JPEP01370A0000 R4

11
7/14/2019 JPEP01370A0000 R4 http://slidepdf.com/reader/full/jpep01370a0000-r4 1/11 JPEP-0-1370-A-0000 Rev.4 PAGE 3 OF 13 JPEP Wk Class FWBS Doc Cat Seq No Lan Rev Title Identical JGS No JPEP 0 1370 A 0000 1 LIST OF JGC PROJECT EXECUTION PRACTICE (JPEP) FOR INSTRUMENT JPEP 0 1370 A 0001 1 KEY PERSONS MANUAL (CONTROL & ENGINEERING DEPARTMENT) JPEP 0 1370 A 0001 J 1 KEY PERSON MANUAL(KPM) JPEP 0 1370 A 0002 J 0 制御設計における3DCAD利用ガイドライン JPEP 0 1370 A 0003 0 3D CAD Guideline in Control Engineering Department JPEP 0 1370 A 0004 1 THE INSTRUMENT PARTS for 3D MODELING JPEP 0 1370 A 0005 2 STANDARD 2D SYMBOL for INSTRUMENT LAYOUT DRAWING JPEP 0 1370 A 0010 0 EXECUTION STRATEGY FOR INSTRUMENTATION ENGINEERING WITH IT TOOLS JPEP 0 1370 B 0001 1 E.P.C. WORK FLOW (INSTRUMENTATION/CONTROL-ENGINEERING) JPEP 0 1370 B 0001 J 1 E.P.C WORK FLOW FOR INSTRUMENTATION/ CONTROL ENG. JPEP 0 1370 B 0002 1 DESIGN ENGINEERING EXECUTION FLOW FOR INSTRUMENTATION/CONTROL ENGINEERING JGS 220-400-2-03 JPEP 0 1370 B 0002 J 1 DESIGN ENGINEERING WORK FLOW FOR INST./ CONTROL ENG. JGS 220-400-2-03 JPEP 0 1370 B 0003 J 1 Instrumentation Standard Document List JGS 220-400-2-01 JPEP 0 1370 B 0004 J 1 SPLIT OF WORK BETWEEN JGC AND ENG. SUBCONTRACTOR JPEP 0 1370 B 0005 J 1 PREP. GUID. FOR ORGANIZATION CHART OF INST./ CONTROL ENG. WORK EXECUTION JPEP 0 1370 B 0006 J 1 MAN POWER MOBILIZATION FOR INST./ CONTROL ENG. JPEP 0 1370 B 0007 J 1 ASSESMENT OF JOB MH CONTROL AND RESULT FOR INST./ CONTROL ENG. JPEP 0 1370 B 0008 J 2 COLLECTION AND CONTROL GUID. FOR JOB DATA OF INST./ CONTROL ENG. JPEP 0 1370 B 0009 J 1 FORM OF INQUIRY REQUIREMENT FOR INST. MATERIALS AND TECHNICAL BID EVALUATION REPORT JPEP 0 1370 B 0010 J 1 TIME-NOW SCHEDULE FOR INST./ CONTROL ENG. JPEP 0 1370 B 0011 J 1 COUNTERMEASURE FOR COSTDOWN (PROFIT IMPROVEMENT) OF INST./ CONTROL ENG. JPEP 0 1370 B 0012 J 1 RISK, PROBLEM AND COUNTERMEASURE FOR INST./ CONTROL ENG. JPEP 0 1370 B 0013 J 1 BM/BQ AND COST CONTROL FOR INST./ CONTROL ENG. JPEP 0 1370 B 0014 J 1 STANDARD VENDOR LIST (CONTROL ENGINEERING DEPT.) JPEP 0 1370 B 0015 J 1 ENGINEERING MONTHLY REPORT (CONTROL ENGNEERING DEPT.) JPEP 0 1370 B 0016 J 1 FILING SYSTEM FOR INST./ CONTROL ENGINEERING IDS-022 JPEP 0 1370 B 0017 J 1 LIST OF DEPARTMENTAL STANDARDS AND KNOW-HOW DATA BASE FOR INST./ CONTROL ENG. IDS - 001/K-DB JPEP 0 1370 B 0018 J 1 DISTRIBUTION GUID. FOR JOB DOCUMENTS JPEP 0 1370 B 0020 J 1 PROCEDURE FOR ENGINEERING REVIEW WITH FORM OF PLAN AND REPORT IDS-103/105 JPEP 0 1370 B 0021 1 Responsibility Matrix Chart Of Documents(Instrument) JGS 400-2-02 JPEP 0 1370 B 0022 J 1 ITEMS TO BE CONFIRMED WITH PROCESS SECTION JPEP 0 1370 B 0023 1 Job Standard Exec. Procedure (Instr.) JPEP 0 1370 B 0031 1 Prep . Guidance Of Split of Work Between Other Desciplines JPEP 0 1370 B 0032 1 Sample Document of Split Of Work Between other Descipline 0-015 JPEP 0 1370 B 0033 1 Sample Document of Split Of Work Between other Descipline 0-1100 JPEP 0 1370 B 0034 1 Split of Work Between Civil/Building JPEP 0 1370 B 0035 1 Split of Work Between System Equipment (Flare Stack) JPEP 0 1370 B 0036 1 Split of Work Between System Equipment (Fired Heater) JPEP 0 1370 B 0037 1 Split of Work Between Rotray Equipment JPEP 0 1370 B 0038 1 Split of Work Between Piping Department JPEP 0 1370 B 0039 1 Split of Work Between Electrical Department JPEP 0 1370 B 0040 1 Split of Work Between Const.Dpt & Elect./Cont. Eng.Dpt. JPEP 0 1370 B 0040 J 1 SPLIT OF WORK BETWEEN CONST. DPT & ELCT./CONT. ENG. DPT JPEP 0 1370 B 0041 1 Split of Work Between Procurement Dpt. & Elect./Cont.Eng JPEP 0 1370 B 0041 J 1 SPLIT OF WORK BETWEEN PROCUREMENT DPT & ELCT./ CONT. ENG. DPT JPEP 0 1370 B 0042 1 Split of Work Between HSE Department JPEP 0 1370 B 0043 1 Split of Work Between HSE (Fire Proofing For Instrument.) JPEP 0 1370 B 0044 1 Split of Work Between System Equipment Department. JPEP 0 1370 B 0045 1 Sample Document of Detail of Insterface & Split of Work 0-015 JPEP 0 1370 B 0051 J 1 STANDARD SPLIT OF WORK BETWEEN JGC AND JPS (CONTROL ENG. DPT) JPEP 0 1370 B 0052 1 Standard Split Of Work between JGC & JPS ( Control Emg.) JGS-126-100-1-01 JPEP 0 1370 B 0053 0 Guideline for function of GEC engineer at YOC JPEP 0 1370 B 0054 1 Guideline for new comer JPEP 0 1370 B 0101 0 Sample for Work Instruction to LCE General (To JPhil JPEP 0 1370 B 0102 0 Sample for Work Instruction to LCE for the Handling of in- Port/in-MAP(To JPhil) JPEP 0 1370 B 0103 0 Sample for Work Instruction to LCE for Preparation of Single Line Loop Diagram(To JPhil) JPEP 0 1370 B 0104 0 Sample for Work Instruction to LCE -E-Package to JPHIL/Sohar PJ-

Transcript of JPEP01370A0000 R4

1370 listJPEPWk ClassFWBSDoc.Cat.Seq.No.Lan.Rev.TitleIdentical JGS No.JPEP01370A00001LIST OF JGC PROJECT EXECUTION PRACTICE (JPEP) FOR INSTRUMENTJPEP01370A00011KEY PERSONS MANUAL (CONTROL & ENGINEERING DEPARTMENT)JPEP01370A0001J1KEY PERSON MANUAL(KPM)JPEP01370A0002J03DCADJPEP01370A000303D CAD Guideline in Control Engineering DepartmentJPEP01370A00041THE INSTRUMENT PARTS for 3D MODELINGJPEP01370A00052STANDARD 2D SYMBOL for INSTRUMENT LAYOUT DRAWINGJPEP01370A00100EXECUTION STRATEGY FOR INSTRUMENTATION ENGINEERING WITH IT TOOLSJPEP01370B00011E.P.C. WORK FLOW (INSTRUMENTATION/CONTROL-ENGINEERING)JPEP01370B0001J1E.P.C WORK FLOW FOR INSTRUMENTATION/ CONTROL ENG.JPEP01370B00021DESIGN ENGINEERING EXECUTION FLOW FOR INSTRUMENTATION/CONTROL ENGINEERINGJGS 220-400-2-03JPEP01370B0002J1DESIGN ENGINEERING WORK FLOW FOR INST./ CONTROL ENG.JGS 220-400-2-03JPEP01370B0003J1Instrumentation Standard Document ListJGS 220-400-2-01JPEP01370B0004J1SPLIT OF WORK BETWEEN JGC AND ENG. SUBCONTRACTORJPEP01370B0005J1PREP. GUID. FOR ORGANIZATION CHART OF INST./ CONTROL ENG. WORK EXECUTIONJPEP01370B0006J1MAN POWER MOBILIZATION FOR INST./ CONTROL ENG.JPEP01370B0007J1ASSESMENT OF JOB MH CONTROL AND RESULT FOR INST./ CONTROL ENG.JPEP01370B0008J2COLLECTION AND CONTROL GUID. FOR JOB DATA OF INST./ CONTROL ENG.JPEP01370B0009J1FORM OF INQUIRY REQUIREMENT FOR INST. MATERIALS AND TECHNICAL BID EVALUATION REPORTJPEP01370B0010J1TIME-NOW SCHEDULE FOR INST./ CONTROL ENG.JPEP01370B0011J1COUNTERMEASURE FOR COSTDOWN (PROFIT IMPROVEMENT) OF INST./ CONTROL ENG.JPEP01370B0012J1RISK, PROBLEM AND COUNTERMEASURE FOR INST./ CONTROL ENG.JPEP01370B0013J1BM/BQ AND COST CONTROL FOR INST./ CONTROL ENG.JPEP01370B0014J1STANDARD VENDOR LIST (CONTROL ENGINEERING DEPT.)JPEP01370B0015J1ENGINEERING MONTHLY REPORT (CONTROL ENGNEERING DEPT.)JPEP01370B0016J1FILING SYSTEM FOR INST./ CONTROL ENGINEERINGIDS-022JPEP01370B0017J1LIST OF DEPARTMENTAL STANDARDS AND KNOW-HOW DATA BASE FOR INST./ CONTROL ENG.IDS - 001/K-DBJPEP01370B0018J1DISTRIBUTION GUID. FOR JOB DOCUMENTSJPEP01370B0020J1PROCEDURE FOR ENGINEERING REVIEW WITH FORM OF PLAN AND REPORTIDS-103/105JPEP01370B00211Responsibility Matrix Chart Of Documents(Instrument)JGS 400-2-02JPEP01370B0022J1ITEMS TO BE CONFIRMED WITH PROCESS SECTIONJPEP01370B00231Job Standard Exec. Procedure (Instr.)JPEP01370B00311Prep . Guidance Of Split of Work Between Other DesciplinesJPEP01370B00321Sample Document of Split Of Work Between other Descipline0-015JPEP01370B00331Sample Document of Split Of Work Between other Descipline0-1100JPEP01370B00341Split of Work Between Civil/BuildingJPEP01370B00351Split of Work Between System Equipment (Flare Stack)JPEP01370B00361Split of Work Between System Equipment (Fired Heater)JPEP01370B00371Split of Work Between Rotray EquipmentJPEP01370B00381Split of Work Between Piping DepartmentJPEP01370B00391Split of Work Between Electrical DepartmentJPEP01370B00401Split of Work Between Const.Dpt & Elect./Cont. Eng.Dpt.JPEP01370B0040J1SPLIT OF WORK BETWEEN CONST. DPT & ELCT./CONT. ENG. DPTJPEP01370B00411Split of Work Between Procurement Dpt. & Elect./Cont.EngJPEP01370B0041J1SPLIT OF WORK BETWEEN PROCUREMENT DPT & ELCT./ CONT. ENG. DPTJPEP01370B00421Split of Work Between HSE DepartmentJPEP01370B00431Split of Work Between HSE (Fire Proofing For Instrument.)JPEP01370B00441Split of Work Between System Equipment Department.JPEP01370B00451Sample Document of Detail of Insterface & Split of Work0-015JPEP01370B0051J1STANDARD SPLIT OF WORK BETWEEN JGC AND JPS (CONTROL ENG. DPT)JPEP01370B00521Standard Split Of Work between JGC & JPS ( Control Emg.)JGS-126-100-1-01JPEP01370B00530Guideline for function of GEC engineer at YOCJPEP01370B00541Guideline for new comerJPEP01370B01010Sample for Work Instruction to LCE General (To JPhilJPEP01370B01020Sample for Work Instruction to LCE for the Handling of in- Port/in-MAP(To JPhil)JPEP01370B01030Sample for Work Instruction to LCE for Preparation of Single Line Loop Diagram(To JPhil)JPEP01370B01040Sample for Work Instruction to LCE -E-Package to JPHIL/Sohar PJ-JPEP01370F0001J1PREP. AND CONTOL GUID. FOR JOB OUTLINE AND EXECUTION STRATEGY (CONTROL ENG. DPT.)IDS-101/IDS-101EJPEP01370F0001J1PREP. AND CONTOL GUID. FOR JOB OUTLINE AND EXECUTION STRATEGY (CONTROL ENG. DPT.)JPEP51370F0001J1TRANSFER FROM PROPOSAL TO AWARDED JOB (CONTROL ENGINEERING DPT.)JPEP01370F00021Check Sheets for Instruments / Equipment Spec. & Data SheetJPEP51370F00020ITB SUMMARY SHEETSJPEP01370F00030INSTRUMENTATION TECHNICAL REQUIREMENTS FOR PACKAGE UNITSJPEP51370F00030COST DOWN CHECK SHEET AT 5-JOB PHASEJPEP01370F0004J0CHECK LIST FOR P&ID REVIEW OF INSTRUMENTATIONJPEP51370F00040CHECK LIST FOR COST ESTIMATION ACCURACY IMPROVEMENTJPEP01370F0005J0COST DOWN CHECK SHEET AT 0-JOB PHASEJPEP01370F00060FORM OF Subcontractor Pre-qualificationJPEP01370F00080CHECK LIST FOR DEPARTMENTAL AUDITJPEP01370F00090Operation and Control Philosophy for Package UnitJPEP01370F00511Form of Technical Bid Evaluation for Inst. / EquipmentJPEP01370F00511FORM OF TECHNICAL BID EVALUATION FOR INSTRUMENTATIONJPEP01370F01002Forms for Instrument DimensionsJGS Form 1823 modifiedJPEP01370F01011Form of Pre- Inspection Meeting W/Vender for INST./ EQTJPEP01370F01021Check list For Design INF.Exchange Between DesciplinesJPEP01370G00011Instrument Tag Numbering Procedure0-7900JPEP01370G00111Requirement for Foundation Field Bus.JPEP01370G00161List of International Codes and Regulations for InstrumentJPEP01370G00171Spare Parts Handling PhilosophyJPEP01370G00211Prep. Guidnace of General Spec. for InstrumentationJPEP01370G00223Prep. Guidance of General Requirement for PKG.EQT. & SampleJPEP01370G00231Prep. Guidnace of Spec. for scope of Shop Inspection for InstrumentJPEP01370G00241Prep. Guidnace of Conseptual INSTR. System DWG and SampleJPEP01370G00251Prep. Guidnace of Spec.. for Instr. Protection & SampleJPEP01370G00261Material Selection for InstrumentationJPEP01370G00272LC and LG ArrangementJPEP01370G0028J2PREP. GUID. FOR LC AND LG ARRANGEMENTPDS 320-1-17JPEP01370G00290PREPARATION GUIDANCE FOR INSTRUMENT AND CONTROL SYSTEM DRAWING AND SAMPLESJPEP01370G00321Generation of Main Data BaseJPEP01370G00331Generation of Loop DrawingJPEP01370G00341Generation of Hook up DrawingJPEP01370G00351Generation of Cable SheduleJPEP01370G00361Generation of Layout DrawingJPEP01370G00371Generation of Material Take OffJPEP01370G00411CAD Drafting Procedure (Instrumentation)JPEP01370G00511Process Instrumentation & Control (API RP 554)API RP 554JPEP01370G00521Pipe Flanges & Flanged FittingASME B16.5-1996JPEP01370G00531Stainless Steel PipeANSI/ASME B36.19M-1985JPEP01370G00541Welded and Seamless Wrought Steel PipeASME B36.10M-1996JPEP01370G00551Electrical Safety Code Institute of PetroliumIP CODEJPEP01370G0056J1DATA FOR EXPLOSION PROTECTIONVenderJPEP01370G00911Sample INF. of Instrument Dimension & Installation RequirementJPEP01370G00921Sample INF. of Signal Between Electrical Power Supply SystemJPEP01370G00931Sample inf. Document of Instrument Dimension/Installation RequirmentJPEP01370G01011Prep. Guidance of Requisition for Instruments/Equipments & MaterialJPEP01370G01021Prep. of Inf. for Size, Routes & Weight of Instrument CableJGS0-200-400-1-08EJPEP01370G01031Prep. of Inf. for Dimensional Drawing Inf. For InstrumentationJGS 200-400-1-02EJPEP01370G01041Prep. of Inf. for Embedded Members in BLD. Wall /FLR.JGS 200-400-1-23EJPEP01370G01051Prep. of Inf. Instrument facilities (L/P, AnalyserJGS 200-400-1-03EJPEP01370G01061Prep. of Inf. for INST. Air Header & LocationJGS 20-400-1-04EJPEP01370G01071Prep. of Inf. for Heat Trace ListJGS 200-400-1-07EJPEP01370G01081Prep. of Inf. for Heat Emission FM EquipmentJGS 200-400-1-21EJPEP01370G01091Prep. of Inf. for Control Room & Analyser HouseJGS 200-400-1-22EJPEP01370G01101Prep. of Inf. Instrument Power SupplyJGS 200-400-1-41EJPEP01370G01111Prep. of Inf. for Instrument GroundingJGS 200-400-1-42EEJPEP01370G01121Prep. of Inf. for Interlocks & Elect. Facilities.JGS 200-400-1-43EJPEP01370G01131Prep. of Inf. for Instrument LightingJGS 200-400-1-44EJPEP01370G01141Prep. of Inf. for Instrument Air ConsumptionJPEP01370G01151Prep. of Inf. for Tie-ins Between PKG. Vender0-8900JPEP01370G01161Prep. of Inf. for List of Free Issue Item To System Vender0-0150JPEP01370G01171Prep. of Inf. for Embedded Metalic Members & HoleJGS 200-400-1-24EJPEP01370G01181Prep. of Inf. for Size & Route of Instrument Cable TrenchJGS 200-400-1-25EJPEP01370G01191Prep. of Inf. for Road Crossing Construction For InstrumentJGS 200-400-1-26EJPEP01370G01201Prep. of Inf. for Misc. Foundation For InstrumentJGS 200-400-01-27EJPEP01370G01211Prep. of Inf. for Painting Bill Of QuantityJPEP01370G01221Prep. of Inf. for Fire Proofing Bill Of QuantityJPEP01370G01231Prep. of Inf. for List Of Installation Type Of Local PG'sJPEP01370G01241Prep. of Inf. for List of Orientation for Instrument & ACCJPEP01370G01251Prep. of Inf. Dimension & Take off Direction for OrificeJGS 200-400-1-01EJPEP01370G02012Sample Vendor Documents for Instrumentation in Package UnitsJPEP01370G05011Handling Procedure for Basic Design DataJPEP01370G05021Basic Engineering Design DataJGS 120-1-04EJPEP01370G05031Application For Codes & Standards.JGS 120-1-05EJPEP01370G05041Process Control SchemesJGS 120-1-13EJPEP01370G05051Preparation of Instrument DataJGS 120-1-36EJPEP01370G05061Preparation of LC & LG ArrangementJGS 120-1-56EJPEP01370G05071Drawing Standards for P & ID PreparationJGS120-1-70EJPEP01370G05081Design Criteria for P & ID PreparationJGS 120-1-71EJPEP01370G05091Emergency Measures for Process UnitJGS 120-1-42EJPEP01370G05101Process Safeguarding Flow SchemsJGS 120-1-43EJPEP01370G05111HAZOPJGS 120-1-79EJPEP01370G05121Plant Layout for Basic Design EngineeringJGS 120-1-50EJPEP01370G05131Noise ControlJGS 120-1-57EJPEP01370G0999J1PREP. GUID. FOR ENGLISH MANUAL AND TECHNICAL REPORT (GUIDELINE FOR WRITERS)JPEP01370G10011Recommended Pratice for Re -Instrumentation ProjectJPEP01370G10020Experiences List For Re-Instrumentation ProjectJPEP01370S0001J1SAMPLE OF ENGINEERING PROCEDURE FOR INST. AND CONTROL DESIGN0-2000JPEP01370S00311Sample Spec. For Required Data For Safety Vale Test @ Site0-8700JPEP01370S10010Sample Specification for DCS 1 0F 3 ( For Re- Instrumentation)JPEP01370S10020Sample Specification for DCS 2 0F 3 ( For Re- Instrumentation)JPEP01370S10030Sample Specification for DCS 3 0F 3 ( For Re- Instrumentation)JPEP01370S10040Sample Specification for ESD (For Re- Instrumentation)JPEP01370S10050Sample Specification for Scope of Work ( For Re- Instrumentation)JPEP01370S10060Sample Specification for Change over Procedure ( For Re- Instrumentation)JPEP01370S10070Sample Specification for Demolishing Work( For Re- Instrumentation)JPEP01370S10080Sample Specification for Instrumentation ( For Re- Instrumentation)JPEP01370S10090Sample Specification for Panel Equipment ( For Re- Instrumentation)JPEP01370S10100Sample Specification for Modification Work ( For Re- Instrumentation)JPEP01370S10110Sample Specification for Existing Document Confirmation ( For Re- Instrumentation)JPEP01370S10120Sample Specification for Instrument List ( For Re- Instrumentation)JPEP01370S10130Sample Schedule for For Re- InstrumentationJPEP01370S10140Sample Vender Drawing 1 of 2 ( For Re -Instrumentation)JPEP01370S10150Sample Vender Drawing 2 of 2 ( For Re -Instrumentation)JPEP01370S10160Sample Presentation Material For Re -Instrumentation Project.JPEP01370T00011In3(incube) User ManualJPEP01370T0001J1in3(incube) USERS MANUALJPEP01370T00020Instrument Data Base Spec. For inTOOLSJPEP01371B01010Sample for Work Instruction to LCE for Control System (To JPhil)JPEP01371B01020Sample for Work Intruction to LCE for Prearation of Logic Diagram(To JPhil)JPEP01371F0001E, J0Check List of Modbus CommunicationJPEP01371F0002E, J0Check List for OCP CommunicationJPEP01371F01000STANDARD FORMAT OF I/O INFORMATION FOR PACKAGE SYSTEMJPEP01371F01010Standard Format For Modbus Specification/Mapping listJPEP01371F01020Standard Format For OPC Specification/Tag listJPEP01371G00011Prep. Guidance for G.S of Control & Monitoring System and SampleJPEP01371G00021Prep. Guidance for G.S of ESD SpecificationJPEP01371G00031Prep. Guidance for G.S of Panel and Tack and SampleJPEP01371G00041Prep. Guidance for G.S of Cause and Effect DiagramJPEP01371G00051Prep. Guidance for DCS I/O Data Base and SampleJPEP01371G00061Prep. Guidance for Interlock and Logic Diagram and SampleJPEP01371G00071Prep. Guidance For Alaram Set Point List and SampleJPEP01371G00081Prep. Guidance For Narative Description for Complex Loop and SampleJPEP01371G00091Prep. Guidance For SPC. of DCS MMI Philosophy and SampleJPEP01371G00101Prep. Guidance For DCS Graphic DWG. and SampleJPEP01371G00111Prep. Guidance For Spec. of DCS Reporting Function and SampleJPEP01371G00121Prep. Guidance for Spec.Of System communication and SampleJPEP01371G00131Prep. Guidance for Spec.Of Advance Control System and SampleJPEP01371G00141Prep. Guidance for DCS Grouping Philosophy and SampleJPEP01371G00151Prep. Guidance for Spec. of DCS Sparing Philosophy and SampleJPEP01371G00161Prep. Guidance for Spec.Of F & G MIMIC PanelJPEP01371G00311Prep. Guidance and Sample Spec. For Local PanelJPEP01371G00321Prep. Guidance and Sample Spec. for Board InstrumentJPEP01371G00331Grounding Requirment for DCS (Vendor 's Requirments)JPEP01371G00341Prep. Guidance and Sample Spec. for Pipeline Leak Detection SystemJPEP01371G00511Sample Technical Bid Evaluation For PCS/ESDJPEP01371S00011Spec. for Binary Logic Symbols for InstrumentationJPEP01371S00021Sample PJ Spec.for Re-Instrumentation0-0777JPEP01371S00031Sample PJ Spec. for PJ Scope Of Work for Re-Instrumentation0-8700JPEP01371S00041Sample PJ Spec. for Instrument Loop Change Over Procedure0-0777JPEP01371S01011Sample Requisition of DCS & ESD0-0150JPEP01372G00011Prep. Guidance for Spec. of Operator Training System and SampleJPEP01373B01010Sample for Work Instruction to LCE for Orifice Calculation(To JPhil)JPEP01373D40011Standard DWG. for Thermowell ( Drilled Bar Stock Type)JGS 332-411-6-07EJPEP01373D40021Standard DWG. for Thermowell ( Welding End Type)JGS 332-411-6-08EJPEP01373D60011Standard DWG. for RF Orifice PlateJGS 332-411-6-01EJPEP01373D60021Standard DWG. for 300 RJ Orifice PlateJGS 332-411-6-02EJPEP01373D60031Standard DWG. for 600 RJ Orifice PlateJGS 332-411-6-03EJPEP01373D60041Standard DWG. for 900 RJ Orifice PlateJGS 332-411-6-04EJPEP01373D60051Standard DWG. for 1500 RJ Orifice PlateJGS 332-411-6-05EJPEP01373D60061Standard DWG. for 2500 RJ Orifice PlateJGS 332-411-6-06EJPEP01373G00511Sample Technical Bid Evaluation For Transformer0-0800JPEP01373G10012Design Criteria For Pressure Measurement MethodsJPEP01373G10023Prep. Guidance and Sample Spec. for Pressure InstrumentJPEP01373G10032Prep. Guidance and Sample Spec. for Diff. Pressure InstrumentJPEP01373G10043Prep. Guidance and Sample Spec. for Pressure SWJPEP01373G20011Design Criteria for Flow Measurement MethodsJPEP01373G20021Installation Requirements For Flow MetersJPEP01373G20033Prep. Guidance and Sample Spec. for D/P Flow InstrumentJPEP01373G20043Prep. Guidance and Sample Spec. for Variable Area Flow InstrumentJPEP01373G20053Prep. Guidance and Sample Spec. for Electromagnetic Flow InstrumentJPEP01373G20063Prep. Guidance and Sample Spec. for Turbine Type Flow InstrumentJPEP01373G20073Prep. Guidance and Sample Spec. for Positive Displacement Type Flow InstrumentJPEP01373G20083Prep. Guidance and Sample Spec. for Vortex Type Flow InstrumentJPEP01373G20093Prep. Guidance and Sample Spec. for Untrasonic Type Flow InstrumentJPEP01373G20103Prep. Guidance and Sample Spec. for Coliolis Type Flow InstrumentJPEP01373G20113Prep. Guidance and Sample Spec. for Thermal Type Flow InstrumentJPEP01373G20121Prep. Guidance and Sample Spec. for Multi-phaseType Flow InstrumentJPEP01373G30011Design Criteria For Level Measurement MethodsJPEP01373G30021Prep. of Inf. For Installation of Thk Gauge and Level SWJGS 200-400-1-10EJPEP01373G30033Prep. Guidance and Sample Spec. for D/P Type Level Instrument.JPEP01373G30043Prep. Guidance and Sample Spec. for Displacement Type Level Instrument.JPEP01373G30053Prep. Guidance and Sample Spec. for Capacitance Type Level Instrument.JPEP01373G30063Prep. Guidance and Sample Spec. for Radioactive Type Level Instrument.JPEP01373G30073Prep. Guidance and Sample Spec. for Float/Disp.Type Level SWJPEP01373G30083Prep. Guidance and Sample Spec. for Ultrasonic Type Level Instrument.JPEP01373G40012Design Criteria for Temperature Measurment MethodsJPEP01373G40023Prep. Guidance and Sample Spec. for Temperature Instrument.JPEP01373G40033Prep. Guidance and Sample Spec. for Thermocouple and WellsJPEP01373G40043Prep. Guidance and Sample Spec. for Resistance Bulb and WellsJPEP01373G40053Prep. Guidance and Sample Spec. for Temperature SW and WellsJPEP01373G40062Prep. Guidance and Sample Spec. for Special Temperature Instrument.JPEP01373G40071Prep. Guidance and Sample Spec. for PyrometerJPEP01373G40081Calculation Formula for Thermowell Strength.JPEP01373G50012Prep. Guidance and Sample Spec. for Pressure GuageJPEP01373G50023Prep. Guidance and Sample Spec. for Draft GuageJPEP01373G50033Prep. Guidance and Sample Spec. for Guage GlassJPEP01373G50043Prep. Guidance and Sample Spec. for Tank GuageJPEP01373G50053Prep. Guidance and Sample Spec. for Thermometer and WellsJPEP01373G60013Prep. Guidance and Sample Spec. for Orifice PlateJPEP01373G60023Prep. Guidance and Sample Spec. for VenturitubeJPEP01373G60033Prep. Guidance and Sample Spec. for Flow NozzleJPEP01373G60043Prep. Guidance and Sample Spec. for Pitot TubeJPEP01373G70013Prep. Guidance and Sample Spec. for Field ConvertorJPEP01373S00011Sample SpeC. for Valve ManiholdsJPEP01373S01011Sample Requisition for Field Transmitters0-0150JPEP01374B01011Sample for Work Instruction to LCE for Vendor Document Review of Valve (To J-Tech)JPEP01374G10011Design Criteria for Control VlavesJPEP01374G10021Control Valve Hand Book(Mason)JPEP01374G10031Control Valve Hand Book(Fisher)JPEP01374G10042Perp. Guidance & Sample Spec. for Control ValveJPEP01374G10051Control ValveJGS 120-1-60EJPEP01374G10511Sample Technical Bid Evaluation for Control Valves0-0800JPEP01374G20012Prep. Guidance & Sample Spec. for ON-OFF ValvesJPEP01374G20020Prep. Guidance & Sample Spec. for Over Pressure Protection ValveJPEP01374G30011Design Criteria for Safety ValvesJPEP01374G30021Pressure Relief Valve Engeering Hand BookJPEP01374G30032Prep. Guidance & Sample Spec. for Safety ValveJPEP01374G30041Sample Inf. Of Tie-In Dimension of Safety Relief ValvesJPEP01374G30051Pressure Relief DevicesJGS 120-1-61EJPEP01374G30511Sample Technical Bid Evaluation For Safety Valves0-0800JPEP01374G40012Prep. Guidance & Sample Spec. for Gas Blanket SystemJPEP01374G50011Prep. Guidance & Sample Spec. for Motor Operated ValvesJPEP01374G50021Prep. Guidance & Sample Spec. for Hydraulic ValvesJPEP01374G60010Sample Drawings for Standard Volume Tanks For Control Valves and On-Off valvesJPEP01374S11011Sample Requisition of Control Valve0-0150JPEP01375G00011Prep. of Inf. for Analyser Sampling PipingJGS 200-400-1-5-05EJPEP01375G00021Prep. of Inf. for Analyser Utility ListJGD 200-400-1-06EJPEP01375G00031Prep. of Inf. for Drip Funnel for AnalyserJGS 200-400-01-28EJPEP01375G00041Prep. Guidance & Sample Spec. for Analyser Data Aquisit. SystemJPEP01375G00051Prep. Guidance & Sample Spec. for Machinary Monitoring SystemJPEP01375G00511Sample Technical Bid Evaluation For Analyser0-0800JPEP01375G10011Prep. Guidance & Sample Spec. for Infrared AnalyserJPEP01375G10021Prep. Guidance & Sample Spec. for Thermal Conductivity AnalyserJPEP01375G10031Prep. Guidance & Sample Spec. for O2 AnalyserJPEP01375G10041Prep. Guidance & Sample Spec. for Conductivity AnalyserJPEP01375G10051Prep. Guidance & Sample Spec. for Density AnalyserJPEP01375G10061Prep. Guidance & Sample Spec. for PH MeterJPEP01375G10071Prep. Guidance & Sample Spec. for Moisture AnalyserJPEP01375G10081Prep. Guidance & Sample Spec. for G.CJPEP01375G10091Prep. Guidance & Sample Spec. for Analyser System PackageJPEP01375G10101Prep. Guidance & Sample Spec. for Analyser Sampling SystemJPEP01375G10121Prep. Guidance & Sample Spec. for Analyser HouseJPEP01375G10131Prep. Guidance & Sample Spec. for Air Pollution Monitoring SystemJPEP01375G20011Prep. Guidance & Sample Spec. for Gas DetectorJPEP01375G20021Prep. Guidance & Sample Spec. for Flame DetectorJPEP01375S01011Sampling Requisition for AnalyserJPEP01377G10031Prep. Guidance & Sample Spec. for Flame Monitoring SystemJPEP01377G10051Prep. Guidance & Sample Spec. for Track Loading SystemJPEP01377G10061Prep. Guidance & Sample Spec. for Metering SystemJPEP01377G10071Prep. Guidance & Sample Spec. for Meter Proving . SystemJPEP01377G10081Prep. Guidance & Sample Spec. for Tank Gauging SystemJPEP01377G10091Prep. Guidance & Sample Spec. for Fire & Gas Monitoring SystemJPEP01377G10101Prep. Guidance & Sample Spec. for MOV Control SystemJPEP01377G10111Prep. Guidance & Sample Spec. for Compressor Control SystemJPEP01377G10121Prep. Guidance & Sample Spec. for Gas Detection SystemJPEP01377G10131Prep. Guidance & Sample Spec. for Wellhead Control PanelJPEP01378B01011Sample for Work Instruction to LCE for Preparation of Typical Installation Drawing(To J-tECH)JPEP01378D00011Installation Drawing for General Type PG'SJGS 659-431-6-02EJPEP01378D00021Installation Drawing for General Type of PG'S W/Vent PlugJGS 659-431-6-02EJPEP01378D00031Installation Drawing for Diaphram Type PG'SJGS 659-431-6-03EJPEP01378D00041Sample Assembly Dwg. For Pressure Gauge Installation0-0500/0560/1100JPEP01378D00051Standard Drawing for Drain PotJGS 332-421-6-09EJPEP01378D00061Standard Drawing for Special Tees & Plug for Inst.JGS 332-421-6-11EJPEP01378D00071Standard Drawing for Bosses for Orifice MeterJGS 332-421-6-16EJPEP01378D00081Standard Drawing for Inst. Install. Matl(Cond.Pot & SeaIPC CSE -01-87JPEP01378D00091Standard Drawing for Inst.Install. Matl. (Vent Plug & Fitting)IPC CSEC-02-87JPEP01378D00101Standard Drawing for Inst.Install. Matl. (Drain Plug & Fitting)IPC CSE -03-87JPEP01378D00111Standard Drawing for Inst.Install. Matl. (PG Connector)IPC CSE -04-87JPEP01378D00121Standard Drawing for Inst.Install. Matl. (Pipe Syphons)IPC CSE -05-87JPEP01378D00131Standard Drawing for Inst.Install. Matl. (Cable Duct)IPC CSE -21-87JPEP01378D00141Standard Drawing for Inst.Install. Matl. (Tube Trays)IPC CSE -22-87JPEP01378D00151Standard Drawing for Inst.Install. Matl. (Stanchions)IPC CSE -31-87JPEP01378D00161Standard Drawing for Inst.Install. Matl. (Receiver GaugeIPC CSE -32-87JPEP01378D01010TYPICAL INSTALLATION DRAWINGS FOR INSTRUMENTSJPEP01378F00011Construction Bill of Quantity (BQ Table)JPEP01378F00021Design dwg. Check ListJGC FORM 2710JPEP01378F00030MTO CHECK LIST FOR INSTRUMENTJPEP01378F01050Material Take Off (MTO) Procedure For Instrumant Equipment and MaterialsJPEP01378G00011Prep. Guidance for Instrument Loop Dwg. & Sample Dwg.0-8770, 0-7000JPEP01378G00021Prep. Guidance for Instrument Installation Methods & Sample DwgJPEP01378G00031Prep. Guidance for Ground. & Light. Prot. Lyt & Sample Dwg0-8700JPEP01378G00041Design Guid. for Power Supply Diag. and Sample Dwg.JPEP01378G00041SAMPLE DRAWING FOR POWER SUPPLY DIAG. Power Supply Exihbit-1JPEP01378G00041SAMPLE DWG FOR POWER SUPPLY DIAG. Power Supply Exihbit-2JPEP01378G00041SAMPLE DWG FOR POWER SUPPLY DIAG. Power Supply Exihbit-3JPEP01378G00051Prep.Guid. of General Descrip. of Install. Dwg. and Sample DrawingJPEP01378G00061Prep.Guid. of Braek Down Dwg. for Inst. Construction Dwg.JPEP01378G00071Dseign Guid. of Inst. Eqt. Lyt in Building and Sample Drawing.JPEP01378G00081Design Guid. of Lyt of Tray/Duct/Piping in Building and Sample DrawingJPEP01378G00091Design Guid. of Lyt of Wiring/Cabling in Building and Sample DrawingJPEP01378G00101Design Guid. of Lyt Dwg.for Main Cable Way and Sample DrawingJPEP01378G00111Design Guid. of Lyt Dwg. for Main Cables and Sample DrawingJPEP01378G00121Design Guid. of Lyt Dwg. for Wiring/Piping/Tubing and Sample DrawingJPEP01378G00131Design Guid. of Inst. Impulse Dwg. and Sample DrawingJPEP01378G00141Design Guid. of Area Class . For Inst. Fire Proofing and Sample DrawingJPEP01378G00151Design Guid. of Instrument Connection List and Sample DrawingJPEP01378G00161Design Guid. of Analyser Impulse Hook Up and Sample DrawingJPEP01378G00171Design Guid. of Instrument Plot Plan and Sample GuidanceJPEP01378G00181Prep. Guidance of Inst. Calibration Sheet and SampleJPEP01378G00191Prep. Guidance of Inst. Loop Test Pkg. and SampleJPEP01378G00201Prep. Guidance of Inst. Installation Schedule and SampleJPEP01378G00211Prep. Guidance of Bid Eva. for Instrumentation WorkJPEP01378G00221Sample Detailed Design PracticeS-00-1378-XXXJPEP01378G00231Prep. Guidance and Sample List for Bill of Bulk MaterialJPEP01378G00241Prep. Guidance and Sample List for Cable DrumJPEP01378G00251Standard Technical Documents for Inst. Work InquiryJPEP01378G00261Guide for BQ Data Preparation for instrument installation WorkJPEP01378G00271Specification of Design for Installation WorkJGS 230-430-1-01EJPEP01378G00281Specification of Symbols for Instrument Installation Dwg.JGS 230-430-2-01EJPEP01378G00291Specification of Preparation of instrument Installation Dwg.JGS 223-400-1-01EJPEP01378G00301Specification of Instrumentation WorkJGS 650-430-5-01EJPEP01378G00311Specification of Test and inspection for intrumentation WorkJPEP01378G00321Specification of instrument Loop Check & Pre-Commi.JGS 433-400-5-02EJPEP01378G00331Specification of Winterization for Instrument Design.JGS 212-400-1-01EJPEP01378G00341Specification of Test and Inspection for Instrument Installation WorkIPC CSE -91-79JPEP01378G00351Prep. Guidance and Sample Spec. for Radioactive Material0-0560JPEP01378G01010INSTRUMENT 3D MODELING DETAILJPEP01378G01031Prep. of Inf. for Typ & Locat. Locat. of Ope. Platfrom and LadderJGS 200-400-1-09EJPEP01378G01040Check List for Review of Inst. Construction DocumentJPEP01378S00011Sample Spec. For Instrumentation Work0-8700/0-0150JPEP01378S00021Sample Spec. for Test and Inspection for Instrumentation Wrok0-0777/0-0150JPEP01378S00031Sample Spec.for Instrumentation Loop Check & Inst. Calibration0-8700/0-0150JPEP01378S00041Sample Spec.of Fire Proofing for Instrumentation0-8700JPEP01378S00051Sample Spec. of Installation Bulk Materials0-9370/0-8700JPEP01378S00061Sample Spec. of Material Codes for Installation Material0-0777/0-0150JPEP01378S00071Sample Spec. of Instrument Cables0-0150/0-8700JPEP01378S01011Sample Requisition for Instrument Bulk Materials0-0777JPEP01378S01021Sample Requisition for Instrument Cable0-0150

&RJPEP-0-1370-A-0000 Rev.4PAGE &P+2 OF 13