JV - Opera Pres

download JV - Opera Pres

of 8

Transcript of JV - Opera Pres

  • 7/31/2019 JV - Opera Pres

    1/8

  • 7/31/2019 JV - Opera Pres

    2/8

    Contents

    Project Objectives, Structure and Management

    Project Overview An Opera in Three Movements

    1st Movement |Prelude: Andante dolce

    Initiatives ensuring a sound foundation a necessary preludeto occur at a measured pace

    2nd Movement: Allegretto animato

    Picking up the pace - initiatives to maximize the value ofcurrent business models

    A range of initiatives with implementation horizons varyingfrom

  • 7/31/2019 JV - Opera Pres

    3/8

    A Three Movement Opera

    1st Movement:Establishing the

    Foundations

    2nd Movement: Maximizing the ExistingBusiness Model

    3rd Movement:Creating

    additional valuepropositions and

    revenue

    3

    4-6 weeks

    3 24 months staged implementation than BAU

    12 36 months

    Quick Wins Sustainable strategies

    Monthly reports for remainder of XXXX

    Quarterly reporting from Jan XXXX onwards

  • 7/31/2019 JV - Opera Pres

    4/8

    Key Points

    Point 1

    Point 2

    Point 3

    4

  • 7/31/2019 JV - Opera Pres

    5/8

    1st Movement Establishing SolidFoundations

    Andante dolce

    Work Stream 1: Agree on common data and data sources

    Objective: For each party to understand the nature of data available and its limitations, and the issuesarising. To reach a common understanding of what data will be used for tracking; and where inconsistentwhat factors can be agreed to normalize data at what agreed margin of error

    Time scale: Investigate, identify issues and reach best possible agreement within 6 weeks

    Work Stream 2: Commercial relationship

    Clear understanding of the commercial relationship between the parties at all levels (country, region,global), benchmarked against competitor set. Identify if any commercial issues can or may impede therelationship and if so what is the recommended way forward

    Time frame: Investigate and if necessary identify issues to be addressed within 6 weeks

    Work Stream 3: Identify and remove relationship impediments

    Objective: Identify where relative weaknesses or impediments to the relationship exist. Acknowledge wheredifficulties have existed but do not allow a forum for old grievances to be aired on the basis that an amnestyhas been declared and the relationship re-set. Develop and implement specific targeted strategies toresolve issues, elevate to Steering Group if necessary

    Time scale: Investigation phase 4-6 weeks. Implement all recommendations within 3 months.

    Work Stream 4: Touch points needs-based strategy

    Objective: Identify the key touch point functions within XXX that influence positively or negatively XXX.Investigate the needs of each group and develop, then implement an integrated strategy to address thespecific needs of each group

    Time scale: Investigation phase 4-8 weeks. Implement quick wins 3-6 months. Implement ongoinginitiatives 6 months+ and ongoing

    5

  • 7/31/2019 JV - Opera Pres

    6/8

    2nd Movement Maximizing value fromcurrent business model

    Allegretto animato

    Work Stream 1: XXX

    Objective:

    Time scale:

    Work Stream 2: XXX

    Objective:

    Time scale:

    Work Stream 3: XXX

    Objective:

    Time scale:

    6

  • 7/31/2019 JV - Opera Pres

    7/8

    3rd Movement Developing new valuepropositions and revenue streams

    Work Stream 1: XXX

    Objective:

    Time scale:

    Work Stream 2: XXX

    Objective:

    Time scale:

    Work Stream 3: XXX

    Objective:

    Time scale:

    7

    Presto brio

  • 7/31/2019 JV - Opera Pres

    8/88

    Our ObjectiveAlone, the best in our field. But in harmony together

    Maestoso. Bravura.