Page 1: Kohinoor Square

7/29/2019 Kohinoor Square

http://slidepdf.com/reader/full/kohinoor-square 1/5

Kohinoor Square is being constructed as an iconic commercial complex in Dadar (W),

quite literally in the heart of Mumbai.

When completed, the multi-building project, punctuated by two towers a 201m

diamond-shaped iconic tower and its 117m fraternal twin tower- will be the most

striking and innovative structure in Mumbai. Development, Information Technology

Park & World-Class infrastructure has been provided.

The Kohinoor Diamond concept continues to inspire the search for abstract patterns

reflecting the diamond’s geometry of faceted triangulation.

Project Details

Project Location: Mumbai

Client: Kohinoor CTNL Infrastructure Company Limited

Total Site Area: 5 acre

Total Built-up Area: 25,50,580 square feet

Project Cost: Rs. 700 Crores

Project Team

Project Management: Fairwood Consultants Private Limited

Architect: gkk works, US & SAA Architects, India

Structural Engineer: Thornton Tomasetti, US & Mahimtura Consultants, India

Vertical Transportation: Lerch Bates, Inc, US

Parking: International Parking Design, Inc., US & India

Code Analysis: Schirmer Engineering Corporation, US

MEP Engineering: Buro Happold Consulting Engineers Limited, UK Spectral

Services Consultants Private Limited, India

Wind Tunnel Consultant: Rowan Williams Davies & Irwin, Inc., Canada & India

Aviation Consultant: Aviacon

Principal Contractor: L&T

Project Status: On-going

Page 2: Kohinoor Square

7/29/2019 Kohinoor Square

http://slidepdf.com/reader/full/kohinoor-square 2/5

The Project involves commercial real estate development of 14.74 lac sq ft, with the

 principal high rise tower planned in an exquisite 50 storey diamond shaped office

complex. Additionally, a 14 floor public car park with a shorter 18 storey office tower 

atop and another 6 storey retail space is also proposed. The aggregate cost of the

 project is estimated at Rs. 2100 crore KCICL is promoted by the Kohinoor Group,

who hold a predominant share in the project. IIRF India Realty VII Ltd. (IIRF – 7),

the Real Estate Fund advised and managed by IL&FS Investment Managers Limited

(“IIML”), holds a 40% share in the project

IL&FS Financial Services Ltd (IFIN) has fully tied up debt of Rs 936 cr for 

‘Kohinoor Square’, an iconic commercial real estate project being developed by

KCICL at at Dadar (West), Mumbai. This is one largest Project Financing achieved in

the Indian markets for a commercial real estate project, in recent times.

The combined Loan and Security Documents for the Project were executed on June 1,

2010 in Mumbai, with a consortium of Ten Banks participating in the project. State

Bank of India is the Lead Bank.

Page 3: Kohinoor Square

7/29/2019 Kohinoor Square

http://slidepdf.com/reader/full/kohinoor-square 3/5

Coupling:-

The traditional method of connecting reinforcement bars with lap joints continuity in

reinforced concrete need not be always appropriate. Advantages of simplicity and

economy in lap splicing is limited to smaller diameter bars, mechanical couplers offer 

the solution for splicing when large diameter bars are involved.

Technically Superior: Spliced rebar performs like continuous reinforcement. Splicing

develops strength mechanically, independent of concrete. Therefore provides ductility

in RCC structures independent of condition of concrete. Proven cyclic performence of 

spliced rebar offers strength during man-made, seismic or other natural events. The

continuity of spliced rebar offers excellent provision for grounding electrical current.

coupler reduces rebar congestion and improves concrete flow & consolidation. It

offers greater flexibility in design options. The simplicity in detailing of 

reinforcement, particularly in reinforcement congestion zones minimizes the

reinforcement fixing errors, detailing and fixing of seismic reinforcement becomes

effortless. Workability with higher steel-to-concrete ratio allows optimum sizing of 

RCC structural members.

coupler offers quality, cost and time saving. Fixing couplers requires no special skills

or equipments. Simple mechanical ways in adopting mechanical splicing compared to

lapping, accelerates construction schedules for optimum cost and efficiency.

Handling the rebar in convenient sizes saves on valuable crane time. It is economical

to use couplers for higher diameter rebar as it saves on considerable weight and rebar 

wastage. Special application for micro-piling, piling, slope protection, pre-cast

concrete, slip-forming, formwork protection, top-down construction makes coupler as

a part of any major project.

Page 4: Kohinoor Square

7/29/2019 Kohinoor Square

http://slidepdf.com/reader/full/kohinoor-square 4/5

Core Tube Structural system

In kohinoor square the method of core tude construction is use.The tube system

concept is based on the idea that a building can be designed to resist lateral loads by

designing it as a hollow cantilever   perpendicular to the ground. In the simplest

incarnation of the tube, the perimeter of the exterior consists of closely spaced

columns that are tied together with deep  spandrel   beams through moment

connections. This assembly of columns and beams forms a rigid frame that amounts

to a dense and strong structural wall along the exterior of the building.[3]

This exterior framing is designed sufficiently strong to resist all lateral loads on the

 building, thereby allowing the interior of the building to be simply framed for gravityloads. Interior columns are comparatively few and located at the core. The distance

 between the exterior and the core frames is spanned with beams or trusses and

intentionally left column-free. This maximizes the effectiveness of the perimeter tube

 by transferring some of the gravity loads within the structure to it and increases its

ability to resist overturning due to lateral loads.

In the construction of Kohinoor Square’s core wall self climbing jump form work is

usedjump form systems comprise the formwork and working platforms for 

cleaning/fixing of the formwork, steel fixing and concreting. The formwork supports

itself on the

concrete cast earlier so does not rely on support or access from other parts of the

 building or permanent works. Jump form, here taken to include systems often

described as climbing form, is suitable for construction of multi-storey vertical

concrete elements in high-rise structures, such as shear walls, core walls, lift shafts,stair shafts and bridge pylons. These are constructed in a staged process. It is a highly

 productive system designed to increase speed and efficiency while minimising labour 

and crane time.

Systems are normally modular and can be joined to form long lengths to suit varying

construction geometries.

Self-climbing jump form – does not require a crane as it climbs on rails up the

 building by means of hydraulic jacks, or by jacking the platforms off internal recesses

Page 5: Kohinoor Square

7/29/2019 Kohinoor Square

http://slidepdf.com/reader/full/kohinoor-square 5/5

in the structure. It is possible to link the hydraulic jacks and lift multiple units in a

single operation.