Occupational Health And Safety Act LEGAL COMPLIANCE OFALL HAZARDOUS LOCATIONS IN TERMS OF THE OCCUPATIONAL HEALTH AND SAFETY ACT Presented by: MEL WILMANS Hazardous Locations Consultant Act 85 of 1993

Transcript of LEGAL COMPLIANCE - flp.co.za Presentations/2011... · O c c u p a t i o n al H e a l t h An d S a f...

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

LEGAL COMPLIANCEOFALL

HAZARDOUS LOCATIONSINTERMS OF THE

OCCUPATIONAL HEALTH AND SAFETY ACT

Presented by: MEL WILMANSHazardous Locations Consultant

Act 85 of 1993

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

TOPICS• A.) INTRODUCTION

• B.) HAZLOC LEGAL REQUIREMENT i.t.o OHS Act. (Act 85 of 1993)

• B.1) Act (Definitions)• B.2) Responsibilities

• C.) CERTIFICATE OF COMPLIANCE (E.I.R.)• C.1) History of the C.o.C• C.2) Authority for issuing the C.o.C (as per SANS 10142-1 Annex P)• C.2) What is a certificate of compliance ?• C.3) Why must a C.o.C be issued ?• C.4) When must it be issued ?• C.5) What supporting documentation must submitted with certificate?• C.6) Who can issue the C.o.C ?• C.7) Record keeping

• D.) INSPECTIONS - HAZLOC (PLANT) (E.M.R. Section 8 and SANS10086-1)

• D.1) Management actions• D.2) Plant

• E.) SERIOUS CONCERNS (Limitations with legislation)• E.1) Engineering Staff• E.2) Registered persons• E.3) Registered M.I.E’s

• F.) SUMMARY / CONCLUSION

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

T H E C O M P L I A N C E O F A NE L E C T R I C A L I N S TA L L AT I O N

I S T H E OW N E R ’ SR E S P O N S I B I L I T Y ( E . I . R 2 0 0 9 ) .

T H I S AC C O U N TA B I L I T YC A N N OT B E H A N D E D O R

D E L I G AT E D T O S U B - O R D I N AT E S

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

OCCUPATION HEALTH

AND SAFETY ACT

OCCUPATION HEALTH

AND SAFETY ACT(Act 85 of 1993)

IN TERMS OF

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

- Section 39 of the ACT

MUST PROVE, by having

RECORDS, of

COMPLIANCE

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

ELECTRICALINSTALLATION

REGULATION

ELECTRICALINSTALLATION

REGULATIONWiring of premises (2009)

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

“point of consumption”

D E F I N I T I O N S

“point of control”

“point of outlet”

“point of supply”

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

B.2) RESPONSIBILITY

(1) The user or the lessor of theelect r ica l insta l la t ion, as the case maybe, shal l be responsib le for the safety ,

safe use and maintenance of theelect r ica l insta l la t ion he or she uses or

leases and, except for work aspermi t ted in regulat ion 11 (3) , shal l not

tamper with or al low any tamperingon any insta l la t ion whether or not acer t i f icate of compl iance has been

issued

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

B.2) RESPONSIBILITY

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

B.2) RESPONSIBILITY

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

Cable gland Ex e,but motor Ex d ???

Name platemissing

Open entryhole

Dent on cooling fanrestrict air flow

GENERAL CONDITIONUNSAFE FOR USE

Manufacturer ID plate (noinformation)

FLAMEPATH ?

Rust

Cover bolt missing

PROOF THAT NOINSPECTIONS , ORPROPER CLEANINGWERE EVER DONE ONUNIT

UNIT INSTALLEDIN A ZONE 21

LOCATION

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

IN SHORT:

Each user of an electr icalinstal lat ion is RESPONSIBLE for the

safe use and maintenance, of theinstal lat ion under his/her control ,

and WILL have a VALID cert i f icate ofcompliance for every such

instal lat ion.

B.2) RESPONSIBILITY

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

OF ALL PERSONS INVOLVED IN HAZLOC PROCESS

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

MANAGEMENT ( A N D / O R G M R 2 . 1 )

SYSTEM ENGINEER ( R E S P O N S I B L EP E R S O N )

REGISTERED PERSON (S) M . I . E ’ S

ENGINEERING , MAINTENANCE ANDOPERATING STAFF

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

• Enforcement and maintaining of a l llegal requirements

• Area classi f icat ion Approval

• Personnel (Training, Appointments)

• Budget

• Lead by example

MANAGEMENT ( and/or GMR 2.1)

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

• All Plants ( ful ly compliant)

• Documentation and Certi f icate ofcompliance (per area)

• All modif icat ions wel l control led

• Inspection and maintenanceschedules in place

• Regular feedback to management

• Development and implementation ofprocedures and standards

SYSTEM ENGINEER (R.Person)

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

• Test and issuing of C .o.C’s

• Assist with area c lassi f icat ions

• Inspections (al l types)

• Involved in plant maintenance

• Supervise / Control e lectricalmodif icat ions

REGISTERED PERSON(s) M.I.E’s

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

• Design approved modif icat ions

• Preser vat ion of documentat ion andcert i f i cat ions

• Mainta in standards & requirements

• Electronic capture of lega ldocumentat ion

• Operate p lant as per OEM requirements

Engineering, Maintenance andOperating staff

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

OHS Act and Codes of

Practice

OHS Act and Codes of

Practice(Act 85 of 1993)

IN TERMS OF

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

C.) Certificate of Compliance - Section 9

C.4) Process for issuing a C.o.C

C.6) Why is a C.o.C needed ?

C.9) Who may issue a C.o.C ?C.8) What documents must support the C.o.C ?

C.10) When can a C.o.C be issued ?

C.7) What test is required to issue a C.o.C ?

C.11) C.o.C on a low energy(IS) system ?

C.2) Owner responsibility

C.5) What does the C.o.C consist off?

C.1) History of the C.o.C

C.3) What is a C.o.C ?

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

E.I.R of 1992 introduced the new C.o.C, single page, also The introduction of the ‘new accredited person’ or also known as

the wireman Responsibility shift from municipality inspectors to accredited

persons, but.. Window period of 2 years to register for new M.I.E’s to fill gap,

C.1) History of C.o.C

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

The requirements for the FIRST Master Installation Electricianswas:

• Registered Installation electrician for 2 years• Proof of experience (5 years) in hazloc environment• Letter from employer to validate experience in classified plants• ?????

C.1) History of C.o.C (cont.)

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

( 1 . ) S u b j e c t t o t h e p r o v i s i o n s o fs u b - r e g u l a t i o n ( 3 ) e v e r y u s e r o r

l e s s o r o f a n e l e c t r i c a l i n s t a l l a t i o n ,a s t h e c a s e m a y b e , s h a l l h a v e a n

o r i g i n a l v a l i d c e r t i f i c a t e o fc o m p l i a n c e i n t h e f o r m o f a n n e x u r e4 , w h i c h s h a l l b e a c c o m p a n i e d b y at e s t r e p o r t i n t h e f o r m a t a p p r o v e d

b y t h e c h i e f i n s p e c t o r , i n r e s p e c t o fe v e r y s u c h e l e c t r i c a l i n s t a l l a t i o n :

C.2) Owner Responsibility

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

I t ’ s a d e c l a r a t i o n o fs a f e t y i s s u e d b y a

c o m p e t e n t ( r e g i s t e r e d )p e r s o n i n t e r m s o f t h ei n s t a l l a t i o n h e / s h e i s

r e s p o n s i b l e a f t e re l e c t r i c a l i n s t a l l a t i o n

w o r k w a s d o n e .

C.3) What is a C.o.C ??

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

C.4) C.o.C Process

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

T Y P E o f I N S T A L L A T I O N

EXISTING PLANT

Conduct detailed Risk Assessment (followclassification process). Does the RAconstitutes that the plant MUST beclassified in terms of SANS 10108

NEW PLANT

Conduct C.o.C required testing and completedocumentation, complete with TEST REPORT

Have certified Ex Equipment been installed

Ex Equipment in order (all with valid certifiedcertificates, documentation)

NO

Replace non-approved equipmentwith certified type;

all repairs /replacements must

be in line withstandards and

installed bycompetent staff

Apply rules fornormal

electricalinstallations..

HAZLOC Committeeto classify by applyingClassification Process

to required Zoning,and has managementapprove classification

of areasHave all non-compliances be rectified and is the plant

ready to be tested to have a VALID C.o.C issued

Compile all documentation (drawings, test certificates, OEMinstructions, inspection schedules.) per area, into plant file

NO

BUT, never inspected - Re-certify ExEquipment or replace with new approved type

YESAre VALID C.o.C’sissued & available @all points of control

Have all HIGH risk areas been classified, andbeen approved by Management

NOYESYES

YESYES

NO

YES

YES

NO

NO

Plant owner can relax for now, but compliance status MUST bemaintained, by regular inspections, and by competent staff.

All modifications MUST also be well managed and documented

NO

NO

YES

NO

YES

YES

NOTE:

Inform managementabout the risk of

possible explosionsand their

responsibilities

NO

Planned inspections program developedand linked to maintenance system

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

T Y P E o f I N S T A L L A T I O N

EXISTING PLANT

Conduct detailed Risk Assessment (follow classification process), onthe new plant taking into account, the possibility of an uncontrolled

explosion happening..

Does the RA constitutes that the plant MUST be classified in terms ofSANS 10108

NEW PLANT

Conduct C.o.C required testing and completedocumentation, complete with TEST REPORT

Ex Equipment in order (all with valid certificates, testreports, etc.)

Refer back tosuppliers. Replace un-approved equipmentwith certified type, allrepairs / replacements

must be in line withapplicable standards

Apply rules for normalelectrical installations..

HAZLOC Committee toclassify by applying

Classification Processto required Zoning,

and has managementapprove classification

of areasHave all non-compliances be rectified and is the plantready to be tested to have a VALID C.o.C issued

Compile all documentation (drawings, test, IAcertificates, OEM instructions, inspection

schedules.) per area, into plant file

YES

Have all possible HIGH risk areasbeen classified, and approved by

Management

NOYESYES

YES

NO

YES

YES

NO

NO

NO

YES

NO

NOTE:

Inform management about the risk ofpossible explosions and their

responsibilities

NO

YES

Plant owner can relax for now, but compliance status MUST bemaintained, by regular inspections, and by competent staff.

All modifications MUST also be well managed and documented

Planned inspections programdeveloped and linked to

maintenance system

Will approved Ex Equipment been installed, as perengineering specifications

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

Section 1 – Location (physical details)

Section 2 – Installation (technical info)

Section 3 - Description of Installation (quantities)

Section 4 - Inspection and Testing

Section 5 – Responsibility (design, material, construction, MIE)

C.5) Info on C.o.C

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

It’s a legal requirement, issued by a registered person

Ensure compliance of the electrical installation

Peace of mind for management to maintain safety integrity

Electrical Supplier may request it (Eskom, Municipality, etc)

Basic principle for a safe electrical environment

Chief Inspector of Machineries prescribed format of proof

C.6) Why a C.o.C ?

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

Back to basics:

OHM’s LAW

C.7) What tests?

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c tO c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

Earth ing and bonding (Test 1 & 2)

Ear th fau l t loop impedance (Test 4)

Insulat ion Resis tance (Test 7)

Vol tages (no load, fu l l load, fur thestconnect ion) (Test 8 ,9,10)

Vol tage Neutra l to Ear th (Test 5)

C.7) What tests are required?

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

The test report (as required by the E.I.R)

The calibration certificates of all used test equipment

Additional certificate (section 8.8.2) for a hazardous location

The attached Hazloc classification report & approval

All installed equipment’s OEM certification & local IA certification

Detail scope of project or upgrade (modification)

All supporting documentation (drawings, schematics)

The M.I.E’s proof of registration @ D.o.L

C.8) Supporting documents?

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c tO c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

O N LY a c o m p e t e n tp e r s o n r e g i s t e r e d a s aM . I . E a n d a p p o i n t e d b yt h e C h i e f I n s p e c t o r o f

M a c h i n e r y

C.9) Who can issue?

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

When the M.I.E is satisfied and confirmed that all defectshave been cleared, and accepted by the owner

When all documentation have been obtained

All test results within required values

The installation adhered to the requirements of therequired codes of practice,

All IS loops have been approved and verified

C.10) When ?

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

A C . O . C . w i l l b e n o t b e r e q u i r e d f o r t h ef o l l o w i n g c a s e s , b u t t a k e n o t e o f t h e

s p e c i f i c c o m p e t e n c e r e q u i r e m e n t s i ne a c h c a s e f o r h a z a r d o u s l o c a t i o n s .

C.11) C.o.C on low energy systems

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

4 - 2 0 m A I n t r i n s i c s a f e E x i ( o r E xe , d , n , m , p , e t c ) l o o p s i n t o h a z a r d o u sl o c a t i o n s ( Z o n e 0 , 1 , 2 , o r 2 0 , 2 1 , 2 2 )N o C O C r e q u i r e d , b u t i n s t a l l a t i o na n d d o c u m e n t a t i o n m u s t b e s i g n e do f f b y a p e r s o n c o m p e t e n t i nH a z a r d o u s l o c a t i o n s , a n d n o r m a lQ A / Q C .

4 - 2 0 m A n o n - I S l o o p s i n t o s a f e a r e a -N o C O C r e q u i r e d , n o r m a l Q A / Q C .

C.11) C.o.C on l.e systems (cont.)

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

2 4 V D C ( o r a n y o t h e r l o w e r t h a n 5 0 V )i n s t r u m e n t l o o p s ( e . g . S o l e n o i d s ) i n t oh a z a r d o u s a r e a

- N o C O C r e q u i r e d , b u t i n s t a l l a t i o na n d d o c u m e n t a t i o n m u s t b e s i g n e do f f b y a p e r s o n c o m p e t e n t i nH a z a r d o u s l o c a t i o n s , a n d n o r m a lQ A / Q C .

2 4 V D C ( o r a n y o t h e r l o w e r t h a n5 0 V ) i n s t r u m e n t l o o p s ( e . g .S o l e n o i d s ) i n t o s a f e a r e a

- N o C O C r e q u i r e d , n o r m a l Q A / Q C

C.11) C.o.C on l.e systems (cont.)

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

1 1 5 V A C ( o r a n y o t h e r h i g h e r t h a n5 0 V ) i n s t r u m e n t l o o p s ( e . g . s o l e n o i d s )i n t o h a z a r d o u s a r e a

- C O C r e q u i r e d w i t h H a z a r d o u sL o c a t i o n a d d i t i o n a l f o r m s i g n e d o f fb y a M a s t e r I n s t a l l a t i o n E l e c t r i c i a n( r e g i s t e r e d w i t h t h e D O L ) , a n dn o r m a l Q A / Q C .

1 1 5 V A C ( o r a n y o t h e r h i g h e r t h a n5 0 V ) i n s t r u m e n t l o o p s ( e . g . s o l e n o i d so r E / I i n t e r f a c e ) i n t o s a f e a r e a- C O C r e q u i r e d , a n d n o r m a l Q A / Q C .

C.11) C.o.C on l.e systems (cont.)

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

2 4 V D C , 1 1 5 V A C ( o r a n y o t h e r ) p o w e rs u p p l y f e e d i n t o h a z a r d o u s a r e a- C O C r e q u i r e d w i t h H a z a r d o u sL o c a t i o n a d d i t i o n a l f o r m s i g n e d o f f b ya M . I . E ( r e g i s t e r e d w i t h t h e D O L ) , a n dn o r m a l Q A / Q C .

2 4 V D C o r 1 1 5 V A C ( o r a n y o t h e r )p o w e r s u p p l y f e e d i n t o s a f e a r e a- C O C r e q u i r e d a n d n o r m a l Q A / Q C . "

C.11) C.o.C on l.e systems (cont.)

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

ELECTRICALMACHINERY

REGULATION

ELECTRICALMACHINERY

REGULATIONS E C T I O N 9 - - E l e c t r i c a l M a c h i n e r y i n H a z a r d o u s L o c a t i o n s

( 2 0 1 1 )

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

ELECTRICAL MACHINERY REGULATION

Regulation 9.1 - Classification of potential areas– I d e n t i f y a l l p o t e n t i a l a r e a s– M a n a g e m e n t t o a p p r o v e c l a s s i f i c a t i o n

Regulation 9.8 - Inspection period– I n s p e c t e d a n d Te s t e d n o t e x c e e d i n g 2 4 m o n t h s o r

l e s s , a s r e q u i r e d

Regulation 9.9 - Competency and Records– C o m p e t e n t p e r s o n– T e s t c e r t i f i c a t e s , s c o p e o f w o r k , a r e a

c l a s s i f i c a t i o n , u p d a t e d p l a n t l a y - o u td r a w i n g s , a l l c e r t i f i e d e q u i p m e n tl i s t e d i n r e c o r d b o o k a n d t h eC e r t i f i c a t e o f c o m p l i a n c e f o r t h ei n s t a l l a t i o n

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

APPLICABLE CODES OF PRACTICE

SANS 10108 of 2007 (Ed 6)The c lass i f i cat ion of Hazardous Locat ions

SANS 60079 – 10-1 of 2008E lectr ica l equipment for explos ive gasatmospheres

SANS 1086 – 1 of 2003The insta l lat ion inspect ion and maintenanceof equipment used in explos ive atmospheres

SANS 10142 – 1 of 2006(Amdt 7)The wir ing of premises

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

SANS 10086 - 1SANS 10086 - 1T h e i n s t a l l a t i o n , i n s p e c t i o n a n d m a i n t e n a n c e o f

e q u i p m e n t u s e d i n ex p l o s i ve a t m o s p h e re s

Pa r t 1 : I n s t a l l a t i o n s i n c l u d i n g s u r f a c ei n s t a l l a t i o n s o n m i n e s

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

SECTION 1 SCOPE:T h e s t a n d a r d c o v e r s t h e

i n s t a l l a t i o n , i n s p e c t i o n a n dm a i n t e n a n c e o f e l e c t r i c a l a n d

m e c h a n i c a l e q u i p m e n t t o b e u s e d i na p p l i c a t i o n s i n c l u d i n g s u r f a c e

i n s t a l l a t i o n s o n m i n e s , i na t m o s p h e r e s t h a t m i g h t b e e x p l o s i v e

b e c a u s e o f t h e p r e s e n c e o f g a s e s ,v a p o u r s , m i s t , d u s t s o r f i b r e s t h a ta r e f l a m m a b l e i n t h e p r e s e n c e o f

a t m o s p h e r i c o x y g e n .

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

SECTION 12 INSPECTION & MAINTENANCEOF ELECTRICAL INSTALLATIONS IN

HAZARDOUS LOCATIONS :

S e c t i o n 1 2 . 1 . 1 D O C U M E N TAT I O N

S e c t i o n 1 2 . 1 . 2 Q UA L I F I C AT I O N O F P E R S O N N E L

S e c t i o n 1 2 . 1 . 3 I N S P EC T I O N S

S e c t i o n 1 2 . 1 . 1 0 G E N E R A L G U I DA N C E N OT E S TO T H EI N S P EC T I O N S C H E D U L E S

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

SECTION 12.1.1 DOCUMENTATION:

Up to date details of the following items shall be available:

a.) the classification of hazardous areas (see SANS 10108);(REPORT, DRAWINGS)

b.) the equipment group and temperature class;

c.) sufficient records to enable explosion-protected equipmentto be maintained in accordance with its type of protection (for

example, list and location of equipment, spares, technicalinformation); and

d.) the route of underground cables.

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

SECTION 12.1.2 QUALIFICATION OF PERSONNEL:

The inspect ion and maintenance o finsta l l a t ions sha l l be carr ied out on ly bycompetent personne l whose tra in ing hasinc luded instruct ion on the var ious types

of protect ion and insta l l a t ion pract ice ,re levant ru les and regu lat ions and the

genera l pr inc ip les o f area c lass i f i cat ion .

Appropr iate re fresher tra in ing sha l l beg iven to such personne l on a regu lar

bas i s .

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

SECTION 12.1.3 INSPECTIONS:Before plant or equipment in a

hazardous area is brought into service ,it shal l be given an init ia l inspection

and shal l subsequently be re- inspectedperiodical ly to ensure that theinstal lat ion is maintained in a

condit ion that is sat is factory forcontinued use

12.1.3.2 Types of inspection

12.1.3.3 Grades of inspection

Initial, Periodic, Sample and Special

Visual, Close & Detailed

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

SECTION 12.1.10 GENERAL GUIDANCE NOTESTO THE INSPECTION SCHEDULES:

a.) Equipment that is appropriate to area classification:b.) Equipment group is correct:c.) Equipment maximum surface temperature is correct:d.) Equipment circuit identificatione.) Cable entry devices.f.) Type of cable is appropriateg.) Sealing (trunking, ducts, pipes or conduits)h.) Overcurrent (protection):i.) Warning devices and signs

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

STAFF LIMITATIONSIN TERMS OF THE ELECTRICAL INSTALLATION REGULATIONS (2009)

FACTS !

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

Do not understand information required for a VALID C.o.C

Have never witnessed the required test conducted by acontractor, to validate the results !

Has never seen the new C.o.C format (six page)

Never read or understands the new EIR or the SANS 10142-1 Code

Their responsibility is un-known i.t.o the new regulation(especially in the electrical field)

Has never attended any training in this field (or practical's)

Don’t know that an A.I.A, or Competent Person MUST beappointed on all new installation above 25 kVA

E.1) Engineering StaffL I M I T A T I O N S - A B I L I T Y – A T T I T U D E - C O M M I T M E N T

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

Do not understand information required for a VALID C.o.C Don’t know what test results must be obtained, in order to

issue a VALID C.o.C Doesn’t have the correct calibrated test equipment to conduct

the required tests Never read or understand the new EIR or the SANS 10142-1 Code Doesn’t know their responsibility i.t.o the new regulations

Has never attended any training in this field (or practical's) Skill’s transfer does not happen….(WHY ??)

E.2) Registered Persons

Don’t know that an A.I.A, or Competent Person MUST beappointed on all new installation above 25 kVA

L I M I T A T I O N S - A B I L I T Y – A T T I T U D E - C O M M I T M E N T

Currently registered MIE’s and actively involved in industry only 5%

Not obliged to attended any (frequent) training sessions tostay abreast with new legislation or amendments to the codes

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

Have no future in their field of expertise – no professionalstatus (ECA)

E.3) Potential M.I.E’sL I M I T A T I O N S - A B I L I T Y – A T T I T U D E - C O M M I T M E N T

FINALLYNOT ENOUGH M.I.E’s FOR THE MASSIVE WORK LOAD !!!

Current D.o.L registration brochure limits the registration ofnew M.I.E’s, who is capable, highly skilled and experienced

What image does the MIE project in industries

Where should the focus be = technical qualification orpractical ability

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

SUMMARYSUMMARY

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

CONCLUSIONUnderstand the legal requirements and adhere to it, as

soon as possible. (Ensure all required systems in place)

Conduct detailed RISK ASSESSMENT’s to ID areas ofconcern, and classify accordingly

Compile all proof of compliance documentation (meetings,plant walkdowns, inspections, reports, audits etc.)

Train, appoint and equip competent staff

Ensure full compliance by having valid C.o.C’s for all points ofcontrol (Db’s) for normal and specialized electrical installations.

Appoint effective competent people to maintain YOUR plants

Maintain your legal compliance responsibly. . . .

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

O c c u p a t i o n a l H e a l t h A n d S a f e t y A c t

Thank-you very much !

My Contact details:

Cell : 082 895 6741

Fax : (086) 658 8404

E-mail : [email protected]