 MM ML 27,745 27,745 27,745 27,745 27,745 27,745 27,745 27,745 27,745 27,74521.36 SWITCH 10/100/1000 24 PUERTOS UN 375,070 375,070 375,070 375,070 375,070 375,070 375,070 375,070 375,070 375,07021.37 SWITCH 10/100/1000 16 PUERTOS UN 237,162 237,162 237,162 237,162 237,162 237,162 237,162 237,162 237,162 237,16221.38 SWITCH 10/100/1000 8 PUERTOS UN 63,067 63,067 63,067 63,067 63,067 63,067 63,067 63,067 63,067 63,06721.39 CABLE TELEFÓNICO 2 PARES ML 1,361 1,361 1,361 1,361 1,361 1,361 1,361 1,361 1,361 1,36121.40 CABLE TELEFÓNICO 10 PARES ML 6,599 6,599 6,599 6,599 6,599 6,599 6,599 6,599 6,599 6,59921.41 CABLE TELEFÓNICO 20 PARES ML 8,838 8,838 8,838 8,838 8,838 8,838 8,838 8,838 8,838 8,83821.42 CABLE TELEFÓNICO 40 PARES ML 12,319 12,319 12,319 12,319 12,319 12,319 12,319 12,319 12,319 12,31921.43 CABLE TELEVISIÓN RG6 ML 1,672 1,672 1,672 1,672 1,672 1,672 1,672 1,672 1,672 1,67221.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,053 16,053 16,053 16,053 16,053 16,053 16,053 16,053 16,053 16,05321.45 ACOMETIDA TELEFÓNICA 1" ML 24,699 24,699 24,699 24,699 24,699 24,699 24,699 24,699 24,699 24,69921.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269

21.47 ML 10,844 10,844 10,844 10,844 10,844 10,844 10,844 10,844 10,844 10,844

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 486,148 486,148 486,148 486,148 486,148 486,148 486,148 486,148 486,148 486,148

CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN)

Page 309: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,694 19,694 19,694 19,694 19,694 19,694 19,694 19,694 19,694 19,6941.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 65,511 65,511 65,511 65,511 65,511 65,511 65,511 65,511 65,511 65,5111.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 367,555 367,555 367,555 367,555 367,555 367,555 367,555 367,555 367,555 367,5551.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 784,386 784,386 784,386 784,386 784,386 784,386 784,386 784,386 784,386 784,3861.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 90,129 90,129 90,129 90,129 90,129 90,129 90,129 90,129 90,129 90,1291.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 547,459 547,459 547,459 547,459 547,459 547,459 547,459 547,459 547,459 547,4591.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,2811.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,694 9,694 9,694 9,694 9,694 9,694 9,694 9,694 9,694 9,6941.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,853 14,853 14,853 14,853 14,853 14,853 14,853 14,853 14,853 14,8531.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,2141.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,3811.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,3811.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 76,938 76,938 76,938 76,938 76,938 76,938 76,938 76,938 76,938 76,9381.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 89,151 89,151 89,151 89,151 89,151 89,151 89,151 89,151 89,151 89,1511.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 275,707 275,707 275,707 275,707 275,707 275,707 275,707 275,707 275,707 275,7071.17 TEE PVC UNIÓN MECÁNICA 2" UN 103,474 103,474 103,474 103,474 103,474 103,474 103,474 103,474 103,474 103,4741.18 TEE PVC UNIÓN MECÁNICA 4" UN 170,562 170,562 170,562 170,562 170,562 170,562 170,562 170,562 170,562 170,5621.19 TEE PVC UNIÓN MECÁNICA 8" UN 753,934 753,934 753,934 753,934 753,934 753,934 753,934 753,934 753,934 753,9341.20 TEE PVC UNIÓN MECÁNICA 10" UN 868,489 868,489 868,489 868,489 868,489 868,489 868,489 868,489 868,489 868,4891.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 10,074 10,074 10,074 10,074 10,074 10,074 10,074 10,074 10,074 10,0741.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,933 8,933 8,933 8,933 8,933 8,933 8,933 8,933 8,933 8,9331.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 21,201 21,201 21,201 21,201 21,201 21,201 21,201 21,201 21,201 21,2011.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 85,084 85,084 85,084 85,084 85,084 85,084 85,084 85,084 85,084 85,0841.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 126,077 126,077 126,077 126,077 126,077 126,077 126,077 126,077 126,077 126,0771.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 20,912 20,912 20,912 20,912 20,912 20,912 20,912 20,912 20,912 20,9121.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 71,536 71,536 71,536 71,536 71,536 71,536 71,536 71,536 71,536 71,5361.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 105,389 105,389 105,389 105,389 105,389 105,389 105,389 105,389 105,389 105,3891.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,895 21,895 21,895 21,895 21,895 21,895 21,895 21,895 21,895 21,8951.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 45,011 45,011 45,011 45,011 45,011 45,011 45,011 45,011 45,011 45,0111.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 180,529 180,529 180,529 180,529 180,529 180,529 180,529 180,529 180,529 180,5291.32 UNIÓN REPARACION PVC 4" UN 52,467 52,467 52,467 52,467 52,467 52,467 52,467 52,467 52,467 52,4671.33 UNIÓN REPARACIÓN PVC 8" UN 209,925 209,925 209,925 209,925 209,925 209,925 209,925 209,925 209,925 209,9251.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 126,758 126,758 126,758 126,758 126,758 126,758 126,758 126,758 126,758 126,7581.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 358,287 358,287 358,287 358,287 358,287 358,287 358,287 358,287 358,287 358,2871.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,5031.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,109 8,109 8,109 8,109 8,109 8,109 8,109 8,109 8,109 8,1092.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,628 18,628 18,628 18,628 18,628 18,628 18,628 18,628 18,628 18,6282.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592

Page 310: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

2.4 RELLENO TIPO 1 "GRAVILLA" M3 99,321 115,140 84,507 96,476 113,265 92,408 116,227 88,575 97,463 122,1522.5 RELLENO TIPO 2 "RECEBO" M3 42,651 81,456 43,919 69,789 60,760 55,560 73,695 51,680 30,984 74,9892.6 RELLENO TIPO 4 "SUBBASE B-200" M3 55,001 93,806 51,329 77,199 73,110 62,970 86,045 59,090 44,861 87,3392.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 83,045 99,225 80,995 80,358 97,780 80,995 100,855 77,283 81,383 107,0042.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 84,547 101,042 82,458 81,808 99,569 82,458 102,703 78,674 82,853 108,9712.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 90,678 103,690 72,807 77,011 71,100 82,269 86,869 59,140 78,063 86,869

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 81,996 81,996 81,996 81,996 81,996 81,996 81,996 81,996 81,996 81,9963.2 CODO 45 PVC ALCANTARILLADO 16" UN 854,814 854,814 854,814 854,814 854,814 854,814 854,814 854,814 854,814 854,8143.3 CODO 90 PVC ALCANTARILLADO 8" UN 107,163 107,163 107,163 107,163 107,163 107,163 107,163 107,163 107,163 107,1633.4 CODO 90 PVC ALCANTARILLADO 16" UN 989,762 989,762 989,762 989,762 989,762 989,762 989,762 989,762 989,762 989,7623.5 CODO 90 PVC ALCANTARILLADO 24" UN 689,639 689,639 689,639 689,639 689,639 689,639 689,639 689,639 689,639 689,6393.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,088 58,088 58,088 58,088 58,088 58,088 58,088 58,088 58,088 58,0883.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,7113.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,6153.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 192,614 192,614 192,614 192,614 192,614 192,614 192,614 192,614 192,614 192,614

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 309,173 309,173 309,173 309,173 309,173 309,173 309,173 309,173 309,173 309,1733.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 81,712 81,712 81,712 81,712 81,712 81,712 81,712 81,712 81,712 81,7123.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,7113.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,6153.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,6153.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 309,174 309,174 309,174 309,174 309,174 309,174 309,174 309,174 309,174 309,1743.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 284,104 284,104 284,104 284,104 284,104 284,104 284,104 284,104 284,104 284,1043.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 455,746 455,746 455,746 455,746 455,746 455,746 455,746 455,746 455,746 455,7463.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 727,978 727,978 727,978 727,978 727,978 727,978 727,978 727,978 727,978 727,9783.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 45,472 45,472 45,472 45,472 45,472 45,472 45,472 45,472 45,472 45,4723.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 239,454 239,454 239,454 239,454 239,454 239,454 239,454 239,454 239,454 239,4543.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 260,444 260,444 260,444 260,444 260,444 260,444 260,444 260,444 260,444 260,4443.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 763,163 763,163 763,163 763,163 763,163 763,163 763,163 763,163 763,163 763,1633.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 43,121 43,255 42,937 42,980 42,919 43,034 43,082 42,796 42,991 43,0823.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 217,510 217,510 217,510 217,510 217,510 217,510 217,510 217,510 217,510 217,5103.25 TUBERÍA PVC ALCANTARILLADO 8" ML 35,890 35,890 35,890 35,890 35,890 35,890 35,890 35,890 35,890 35,8903.26 TUBERÍA PVC ALCANTARILLADO 10" ML 50,671 50,671 50,671 50,671 50,671 50,671 50,671 50,671 50,671 50,6713.27 TUBERÍA PVC ALCANTARILLADO 12" ML 73,031 73,031 73,031 73,031 73,031 73,031 73,031 73,031 73,031 73,0313.28 TUBERÍA PVC ALCANTARILLADO 16" ML 112,031 112,031 112,031 112,031 112,031 112,031 112,031 112,031 112,031 112,0313.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 179,857 179,857 179,857 179,857 179,857 179,857 179,857 179,857 179,857 179,8573.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 264,064 264,064 264,064 264,064 264,064 264,064 264,064 264,064 264,064 264,0643.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 333,299 333,299 333,299 333,299 333,299 333,299 333,299 333,299 333,299 333,2993.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 437,879 437,879 437,879 437,879 437,879 437,879 437,879 437,879 437,879 437,8793.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 600,645 600,645 600,645 600,645 600,645 600,645 600,645 600,645 600,645 600,645

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 UN 536,446 550,832 526,462 532,807 540,835 533,641 545,708 525,128 534,727 548,957PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

Page 311: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

4.2 ML 512,650 519,580 503,132 505,371 502,222 508,171 510,621 495,852 505,931 510,621

4.3 UN 525,016 534,606 518,359 522,590 527,942 523,145 531,190 517,470 523,870 533,356

4.4 UN 638,897 656,880 626,417 634,349 644,384 635,390 650,475 624,750 636,749 654,536

4.5 ML 726,831 736,590 713,428 716,581 712,147 720,524 723,974 703,177 717,370 723,974

4.6 UN 615,980 629,167 606,827 612,644 620,003 613,408 624,470 605,605 614,404 627,448

4.7 SUMIDERO EN LADRILLO SL-100 UN 737,367 743,296 731,705 733,976 734,793 735,199 738,889 728,825 734,655 739,6644.8 SUMIDERO EN LADRILLO SL-250 UN 1,101,158 1,119,832 1,085,776 1,093,284 1,099,340 1,095,976 1,109,182 1,080,026 1,095,627 1,112,3944.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,573,089 1,611,980 1,546,859 1,563,020 1,583,139 1,566,265 1,596,789 1,542,152 1,568,434 1,605,105

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,137,361 2,202,010 2,093,760 2,120,624 2,154,065 2,126,019 2,176,756 2,085,935 2,129,623 2,190,5794.11 SUMIDERO PREFABRICADO SL-100 UN 967,264 967,264 967,264 967,264 967,264 967,264 967,264 967,264 967,264 967,2644.12 SUMIDERO PREFABRICADO SL-250 UN 2,266,432 2,266,432 2,266,432 2,266,432 2,266,432 2,266,432 2,266,432 2,266,432 2,266,432 2,266,432

4.13 UN 102,750 103,033 102,362 102,453 102,325 102,568 102,668 102,065 102,476 102,668

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 45,094 45,794 44,132 44,358 44,040 44,641 44,889 43,396 44,415 44,8895.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 51,906 52,606 50,944 51,170 50,852 51,453 51,701 50,208 51,227 51,7015.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 47,914 50,618 46,165 47,191 48,432 47,515 49,429 45,729 47,589 49,9605.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 51,625 54,143 49,878 50,988 52,393 51,134 53,246 49,644 51,324 53,8145.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 52,165 54,656 50,487 51,520 52,806 51,730 53,681 50,184 51,867 54,2125.6 BORDE SEPARADOR VERDE A-170 ML 196,430 196,713 196,041 196,133 196,004 196,247 196,347 195,744 196,156 196,3475.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,743 15,068 14,533 14,656 14,805 14,695 14,925 14,481 14,704 14,9895.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 34,358 36,264 33,126 33,849 34,724 34,077 35,426 32,818 34,130 35,8015.9 CAÑUELA PREFABRICADA TIPO A-120 ML 64,487 64,638 64,279 64,328 64,259 64,389 64,443 64,120 64,340 64,443

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 444,020 448,213 438,918 440,926 441,304 441,624 444,843 436,483 441,237 445,4075.11 LOSETA PREFABRICADA A-40 M2 47,479 48,126 46,590 46,799 46,505 47,061 47,290 45,910 46,852 47,2905.12 LOSETA PREFABRICADA A-60 M2 67,656 68,303 66,767 66,976 66,682 67,238 67,466 66,087 67,028 67,466

5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 27,773 28,780 27,074 27,519 28,080 27,577 28,422 26,981 27,653 28,649

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 45,519 47,557 44,105 45,004 46,141 45,122 46,831 43,916 45,276 47,292

5.15 SARDINEL PREFABRICADO A-10 ML 81,102 88,219 80,895 78,556 87,641 82,995 87,028 80,139 83,941 88,0235.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 45,456 45,848 44,918 45,044 44,867 45,203 45,341 44,507 45,076 45,341

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 115,230 116,429 114,398 114,927 115,596 114,996 116,002 114,287 115,087 116,2736.2 BANCA EN CONCRETO M-30 UN 481,968 483,646 480,803 481,543 482,480 481,641 483,049 480,648 481,767 483,4286.3 BOLARDO M-63 ALTO/HIERRO UN 174,216 174,471 174,043 174,151 174,285 174,170 174,374 174,014 174,186 174,4296.4 BOLARDO M-60 CONCRETO UN 112,071 113,509 111,072 111,707 112,509 111,790 112,997 110,939 111,899 113,3226.5 BOLARDO M-61 BAJO/CONCRETO UN 113,493 114,932 112,495 113,129 113,932 113,212 114,419 112,361 113,321 114,7446.6 BOLARDO M-62 BAJO/HIERRO UN 157,122 158,652 156,082 156,729 157,538 156,845 158,069 155,909 156,939 158,402

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

Page 312: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

6.7 BORDE CONTENEDOR DE RAICES A-70 ML 46,989 47,525 46,252 46,425 46,181 46,642 46,832 45,688 46,468 46,8326.8 BORDILLO PREFABRICADO A-80 ML 53,465 54,066 52,640 52,834 52,562 53,077 53,289 52,010 52,883 53,2896.9 CANECA M-120 UN 241,922 242,056 241,738 241,781 241,720 241,835 241,883 241,597 241,792 241,883

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 632,873 633,592 632,374 632,691 633,093 632,733 633,336 632,307 632,787 633,4996.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,411,142 2,411,622 2,410,809 2,411,021 2,411,288 2,411,049 2,411,451 2,410,765 2,411,085 2,411,5596.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,839,838 2,840,318 2,839,505 2,839,717 2,839,984 2,839,745 2,840,147 2,839,461 2,839,781 2,840,2556.13 CICLOPARQUEADERO M100 TIPO 1 UN 397,073 397,583 396,727 396,942 397,212 396,981 397,389 396,669 397,012 397,5006.14 CICLOPARQUEADERO M101 TIPO 2 UN 527,719 529,759 526,332 527,195 528,273 527,350 528,982 526,102 527,475 529,4256.15 BANCA EN MADERA M-50 UN 359,333 359,333 359,333 359,333 359,333 359,333 359,333 359,333 359,333 359,3336.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 182,107 182,826 181,608 181,925 182,326 181,967 182,570 181,541 182,021 182,7326.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 432,400 432,735 431,939 432,048 431,895 432,183 432,302 431,587 432,075 432,3026.18 POSTE HISTÓRICO M-131 UN 3,641,232 3,644,829 3,638,736 3,640,322 3,642,329 3,640,531 3,643,548 3,638,403 3,640,802 3,644,360

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,459 1,459 1,459 1,459 1,459 1,459 1,459 1,459 1,459 1,4597.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,695 14,695 14,695 14,695 14,695 14,695 14,695 14,695 14,695 14,6957.3 SEÑAL DOBLE DE CICLORUTA UN 368,794 368,935 368,600 368,646 368,581 368,703 368,753 368,451 368,657 368,7537.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 426,555 427,575 425,862 426,293 426,833 426,371 427,187 425,747 426,433 427,4087.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 247,435 247,577 247,241 247,287 247,222 247,344 247,394 247,092 247,298 247,3947.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 291,322 291,464 291,128 291,174 291,109 291,231 291,281 290,979 291,185 291,2817.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 400,087 400,229 399,893 399,939 399,874 399,996 400,046 399,744 399,950 400,0467.8 TACHAS REFLECTIVAS UN 10,385 10,385 10,385 10,385 10,385 10,385 10,385 10,385 10,385 10,3857.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,961 10,961 10,961 10,961 10,961 10,961 10,961 10,961 10,961 10,961

7.10 UN 42,411 42,411 42,411 42,411 42,411 42,411 42,411 42,411 42,411 42,411TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 313: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,785 28,785 28,785 28,785 28,785 28,785 28,785 28,785 28,785 28,785

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505

2.7 230.1 M2 341 341 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 47,260 47,260 47,260 47,260 47,260 47,260 47,260 47,260 47,260 47,260

2.11 600.3 M3 58,406 58,406 58,406 58,406 58,406 58,406 58,406 58,406 58,406 58,406

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE MATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 314: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 125,622 170,895 125,622 110,100 169,601 138,557 164,427 121,742 145,025 170,8953.3 330.1 BASE GRANULAR M3 133,513 178,786 133,513 117,991 177,492 146,448 172,318 129,633 152,916 178,786

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,109 2,109 2,109 2,109 2,109 2,109 2,109 2,109 2,109 2,1093.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,060 1,060 1,060 1,060 1,060 1,060 1,060 1,060 1,060 1,060

3.7 461.1 M3 163,031 167,557 159,157 162,108 166,157 161,416 167,231 159,796 162,497 168,704

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 57,474 58,545 56,180 56,551 56,315 56,900 57,393 55,294 56,652 57,448

3.9 450.1 P M3 504,829 524,729 506,073 462,542 488,660 517,267 499,854 514,779 484,929 507,317

3.10 450.2 P M3 529,829 549,729 531,073 487,542 513,660 542,267 524,854 539,779 509,929 532,317

3.11 450.9 P M3 554,674 574,574 555,917 512,386 538,505 567,111 549,699 564,624 534,774 557,161

3.12 450.3 P M3 554,829 574,729 556,073 512,542 538,660 567,267 549,854 564,779 534,929 557,317

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 232,204 277,476 232,204 216,682 276,183 245,139 271,009 228,323 251,606 277,4763.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 223,580 268,853 223,580 208,058 267,559 236,515 262,385 219,700 242,983 268,8533.15 311.1 AFIRMADO M3 53,781 92,586 50,109 75,979 71,890 61,750 84,825 57,870 43,641 86,1193.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 12,170 12,471 11,888 12,116 12,435 12,038 12,492 11,965 12,134 12,6053.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 5,080 5,231 4,939 5,053 5,213 5,014 5,241 4,978 5,062 5,298

3.18 500.1 M3 538,548 562,518 523,056 532,140 543,142 535,014 551,976 519,184 535,674 556,688

3.19 500.1 M3 567,063 592,106 550,877 560,368 571,863 563,371 581,093 546,832 564,060 586,015

3.20 500.1 M3 585,900 611,735 569,284 578,969 590,657 582,173 600,229 564,993 582,801 605,257

3.21 *** ML 5,801 5,801 5,801 5,801 5,801 5,801 5,801 5,801 5,801 5,801

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 104,120 121,400 101,931 101,251 119,857 101,931 123,141 97,967 102,345 129,708

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 887,564 914,754 869,991 880,295 892,775 883,556 902,796 865,599 884,304 908,1404.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 785,546 812,285 768,264 778,399 790,671 781,604 800,526 763,944 782,340 805,7824.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 823,128 850,926 805,162 815,698 828,456 819,030 838,701 800,671 819,795 844,1654.4 630 P CONCRETOS f´c =3500 psi (bases) M3 506,153 530,108 490,009 499,948 512,314 501,963 520,730 487,093 503,286 525,8444.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 595,924 620,828 579,141 589,473 602,329 591,567 611,078 576,108 592,943 616,3954.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 500,956 525,173 484,148 494,830 508,344 496,233 516,547 481,904 498,062 522,0154.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 590,521 615,696 573,048 584,152 598,201 585,611 606,729 570,714 587,512 612,4144.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 728,428 752,645 711,620 722,302 735,816 723,705 744,019 709,376 725,534 749,4874.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 517,218 542,394 499,745 510,850 524,899 512,308 533,427 497,412 514,210 539,1114.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 763,748 788,924 746,275 757,380 771,429 758,838 779,957 743,942 760,740 785,641

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA

MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

Page 315: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

4.11 650 P KG 8,402 8,402 8,402 8,402 8,402 8,402 8,402 8,402 8,402 8,402

4.12 650 P KG 11,317 11,317 11,317 11,317 11,317 11,317 11,317 11,317 11,317 11,317

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,244 1,244 1,244 1,244 1,244 1,244 1,244 1,244 1,244 1,244

4.14 621.1 ML 1,966,028 1,966,028 1,966,028 1,966,028 1,966,028 1,966,028 1,966,028 1,966,028 1,966,028 1,966,028

4.15 621.1 P ML 3,207,601 3,254,110 3,177,541 3,195,168 3,216,515 3,200,745 3,233,656 3,170,029 3,202,024 3,242,797

4.16 621.2 M3 1,103,493 1,127,470 1,086,852 1,097,428 1,110,808 1,098,817 1,118,930 1,084,630 1,100,628 1,124,344

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 70,348 70,348 70,348 70,348 70,348 70,348 70,348 70,348 70,348 70,3484.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 268,717 271,594 266,720 267,989 269,595 268,156 270,569 266,453 268,373 271,2194.19 632 P BARANDA METÁLICA ML 302,937 302,937 302,937 302,937 302,937 302,937 302,937 302,937 302,937 302,9374.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,357 12,357 12,357 12,357 12,357 12,357 12,357 12,357 12,357 12,3574.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 401,844 452,256 382,436 408,411 418,073 402,837 435,811 382,926 392,422 441,8224.22 673.1 MATERIAL GRANULAR FILTRANTE M3 91,580 108,860 89,391 88,710 107,317 89,391 110,600 85,427 89,805 117,1674.23 610.1 RELLENO PARA ESTRUCTURAS M3 39,381 75,201 40,551 64,431 56,097 51,297 68,037 47,715 28,611 69,2314.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 337,839 363,590 320,329 331,216 344,834 333,177 353,783 317,419 334,758 359,376

4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 328,888 350,469 317,691 323,910 338,766 325,323 345,277 314,520 326,413 350,987

4.26 630.7 M3 353,530 375,111 342,332 348,552 363,408 349,965 369,919 339,162 351,054 375,629

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 340,554 362,293 329,769 335,379 349,239 337,480 356,128 325,830 338,055 361,5544.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 365,196 386,935 354,410 360,021 373,880 362,122 380,770 350,472 362,697 386,1964.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 460,815 486,831 443,999 453,860 465,801 456,980 475,389 439,797 457,695 480,5034.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 548,966 576,013 531,484 541,736 554,150 544,979 564,117 527,115 545,722 569,4334.31 681.1 GAVIÓN M3 172,912 189,407 170,823 170,173 187,934 170,823 191,068 167,039 171,218 197,3364.32 681.1 GAVIÓN MALLA PVC M3 179,547 196,041 177,457 176,807 194,568 177,457 197,702 173,673 177,852 203,971

4.33 672.1 ML 35,266 36,863 34,234 34,839 35,572 35,031 36,161 33,976 35,074 36,475

4.34 672.1 ML 13,983 14,782 13,467 13,770 14,136 13,865 14,431 13,338 13,887 14,587

4.35 *** M2 8,121 8,121 8,121 8,121 8,121 8,121 8,121 8,121 8,121 8,121

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,630 11,630 11,630 11,630 11,630 11,630 11,630 11,630 11,630 11,630

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,694 15,694 15,694 15,694 15,694 15,694 15,694 15,694 15,694 15,694

4.38 *** M2 18,838 18,838 18,838 18,838 18,838 18,838 18,838 18,838 18,838 18,838

4.39 *** M2 24,223 24,223 24,223 24,223 24,223 24,223 24,223 24,223 24,223 24,223

4.40 *** M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO)

CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES

BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

Page 316: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

4.41 *** M2 6,370 6,370 6,370 6,370 6,370 6,370 6,370 6,370 6,370 6,370

4.42 *** M2 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618 6,618

4.43 *** M2 5,659 5,659 5,659 5,659 5,659 5,659 5,659 5,659 5,659 5,659

4.44 *** M2 7,234 7,234 7,234 7,234 7,234 7,234 7,234 7,234 7,234 7,234

4.45 *** M2 5,304 5,304 5,304 5,304 5,304 5,304 5,304 5,304 5,304 5,304

4.46 *** M2 7,136 7,136 7,136 7,136 7,136 7,136 7,136 7,136 7,136 7,136

4.47 *** M2 12,240 12,240 12,240 12,240 12,240 12,240 12,240 12,240 12,240 12,240

4.48 661.1 ML 318,686 319,125 318,486 318,544 318,574 318,704 318,787 318,296 318,633 318,823

4.49 660.3 ML 271,881 277,264 268,026 270,273 272,841 270,776 274,956 267,152 270,997 276,063

4.50 *** ML 628,851 628,851 628,851 628,851 628,851 628,851 628,851 628,851 628,851 628,851

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 102,793 140,105 99,261 124,136 120,205 110,455 132,643 106,724 93,043 133,886

4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,282

4.53 *** ML 50,284 50,284 50,284 50,284 50,284 50,284 50,284 50,284 50,284 50,284

4.54 *** ML 80,995 80,995 80,995 80,995 80,995 80,995 80,995 80,995 80,995 80,995

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 451,488 478,535 434,006 444,257 456,672 447,501 466,639 429,637 448,244 471,9554.56 682.1 P COLCHONETA RENO M3 188,496 204,990 186,406 185,757 203,517 186,406 206,652 182,622 186,801 212,9204.57 *** TRINCHO EN MADERA M2 48,064 48,064 48,064 48,064 48,064 48,064 48,064 48,064 48,064 48,064

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,459 1,459 1,459 1,459 1,459 1,459 1,459 1,459 1,459 1,4595.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,695 14,695 14,695 14,695 14,695 14,695 14,695 14,695 14,695 14,6955.3 730.3 TOPE DEFENSA METÁLICA UN 68,078 68,078 68,078 68,078 68,078 68,078 68,078 68,078 68,078 68,0785.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 68,078 68,078 68,078 68,078 68,078 68,078 68,078 68,078 68,078 68,0785.5 730.1 DEFENSA METÁLICA ML 175,222 176,475 174,359 174,902 175,586 174,985 176,015 174,232 175,072 176,294

5.6 701.1 UN 10,385 10,385 10,385 10,385 10,385 10,385 10,385 10,385 10,385 10,385

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 567 567 567 567 567 567 567 567 567 567

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36"

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

Page 317: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasugá Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: SUMAPAZ

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286

6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,150 12,150 12,150 12,150 12,150 12,150 12,150 12,150 12,150 12,1506.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 32,860 32,860 32,860 32,860 32,860 32,860 32,860 32,860 32,860 32,8606.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,945 5,945 5,945 5,945 5,945 5,945 5,945 5,945 5,945 5,945

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 318: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,483,105 1,514,756 1,477,171 1,523,903 1,488,783 1,507,553 1,521,397 1,490,232 1,502,889 1,489,0371.2 CAMPAMENTO 9 M2 UN 864,525 880,351 861,558 884,925 867,364 876,749 883,671 868,089 874,418 867,4921.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,148 10,148 10,148 10,148 10,148 10,148 10,148 10,148 10,148 10,1481.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,427 11,427 11,427 11,427 11,427 11,427 11,427 11,427 11,427 11,4271.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,291 13,291 13,291 13,291 13,291 13,291 13,291 13,291 13,291 13,2911.6 CERCA EN TABLA H=2.30 M ML 48,646 48,646 48,646 48,646 48,646 48,646 48,646 48,646 48,646 48,6461.7 CERCA EN TEJA DE ZINC H=1.80 M ML 34,833 35,184 34,768 35,271 34,890 35,080 35,255 34,892 35,036 34,8981.8 CERCA EN TELA VERDE H = 2.10 M ML 15,509 15,860 15,444 15,947 15,566 15,755 15,931 15,568 15,712 15,5731.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 618,152 620,463 614,855 621,331 617,661 619,460 621,669 617,089 619,424 616,645

1.41 M2 7,244 7,244 7,244 7,244 7,244 7,244 7,244 7,244 7,244 7,244

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

Page 319: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,292 2,292 2,292 2,292 2,292 2,292 2,292 2,292 2,292 2,2921.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,140,488 1,140,488 1,140,488 1,140,488 1,140,488 1,140,488 1,140,488 1,140,488 1,140,488 1,140,4881.44 RED TELEFÓNICA PROVISIONAL UN 162,770 162,770 162,770 162,770 162,770 162,770 162,770 162,770 162,770 162,770

1.45 M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 93,157 100,008 63,251 100,008 76,498 82,653 106,476 68,737 80,378 69,7182.2 BASE ARENA CEMENTO 1:20 M3 162,178 200,029 155,667 202,539 163,574 175,197 207,746 155,762 173,991 168,6872.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,593 4,593 4,593 4,593 4,593 4,593 4,593 4,593 4,593 4,5932.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 504,731 538,988 498,394 547,882 510,470 529,502 545,980 511,103 525,046 511,0692.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 518,261 554,089 511,686 562,754 524,006 543,099 561,276 524,076 538,811 524,8372.8 ZAPATAS EN CONCRETO 3500 PSI M3 485,070 518,618 478,914 526,732 490,450 508,328 525,348 490,515 504,313 491,2282.9 PILOTE DE MADERA D=20 CM ML 36,282 36,282 36,282 36,282 36,282 36,282 36,282 36,282 36,282 36,282

2.10 ML 110,724 110,724 110,724 110,724 110,724 110,724 110,724 110,724 110,724 110,724

2.11 ML 133,487 133,487 133,487 133,487 133,487 133,487 133,487 133,487 133,487 133,487

2.12 ML 161,013 161,013 161,013 161,013 161,013 161,013 161,013 161,013 161,013 161,013

2.13 ML 198,068 198,068 198,068 198,068 198,068 198,068 198,068 198,068 198,068 198,068

2.14 PILOTE HINCADO 25X25 ML 89,840 92,313 89,391 92,850 90,211 91,451 92,797 90,159 91,191 90,2882.15 PILOTE HINCADO 30X30 ML 109,334 112,919 108,684 113,697 109,873 111,670 113,621 109,797 111,293 109,9852.16 DADOS EN CONCRETO 3500PSI M3 474,294 507,842 468,138 515,955 479,674 497,551 514,572 479,739 493,537 480,451

2.17 ML 119,086 119,086 119,086 119,086 119,086 119,086 119,086 119,086 119,086 119,086

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 27,961 28,196 27,921 28,212 27,970 28,042 28,244 27,921 28,034 28,0013.2 SIFÓN EN PVC 6" UN 142,805 143,041 142,765 143,056 142,814 142,886 143,088 142,766 142,879 142,8463.3 CAJA DE INSPECCIÓN DE 100X100 UN 371,570 375,667 346,983 378,941 364,655 371,174 382,813 359,345 372,755 356,2893.4 CAJA DE INSPECCIÓN DE 40X40 UN 178,760 182,305 176,080 183,560 178,732 181,245 183,619 178,444 180,864 178,0783.5 CAJA DE INSPECCIÓN DE 60X60 UN 201,036 207,071 196,752 208,959 200,944 204,891 209,220 200,276 204,338 200,0353.6 CAJA DE INSPECCIÓN DE 80X80 UN 265,698 276,884 260,457 280,077 266,348 273,112 280,156 265,653 271,877 265,6543.7 DUCTO ELÉCTRICO PVC 4" ML 75,223 75,103 74,958 75,103 75,117 75,107 75,152 75,057 75,146 75,0073.8 POZO SÉPTICO ETERNIT 1000 LT UN 950,417 949,216 947,766 949,216 949,355 949,259 949,714 948,758 949,654 948,2643.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 85,168 87,766 84,722 87,939 85,264 86,062 88,296 84,728 85,979 85,615

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 49,285 50,656 49,049 50,747 49,336 49,756 50,935 49,053 49,713 49,5213.11 TUBERÍA DRENAJE PVC 110 ML 20,597 21,144 20,487 21,390 20,730 21,166 21,276 20,837 21,034 20,7073.12 TUBERÍA DRENAJE PVC 160 ML 31,142 31,689 31,032 31,935 31,276 31,711 31,821 31,382 31,580 31,2523.13 TUBERÍA DRENAJE PVC 200 ML 42,700 43,466 42,546 43,810 42,887 43,497 43,651 43,035 43,312 42,8543.14 TUBERÍA DRENAJE PVC 250 ML 57,938 58,814 57,763 59,207 58,152 58,849 59,025 58,322 58,638 58,1143.15 TUBERÍA DRENAJE PVC 315 ML 79,602 80,368 79,448 80,711 79,788 80,398 80,552 79,937 80,214 79,755

RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE)

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 320: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

3.16 UN 729,444 738,200 727,686 742,127 731,579 738,552 740,310 733,278 736,442 731,202

3.17 UN 1,037,753 1,055,266 1,034,237 1,063,119 1,042,023 1,055,969 1,059,485 1,045,421 1,051,750 1,041,269

3.18 UN 1,364,854 1,399,879 1,357,822 1,415,587 1,373,395 1,401,286 1,408,318 1,380,190 1,392,847 1,371,886

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 27,647 27,647 27,647 27,647 27,647 27,647 27,647 27,647 27,647 27,6474.2 CASETÓN DE LONA 0.80X0.70 M2 36,319 36,319 36,319 36,319 36,319 36,319 36,319 36,319 36,319 36,3194.3 COLUMNAS 3500 PSI M3 626,964 660,512 620,807 668,625 632,343 650,221 667,242 632,408 646,206 633,1214.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 213,184 245,351 209,185 257,489 221,277 240,976 252,338 223,029 235,307 219,273

4.5 M2 75,600 78,857 75,002 79,645 76,122 77,858 79,511 76,129 77,468 76,198

4.6 M2 89,057 92,966 88,340 93,911 89,684 91,767 93,750 89,691 91,299 89,774

4.7 M2 100,814 106,025 99,857 107,285 101,649 104,427 107,071 101,660 103,803 101,770

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 106,424 111,962 105,408 113,301 107,312 110,263 113,072 107,323 109,600 107,441

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 122,543 129,383 121,287 131,037 123,639 127,284 130,755 123,653 126,466 123,798

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 136,576 144,393 135,142 146,284 137,830 141,995 145,961 137,845 141,060 138,011

4.11 M2 151,828 160,622 150,214 162,749 153,238 157,925 162,387 153,255 156,872 153,442

4.12 ENTREPISO VIGUETA PLACA M2 73,237 73,825 73,132 73,929 73,302 73,566 73,945 73,256 73,514 73,3434.13 ESCALERA MACIZA 3500 PSI M3 734,067 767,616 727,911 775,729 739,447 757,325 774,346 739,512 753,310 740,2254.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 68,769 69,300 68,681 69,314 68,808 68,945 69,384 68,702 68,948 68,8574.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 61,480 64,835 60,864 65,646 62,018 63,806 65,508 62,024 63,404 62,0964.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 69,748 73,852 68,995 74,845 70,406 72,593 74,675 70,414 72,102 70,5014.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 81,853 87,000 80,909 88,244 82,679 85,421 88,032 82,689 84,805 82,7984.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 562,546 596,094 556,390 604,207 567,926 585,803 602,824 567,990 581,788 568,703

4.19000000000001 UN 38,077 39,124 37,888 39,351 38,235 38,759 39,329 38,213 38,649 38,267

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 222,968 237,951 220,219 241,574 225,371 233,355 240,956 225,400 231,562 225,7184.21000000000001 ACERO FIGURADO 37000 PSI KG 3,119 3,119 3,119 3,119 3,119 3,119 3,119 3,119 3,119 3,119

4.22 ACERO FIGURADO 60000 PSI KG 3,241 3,241 3,241 3,241 3,241 3,241 3,241 3,241 3,241 3,2414.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478

4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 665,871 699,420 659,715 707,533 671,251 689,129 706,150 671,316 685,114 672,0294.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 615,570 652,279 608,832 661,174 621,463 641,047 659,646 621,550 636,644 622,309

4.26 VIGA AÉREA 3500 PSI M3 665,583 699,131 659,427 707,244 670,963 688,840 705,861 671,027 684,825 671,7404.27000000000001 VIGA CINTA 3500 PSI M3 650,240 683,788 644,083 691,901 655,619 673,497 690,518 655,684 669,482 656,397

4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 809,259 842,808 803,103 850,921 814,639 832,517 849,538 814,704 828,502 815,4174.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 262,638 298,861 255,847 309,330 269,136 290,618 306,462 270,795 285,281 269,428

5 MAMPOSTERÍA

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO)

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO)

PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M)

Page 321: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 22,957 23,889 22,790 24,056 23,070 23,492 24,074 23,007 23,411 23,1245.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,502 39,435 38,335 39,602 38,615 39,037 39,619 38,552 38,956 38,6695.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,671 24,906 24,630 24,921 24,679 24,752 24,954 24,631 24,744 24,7115.4 ARCOS EN LADRILLO PRENSADO ML 119,226 119,696 119,145 119,727 119,243 119,387 119,792 119,146 119,372 119,3075.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 34,075 35,121 33,885 35,348 34,232 34,756 35,326 34,210 34,646 34,2645.6 DINTELES EN BLOQUE 0.15 M ML 19,550 20,081 19,462 20,095 19,589 19,726 20,165 19,483 19,729 19,6385.7 ENCHAPES LADRILLO PRENSADO M2 66,548 67,489 66,387 67,551 66,583 66,872 67,680 66,389 66,842 66,7105.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 70,138 73,626 69,505 74,383 70,662 72,410 74,309 70,588 72,044 70,7715.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,303 53,303 53,303 53,303 53,303 53,303 53,303 53,303 53,303 53,303

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,686 32,686 32,686 32,686 32,686 32,686 32,686 32,686 32,686 32,6865.11 MURO DRYWALL DOBLE CARA 0.10 M M2 51,661 51,661 51,661 51,661 51,661 51,661 51,661 51,661 51,661 51,6615.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 31,865 31,865 31,865 31,865 31,865 31,865 31,865 31,865 31,865 31,8655.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 64,643 64,643 64,643 64,643 64,643 64,643 64,643 64,643 64,643 64,6435.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,362 39,362 39,362 39,362 39,362 39,362 39,362 39,362 39,362 39,3625.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 66,172 66,172 66,172 66,172 66,172 66,172 66,172 66,172 66,172 66,1725.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 40,127 40,127 40,127 40,127 40,127 40,127 40,127 40,127 40,127 40,1275.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,072 27,545 26,991 27,576 27,090 27,235 27,641 26,992 27,220 27,1535.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,821 17,058 16,781 17,073 16,830 16,903 17,106 16,781 16,895 16,862

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 37,604 37,919 37,550 37,940 37,616 37,713 37,983 37,551 37,702 37,6585.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 22,899 23,057 22,872 23,067 22,905 22,953 23,089 22,872 22,948 22,926

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 44,327 44,642 44,273 44,663 44,339 44,435 44,706 44,273 44,425 44,3815.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 26,773 26,931 26,746 26,941 26,779 26,827 26,963 26,747 26,822 26,800

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 80,208 81,783 79,937 81,887 80,266 80,749 82,104 79,941 80,699 80,4785.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 47,018 47,806 46,883 47,858 47,048 47,289 47,967 46,885 47,264 47,154

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 24,961 25,277 24,907 25,297 24,973 25,070 25,341 24,908 25,060 25,0165.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,513 15,670 15,485 15,681 15,518 15,567 15,702 15,486 15,562 15,540

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 47,840 48,470 47,732 48,512 47,863 48,057 48,598 47,733 48,037 47,9485.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 29,755 30,070 29,701 30,091 29,766 29,863 30,134 29,701 29,853 29,809

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 63,964 64,495 63,876 64,509 64,003 64,139 64,579 63,897 64,143 64,0525.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,094 39,360 39,050 39,367 39,114 39,182 39,402 39,061 39,184 39,138

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 120,244 122,449 119,865 122,595 120,325 121,002 122,899 119,870 120,932 120,6235.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 74,131 75,234 73,941 75,307 74,172 74,510 75,458 73,944 74,475 74,321

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 59,089 60,154 58,906 60,225 59,128 59,455 60,372 58,908 59,421 59,2725.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 36,657 37,189 36,565 37,225 36,676 36,840 37,298 36,566 36,823 36,748

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 35,532 36,237 35,411 36,284 35,558 35,774 36,381 35,412 35,752 35,6535.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 21,649 22,002 21,588 22,025 21,662 21,770 22,074 21,589 21,759 21,710

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 25,524 25,839 25,470 25,860 25,535 25,632 25,903 25,470 25,622 25,5785.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,584 15,742 15,557 15,752 15,590 15,638 15,774 15,558 15,633 15,611

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 38,544 39,174 38,435 39,216 38,567 38,760 39,302 38,437 38,740 38,6525.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 23,675 23,990 23,620 24,011 23,686 23,783 24,054 23,621 23,773 23,729

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 73,775 74,720 73,612 74,782 73,809 74,100 74,912 73,614 74,070 73,9375.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 45,073 45,546 44,992 45,577 45,091 45,236 45,642 44,993 45,221 45,154

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 53,981 54,611 53,873 54,653 54,004 54,198 54,740 53,874 54,178 54,089

5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 32,626 32,941 32,571 32,961 32,637 32,734 33,005 32,572 32,724 32,680

Page 322: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 114,729 116,935 114,350 117,081 114,811 115,488 117,384 114,356 115,418 115,109

5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 69,759 70,861 69,569 70,934 69,799 70,138 71,086 69,572 70,103 69,948

5.47000000000002 REMATES LADRILLO PRENSADO ML 21,680 21,916 21,640 21,931 21,689 21,761 21,963 21,641 21,754 21,7215.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 27,471 28,238 27,339 28,289 27,500 27,735 28,394 27,341 27,711 27,603

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 46,291 47,314 46,116 47,381 46,329 46,643 47,522 46,118 46,610 46,4675.50 LAVADA DE FACHADA M2 3,999 3,999 3,999 3,999 3,999 3,999 3,999 3,999 3,999 3,999

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,672 39,604 38,505 39,771 38,785 39,207 39,789 38,722 39,126 38,8395.52 DOVELA, GROUTING 3000 PSI ML 7,609 7,609 7,609 7,609 7,609 7,609 7,609 7,609 7,609 7,609

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,079 10,079 10,079 10,079 10,079 10,079 10,079 10,079 10,079 10,0795.54 ANCLAJE 1/2" L=50CM UN 13,184 13,184 13,184 13,184 13,184 13,184 13,184 13,184 13,184 13,184

5.55000000000003 ANCLAJE 5/8" L=70CM UN 18,378 18,378 18,378 18,378 18,378 18,378 18,378 18,378 18,378 18,3785.56 ANCLAJE 3/4" L=70CM UN 27,394 27,394 27,394 27,394 27,394 27,394 27,394 27,394 27,394 27,394

5.57000000000003 ANCLAJE 1" L= 70CM UN 3,931 4,179 3,885 4,244 3,973 4,111 4,230 3,977 4,078 3,977

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,797 11,797 11,797 11,797 11,797 11,797 11,797 11,797 11,797 11,7976.2 FILOS O DILATACIONES B/PLACA ML 4,536 4,771 4,495 4,786 4,544 4,617 4,819 4,496 4,609 4,5766.3 FILOS O DILATACIONES S/MURO ML 5,439 5,674 5,398 5,690 5,448 5,520 5,722 5,399 5,512 5,4796.4 GOTERA EN MORTERO 1:4 ML 6,527 6,762 6,486 6,777 6,535 6,607 6,810 6,487 6,600 6,5676.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,310 4,3106.6 MALLA BAJO ENTRAMADO M2 10,291 10,291 10,291 10,291 10,291 10,291 10,291 10,291 10,291 10,2916.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,181 19,927 19,053 19,976 19,208 19,437 20,079 19,054 19,414 19,3096.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,566 11,939 11,502 11,964 11,580 11,694 12,015 11,503 11,682 11,6306.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 16,863 17,525 16,749 17,569 16,888 17,091 17,660 16,751 17,070 16,977

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,171 10,502 10,114 10,524 10,183 10,285 10,569 10,115 10,274 10,2286.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,217 16,963 16,089 17,013 16,245 16,474 17,115 16,091 16,450 16,3466.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,848 10,221 9,784 10,246 9,862 9,976 10,297 9,785 9,965 9,9126.13 PAÑETE CULATAS 1:4, E=2 CM M2 16,863 17,525 16,749 17,569 16,888 17,091 17,660 16,751 17,070 16,9776.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,171 10,502 10,114 10,524 10,183 10,285 10,569 10,115 10,274 10,2286.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,370 16,902 16,279 16,937 16,390 16,553 17,010 16,280 16,536 16,4626.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,924 10,189 9,878 10,207 9,933 10,015 10,244 9,879 10,007 9,9696.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 13,977 14,481 13,890 14,515 13,996 14,151 14,584 13,892 14,134 14,0646.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,508 8,760 8,465 8,777 8,518 8,595 8,812 8,466 8,587 8,552

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,485 14,053 13,387 14,091 13,506 13,681 14,169 13,389 13,662 13,5836.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,262 8,546 8,213 8,565 8,273 8,360 8,604 8,214 8,351 8,311

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,456 18,118 17,342 18,161 17,480 17,684 18,252 17,344 17,662 17,5706.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,452 10,783 10,395 10,805 10,464 10,566 10,850 10,396 10,555 10,509

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,810 17,556 16,682 17,606 16,838 17,067 17,708 16,684 17,043 16,9386.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,129 10,502 10,065 10,527 10,143 10,258 10,578 10,066 10,246 10,193

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 13,950 14,518 13,852 14,556 13,971 14,145 14,634 13,854 14,127 14,0486.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,481 8,765 8,432 8,784 8,492 8,579 8,823 8,433 8,570 8,530

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,487 18,233 17,359 18,283 17,515 17,744 18,385 17,361 17,720 17,6166.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,776 11,149 10,712 11,174 10,790 10,904 11,225 10,713 10,892 10,840

Page 323: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 21,550 22,495 21,388 22,558 21,585 21,875 22,688 21,390 21,845 21,713

7.2 M2 64,462 66,206 64,146 66,585 64,724 65,598 66,548 64,687 65,415 64,779

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 39,639 39,639 39,639 39,639 39,639 39,639 39,639 39,639 39,639 39,6397.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,146 16,146 16,146 16,146 16,146 16,146 16,146 16,146 16,146 16,1467.5 ML 25,317 25,317 25,317 25,317 25,317 25,317 25,317 25,317 25,317 25,3177.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 58,967 58,967 58,967 58,967 58,967 58,967 58,967 58,967 58,967 58,9677.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 42,270 42,270 42,270 42,270 42,270 42,270 42,270 42,270 42,270 42,2707.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,466 25,466 25,466 25,466 25,466 25,466 25,466 25,466 25,466 25,4667.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 57,396 57,396 57,396 57,396 57,396 57,396 57,396 57,396 57,396 57,396

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 74,061 74,061 74,061 74,061 74,061 74,061 74,061 74,061 74,061 74,0617.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 96,300 96,300 96,300 96,300 96,300 96,300 96,300 96,300 96,300 96,3007.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 42,391 42,391 42,391 42,391 42,391 42,391 42,391 42,391 42,391 42,3917.13 CANAL PVC AMAZONAS ML 61,497 61,497 61,497 61,497 61,497 61,497 61,497 61,497 61,497 61,4977.14 CANAL PVC RAINGO ML 54,364 54,364 54,364 54,364 54,364 54,364 54,364 54,364 54,364 54,3647.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 86,186 86,186 86,186 86,186 86,186 86,186 86,186 86,186 86,186 86,1867.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 49,792 49,792 49,792 49,792 49,792 49,792 49,792 49,792 49,792 49,7927.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 40,911 40,911 40,911 40,911 40,911 40,911 40,911 40,911 40,911 40,9117.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,537 23,537 23,537 23,537 23,537 23,537 23,537 23,537 23,537 23,537

7.19000000000001 TEJA DE BARRO M2 46,022 47,198 45,820 47,276 46,065 46,426 47,437 45,823 46,389 46,2247.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 34,089 34,089 34,089 34,089 34,089 34,089 34,089 34,089 34,089 34,089

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,288 31,288 31,288 31,288 31,288 31,288 31,288 31,288 31,288 31,2887.22 TEJA FIBROCEMENTO Nº4 M2 26,612 26,612 26,612 26,612 26,612 26,612 26,612 26,612 26,612 26,612

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 25,838 25,838 25,838 25,838 25,838 25,838 25,838 25,838 25,838 25,8387.24 TEJA FIBROCEMENTO No. 8 M2 26,584 26,584 26,584 26,584 26,584 26,584 26,584 26,584 26,584 26,584

7.25000000000001 TEJA TERMOACÚSTICA M2 36,812 36,812 36,812 36,812 36,812 36,812 36,812 36,812 36,812 36,8127.26 TEJA PLÁSTICA No.6 M2 32,459 32,459 32,459 32,459 32,459 32,459 32,459 32,459 32,459 32,459

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 59,512 59,512 59,512 59,512 59,512 59,512 59,512 59,512 59,512 59,512

7.28 M2 108,155 108,155 108,155 108,155 108,155 108,155 108,155 108,155 108,155 108,155

7.29000000000001 TEJA SIN TRASLAPO M2 48,699 48,699 48,699 48,699 48,699 48,699 48,699 48,699 48,699 48,6997.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,576 31,576 31,576 31,576 31,576 31,576 31,576 31,576 31,576 31,576

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 24,899 24,899 24,899 24,899 24,899 24,899 24,899 24,899 24,899 24,899

7.32 M2 39,880 39,880 39,880 39,880 39,880 39,880 39,880 39,880 39,880 39,880

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,754 14,754 14,754 14,754 14,754 14,754 14,754 14,754 14,754 14,7547.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,639 17,639 17,639 17,639 17,639 17,639 17,639 17,639 17,639 17,639

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,0367.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 25,754 25,754 25,754 25,754 25,754 25,754 25,754 25,754 25,754 25,754

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,142 16,142 16,142 16,142 16,142 16,142 16,142 16,142 16,142 16,1427.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 37,853 37,853 37,853 37,853 37,853 37,853 37,853 37,853 37,853 37,853

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 220,976 220,976 220,976 220,976 220,976 220,976 220,976 220,976 220,976 220,9767.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 285,648 285,648 285,648 285,648 285,648 285,648 285,648 285,648 285,648 285,648

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 180,829 180,829 180,829 180,829 180,829 180,829 180,829 180,829 180,829 180,829

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 324: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 260,169 260,169 260,169 260,169 260,169 260,169 260,169 260,169 260,169 260,169

8 MORTEROS Y CONCRETOS8.1 CONCRETO 4000 PSI M3 378,127 413,977 371,622 421,755 383,515 401,481 420,995 382,755 397,715 384,6318.2 CONCRETO 3500 PSI M3 329,661 362,232 323,684 370,109 334,884 352,241 368,766 334,947 348,343 335,6398.3 CONCRETO 3000 PSI M3 323,828 357,087 317,675 365,722 329,400 347,877 363,875 330,014 343,551 329,9818.4 CONCRETO 2500 PSI M3 288,284 323,165 281,955 330,733 293,526 311,007 329,993 292,786 307,343 294,6128.5 CONCRETO 2000 PSI M3 268,500 303,618 262,039 312,301 274,208 293,164 310,700 274,452 288,850 274,9608.6 CONCRETO 1500 PSI M3 243,480 278,648 236,887 288,812 249,789 270,645 286,027 251,399 265,463 250,0728.7 MORTERO SECO 1:10 M3 200,827 233,271 195,247 235,423 202,024 211,986 239,886 195,328 210,952 206,4078.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 379,664 411,167 374,245 413,256 380,826 390,499 417,590 374,324 389,495 385,0818.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 348,909 384,430 342,800 386,785 350,220 361,127 391,672 342,889 359,994 355,018

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 402,625 435,846 396,911 438,048 403,851 414,052 442,619 396,994 412,992 408,3388.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 529,225 562,446 523,511 564,648 530,451 540,652 569,219 523,594 539,592 534,938

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 88,652 88,652 88,652 88,652 88,652 88,652 88,652 88,652 88,652 88,6529.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,898 3,133 2,858 3,149 2,907 2,979 3,181 2,858 2,971 2,9389.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 99,952 99,952 99,952 99,952 99,952 99,952 99,952 99,952 99,952 99,9529.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 121,731 121,731 121,731 121,731 121,731 121,731 121,731 121,731 121,731 121,7319.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 167,782 167,782 167,782 167,782 167,782 167,782 167,782 167,782 167,782 167,7829.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 187,334 187,334 187,334 187,334 187,334 187,334 187,334 187,334 187,334 187,3349.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 206,911 206,911 206,911 206,911 206,911 206,911 206,911 206,911 206,911 206,9119.8 HOJA PUERTA FORTEC 0.81 UN 146,648 146,648 146,648 146,648 146,648 146,648 146,648 146,648 146,648 146,6489.9 HOJA PUERTA FORTEC 0.91 UN 161,961 161,961 161,961 161,961 161,961 161,961 161,961 161,961 161,961 161,961

9.10 HOJA PUERTA FORTEC 1.50 UN 240,049 240,049 240,049 240,049 240,049 240,049 240,049 240,049 240,049 240,0499.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 90,946 90,946 90,946 90,946 90,946 90,946 90,946 90,946 90,946 90,9469.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 120,654 120,654 120,654 120,654 120,654 120,654 120,654 120,654 120,654 120,6549.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 133,618 133,618 133,618 133,618 133,618 133,618 133,618 133,618 133,618 133,6189.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 339,412 339,412 339,412 339,412 339,412 339,412 339,412 339,412 339,412 339,4129.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,212 30,212 30,212 30,212 30,212 30,212 30,212 30,212 30,212 30,2129.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,296 19,296 19,296 19,296 19,296 19,296 19,296 19,296 19,296 19,2969.17 VENTANERÍA EN MADERA CEDRO MACHO M2 70,410 70,410 70,410 70,410 70,410 70,410 70,410 70,410 70,410 70,4109.18 CERRADURA DE ENTRADA PRINCIPAL UN 87,059 87,059 87,059 87,059 87,059 87,059 87,059 87,059 87,059 87,0599.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 67,722 67,722 67,722 67,722 67,722 67,722 67,722 67,722 67,722 67,7229.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 21,269 21,269 21,269 21,269 21,269 21,269 21,269 21,269 21,269 21,2699.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,269 21,269 21,269 21,269 21,269 21,269 21,269 21,269 21,269 21,2699.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,189 20,189 20,189 20,189 20,189 20,189 20,189 20,189 20,189 20,1899.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 74,800 74,800 74,800 74,800 74,800 74,800 74,800 74,800 74,800 74,8009.24 ESPEJO BISELADO INCOLORO 4 MM M2 96,622 96,622 96,622 96,622 96,622 96,622 96,622 96,622 96,622 96,6229.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 44,250 44,250 44,250 44,250 44,250 44,250 44,250 44,250 44,250 44,2509.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 52,978 52,978 52,978 52,978 52,978 52,978 52,978 52,978 52,978 52,9789.27 VIDRIO TEMPLADO PULIDO 10 MM M2 212,991 212,991 212,991 212,991 212,991 212,991 212,991 212,991 212,991 212,9919.28 VIDRIO TEMPLADO PULIDO 8 MM M2 191,170 191,170 191,170 191,170 191,170 191,170 191,170 191,170 191,170 191,1709.29 VIDRIO TRANSPARENTE 3 MM M2 47,523 47,523 47,523 47,523 47,523 47,523 47,523 47,523 47,523 47,523

Page 325: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

9.30 VIDRIO TRANSPARENTE 4 MM M2 55,161 55,161 55,161 55,161 55,161 55,161 55,161 55,161 55,161 55,1619.31 VIDRIO TRANSPARENTE 5 MM M2 61,707 61,707 61,707 61,707 61,707 61,707 61,707 61,707 61,707 61,7079.32 VIDRIO TRANSPARENTE 6 MM M2 65,635 65,635 65,635 65,635 65,635 65,635 65,635 65,635 65,635 65,635

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 55,407 55,407 55,407 55,407 55,407 55,407 55,407 55,407 55,407 55,40710.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 160,423 160,423 160,423 160,423 160,423 160,423 160,423 160,423 160,423 160,423

10.3 ML 80,702 80,702 80,702 80,702 80,702 80,702 80,702 80,702 80,702 80,702

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 105,665 105,665 105,665 105,665 105,665 105,665 105,665 105,665 105,665 105,66510.5 MARCO TAPA CAJA DE INSPECCIÓN UN 100,611 100,611 100,611 100,611 100,611 100,611 100,611 100,611 100,611 100,61110.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 70,216 70,216 70,216 70,216 70,216 70,216 70,216 70,216 70,216 70,21610.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 149,368 149,368 149,368 149,368 149,368 149,368 149,368 149,368 149,368 149,36810.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 79,997 79,997 79,997 79,997 79,997 79,997 79,997 79,997 79,997 79,99710.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,820 4,820 4,820 4,820 4,820 4,820 4,820 4,820 4,820 4,820

10.10 M2 73,887 73,887 73,887 73,887 73,887 73,887 73,887 73,887 73,887 73,887

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 30,944 30,944 30,944 30,944 30,944 30,944 30,944 30,944 30,944 30,944

10.12 M2 387,529 387,529 387,529 387,529 387,529 387,529 387,529 387,529 387,529 387,529

10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 140,168 140,168 140,168 140,168 140,168 140,168 140,168 140,168 140,168 140,168

10.14 M2 154,912 154,912 154,912 154,912 154,912 154,912 154,912 154,912 154,912 154,912

10.15 M2 354,138 354,138 354,138 354,138 354,138 354,138 354,138 354,138 354,138 354,138

10.16 M2 94,021 94,021 94,021 94,021 94,021 94,021 94,021 94,021 94,021 94,021

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 282,268 282,268 282,268 282,268 282,268 282,268 282,268 282,268 282,268 282,268

10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,481 4,481 4,481 4,481 4,481 4,481 4,481 4,481 4,481 4,481

10.19 VENTANA EN ALUMINIO CORREDIZA M2 199,391 199,391 199,391 199,391 199,391 199,391 199,391 199,391 199,391 199,39110.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 89,796 89,796 89,796 89,796 89,796 89,796 89,796 89,796 89,796 89,79610.21 REJILLA PISO 0.30 M M2 63,404 63,404 63,404 63,404 63,404 63,404 63,404 63,404 63,404 63,40410.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 65,034 65,034 65,034 65,034 65,034 65,034 65,034 65,034 65,034 65,034

10.23 KG 7,441 7,441 7,441 7,441 7,441 7,441 7,441 7,441 7,441 7,441

10.24 KG 8,253 8,253 8,253 8,253 8,253 8,253 8,253 8,253 8,253 8,253

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

Page 326: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

10.25 KG 6,483 6,483 6,483 6,483 6,483 6,483 6,483 6,483 6,483 6,483

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO11.1 ACOMETIDA EN PVC 1/2" 5M UN 166,290 166,290 166,290 166,290 166,290 166,290 166,290 166,290 166,290 166,29011.2 ACOMETIDA EN PVC 3/4" 5M UN 197,858 197,858 197,858 197,858 197,858 197,858 197,858 197,858 197,858 197,85811.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,146 16,146 16,146 16,146 16,146 16,146 16,146 16,146 16,146 16,14611.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,317 25,317 25,317 25,317 25,317 25,317 25,317 25,317 25,317 25,31711.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,514 24,514 24,514 24,514 24,514 24,514 24,514 24,514 24,514 24,51411.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,294 31,294 31,294 31,294 31,294 31,294 31,294 31,294 31,294 31,29411.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 64,137 64,137 64,137 64,137 64,137 64,137 64,137 64,137 64,137 64,13711.8 CONEXIÓN TANQUE ELEVADO PVC UN 166,329 166,329 166,329 166,329 166,329 166,329 166,329 166,329 166,329 166,32911.9 INSTALACIÓN APARATO SANITARIO UN 33,388 33,388 33,388 33,388 33,388 33,388 33,388 33,388 33,388 33,388

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,521 23,521 23,521 23,521 23,521 23,521 23,521 23,521 23,521 23,52111.13 NIPLE PASAMURO 2" UN 50,096 50,096 50,096 50,096 50,096 50,096 50,096 50,096 50,096 50,09611.14 NIPLE PASAMURO 4" UN 74,825 74,825 74,825 74,825 74,825 74,825 74,825 74,825 74,825 74,82511.15 PUNTO AGUA CALIENTE CPVC UN 62,257 62,257 62,257 62,257 62,257 62,257 62,257 62,257 62,257 62,25711.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 45,755 45,755 45,755 45,755 45,755 45,755 45,755 45,755 45,755 45,75511.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,49411.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 61,222 61,222 61,222 61,222 61,222 61,222 61,222 61,222 61,222 61,22211.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 48,567 48,567 48,567 48,567 48,567 48,567 48,567 48,567 48,567 48,56711.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 60,321 60,321 60,321 60,321 60,321 60,321 60,321 60,321 60,321 60,32111.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 64,417 64,417 64,417 64,417 64,417 64,417 64,417 64,417 64,417 64,41711.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 53,795 53,795 53,795 53,795 53,795 53,795 53,795 53,795 53,795 53,79511.23 RED SUMINISTRO CPVC 1/2" ML 9,134 9,134 9,134 9,134 9,134 9,134 9,134 9,134 9,134 9,13411.24 RED SUMINISTRO CPVC 3/4" ML 12,774 12,774 12,774 12,774 12,774 12,774 12,774 12,774 12,774 12,77411.25 RED SUMINISTRO PVC 1 1/2" ML 16,424 16,424 16,424 16,424 16,424 16,424 16,424 16,424 16,424 16,42411.26 RED SUMINISTRO PVC 1" ML 10,195 10,195 10,195 10,195 10,195 10,195 10,195 10,195 10,195 10,19511.27 RED SUMINISTRO PVC 1/2" ML 6,145 6,145 6,145 6,145 6,145 6,145 6,145 6,145 6,145 6,14511.28 RED SUMINISTRO PVC 2 1/2" ML 41,322 41,322 41,322 41,322 41,322 41,322 41,322 41,322 41,322 41,32211.29 RED SUMINISTRO PVC 2" ML 23,760 23,760 23,760 23,760 23,760 23,760 23,760 23,760 23,760 23,76011.30 RED SUMINISTRO PVC 3/4" ML 7,662 7,662 7,662 7,662 7,662 7,662 7,662 7,662 7,662 7,66211.31 RED SANITARIA PVC-S 2" ML 18,082 18,082 18,082 18,082 18,082 18,082 18,082 18,082 18,082 18,08211.32 RED SANITARIA PVC-S 3" ML 25,047 25,047 25,047 25,047 25,047 25,047 25,047 25,047 25,047 25,04711.33 RED SANITARIA PVC-S 4" ML 33,887 33,887 33,887 33,887 33,887 33,887 33,887 33,887 33,887 33,88711.34 RED SANITARIA PVC-S 6" ML 63,158 63,158 63,158 63,158 63,158 63,158 63,158 63,158 63,158 63,15811.35 REGISTRO 1" UN 82,524 82,524 82,524 82,524 82,524 82,524 82,524 82,524 82,524 82,52411.36 REGISTRO 1/2" UN 47,260 47,260 47,260 47,260 47,260 47,260 47,260 47,260 47,260 47,26011.37 REGISTRO 3/4" UN 57,860 57,860 57,860 57,860 57,860 57,860 57,860 57,860 57,860 57,86011.38 REGISTRO 1 1/2" UN 107,631 107,631 107,631 107,631 107,631 107,631 107,631 107,631 107,631 107,631

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 327: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

11.39 REGISTRO 2 1/2" UN 277,428 277,428 277,428 277,428 277,428 277,428 277,428 277,428 277,428 277,42811.40 REGISTRO 2" UN 206,875 206,875 206,875 206,875 206,875 206,875 206,875 206,875 206,875 206,87511.41 REVENTILACIÓN 2" ML 12,644 12,644 12,644 12,644 12,644 12,644 12,644 12,644 12,644 12,64411.42 REVENTILACIÓN 3" ML 15,958 15,958 15,958 15,958 15,958 15,958 15,958 15,958 15,958 15,958

11.43 UN 126,416 126,416 126,416 126,416 126,416 126,416 126,416 126,416 126,416 126,416

11.44 UN 204,924 204,924 204,924 204,924 204,924 204,924 204,924 204,924 204,924 204,924

11.45 UN 337,093 337,093 337,093 337,093 337,093 337,093 337,093 337,093 337,093 337,093

11.46 ML 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293 35,293

11.47 ML 40,791 40,791 40,791 40,791 40,791 40,791 40,791 40,791 40,791 40,791

11.48 ML 66,950 66,950 66,950 66,950 66,950 66,950 66,950 66,950 66,950 66,950

11.49 ML 52,180 52,180 52,180 52,180 52,180 52,180 52,180 52,180 52,180 52,180

11.50 ML 74,117 74,117 74,117 74,117 74,117 74,117 74,117 74,117 74,117 74,117

11.51 ML 77,859 77,859 77,859 77,859 77,859 77,859 77,859 77,859 77,859 77,859

11.52 ML 180,427 180,427 180,427 180,427 180,427 180,427 180,427 180,427 180,427 180,427

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,544 35,544 35,544 35,544 35,544 35,544 35,544 35,544 35,544 35,54411.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,684 35,684 35,684 35,684 35,684 35,684 35,684 35,684 35,684 35,68411.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,680 28,680 28,680 28,680 28,680 28,680 28,680 28,680 28,680 28,68011.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,437 32,437 32,437 32,437 32,437 32,437 32,437 32,437 32,437 32,437

11.57 ML 2,930 2,930 2,930 2,930 2,930 2,930 2,930 2,930 2,930 2,930

11.58 ML 4,548 4,548 4,548 4,548 4,548 4,548 4,548 4,548 4,548 4,548

11.59 GABINETE TIPO III UN 1,015,919 1,015,919 1,015,919 1,015,919 1,015,919 1,015,919 1,015,919 1,015,919 1,015,919 1,015,91911.60 GABINETE TIPO I UN 802,237 802,237 802,237 802,237 802,237 802,237 802,237 802,237 802,237 802,23711.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,266,557 1,266,557 1,266,557 1,266,557 1,266,557 1,266,557 1,266,557 1,266,557 1,266,557 1,266,55711.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,210,166 1,210,166 1,210,166 1,210,166 1,210,166 1,210,166 1,210,166 1,210,166 1,210,166 1,210,16611.63 VÁLVULA MARIPOSA 3" UN 657,610 657,610 657,610 657,610 657,610 657,610 657,610 657,610 657,610 657,61011.64 VÁLVULA MARIPOSA 4" UN 750,428 750,428 750,428 750,428 750,428 750,428 750,428 750,428 750,428 750,42811.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 322,356 322,356 322,356 322,356 322,356 322,356 322,356 322,356 322,356 322,356

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 225,170 225,170 225,170 225,170 225,170 225,170 225,170 225,170 225,170 225,17012.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 32,736 32,736 32,736 32,736 32,736 32,736 32,736 32,736 32,736 32,73612.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 40,316 40,316 40,316 40,316 40,316 40,316 40,316 40,316 40,316 40,31612.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 43,835 43,835 43,835 43,835 43,835 43,835 43,835 43,835 43,835 43,835

TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN)

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2"

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2"

Page 328: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 53,466 53,466 53,466 53,466 53,466 53,466 53,466 53,466 53,466 53,46612.6 SALIDA TELÉFONO PVC COMPLETA UN 35,727 35,727 35,727 35,727 35,727 35,727 35,727 35,727 35,727 35,72712.7 SALIDA TIMBRE PVC COMPLETA UN 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,75612.8 STRIP TELEFÓNICO 10 PARES UN 107,549 107,549 107,549 107,549 107,549 107,549 107,549 107,549 107,549 107,54912.9 SALIDA TOMA DOBLE PVC COMPLETA UN 30,954 30,954 30,954 30,954 30,954 30,954 30,954 30,954 30,954 30,954

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 72,778 72,778 72,778 72,778 72,778 72,778 72,778 72,778 72,778 72,77812.11 SALIDA T.V PVC COMPLETA. UN 47,936 47,936 47,936 47,936 47,936 47,936 47,936 47,936 47,936 47,93612.12 SALIDA BIFÁSICA C.N. UN 28,148 28,148 28,148 28,148 28,148 28,148 28,148 28,148 28,148 28,14812.13 TABLERO PARCIAL 4 CIRCUITOS UN 80,979 80,979 80,979 80,979 80,979 80,979 80,979 80,979 80,979 80,97912.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 333,787 333,787 333,787 333,787 333,787 333,787 333,787 333,787 333,787 333,78712.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 449,000 449,000 449,000 449,000 449,000 449,000 449,000 449,000 449,000 449,00012.16 TUBERÍA PVC CONDUIT 1/2" ML 2,611 2,611 2,611 2,611 2,611 2,611 2,611 2,611 2,611 2,61112.17 TUBERÍA PVC CONDUIT 3/4" ML 3,401 3,401 3,401 3,401 3,401 3,401 3,401 3,401 3,401 3,40112.18 TUBERÍA PVC CONDUIT 1" ML 5,228 5,228 5,228 5,228 5,228 5,228 5,228 5,228 5,228 5,22812.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,39412.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 180,684 180,684 180,684 180,684 180,684 180,684 180,684 180,684 180,684 180,68412.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 57,246 57,246 57,246 57,246 57,246 57,246 57,246 57,246 57,246 57,24612.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 77,296 77,296 77,296 77,296 77,296 77,296 77,296 77,296 77,296 77,29612.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,733 27,733 27,733 27,733 27,733 27,733 27,733 27,733 27,733 27,73312.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,041,754 1,041,754 1,041,754 1,041,754 1,041,754 1,041,754 1,041,754 1,041,754 1,041,754 1,041,75412.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 771,144 771,144 771,144 771,144 771,144 771,144 771,144 771,144 771,144 771,14412.26 POSTE METÁLICO 6M UN 963,374 963,374 963,374 963,374 963,374 963,374 963,374 963,374 963,374 963,374

12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 437,469 437,469 437,469 437,469 437,469 437,469 437,469 437,469 437,469 437,469

12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 75,845 75,845 75,845 75,845 75,845 75,845 75,845 75,845 75,845 75,84512.29 LUMINARIA 70W SODIO UN 193,916 193,916 193,916 193,916 193,916 193,916 193,916 193,916 193,916 193,91612.30 LUMINARIA 150W SODIO UN 228,485 228,485 228,485 228,485 228,485 228,485 228,485 228,485 228,485 228,48512.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,230,456 1,230,456 1,230,456 1,230,456 1,230,456 1,230,456 1,230,456 1,230,456 1,230,456 1,230,45612.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 906,372 906,372 906,372 906,372 906,372 906,372 906,372 906,372 906,372 906,372

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 34,134 35,411 33,914 35,496 34,181 34,573 35,672 33,917 34,532 34,35313.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 29,097 30,374 28,877 30,459 29,144 29,536 30,635 28,880 29,495 29,31613.3 ALISTADO PARA LISTÓN M2 11,222 11,477 11,178 11,494 11,231 11,310 11,529 11,178 11,301 11,26613.4 ALISTADO PISOS 1:3, E=0.04 M2 23,368 25,924 22,929 26,093 23,463 24,247 26,445 22,935 24,166 23,80813.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 61,441 63,996 61,001 64,166 61,535 62,320 64,517 61,008 62,238 61,88013.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,664 21,366 20,535 21,540 20,778 21,157 21,508 20,783 21,071 20,79313.7 CONCRETO BASE GRADAS 2500 PSI M2 46,128 49,616 45,495 50,373 46,652 48,400 50,299 46,578 48,034 46,76113.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 64,251 69,832 63,238 71,043 65,090 67,887 70,924 64,971 67,300 65,26413.9 MANTO FIBERGLASS 600X1 M2 22,227 22,227 22,227 22,227 22,227 22,227 22,227 22,227 22,227 22,227

13.10 PEGANTE MORTERO-CONCRETO M2 19,114 19,114 19,114 19,114 19,114 19,114 19,114 19,114 19,114 19,11413.11 PERMA PLY 2 CAPAS M2 19,913 19,913 19,913 19,913 19,913 19,913 19,913 19,913 19,913 19,91313.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 37,714 40,853 37,144 41,534 38,185 39,759 41,468 38,119 39,429 38,28313.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 44,273 48,110 43,576 48,942 44,849 46,772 48,861 44,768 46,369 44,96913.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 64,352 70,282 63,276 71,568 65,243 68,215 71,442 65,117 67,592 65,428

Page 329: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

13.15 TRITURADO FINO 1/2 M3 78,919 101,467 74,392 111,578 84,417 102,372 106,899 88,792 96,940 83,44613.16 TRITURADO GRUESO 3/4 M3 90,812 105,274 76,342 113,913 91,263 106,217 111,905 92,613 103,156 86,067

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,010 37,521 36,922 37,555 37,029 37,186 37,626 36,924 37,170 37,098

14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 22,823 23,078 22,779 23,095 22,832 22,910 23,130 22,779 22,902 22,867

14.3 ADOQUÍN CONCRETO 6CM M2 48,601 49,879 48,381 49,963 48,648 49,040 50,139 48,384 49,000 48,82114.4 ADOQUÍN CONCRETO 8CM M2 57,751 59,029 57,531 59,113 57,798 58,190 59,289 57,534 58,150 57,97114.5 ADOQUÍN GRES PEATONAL M2 47,536 48,814 47,316 48,899 47,583 47,976 49,074 47,320 47,935 47,756

14.6 M2 51,714 52,225 51,626 52,259 51,733 51,890 52,330 51,628 51,874 51,802

14.7 GRAVILLA PARA GRADAS ML 29,083 29,572 28,992 29,694 29,149 29,414 29,681 29,142 29,350 29,174

14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 105,064 107,364 104,668 107,516 105,149 105,855 107,833 104,674 105,781 105,459

14.9 ACABADO EN GRAVILLA LAVADA M2 36,447 37,682 36,221 37,943 36,590 37,198 37,951 36,522 37,061 36,67314.10 GUARDAESCOBA EN GRANITO ML 29,570 29,570 29,570 29,570 29,570 29,570 29,570 29,570 29,570 29,57014.11 GUARDAESCOBA EN GRAVILLA ML 8,071 8,561 7,980 8,683 8,138 8,403 8,670 8,130 8,338 8,16214.12 GUARDAESCOBA PVC CARAMELO ML 7,235 7,235 7,235 7,235 7,235 7,235 7,235 7,235 7,235 7,23514.13 GUARDAESCOBA PVC CEDRO ML 9,163 9,163 9,163 9,163 9,163 9,163 9,163 9,163 9,163 9,16314.14 GUARDAESCOBA PINO CARIBE ML 7,701 7,701 7,701 7,701 7,701 7,701 7,701 7,701 7,701 7,70114.15 GUARDAESCOBA CEDRO BLANCO ML 7,690 7,690 7,690 7,690 7,690 7,690 7,690 7,690 7,690 7,69014.16 GUARDAESCOBA EN MADERA SAPAN ML 12,137 12,137 12,137 12,137 12,137 12,137 12,137 12,137 12,137 12,13714.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,850 6,850 6,850 6,850 6,850 6,850 6,850 6,850 6,850 6,85014.18 LISTÓN M.H. AMARILLO M2 54,372 54,372 54,372 54,372 54,372 54,372 54,372 54,372 54,372 54,37214.19 PASO ESCALERA GRANITO ML 80,933 82,722 80,626 82,841 80,999 81,549 83,087 80,630 81,492 81,24114.20 PIRLANES ALUMINIO ML 5,754 5,754 5,754 5,754 5,754 5,754 5,754 5,754 5,754 5,75414.21 PIRLANES LADRILLO ML 24,618 25,088 24,537 25,119 24,635 24,780 25,184 24,538 24,765 24,69914.22 PISO VINILO TRÁFICO RESIDENCIAL M2 31,059 31,059 31,059 31,059 31,059 31,059 31,059 31,059 31,059 31,05914.23 PISO VINILO TRÁFICO PESADO M2 41,464 41,464 41,464 41,464 41,464 41,464 41,464 41,464 41,464 41,46414.24 PULIDA LACADA PISO MADERA M2 41,251 41,251 41,251 41,251 41,251 41,251 41,251 41,251 41,251 41,25114.25 TABLETA DE GRES 25X25 M2 36,768 37,279 36,680 37,313 36,787 36,944 37,383 36,681 36,928 36,85614.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 37,435 37,947 37,348 37,980 37,454 37,611 38,051 37,349 37,595 37,523

14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100

14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,088 34,794 33,967 34,840 34,114 34,331 34,937 33,969 34,308 34,21014.29 JABONERA PORCELANA ACUARIO UN 14,141 14,141 14,141 14,141 14,141 14,141 14,141 14,141 14,141 14,141

14.30 UN 98,057 98,057 98,057 98,057 98,057 98,057 98,057 98,057 98,057 98,057

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,625 7,625 7,625 7,625 7,625 7,625 7,625 7,625 7,625 7,62514.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,610 15,610 15,610 15,610 15,610 15,610 15,610 15,610 15,610 15,61014.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,524 10,524 10,524 10,524 10,524 10,524 10,524 10,524 10,524 10,52414.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,022 10,022 10,022 10,022 10,022 10,022 10,022 10,022 10,022 10,02214.35 REMATES BOCEL ALUMINIO ML 6,392 6,392 6,392 6,392 6,392 6,392 6,392 6,392 6,392 6,39214.36 REMATES BOCEL PORCELANA ML 6,501 6,501 6,501 6,501 6,501 6,501 6,501 6,501 6,501 6,50114.37 TAPA REGISTRO 20X20 UN 14,628 14,628 14,628 14,628 14,628 14,628 14,628 14,628 14,628 14,628

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

Page 330: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

14.38 TAPA REGISTRO 6X6 UN 12,901 12,901 12,901 12,901 12,901 12,901 12,901 12,901 12,901 12,901

14.39 M2 14,152 14,152 14,152 14,152 14,152 14,152 14,152 14,152 14,152 14,152

14.40 M2 16,420 16,420 16,420 16,420 16,420 16,420 16,420 16,420 16,420 16,420

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 47,218 47,729 47,130 47,763 47,237 47,394 47,833 47,131 47,377 47,30614.42 MEDIA CAÑA EN GRANITO ML 56,901 56,901 56,901 56,901 56,901 56,901 56,901 56,901 56,901 56,90114.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,210 26,210 26,210 26,210 26,210 26,210 26,210 26,210 26,210 26,21014.44 PINTURA ACRÍLICA PARA PISOS M2 10,321 10,321 10,321 10,321 10,321 10,321 10,321 10,321 10,321 10,321

14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,734 11,734 11,734 11,734 11,734 11,734 11,734 11,734 11,734 11,734

14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 82,060 82,060 82,060 82,060 82,060 82,060 82,060 82,060 82,060 82,060

15 CIELO RASO15.1 APLIQUE YESO ML 56,558 56,558 56,558 56,558 56,558 56,558 56,558 56,558 56,558 56,55815.2 ARMADURA MADERA Y MALLA M2 26,642 26,642 26,642 26,642 26,642 26,642 26,642 26,642 26,642 26,64215.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51,431 51,431 51,431 51,431 51,431 51,431 51,431 51,431 51,431 51,43115.4 CIELO RASO DURACUSTIC M2 50,779 50,779 50,779 50,779 50,779 50,779 50,779 50,779 50,779 50,77915.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 46,965 46,965 46,965 46,965 46,965 46,965 46,965 46,965 46,965 46,96515.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 66,691 66,691 66,691 66,691 66,691 66,691 66,691 66,691 66,691 66,69115.7 CORNISAS YESO ML 35,355 35,355 35,355 35,355 35,355 35,355 35,355 35,355 35,355 35,355

15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 74,138 74,138 74,138 74,138 74,138 74,138 74,138 74,138 74,138 74,138

15.9 MALLA CON VENA M2 10,240 10,240 10,240 10,240 10,240 10,240 10,240 10,240 10,240 10,240

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592

16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 82,887 67,281 48,431 67,281 69,088 67,833 73,748 61,327 72,968 54,89816.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 87,797 113,563 82,624 125,118 94,080 114,598 119,771 99,079 108,390 92,971

16.10 M3 107,002 157,449 100,535 147,101 132,872 119,937 152,275 144,514 132,872 107,002

16.11 AFRIMADO (NORMA INVIAS 311) M3 88,758 95,609 58,851 95,609 72,098 78,254 102,076 64,337 75,979 65,31916.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 99,752 150,199 93,285 139,851 125,622 112,687 145,025 137,264 125,622 99,75216.13 BASE GRANULAR (NORMA INVIAS 330) M3 107,643 158,090 101,176 147,742 133,513 120,578 152,916 145,155 133,513 107,643

DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS)

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

Page 331: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

17 APARATOS SANITARIOS

17.1 UN 216,643 216,643 216,643 216,643 216,643 216,643 216,643 216,643 216,643 216,643

17.2 UN 683,471 683,471 683,471 683,471 683,471 683,471 683,471 683,471 683,471 683,471

17.3 UN 386,302 386,302 386,302 386,302 386,302 386,302 386,302 386,302 386,302 386,302

17.4 UN 124,282 124,282 124,282 124,282 124,282 124,282 124,282 124,282 124,282 124,282

17.5 UN 153,994 153,994 153,994 153,994 153,994 153,994 153,994 153,994 153,994 153,994

17.6 UN 182,207 182,207 182,207 182,207 182,207 182,207 182,207 182,207 182,207 182,207

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 281,513 281,513 281,513 281,513 281,513 281,513 281,513 281,513 281,513 281,513

17.8 UN 739,127 739,127 739,127 739,127 739,127 739,127 739,127 739,127 739,127 739,127

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 230,766 230,766 230,766 230,766 230,766 230,766 230,766 230,766 230,766 230,766

17.10 UN 110,941 110,941 110,941 110,941 110,941 110,941 110,941 110,941 110,941 110,941

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 62,998 62,998 62,998 62,998 62,998 62,998 62,998 62,998 62,998 62,998

17.12 UN 183,829 183,829 183,829 183,829 183,829 183,829 183,829 183,829 183,829 183,829

17.13 UN 293,910 293,910 293,910 293,910 293,910 293,910 293,910 293,910 293,910 293,910

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,464 4,464 4,464 4,464 4,464 4,464 4,464 4,464 4,464 4,464

18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,218 2,218 2,218 2,218 2,218 2,218 2,218 2,218 2,218 2,21818.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,383 8,383 8,383 8,383 8,383 8,383 8,383 8,383 8,383 8,38318.4 BARNIZ SOBRE MUEBLES M2 31,869 31,869 31,869 31,869 31,869 31,869 31,869 31,869 31,869 31,86918.5 CARBURO SOBRE PAÑETES M2 4,315 4,315 4,315 4,315 4,315 4,315 4,315 4,315 4,315 4,31518.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,573 10,573 10,573 10,573 10,573 10,573 10,573 10,573 10,573 10,57318.7 DEMARCACIÓN CON MARMOLINA ML 2,688 2,688 2,688 2,688 2,688 2,688 2,688 2,688 2,688 2,68818.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,927 1,927 1,927 1,927 1,927 1,927 1,927 1,927 1,927 1,92718.9 ESMALTE SOBRE LÁMINA LLENA M2 10,002 10,002 10,002 10,002 10,002 10,002 10,002 10,002 10,002 10,002

18.10 ESMALTE SOBRE MADERA LINEAL ML 2,999 2,999 2,999 2,999 2,999 2,999 2,999 2,999 2,999 2,99918.11 ESMALTE SOBRE MADERA LLENA M2 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,10318.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,921 3,921 3,921 3,921 3,921 3,921 3,921 3,921 3,921 3,92118.13 ESMALTE SOBRE MARCOS MADERA M2 4,675 4,675 4,675 4,675 4,675 4,675 4,675 4,675 4,675 4,67518.14 ESTUCO M2 5,866 5,866 5,866 5,866 5,866 5,866 5,866 5,866 5,866 5,866

SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

Page 332: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

18.15 ESTUCO (LINEAL) ML 3,614 3,614 3,614 3,614 3,614 3,614 3,614 3,614 3,614 3,61418.16 ESTUCO Y VINILO 3 MANOS M2 12,243 12,243 12,243 12,243 12,243 12,243 12,243 12,243 12,243 12,24318.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,552 7,552 7,552 7,552 7,552 7,552 7,552 7,552 7,552 7,55218.18 LACA PISOS MADERA M2 18,033 18,033 18,033 18,033 18,033 18,033 18,033 18,033 18,033 18,03318.19 LÍNEAS TRÁFICO 0.10 ML 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,07518.20 MARMOLINA SOBRE PAÑETE M2 8,739 8,739 8,739 8,739 8,739 8,739 8,739 8,739 8,739 8,73918.21 TINTILLA SOBRE MADERA LINEAL ML 2,547 2,547 2,547 2,547 2,547 2,547 2,547 2,547 2,547 2,54718.22 TINTILLA SOBRE MADERA LLENA M2 9,737 9,737 9,737 9,737 9,737 9,737 9,737 9,737 9,737 9,73718.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,341 5,341 5,341 5,341 5,341 5,341 5,341 5,341 5,341 5,34118.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,372 3,372 3,372 3,372 3,372 3,372 3,372 3,372 3,372 3,37218.25 WASH-PRIMER SOBRE ALUMNIO M2 16,321 16,321 16,321 16,321 16,321 16,321 16,321 16,321 16,321 16,32118.26 PINTURA EPÓXICA M2 10,078 10,078 10,078 10,078 10,078 10,078 10,078 10,078 10,078 10,07818.27 PINTURA EPÓXICA (LINEAL) ML 6,189 6,189 6,189 6,189 6,189 6,189 6,189 6,189 6,189 6,189

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,713,501 3,713,501 3,713,501 3,713,501 3,713,501 3,713,501 3,713,501 3,713,501 3,713,501 3,713,501

19.2 UN 6,518,477 6,518,477 6,518,477 6,518,477 6,518,477 6,518,477 6,518,477 6,518,477 6,518,477 6,518,477

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,955,426 1,955,426 1,955,426 1,955,426 1,955,426 1,955,426 1,955,426 1,955,426 1,955,426 1,955,426

19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,480,408 5,480,408 5,480,408 5,480,408 5,480,408 5,480,408 5,480,408 5,480,408 5,480,408 5,480,408

19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,455,920 5,455,920 5,455,920 5,455,920 5,455,920 5,455,920 5,455,920 5,455,920 5,455,920 5,455,92019.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,07519.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,950,949 1,950,949 1,950,949 1,950,949 1,950,949 1,950,949 1,950,949 1,950,949 1,950,949 1,950,94919.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 62,549 62,549 62,549 62,549 62,549 62,549 62,549 62,549 62,549 62,54919.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,100,310 1,100,669 1,100,245 1,100,746 1,100,364 1,100,544 1,100,739 1,100,356 1,100,506 1,100,375

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 563,903 572,218 562,365 574,376 565,296 569,915 573,915 565,449 568,834 565,441

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,032 23,032 23,032 23,032 23,032 23,032 23,032 23,032 23,032 23,03220.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 34,086 34,086 34,086 34,086 34,086 34,086 34,086 34,086 34,086 34,08620.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 42,080 42,080 42,080 42,080 42,080 42,080 42,080 42,080 42,080 42,080

20.4 ML 25,400 25,400 25,400 25,400 25,400 25,400 25,400 25,400 25,400 25,400

20.5 ML 29,018 29,018 29,018 29,018 29,018 29,018 29,018 29,018 29,018 29,018

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,484 42,484 42,484 42,484 42,484 42,484 42,484 42,484 42,484 42,484

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,713 19,713 19,713 19,713 19,713 19,713 19,713 19,713 19,713 19,71320.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,788 20,788 20,788 20,788 20,788 20,788 20,788 20,788 20,788 20,78820.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,715 25,715 25,715 25,715 25,715 25,715 25,715 25,715 25,715 25,715

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,628 11,628 11,628 11,628 11,628 11,628 11,628 11,628 11,628 11,62820.11 VÁLVULA DE BOLA GAS 3/4" UN 18,131 18,131 18,131 18,131 18,131 18,131 18,131 18,131 18,131 18,13120.12 VÁLVULA DE BOLA GAS 1" UN 27,136 27,136 27,136 27,136 27,136 27,136 27,136 27,136 27,136 27,13620.13 VÁLVULA POLIETILENO GAS 1/2" UN 161,284 161,284 161,284 161,284 161,284 161,284 161,284 161,284 161,284 161,284

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS)

TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS)

Page 333: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

20.14 VÁLVULA POLIETILENO GAS 3/4" UN 165,875 165,875 165,875 165,875 165,875 165,875 165,875 165,875 165,875 165,87520.15 VÁLVULA POLIETILENO GAS 1" UN 268,711 268,711 268,711 268,711 268,711 268,711 268,711 268,711 268,711 268,71120.16 ACOMETIDA GAS 1/2" ML 222,120 222,120 222,120 222,120 222,120 222,120 222,120 222,120 222,120 222,120

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 98,110 98,110 98,110 98,110 98,110 98,110 98,110 98,110 98,110 98,11021.2 CABLE DETECTOR LINEAL DE CALOR ML 24,425 24,425 24,425 24,425 24,425 24,425 24,425 24,425 24,425 24,42521.3 SIRENA DE 110 V UN 69,387 69,387 69,387 69,387 69,387 69,387 69,387 69,387 69,387 69,38721.4 CÁMARA CCTV UN 202,979 202,979 202,979 202,979 202,979 202,979 202,979 202,979 202,979 202,97921.5 PARLANTE-CIELO FALSO UN 39,626 39,626 39,626 39,626 39,626 39,626 39,626 39,626 39,626 39,62621.6 AMPLIFICADOR 100W UN 426,618 426,618 426,618 426,618 426,618 426,618 426,618 426,618 426,618 426,61821.7 AMPLIFICADOR 300W UN 1,056,153 1,056,153 1,056,153 1,056,153 1,056,153 1,056,153 1,056,153 1,056,153 1,056,153 1,056,15321.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,717 32,717 32,717 32,717 32,717 32,717 32,717 32,717 32,717 32,71721.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 168,855 168,855 168,855 168,855 168,855 168,855 168,855 168,855 168,855 168,855

21.10 TOMA PARA MICRÓFONO UN 33,627 33,627 33,627 33,627 33,627 33,627 33,627 33,627 33,627 33,62721.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,592 2,592 2,592 2,592 2,592 2,592 2,592 2,592 2,592 2,59221.12 SPLITERS UN 4,169 4,169 4,169 4,169 4,169 4,169 4,169 4,169 4,169 4,16921.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,155 14,155 14,155 14,155 14,155 14,155 14,155 14,155 14,155 14,15521.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,618 18,618 18,618 18,618 18,618 18,618 18,618 18,618 18,618 18,61821.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,610 25,610 25,610 25,610 25,610 25,610 25,610 25,610 25,610 25,61021.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 94,278 94,278 94,278 94,278 94,278 94,278 94,278 94,278 94,278 94,278

21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 24,794 24,794 24,794 24,794 24,794 24,794 24,794 24,794 24,794 24,794

21.18 BANDEJA PORTACABLES PARA RACK UN 81,168 81,168 81,168 81,168 81,168 81,168 81,168 81,168 81,168 81,16821.19 RACK 2' X 24" UN 130,619 130,619 130,619 130,619 130,619 130,619 130,619 130,619 130,619 130,61921.20 RACK 3' X 24" UN 158,707 158,707 158,707 158,707 158,707 158,707 158,707 158,707 158,707 158,70721.21 RACK 5' X 24" UN 250,483 250,483 250,483 250,483 250,483 250,483 250,483 250,483 250,483 250,48321.22 RACK 7' X 24" UN 323,942 323,942 323,942 323,942 323,942 323,942 323,942 323,942 323,942 323,94221.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 368,500 368,500 368,500 368,500 368,500 368,500 368,500 368,500 368,500 368,50021.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 221,267 221,267 221,267 221,267 221,267 221,267 221,267 221,267 221,267 221,267

21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 53,258 53,258 53,258 53,258 53,258 53,258 53,258 53,258 53,258 53,258

21.26 PATCH CORD 2M CATEGORÍA 6A UN 5,525 5,525 5,525 5,525 5,525 5,525 5,525 5,525 5,525 5,52521.27 PATCH CORD 5M CATEGORÍA 6A UN 14,026 14,026 14,026 14,026 14,026 14,026 14,026 14,026 14,026 14,02621.28 CABLE UTP CATEGORÍA 6A ML 2,589 2,589 2,589 2,589 2,589 2,589 2,589 2,589 2,589 2,58921.29 CANALETA METÁLICA 4X6 CMS ML 25,970 25,970 25,970 25,970 25,970 25,970 25,970 25,970 25,970 25,97021.30 CANALETA METÁLICA 4X10 CMS ML 27,104 27,104 27,104 27,104 27,104 27,104 27,104 27,104 27,104 27,10421.31 CANALETA METÁLICA 6X10 CMS ML 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,67121.32 CANALETA PLÁSTICA 13X7 MM ML 15,405 15,405 15,405 15,405 15,405 15,405 15,405 15,405 15,405 15,40521.33 CANALETA PLÁSTICA 20X12 MM ML 17,234 17,234 17,234 17,234 17,234 17,234 17,234 17,234 17,234 17,23421.34 CANALETA PLÁSTICA 32X12 MM ML 17,164 17,164 17,164 17,164 17,164 17,164 17,164 17,164 17,164 17,16421.35 CANALETA PLÁSTICA 40X60 MM ML 27,448 27,448 27,448 27,448 27,448 27,448 27,448 27,448 27,448 27,44821.36 SWITCH 10/100/1000 24 PUERTOS UN 370,443 370,443 370,443 370,443 370,443 370,443 370,443 370,443 370,443 370,44321.37 SWITCH 10/100/1000 16 PUERTOS UN 234,350 234,350 234,350 234,350 234,350 234,350 234,350 234,350 234,350 234,35021.38 SWITCH 10/100/1000 8 PUERTOS UN 62,609 62,609 62,609 62,609 62,609 62,609 62,609 62,609 62,609 62,609

Page 334: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

21.39 CABLE TELEFÓNICO 2 PARES ML 1,349 1,349 1,349 1,349 1,349 1,349 1,349 1,349 1,349 1,34921.40 CABLE TELEFÓNICO 10 PARES ML 6,535 6,535 6,535 6,535 6,535 6,535 6,535 6,535 6,535 6,53521.41 CABLE TELEFÓNICO 20 PARES ML 8,743 8,743 8,743 8,743 8,743 8,743 8,743 8,743 8,743 8,74321.42 CABLE TELEFÓNICO 40 PARES ML 12,183 12,183 12,183 12,183 12,183 12,183 12,183 12,183 12,183 12,18321.43 CABLE TELEVISIÓN RG6 ML 1,662 1,662 1,662 1,662 1,662 1,662 1,662 1,662 1,662 1,66221.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,006 16,006 16,006 16,006 16,006 16,006 16,006 16,006 16,006 16,00621.45 ACOMETIDA TELEFÓNICA 1" ML 24,571 24,571 24,571 24,571 24,571 24,571 24,571 24,571 24,571 24,57121.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,187 13,187 13,187 13,187 13,187 13,187 13,187 13,187 13,187 13,187

21.47 ML 10,740 10,740 10,740 10,740 10,740 10,740 10,740 10,740 10,740 10,740

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 479,313 479,313 479,313 479,313 479,313 479,313 479,313 479,313 479,313 479,313

CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN)

Page 335: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,446 19,446 19,446 19,446 19,446 19,446 19,446 19,446 19,446 19,4461.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 64,610 64,610 64,610 64,610 64,610 64,610 64,610 64,610 64,610 64,6101.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 362,227 362,227 362,227 362,227 362,227 362,227 362,227 362,227 362,227 362,2271.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 772,998 772,998 772,998 772,998 772,998 772,998 772,998 772,998 772,998 772,9981.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 88,861 88,861 88,861 88,861 88,861 88,861 88,861 88,861 88,861 88,8611.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 539,449 539,449 539,449 539,449 539,449 539,449 539,449 539,449 539,449 539,4491.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,159,882 1,159,882 1,159,882 1,159,882 1,159,882 1,159,882 1,159,882 1,159,882 1,159,882 1,159,8821.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,612 9,612 9,612 9,612 9,612 9,612 9,612 9,612 9,612 9,6121.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,767 11,767 11,767 11,767 11,767 11,767 11,767 11,767 11,767 11,767

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,693 14,693 14,693 14,693 14,693 14,693 14,693 14,693 14,693 14,6931.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,034 16,034 16,034 16,034 16,034 16,034 16,034 16,034 16,034 16,0341.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 19,154 19,154 19,154 19,154 19,154 19,154 19,154 19,154 19,154 19,1541.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 19,154 19,154 19,154 19,154 19,154 19,154 19,154 19,154 19,154 19,1541.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 75,837 75,837 75,837 75,837 75,837 75,837 75,837 75,837 75,837 75,8371.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 87,883 87,883 87,883 87,883 87,883 87,883 87,883 87,883 87,883 87,8831.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 271,749 271,749 271,749 271,749 271,749 271,749 271,749 271,749 271,749 271,7491.17 TEE PVC UNIÓN MECÁNICA 2" UN 101,978 101,978 101,978 101,978 101,978 101,978 101,978 101,978 101,978 101,9781.18 TEE PVC UNIÓN MECÁNICA 4" UN 168,095 168,095 168,095 168,095 168,095 168,095 168,095 168,095 168,095 168,0951.19 TEE PVC UNIÓN MECÁNICA 8" UN 742,846 742,846 742,846 742,846 742,846 742,846 742,846 742,846 742,846 742,8461.20 TEE PVC UNIÓN MECÁNICA 10" UN 855,693 855,693 855,693 855,693 855,693 855,693 855,693 855,693 855,693 855,6931.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 9,970 9,970 9,970 9,970 9,970 9,970 9,970 9,970 9,970 9,9701.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,846 8,846 8,846 8,846 8,846 8,846 8,846 8,846 8,846 8,8461.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 20,892 20,892 20,892 20,892 20,892 20,892 20,892 20,892 20,892 20,8921.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 83,968 83,968 83,968 83,968 83,968 83,968 83,968 83,968 83,968 83,9681.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 124,349 124,349 124,349 124,349 124,349 124,349 124,349 124,349 124,349 124,3491.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 20,661 20,661 20,661 20,661 20,661 20,661 20,661 20,661 20,661 20,6611.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 70,621 70,621 70,621 70,621 70,621 70,621 70,621 70,621 70,621 70,6211.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 103,970 103,970 103,970 103,970 103,970 103,970 103,970 103,970 103,970 103,9701.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,614 21,614 21,614 21,614 21,614 21,614 21,614 21,614 21,614 21,6141.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 44,416 44,416 44,416 44,416 44,416 44,416 44,416 44,416 44,416 44,4161.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 177,991 177,991 177,991 177,991 177,991 177,991 177,991 177,991 177,991 177,9911.32 UNIÓN REPARACION PVC 4" UN 51,761 51,761 51,761 51,761 51,761 51,761 51,761 51,761 51,761 51,7611.33 UNIÓN REPARACIÓN PVC 8" UN 206,948 206,948 206,948 206,948 206,948 206,948 206,948 206,948 206,948 206,9481.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 125,144 125,144 125,144 125,144 125,144 125,144 125,144 125,144 125,144 125,1441.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 353,218 353,218 353,218 353,218 353,218 353,218 353,218 353,218 353,218 353,2181.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,040,838 1,040,838 1,040,838 1,040,838 1,040,838 1,040,838 1,040,838 1,040,838 1,040,838 1,040,8381.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,537,899 1,537,899 1,537,899 1,537,899 1,537,899 1,537,899 1,537,899 1,537,899 1,537,899 1,537,899

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,068 8,068 8,068 8,068 8,068 8,068 8,068 8,068 8,068 8,0682.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,543 18,543 18,543 18,543 18,543 18,543 18,543 18,543 18,543 18,5432.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 76,661 101,255 71,723 112,285 82,658 102,243 107,181 87,430 96,318 81,599

Page 336: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

2.5 RELLENO TIPO 2 "RECEBO" M3 79,708 64,101 45,251 64,101 65,908 64,654 70,569 58,147 69,789 51,7192.6 RELLENO TIPO 4 "SUBBASE B-200" M3 89,978 96,829 60,071 96,829 73,318 79,474 103,296 65,557 77,199 66,5392.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 64,305 90,911 64,305 105,485 74,739 91,936 97,060 76,563 85,787 69,4292.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 65,444 92,566 65,444 107,423 76,080 93,611 98,835 77,940 87,342 70,6672.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 73,135 103,698 67,878 105,724 74,262 83,647 109,929 67,954 82,673 78,391

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 80,819 80,819 80,819 80,819 80,819 80,819 80,819 80,819 80,819 80,8193.2 CODO 45 PVC ALCANTARILLADO 16" UN 842,132 842,132 842,132 842,132 842,132 842,132 842,132 842,132 842,132 842,1323.3 CODO 90 PVC ALCANTARILLADO 8" UN 105,611 105,611 105,611 105,611 105,611 105,611 105,611 105,611 105,611 105,6113.4 CODO 90 PVC ALCANTARILLADO 16" UN 975,068 975,068 975,068 975,068 975,068 975,068 975,068 975,068 975,068 975,0683.5 CODO 90 PVC ALCANTARILLADO 24" UN 679,434 679,434 679,434 679,434 679,434 679,434 679,434 679,434 679,434 679,4343.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 57,951 57,951 57,951 57,951 57,951 57,951 57,951 57,951 57,951 57,9513.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 80,540 80,540 80,540 80,540 80,540 80,540 80,540 80,540 80,540 80,5403.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,8053.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 189,804 189,804 189,804 189,804 189,804 189,804 189,804 189,804 189,804 189,804

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 304,641 304,641 304,641 304,641 304,641 304,641 304,641 304,641 304,641 304,6413.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 80,541 80,541 80,541 80,541 80,541 80,541 80,541 80,541 80,541 80,5413.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 80,540 80,540 80,540 80,540 80,540 80,540 80,540 80,540 80,540 80,5403.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,8053.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,805 189,8053.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 304,642 304,642 304,642 304,642 304,642 304,642 304,642 304,642 304,642 304,6423.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 280,374 280,374 280,374 280,374 280,374 280,374 280,374 280,374 280,374 280,3743.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 449,458 449,458 449,458 449,458 449,458 449,458 449,458 449,458 449,458 449,4583.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 717,821 717,821 717,821 717,821 717,821 717,821 717,821 717,821 717,821 717,8213.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 44,842 44,842 44,842 44,842 44,842 44,842 44,842 44,842 44,842 44,8423.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 236,391 236,391 236,391 236,391 236,391 236,391 236,391 236,391 236,391 236,3913.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 256,713 256,713 256,713 256,713 256,713 256,713 256,713 256,713 256,713 256,7133.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 752,443 752,443 752,443 752,443 752,443 752,443 752,443 752,443 752,443 752,4433.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 42,369 42,684 42,315 42,705 42,381 42,477 42,748 42,316 42,467 42,4233.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 214,774 214,774 214,774 214,774 214,774 214,774 214,774 214,774 214,774 214,7743.25 TUBERÍA PVC ALCANTARILLADO 8" ML 35,400 35,400 35,400 35,400 35,400 35,400 35,400 35,400 35,400 35,4003.26 TUBERÍA PVC ALCANTARILLADO 10" ML 49,961 49,961 49,961 49,961 49,961 49,961 49,961 49,961 49,961 49,9613.27 TUBERÍA PVC ALCANTARILLADO 12" ML 71,989 71,989 71,989 71,989 71,989 71,989 71,989 71,989 71,989 71,9893.28 TUBERÍA PVC ALCANTARILLADO 16" ML 110,421 110,421 110,421 110,421 110,421 110,421 110,421 110,421 110,421 110,4213.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 177,237 177,237 177,237 177,237 177,237 177,237 177,237 177,237 177,237 177,2373.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 260,455 260,455 260,455 260,455 260,455 260,455 260,455 260,455 260,455 260,4553.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 328,674 328,674 328,674 328,674 328,674 328,674 328,674 328,674 328,674 328,6743.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 431,776 431,776 431,776 431,776 431,776 431,776 431,776 431,776 431,776 431,7763.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 592,115 592,115 592,115 592,115 592,115 592,115 592,115 592,115 592,115 592,115

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 UN 515,160 535,115 511,468 540,296 518,503 529,589 539,188 518,871 526,993 518,851PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

Page 337: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

4.2 ML 498,252 514,531 495,452 515,610 498,853 503,851 517,849 495,493 503,332 501,052

4.3 UN 508,759 522,063 506,298 525,517 510,988 518,379 524,778 511,234 516,649 511,221

4.4 UN 612,349 637,293 607,734 643,769 616,528 630,386 642,384 616,988 627,141 616,964

4.5 ML 705,785 728,708 701,843 730,227 706,631 713,670 733,381 701,900 712,938 709,727

4.6 UN 594,605 612,897 591,221 617,647 597,670 607,832 616,631 598,007 605,453 597,989

4.7 SUMIDERO EN LADRILLO SL-100 UN 726,310 736,762 724,451 738,345 727,312 731,664 738,880 726,204 730,884 728,1654.8 SUMIDERO EN LADRILLO SL-250 UN 1,072,818 1,102,303 1,067,499 1,107,945 1,076,464 1,090,255 1,108,266 1,074,724 1,087,462 1,078,1314.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,516,159 1,569,581 1,506,354 1,582,525 1,524,736 1,553,236 1,580,303 1,524,862 1,546,828 1,525,966

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,048,640 2,137,442 2,032,341 2,158,958 2,062,896 2,110,269 2,155,264 2,063,105 2,099,618 2,064,9424.11 SUMIDERO PREFABRICADO SL-100 UN 955,494 955,494 955,494 955,494 955,494 955,494 955,494 955,494 955,494 955,4944.12 SUMIDERO PREFABRICADO SL-250 UN 2,236,237 2,236,237 2,236,237 2,236,237 2,236,237 2,236,237 2,236,237 2,236,237 2,236,237 2,236,237

4.13 UN 101,607 102,271 101,492 102,315 101,631 101,835 102,406 101,494 101,814 101,721

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 43,733 45,379 43,450 45,488 43,794 44,299 45,714 43,454 44,247 44,0165.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 50,493 52,139 50,210 52,248 50,554 51,059 52,474 50,214 51,007 50,7765.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 44,602 48,265 43,938 49,059 45,153 46,988 48,982 45,075 46,603 45,2675.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 48,334 51,827 47,688 52,733 48,919 50,859 52,539 48,984 50,405 48,9805.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 48,947 52,367 48,319 53,194 49,495 51,318 53,053 49,502 50,908 49,5745.6 BORDE SEPARADOR VERDE A-170 ML 193,302 193,966 193,188 194,010 193,326 193,530 194,102 193,189 193,509 193,4165.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,330 14,770 14,251 14,865 14,396 14,617 14,856 14,387 14,571 14,4105.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 32,031 34,612 31,563 35,172 32,419 33,713 35,118 32,364 33,441 32,4995.9 CAÑUELA PREFABRICADA TIPO A-120 ML 63,559 63,914 63,498 63,937 63,572 63,681 63,986 63,498 63,669 63,620

5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 434,290 442,944 432,734 444,413 435,094 438,897 444,795 434,246 438,132 435,8465.11 LOSETA PREFABRICADA A-40 M2 46,187 47,708 45,926 47,808 46,243 46,710 48,018 45,929 46,662 46,4495.12 LOSETA PREFABRICADA A-60 M2 66,003 67,523 65,741 67,624 66,059 66,526 67,833 65,745 66,477 66,264

5.13 ML 26,425 27,822 26,167 28,185 26,659 27,436 28,107 26,685 27,254 26,684

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 42,839 45,666 42,316 46,400 43,313 44,884 46,243 43,365 44,516 43,362

5.15 SARDINEL PREFABRICADO A-10 ML 76,119 84,235 75,063 82,667 80,112 78,231 83,512 81,830 80,210 76,1805.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 44,489 45,409 44,331 45,470 44,523 44,806 45,597 44,333 44,776 44,647

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 112,581 114,244 112,273 114,676 112,860 113,783 114,583 112,890 113,567 112,8896.2 BANCA EN CONCRETO M-30 UN 473,540 475,869 473,110 476,473 473,930 475,224 476,344 473,973 474,921 473,9716.3 BOLARDO M-63 ALTO/HIERRO UN 171,772 172,124 171,708 172,210 171,830 172,019 172,194 171,832 171,976 171,8376.4 BOLARDO M-60 CONCRETO UN 109,282 111,277 108,913 111,795 109,616 110,725 111,685 109,653 110,465 109,6516.5 BOLARDO M-61 BAJO/CONCRETO UN 110,704 112,700 110,335 113,218 111,039 112,147 113,107 111,075 111,888 111,0736.6 BOLARDO M-62 BAJO/HIERRO UN 153,581 155,688 153,193 156,209 153,924 155,061 156,113 153,938 154,802 153,969

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI

Page 338: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

6.7 BORDE CONTENEDOR DE RAICES A-70 ML 45,925 47,185 45,708 47,269 45,972 46,359 47,442 45,712 46,318 46,1426.8 BORDILLO PREFABRICADO A-80 ML 52,043 53,454 51,801 53,548 52,095 52,529 53,742 51,804 52,484 52,2866.9 CANECA M-120 UN 238,386 238,701 238,332 238,722 238,398 238,494 238,765 238,333 238,484 238,440

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 623,410 624,408 623,225 624,667 623,577 624,131 624,611 623,595 624,001 623,5946.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,375,607 2,376,273 2,375,484 2,376,445 2,375,719 2,376,088 2,376,408 2,375,731 2,376,002 2,375,7316.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,797,912 2,798,578 2,797,789 2,798,750 2,798,024 2,798,393 2,798,713 2,798,036 2,798,307 2,798,0366.13 CICLOPARQUEADERO M100 TIPO 1 UN 390,849 391,551 390,720 391,725 390,963 391,342 391,693 390,968 391,256 390,9786.14 CICLOPARQUEADERO M101 TIPO 2 UN 517,991 520,800 517,474 521,495 518,447 519,964 521,367 518,467 519,619 518,5086.15 BANCA EN MADERA M-50 UN 354,347 354,347 354,347 354,347 354,347 354,347 354,347 354,347 354,347 354,3476.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 179,187 180,184 179,002 180,443 179,354 179,908 180,388 179,372 179,778 179,3716.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 425,789 426,576 425,653 426,629 425,818 426,060 426,737 425,655 426,035 425,9246.18 POSTE HISTÓRICO M-131 UN 3,584,725 3,589,714 3,583,802 3,591,009 3,585,561 3,588,333 3,590,732 3,585,653 3,587,684 3,585,648

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,439 1,439 1,439 1,439 1,439 1,439 1,439 1,439 1,439 1,4397.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,562 14,562 14,562 14,562 14,562 14,562 14,562 14,562 14,562 14,5627.3 SEÑAL DOBLE DE CICLORUTA UN 363,435 363,768 363,378 363,790 363,448 363,550 363,835 363,379 363,539 363,4927.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 419,645 421,049 419,386 421,397 419,873 420,631 421,333 419,883 420,459 419,9037.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 244,068 244,401 244,011 244,423 244,081 244,183 244,468 244,012 244,172 244,1267.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 287,301 287,634 287,244 287,656 287,314 287,416 287,701 287,245 287,405 287,3597.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 394,443 394,776 394,386 394,798 394,456 394,558 394,843 394,387 394,547 394,5017.8 TACHAS REFLECTIVAS UN 10,252 10,252 10,252 10,252 10,252 10,252 10,252 10,252 10,252 10,2527.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 10,818 10,818 10,818 10,818 10,818 10,818 10,818 10,818 10,818 10,818

7.10 UN 41,860 41,860 41,860 41,860 41,860 41,860 41,860 41,860 41,860 41,860TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 339: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 28,647 28,647 28,647 28,647 28,647 28,647 28,647 28,647 28,647 28,647

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXIST M2 341 341 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 47,087 47,087 47,087 47,087 47,087 47,087 47,087 47,087 47,087 47,087

2.11 600.3 M3 58,233 58,233 58,233 58,233 58,233 58,233 58,233 58,233 58,233 58,233

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 340: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 99,752 150,199 93,285 139,851 125,622 112,687 145,025 137,264 125,622 99,7523.3 330.1 BASE GRANULAR M3 107,643 158,090 101,176 147,742 133,513 120,578 152,916 145,155 133,513 107,643

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,082 2,082 2,082 2,082 2,082 2,082 2,082 2,082 2,082 2,0823.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,048 1,048 1,048 1,048 1,048 1,048 1,048 1,048 1,048 1,048

3.7 461.1 M3 155,703 162,488 154,373 165,139 157,199 162,102 164,046 158,150 160,697 157,032

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 55,434 57,702 55,040 57,916 55,562 56,340 58,164 55,169 56,236 55,828

3.9 450.1 P M3 472,492 471,248 456,323 473,735 503,585 489,904 520,998 453,835 502,342 462,542

3.10 450.2 P M3 497,492 496,248 481,323 498,735 528,585 514,904 545,998 478,835 527,342 487,542

3.11 450.9 P M3 521,933 520,689 505,764 523,177 553,027 539,346 570,439 503,277 551,783 511,983

3.12 450.3 P M3 522,492 521,248 506,323 523,735 553,585 539,904 570,998 503,835 552,342 512,542

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 204,800 255,247 198,333 244,899 230,670 217,735 250,073 242,312 230,670 204,8003.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 196,231 246,677 189,763 236,329 222,101 209,166 241,503 233,742 222,101 196,2313.15 311.1 AFIRMADO M3 88,758 95,609 58,851 95,609 72,098 78,254 102,076 64,337 75,979 65,3193.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,627 12,096 11,533 12,306 11,742 12,115 12,209 11,833 12,002 11,7213.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,817 5,051 4,770 5,156 4,874 5,060 5,107 4,919 5,004 4,864

3.18 500.1 M3 507,915 540,374 502,025 547,416 512,793 529,060 546,728 512,105 525,650 513,804

3.19 500.1 M3 534,901 568,813 528,748 576,171 539,998 556,993 575,452 539,279 553,431 541,054

3.20 500.1 M3 552,712 587,640 546,383 595,117 557,920 575,296 594,458 557,086 571,686 559,041

3.21 *** ML 5,761 5,761 5,761 5,761 5,761 5,761 5,761 5,761 5,761 5,761

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 84,107 112,521 84,107 128,085 95,250 113,616 119,088 97,198 107,049 89,580

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 853,148 889,967 846,468 897,955 858,682 877,134 897,175 857,901 873,266 859,8294.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 751,914 788,122 745,344 795,978 757,356 775,501 795,210 756,588 771,698 758,4834.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 788,233 825,875 781,402 834,042 793,890 812,754 833,244 793,092 808,800 795,0624.4 630 P CONCRETOS f´c =3500 psi (bases) M3 475,491 508,388 469,454 516,344 480,766 498,297 514,987 480,830 494,360 481,5294.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 564,050 598,250 557,774 606,520 569,534 587,759 605,110 569,600 583,666 570,3274.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 469,600 503,191 463,385 511,913 475,227 493,889 510,047 475,848 489,520 475,8144.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 557,925 592,847 551,465 601,914 563,776 583,177 599,975 564,421 578,634 564,3864.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 697,072 730,663 690,857 739,385 702,699 721,361 737,519 703,320 716,992 703,2864.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 484,689 519,611 478,228 528,678 490,540 509,940 526,738 491,184 505,398 491,150

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA

MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

Page 341: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 731,219 766,141 724,758 775,207 737,069 756,470 773,268 737,714 751,928 737,679

4.11 650 P KG 8,350 8,350 8,350 8,350 8,350 8,350 8,350 8,350 8,350 8,350

4.12 650 P KG 11,225 11,225 11,225 11,225 11,225 11,225 11,225 11,225 11,225 11,225

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,235 1,235 1,235 1,235 1,235 1,235 1,235 1,235 1,235 1,235

4.14 621.1 ML 1,947,496 1,947,496 1,947,496 1,947,496 1,947,496 1,947,496 1,947,496 1,947,496 1,947,496 1,947,496

4.15 621.1 P ML 3,141,796 3,204,776 3,130,369 3,218,440 3,151,261 3,182,824 3,217,105 3,149,926 3,176,208 3,153,223

4.16 621.2 M3 1,070,757 1,104,016 1,064,604 1,112,651 1,076,329 1,094,806 1,110,804 1,076,943 1,090,480 1,076,910

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 69,476 69,476 69,476 69,476 69,476 69,476 69,476 69,476 69,476 69,4764.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 263,379 267,370 262,641 268,407 264,048 266,265 268,185 264,122 265,746 264,1184.19 632 P BARANDA METÁLICA ML 300,294 300,294 300,294 300,294 300,294 300,294 300,294 300,294 300,294 300,2944.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,217 12,217 12,217 12,217 12,217 12,217 12,217 12,217 12,217 12,217

4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 391,253 431,396 366,330 439,191 386,400 408,193 442,409 380,862 403,020 383,347

4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 71,567 99,981 71,567 115,545 82,710 101,075 106,548 84,658 94,508 77,0394.23 610.1 RELLENO PARA ESTRUCTURAS M3 73,566 59,160 41,760 59,160 60,828 59,670 65,130 53,664 64,410 47,7304.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 306,004 341,474 299,479 350,243 311,769 330,915 348,626 312,016 326,558 312,529

4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 302,699 334,102 298,823 344,972 310,176 328,228 340,740 311,031 323,252 308,565

4.26 630.7 M3 327,341 358,744 323,464 369,614 334,818 352,870 365,381 335,673 347,893 333,207

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 314,570 345,831 310,772 356,031 321,767 338,934 352,315 322,031 334,347 320,356

4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 339,211 370,472 335,414 380,673 346,409 363,576 376,957 346,673 358,989 344,998

4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 429,325 464,555 422,933 472,199 434,620 452,275 471,451 433,872 448,575 435,7164.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 516,229 552,854 509,583 560,800 521,733 540,088 560,023 520,956 536,241 522,8734.31 681.1 GAVIÓN M3 153,254 180,376 153,254 195,233 163,890 181,421 186,645 165,750 175,152 158,4774.32 681.1 GAVIÓN MALLA PVC M3 159,790 186,912 159,790 201,769 170,426 187,957 193,181 172,286 181,688 165,013

4.33 672.1 ML 33,313 35,476 32,921 35,945 33,638 34,722 35,899 33,592 34,495 33,705

4.34 672.1 ML 12,997 14,078 12,800 14,313 13,159 13,701 14,290 13,136 13,587 13,193

4.35 *** M2 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,484 11,484 11,484 11,484 11,484 11,484 11,484 11,484 11,484 11,484

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,487 15,487 15,487 15,487 15,487 15,487 15,487 15,487 15,487 15,487

4.38 *** M2 18,584 18,584 18,584 18,584 18,584 18,584 18,584 18,584 18,584 18,584

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO)

CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES

BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

Page 342: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

4.39 *** M2 23,890 23,890 23,890 23,890 23,890 23,890 23,890 23,890 23,890 23,890

4.40 *** M2 5,524 5,524 5,524 5,524 5,524 5,524 5,524 5,524 5,524 5,524

4.41 *** M2 6,295 6,295 6,295 6,295 6,295 6,295 6,295 6,295 6,295 6,295

4.42 *** M2 6,539 6,539 6,539 6,539 6,539 6,539 6,539 6,539 6,539 6,539

4.43 *** M2 5,595 5,595 5,595 5,595 5,595 5,595 5,595 5,595 5,595 5,595

4.44 *** M2 7,145 7,145 7,145 7,145 7,145 7,145 7,145 7,145 7,145 7,145

4.45 *** M2 5,244 5,244 5,244 5,244 5,244 5,244 5,244 5,244 5,244 5,244

4.46 *** M2 7,049 7,049 7,049 7,049 7,049 7,049 7,049 7,049 7,049 7,049

4.47 *** M2 12,077 12,077 12,077 12,077 12,077 12,077 12,077 12,077 12,077 12,077

4.48 661.1 ML 314,408 314,944 314,319 314,958 314,447 314,586 315,029 314,341 314,589 314,497

4.49 660.3 ML 262,258 269,946 260,851 271,726 263,424 267,419 271,498 263,335 266,535 263,664

4.50 *** ML 620,321 620,321 620,321 620,321 620,321 620,321 620,321 620,321 620,321 620,321

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 136,394 142,981 107,638 142,981 120,375 126,294 149,200 112,913 124,106 113,856

4.52 640.1 KG 3,241 3,241 3,241 3,241 3,241 3,241 3,241 3,241 3,241 3,241

4.53 *** ML 49,596 49,596 49,596 49,596 49,596 49,596 49,596 49,596 49,596 49,596

4.54 *** ML 79,870 79,870 79,870 79,870 79,870 79,870 79,870 79,870 79,870 79,870

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 418,383 455,008 411,737 462,954 423,887 442,242 462,177 423,110 438,395 425,0274.56 682.1 P COLCHONETA RENO M3 168,739 195,861 168,739 210,718 179,375 196,906 202,130 181,235 190,638 173,9634.57 *** TRINCHO EN MADERA M2 47,413 47,413 47,413 47,413 47,413 47,413 47,413 47,413 47,413 47,413

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,439 1,439 1,439 1,439 1,439 1,439 1,439 1,439 1,439 1,4395.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,562 14,562 14,562 14,562 14,562 14,562 14,562 14,562 14,562 14,5625.3 730.3 TOPE DEFENSA METÁLICA UN 67,127 67,127 67,127 67,127 67,127 67,127 67,127 67,127 67,127 67,1275.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 67,127 67,127 67,127 67,127 67,127 67,127 67,127 67,127 67,127 67,1275.5 730.1 DEFENSA METÁLICA ML 171,449 173,183 171,129 173,624 171,736 172,687 173,535 171,759 172,467 171,769

5.6 701.1 UN 10,252 10,252 10,252 10,252 10,252 10,252 10,252 10,252 10,252 10,252

6 NORMA INV MANTENIMIENTO VIAL

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36"

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES

Page 343: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viotá

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: TEQUENDAMA

San_Ant_Tequendama

6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 563 563 563 563 563 563 563 563 563 563

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286

6.5 801.1 HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,009 12,009 12,009 12,009 12,009 12,009 12,009 12,009 12,009 12,0096.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 32,410 32,410 32,410 32,410 32,410 32,410 32,410 32,410 32,410 32,4106.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,910 5,910 5,910 5,910 5,910 5,910 5,910 5,910 5,910 5,910

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

Page 344: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

CONSTRUCCIÓN1 PRELIMINARES

1.1 CAMPAMENTO 18 M2 UN 1,503,430 1,516,599 1,517,390 1,541,519 1,529,652 1,522,416 1,512,923 1,513,039 1,518,577 1,507,1061.2 CAMPAMENTO 9 M2 UN 875,549 882,133 882,529 894,593 888,660 885,042 880,295 880,353 883,122 877,3861.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,241 10,241 10,241 10,241 10,241 10,241 10,241 10,241 10,241 10,2411.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,534 11,534 11,534 11,534 11,534 11,534 11,534 11,534 11,534 11,5341.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,410 13,410 13,410 13,410 13,410 13,410 13,410 13,410 13,410 13,4101.6 CERCA EN TABLA H=2.30 M ML 49,456 49,456 49,456 49,456 49,456 49,456 49,456 49,456 49,456 49,4561.7 CERCA EN TEJA DE ZINC H=1.80 M ML 35,421 35,557 35,572 35,828 35,699 35,627 35,524 35,507 35,559 35,4571.8 CERCA EN TELA VERDE H = 2.10 M ML 15,745 15,881 15,896 16,153 16,023 15,952 15,848 15,831 15,883 15,7821.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715

1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,7531.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,7331.12 DEMOLICIÓN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,1571.13 DEMOLICIÓN PAÑETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,5871.14 DEMOLICIÓN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,7471.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,7311.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,0931.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,7541.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5011.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,8561.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,9621.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,8911.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,3891.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,3741.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,9631.25 DEMOLICIÓN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,8671.26 DEMOLICIÓN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,0901.27 DEMOLICIÓN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,8901.28 DEMOLICIÓN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,7211.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,7361.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,1691.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,3831.32 DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,6451.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,4531.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,8221.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,3071.37 DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,6471.38 DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,9721.39 DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,5391.40 LETRINA DE 2.0x1.0 UN 627,367 628,134 628,679 632,439 630,649 630,927 629,694 627,237 627,754 626,739

1.41 M2 7,339 7,339 7,339 7,339 7,339 7,339 7,339 7,339 7,339 7,339

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 2,327 2,327 2,327 2,327 2,327 2,327 2,327 2,327 2,327 2,3271.43 RED ELÉCTRICA PROVISIONAL L=50M UN 1,159,033 1,159,033 1,159,033 1,159,033 1,159,033 1,159,033 1,159,033 1,159,033 1,159,033 1,159,033

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE PRESICIÓN

Page 345: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

1.44 RED TELEFÓNICA PROVISIONAL UN 165,322 165,322 165,322 165,322 165,322 165,322 165,322 165,322 165,322 165,322

1.45 M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

2 CIMIENTOS2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 76,186 68,425 73,599 89,121 82,653 95,588 93,001 63,251 63,251 63,2512.2 BASE ARENA CEMENTO 1:20 M3 152,391 144,579 149,788 130,484 134,390 163,033 153,919 135,465 135,465 136,7682.3 DEMOLICIÓN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,4342.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,0402.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 4,623 4,623 4,623 4,623 4,623 4,623 4,623 4,623 4,623 4,6232.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 512,783 526,367 527,634 552,985 540,310 533,062 522,923 521,804 527,128 516,4812.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 527,948 541,732 543,318 569,347 556,197 548,988 538,468 536,511 541,655 531,6382.8 ZAPATAS EN CONCRETO 3500 PSI M3 493,908 506,815 508,301 532,673 520,360 513,609 503,759 501,927 506,743 497,3642.9 PILOTE DE MADERA D=20 CM ML 36,413 36,413 36,413 36,413 36,413 36,413 36,413 36,413 36,413 36,413

2.10 ML 111,079 111,079 111,079 111,079 111,079 111,079 111,079 111,079 111,079 111,079

2.11 ML 134,278 134,278 134,278 134,278 134,278 134,278 134,278 134,278 134,278 134,278

2.12 ML 162,331 162,331 162,331 162,331 162,331 162,331 162,331 162,331 162,331 162,331

2.13 ML 200,096 200,096 200,096 200,096 200,096 200,096 200,096 200,096 200,096 200,096

2.14 PILOTE HINCADO 25X25 ML 90,950 91,861 91,996 93,746 92,849 92,387 91,668 91,457 91,771 91,1882.15 PILOTE HINCADO 30X30 ML 110,944 112,264 112,459 114,996 113,695 113,026 111,985 111,679 112,134 111,2882.16 DADOS EN CONCRETO 3500PSI M3 483,132 496,039 497,524 521,897 509,584 502,833 492,983 491,151 495,967 486,588

2.17 ML 119,295 119,295 119,295 119,295 119,295 119,295 119,295 119,295 119,295 119,295

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 28,263 28,215 28,247 28,127 28,152 28,329 28,273 28,158 28,158 28,1663.2 SIFÓN EN PVC 6" UN 145,393 145,345 145,377 145,257 145,281 145,459 145,403 145,288 145,288 145,2963.3 CAJA DE INSPECCIÓN DE 100X100 UN 358,524 356,106 360,210 373,756 367,078 377,612 372,021 350,833 352,611 348,9353.4 CAJA DE INSPECCIÓN DE 40X40 UN 178,499 179,291 179,712 182,471 181,045 181,840 180,425 178,547 179,271 177,7123.5 CAJA DE INSPECCIÓN DE 60X60 UN 199,531 200,442 201,222 204,861 202,835 204,792 202,482 199,090 200,144 197,9123.6 CAJA DE INSPECCIÓN DE 80X80 UN 263,834 265,797 266,825 271,996 268,971 271,608 267,837 263,795 265,573 261,8083.7 DUCTO ELÉCTRICO PVC 4" ML 75,427 75,367 75,407 75,526 75,476 75,576 75,556 75,327 75,327 75,3273.8 POZO SÉPTICO ETERNIT 1000 LT UN 966,894 966,297 966,695 967,889 967,392 968,387 968,188 965,899 965,899 965,8993.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 85,446 84,910 85,267 83,942 84,210 86,176 85,551 84,284 84,284 84,374

3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 49,586 49,303 49,492 48,793 48,934 49,972 49,642 48,973 48,973 49,0213.11 TUBERÍA DRENAJE PVC 110 ML 20,644 20,930 20,908 21,391 21,171 20,996 20,820 20,930 21,084 20,7323.12 TUBERÍA DRENAJE PVC 160 ML 31,391 31,677 31,655 32,138 31,919 31,743 31,567 31,677 31,831 31,4793.13 TUBERÍA DRENAJE PVC 200 ML 43,076 43,476 43,445 44,122 43,814 43,568 43,322 43,476 43,691 43,1993.14 TUBERÍA DRENAJE PVC 250 ML 58,572 59,029 58,994 59,767 59,415 59,134 58,853 59,029 59,275 58,7123.15 TUBERÍA DRENAJE PVC 315 ML 80,731 81,131 81,100 81,777 81,469 81,223 80,977 81,131 81,346 80,854

3.16 UN 739,381 743,952 743,600 751,335 747,819 745,006 742,194 743,952 746,413 740,787

RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE)

PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE)

Page 346: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

3.17 UN 1,050,365 1,059,506 1,058,803 1,074,274 1,067,242 1,061,616 1,055,990 1,059,506 1,064,429 1,053,178

3.18 UN 1,376,808 1,395,091 1,393,685 1,424,625 1,410,561 1,399,310 1,388,059 1,395,091 1,404,936 1,382,433

4 ESTRUCTURAS EN CONCRETO4.1 CASETÓN DE LONA 0.8 X 0.35 M2 28,072 28,072 28,072 28,072 28,072 28,072 28,072 28,072 28,072 28,0724.2 CASETÓN DE LONA 0.80X0.70 M2 36,923 36,923 36,923 36,923 36,923 36,923 36,923 36,923 36,923 36,9234.3 COLUMNAS 3500 PSI M3 637,008 649,915 651,400 675,773 663,459 656,708 646,858 645,026 649,842 640,4634.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 214,189 226,425 226,526 251,996 239,819 231,583 221,841 224,051 230,729 217,092

4.5 M2 77,073 78,326 78,470 80,837 79,641 78,986 78,029 77,852 78,319 77,409

4.6 M2 90,839 92,343 92,516 95,355 93,921 93,134 91,987 91,773 92,334 91,242

4.7 M2 102,451 104,456 104,687 108,473 106,560 105,511 103,981 103,697 104,445 102,988

4.8 M2 108,163 110,293 110,538 114,561 112,528 111,414 109,789 109,486 110,281 108,733

4.9 M2 124,642 127,274 127,576 132,546 130,035 128,659 126,650 126,277 127,259 125,347

4.10 M2 138,957 141,965 142,311 147,990 145,121 143,548 141,253 140,826 141,948 139,763

4.11 M2 154,486 157,869 158,258 164,647 161,419 159,650 157,068 156,587 157,850 155,391

4.12 ENTREPISO VIGUETA PLACA M2 74,277 74,356 74,404 74,519 74,423 74,546 74,386 74,250 74,302 74,2074.13 ESCALERA MACIZA 3500 PSI M3 745,887 758,793 760,279 784,652 772,338 765,587 755,737 753,905 758,721 749,3424.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 70,279 70,407 70,477 70,776 70,600 70,560 70,419 70,249 70,249 70,3014.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 62,511 63,802 63,951 66,388 65,157 64,482 63,497 63,313 63,795 62,8574.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 70,972 72,551 72,732 75,714 74,207 73,382 72,177 71,953 72,542 71,3944.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 83,344 85,324 85,551 89,290 87,401 86,366 84,855 84,574 85,313 83,8744.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 571,793 584,700 586,185 610,558 598,245 591,494 581,644 579,812 584,628 575,249

4.19000000000001 UN 38,540 38,925 38,982 39,722 39,343 39,147 38,843 38,754 38,887 38,640

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 226,858 232,622 233,286 244,171 238,671 235,657 231,258 230,439 232,590 228,4014.21000000000001 ACERO FIGURADO 37000 PSI KG 3,175 3,175 3,175 3,175 3,175 3,175 3,175 3,175 3,175 3,175

4.22 ACERO FIGURADO 60000 PSI KG 3,298 3,298 3,298 3,298 3,298 3,298 3,298 3,298 3,298 3,2984.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG 4,534 4,534 4,534 4,534 4,534 4,534 4,534 4,534 4,534 4,534

4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 675,329 688,236 689,721 714,094 701,780 695,030 685,180 683,348 688,164 678,7854.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 625,323 639,457 641,075 667,757 654,281 646,884 636,104 634,120 639,402 629,109

4.26 VIGA AÉREA 3500 PSI M3 675,361 688,268 689,753 714,126 701,813 695,062 685,212 683,380 688,196 678,8174.27000000000001 VIGA CINTA 3500 PSI M3 660,024 672,931 674,416 698,789 686,475 679,725 669,875 668,042 672,859 663,479

4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 819,171 832,078 833,564 857,937 845,623 838,872 829,022 827,190 832,006 822,6274.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 265,590 280,661 281,566 309,181 295,600 287,319 276,455 276,587 282,925 269,797

5 MAMPOSTERÍA5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 23,144 23,352 23,423 23,796 23,568 23,615 23,356 23,182 23,270 23,114

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO)

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO)

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO)

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO)

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO)

PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M)

Page 347: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 38,709 38,917 38,987 39,361 39,132 39,180 38,921 38,746 38,835 38,6795.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 24,783 24,734 24,767 24,647 24,671 24,849 24,792 24,678 24,678 24,6865.4 ARCOS EN LADRILLO PRENSADO ML 120,059 119,962 120,026 119,787 119,835 120,191 120,078 119,848 119,848 119,8655.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 34,525 34,911 34,968 35,708 35,328 35,133 34,829 34,740 34,873 34,6265.6 DINTELES EN BLOQUE 0.15 M ML 20,053 20,181 20,252 20,551 20,375 20,334 20,194 20,023 20,023 20,0765.7 ENCHAPES LADRILLO PRENSADO M2 67,300 67,106 67,236 66,756 66,853 67,565 67,338 66,880 66,880 66,9125.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 71,600 72,884 73,074 75,542 74,277 73,625 72,613 72,315 72,758 71,9355.9 MURO DRYWALL DOBLE CARA 0.12 M M2 53,891 53,891 53,891 53,891 53,891 53,891 53,891 53,891 53,891 53,891

5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,980 32,980 32,980 32,980 32,980 32,980 32,980 32,980 32,980 32,9805.11 MURO DRYWALL DOBLE CARA 0.10 M M2 52,215 52,215 52,215 52,215 52,215 52,215 52,215 52,215 52,215 52,2155.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 32,142 32,142 32,142 32,142 32,142 32,142 32,142 32,142 32,142 32,1425.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 65,495 65,495 65,495 65,495 65,495 65,495 65,495 65,495 65,495 65,4955.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,789 39,789 39,789 39,789 39,789 39,789 39,789 39,789 39,789 39,7895.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 67,056 67,056 67,056 67,056 67,056 67,056 67,056 67,056 67,056 67,0565.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 40,569 40,569 40,569 40,569 40,569 40,569 40,569 40,569 40,569 40,5695.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 27,220 27,123 27,188 26,947 26,996 27,353 27,239 27,009 27,009 27,0255.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 16,896 16,847 16,879 16,759 16,783 16,962 16,905 16,790 16,790 16,798

5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 38,050 37,985 38,028 37,868 37,900 38,139 38,063 37,909 37,909 37,9205.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 23,122 23,089 23,111 23,031 23,047 23,166 23,128 23,051 23,051 23,057

5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 44,866 44,801 44,844 44,683 44,716 44,954 44,878 44,725 44,725 44,7365.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 27,043 27,010 27,032 26,951 26,968 27,087 27,049 26,972 26,972 26,978

5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 80,878 80,553 80,770 79,966 80,129 81,321 80,942 80,174 80,174 80,2285.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 47,354 47,191 47,300 46,898 46,979 47,575 47,385 47,001 47,001 47,029

5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 25,135 25,070 25,113 24,953 24,985 25,224 25,148 24,994 24,994 25,0055.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 15,599 15,567 15,588 15,508 15,524 15,644 15,606 15,529 15,529 15,534

5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 48,203 48,073 48,159 47,838 47,903 48,380 48,228 47,921 47,921 47,9435.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 29,936 29,871 29,915 29,754 29,786 30,025 29,949 29,795 29,795 29,806

5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 65,321 65,449 65,520 65,819 65,643 65,602 65,462 65,291 65,291 65,3445.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,773 39,837 39,872 40,022 39,934 39,914 39,843 39,758 39,758 39,784

5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 121,368 120,913 121,216 120,092 120,319 121,988 121,457 120,382 120,382 120,4585.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 74,693 74,465 74,617 74,055 74,169 75,003 74,738 74,200 74,200 74,238

5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 59,603 59,383 59,529 58,986 59,096 59,902 59,646 59,126 59,126 59,1635.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 36,914 36,804 36,877 36,605 36,660 37,063 36,935 36,675 36,675 36,694

5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 35,781 35,636 35,733 35,373 35,446 35,979 35,810 35,466 35,466 35,4905.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 21,774 21,701 21,749 21,570 21,606 21,873 21,788 21,616 21,616 21,628

5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 25,723 25,658 25,702 25,541 25,574 25,812 25,736 25,583 25,583 25,5935.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 15,684 15,652 15,673 15,593 15,609 15,728 15,690 15,614 15,614 15,619

5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 38,893 38,763 38,850 38,529 38,594 39,070 38,919 38,612 38,612 38,6335.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 23,850 23,784 23,828 23,667 23,700 23,938 23,862 23,709 23,709 23,719

5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 74,583 74,388 74,518 74,036 74,134 74,849 74,621 74,160 74,160 74,1935.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 45,477 45,380 45,445 45,204 45,253 45,610 45,497 45,266 45,266 45,282

5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 54,533 54,403 54,490 54,169 54,234 54,711 54,559 54,252 54,252 54,273

5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 32,910 32,845 32,888 32,727 32,760 32,998 32,922 32,769 32,769 32,780

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 115,701 115,246 115,549 114,424 114,652 116,321 115,790 114,714 114,714 114,790

Page 348: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 70,255 70,028 70,180 69,617 69,731 70,565 70,300 69,762 69,762 69,800

5.47000000000002 REMATES LADRILLO PRENSADO ML 21,837 21,788 21,820 21,700 21,725 21,903 21,846 21,731 21,731 21,7395.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 27,564 27,406 27,511 27,120 27,199 27,780 27,595 27,221 27,221 27,248

5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 46,527 46,316 46,456 45,935 46,041 46,814 46,568 46,070 46,070 46,1055.50 LAVADA DE FACHADA M2 4,009 4,009 4,009 4,009 4,009 4,009 4,009 4,009 4,009 4,009

5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML 38,878 39,087 39,157 39,531 39,302 39,349 39,090 38,916 39,005 38,8485.52 DOVELA, GROUTING 3000 PSI ML 7,626 7,626 7,626 7,626 7,626 7,626 7,626 7,626 7,626 7,626

5.53000000000003 ANCLAJE 3/8" L=30CM UN 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,1325.54 ANCLAJE 1/2" L=50CM UN 13,264 13,264 13,264 13,264 13,264 13,264 13,264 13,264 13,264 13,264

5.55000000000003 ANCLAJE 5/8" L=70CM UN 18,539 18,539 18,539 18,539 18,539 18,539 18,539 18,539 18,539 18,5395.56 ANCLAJE 3/4" L=70CM UN 27,703 27,703 27,703 27,703 27,703 27,703 27,703 27,703 27,703 27,703

5.57000000000003 ANCLAJE 1" L= 70CM UN 3,982 4,080 4,089 4,273 4,181 4,129 4,055 4,047 4,086 4,009

6 PAÑETES, REVOQUES Y REPELLOS6.1 ENTRAMADO MADERA CIELO RASO M2 11,839 11,839 11,839 11,839 11,839 11,839 11,839 11,839 11,839 11,8396.2 FILOS O DILATACIONES B/PLACA ML 4,484 4,435 4,468 4,348 4,372 4,550 4,493 4,379 4,379 4,3876.3 FILOS O DILATACIONES S/MURO ML 5,387 5,338 5,371 5,251 5,275 5,453 5,396 5,282 5,282 5,2906.4 GOTERA EN MORTERO 1:4 ML 6,491 6,443 6,475 6,355 6,379 6,557 6,501 6,386 6,386 6,3946.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 4,363 4,363 4,363 4,363 4,363 4,363 4,363 4,363 4,363 4,3636.6 MALLA BAJO ENTRAMADO M2 10,358 10,358 10,358 10,358 10,358 10,358 10,358 10,358 10,358 10,3586.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 19,045 18,891 18,994 18,613 18,690 19,255 19,075 18,711 18,711 18,7376.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,498 11,421 11,472 11,282 11,321 11,603 11,513 11,331 11,331 11,3446.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 16,768 16,632 16,723 16,386 16,454 16,954 16,795 16,473 16,473 16,495

6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,124 10,055 10,101 9,932 9,966 10,217 10,137 9,976 9,976 9,9876.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 16,082 15,928 16,030 15,650 15,727 16,291 16,112 15,748 15,748 15,7746.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 9,780 9,703 9,755 9,564 9,603 9,885 9,795 9,613 9,613 9,6266.13 PAÑETE CULATAS 1:4, E=2 CM M2 16,768 16,632 16,723 16,386 16,454 16,954 16,795 16,473 16,473 16,4956.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,124 10,055 10,101 9,932 9,966 10,217 10,137 9,976 9,976 9,9876.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,338 16,228 16,302 16,030 16,085 16,488 16,360 16,100 16,100 16,1196.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 9,908 9,853 9,889 9,754 9,781 9,982 9,918 9,789 9,789 9,7986.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 13,905 13,801 13,870 13,613 13,665 14,047 13,925 13,679 13,679 13,6976.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,472 8,420 8,455 8,326 8,352 8,543 8,482 8,359 8,359 8,368

6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 13,382 13,264 13,342 13,053 13,111 13,541 13,404 13,127 13,127 13,1476.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,210 8,152 8,191 8,046 8,075 8,290 8,222 8,083 8,083 8,093

6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 17,361 17,225 17,316 16,978 17,046 17,547 17,388 17,065 17,065 17,0886.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,405 10,336 10,382 10,213 10,247 10,498 10,418 10,257 10,257 10,268

6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 16,674 16,520 16,623 16,243 16,319 16,884 16,704 16,341 16,341 16,3666.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,061 9,984 10,036 9,845 9,884 10,166 10,076 9,895 9,895 9,907

6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 13,846 13,729 13,807 13,517 13,576 14,006 13,869 13,592 13,592 13,6126.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,429 8,371 8,410 8,265 8,294 8,509 8,441 8,302 8,302 8,312

6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 17,352 17,198 17,300 16,920 16,997 17,561 17,382 17,018 17,018 17,0446.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 10,708 10,631 10,682 10,492 10,530 10,813 10,723 10,541 10,541 10,554

7 CUBIERTAS7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 21,415 21,220 21,350 20,868 20,965 21,681 21,453 20,992 20,992 21,025

Page 349: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

7.2 M2 65,700 66,342 66,437 67,671 67,038 66,712 66,206 66,057 66,279 65,867

7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 40,299 40,299 40,299 40,299 40,299 40,299 40,299 40,299 40,299 40,2997.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,3517.5 ML 25,662 25,662 25,662 25,662 25,662 25,662 25,662 25,662 25,662 25,6627.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 60,007 60,007 60,007 60,007 60,007 60,007 60,007 60,007 60,007 60,0077.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 42,963 42,963 42,963 42,963 42,963 42,963 42,963 42,963 42,963 42,9637.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,810 25,810 25,810 25,810 25,810 25,810 25,810 25,810 25,810 25,8107.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 58,402 58,402 58,402 58,402 58,402 58,402 58,402 58,402 58,402 58,402

7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 75,412 75,412 75,412 75,412 75,412 75,412 75,412 75,412 75,412 75,4127.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 98,112 98,112 98,112 98,112 98,112 98,112 98,112 98,112 98,112 98,1127.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 43,060 43,060 43,060 43,060 43,060 43,060 43,060 43,060 43,060 43,0607.13 CANAL PVC AMAZONAS ML 62,405 62,405 62,405 62,405 62,405 62,405 62,405 62,405 62,405 62,4057.14 CANAL PVC RAINGO ML 55,127 55,127 55,127 55,127 55,127 55,127 55,127 55,127 55,127 55,1277.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 87,646 87,646 87,646 87,646 87,646 87,646 87,646 87,646 87,646 87,6467.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 50,678 50,678 50,678 50,678 50,678 50,678 50,678 50,678 50,678 50,6787.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 41,612 41,612 41,612 41,612 41,612 41,612 41,612 41,612 41,612 41,6127.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 23,789 23,789 23,789 23,789 23,789 23,789 23,789 23,789 23,789 23,789

7.19000000000001 TEJA DE BARRO M2 46,153 45,911 46,072 45,473 45,594 46,484 46,201 45,628 45,628 45,6687.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 34,678 34,678 34,678 34,678 34,678 34,678 34,678 34,678 34,678 34,678

7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 31,819 31,819 31,819 31,819 31,819 31,819 31,819 31,819 31,819 31,8197.22 TEJA FIBROCEMENTO Nº4 M2 26,953 26,953 26,953 26,953 26,953 26,953 26,953 26,953 26,953 26,953

7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 26,178 26,178 26,178 26,178 26,178 26,178 26,178 26,178 26,178 26,1787.24 TEJA FIBROCEMENTO No. 8 M2 26,939 26,939 26,939 26,939 26,939 26,939 26,939 26,939 26,939 26,939

7.25000000000001 TEJA TERMOACÚSTICA M2 37,391 37,391 37,391 37,391 37,391 37,391 37,391 37,391 37,391 37,3917.26 TEJA PLÁSTICA No.6 M2 32,948 32,948 32,948 32,948 32,948 32,948 32,948 32,948 32,948 32,948

7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 60,536 60,536 60,536 60,536 60,536 60,536 60,536 60,536 60,536 60,536

7.28 M2 110,172 110,172 110,172 110,172 110,172 110,172 110,172 110,172 110,172 110,172

7.29000000000001 TEJA SIN TRASLAPO M2 49,545 49,545 49,545 49,545 49,545 49,545 49,545 49,545 49,545 49,5457.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,862 31,862 31,862 31,862 31,862 31,862 31,862 31,862 31,862 31,862

7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 25,171 25,171 25,171 25,171 25,171 25,171 25,171 25,171 25,171 25,171

7.32 M2 40,461 40,461 40,461 40,461 40,461 40,461 40,461 40,461 40,461 40,461

7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 14,874 14,874 14,874 14,874 14,874 14,874 14,874 14,874 14,874 14,8747.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 17,819 17,819 17,819 17,819 17,819 17,819 17,819 17,819 17,819 17,819

7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,279 20,279 20,279 20,279 20,279 20,279 20,279 20,279 20,279 20,2797.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 26,116 26,116 26,116 26,116 26,116 26,116 26,116 26,116 26,116 26,116

7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 16,316 16,316 16,316 16,316 16,316 16,316 16,316 16,316 16,316 16,3167.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 38,284 38,284 38,284 38,284 38,284 38,284 38,284 38,284 38,284 38,284

7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 225,369 225,369 225,369 225,369 225,369 225,369 225,369 225,369 225,369 225,3697.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 288,257 288,257 288,257 288,257 288,257 288,257 288,257 288,257 288,257 288,257

7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 183,754 183,754 183,754 183,754 183,754 183,754 183,754 183,754 183,754 183,7547.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 264,890 264,890 264,890 264,890 264,890 264,890 264,890 264,890 264,890 264,890

8 MORTEROS Y CONCRETOS

AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

BAJANTE PVC AGUAS LLUVIAS D=4"

TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM

ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

Page 350: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

8.1 CONCRETO 4000 PSI M3 389,800 403,000 404,951 430,319 417,310 410,615 400,207 397,146 401,699 393,2438.2 CONCRETO 3500 PSI M3 338,001 350,532 351,974 375,637 363,682 357,128 347,565 345,786 350,462 341,3568.3 CONCRETO 3000 PSI M3 330,625 343,814 345,044 369,656 357,350 350,314 340,470 339,383 344,552 334,2158.4 CONCRETO 2500 PSI M3 298,058 310,902 312,800 337,483 324,825 318,311 308,184 305,206 309,636 301,4098.5 CONCRETO 2000 PSI M3 275,369 289,007 290,483 316,141 303,220 296,043 285,706 284,023 289,191 279,0398.6 CONCRETO 1500 PSI M3 246,346 260,978 261,857 288,667 275,482 267,442 256,894 257,023 263,176 250,4308.7 MORTERO SECO 1:10 M3 193,327 186,631 191,095 174,549 177,897 202,448 194,636 178,819 178,819 179,9358.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 375,148 368,646 372,981 356,915 360,165 384,005 376,420 361,060 361,060 362,1458.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 342,438 335,107 339,994 321,880 325,545 352,425 343,872 326,554 326,554 327,776

8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 397,982 391,126 395,697 378,755 382,183 407,323 399,324 383,127 383,127 384,2708.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 527,222 520,366 524,937 507,995 511,423 536,563 528,564 512,367 512,367 513,510

9 CARPINTERÍA EN MADERA9.1 BARANDA EN MADERA CEDRO MACHO ML 89,985 89,985 89,985 89,985 89,985 89,985 89,985 89,985 89,985 89,9859.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 2,855 2,806 2,839 2,719 2,743 2,921 2,864 2,750 2,750 2,7589.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 101,318 101,318 101,318 101,318 101,318 101,318 101,318 101,318 101,318 101,3189.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 123,549 123,549 123,549 123,549 123,549 123,549 123,549 123,549 123,549 123,5499.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 170,842 170,842 170,842 170,842 170,842 170,842 170,842 170,842 170,842 170,8429.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 190,790 190,790 190,790 190,790 190,790 190,790 190,790 190,790 190,790 190,7909.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 210,762 210,762 210,762 210,762 210,762 210,762 210,762 210,762 210,762 210,7629.8 HOJA PUERTA FORTEC 0.81 UN 149,485 149,485 149,485 149,485 149,485 149,485 149,485 149,485 149,485 149,4859.9 HOJA PUERTA FORTEC 0.91 UN 165,116 165,116 165,116 165,116 165,116 165,116 165,116 165,116 165,116 165,116

9.10 HOJA PUERTA FORTEC 1.50 UN 244,825 244,825 244,825 244,825 244,825 244,825 244,825 244,825 244,825 244,8259.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 92,628 92,628 92,628 92,628 92,628 92,628 92,628 92,628 92,628 92,6289.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 122,952 122,952 122,952 122,952 122,952 122,952 122,952 122,952 122,952 122,9529.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 136,184 136,184 136,184 136,184 136,184 136,184 136,184 136,184 136,184 136,1849.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 346,249 346,249 346,249 346,249 346,249 346,249 346,249 346,249 346,249 346,2499.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,617 30,617 30,617 30,617 30,617 30,617 30,617 30,617 30,617 30,6179.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,475 19,475 19,475 19,475 19,475 19,475 19,475 19,475 19,475 19,4759.17 VENTANERÍA EN MADERA CEDRO MACHO M2 71,335 71,335 71,335 71,335 71,335 71,335 71,335 71,335 71,335 71,3359.18 CERRADURA DE ENTRADA PRINCIPAL UN 88,758 88,758 88,758 88,758 88,758 88,758 88,758 88,758 88,758 88,7589.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 69,019 69,019 69,019 69,019 69,019 69,019 69,019 69,019 69,019 69,019

9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 21,603 21,603 21,603 21,603 21,603 21,603 21,603 21,603 21,603 21,603

9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 21,603 21,603 21,603 21,603 21,603 21,603 21,603 21,603 21,603 21,6039.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,5019.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 76,158 76,158 76,158 76,158 76,158 76,158 76,158 76,158 76,158 76,1589.24 ESPEJO BISELADO INCOLORO 4 MM M2 98,433 98,433 98,433 98,433 98,433 98,433 98,433 98,433 98,433 98,4339.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 44,974 44,974 44,974 44,974 44,974 44,974 44,974 44,974 44,974 44,9749.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 53,884 53,884 53,884 53,884 53,884 53,884 53,884 53,884 53,884 53,8849.27 VIDRIO TEMPLADO PULIDO 10 MM M2 217,066 217,066 217,066 217,066 217,066 217,066 217,066 217,066 217,066 217,0669.28 VIDRIO TEMPLADO PULIDO 8 MM M2 194,792 194,792 194,792 194,792 194,792 194,792 194,792 194,792 194,792 194,7929.29 VIDRIO TRANSPARENTE 3 MM M2 48,316 48,316 48,316 48,316 48,316 48,316 48,316 48,316 48,316 48,3169.30 VIDRIO TRANSPARENTE 4 MM M2 56,111 56,111 56,111 56,111 56,111 56,111 56,111 56,111 56,111 56,1119.31 VIDRIO TRANSPARENTE 5 MM M2 62,794 62,794 62,794 62,794 62,794 62,794 62,794 62,794 62,794 62,7949.32 VIDRIO TRANSPARENTE 6 MM M2 66,803 66,803 66,803 66,803 66,803 66,803 66,803 66,803 66,803 66,803

Page 351: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

10 CARPINTERÍA METÁLICA10.1 CAJA CONTADOR DE AGUA UN 56,202 56,202 56,202 56,202 56,202 56,202 56,202 56,202 56,202 56,20210.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 163,397 163,397 163,397 163,397 163,397 163,397 163,397 163,397 163,397 163,397

10.3 ML 81,902 81,902 81,902 81,902 81,902 81,902 81,902 81,902 81,902 81,902

10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 106,677 106,677 106,677 106,677 106,677 106,677 106,677 106,677 106,677 106,67710.5 MARCO TAPA CAJA DE INSPECCIÓN UN 101,993 101,993 101,993 101,993 101,993 101,993 101,993 101,993 101,993 101,99310.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 71,201 71,201 71,201 71,201 71,201 71,201 71,201 71,201 71,201 71,20110.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 151,536 151,536 151,536 151,536 151,536 151,536 151,536 151,536 151,536 151,53610.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 81,067 81,067 81,067 81,067 81,067 81,067 81,067 81,067 81,067 81,06710.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 4,879 4,879 4,879 4,879 4,879 4,879 4,879 4,879 4,879 4,879

10.10 M2 74,535 74,535 74,535 74,535 74,535 74,535 74,535 74,535 74,535 74,535

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 31,232 31,232 31,232 31,232 31,232 31,232 31,232 31,232 31,232 31,232

10.12 M2 394,926 394,926 394,926 394,926 394,926 394,926 394,926 394,926 394,926 394,926

10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 142,634 142,634 142,634 142,634 142,634 142,634 142,634 142,634 142,634 142,634

10.14 M2 157,243 157,243 157,243 157,243 157,243 157,243 157,243 157,243 157,243 157,243

10.15 M2 360,660 360,660 360,660 360,660 360,660 360,660 360,660 360,660 360,660 360,660

10.16 M2 94,959 94,959 94,959 94,959 94,959 94,959 94,959 94,959 94,959 94,959

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 287,771 287,771 287,771 287,771 287,771 287,771 287,771 287,771 287,771 287,771

10.18 ML 4,539 4,539 4,539 4,539 4,539 4,539 4,539 4,539 4,539 4,539

10.19 VENTANA EN ALUMINIO CORREDIZA M2 203,022 203,022 203,022 203,022 203,022 203,022 203,022 203,022 203,022 203,02210.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 90,774 90,774 90,774 90,774 90,774 90,774 90,774 90,774 90,774 90,77410.21 REJILLA PISO 0.30 M M2 64,344 64,344 64,344 64,344 64,344 64,344 64,344 64,344 64,344 64,34410.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 65,941 65,941 65,941 65,941 65,941 65,941 65,941 65,941 65,941 65,941

10.23 KG 7,513 7,513 7,513 7,513 7,513 7,513 7,513 7,513 7,513 7,513

10.24 KG 8,344 8,344 8,344 8,344 8,344 8,344 8,344 8,344 8,344 8,344

ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS)

REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO

SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

Page 352: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

10.25 KG 6,536 6,536 6,536 6,536 6,536 6,536 6,536 6,536 6,536 6,536

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11.1 ACOMETIDA EN PVC 1/2" 5M UN 168,035 168,035 168,035 168,035 168,035 168,035 168,035 168,035 168,035 168,03511.2 ACOMETIDA EN PVC 3/4" 5M UN 200,258 200,258 200,258 200,258 200,258 200,258 200,258 200,258 200,258 200,25811.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,35111.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 25,662 25,662 25,662 25,662 25,662 25,662 25,662 25,662 25,662 25,66211.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 24,811 24,811 24,811 24,811 24,811 24,811 24,811 24,811 24,811 24,81111.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 31,708 31,708 31,708 31,708 31,708 31,708 31,708 31,708 31,708 31,70811.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 65,089 65,089 65,089 65,089 65,089 65,089 65,089 65,089 65,089 65,08911.8 CONEXIÓN TANQUE ELEVADO PVC UN 168,074 168,074 168,074 168,074 168,074 168,074 168,074 168,074 168,074 168,07411.9 INSTALACIÓN APARATO SANITARIO UN 33,399 33,399 33,399 33,399 33,399 33,399 33,399 33,399 33,399 33,399

11.10 INSTALACIÓN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,40511.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,42211.12 LLAVE MANGUERA UN 23,725 23,725 23,725 23,725 23,725 23,725 23,725 23,725 23,725 23,72511.13 NIPLE PASAMURO 2" UN 50,454 50,454 50,454 50,454 50,454 50,454 50,454 50,454 50,454 50,45411.14 NIPLE PASAMURO 4" UN 75,404 75,404 75,404 75,404 75,404 75,404 75,404 75,404 75,404 75,40411.15 PUNTO AGUA CALIENTE CPVC UN 62,867 62,867 62,867 62,867 62,867 62,867 62,867 62,867 62,867 62,86711.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 46,022 46,022 46,022 46,022 46,022 46,022 46,022 46,022 46,022 46,02211.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 48,818 48,818 48,818 48,818 48,818 48,818 48,818 48,818 48,818 48,81811.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 61,638 61,638 61,638 61,638 61,638 61,638 61,638 61,638 61,638 61,63811.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 49,007 49,007 49,007 49,007 49,007 49,007 49,007 49,007 49,007 49,00711.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 61,008 61,008 61,008 61,008 61,008 61,008 61,008 61,008 61,008 61,00811.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 65,186 65,186 65,186 65,186 65,186 65,186 65,186 65,186 65,186 65,18611.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 54,604 54,604 54,604 54,604 54,604 54,604 54,604 54,604 54,604 54,60411.23 RED SUMINISTRO CPVC 1/2" ML 9,256 9,256 9,256 9,256 9,256 9,256 9,256 9,256 9,256 9,25611.24 RED SUMINISTRO CPVC 3/4" ML 12,971 12,971 12,971 12,971 12,971 12,971 12,971 12,971 12,971 12,97111.25 RED SUMINISTRO PVC 1 1/2" ML 16,671 16,671 16,671 16,671 16,671 16,671 16,671 16,671 16,671 16,67111.26 RED SUMINISTRO PVC 1" ML 10,331 10,331 10,331 10,331 10,331 10,331 10,331 10,331 10,331 10,33111.27 RED SUMINISTRO PVC 1/2" ML 6,216 6,216 6,216 6,216 6,216 6,216 6,216 6,216 6,216 6,21611.28 RED SUMINISTRO PVC 2 1/2" ML 42,037 42,037 42,037 42,037 42,037 42,037 42,037 42,037 42,037 42,03711.29 RED SUMINISTRO PVC 2" ML 24,140 24,140 24,140 24,140 24,140 24,140 24,140 24,140 24,140 24,14011.30 RED SUMINISTRO PVC 3/4" ML 7,758 7,758 7,758 7,758 7,758 7,758 7,758 7,758 7,758 7,75811.31 RED SANITARIA PVC-S 2" ML 18,343 18,343 18,343 18,343 18,343 18,343 18,343 18,343 18,343 18,34311.32 RED SANITARIA PVC-S 3" ML 25,431 25,431 25,431 25,431 25,431 25,431 25,431 25,431 25,431 25,43111.33 RED SANITARIA PVC-S 4" ML 34,420 34,420 34,420 34,420 34,420 34,420 34,420 34,420 34,420 34,42011.34 RED SANITARIA PVC-S 6" ML 64,298 64,298 64,298 64,298 64,298 64,298 64,298 64,298 64,298 64,29811.35 REGISTRO 1" UN 83,895 83,895 83,895 83,895 83,895 83,895 83,895 83,895 83,895 83,89511.36 REGISTRO 1/2" UN 48,028 48,028 48,028 48,028 48,028 48,028 48,028 48,028 48,028 48,02811.37 REGISTRO 3/4" UN 58,848 58,848 58,848 58,848 58,848 58,848 58,848 58,848 58,848 58,848

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

Page 353: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

11.38 REGISTRO 1 1/2" UN 109,523 109,523 109,523 109,523 109,523 109,523 109,523 109,523 109,523 109,52311.39 REGISTRO 2 1/2" UN 282,758 282,758 282,758 282,758 282,758 282,758 282,758 282,758 282,758 282,75811.40 REGISTRO 2" UN 210,741 210,741 210,741 210,741 210,741 210,741 210,741 210,741 210,741 210,74111.41 REVENTILACIÓN 2" ML 12,812 12,812 12,812 12,812 12,812 12,812 12,812 12,812 12,812 12,81211.42 REVENTILACIÓN 3" ML 16,176 16,176 16,176 16,176 16,176 16,176 16,176 16,176 16,176 16,176

11.43 UN 128,186 128,186 128,186 128,186 128,186 128,186 128,186 128,186 128,186 128,186

11.44 UN 208,039 208,039 208,039 208,039 208,039 208,039 208,039 208,039 208,039 208,039

11.45 UN 342,383 342,383 342,383 342,383 342,383 342,383 342,383 342,383 342,383 342,383

11.46 ML 35,550 35,550 35,550 35,550 35,550 35,550 35,550 35,550 35,550 35,550

11.47 ML 41,147 41,147 41,147 41,147 41,147 41,147 41,147 41,147 41,147 41,147

11.48 ML 67,487 67,487 67,487 67,487 67,487 67,487 67,487 67,487 67,487 67,487

11.49 ML 52,999 52,999 52,999 52,999 52,999 52,999 52,999 52,999 52,999 52,999

11.50 ML 75,339 75,339 75,339 75,339 75,339 75,339 75,339 75,339 75,339 75,339

11.51 ML 78,888 78,888 78,888 78,888 78,888 78,888 78,888 78,888 78,888 78,888

11.52 ML 181,866 181,866 181,866 181,866 181,866 181,866 181,866 181,866 181,866 181,866

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 35,834 35,834 35,834 35,834 35,834 35,834 35,834 35,834 35,834 35,83411.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 35,977 35,977 35,977 35,977 35,977 35,977 35,977 35,977 35,977 35,97711.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 29,061 29,061 29,061 29,061 29,061 29,061 29,061 29,061 29,061 29,06111.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,896 32,896 32,896 32,896 32,896 32,896 32,896 32,896 32,896 32,896

11.57 ML 2,978 2,978 2,978 2,978 2,978 2,978 2,978 2,978 2,978 2,978

11.58 ML 4,629 4,629 4,629 4,629 4,629 4,629 4,629 4,629 4,629 4,629

11.59 GABINETE TIPO III UN 1,034,109 1,034,109 1,034,109 1,034,109 1,034,109 1,034,109 1,034,109 1,034,109 1,034,109 1,034,10911.60 GABINETE TIPO I UN 815,994 815,994 815,994 815,994 815,994 815,994 815,994 815,994 815,994 815,99411.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 1,290,650 1,290,650 1,290,650 1,290,650 1,290,650 1,290,650 1,290,650 1,290,650 1,290,650 1,290,65011.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,233,089 1,233,089 1,233,089 1,233,089 1,233,089 1,233,089 1,233,089 1,233,089 1,233,089 1,233,08911.63 VÁLVULA MARIPOSA 3" UN 669,006 669,006 669,006 669,006 669,006 669,006 669,006 669,006 669,006 669,00611.64 VÁLVULA MARIPOSA 4" UN 763,750 763,750 763,750 763,750 763,750 763,750 763,750 763,750 763,750 763,75011.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 328,856 328,856 328,856 328,856 328,856 328,856 328,856 328,856 328,856 328,856

12 INSTALACIONES ELÉCTRICAS12.1 ACOMETIDA AÉREA 10 M. PVC UN 228,791 228,791 228,791 228,791 228,791 228,791 228,791 228,791 228,791 228,79112.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 33,257 33,257 33,257 33,257 33,257 33,257 33,257 33,257 33,257 33,25712.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 40,993 40,993 40,993 40,993 40,993 40,993 40,993 40,993 40,993 40,993

TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN)

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN)

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2"

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2"

Page 354: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 44,529 44,529 44,529 44,529 44,529 44,529 44,529 44,529 44,529 44,52912.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 54,359 54,359 54,359 54,359 54,359 54,359 54,359 54,359 54,359 54,35912.6 SALIDA TELÉFONO PVC COMPLETA UN 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,30012.7 SALIDA TIMBRE PVC COMPLETA UN 36,321 36,321 36,321 36,321 36,321 36,321 36,321 36,321 36,321 36,32112.8 STRIP TELEFÓNICO 10 PARES UN 109,162 109,162 109,162 109,162 109,162 109,162 109,162 109,162 109,162 109,16212.9 SALIDA TOMA DOBLE PVC COMPLETA UN 31,438 31,438 31,438 31,438 31,438 31,438 31,438 31,438 31,438 31,438

12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 73,955 73,955 73,955 73,955 73,955 73,955 73,955 73,955 73,955 73,95512.11 SALIDA T.V PVC COMPLETA. UN 48,707 48,707 48,707 48,707 48,707 48,707 48,707 48,707 48,707 48,70712.12 SALIDA BIFÁSICA C.N. UN 28,604 28,604 28,604 28,604 28,604 28,604 28,604 28,604 28,604 28,60412.13 TABLERO PARCIAL 4 CIRCUITOS UN 82,287 82,287 82,287 82,287 82,287 82,287 82,287 82,287 82,287 82,28712.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 339,039 339,039 339,039 339,039 339,039 339,039 339,039 339,039 339,039 339,03912.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 456,274 456,274 456,274 456,274 456,274 456,274 456,274 456,274 456,274 456,27412.16 TUBERÍA PVC CONDUIT 1/2" ML 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,65312.17 TUBERÍA PVC CONDUIT 3/4" ML 3,453 3,453 3,453 3,453 3,453 3,453 3,453 3,453 3,453 3,45312.18 TUBERÍA PVC CONDUIT 1" ML 5,313 5,313 5,313 5,313 5,313 5,313 5,313 5,313 5,313 5,31312.19 TUBERÍA PVC CONDUIT 1 1/2" ML 9,543 9,543 9,543 9,543 9,543 9,543 9,543 9,543 9,543 9,54312.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 183,568 183,568 183,568 183,568 183,568 183,568 183,568 183,568 183,568 183,56812.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 58,126 58,126 58,126 58,126 58,126 58,126 58,126 58,126 58,126 58,12612.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 78,592 78,592 78,592 78,592 78,592 78,592 78,592 78,592 78,592 78,59212.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 28,000 28,000 28,000 28,000 28,000 28,000 28,000 28,000 28,000 28,00012.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,057,354 1,057,354 1,057,354 1,057,354 1,057,354 1,057,354 1,057,354 1,057,354 1,057,354 1,057,35412.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 782,584 782,584 782,584 782,584 782,584 782,584 782,584 782,584 782,584 782,58412.26 POSTE METÁLICO 6M UN 980,816 980,816 980,816 980,816 980,816 980,816 980,816 980,816 980,816 980,816

12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 445,978 445,978 445,978 445,978 445,978 445,978 445,978 445,978 445,978 445,978

12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 77,078 77,078 77,078 77,078 77,078 77,078 77,078 77,078 77,078 77,07812.29 LUMINARIA 70W SODIO UN 197,535 197,535 197,535 197,535 197,535 197,535 197,535 197,535 197,535 197,53512.30 LUMINARIA 150W SODIO UN 232,821 232,821 232,821 232,821 232,821 232,821 232,821 232,821 232,821 232,82112.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,255,560 1,255,560 1,255,560 1,255,560 1,255,560 1,255,560 1,255,560 1,255,560 1,255,560 1,255,56012.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 924,752 924,752 924,752 924,752 924,752 924,752 924,752 924,752 924,752 924,752

13 PISOS BASES13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 34,140 33,877 34,053 33,401 33,533 34,500 34,192 33,569 33,569 33,61313.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 29,091 28,828 29,003 28,352 28,484 29,450 29,143 28,520 28,520 28,56413.3 ALISTADO PARA LISTÓN M2 11,219 11,166 11,201 11,071 11,097 11,290 11,229 11,104 11,104 11,11313.4 ALISTADO PISOS 1:3, E=0.04 M2 22,827 22,299 22,651 21,348 21,611 23,545 22,930 21,684 21,684 21,77213.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 61,606 61,079 61,430 60,127 60,391 62,325 61,709 60,463 60,463 60,55113.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 20,824 21,096 21,126 21,639 21,381 21,237 21,030 20,997 21,100 20,89713.7 CONCRETO BASE GRADAS 2500 PSI M2 47,140 48,424 48,614 51,082 49,817 49,165 48,152 47,855 48,298 47,47513.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 65,867 67,922 68,226 72,175 70,150 69,107 67,487 67,011 67,719 66,40313.9 MANTO FIBERGLASS 600X1 M2 22,554 22,554 22,554 22,554 22,554 22,554 22,554 22,554 22,554 22,554

13.10 PEGANTE MORTERO-CONCRETO M2 19,325 19,325 19,325 19,325 19,325 19,325 19,325 19,325 19,325 19,32513.11 PERMA PLY 2 CAPAS M2 20,083 20,083 20,083 20,083 20,083 20,083 20,083 20,083 20,083 20,08313.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 38,611 39,767 39,937 42,159 41,020 40,433 39,522 39,254 39,653 38,91213.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 45,365 46,778 46,987 49,702 48,310 47,593 46,479 46,151 46,639 45,73413.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 66,048 68,232 68,554 72,750 70,598 69,491 67,769 67,263 68,016 66,618

Page 355: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

13.15 TRITURADO FINO 1/2 M3 70,684 82,454 81,549 101,467 92,413 85,170 77,927 82,454 88,792 74,30613.16 TRITURADO GRUESO 3/4 M3 77,154 84,822 85,640 107,434 97,709 95,500 88,516 83,230 88,645 76,268

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,288 37,183 37,253 36,993 37,045 37,432 37,309 37,060 37,060 37,077

14.2 ML 22,962 22,909 22,945 22,814 22,841 23,034 22,972 22,848 22,848 22,857

14.3 ADOQUÍN CONCRETO 6CM M2 48,773 48,510 48,686 48,034 48,166 49,133 48,825 48,202 48,202 48,24614.4 ADOQUÍN CONCRETO 8CM M2 58,173 57,910 58,086 57,434 57,566 58,533 58,225 57,602 57,602 57,64614.5 ADOQUÍN GRES PEATONAL M2 47,702 47,438 47,614 46,962 47,094 48,061 47,753 47,130 47,130 47,174

14.6 M2 52,315 52,209 52,279 52,019 52,072 52,458 52,335 52,086 52,086 52,104

14.7 GRAVILLA PARA GRADAS ML 28,961 29,031 29,056 29,133 29,065 29,183 29,047 28,969 29,035 28,893

14.8 M2 105,899 105,424 105,741 104,568 104,805 106,546 105,992 104,871 104,871 104,950

14.9 ACABADO EN GRAVILLA LAVADA M2 36,149 36,236 36,322 36,345 36,236 36,666 36,331 36,051 36,183 35,90814.10 GUARDAESCOBA EN GRANITO ML 29,741 29,741 29,741 29,741 29,741 29,741 29,741 29,741 29,741 29,74114.11 GUARDAESCOBA EN GRAVILLA ML 7,918 7,987 8,013 8,090 8,022 8,140 8,003 7,926 7,991 7,85014.12 GUARDAESCOBA PVC CARAMELO ML 7,364 7,364 7,364 7,364 7,364 7,364 7,364 7,364 7,364 7,36414.13 GUARDAESCOBA PVC CEDRO ML 9,333 9,333 9,333 9,333 9,333 9,333 9,333 9,333 9,333 9,33314.14 GUARDAESCOBA PINO CARIBE ML 7,788 7,788 7,788 7,788 7,788 7,788 7,788 7,788 7,788 7,78814.15 GUARDAESCOBA CEDRO BLANCO ML 7,776 7,776 7,776 7,776 7,776 7,776 7,776 7,776 7,776 7,77614.16 GUARDAESCOBA EN MADERA SAPAN ML 12,314 12,314 12,314 12,314 12,314 12,314 12,314 12,314 12,314 12,31414.17 GUARDAESCOBA GRES Y CERÁMICA ML 6,874 6,874 6,874 6,874 6,874 6,874 6,874 6,874 6,874 6,87414.18 LISTÓN M.H. AMARILLO M2 55,057 55,057 55,057 55,057 55,057 55,057 55,057 55,057 55,057 55,05714.19 PASO ESCALERA GRANITO ML 81,178 80,809 81,055 80,143 80,327 81,681 81,250 80,378 80,378 80,44014.20 PIRLANES ALUMINIO ML 5,765 5,765 5,765 5,765 5,765 5,765 5,765 5,765 5,765 5,76514.21 PIRLANES LADRILLO ML 24,657 24,560 24,625 24,385 24,433 24,789 24,676 24,447 24,447 24,46314.22 PISO VINILO TRÁFICO RESIDENCIAL M2 31,541 31,541 31,541 31,541 31,541 31,541 31,541 31,541 31,541 31,54114.23 PISO VINILO TRÁFICO PESADO M2 42,170 42,170 42,170 42,170 42,170 42,170 42,170 42,170 42,170 42,17014.24 PULIDA LACADA PISO MADERA M2 41,751 41,751 41,751 41,751 41,751 41,751 41,751 41,751 41,751 41,75114.25 TABLETA DE GRES 25X25 M2 37,058 36,953 37,023 36,762 36,815 37,202 37,079 36,830 36,830 36,84714.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 37,740 37,634 37,705 37,444 37,497 37,884 37,761 37,511 37,511 37,529

14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,150 8,150 8,150 8,150 8,150 8,150 8,150 8,150 8,150 8,150

14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,256 34,110 34,207 33,848 33,921 34,454 34,284 33,941 33,941 33,96514.29 JABONERA PORCELANA ACUARIO UN 14,349 14,349 14,349 14,349 14,349 14,349 14,349 14,349 14,349 14,349

14.30 UN 99,722 99,722 99,722 99,722 99,722 99,722 99,722 99,722 99,722 99,722

14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,672 7,67214.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 15,823 15,823 15,823 15,823 15,823 15,823 15,823 15,823 15,823 15,82314.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 10,632 10,632 10,632 10,632 10,632 10,632 10,632 10,632 10,632 10,63214.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 10,119 10,119 10,119 10,119 10,119 10,119 10,119 10,119 10,119 10,11914.35 REMATES BOCEL ALUMINIO ML 6,420 6,420 6,420 6,420 6,420 6,420 6,420 6,420 6,420 6,42014.36 REMATES BOCEL PORCELANA ML 6,529 6,529 6,529 6,529 6,529 6,529 6,529 6,529 6,529 6,52914.37 TAPA REGISTRO 20X20 UN 14,821 14,821 14,821 14,821 14,821 14,821 14,821 14,821 14,821 14,821

BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL)

BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA)

JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

Page 356: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

14.38 TAPA REGISTRO 6X6 UN 13,058 13,058 13,058 13,058 13,058 13,058 13,058 13,058 13,058 13,058

14.39 M2 14,445 14,445 14,445 14,445 14,445 14,445 14,445 14,445 14,445 14,445

14.40 M2 16,761 16,761 16,761 16,761 16,761 16,761 16,761 16,761 16,761 16,761

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 47,775 47,669 47,739 47,479 47,531 47,918 47,795 47,546 47,546 47,56414.42 MEDIA CAÑA EN GRANITO ML 57,963 57,963 57,963 57,963 57,963 57,963 57,963 57,963 57,963 57,96314.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,261 26,261 26,261 26,261 26,261 26,261 26,261 26,261 26,261 26,26114.44 PINTURA ACRÍLICA PARA PISOS M2 10,449 10,449 10,449 10,449 10,449 10,449 10,449 10,449 10,449 10,449

14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,941 11,941 11,941 11,941 11,941 11,941 11,941 11,941 11,941 11,941

14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 83,614 83,614 83,614 83,614 83,614 83,614 83,614 83,614 83,614 83,614

15 CIELO RASO15.1 APLIQUE YESO ML 57,605 57,605 57,605 57,605 57,605 57,605 57,605 57,605 57,605 57,60515.2 ARMADURA MADERA Y MALLA M2 26,790 26,790 26,790 26,790 26,790 26,790 26,790 26,790 26,790 26,79015.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 52,141 52,141 52,141 52,141 52,141 52,141 52,141 52,141 52,141 52,14115.4 CIELO RASO DURACUSTIC M2 51,475 51,475 51,475 51,475 51,475 51,475 51,475 51,475 51,475 51,47515.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 47,642 47,642 47,642 47,642 47,642 47,642 47,642 47,642 47,642 47,64215.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 67,670 67,670 67,670 67,670 67,670 67,670 67,670 67,670 67,670 67,67015.7 CORNISAS YESO ML 36,025 36,025 36,025 36,025 36,025 36,025 36,025 36,025 36,025 36,025

15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 75,310 75,310 75,310 75,310 75,310 75,310 75,310 75,310 75,310 75,310

15.9 MALLA CON VENA M2 10,305 10,305 10,305 10,305 10,305 10,305 10,305 10,305 10,305 10,305

16 EXCAVACIONES Y RELLENOS16.1 EXPLANACIÓN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120

16.2 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

16.4 M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

16.5 M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

16.6 M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704

16.7 M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592

16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 61,366 53,605 58,779 74,301 67,833 80,768 78,181 48,431 48,431 48,431

16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 78,387 91,836 90,802 113,563 103,217 94,941 86,664 91,836 99,079 82,525

16.10 M3 100,535 110,883 109,589 138,046 125,111 114,763 104,415 110,883 119,937 101,828

DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS)

RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

Page 357: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

16.11 AFRIMADO (NORMA INVIAS 311) M3 71,786 64,025 69,199 84,721 78,254 91,189 88,602 58,851 58,851 58,85116.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 93,285 103,633 102,339 130,796 117,861 107,513 97,165 103,633 112,687 94,57816.13 BASE GRANULAR (NORMA INVIAS 330) M3 101,176 111,524 110,230 138,687 125,752 115,404 105,056 111,524 120,578 102,469

17 APARATOS SANITARIOS

17.1 UN 220,457 220,457 220,457 220,457 220,457 220,457 220,457 220,457 220,457 220,457

17.2 UN 696,895 696,895 696,895 696,895 696,895 696,895 696,895 696,895 696,895 696,895

17.3 UN 393,635 393,635 393,635 393,635 393,635 393,635 393,635 393,635 393,635 393,635

17.4 UN 126,103 126,103 126,103 126,103 126,103 126,103 126,103 126,103 126,103 126,103

17.5 UN 156,508 156,508 156,508 156,508 156,508 156,508 156,508 156,508 156,508 156,508

17.6 UN 185,306 185,306 185,306 185,306 185,306 185,306 185,306 185,306 185,306 185,306

17.7 UN 286,672 286,672 286,672 286,672 286,672 286,672 286,672 286,672 286,672 286,672

17.8 UN 753,705 753,705 753,705 753,705 753,705 753,705 753,705 753,705 753,705 753,705

17.9 UN 234,873 234,873 234,873 234,873 234,873 234,873 234,873 234,873 234,873 234,873

17.10 UN 112,485 112,485 112,485 112,485 112,485 112,485 112,485 112,485 112,485 112,485

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 63,623 63,623 63,623 63,623 63,623 63,623 63,623 63,623 63,623 63,623

17.12 UN 186,961 186,961 186,961 186,961 186,961 186,961 186,961 186,961 186,961 186,961

17.13 UN 299,326 299,326 299,326 299,326 299,326 299,326 299,326 299,326 299,326 299,326

18 PINTURAS

18.1 M2 4,483 4,483 4,483 4,483 4,483 4,483 4,483 4,483 4,483 4,483

18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,242 2,242 2,242 2,242 2,242 2,242 2,242 2,242 2,242 2,24218.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,431 8,431 8,431 8,431 8,431 8,431 8,431 8,431 8,431 8,43118.4 BARNIZ SOBRE MUEBLES M2 32,221 32,221 32,221 32,221 32,221 32,221 32,221 32,221 32,221 32,22118.5 CARBURO SOBRE PAÑETES M2 4,340 4,340 4,340 4,340 4,340 4,340 4,340 4,340 4,340 4,34018.6 COLORPLAST FACHADA SOBRE FACHADA M2 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,70518.7 DEMARCACIÓN CON MARMOLINA ML 2,701 2,701 2,701 2,701 2,701 2,701 2,701 2,701 2,701 2,70118.8 ESMALTE SOBRE LÁMINA LINEAL ML 1,945 1,945 1,945 1,945 1,945 1,945 1,945 1,945 1,945 1,94518.9 ESMALTE SOBRE LÁMINA LLENA M2 10,079 10,079 10,079 10,079 10,079 10,079 10,079 10,079 10,079 10,079

SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA)

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR

Page 358: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

18.10 ESMALTE SOBRE MADERA LINEAL ML 3,027 3,027 3,027 3,027 3,027 3,027 3,027 3,027 3,027 3,02718.11 ESMALTE SOBRE MADERA LLENA M2 11,197 11,197 11,197 11,197 11,197 11,197 11,197 11,197 11,197 11,19718.12 ESMALTE SOBRE MARCOS LÁMINA M2 3,974 3,974 3,974 3,974 3,974 3,974 3,974 3,974 3,974 3,97418.13 ESMALTE SOBRE MARCOS MADERA M2 4,735 4,735 4,735 4,735 4,735 4,735 4,735 4,735 4,735 4,73518.14 ESTUCO M2 5,902 5,902 5,902 5,902 5,902 5,902 5,902 5,902 5,902 5,90218.15 ESTUCO (LINEAL) ML 3,633 3,633 3,633 3,633 3,633 3,633 3,633 3,633 3,633 3,63318.16 ESTUCO Y VINILO 3 MANOS M2 12,344 12,344 12,344 12,344 12,344 12,344 12,344 12,344 12,344 12,34418.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,603 7,603 7,603 7,603 7,603 7,603 7,603 7,603 7,603 7,60318.18 LACA PISOS MADERA M2 18,137 18,137 18,137 18,137 18,137 18,137 18,137 18,137 18,137 18,13718.19 LÍNEAS TRÁFICO 0.10 ML 2,090 2,090 2,090 2,090 2,090 2,090 2,090 2,090 2,090 2,09018.20 MARMOLINA SOBRE PAÑETE M2 8,853 8,853 8,853 8,853 8,853 8,853 8,853 8,853 8,853 8,85318.21 TINTILLA SOBRE MADERA LINEAL ML 2,580 2,580 2,580 2,580 2,580 2,580 2,580 2,580 2,580 2,58018.22 TINTILLA SOBRE MADERA LLENA M2 9,826 9,826 9,826 9,826 9,826 9,826 9,826 9,826 9,826 9,82618.23 VINILO SOBRE PAÑETE 2 MANOS M2 5,384 5,384 5,384 5,384 5,384 5,384 5,384 5,384 5,384 5,38418.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) 3,393 3,393 3,393 3,393 3,393 3,393 3,393 3,393 3,393 3,39318.25 WASH-PRIMER SOBRE ALUMNIO M2 16,524 16,524 16,524 16,524 16,524 16,524 16,524 16,524 16,524 16,52418.26 PINTURA EPÓXICA M2 10,152 10,152 10,152 10,152 10,152 10,152 10,152 10,152 10,152 10,15218.27 PINTURA EPÓXICA (LINEAL) ML 6,225 6,225 6,225 6,225 6,225 6,225 6,225 6,225 6,225 6,225

19 DOTACIONES DEPORTIVAS19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 3,789,505 3,789,505 3,789,505 3,789,505 3,789,505 3,789,505 3,789,505 3,789,505 3,789,505 3,789,505

19.2 UN 6,651,862 6,651,862 6,651,862 6,651,862 6,651,862 6,651,862 6,651,862 6,651,862 6,651,862 6,651,862

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 1,995,433 1,995,433 1,995,433 1,995,433 1,995,433 1,995,433 1,995,433 1,995,433 1,995,433 1,995,433

19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,592,455 5,592,455 5,592,455 5,592,455 5,592,455 5,592,455 5,592,455 5,592,455 5,592,455 5,592,455

19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,567,967 5,567,967 5,567,967 5,567,967 5,567,967 5,567,967 5,567,967 5,567,967 5,567,967 5,567,96719.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,090 2,090 2,090 2,090 2,090 2,090 2,090 2,090 2,090 2,09019.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 1,990,846 1,990,846 1,990,846 1,990,846 1,990,846 1,990,846 1,990,846 1,990,846 1,990,846 1,990,84619.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 63,846 63,846 63,846 63,846 63,846 63,846 63,846 63,846 63,846 63,84619.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,122,785 1,122,917 1,122,936 1,123,190 1,123,060 1,122,993 1,122,889 1,122,858 1,122,904 1,122,819

19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 573,621 576,918 577,225 583,378 580,302 578,543 576,082 575,810 577,102 574,518

20 INSTALACIONES RED GASES20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,323 23,323 23,323 23,323 23,323 23,323 23,323 23,323 23,323 23,32320.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 34,588 34,588 34,588 34,588 34,588 34,588 34,588 34,588 34,588 34,58820.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 42,724 42,724 42,724 42,724 42,724 42,724 42,724 42,724 42,724 42,724

20.4 ML 25,598 25,598 25,598 25,598 25,598 25,598 25,598 25,598 25,598 25,598

20.5 ML 29,282 29,282 29,282 29,282 29,282 29,282 29,282 29,282 29,282 29,282

20.6 ML 42,872 42,872 42,872 42,872 42,872 42,872 42,872 42,872 42,872 42,872

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,871 19,871 19,871 19,871 19,871 19,871 19,871 19,871 19,871 19,87120.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,959 20,959 20,959 20,959 20,959 20,959 20,959 20,959 20,959 20,95920.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,949 25,949 25,949 25,949 25,949 25,949 25,949 25,949 25,949 25,949

20.10 VÁLVULA DE BOLA GAS 1/2" UN 11,815 11,815 11,815 11,815 11,815 11,815 11,815 11,815 11,815 11,815

CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS)TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS)TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS)

Page 359: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

20.11 VÁLVULA DE BOLA GAS 3/4" UN 18,447 18,447 18,447 18,447 18,447 18,447 18,447 18,447 18,447 18,44720.12 VÁLVULA DE BOLA GAS 1" UN 27,633 27,633 27,633 27,633 27,633 27,633 27,633 27,633 27,633 27,63320.13 VÁLVULA POLIETILENO GAS 1/2" UN 164,390 164,390 164,390 164,390 164,390 164,390 164,390 164,390 164,390 164,39020.14 VÁLVULA POLIETILENO GAS 3/4" UN 169,077 169,077 169,077 169,077 169,077 169,077 169,077 169,077 169,077 169,07720.15 VÁLVULA POLIETILENO GAS 1" UN 273,985 273,985 273,985 273,985 273,985 273,985 273,985 273,985 273,985 273,98520.16 ACOMETIDA GAS 1/2" ML 226,241 226,241 226,241 226,241 226,241 226,241 226,241 226,241 226,241 226,241

21.1 INSTALACIONES RED VOZ Y DATOS21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 99,823 99,823 99,823 99,823 99,823 99,823 99,823 99,823 99,823 99,82321.2 CABLE DETECTOR LINEAL DE CALOR ML 24,920 24,920 24,920 24,920 24,920 24,920 24,920 24,920 24,920 24,92021.3 SIRENA DE 110 V UN 70,559 70,559 70,559 70,559 70,559 70,559 70,559 70,559 70,559 70,55921.4 CÁMARA CCTV UN 205,579 205,579 205,579 205,579 205,579 205,579 205,579 205,579 205,579 205,57921.5 PARLANTE-CIELO FALSO UN 40,180 40,180 40,180 40,180 40,180 40,180 40,180 40,180 40,180 40,18021.6 AMPLIFICADOR 100W UN 434,127 434,127 434,127 434,127 434,127 434,127 434,127 434,127 434,127 434,12721.7 AMPLIFICADOR 300W UN 1,076,774 1,076,774 1,076,774 1,076,774 1,076,774 1,076,774 1,076,774 1,076,774 1,076,774 1,076,77421.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 32,777 32,777 32,777 32,777 32,777 32,777 32,777 32,777 32,777 32,77721.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 172,157 172,157 172,157 172,157 172,157 172,157 172,157 172,157 172,157 172,157

21.10 TOMA PARA MICRÓFONO UN 34,017 34,017 34,017 34,017 34,017 34,017 34,017 34,017 34,017 34,01721.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 2,632 2,632 2,632 2,632 2,632 2,632 2,632 2,632 2,632 2,63221.12 SPLITERS UN 4,247 4,247 4,247 4,247 4,247 4,247 4,247 4,247 4,247 4,24721.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,248 14,248 14,248 14,248 14,248 14,248 14,248 14,248 14,248 14,24821.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 18,757 18,757 18,757 18,757 18,757 18,757 18,757 18,757 18,757 18,75721.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,843 25,843 25,843 25,843 25,843 25,843 25,843 25,843 25,843 25,84321.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 95,998 95,998 95,998 95,998 95,998 95,998 95,998 95,998 95,998 95,998

21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 25,240 25,240 25,240 25,240 25,240 25,240 25,240 25,240 25,240 25,240

21.18 BANDEJA PORTACABLES PARA RACK UN 82,737 82,737 82,737 82,737 82,737 82,737 82,737 82,737 82,737 82,73721.19 RACK 2' X 24" UN 131,987 131,987 131,987 131,987 131,987 131,987 131,987 131,987 131,987 131,98721.20 RACK 3' X 24" UN 160,657 160,657 160,657 160,657 160,657 160,657 160,657 160,657 160,657 160,65721.21 RACK 5' X 24" UN 253,665 253,665 253,665 253,665 253,665 253,665 253,665 253,665 253,665 253,66521.22 RACK 7' X 24" UN 328,649 328,649 328,649 328,649 328,649 328,649 328,649 328,649 328,649 328,64921.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 372,118 372,118 372,118 372,118 372,118 372,118 372,118 372,118 372,118 372,11821.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 223,173 223,173 223,173 223,173 223,173 223,173 223,173 223,173 223,173 223,173

21.25 UN 54,156 54,156 54,156 54,156 54,156 54,156 54,156 54,156 54,156 54,156

21.26 PATCH CORD 2M CATEGORÍA 6A UN 5,629 5,629 5,629 5,629 5,629 5,629 5,629 5,629 5,629 5,62921.27 PATCH CORD 5M CATEGORÍA 6A UN 14,306 14,306 14,306 14,306 14,306 14,306 14,306 14,306 14,306 14,30621.28 CABLE UTP CATEGORÍA 6A ML 2,616 2,616 2,616 2,616 2,616 2,616 2,616 2,616 2,616 2,61621.29 CANALETA METÁLICA 4X6 CMS ML 26,270 26,270 26,270 26,270 26,270 26,270 26,270 26,270 26,270 26,27021.30 CANALETA METÁLICA 4X10 CMS ML 27,427 27,427 27,427 27,427 27,427 27,427 27,427 27,427 27,427 27,42721.31 CANALETA METÁLICA 6X10 CMS ML 28,006 28,006 28,006 28,006 28,006 28,006 28,006 28,006 28,006 28,00621.32 CANALETA PLÁSTICA 13X7 MM ML 15,562 15,562 15,562 15,562 15,562 15,562 15,562 15,562 15,562 15,56221.33 CANALETA PLÁSTICA 20X12 MM ML 17,429 17,429 17,429 17,429 17,429 17,429 17,429 17,429 17,429 17,42921.34 CANALETA PLÁSTICA 32X12 MM ML 17,358 17,358 17,358 17,358 17,358 17,358 17,358 17,358 17,358 17,35821.35 CANALETA PLÁSTICA 40X60 MM ML 27,854 27,854 27,854 27,854 27,854 27,854 27,854 27,854 27,854 27,85421.36 SWITCH 10/100/1000 24 PUERTOS UN 376,786 376,786 376,786 376,786 376,786 376,786 376,786 376,786 376,786 376,786

SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN)

Page 360: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

21.37 SWITCH 10/100/1000 16 PUERTOS UN 238,205 238,205 238,205 238,205 238,205 238,205 238,205 238,205 238,205 238,20521.38 SWITCH 10/100/1000 8 PUERTOS UN 63,237 63,237 63,237 63,237 63,237 63,237 63,237 63,237 63,237 63,23721.39 CABLE TELEFÓNICO 2 PARES ML 1,365 1,365 1,365 1,365 1,365 1,365 1,365 1,365 1,365 1,36521.40 CABLE TELEFÓNICO 10 PARES ML 6,622 6,622 6,622 6,622 6,622 6,622 6,622 6,622 6,622 6,62221.41 CABLE TELEFÓNICO 20 PARES ML 8,874 8,874 8,874 8,874 8,874 8,874 8,874 8,874 8,874 8,87421.42 CABLE TELEFÓNICO 40 PARES ML 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,36921.43 CABLE TELEVISIÓN RG6 ML 1,676 1,676 1,676 1,676 1,676 1,676 1,676 1,676 1,676 1,67621.44 ACOMETIDA TELEFÓNICA 1/2" ML 16,070 16,070 16,070 16,070 16,070 16,070 16,070 16,070 16,070 16,07021.45 ACOMETIDA TELEFÓNICA 1" ML 24,745 24,745 24,745 24,745 24,745 24,745 24,745 24,745 24,745 24,74521.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 13,299 13,299 13,299 13,299 13,299 13,299 13,299 13,299 13,299 13,299

21.47 ML 10,883 10,883 10,883 10,883 10,883 10,883 10,883 10,883 10,883 10,883

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 488,683 488,683 488,683 488,683 488,683 488,683 488,683 488,683 488,683 488,683

CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN)

Page 361: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

URBANISMO1 ACUEDUCTO

1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 19,786 19,786 19,786 19,786 19,786 19,786 19,786 19,786 19,786 19,7861.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 65,844 65,844 65,844 65,844 65,844 65,844 65,844 65,844 65,844 65,8441.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 369,530 369,530 369,530 369,530 369,530 369,530 369,530 369,530 369,530 369,5301.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 788,610 788,610 788,610 788,610 788,610 788,610 788,610 788,610 788,610 788,6101.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 90,599 90,599 90,599 90,599 90,599 90,599 90,599 90,599 90,599 90,5991.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 550,429 550,429 550,429 550,429 550,429 550,429 550,429 550,429 550,429 550,4291.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,183,735 1,183,735 1,183,735 1,183,735 1,183,735 1,183,735 1,183,735 1,183,735 1,183,735 1,183,7351.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 9,726 9,726 9,726 9,726 9,726 9,726 9,726 9,726 9,726 9,726

1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 11,926 11,926 11,926 11,926 11,926 11,926 11,926 11,926 11,926 11,926

1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 14,913 14,913 14,913 14,913 14,913 14,913 14,913 14,913 14,913 14,9131.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 16,281 16,281 16,281 16,281 16,281 16,281 16,281 16,281 16,281 16,2811.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 19,466 19,466 19,466 19,466 19,466 19,466 19,466 19,466 19,466 19,4661.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 19,466 19,466 19,466 19,466 19,466 19,466 19,466 19,466 19,466 19,4661.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 77,347 77,347 77,347 77,347 77,347 77,347 77,347 77,347 77,347 77,3471.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 89,622 89,622 89,622 89,622 89,622 89,622 89,622 89,622 89,622 89,6221.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 277,175 277,175 277,175 277,175 277,175 277,175 277,175 277,175 277,175 277,1751.17 TEE PVC UNIÓN MECÁNICA 2" UN 104,030 104,030 104,030 104,030 104,030 104,030 104,030 104,030 104,030 104,0301.18 TEE PVC UNIÓN MECÁNICA 4" UN 171,476 171,476 171,476 171,476 171,476 171,476 171,476 171,476 171,476 171,4761.19 TEE PVC UNIÓN MECÁNICA 8" UN 758,047 758,047 758,047 758,047 758,047 758,047 758,047 758,047 758,047 758,0471.20 TEE PVC UNIÓN MECÁNICA 10" UN 873,235 873,235 873,235 873,235 873,235 873,235 873,235 873,235 873,235 873,2351.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 10,112 10,112 10,112 10,112 10,112 10,112 10,112 10,112 10,112 10,1121.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 8,965 8,965 8,965 8,965 8,965 8,965 8,965 8,965 8,965 8,9651.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 21,317 21,317 21,317 21,317 21,317 21,317 21,317 21,317 21,317 21,3171.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 85,498 85,498 85,498 85,498 85,498 85,498 85,498 85,498 85,498 85,4981.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 126,717 126,717 126,717 126,717 126,717 126,717 126,717 126,717 126,717 126,7171.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 21,005 21,005 21,005 21,005 21,005 21,005 21,005 21,005 21,005 21,0051.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 71,874 71,874 71,874 71,874 71,874 71,874 71,874 71,874 71,874 71,8741.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 105,914 105,914 105,914 105,914 105,914 105,914 105,914 105,914 105,914 105,9141.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 21,998 21,998 21,998 21,998 21,998 21,998 21,998 21,998 21,998 21,9981.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 45,232 45,232 45,232 45,232 45,232 45,232 45,232 45,232 45,232 45,2321.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 181,472 181,472 181,472 181,472 181,472 181,472 181,472 181,472 181,472 181,4721.32 UNIÓN REPARACION PVC 4" UN 52,729 52,729 52,729 52,729 52,729 52,729 52,729 52,729 52,729 52,7291.33 UNIÓN REPARACIÓN PVC 8" UN 211,029 211,029 211,029 211,029 211,029 211,029 211,029 211,029 211,029 211,0291.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 127,357 127,357 127,357 127,357 127,357 127,357 127,357 127,357 127,357 127,3571.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 360,168 360,168 360,168 360,168 360,168 360,168 360,168 360,168 360,168 360,1681.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,062,314 1,062,314 1,062,314 1,062,314 1,062,314 1,062,314 1,062,314 1,062,314 1,062,314 1,062,3141.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,569,671 1,569,671 1,569,671 1,569,671 1,569,671 1,569,671 1,569,671 1,569,671 1,569,671 1,569,671

2 ALCANTARILLADO - EXCAVACIONES2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,125 8,125 8,125 8,125 8,125 8,125 8,125 8,125 8,125 8,1252.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,659 18,659 18,659 18,659 18,659 18,659 18,659 18,659 18,659 18,6592.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,5922.4 RELLENO TIPO 1 "GRAVILLA" M3 67,678 80,516 79,529 101,255 91,380 83,479 75,579 80,516 87,430 71,628

Page 362: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

2.5 RELLENO TIPO 2 "RECEBO" M3 58,186 50,425 55,599 71,121 64,654 77,589 75,002 45,251 45,251 45,2512.6 RELLENO TIPO 4 "SUBBASE B-200" M3 73,006 65,245 70,419 85,941 79,474 92,409 89,822 60,071 60,071 60,0712.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 61,190 69,389 68,364 90,911 80,663 72,464 64,265 69,389 76,563 62,2152.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 62,268 70,626 69,582 92,566 82,119 73,761 65,403 70,626 77,940 63,3132.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 64,039 57,731 61,937 46,350 49,503 72,632 65,272 50,372 50,372 51,423

3 ALCANTARILLADO - TUBERÍA3.1 CODO 45 PVC ALCANTARILLADO 8" UN 82,432 82,432 82,432 82,432 82,432 82,432 82,432 82,432 82,432 82,4323.2 CODO 45 PVC ALCANTARILLADO 16" UN 859,519 859,519 859,519 859,519 859,519 859,519 859,519 859,519 859,519 859,5193.3 CODO 90 PVC ALCANTARILLADO 8" UN 107,737 107,737 107,737 107,737 107,737 107,737 107,737 107,737 107,737 107,7373.4 CODO 90 PVC ALCANTARILLADO 16" UN 995,214 995,214 995,214 995,214 995,214 995,214 995,214 995,214 995,214 995,2143.5 CODO 90 PVC ALCANTARILLADO 24" UN 693,425 693,425 693,425 693,425 693,425 693,425 693,425 693,425 693,425 693,4253.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,139 58,139 58,139 58,139 58,139 58,139 58,139 58,139 58,139 58,1393.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 82,146 82,146 82,146 82,146 82,146 82,146 82,146 82,146 82,146 82,1463.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,6573.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 193,656 193,656 193,656 193,656 193,656 193,656 193,656 193,656 193,656 193,656

3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 310,855 310,855 310,855 310,855 310,855 310,855 310,855 310,855 310,855 310,8553.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 82,147 82,147 82,147 82,147 82,147 82,147 82,147 82,147 82,147 82,1473.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 82,146 82,146 82,146 82,146 82,146 82,146 82,146 82,146 82,146 82,1463.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,6573.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,657 193,6573.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 310,856 310,856 310,856 310,856 310,856 310,856 310,856 310,856 310,856 310,8563.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 285,487 285,487 285,487 285,487 285,487 285,487 285,487 285,487 285,487 285,4873.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 458,079 458,079 458,079 458,079 458,079 458,079 458,079 458,079 458,079 458,0793.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 731,746 731,746 731,746 731,746 731,746 731,746 731,746 731,746 731,746 731,7463.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 45,706 45,706 45,706 45,706 45,706 45,706 45,706 45,706 45,706 45,7063.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 240,591 240,591 240,591 240,591 240,591 240,591 240,591 240,591 240,591 240,5913.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 261,827 261,827 261,827 261,827 261,827 261,827 261,827 261,827 261,827 261,8273.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 767,141 767,141 767,141 767,141 767,141 767,141 767,141 767,141 767,141 767,1413.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 43,057 42,992 43,035 42,875 42,907 43,145 43,070 42,916 42,916 42,9273.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 218,526 218,526 218,526 218,526 218,526 218,526 218,526 218,526 218,526 218,5263.25 TUBERÍA PVC ALCANTARILLADO 8" ML 36,073 36,073 36,073 36,073 36,073 36,073 36,073 36,073 36,073 36,0733.26 TUBERÍA PVC ALCANTARILLADO 10" ML 50,935 50,935 50,935 50,935 50,935 50,935 50,935 50,935 50,935 50,9353.27 TUBERÍA PVC ALCANTARILLADO 12" ML 73,419 73,419 73,419 73,419 73,419 73,419 73,419 73,419 73,419 73,4193.28 TUBERÍA PVC ALCANTARILLADO 16" ML 112,627 112,627 112,627 112,627 112,627 112,627 112,627 112,627 112,627 112,6273.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 180,829 180,829 180,829 180,829 180,829 180,829 180,829 180,829 180,829 180,8293.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 265,403 265,403 265,403 265,403 265,403 265,403 265,403 265,403 265,403 265,4033.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 335,015 335,015 335,015 335,015 335,015 335,015 335,015 335,015 335,015 335,0153.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 440,143 440,143 440,143 440,143 440,143 440,143 440,143 440,143 440,143 440,1433.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 603,809 603,809 603,809 603,809 603,809 603,809 603,809 603,809 603,809 603,809

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 UN 522,989 530,902 531,640 546,407 539,024 534,802 528,896 528,244 531,345 525,143

4.2 ML 500,052 496,693 498,933 490,631 492,311 504,629 500,710 492,773 492,773 493,334

PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

Page 363: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

4.3 UN 516,798 522,074 522,566 532,411 527,488 524,674 520,736 520,301 522,369 518,234

4.4 UN 622,053 631,944 632,867 651,326 642,096 636,819 629,436 628,621 632,498 624,745

4.5 ML 709,303 704,572 707,726 696,036 698,401 715,748 710,229 699,053 699,053 699,842

4.6 UN 604,319 611,573 612,249 625,786 619,018 615,148 609,734 609,136 611,979 606,293

4.7 SUMIDERO EN LADRILLO SL-100 UN 730,315 731,082 732,052 732,822 731,585 734,765 731,988 729,055 729,778 728,5454.8 SUMIDERO EN LADRILLO SL-250 UN 1,080,605 1,086,634 1,088,747 1,098,981 1,092,428 1,095,159 1,086,973 1,081,553 1,084,551 1,078,9724.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,539,702 1,560,272 1,562,626 1,601,457 1,581,844 1,571,080 1,555,392 1,552,505 1,560,191 1,545,212

4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,079,669 2,113,861 2,117,776 2,182,322 2,149,721 2,131,829 2,105,750 2,100,949 2,113,725 2,088,8284.11 SUMIDERO PREFABRICADO SL-100 UN 971,630 971,630 971,630 971,630 971,630 971,630 971,630 971,630 971,630 971,6304.12 SUMIDERO PREFABRICADO SL-250 UN 2,277,633 2,277,633 2,277,633 2,277,633 2,277,633 2,277,633 2,277,633 2,277,633 2,277,633 2,277,633

4.13 UN 102,399 102,262 102,354 102,015 102,083 102,586 102,426 102,102 102,102 102,125

5 ANDENES Y SARDINELES5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 43,763 43,424 43,650 42,811 42,981 44,226 43,830 43,027 43,027 43,0845.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 50,679 50,340 50,566 49,727 49,897 51,142 50,746 49,943 49,943 50,0005.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 45,680 47,029 47,228 49,820 48,491 47,807 46,744 46,431 46,896 46,0325.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 49,100 50,485 50,614 53,198 51,906 51,167 50,134 50,020 50,562 49,4775.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 49,875 51,190 51,342 53,826 52,571 51,883 50,879 50,692 51,183 50,2275.6 BORDE SEPARADOR VERDE A-170 ML 196,868 196,731 196,822 196,483 196,552 197,055 196,895 196,571 196,571 196,594

5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 14,479 14,640 14,664 14,975 14,816 14,734 14,606 14,569 14,624 14,521

5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 32,779 33,730 33,870 35,697 34,760 34,278 33,529 33,308 33,636 33,027

5.9 CAÑUELA PREFABRICADA TIPO A-120 ML 64,445 64,372 64,421 64,240 64,276 64,545 64,460 64,286 64,286 64,2995.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 436,914 436,834 437,608 436,458 436,169 440,193 437,921 435,314 435,972 434,6855.11 LOSETA PREFABRICADA A-40 M2 46,308 45,994 46,204 45,428 45,585 46,736 46,370 45,628 45,628 45,6815.12 LOSETA PREFABRICADA A-60 M2 66,619 66,305 66,515 65,739 65,896 67,047 66,681 65,939 65,939 65,992

5.13 ML 26,770 27,324 27,376 28,409 27,892 27,597 27,183 27,138 27,355 26,921

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 43,476 44,597 44,702 46,794 45,748 45,150 44,313 44,221 44,660 43,781

5.15 SARDINEL PREFABRICADO A-10 ML 76,113 77,632 77,482 81,679 79,725 78,402 76,725 77,546 78,939 76,1665.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 44,815 44,625 44,752 44,283 44,378 45,074 44,852 44,404 44,404 44,436

6 MOBILIARIO URBANO6.1 BANCA EN CONCRETO M-40 UN 114,429 115,088 115,150 116,380 115,765 115,413 114,921 114,867 115,125 114,6086.2 BANCA EN CONCRETO M-30 UN 482,597 483,520 483,606 485,329 484,468 483,975 483,286 483,210 483,572 482,8486.3 BOLARDO M-63 ALTO/HIERRO UN 174,759 174,896 174,910 175,167 175,038 174,966 174,863 174,846 174,897 174,7966.4 BOLARDO M-60 CONCRETO UN 110,964 111,755 111,829 113,305 112,567 112,145 111,554 111,489 111,799 111,1796.5 BOLARDO M-61 BAJO/CONCRETO UN 112,386 113,177 113,251 114,728 113,990 113,567 112,977 112,912 113,222 112,6016.6 BOLARDO M-62 BAJO/HIERRO UN 156,255 157,074 157,162 158,702 157,926 157,496 156,875 156,774 157,085 156,475

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO)

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI

Page 364: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

6.7 BORDE CONTENEDOR DE RAICES A-70 ML 46,014 45,754 45,927 45,284 45,414 46,368 46,064 45,450 45,450 45,4936.8 BORDILLO PREFABRICADO A-80 ML 52,463 52,172 52,366 51,646 51,792 52,859 52,520 51,832 51,832 51,8806.9 CANECA M-120 UN 242,891 242,826 242,869 242,709 242,741 242,979 242,904 242,750 242,750 242,761

6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 635,314 635,709 635,746 636,485 636,115 635,904 635,609 635,576 635,731 635,4216.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,423,610 2,423,874 2,423,899 2,424,391 2,424,145 2,424,004 2,423,807 2,423,786 2,423,889 2,423,6826.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,854,677 2,854,941 2,854,966 2,855,458 2,855,212 2,855,071 2,854,874 2,854,853 2,854,956 2,854,7496.13 CICLOPARQUEADERO M100 TIPO 1 UN 398,656 398,929 398,959 399,472 399,213 399,070 398,863 398,830 398,933 398,7306.14 CICLOPARQUEADERO M101 TIPO 2 UN 528,420 529,511 529,629 531,682 530,648 530,074 529,247 529,113 529,526 528,7146.15 BANCA EN MADERA M-50 UN 361,182 361,182 361,182 361,182 361,182 361,182 361,182 361,182 361,182 361,1826.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 182,120 182,516 182,553 183,291 182,922 182,711 182,416 182,383 182,538 182,2286.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 433,996 433,833 433,942 433,540 433,621 434,217 434,028 433,644 433,644 433,6716.18 POSTE HISTÓRICO M-131 UN 3,656,843 3,658,821 3,659,006 3,662,697 3,660,851 3,659,796 3,658,319 3,658,156 3,658,932 3,657,381

7 SEÑALIZACIÓN7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,466 1,466 1,466 1,466 1,466 1,466 1,466 1,466 1,466 1,4667.2 MARCA VIAL CON PINTURA EN FRÍO M2 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,7457.3 SEÑAL DOBLE DE CICLORUTA UN 370,421 370,353 370,398 370,229 370,263 370,515 370,435 370,273 370,273 370,2847.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 427,665 428,211 428,270 429,296 428,780 428,492 428,079 428,012 428,218 427,8127.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 248,323 248,255 248,300 248,131 248,165 248,417 248,337 248,175 248,175 248,1867.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 292,453 292,385 292,430 292,261 292,295 292,547 292,467 292,305 292,305 292,3167.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 401,819 401,751 401,796 401,627 401,661 401,913 401,833 401,671 401,671 401,6827.8 TACHAS REFLECTIVAS UN 10,435 10,435 10,435 10,435 10,435 10,435 10,435 10,435 10,435 10,435

7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 11,013 11,013 11,013 11,013 11,013 11,013 11,013 11,013 11,013 11,013

7.10 UN 42,615 42,615 42,615 42,615 42,615 42,615 42,615 42,615 42,615 42,615TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

Page 365: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1.1 201 P M3 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085 102,085

1.2 201 P M3 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343 33,343

1.3 200.1 HA 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731 1,929,731

1.4 200.2 HA 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656 659,656

1.5 201.7 M3 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744 56,744

1.6 *** M3-KM 995 995 995 995 995 995 995 995 995 995

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 M3 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472 7,472

2.2 210.2.1 M3 28,839 28,839 28,839 28,839 28,839 28,839 28,839 28,839 28,839 28,839

2.3 210.2.2 M3 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753 6,753

2.4 220.1 TERRAPLENES M3 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,975 10,9752.5 221.1 PEDRAPLÉN COMPACTO M3 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,440 9,4402.6 221.2 PEDRAPLÉN SUELTO M3 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,505 5,5052.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXI M2 341 341 341 341 341 341 341 341 341 341

2.8 230.2 M3 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096 9,096

2.9 600.1 M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

2.10 600.2 M3 47,328 47,328 47,328 47,328 47,328 47,328 47,328 47,328 47,328 47,328

2.11 600.3 M3 58,474 58,474 58,474 58,474 58,474 58,474 58,474 58,474 58,474 58,474

2.12 600.4 M3 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594 10,594

2.13 600.4 P M3 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966 25,966

2.14 600.5 M3 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078 21,078

2.15 600.5 P M3 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376 36,376

DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE MATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

Page 366: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

3 NORMA INV ESTRUCTURA DE PAVIMENTO3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,088 4,0883.2 320.1 SUBBASE GRANULAR M3 93,285 103,633 102,339 130,796 117,861 107,513 97,165 103,633 112,687 94,5783.3 330.1 BASE GRANULAR M3 101,176 111,524 110,230 138,687 125,752 115,404 105,056 111,524 120,578 102,469

3.4 365.1 M3 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536 72,536

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,119 2,1193.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064 1,064

3.7 461.1 M3 155,849 159,130 159,018 164,714 162,055 160,103 157,976 158,853 160,499 156,829

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 55,765 55,505 55,784 55,063 55,132 56,510 55,945 54,994 55,046 55,010

3.9 450.1 P M3 498,727 491,264 496,239 517,383 504,945 531,064 521,114 471,364 463,902 482,558

3.10 450.2 P M3 530,583 523,120 528,095 549,239 536,802 562,920 552,970 503,220 495,758 514,414

3.11 450.9 P M3 555,570 548,108 553,083 574,227 561,789 587,908 577,958 528,208 520,745 539,402

3.12 450.3 P M3 566,100 558,638 563,613 584,757 572,319 598,438 588,488 538,738 531,275 549,932

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 200,434 210,782 209,489 237,946 225,011 214,663 204,315 210,782 219,837 201,7283.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 191,791 202,139 200,845 229,302 216,367 206,019 195,671 202,139 211,193 193,0843.15 311.1 AFIRMADO M3 71,786 64,025 69,199 84,721 78,254 91,189 88,602 58,851 58,851 58,8513.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,606 11,851 11,832 12,246 12,058 11,907 11,757 11,851 11,982 11,6813.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,796 4,918 4,909 5,115 5,021 4,946 4,871 4,918 4,984 4,833

3.18 500.1 M3 519,242 531,194 532,960 555,929 544,150 538,088 528,665 525,893 530,016 522,360

3.19 500.1 M3 546,954 559,441 561,287 585,284 572,978 566,644 556,799 553,903 558,210 550,211

3.20 500.1 M3 565,503 578,296 580,239 604,877 592,220 585,755 575,629 572,521 576,890 568,829

3.21 *** ML 5,816 5,816 5,816 5,816 5,816 5,816 5,816 5,816 5,816 5,816

3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 80,781 89,537 88,442 112,521 101,576 92,820 84,064 89,537 97,198 81,875

4 NORMA INV OBRAS DE ARTE4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 865,522 879,078 881,083 907,136 893,775 886,899 876,210 873,066 877,742 869,0584.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 763,794 777,126 779,097 804,718 791,579 784,817 774,305 771,213 775,812 767,2714.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 800,489 814,349 816,398 843,034 829,375 822,345 811,417 808,203 812,983 804,1054.4 630 P CONCRETOS f´c =3500 psi (bases) M3 484,005 496,661 498,118 522,017 509,943 503,323 493,665 491,868 496,591 487,3944.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 572,898 586,055 587,569 612,415 599,863 592,981 582,940 581,072 585,982 576,4204.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 476,555 489,876 491,119 515,977 503,548 496,441 486,499 485,401 490,622 480,1814.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 565,153 579,001 580,293 606,135 593,214 585,826 575,490 574,349 579,776 568,9224.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 704,027 717,348 718,590 743,449 731,020 723,913 713,971 712,873 718,094 707,6534.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 491,826 505,674 506,966 532,808 519,887 512,499 502,163 501,022 506,449 495,5954.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 738,356 752,204 753,496 779,338 766,417 759,029 748,693 747,552 752,979 742,125

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA

MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO)

MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO ASFÁLTICO)

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNSELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

Page 367: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

4.11 650 P KG 8,420 8,420 8,420 8,420 8,420 8,420 8,420 8,420 8,420 8,420

4.12 650 P KG 11,351 11,351 11,351 11,351 11,351 11,351 11,351 11,351 11,351 11,351

4.13 641.1 ACERO DE PREESFUERZO TON-M 1,247 1,247 1,247 1,247 1,247 1,247 1,247 1,247 1,247 1,247

4.14 621.1 ML 1,973,013 1,973,013 1,973,013 1,973,013 1,973,013 1,973,013 1,973,013 1,973,013 1,973,013 1,973,013

4.15 621.1 P ML 3,172,616 3,195,805 3,199,233 3,243,798 3,220,944 3,209,182 3,190,899 3,185,521 3,193,520 3,178,665

4.16 621.2 M3 1,079,994 1,093,183 1,094,413 1,119,025 1,106,719 1,099,683 1,089,839 1,088,752 1,093,921 1,083,584

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 70,672 70,672 70,672 70,672 70,672 70,672 70,672 70,672 70,672 70,672

4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 266,445 268,028 268,175 271,129 269,652 268,808 267,626 267,496 268,116 266,876

4.19 632 P BARANDA METÁLICA ML 303,917 303,917 303,917 303,917 303,917 303,917 303,917 303,917 303,917 303,9174.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 12,409 12,409 12,409 12,409 12,409 12,409 12,409 12,409 12,409 12,409

4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 390,879 399,332 404,471 439,447 422,429 423,679 411,657 390,281 394,844 386,370

4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 68,240 76,996 75,902 99,981 89,036 80,280 71,524 76,996 84,658 69,3354.23 610.1 RELLENO PARA ESTRUCTURAS M3 53,721 46,557 51,333 65,661 59,691 71,631 69,243 41,781 41,781 41,7814.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 312,942 326,716 328,207 354,122 341,072 333,823 323,382 321,683 326,902 316,649

4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 305,611 316,978 317,465 341,616 329,884 322,393 313,007 313,987 319,874 308,211

4.26 630.7 M3 330,253 341,620 342,107 366,258 354,525 347,035 337,649 338,629 344,516 332,853

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 319,224 330,115 330,856 354,421 342,847 335,754 326,494 326,697 332,141 321,633

4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 343,866 354,757 355,497 379,063 367,488 360,396 351,136 351,339 356,783 346,275

4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 439,197 452,169 454,086 479,016 466,232 459,652 449,424 446,416 450,891 442,5814.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 526,492 539,978 541,971 567,888 554,597 547,757 537,124 533,997 538,649 530,0104.31 681.1 GAVIÓN M3 150,839 159,197 158,152 181,137 170,689 162,331 153,973 159,197 166,510 151,8844.32 681.1 GAVIÓN MALLA PVC M3 157,510 165,868 164,823 187,808 177,360 169,002 160,644 165,868 173,181 158,555

4.33 672.1 ML 33,944 34,740 34,858 36,388 35,603 35,200 34,572 34,387 34,662 34,152

4.34 672.1 ML 13,325 13,723 13,782 14,547 14,154 13,953 13,639 13,546 13,684 13,429

4.35 *** M2 8,156 8,156 8,156 8,156 8,156 8,156 8,156 8,156 8,156 8,156

4.36 *** M2 11,683 11,683 11,683 11,683 11,683 11,683 11,683 11,683 11,683 11,683

4.37 *** M2 15,770 15,770 15,770 15,770 15,770 15,770 15,770 15,770 15,770 15,770

4.38 *** M2 18,931 18,931 18,931 18,931 18,931 18,931 18,931 18,931 18,931 18,931

4.39 *** M2 24,347 24,347 24,347 24,347 24,347 24,347 24,347 24,347 24,347 24,347

SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO)

CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES

BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50

SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

Page 368: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

4.40 *** M2 5,611 5,611 5,611 5,611 5,611 5,611 5,611 5,611 5,611 5,611

4.41 *** M2 6,398 6,398 6,398 6,398 6,398 6,398 6,398 6,398 6,398 6,398

4.42 *** M2 6,648 6,648 6,648 6,648 6,648 6,648 6,648 6,648 6,648 6,648

4.43 *** M2 5,683 5,683 5,683 5,683 5,683 5,683 5,683 5,683 5,683 5,683

4.44 *** M2 7,266 7,266 7,266 7,266 7,266 7,266 7,266 7,266 7,266 7,266

4.45 *** M2 5,326 5,326 5,326 5,326 5,326 5,326 5,326 5,326 5,326 5,326

4.46 *** M2 7,168 7,168 7,168 7,168 7,168 7,168 7,168 7,168 7,168 7,168

4.47 *** M2 12,300 12,300 12,300 12,300 12,300 12,300 12,300 12,300 12,300 12,300

4.48 661.1 ML 320,067 320,196 320,267 320,569 320,392 320,351 320,209 320,036 320,036 320,090

4.49 660.3 ML 267,462 270,052 270,439 275,231 272,716 271,783 269,556 268,895 269,929 267,921

4.50 *** ML 632,015 632,015 632,015 632,015 632,015 632,015 632,015 632,015 632,015 632,015

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 120,105 112,643 117,618 132,543 126,324 138,761 136,274 107,668 107,668 107,668

4.52 640.1 KG 3,298 3,298 3,298 3,298 3,298 3,298 3,298 3,298 3,298 3,298

4.53 *** ML 50,538 50,538 50,538 50,538 50,538 50,538 50,538 50,538 50,538 50,538

4.54 *** ML 81,413 81,413 81,413 81,413 81,413 81,413 81,413 81,413 81,413 81,413

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 429,151 442,637 444,630 470,547 457,256 450,416 439,783 436,656 441,307 432,6694.56 682.1 P COLCHONETA RENO M3 166,459 174,817 173,772 196,757 186,309 177,951 169,593 174,817 182,130 167,5044.57 *** TRINCHO EN MADERA M2 48,306 48,306 48,306 48,306 48,306 48,306 48,306 48,306 48,306 48,306

5 NORMA INV SEÑALIZACIÓN5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 1,466 1,466 1,466 1,466 1,466 1,466 1,466 1,466 1,466 1,4665.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,7455.3 730.3 TOPE DEFENSA METÁLICA UN 68,431 68,431 68,431 68,431 68,431 68,431 68,431 68,431 68,431 68,4315.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 68,431 68,431 68,431 68,431 68,431 68,431 68,431 68,431 68,431 68,4315.5 730.1 DEFENSA METÁLICA ML 174,791 175,472 175,540 176,816 176,176 175,815 175,303 175,235 175,498 174,975

5.6 701.1 UN 10,435 10,435 10,435 10,435 10,435 10,435 10,435 10,435 10,435 10,435

6 NORMA INV MANTENIMIENTO VIAL6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 567 567 567 567 567 567 567 567 567 567

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36"

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN)

SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES

Page 369: LISTA DE PRECIOS ICCU 2013.xlsx

ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTEÍTEM DESCRIPCIÓN UNIDAD Carmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubaté

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2013)

PROVINCIA: UBATE

6.2 801.6 UN 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510 100,510

6.3 801.7 ML 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465 19,465

6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286 6,286

6.5 801.1 HA 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240 342,240

6.6 801.4 M2 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363 1,363

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,205 12,205 12,205 12,205 12,205 12,205 12,205 12,205 12,205 12,2056.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 33,027 33,027 33,027 33,027 33,027 33,027 33,027 33,027 33,027 33,0276.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 5,963 5,963 5,963 5,963 5,963 5,963 5,963 5,963 5,963 5,963

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.