![Page 1: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/1.jpg)
Introduction of Technical Guidelines on Retro-commissioning (RCx) in Hong Kong
28 November 2017
![Page 2: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/2.jpg)
BUILDING
Systems are working
Users feels not bad
BUT…….
System are not work at high efficiency
THUS……
Waste Energy
Waste Money
……
What can we do?
HUMAN BODY
(Sub-health)(亞健康)
We are not sick
Go to work every day
BUT…….
Just feel not right
THUS……
Low productive
We can……
Body check, take health advices; get healthy
Building Operation
![Page 3: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/3.jpg)
Commercial, 65%
Residential, 27%
Industrial, 6% Transport, 2%
Electricity consumption in Hong Kong
> 90%
Buildings consume over
Electricity use in HK
3 (Source: Hong Kong Energy End-use Data, EMSD)
![Page 4: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/4.jpg)
The Buildings Energy Efficiency Ordinance (BEEO)
- Central Building Services Installations (CBSIs) in new prescribed buildings shall comply with the Building Energy Code (BEC)
- Major retrofitting works (MRW) for CBSIs in existing prescribed buildings shall comply with BEC
- Energy Audit every 10 yrs (Commercial building / commercial portion)
![Page 5: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/5.jpg)
Age over 25 Buildings with age over 25
> 60%
in existing private buildings
5
![Page 6: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/6.jpg)
Buildings often get out of tune…
Changes induced by addition, alterations and improvement works
Drift off / override of system control set points
Drop in accuracy of sensors
Operation error Time
Buildings lose their efficiency as a result … 6
Bu
ildin
g’s
En
erg
y P
refe
ren
ce
Building Operation
![Page 7: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/7.jpg)
Buildings often get out of tune…
Changes induced by addition, alterations and improvement works
Drift off / override of system control set points
Drop in accuracy of sensors
Operation error Time
… energy efficiency back to design/better 7
Bu
ildin
g’s
En
erg
y P
refe
ren
ce
Building Operation
![Page 8: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/8.jpg)
What is Retro-commissioning ?
A cost-effective systematic process to periodically check an existing
building’s performance.
The process identifies operational improvements that can effectively save energy and thus lower energy bills and improve indoor environment
“Retro-commissioning” covers the scope of “existing building commissioning”, “re-commissioning” and “continuous commissioning”.
8
![Page 9: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/9.jpg)
9
Buildings frequently undergo operational and occupancy changes
that challenge the mechanical, electrical and control systems, hindering optimal performance.
In today’s complex buildings, systems are highly interactive, with sophisticated controls that can create a trickle-down effect on building operations
Why is retro-commissioning important?
![Page 10: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/10.jpg)
Retro-commissioning is not common in Hong Kong
Building owners not familiar
Value not fully Demonstrated
Insufficient local guidelines
X X Limited
experienced staff and
service providers
X Lack of building
information
10
![Page 11: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/11.jpg)
4 Work stages of RCx
Sample Technical Approach of RCx
Forms or checklist for RCx
11
Search: TG RCx HK
![Page 12: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/12.jpg)
Direct Benefits of RCx Energy Savings / Electricity Bill
Indirect Benefits of RCx
Improve building performance
Improve occupant comfort and productivity
Improve system reliability
Improve building systems efficiency and extended equipment life
Provide appropriate training to O&M staff
No or Low cost - short payback
![Page 13: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/13.jpg)
Stage 1: Planning
Stage 2: Investigation
Stage 3: Implementation
Stage 4: On-going Commissioning
13
RCx Framework
![Page 14: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/14.jpg)
14
How to start? Venues
Building portfolio
Annual electricity consumption?
Accessibility?
System complexity?
Considerations
![Page 15: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/15.jpg)
15
How to start? People
Operators / technicians
Engineers
Maintenance contractors
Equipment/ System Suppliers
Services Providers?
Considerations
![Page 16: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/16.jpg)
16
How to start? Investment & Return
Venues (accessibility?)
People (internal-staff/ external?)
Together with retrofit?
Phasing?
Environmental concerns?
Considerations
![Page 17: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/17.jpg)
Gather information from stakeholders, documentation (eg. drawings, manuals)
Arrange meeting and interview
Conduct walk-through Inspection
Develop RCx plan for agreement with stakeholders
Forms template developed in TG to facilitate the users to carry out RCx
17
Stage 1: Planning Example:
![Page 18: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/18.jpg)
Conduct site survey and identify current facilities requirement
Perform system adjustments and quick fix
Conduct data logging and trending
Short term diagnostic, monitoring and functional test plans
18
Stage 2: Investigation Example:
![Page 19: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/19.jpg)
Conduct site survey and identify current facilities requirement
Perform system adjustments and quick fix
Conduct data logging and trending
Short term diagnostic, monitoring and functional test plans
19
Stage 2: Investigation Example:
![Page 20: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/20.jpg)
Con’t
Identify potential energy saving measures and improvements
Energy Saving Opportunities (ESO) Forms templates are developed
in TG(RCx)
Investigation Report
20
Stage 2: Investigation Example: chiller sequencing
Cooling tower temperature reset analysis
Analysis COP in different conditions
![Page 21: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/21.jpg)
Implementation of selected energy saving opportunities - Proposed by RCx team and agreed by Stakeholder - Suit budget, minimize disturbance to users
21
Stage 3: Implementation
Performing verification
- Effectiveness of the implemented items
Develop a RCx Final Report
Training for O&M Staff (maintain the RCx benefits)
Example: chiller sequencing
![Page 22: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/22.jpg)
0
1
2
3
4
5
6
7
8
7th May 8th May 9th May 10th May
22
Actual measured data during the chillers sequencing trials
CO
P
Baseline
3 days average COP improvement (by measurement ) Approx. 15%
Measurement & Verification (M&V)
Stage 3: Implementation
![Page 23: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/23.jpg)
To ensure “high” energy performance maintained after RCx
To develop a ongoing commissioning plan
Key indicators such as
Electricity Bill, satisfaction levels of occupants, etc…
To arrange training for O&M staffs
Continuous monitoring – review and update 23
Stage 4: On-going Commissioning
![Page 24: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/24.jpg)
![Page 25: Introduction of Technical Guidelines on Retro ... · - Energy Audit every 10 yrs (Commercial building / commercial portion) ... Develop a RCx Final Report Training for O&M Staff (maintain](https://reader031.fdocument.pub/reader031/viewer/2022021901/5b7dc6177f8b9ada6d8cb9f9/html5/thumbnails/25.jpg)