J60251060 sapt congestion_study_presentation_2013-04-30
-
Upload
muhammadasad-ali -
Category
Documents
-
view
22 -
download
1
Transcript of J60251060 sapt congestion_study_presentation_2013-04-30
icfi.com | ghkint.com
J60251060
Existing Traffic Conditions – Napier Mole Road 2
NB / SB
Effective Lane: 2 / 1
Capacity: 2,300 / 1,150
Average Flow: 700 / 800
V/C Ratio*: <50% / <75%
* desirable V/C: less than 85%
icfi.com | ghkint.com
J60251060
Existing Traffic Conditions – Napier Mole Road 3
NB / SB
Effective Lane: 1 / 1
Capacity: 1,150 / 1,150
Average Flow: 370 / 230
V/C Ratio*: <50% / <25%
* desirable V/C: less than 85%
icfi.com | ghkint.com
J60251060
Existing Traffic Conditions – Access Road to SAPT
NB & SB
Effective Lane: 1 lane 2 ways
Capacity: 300
Average Flow: 200
V/C Ratio*: <75%* desirable V/C: less than 85%
icfi.com | ghkint.com
J60251060
Existing Traffic Conditions – Dedicated Coal Road
NB & SB
Effective Lane: 2-3 lanes 2 ways
Capacity: 1,170
Average Flow: 200
V/C Ratio*: <25%* desirable V/C: less than 85%