    TSPi Process : Step WHO TOOL INSTRUCTIONS

    Before STRAT1 Team Leader Fi ll out the project information on the Project worksheet (Name, Team name,

    Project name, Start Date, Instructor, Cycle).

    Before STRAT1 Team Leader Enter the team member names, ini tials, phone numbers, e-mai l addresses, andfilenames for the team members workbooks in the Team worksheet.

    Before STRAT1 Team Leader Enter the role assignments on the Roles worksheet.

    STRAT1: Produce the

    Size Estimate

    Planning Manager Enter on the SUMS worksheet, the names and size estimates of all assemblies

    and parts for this cycle.

    PLAN1: Produce the

    Task Plan

    Planning Manager Click the Generate Task List button to create a default task list.

    PLAN1: Produce the

    Task Plan

    Planning Manager Revise the task list adding or deleting tasks as necessary. Then for each task,

    estimate the size where appropriate, the time, and the time for each engineer

    assigned to the task.

    PLAN1: Produce the

    Schedule Plan

    Planning Manager Enter hours per week in the Schedule template. Hours per week are based on

    the total hours for the team for each week in the schedule.

    Planning Manager Click the Update Task and Schedule Plan button on the Task Worksheet to

    generate a schedule.

    PLAN1: Quality Plan Team Before creating the quality plan, review the quality standard in the textbook.

    PLAN1: Quality Plan Quality/Process

    Manager

    Enter the planned defect injection rates for each phase on the SUMQ worksheet.

    PLAN1: Quality Plan Quality/Process

    Manager

    Enter estimated phase yields for each phase.

    PLAN1: Qual ity Plan Team Review the calculated defect removal rates and defect densities (Defects/KLOC)

    against the Quality Standard. If necessary, adjust planned time (Task worksheet),

    defect injection rates (SUMQ), or defect removal yields (SUMQ).

    PLAN: Balance

    Workload

    Planning Manager Make 1 copy of the team workbook for each engineer. Use the filename entered

    on the Team worksheet (Workbook Filename). Click the Make copies... button to

    create the copies automatically.

    PLAN: Balance

    Workload

    Each engineer Revise the tasks in the Task worksheet to reflect the individual engineers

    workload (e.g. delete task not assigned to you, and where you share an

    assignment with other engineers, set their planned hours to zero).

    PLAN: Balance

    Workload

    Each engineer Revise the schedule plan on the Schedule worksheet to reflect your available

    hours per week.

    PLAN: Balance

    Workload

    Planning Manager Load the engineers' individual worksheets and the consolidated team plan

    workbook into the same folder. Open the consolidated team plan workbook. Click

    the consolidate plan button on the Team worksheet to build a consolidated plan

    PLAN: Balance

    Workload

    All team members If necessary, reassign tasks to balance the workload and repeat the previous 3

    steps until a balanced plan is achieved. If planned times for any task change,review the quality plan and revise it if necessary.

    TSPi Process : Step WHO TOOL INSTRUCTIONS

    STRAT, PLAN, REQ,

    DES, IMP, TEST, PM

    All team members During all TSPi phases, use the time log to record data on each task. Include the

    assembly and phase for each task, the date, start time, interrupt time, stop time,

    and comments.

    REQ, DES, IMP, TEST All team members During TSPi phases REQ, DES, IMP, and TEST, use the defect log to record

    data on each defect. Include the date, number, type, assembly, phase injected,

    phase removed, fix time, fix reference, and description

    Weekly All team members Click the Update Project button on the Project worksheet to update individual

    plans. Print the Task and Schedule worksheets.

    Weekly All team members Print the Task worksheet.

    Weekly All team members Print the Schedule worksheet.

    Strate Develo ment and Plannin

    Weekl Trackin

  • 7/31/2019 LiderCalidad-Andres

    2/74

    Weekly All team members Prepare a Week report. The worksheet Week includes the planning summary

    information required for the week report.

    Weekly All team members Send a copy of your workbook to the planning manager for use in preparing the

    team's consolidated weekly report.

    Weekly Planning Manager Update consolidated team plan with the current week's data and prepare status

    reports for the weekly meeting.

    Weekly Planning Manager Load the individual engineers workbooks and the consolidated team workbookinto the same folder. Open the consolidated team workbook. Click the

    Consolidate Plans button on Team worksheet to update consolidated team plan

    with the current week's data.

    Weekly Planning Manager Select the Project worksheet and click the update project button before printing

    status reports for the weekly meeting.

    Weekly Planning Manager Print the Task worksheet.

    Weekly Planning Manager Print the Schedule worksheet.

    Weekly Planning Manager Prepare a Week report. The worksheet Week includes the planning summary

    information required for the week report.

    Weekly Planning Manager Select the Project worksheet, select the assembly SYSTEM, then select and print

    the following charts:

    -Earned Value

    -Plan vs. Actual Hours

    Weekly duringimplementation and

    testing phases

    Planning Manager Select the Project worksheet, select the assembly SYSTEM, then select and printthe following charts:

    -Defect Removal Profile

    -Quality Profile

    -Percent Defect Free

    TSPi Process : Step WHO TOOL INSTRUCTIONS

    PM All team members Follow the weekly tracking instructions to prepare and print copies of the final

    task, schedule, and week reports.

    PM All team members Select the Project worksheet and click the export button to save a copy of your

    data for the cycle.

    PM Planning Manager Follow the weekly tracking instructions to prepare and print copies of the final

    task, schedule, and week reports.

    PM Planning Manager Select the SUMP worksheet and print a SUMP form for the SYSTEM and each

    assembly

    PM Planning Manager Select the SUMQ worksheet and print a SUMQ form for the SYSTEM and each

    assembly

    PM Planning Manager Select the SUMS worksheet and print a SUMS form

    PM Planning Manager Select the Project worksheet and click the export button to save a copy of the

    consolidated team data for the cycle.

    Pro ect and C cle Postmortem

  • 7/31/2019 LiderCalidad-Andres

    3/74

    FORM

    Project!Name

    Team!B2

    Roles!B2

    SUMS!B8

    Task!A8

    Task!A8

    Schedule!C8

    Task!A8

    SUMQ!D82

    SUMQ!D55

    Team!B2

    Task!A8

    Schedule!C8

    Team!B2

    FORM

    LOGT!A7

    LOGD!A7

    Project!Name

    Task!A8

    Schedule!C8

  • 7/31/2019 LiderCalidad-Andres

    4/74

    Week!C2

    Team!A2

    Project!Name

    Task!A8

    Schedule!C8

    Week!C2

    Project!Name

    Project!Name

    FORM

    See weekly tracking

    instructions

    Project!Name

    See weekly tracking

    instructions

    SUMP!B2

    SUMQ!B2

    SUMS!B8

    Project!Name

  • 7/31/2019 LiderCalidad-Andres

    5/74

    TSPi - Project Summary

    Name Andres Roberto Alvarez Sanchez Date 12-May-12

    Project Mechanical-Review Start Date 14-May-12

    Team IngeCar Instructor Oscar Hernan Fran Weeks 4

    Assembly Cycle 1

    Version:TSPi.20041202. 2004 Addison

    Wesley .

    Today's Date

    Override

  • 7/31/2019 LiderCalidad-Andres

    6/74

  • 7/31/2019 LiderCalidad-Andres

    7/74

  • 7/31/2019 LiderCalidad-Andres

    8/74

  • 7/31/2019 LiderCalidad-Andres

    9/74

  • 7/31/2019 LiderCalidad-Andres

    10/74

  • 7/31/2019 LiderCalidad-Andres

    11/74

    Plan Actual Phase %

    Design/Code 0 0 Management and Miscellaneous

    Code Review 0 0 Launch and Strategy

    Compile Defe 1 1 Planning

    Unit Test Dde 1 1 Requirements

    Design Revie 0 0 System Test Plan

    COMPILE 3.47222222 REQ Inspection

    CODEINSP 2.77777778 High-Level Design

    UT 2.08333333 Integration Test Plan

    IT 0 HLD Inspection

    ST 0 Detailed Design

    1 Year 0 DLD Review

    Product Life 0 Test Development

    QPI 0 0 DLD Inspection

    Code

    Code Review

    Compile

    Code Inspection

    Unit Test

    Build and Integration Test

    System Test

    Documentation

    Postmortem

  • 7/31/2019 LiderCalidad-Andres

    12/74

    ID Name Initials Phone e-mail

    01 Angela Maria Arcila Ramirez AMAR 3136188300 [email protected]

    02 Leandro Muoz Murcia LMM 3137295688 [email protected]

    03 Andres Humberto Hernandez Gonz AHHG 3172284359 [email protected]

    04 Andres Roberto Alvarez Sanchez ARAS 3116453692 [email protected]

    05 Camilo Jaramillo Trujillo CJT 3008912786 [email protected]

    06

  • 7/31/2019 LiderCalidad-Andres

    13/74

    Workbook Filename

    Planned

    Tasks

    Planned

    Task

    Hours

    Planned

    Schedule

    Weeks

    LiderPlaneacion-Angela.xls

    LiderEquipo-Leandro.xls

    LiderDesarrollo-Andres.xls

    LiderCalidad-Andres.xls

    LiderSoporte-Camilo.xls

    0 0 0

  • 7/31/2019 LiderCalidad-Andres

    14/74

    Team Member Roles

    Team Leader LMM

    AMAR

    Development Manager AHHG

    CJT

    Planning Manager AMAR

    ARAS

    Quality/Process Manager ARAS

    LMM

    Support Manager CJT

    AHHG

  • 7/31/2019 LiderCalidad-Andres

    15/74

    TSPi Plan Summary - Form SUMPName Date 5/12/2012

    Team Instructor Oscar Hernan Fran

    Assembly Cycle 1

    Program Size Plan Actual

    Total Requirements Pages (SRS) 0 0Total HLD Pages (SDS)

    Total Detailed Design Lines

    Base LOC (B) 0 0

    Deleted LOC (D) 0 0

    Modified LOC (M) 0 0

    Added LOC (A) 0 0

    Reused LOC (R) 0 0

    New and Changed LOC (N) 0 0

    Total LOC (T) 0 0

    Total New Reuse LOC 0 0

    Estimated Object LOC (E)

    Upper Prediction Interval (70%)

    Lower Prediction Interval (70%)

    Time in Phase (hours) Plan Actual Actual%

    Management and Miscellaneous 1.0 0.0 0.0%

    Launch and Strategy 1.0 0.0 0.0%

    Planning 1.0 0.0 0.0%

    Requirements 12.0 0.0 0.0%

    System Test Plan 1.0 0.0 0.0%

    REQ Inspection 1.0 0.0 0.0%

    High-Level Design 0.0 0.0 0.0%

    Integration Test Plan 0.0 0.0 0.0%

    HLD Inspection 0.0 0.0 0.0%

    Detailed Design 2.0 0.0 0.0%

    DLD Review 0.0 0.0 0.0%

    Test Development 0.0 0.0 0.0%

    DLD Inspection 0.0 0.0 0.0%

    Code 4.0 0.0 0.0%

    Code Review 2.0 0.0 0.0%

    Compile 2.0 0.0 0.0%

    Code Inspection 2.0 0.0 0.0%

    Unit Test 0.0 0.0 0.0%

    Build and Integration Test 0.0 0.0 0.0%

    System Test 0.0 0.0 0.0%

    Documentation 1.0 0.0 0.0%

    Postmortem 1.0 0.0 0.0%

    Total 31.0 0.0 0.0%

    Total Time UPI (70%)

    Total Time LPI (70%)

    Defects Injected Plan Actual Actual%

    Planning 0.0 0 0.0%

    Requirements 0.0 0 0.0%

    System Test Plan 0.0 0 0.0%

    REQ Inspection 0.0 0 0.0%

    High-Level Design 0.0 0 0.0%

    Integration Test Plan 0.0 0 0.0%

    Andres Roberto Alvarez Sanchez

    IngeCar

  • 7/31/2019 LiderCalidad-Andres

    16/74

    HLD Inspection 0.0 0 0.0%

    Detailed Design 0.0 0 0.0%

    DLD Review 0.0 0 0.0%

    Test Development 0.0 0 0.0%

    DLD Inspection 0.0 0 0.0%

    Code 0.0 0 0.0%

    Code Review 0.0 0 0.0%

    Compile 0.0 0 0.0%

    Code Inspection 0.0 0 0.0%

    Unit Test 0.0 0 0.0%

    Build and Integration Test 0.0 0 0.0%

    System Test 0.0 0 0.0%

    Total Development Defects Injected 0.0 0 0.0%

    Defects Removed Plan Actual Actual%

    Planning 0.0 0 0.0%

    Requirements 0.0 0 0.0%

    System Test Plan 0.0 0 0.0%

    REQ Inspection 0.0 0 0.0%

    High-Level Design 0.0 0 0.0%

    Integration Test Plan 0.0 0 0.0%HLD Inspection 0.0 0 0.0%

    Detailed Design 0.0 0 0.0%

    DLD Review 0.0 0 0.0%

    Test Development 0.0 0 0.0%

    DLD Inspection 0.0 0 0.0%

    Code 0.0 0 0.0%

    Code Review 0.0 0 0.0%

    Compile 0.0 0 0.0%

    Code Inspection 0.0 0 0.0%

    Unit Test 0.0 0 0.0%

    Build and Integration Test 0.0 0 0.0%

    System Test 0.0 0 0.0%

    Total Development Defects Removed 0.0 0

    Acceptance Test 0.0 0

    Product Life 0.0 0

    Summary Plan Actual

    LOC/Hour 0.0

    CPI (Cost-Performance Index)

    % Reuse

    % New Reuse

  • 7/31/2019 LiderCalidad-Andres

    17/74

    o Bedoya

  • 7/31/2019 LiderCalidad-Andres

    18/74

  • 7/31/2019 LiderCalidad-Andres

    19/74

  • 7/31/2019 LiderCalidad-Andres

    20/74

    Phase Plan

    Planning 0

    Requireme 0

    System Te 0

    REQ Inspe 0

    High-Level 0

    Integration 0HLD Inspe 0

    Detailed D 0

    DLD Revie 0

    Test Devel 0

    DLD Inspe 0

    Code 0

    Code Revi 0

    Compile 0

    Code Insp 0

    Unit Test 0

    Build and I 0

    System Te 0

    Acceptanc 0

    Product Lif 0

  • 7/31/2019 LiderCalidad-Andres

    21/74

  • 7/31/2019 LiderCalidad-Andres

    22/74

    Actual

    0

    0

    0

    0

    0

    00

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • 7/31/2019 LiderCalidad-Andres

    23/74

    TSPi Quality Plan - Form SUMQName Date 5/12/2012

    Team Instructor Oscar Hernan F

    Assembly Cycle 1

    SYSTEM Percent Defect Free Actual

    In Compile 100.0%In Unit Test 100.0%

    In Build and Integration Test 100.0%

    In System Test 100.0%

    In Acceptance Test 100.0%

    In Product Life 100.0%

    Defects/Page Plan Actual

    REQ Inspection 0.00 0.00

    HLD Inspection 0.00 0.00

    Defects/KLOC Plan Actual

    DLD Review 0.00 0.00

    DLD Inspection 0.00 0.00

    Code Review 0.00 0.00Compile 0.00 0.00

    Code Inspection 0.00 0.00

    Unit Test 0.00 0.00

    Build and Integration Test 0.00 0.00

    System Test 0.00 0.00

    Total Development 0.00 0.00

    Acceptance Test 0.00 0.00

    Product Life 0.00 0.00

    Total 0.00 0.00

    Defect Ratios Plan Actual

    DLD Review/Unit Test 0.00 0.00

    Code Review/Compile 0.00 0.00

    Development Time Ratios Plan Actual

    REQ Inspection/Requirements 0.08 0.00

    HLD Inspection/High-Level Design 0.00 0.00

    Detailed Design/Code 0.50 0.00

    DLD Review/Detailed Design 0.00 0.00

    Code Review/Code 0.50 0.00

    Inspection/Review Rates Plan Actual

    REQ Inspection 0.00 0.00

    HLD Inspection 0.00 0.00

    DLD Review 0.00 0.00

    DLD Inspection 0.00 0.00

    Code Review 0.00 0.00Code Inspection 0.00 0.00

    A/FR 2.00 0.00

    Phase Yields Plan Actual

    Planning 0%

    Requirements 0%

    Andres Roberto Alvarez Sanchez

    IngeCar

  • 7/31/2019 LiderCalidad-Andres

    24/74

    System Test Plan 0%

    REQ Inspection 0%

    High-Level Design 0%

    Integration Test Plan 0%

    HLD Inspection 0%

    Detailed Design 0%

    DLD Review 0%

    Test Development 0%

    DLD Inspection 0%

    Code 0%

    Code Review 0%

    Compile 0%

    Code Inspection 0%

    Unit Test 0%

    Build and Integration Test 0%

    System Test 0%

    Acceptance Test 0%

    Process Yields Plan Actual

    % Before Compile 0% 0%

    % Before Unit Test 0% 0%

    % Before Build and Integration Test 0% 0%% Before System Test 0% 0%

    % Before Acceptance Test 0% 0%

    Defect Injection Rates (Defects Injected Per Hour) Plan Actual

    Planning 0.00

    Requirements 0.00

    System Test Plan 0.00

    REQ Inspection 0.00

    High-Level Design 0.00

    Integration Test Plan 0.00

    HLD Inspection 0.00

    Detailed Design 0.00

    DLD Review 0.00

    Test Development 0.00

    DLD Inspection 0.00

    Code 0.00

    Code Review 0.00

    Compile 0.00

    Code Inspection 0.00

    Unit Test 0.00

    Build and Integration Test 0.00

    System Test 0.00

    Defect Removal Rates Plan Actual

    Planning 0.00 0.00

    Requirements 0.00 0.00

    System Test Plan 0.00 0.00REQ Inspection 0.00 0.00

    High-Level Design 0.00 0.00

    Integration Test Plan 0.00 0.00

    HLD Inspection 0.00 0.00

    Detailed Design 0.00 0.00

    DLD Review 0.00 0.00

    Test Development 0.00 0.00

    DLD Inspection 0.00 0.00

  • 7/31/2019 LiderCalidad-Andres

    25/74

    Code 0.00 0.00

    Code Review 0.00 0.00

    Compile 0.00 0.00

    Code Inspection 0.00 0.00

    Unit Test 0.00 0.00

    Build and Integration Test 0.00 0.00

    System Test 0.00 0.00

  • 7/31/2019 LiderCalidad-Andres

    26/74

    ranco Bedoya

    Phase Yield Planning Guidelines

    Planning 0%

    Requirements 0%

  • 7/31/2019 LiderCalidad-Andres

    27/74

    System Test Plan 0%

    REQ Inspection 70% Not counting editorial comments

    High-Level Design 0%

    Integration Test Plan 0%

    HLD Inspection 70% Using state analysis, trace tables

    Detailed Design 0%DLD Review 70% Using state analysis, trace tables

    Test Development 0%

    DLD Inspection 70% Using state analysis, trace tables

    Code 0%

    Code Review 70% Using personal checklists

    Compile 50% 90+ % of syntax defects

    Code Inspection 70%

    Unit test - at < 5 defects/KLOC 90% For high defects/KLOC - 50-75%

    Integration test at < 1.0 defects/KLOC 80% For high defects/KLOC - 30-65%

    System test - at < 1.0 defects/KLOC 80% For high defects/KLOC - 30-65%

    Acceptance test - at < 1.0 defects/KLOC 65% For high defects/KLOC - 30%

    Defect Injection Rates Planning Guidelines

    Planning 0

    Requirements 0.25 Only major defects

    System Test Plan 0

    REQ Inspection 0

    High-Level Design 0.25 Only major defects

    Integration Test Plan 0

    HLD Inspection 0

    Detailed Design 0.75 Only design defects

    DLD Review 0

    Test Development 0

    DLD Inspection 0

    Code 2 All defects

    Code Review 0

    Compile 0.3 Any defects

    Code Inspection 0

    Unit Test 0.067 Any defects

    Build and Integration Test 0

    System Test 0

  • 7/31/2019 LiderCalidad-Andres

    28/74

  • 7/31/2019 LiderCalidad-Andres

    29/74

  • 7/31/2019 LiderCalidad-Andres

    30/74

  • 7/31/2019 LiderCalidad-Andres

    31/74

    TSPi Size Summary - Form SUMSName

    Team

    Date

    Instructor

    Cycle Planned Size

    ID

    Assembly, Sub-Assembly, or

    Part Name

    (A)ss

    embly

    or

    (P)art

    Parent Assembly Name

    Own

    er Size Measure Base Deleted

    Modifie

    d Added

    1 Programacion de Citas A SYSTEM AHH LOC 0 0 0 0

    2 Agenda Diaria A SYSTEM AHH LOC 0 0 0 0

    3 Gestion de Clientes A SYSTEM LMM LOC 0 0 0 0

    4 Gestion de Usuarios A SYSTEM ARA LOC 0 0 0 0

    5 Gestion de Vehiculos A SYSTEM AMA LOC 0 0 0 0

    6 Gestion de Procedimientos de A SYSTEM CJT LOC 0 0 0 0

    7 Autenticacion de Usuario A SYSTEM ARA LOC 0 0 0 0

    Andres Roberto Alvarez Sanchez

    IngeCar

    5/12/2012

    Oscar Hernan Franco Bedoya

    1

  • 7/31/2019 LiderCalidad-Andres

    32/74

    Actual Size Planned Defects Injec

    Reused

    New

    and

    Change

    d Total

    Total

    New

    Reuse Base Deleted

    Modifie

    d Added Reused

    New

    and

    Change

    d Total

    Total

    New

    Reuse

    Plannin

    g

    Require

    ments

    System

    Test

    Plan

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    33/74

    ted

    REQ

    Inspecti

    on

    High-

    Level

    Design

    Integrat

    ion

    Test

    Plan

    HLD

    Inspecti

    on

    Detaile

    d

    Design

    DLD

    Review

    Test

    Develo

    pment

    DLD

    Inspecti

    on Code

    Code

    Review

    Compil

    e

    Code

    Inspecti

    on

    Unit

    Test

    Build

    and

    Integrat

    ion

    Test

    System

    Test

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    34/74

    Actual Defects Injected

    Accept

    ance

    Test

    Product

    Life

    Planni

    ng

    Requi

    remen

    ts

    Syste

    m

    Test

    Plan

    REQ

    Inspe

    ction

    High-

    Level

    Desig

    n

    Integr

    ation

    Test

    Plan

    HLD

    Inspe

    ction

    Detail

    ed

    Desig

    n

    DLD

    Revie

    w

    Test

    Devel

    opme

    nt

    DLD

    Inspe

    ction Code

    Code

    Revie

    w

    Comp

    ile

    Code

    Inspe

    ction

    Unit

    Test

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    35/74

    Planned Defects Removed

    Build

    and

    Integr

    ation

    Test

    Syste

    m

    Test

    Accep

    tance

    Test

    Produ

    ct Life

    Planni

    ng

    Requi

    remen

    ts

    Syste

    m

    Test

    Plan

    REQ

    Inspe

    ction

    High-

    Level

    Desig

    n

    Integr

    ation

    Test

    Plan

    HLD

    Inspe

    ction

    Detail

    ed

    Desig

    n

    DLD

    Revie

    w

    Test

    Devel

    opme

    nt

    DLD

    Inspe

    ction Code

    Code

    Revie

    w

    Comp

    ile

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    36/74

    Actual Defects Removed

    Code

    Inspe

    ction

    Unit

    Test

    Build

    and

    Integr

    ation

    Test

    Syste

    m

    Test

    Accep

    tance

    Test

    Produ

    ct Life

    Planni

    ng

    Requi

    remen

    ts

    Syste

    m

    Test

    Plan

    REQ

    Inspe

    ction

    High-

    Level

    Desig

    n

    Integr

    ation

    Test

    Plan

    HLD

    Inspe

    ction

    Detail

    ed

    Desig

    n

    DLD

    Revie

    w

    Test

    Devel

    opme

    nt

    DLD

    Inspe

    ction Code

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    37/74

    Planned Time

    Code

    Revie

    w

    Comp

    ile

    Code

    Inspe

    ction

    Unit

    Test

    Build

    and

    Integr

    ation

    Test

    Syste

    m

    Test

    Accep

    tance

    Test

    Produ

    ct Life

    Manag

    ement

    and

    Miscell

    aneous

    Launch

    and

    Strateg

    y

    Plannin

    g

    Require

    ments

    System

    Test

    Plan

    REQ

    Inspecti

    on

    High-

    Level

    Design

    Integrat

    ion

    Test

    Plan

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    38/74

    Actual

    HLD

    Inspecti

    on

    Detaile

    d

    Design

    DLD

    Review

    Test

    Develo

    pment

    DLD

    Inspecti

    on Code

    Code

    Review

    Compil

    e

    Code

    Inspecti

    on

    Unit

    Test

    Build

    and

    Integrat

    ion

    Test

    System

    Test

    Docum

    entatio

    n

    Postmo

    rtem

    Manag

    ement

    and

    Miscell

    aneous

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 1 0 0 0 2 1 1 1 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 1 0 0 0 2 1 1 1 0 0 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    39/74

    ime

    Launch

    and

    Strateg

    y

    Plannin

    g

    Require

    ments

    System

    Test

    Plan

    REQ

    Inspecti

    on

    High-

    Level

    Design

    Integrat

    ion

    Test

    Plan

    HLD

    Inspecti

    on

    Detaile

    d

    Design

    DLD

    Review

    Test

    Develo

    pment

    DLD

    Inspecti

    on Code

    Code

    Review

    Compil

    e

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    40/74

    Code

    Inspecti

    on

    Unit

    Test

    Build

    and

    Integrat

    ion

    Test

    System

    Test

    Docum

    entatio

    n

    Postmo

    rtem

    Baseline

    Plan Date

    Baselin

    e Plan

    Hours

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

  • 7/31/2019 LiderCalidad-Andres

    41/74

    TSPi Task Planning Template - Form TASKName Andres Roberto Alvarez Sanchez

    Team IngeCar

    Date 5/12/2012

    Instructor Oscar Hernan Franco Bedoya

    Cycle 1

    Assembly Phase Task

    SYSTEM MGMT SYSTEM Management and Miscellaneous

    SYSTEM STRAT SYSTEM Launch and Strategy

    SYSTEM PLAN SYSTEM Planning

    SYSTEM REQ SYSTEM Use Case Model

    SYSTEM REQ SYSTEM Requirements

    SYSTEM STP SYSTEM System Test Plan

    SYSTEM REQINSP SYSTEM REQ Inspection

    Gestion de Usuarios REQ CU Specification

    Gestion de Usuarios REQ MockupGestion de Usuarios REQ Analisys Class

    Gestion de Usuarios REQ Sequence Diagram

    Gestion de Usuarios DLD Detailed Design

    Gestion de Usuarios CODE Code

    Gestion de Usuarios CR Code Review

    Gestion de Usuarios COMPILE Compile

    Gestion de Usuarios CODEINSP Code Inspection

    Autenticacion de Usuario REQ CU Specification

    Autenticacion de Usuario REQ Mockup

    Autenticacion de Usuario REQ Analisys Class

    Autenticacion de Usuario REQ Sequence Diagram

    Autenticacion de Usuario DLD Detailed Design

    Autenticacion de Usuario CODE Code

    Autenticacion de Usuario CR Code Review

    Autenticacion de Usuario COMPILE Compile

    Autenticacion de Usuario CODEINSP Code Inspection

    SYSTEM DOC SYSTEM Documentation

    SYSTEM PM SYSTEM Postmortem

  • 7/31/2019 LiderCalidad-Andres

    42/74

  • 7/31/2019 LiderCalidad-Andres

    43/74

  • 7/31/2019 LiderCalidad-Andres

    44/74

  • 7/31/2019 LiderCalidad-Andres

    45/74

    Total Plan Hours

    Reminder:

    If Size and Rate are present, estimated hours is calculated as Size / Rate

    whenever the plan is updated. To prevent calculation, size or rate must be bla

    Team

    Leade

    r

    opme

    nt

    Mana

    ger

    Planni

    ng

    Mana

    ger

    y/Proc

    ess

    Mana

    ger

    Supp

    ort

    Mana

    ger

    Total

    Resour

    ce

    Hours

    Estimate

    d Size

    Size

    Meas

    ure

    Rate

    (per

    Hr.)

    Time

    in

    Phase

    %

    Engr

    s

    Plan

    Hours Plan Date

    Plan

    Wee

    k

    Actual

    Hours

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    2 2 2.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    2 2 180 LOC 2.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    2 2 2.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    2 2 140 LOC 2.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    1 1 1.0 0.0

    31.0

    Plan Hours by Role

  • 7/31/2019 LiderCalidad-Andres

    46/74

  • 7/31/2019 LiderCalidad-Andres

    47/74

  • 7/31/2019 LiderCalidad-Andres

    48/74

  • 7/31/2019 LiderCalidad-Andres

    49/74

    Total Actual Hours

    nk.

    Actual Date

    Actu

    al

    Wee

    k

    Earne

    d

    Value

    Cumulati

    ve Plan

    Hours

    Cumula

    tive

    Plan

    Value

    Plan

    Value

    Predicted

    Date

    Plan Date +

    Current Slip

    Committed

    Date

    Baseline

    Date

    Baseline

    Plan Hours

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

    0.0

  • 7/31/2019 LiderCalidad-Andres

    50/74

  • 7/31/2019 LiderCalidad-Andres

    51/74

  • 7/31/2019 LiderCalidad-Andres

    52/74

  • 7/31/2019 LiderCalidad-Andres

    53/74

    NotesStart

    Wee

    k PHISW PHIEW

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

    0 0.0 0.0

  • 7/31/2019 LiderCalidad-Andres

    54/74

  • 7/31/2019 LiderCalidad-Andres

    55/74

  • 7/31/2019 LiderCalidad-Andres

    56/74

  • 7/31/2019 LiderCalidad-Andres

    57/74

    TSPi Schedule Planning Template - Form SCHEDULEName Andres Roberto Alvarez Sanchez

    Team IngeCar Total Task Plan Hours 31.0

    Date 5/12/2012 Total Schedule Plan Hours 31.0

    Instructor Oscar Hernan Franco Bedoya Difference 0.0

    Cycle 1

    Date Week

    Planned

    Hours

    Cumulativ

    e Planned

    Hours

    Actual

    Hours

    Cumulativ

    e Actual

    Hours

    Planned

    Value

    Cumulativ

    e Planned

    Value

    Earned

    Value

    Cumulativ

    e EV

    Predicted

    Hours

    5/14/2012 1 8.0

    5/21/2012 2 7.0

    5/28/2012 3 7.0

    6/4/2012 4 9.0

  • 7/31/2019 LiderCalidad-Andres

    58/74

    Cumulativ

    e

    Predicted

    Hours

    Predicted

    Earned

    Value

    Cumulativ

    e

    Predicted

    Earned

    Value

    Baseline

    Plan

    Hours

    Baseline

    Cumulativ

    e Plan

    Hours

    Baseline

    Plan Value

    Baseline

    Cumulativ

    e Plan

    Value

  • 7/31/2019 LiderCalidad-Andres

    59/74

    Notes

  • 7/31/2019 LiderCalidad-Andres

    60/74

    TSPi Time Recording Log - Form LOGTName Date

    Team Instructor

    Cycle

    Hours

    Assembly Phase Task Date Start Int. Stop Delta

    SYSTEM ITP SYSTEM Integration Test Plan 05/12/12 10:59:33 10:59:35 0.0

    Andres Roberto Alvarez Sanchez 5/12/2012

    IngeCar Oscar Hernan Franco

    1.0

    0.0

  • 7/31/2019 LiderCalidad-Andres

    61/74

    Comments

  • 7/31/2019 LiderCalidad-Andres

    62/74

    TSPi Defect Recording Log - Form LOGDName Date 5/12/2012

    Team Instructor Oscar Hernan Franco Bedoya

    Cycle 1

    Date Num Type Assembly Injected Removed

    Fix

    Time Fix Ref.

    1 30 Control Pacient PLAN HLD

    Andres Roberto Alvarez S

    IngeCar

  • 7/31/2019 LiderCalidad-Andres

    63/74

    Description

  • 7/31/2019 LiderCalidad-Andres

    64/74

  • 7/31/2019 LiderCalidad-Andres

    65/74

    TSPi Week Summary - Form WEEKName

    Team

    Status for Week 1 Selected Assembly

    Week Date 5/14/12 SYSTEM

    Task Hours %Change Weekly Data Plan Actual

    Baseline 0.0 Schedule hours for this week 8.0 0.0

    Current 31.0 Schedule hours this cycle to date 0.0 0.0

    %Change Earned value for this week 0.0 0.0

    Earned value this cycle to date 0.0 0.0

    To-date hours for tasks completed 0.0 0.0

    To-date average hours per week 0.0 0.0

    EV per completed task hour to date

    Consolidated Team Member Schedule Data

    Plan

    Hours

    Team Leader

    Development Manager

    Planning Manager

    Quality/Process Manager

    Support Manager

    Totals 0.0

    Development Tasks

    Completed Phase Task Resource

    Task Plan

    Hrs.

    TASKS DUE THROUGH WEEK 3

    SYSTEM MGMT SYSTEM Management and Miscellaneous 1.0

    SYSTEM STRAT SYSTEM Launch and Strategy 1.0

    SYSTEM PLAN SYSTEM Planning 1.0

    SYSTEM REQ SYSTEM Use Case Model 1.0

    SYSTEM REQ SYSTEM Requirements 1.0SYSTEM STP SYSTEM System Test Plan 1.0

    SYSTEM REQINSP SYSTEM REQ Inspection 1.0

    Gestion de Usuarios REQ CU Specification 2.0

    Gestion de Usuarios REQ Mockup 1.0

    Gestion de Usuarios REQ Analisys Class 1.0

    Gestion de Usuarios REQ Sequence Diagram 1.0

    Gestion de Usuarios DLD Detailed Design 1.0

    Gestion de Usuarios CODE Code 2.0

    Gestion de Usuarios CR Code Review 1.0

    Gestion de Usuarios COMPILE Compile 1.0

    Gestion de Usuarios CODEINSP Code Inspection 1.0

    Autenticacion de Usuario REQ CU Specification 2.0

    Autenticacion de Usuario REQ Mockup 1.0

    Autenticacion de Usuario REQ Analisys Class 1.0

    Autenticacion de Usuario REQ Sequence Diagram 1.0

    Autenticacion de Usuario DLD Detailed Design 1.0

    Autenticacion de Usuario CODE Code 2.0

    Autenticacion de Usuario CR Code Review 1.0

    Autenticacion de Usuario COMPILE Compile 1.0

    Autenticacion de Usuario CODEINSP Code Inspection 1.0

    SYSTEM DOC SYSTEM Documentation 1.0

    Andres Roberto Alvarez Sanchez

    IngeCar

  • 7/31/2019 LiderCalidad-Andres

    66/74

    SYSTEM PM SYSTEM Postmortem 1.0

  • 7/31/2019 LiderCalidad-Andres

    67/74

    Date 5/12/12

    Instructor Oscar Hernan Franco Bedoya

    Cycle 1

    Plan /

    Actual

    Plan -

    Actual

    8.0 Baseline 1/0/00

    0.0 Plan 1/0/00

    0.0 Predicted

    0.0

    Actual

    Hours

    Plan

    Value

    Earned

    Value

    0.0 0.0 0.0

    Task

    Actual

    Hrs.

    Earned or

    Plan

    Value

    Plan vs.

    Actual

    Hrs.

    Baseline

    or

    Committe

    d Date Plan Date Slip Date

    Predicted

    Date

    Actual

    Date

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    0.0 12:00:00 a.m.

    Project End Date

  • 7/31/2019 LiderCalidad-Andres

    68/74

    0.0 12:00:00 a.m.

  • 7/31/2019 LiderCalidad-Andres

    69/74

    TSPi Issue/Risk Tracking Log - Form IRTLName Date 5/12/2012

    Team tructor Oscar Hernan Franco Bedoya

    Cycle 1

    Issue or

    Risk

    Number

    R=Ris

    k

    I=Issu

    e

    Date

    Created

    P=Per

    sonal

    T=Te

    am

    Likeli

    hood

    (H,M,

    L)

    Impac

    t

    (H,M,

    L) Owner

    Follow-up

    Date Description

    Andres Roberto Alvarez Sanchez

    IngeCar

  • 7/31/2019 LiderCalidad-Andres

    70/74

    Current Status

    Date Status

    Changed

  • 7/31/2019 LiderCalidad-Andres

    71/74

    TSPi Issue Risk Week Summary - Form IRWEEKName Date 5/12/2012

    Team Team Oscar Hernan Franco Bedoya

    Week 1 Cycle 1

    Issue/Risk

    Number

    P=Per

    sonal

    T=Tea

    m

    R=Ris

    k

    I=Issu

    e Description Status

    Andres Roberto Alv

    IngeCar

  • 7/31/2019 LiderCalidad-Andres

    72/74

    Type Description

    10 Documentation

    20 Syntax

    30 Build, Package

    40 Assignment

    50 Interface60 Checking

    70 Data

    80 Function

    90 System

    100 Environment

  • 7/31/2019 LiderCalidad-Andres

    73/74

    Parameter Value Description

    Design/Code Time 100% Design time as % of coding time

    Code Review Time 50% Code review time as % of code time

    Compile Defects/KLOC 10 Compile defects/KLOC

    Unit Test Ddefects/KLOC 5 Unit test defects/KLOC

    Design Review Time 50% Design review time as % of design time

  • 7/31/2019 LiderCalidad-Andres