JAEA-TestingJAEA-Testing JAEA-Testing 2009-006 Replacement of Power Manipulator in the No.2 Concrete...
Transcript of JAEA-TestingJAEA-Testing JAEA-Testing 2009-006 Replacement of Power Manipulator in the No.2 Concrete...
JAEA
-TestingJAEA-Testing
2009-006
Replacement of Power Manipulator in the No.2
Concrete Cells of JMTR Hot Laboratory
ホットラボコンクリートNo.2セル内パワーマニプレータの更新
March 2010
Japan Atomic Energy Agency 日本原子力研究開発機構
JAEA
-Testing 2009-006 ホットラボコンクリート№2セル内パワーマニプレータの更新
日本原子力研究開発機構
岩松 重美 金澤 賢治 林 光二 相沢 静男中川 哲也
大洗研究開発センター照射試験炉センター原子炉施設管理部
Department of JMTR OperationNeutron Irradiation and Testing Reactor Center
Oarai Research and Development Center
Shigemi IWAMATSU, Yoshiharu KANAZAWA, Koji HAYASHI,Shizuo SOUZAWAand Tetsuya NAKAGAWA
ii
JAEA-Testing 2009-006
Replacement of Power Manipulator in the No.2 Concrete Cells of JMTR Hot
Laboratory
Shigemi IWAMATSU, Yoshiharu KANAZAWA , Koji HAYASHI, Shizuo SOUZAWA and Tetsuya NAKAGAWA
Department of JMTR Operation, Neutron Irradiation and Testing Reactor Center, Oarai Research and Development Center
Japan Atomic Energy Agency Oarai-machi, Higashiibaraki-gun, Ibaraki-ken
(Received December 18, 2009)
This report is concerned with replacement of the power manipulator in the No.2 concrete cell of JMTR hot laboratory in the 2008 fiscal year. The replacement was carried out mainly on a chassis part including the remarkably aged wrist, shoulder and controller. The specifications of the machinery to be replaced, the installation and the acceptance inspection were described in this report.
Keywords: JMTR, Hot Laboratory, Power Manipulator , Concrete Cells.
Research Staff on Loan
����
JAEA-Testing 2009-006
JAEA-Testing 2009-006
���
iv
Contents
1. Introduction ……………………………………………………………………………………..…1 2. History of replacement of power manipulators in JMTR hot laboratory ……………….. 3 3. Specifications of the No.2 concrete cell power manipulator to be replaced………………5 4. Acceptance inspection of the power manipulator .……….…..…….……….………………. 6
4.1 Outline test ………….…..………………………………….…..…………….……………… 6 4.2 Dimension test ……………..………………………………….…..…………….……………6 4.3 Numbering test ………………………………………………………………………………. 6 4.4 Functional and operation test ………………………………………………………………6
5. Installing works of the power manipulator……………………………………………………9 5.1 Removing of older power manipulator in the No.2 concrete cell……………………… 9 5.2 Installing of newer power manipulator in the No.2 concrete cell …….……………… 9
6. Total operation test………………………………………………………………………………14 6.1 Operation test of power manipulator …………………………………………………… 14 6.2 Operation test of power center …………………………………………………………… 14
7. Conclusions ……………………………………………………………………………………… 17 Acknowledgement …………………………………………………………………………………. 17
iv
Contents
1. Introduction ……………………………………………………………………………………..…1 2. History of replacement of power manipulators in JMTR hot laboratory ……………….. 3 3. Specifications of the No.2 concrete cell power manipulator to be replaced………………5 4. Acceptance inspection of the power manipulator .……….…..…….……….………………. 6
4.1 Outline test ………….…..………………………………….…..…………….……………… 6 4.2 Dimension test ……………..………………………………….…..…………….……………6 4.3 Numbering test ………………………………………………………………………………. 6 4.4 Functional and operation test ………………………………………………………………6
5. Installing works of the power manipulator……………………………………………………9 5.1 Removing of older power manipulator in the No.2 concrete cell……………………… 9 5.2 Installing of newer power manipulator in the No.2 concrete cell …….……………… 9
6. Total operation test………………………………………………………………………………14 6.1 Operation test of power manipulator …………………………………………………… 14 6.2 Operation test of power center …………………………………………………………… 14
7. Conclusions ……………………………………………………………………………………… 17 Acknowledgement …………………………………………………………………………………. 17
JAEA-Testing 2009-006
�v
JAEA-Testing 2009-006
− � −
6
Photo.4.1
Photo.4.2 Photo.4.3 Photo.4.4
4.1
4.2
4.3
4.4
Table 4.1
Table 4.1
JAEA-Testing 2009-006
− � −
JAEA-Testing 2009-006
− � −
9
5.
5.1
Photo.5.1 Photo .5.2
Fig.5.1
Photo.5.3
5.2
Photo.5.4
Photo.5.5Photo.5.6
JAEA-Testing 2009-006
− � −
JAEA-Testing 2009-006
− � −
14
6.
6.1
Photo.6.1 , Photo.6.2 Photo.6.3
6.2
Photo.6.4
Photo.6.1
JAEA-Testing 2009-006
− �� −
JAEA-Testing 2009-006
− �� −