LAMPIRAN 1.Biaya Variabel - eprints.undip.ac.ideprints.undip.ac.id/57653/8/Lampiran.pdfLampiran 3....
-
Upload
hoangxuyen -
Category
Documents
-
view
244 -
download
0
Transcript of LAMPIRAN 1.Biaya Variabel - eprints.undip.ac.ideprints.undip.ac.id/57653/8/Lampiran.pdfLampiran 3....
42
LAMPIRAN
Lampiran 1. Rincian Biaya dan Penerimaan Usaha Budidaya Jamur Tiram Siklus
Tanam Pertama Tahun 2014
Uraian Volume Harga Satuan Jumlah
-----------------------Rp---------------------
1.Biaya Variabel
Bekatul (Kg) 20 2.500 50.000
Kapur (Kg) 15 15.000 225.000
Serbuk gergaji
(Karung)
100 5.000 500.000
Plastik baglog (Buah) 4000 180 720.000
Bibit (Botol) 62,5 4.500 281.250
Kayu (Truk) 4 300.000 1.200.000
Cincin log (Buah) 4000 25 100.000
Bensin (Drum) 0,5 600.000 300.000
Biaya air 6 60.000 360.000
Biaya listrik 6 80.000 480.000
Pulsa HP 6 50.000 300.000
Transportasi 6 600.000 3.600.000
Pajak Penghasilan 0,5 1.065.000 532.500
2.Biaya Tetap
Servis kendaraan 1 150.000 150.000
Gaji tenaga kerja 2 6.000.000 12.000.000
Gaji manajer 1 30.000.000 30.000.000
Sewa lahan 0,5 12.000.000 6.000.000
Penyusutan bangunan
dan peralatan budidaya
0,5 2.251.000 1.125.500
Pajak Bumi dan
Bangunan
0,5 11.000.000 5.500.000
Pajak Kendaraan
Bermotor
0,5 300.000 150.000
Total Biaya 63.574.250
Uraian Volume Harga jual Jumlah
------------------------------Rp---------------------------
Penjualan
jamur tiram
(Kg)
7.100 15.000 106.500.000
Total Penerimaan 106.500.000
43
Lampiran 2. Rincian Biaya dan Penerimaan Usaha Budidaya Jamur Tiram Siklus
Tanam Kedua Tahun 2014
Uraian Volume Harga Satuan Jumlah
-----------------------Rp---------------------
1.Biaya Variabel
Bekatul (Kg) 20 2.500 50.000
Kapur (Kg) 15 15.000 225.000
Serbuk gergaji (Karung) 100 5.000 500.000
Plastik baglog (Buah) 4000 180 720.000
Bibit (Botol) 62,5 4500 281.250
Kayu (Truk) 4 300.000 1.200.000
Cincin log (Buah) 4000 25 100.000
Bensin (Drum) 0,5 600.000 300.000
Biaya air 6 60.000 360.000
Biaya listrik 6 80.000 480.000
Pulsa HP 6 50.000 300.000
Transportasi 6 600.000 3.600.000
Pajak Penghasilan 0,5 1.125.000 562.500
2.Biaya Tetap
Servis kendaraan 1 150.000 150.000
Gaji tenaga kerja 2 6.000.000 12.000.000
Gaji manajer 1 30.000.000 30.000.000
Sewa lahan 0,5 12.000.000 6.000.000
Penyusutan bangunan
dan peralatan budidaya
0,5 2.251.000 1.125.500
Pajak Bumi dan
Bangunan
0,5 11.000.000 5.500.000
Pajak Kendaraan
Bermotor
0,5 300.000 150.000
Total Biaya 63.604.250
Uraian Volume Harga jual Jumlah
------------------------------Rp---------------------------
Penjualan
jamur tiram
(Kg)
7.500 15.000 112.500.000
Total Penerimaan 112.500.000
44
Lampiran 3. Rincian Biaya dan Penerimaan Usaha Budidaya Jamur Tiram Siklus
Tanam Pertama Tahun 2015
Uraian Volume Harga Satuan Jumlah
----------------------Rp--------------------
1.Biaya Variabel
Bekatul (Kg) 30 2.500 75.000
Kapur (Kg) 21 15.000 315.000
Serbuk gergaji (Karung) 150 5.000 750.000
Plastik baglog (Buah) 6000 180 720.000
Bibit (Buah) 67 4500 301.500
Kayu (Truk) 4 300.000 1.200.000
Cincin log (Buah) 6000 25 150.000
Bensin (Drum) 0,5 600.000 300.000
Biaya air 6 60.000 360.000
Biaya listrik 6 80.000 480.000
Pulsa HP 6 50.000 300.000
Transportasi 6 600.000 3.600.000
Pajak Penghasilan 0,5 1.350.000 675.000
2.Biaya Tetap
Servis kendaraan 1 150.000 150.000
Gaji tenaga kerja 2 6.000.000 12.000.000
Gaji manajer 1 30.000.000 30.000.000
Sewa lahan 0,5 12.000.000 6.000.000
Penyusutan bangunan
dan peralatan budidaya
0,5 2.251.000 1.125.500
Pajak Bumi dan
Bangunan
0,5 11.000.000 5.500.000
Pajak Kendaraan
Bermotor
0,5 300.000 150.000
Total Biaya 64.152.000
Uraian Volume Harga jual (Rp) Jumlah (Rp)
------------------------------Rp---------------------------
Penjualan
jamur tiram
(Kg)
9.000 15.000 135.000.000
Total Penerimaan 135.000.000
45
Lampiran 4. Rincian Biaya dan Penerimaan Usaha Budidaya Jamur Tiram Siklus
Tanam Kedua Tahun 2015
Uraian Volume Harga Satuan Jumlah
----------------------Rp--------------------
1.Biaya Variabel
Bekatul (Kg) 30 2.500 75.000
Kapur (Kg) 22 15.000 330.000
Serbuk gergaji (Karung) 150 5.000 750.000
Plastik baglog (Buah) 6000 180 720.000
Bibit (Buah) 67 4500 301.500
Kayu (Truk) 4 300.000 1.200.000
Cincin log (Buah) 6000 25 150.000
Bensin (Drum) 0,5 600.000 300.000
Biaya air 6 60.000 360.000
Biaya listrik 6 80.000 480.000
Pulsa HP 6 50.000 300.000
Transportasi 6 600.000 3.600.000
Pajak Penghasil 0,5 1.387.500 693.750
2.Biaya Tetap
Servis kendaraan 1 150.000 150.000
Gaji tenaga kerja 2 6.000.000 12.000.000
Gaji manajer 1 30.000.000 30.000.000
Sewa lahan 0,5 12.000.000 6.000.000
Penyusutan bangunan
dan peralatan budidaya
0,5 2.251.000 1.125.500
Pajak Bumi dan
Bangunan
0,5 11.000.000 5.500.000
Pajak Kendaraan
Bermotor
0,5 300.000 150.000
Total Biaya 64.185.750
Uraian Volume Harga jual (Rp) Jumlah (Rp)
------------------------------Rp---------------------------
Penjualan
jamur tiram
(Kg)
9.250 15.000 138.750.000
Total Penerimaan 138.750.000
46
Lampiran 5. Rincian Biaya dan Penerimaan Usaha Budidaya Jamur Tiram Siklus
Tanam Pertama Tahun 2016
Uraian Volume Harga Satuan Jumlah
-----------------------Rp-------------------
1.Biaya Variabel
Bekatul (Kg) 30 2.500 75.000
Kapur (Kg) 21 15.000 315.000
Serbuk gergaji (Karung) 150 5.000 750.000
Plastik baglog (Buah) 6000 180 720.000
Bibit (Buah) 67 4500 301.500
Kayu (Truk) 4 300.000 1.200.000
Cincin log (Buah) 6000 25 150.000
Bensin (Drum) 0,5 600.000 300.000
Biaya air 6 60.000 360.000
Biaya listrik 6 80.000 480.000
Transportasi 0,5 5.475.000 2.737.500
Pajak Penghasilan 0,5 1.399.500 699.750
2.Biaya Tetap
Servis kendaraan 1 600.000 600.000
Gaji tenaga kerja 2 6.000.000 12.000.000
Gaji manajer 1 30.000.000 30.000.000
Sewa lahan 0,5 12.000.000 6.000.000
Penyusutan bangunan
dan peralatan budidaya
0,5 4.751.000 2.375.500
Pajak Bumi dan
Bangunan
0,5 11.000.000 5.500.000
Pajak Kendaraan
Bermotor
0,5 300.000 150.000
Total Biaya 64.714.250
Uraian Volume Harga jual Jumlah
------------------------------Rp--------------------------
Penjualan
jamur tiram
(Kg)
11.662,5 12.000 139.950.000
Total Penerimaan 139.950.000
47
Lampiran 6. Rincian Biaya dan Penerimaan Usaha Budidaya Jamur Tiram Siklus
Tanam Kedua Tahun 2016
Uraian Volume Harga Satuan Jumlah
-----------------------Rp---------------------
1.Biaya Variabel
Bekatul (Kg) 30 2.500 75.000
Kapur (Kg) 22 15.000 330.000
Serbuk gergaji (Karung) 150 5.000 750.000
Plastik baglog (Buah) 6000 180 720.000
Bibit (Buah) 67 4500 301.500
Kayu (Truk) 4 300.000 1.200.000
Cincin log (Buah) 6000 25 150.000
Bensin (Drum) 0,5 600.000 300.000
Biaya air 6 60.000 360.000
Biaya listrik 6 80.000 480.000
Transportasi 0,5 5.475.000 2.737.500
Pajak Penghasilan 0,5 1.447.500 723.750
2.Biaya Tetap
Servis kendaraan 1 600.000 600.000
Gaji tenaga kerja 2 6.000.000 12.000.000
Gaji manajer 1 30.000.000 30.000.000
Sewa lahan 0,5 12.000.000 6.000.000
Penyusutan bangunan
dan peralatan budidaya
0,5 4.751.000 2.375.500
Pajak Bumi dan
Bangunan
0,5 11.000.000 5.500.000
Pajak Kendaraan
Bermotor
0,5 300.000 150.000
Total Biaya 64.753.250
Uraian Volume Harga jual Jumlah
------------------------------Rp--------------------------
Penjualan
jamur tiram
(Kg)
12.062,5 12.000 144.750.000
Total Penerimaan 144.750.000
48
Lampiran 7. Investasi dan Penyusutan Tahun 2014
Jenis
Investasi
Jumlah Harga Umur Nilai Awal
--unit-- ---Rp--- --tahun-- ----- Rp -----
Kumbung 1 16.000.000 10 16.000.000
Tong
Oven
Motor
Komputer
4
1
1
1
25.000
1.000.000
6.000.000
2.000.000
10
5
6
5
100.000
1.000.000
6.000.000
2.000.000
Handphone
Timbangan
1
1
500.000
45.000
5
5
500.000
45.000
Jumlah 25.645.000
Jenis
Investasi
Nilai Akhir Jumlah Penyusutan
per unit
Penyusutan
----- Rp ----- --unit-- ----- Rp ---- ----- Rp -----
Kumbung 1.600.000 1 1.440.000 1.440.000
Tong
Oven
Motor
Komputer
40.000
500.000
1.200.000
500.000
4
1
1
1
6.000
100.000
300.000
300.000
24.000
100.000
300.000
300.000
Handphone
Timbangan
100.000
10.000
1
1
80.000
7.000
80.000
7.000
Jumlah 3.950.000 2.251.000
Lampiran 8. Investasi dan Penyusutan Tahun 2016
Jenis
Investasi
Jumlah Harga Umur Nilai Awal
--unit-- ---Rp--- --tahun-- ----- Rp -----
Kumbung 1 16.000.000 10 16.000.000
Tong
Oven
Motor
Komputer
4
1
1
1
25.000
1.000.000
6.000.000
2.000.000
10
5
6
5
100.000
1.000.000
6.000.000
2.000.000
Handphone
Timbangan
1
1
500.000
45.000
5
5
500.000
45.000
Motor (2) 3 4.000.000 6 12.000.000
Jumlah 37.645.000
49
Lampiran 8. (Lanjutan)
Jenis
Investasi
Nilai Akhir Jumlah Penyusutan
per unit
Penyusutan
----- Rp ----- --unit-- ----- Rp ---- ----- Rp -----
Kumbung 1.600.000 1 1.440.000 1.440.000
Tong
Oven
Motor
Komputer
40.000
500.000
1.200.000
500.000
4
1
1
1
6.000
100.000
300.000
300.000
24.000
100.000
300.000
300.000
Handphone
Timbangan
100.000
10.000
1
1
80.000
7.000
80.000
7.000
Motor (2) 7.000.000 3 833.333 2.500.000
Jumlah 3.950.000 4.751.000
Lampiran 9. Konversi Discount Factor
DFper tahun = 9,95 %
DF siklus tanam I 2014 = 1
(1+𝑖/𝑚)𝑛.𝑚 = 1
(1+9,95/2)1/2.2 = 0,953
DF siklus tanam II 2014 = 1
(1+9,95/2)1.2 = 0,907
DF siklus tanam I 2015 = 1
(1+9,95/2)3/2.2 = 0,864
DF siklus tanam II 2015 = 1
(1+9,95/2)4/2.2 = 0,823
DF siklus tanam I 2016 = 1
(1+9,95/2)5/2.2 = 0,784
DF siklus tanam II 2016 = 1
(1+9,95/2)6/2.2 = 0,747
50
Lampiran 10. Analisis NPV, ROI, dan PP
Tahun Siklus
Tanam Investasi
Penerimaan
(B) Biaya (C) Penyusutan EBT
Pajak (0,5
%) EAT Proceeds
DF
(9,95
%)
PV
Proceeds
---------------------------------------------------------------------------Rp---------------------------------------------------------- ---Rp---
2016 61.945.000
2017 I 157.310.000 65.089.833 2.375.500 92.220.167 786.550 91.433.617 93.809.117 0,953 89.363.293
II
165.234.286 65.354.369 2.375.500 99.879.917 826.171 99.053.745 101.429.245 0,907 92.043.140
2018 I 173.158.571 65.618.905 2.375.500 107.539.667 865.793 106.673.874 109.049.374 0,864 94.268.268
II
181.082.857 65.883.440 2.375.500 115.199.417 905.414 114.294.002 116.669.502 0,823 96.075.756
2019 I 189.007.143 66.147.976 2.375.500 122.859.167 945.036 121.914.131 124.289.631 0,784 97.500.194
II
196.931.429 66.412.512 2.375.500 130.518.917 984.657 129.534.260 131.909.760 0,747 98.573.829
Total 1.062.724.286 394.507.036 567.824.481
Perhitungan NPV
NPV = ΣPV Proceeds - Investasi
NPV = Rp 567.824.481 – Rp 61.945.000
= Rp 505.879.481
51
Perhitungan ROI
ROI = (EAT/ Investasi) x 100 %
ROI = (Rp 662.903.629/ Rp 61.945.000) x 100 %
= 1070 %
Perhitungan PP
PP = (Investasi/ PV Proceeds) x 6 bulan
PP = (Rp 61.945.000/Rp 89.363.293) x 6 bulan
= 4,16 ( 4 Bulan 5 hari)
Lampiran 11. Perhitungan IRR
Investasi Proceeds DF (317%) PV
Proceeds
DF (318%) PV Proceeds
---------------Rp------------- ----Rp---- -----Rp----
61.945.000
93.809.117 0,388 36.360.123 0,386 36.219.736
101.429.245 0,150 15.237.853 0,149 15.120.413
109.049.374 0,058 6.349.859 0,058 6.276.592
116.669.502 0,023 2.633.168 0,022 2.592.736
124.289.631 0,009 1.087.267 0,009 1.066.439
131.909.760 0,003 447.259 0,003 436.997
Total
62.115.528 61.712.913
NPV 170.528 (232.087)
IRR = i + NPV1
NPV1−NPV2 (i2-i1)
= 317 + 170.528
170.528−(−232.087)(318-317)
= 317,42 %
52
Lampiran 12. PerhitunganGross B/C Ratio
Tahun Siklus
Tanam Penerimaan Biaya DF(9,95%) PV B PV C
--------------Rp------------- --------------Rp-------------
2017 I 157.310.000 65.089.833 0,953 149.854.727 62.005.081
II 165.234.286 65.354.369 0,907 149.943.761 59.306.577
2018 I 173.158.571 65.618.905 0,864 149.687.779 56.724.585
II 181.082.857 65.883.440 0,823 149.119.282 54.254.122
2019 I 189.007.143 66.147.976 0,784 148.268.468 51.890.415
II 196.931.429 66.412.512 0,747 147.163.372 49.628.895
Total 1.062.724.286 394.507.036 5 894.037.390 333.809.675
Gross B/C Ratio = ΣPV Penerimaan/ΣPV Biaya
Gross B/C Ratio = Rp 894.037.390/ Rp 333.809.675
= 2,678
53
Lampiran 13. Analisis Sensitivitas Penurunan Penerimaan 10 %
Perhitungan NPV
NPV = ΣPV Proceeds - Investasi
NPV = Rp 478.867.761 – Rp 61.945.000
= Rp 416.922.761
Perhitungan ROI
ROI = (EAT/ Investasi) x 100 %
Tahun Siklus
Tanam Investasi
Penerimaan
(B) Biaya (C) Penyusutan EBT
Pajak (0,5
%) EAT Proceeds
DF
(9,95
%)
PV
Proceeds
------------------------------------------------------------------Rp--------------------------------------------------------------- ---Rp---
2016 61.945.000
2017 I 141.579.000 65.089.833 2.375.500 76.489.167 707.895 75.781.272 78.156.772 0,953 74.452.747
II
148.710.857 65.354.369 2.375.500 83.356.488 743.554 82.612.934 84.988.434 0,907 77.123.736
2018 I 155.842.714 65.618.905 2.375.500 90.223.810 779.214 89.444.596 91.820.096 0,864 79.374.334
II
162.974.571 65.883.440 2.375.500 97.091.131 814.873 96.276.258 98.651.758 0,823 81.238.388
2019 I 170.106.429 66.147.976 2.375.500 103.958.452 850.532 103.107.920 105.483.420 0,784 82.747.482
II
177.238.286 66.412.512 2.375.500 110.825.774 886.191 109.939.582 112.315.082 0,747 83.931.074
Total 956.451.857 394.507.036 478.867.761
54
ROI = (Rp 557.162.562/Rp 61.945.000) x 100 %
= 899,45 %
Perhitungan PP
PP = (Investasi/PV Proceeds) x 6 bulan
PP = (Rp 61.945.000/Rp 74.452.747) x 6 bulan
= 4,99 ( 4 Bulan 29 hari)
Perhitungan IRR
Investasi Proceeds DF (266%) PV
Proceeds DF (267%) PV Proceeds
-------------Rp------------- ---Rp--- ---Rp---
61.945.000
78.156.772 0,429 33.543.679 0,428 33.471.851 84.988.434 0,184 15.654.817 0,183 15.587.844
91.820.096 0,079 7.258.886 0,079 7.212.355 98.651.758 0,034 3.347.196 0,034 3.318.618 105.483.420 0,015 1.536.047 0,014 1.519.672 112.315.082 0,006 701.944 0,006 692.974
Total
62.042.569
61.803.313
NPV 97.569 (141.687)
IRR = i + NPV1
NPV1−NPV2 (i2-i1)
= 266 + 97.569
97.569−(−141.687)(267-266)
= 266,41 %
55
Perhitungan Gross B/C Ratio
Tahun Siklus
Tanam Penerimaan Biaya
DF(9,95
%) PV B PV C
-------------Rp------------- -------------Rp-------------
2017 I 141.579.000 65.089.833 0,953 134.869.255 62.005.081
II 148.710.857 65.354.369 0,907 134.949.385 59.306.577
2018 I 155.842.714 65.618.905 0,864 134.719.001 56.724.585
II 162.974.571 65.883.440 0,823 134.207.354 54.254.122
2019 I 170.106.429 66.147.976 0,784 133.441.622 51.890.415
II 177.238.286 66.412.512 0,747 132.447.035 49.628.895
Total 956.451.857 394.507.036 5 804.633.651 333.809.675
Gross B/C Ratio = ΣPV Penerimaan/ΣPV Biaya
Gross B/C Ratio = Rp 804.633.651/ Rp 333.809.675
= 2,41
56
Lampiran 14. Analisis Sensitivitas Kenaikan Biaya 10 %
Perhitungan NPV
NPV = ΣPV Proceeds - Investasi
NPV = Rp 534.443.513 – Rp 61.945.000
= Rp 472.498.513
Perhitungan ROI
Tahun Siklus
Tanam Investasi
Penerimaan
(B) Biaya (C) Penyusutan EBT
Pajak
(0,5 %) EAT Proceeds
DF
(9,95
%)
PV
Proceeds
------------------------------------------------------------------Rp------------------------------------------------------------------ ---Rp---
2016 61.945.000
2017 I 157.310.000 71.598.817 2.375.500 85.711.183 786.550 84.924.633 87.300.133 0,953 83.162.784
II 165.234.286 71.889.806 2.375.500 93.344.480 826.171 92.518.308 94.893.808 0,907 86.112.483
2018 I 173.158.571 72.180.795 2.375.500 100.977.776 865.793 100.111.983 102.487.483 0,864 88.595.809
II 181.082.857 72.471.785 2.375.500 108.611.073 905.414 107.705.658 110.081.158 0,823 90.650.344
2019 I 189.007.143 72.762.774 2.375.500 116.244.369 945.036 115.299.333 117.674.833 0,784 92.311.153
II 196.931.429 73.053.763 2.375.500 123.877.665 984.657 122.893.008 125.268.508 0,747 93.610.940
Total 1.062.724.286 433.957.739 534.443.513
57
ROI = (EAT/ Investasi) x 100 %
ROI = (Rp 623.452.923/Rp 61.945.000) x 100 %
= 1006,46 %
Perhitungan PP
PP = (Investasi/PVProceeds) x 6 bulan
PP = (Rp 61.945.000/Rp 83.162.784) x 6 bulan
= 4,47 ( 4 Bulan 14 hari)
Perhitungan IRR
Investasi Proceeds DF (296%) PV
Proceeds
DF (297%) PV Proceeds
-------------Rp-------------- ---Rp--- ---Rp---
61.945.000
87.300.133 0,403 35.201.667 0,402 35.130.838 94.893.808 0,163 15.428.884 0,162 15.366.858
102.487.483 0,066 6.719.172 0,065 6.678.696 110.081.158 0,026 2.910.089 0,026 2.886.738 117.674.833 0,011 1.254.369 0,011 1.241.800 125.268.508 0,004 538.433 0,004 531.966
Total
62.052.614
61.836.896
NPV
107.614
(108.104)
IRR = i + NPV1
NPV1−NPV2 (i2-i1)
= 296 + 107.614
107.614−(−108.104)(297-296)
= 296,5 %
58
Perhitungan Gross B/C Ratio
Tahun Siklus
Tanam Penerimaan Biaya
DF(4,975
%) PV B PV C
------------Rp------------ ------------Rp------------
2017 I 157.310.000 71.598.817 0,953 149.854.727 68.205.589
II 165.234.286 71.889.806 0,907 149.943.761 65.237.235
2018 I 173.158.571 72.180.795 0,864 149.687.779 62.397.044
II 181.082.857 72.471.785 0,823 149.119.282 59.679.534
2019 I 189.007.143 72.762.774 0,784 148.268.468 57.079.457
II 196.931.429 73.053.763 0,747 147.163.372 54.591.785
Total 1.062.724.286 433.957.739 5 894.037.390 367.190.643
Gross B/C Ratio = ΣPV Penerimaan/ΣPV Biaya
Gross B/C Ratio = Rp 894.037.390/ Rp 367.190.643
= 2,4
59
Lampiran 15. Dokumentasi
Gambar 1. Baglog yang sedang di inkubasi pada kumbung inkubasi milik
perusahaan Jaka Makmur
Gambar 2. Kumbung produksi milik perusahaan Jaka Makmur
Gambar 3. Kegiatan pengiriman produk perusahaan Jaka Makmu
60
RIWAYAT HIDUP
Penulis lahir di Medan, Sumatera Utara pada tanggal 28 Maret
1996, putra kedua dari Bapak Marihot Sormin dan Ibu Reny
Hutabarat. Pendidikan Sekolah Dasar di SD Methodist 7 Medan
tamat Tahun 2007, melanjutkan ke SMP Santo Thomas 1 Medan
dan tamat pada Tahun 2010 serta menyelesaikan sekolah di SMA Negeri 1 Medan
pada Tahun 2013.
Penulis merupakan mahasiswa angkatan 2013 Program Studi Agribisnis
Jurusan Pertanian Fakultas Peternakan dan Pertanian Universitas Diponegoro
Semarang. Penulis telah melaksanakan Praktik Kerja Lapangan (PKL) di
PT.Perkebunan Nusantara III Medan pada Tahun 2016 dengan judul Manajemen
Pemasaran Kelapa Sawit (Elaeis guineensis Jacq.) di PT. Perkebunan Nusantara III
(Persero) Medan