Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration,...

12
Kurt Uhlig Walther Meissner Institute Garching, Germany 0 Years of Dilution Refrigeration 0 Years of Dilution Refrigeration , Manchester, 16 September 201 , Manchester, 16 September 201

Transcript of Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration,...

Page 1: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

Kurt UhligWalther Meissner Institute

Garching, Germany

50 Years of Dilution Refrigeration50 Years of Dilution Refrigeration, Manchester, 16 September 2015 , Manchester, 16 September 2015

Page 2: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

1990: Patrick Pari, Adv Cryog Eng 35: 1079 first cryogen-free DR precooled by GM cryocooler

1999: delivery of PT4-05 (#2 in CRYOMECH production line)

2002: Cryogenics 42: 73 „ 3He/4He DR with pulse tube precooling “

2007: Prouvé et al., JLTP 148: 909„Pulse-Tube Dilution Refrigeration Below 10 mK“

Page 3: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

heat leak:Q(tot) = 70 nW

GM-precool:Q(GM) = 170 nW

T(mc2) = 4.3 mK

„Cryogen-free“ dilution refrigerators

CryomechPT405

trap

PT1

PT2

IVC

double mc

3He melting curve therm.

Cryogenics 44 (2004) 53

cfhx

flow restriction

hx‘s

shield

Page 4: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

„Cryogen-free“ dilution refrigerators

VeriCold Inc.:•no inner vacuum can (IVC)•big mixing chamber plate•separate pulse tubes from rotary valve•all electrical feedthroughs @ 300K•precool circuit•(or gas heat switches, BlueFors)

High refrigeration powers(2.5 mW @ 120 mK)(1.75 mW@100 mK)Superconducting magnets(up to 18 T)Clear shotsTop loadingBottom loading (cold sample exchange)

~ 75% of newly sold DRs are CF

Automatic cooldown

Page 5: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

Cryomech PT405 RM:

1st stage: 32 K40 W@ 75 K2nd stage: 2.5 K0.5 W @4 K

4He-1K-stage:

Q = 100 mW @ 1.3 K(80 m3/h pump)T(min) = 1.05 K

DR-stage:

0.7 mW @ 100 mKT(min) = 4.0 mK(CMN + fixed point device)

PT405

CMN sc FPD

CF-DR with 1K-stage(exp. on sc quantum circuits)

Page 6: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

Vibrational heat leak:

•run fridge at base temperature•fill 1K-stage with 4He(liq)•operate 1K-pot in single cycle mode•turn off pulse tube cryocooler•see if mixing chamber temperature drops•(and make sure, still temperature and inlet pressure remain unchanged)

Cryogenics !

Page 7: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

J. Hoehne: arXiv: 1506.08856 (CEC/ICMC 2015)

J. Hoehne, Cryocoolers 18 (2014) 319

gear pump

el. motor

cylinder

pistoncooler

oil

pV - efficiency: η ~ 70%

90 mmν = 1 Hz

Page 8: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

Thanks for your attention!

Page 9: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.
Page 10: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.
Page 11: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

„Cryogen-free“ dilution refrigerators

Characteristics of dry fridge: Wide geometry, no He, no 1K-pot, automatic cooldown and warmup

2004:helium: 5 €/lpower 9c / kWhPTR: 25,000 €

compare withHe-cryostat20 l (liq) / day )

2015:helium: 7.50 €/lpower 0.201 €/kWhPTR: 33,500 €

amortization: 280 days 5kW-PTR (320 days 10 kW-PTR)

amortization:266 days 5kW-PTR(330 days 10kW-PTR)

AUTOMATION!

Page 12: Kurt Uhlig Walther Meissner Institute Garching, Germany 50 Years of Dilution Refrigeration, Manchester, 16 September 2015.

„Cryogen-free“ dilution refrigerators

J. Hoehne: arXiv: 1506.08856 (CEC/ICMC 2015)