Kelompok 2 - Progress Desain Awal (REVISI)
-
Upload
cindy-thearas -
Category
Documents
-
view
226 -
download
1
description
Transcript of Kelompok 2 - Progress Desain Awal (REVISI)
![Page 1: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/1.jpg)
Anggoro Aji – Faradina R – Mirna Heradiani– Syifa Puspita S –Cindy Thearas - M.B. Vimala Dewi - Nur Tristiani –Linda Firlie – Sumayyah – Sri Nuraini
![Page 2: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/2.jpg)
![Page 3: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/3.jpg)
![Page 4: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/4.jpg)
![Page 5: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/5.jpg)
![Page 6: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/6.jpg)
![Page 7: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/7.jpg)
![Page 8: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/8.jpg)
![Page 9: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/9.jpg)
![Page 10: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/10.jpg)
![Page 11: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/11.jpg)
![Page 12: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/12.jpg)
![Page 13: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/13.jpg)
![Page 14: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/14.jpg)
![Page 15: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/15.jpg)
![Page 16: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/16.jpg)
![Page 17: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/17.jpg)
![Page 18: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/18.jpg)
![Page 19: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/19.jpg)
![Page 20: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/20.jpg)
![Page 21: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/21.jpg)
![Page 22: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/22.jpg)
![Page 23: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/23.jpg)
![Page 24: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/24.jpg)
![Page 25: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/25.jpg)
Golden WaterBy Grimanesa Amoros
Instalasi cahaya sementara yangmemanjang dari jembatan Soleri.
“Golden Water Installation”dibuat dari system tabung LED,
muncul ke atas dari kanal,menciptakan efek dari perpaduan
antara air dan cahaya
![Page 26: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/26.jpg)
Gerry
BarryLand Art
Installation
Gerry Barry membuatInstalasi menggunakanbahan-bahan organikdi sepanjang pedesaanIrlandia
![Page 27: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/27.jpg)
Nalini MalaniKassel, Jerman
PrismaticaMontreal, Kanada
Water LilyBruce MonroePennsylvania
Abedinirad dan TorelliBabel Tower
Reflecting view Reflecting view
![Page 28: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/28.jpg)
![Page 29: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/29.jpg)
![Page 30: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/30.jpg)
![Page 31: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/31.jpg)
![Page 32: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/32.jpg)
![Page 33: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/33.jpg)
![Page 34: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/34.jpg)
Maket Existing
![Page 35: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/35.jpg)
![Page 36: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/36.jpg)
![Page 37: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/37.jpg)
![Page 38: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/38.jpg)
![Page 39: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/39.jpg)
No Items Qtt Vol UnitPrice Total Note
1
a
2
a Kawatayambajadiameter2mm 10 m 25000 200000 (70x100)cm/qtt
b Tulanganbesi6mm 4 12m/batang 21000 84000
c CDbekas 150 buah free 0dalamproses
pengumpulan
3
a Pemasangan/Lasstrukturbaja masihdicari
bPemasanganfasadbesidan
kawatayammasihdicari
4
a BiayaGobox/pickup 1 perxantartergantung
jarakantar
5
masihdalam
pertimbangan
Struktur
FasadInstalasi
Workshop
Pengangkutan
InstalasiPadaSite
Total:300.000
Total:284.000
TotalBiayaMeterial:584.000
MATERIAL
BIAYATUKANG
RENCANAANGGARANBIAYAINSTALASIDERMAGAPERPUSUI
Bajahollowantikarat2x2cm
tebal1mm8batang 6m/1batang 37500 300000
![Page 40: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/40.jpg)
Rangka Baja Hollow
RangkaKawat Ayam
Detail Perhitungan Qtt
RangkaTulangan Besi
(50cmx10) x 10 bidang persegi=5m x 10 = 50m
![Page 41: Kelompok 2 - Progress Desain Awal (REVISI)](https://reader031.fdocument.pub/reader031/viewer/2022020223/579079641a28ab6874c6f7a8/html5/thumbnails/41.jpg)
Waktu
Rabu,4Mei2016 Membuatmaketsite&desain Mencariworkshopuntukmenyewajasapertukangan Mencaritokomaterial
Kamis,5Mei2016 Membuatsketsa&dptdesainawal Mencariworkshopuntukmenyewajasapertukangan Mencaritokomaterial
Jumat,6Mei2016 Membuatrencanastruktur&konstruksi MemperkirakanRAB
Sabtu,7Mei2016 Evaluasidesain
Minggu,8Mei2016 Evaluasirencanastruktur&konstruksi EvaluasiRAB
Senin,9Mei2016 Evaluasidesain,keterbangunan,&RAB
Selasa,10Mei2016 Presentasidesainfinal Revisidesainfinal
Rabu,11Mei2016 PresentasiRevisidesainfinal Revisistruktur,konstruksi,&RAB
Kamis,12Mei2016 Mencarimaterial Membahasdesaindengantukang
Jumat,13Mei2016 Membuatinstalasi Dokumentasipengerjaan
Sabtu,14Mei2016 Mencarimaterial Membahasdesaindengantukang
Minggu,15Mei2016 Mencarimaterial Membahasdesaindengantukang
Senin,16Mei2016 Pemasanganstrukturutama(rangkabaja&besi) Dokumentasipengerjaan
Selasa,17Mei2016 Pemasanganstrukturutama(rangkabaja&besi) Dokumentasipengerjaan
Rabu,18Mei2016 Pemasanganstrukturanak(kawatayam) Dokumentasipengerjaan
Kamis,19Mei2016 Pemasanganstrukturanak(kawatayam) Dokumentasipengerjaan
Jumat,20Mei2016 Evaluasiprogresinstalasi Publikasipameran
Sabtu,21Mei2016 Mencarimaterial
Minggu,22Mei2016 Mencarimaterial Pemasanganfasad(CD) Dokumentasipengerjaan
Senin,23Mei2016 Pemasanganfasad(CD) Dokumentasipengerjaan
Selasa,24Mei2016 Pengangkutanbagian-bagianinstalasi Merangkaibagian-bagianinstalasi Dokumentasipengerjaan
Rabu,25Mei2016 Merangkaibagian-bagianinstalasi Finishinginstalasi Dokumentasipengerjaan
Kamis,26Mei2016 Mempersiapkanpameran
Jumat,27Mei2016 PresentasiUAS
Timelinepengerjaan
Kegiatan