Internal Quality Audit for ISO 9001_2008
-
Upload
ashraf-s-youssef -
Category
Documents
-
view
119 -
download
6
description
Transcript of Internal Quality Audit for ISO 9001_2008
Internal Quality AuditInternal Quality AuditFOR ISO 9001 : 2008FOR ISO 9001 : 2008
الداخليين المراجعين تأهيل الداخليين دورة المراجعين تأهيل دورةISO 9001 : 2008ISO 9001 : 2008
Nov, 14-16, 2009Nov, 14-16, 2009
Prepared ByPrepared By::
Ashraf S. Youssef, Ph. DAshraf S. Youssef, Ph. D..
QA & Ind. Methods ManagerQA & Ind. Methods Manager
S.M. ASQ, L.A. BSI, M. ELI, M. EMSS.M. ASQ, L.A. BSI, M. ELI, M. EMS
Course Structure
• Tutorial Sessions
• Case Studies
• Role Play
• Games
Learning Objectives
• To understand:Purpose, benefits and typical structure of a
Quality Management System (QMS)Plan-Do-Check Act (PDCA) methodology,
and the process approach to Quality Management
The 8 principles of Quality Management and how they relate to the QMS and ISO 9001
Purpose, scope and uses of the ISO 9000 series standards
Auditing ProcessRoles, responsibilities and competence
requirements of auditors and lead auditors with reference to ISO 19011
4
1. Purpose and structure of o a QMS, PDCA o and the 8 principles of quality management
2. ISOM 9001 Explored & Understood2. ISOM 9001 Explored & Understood
3. Internal Quality Audit Steps3. Internal Quality Audit Steps
4. Auditor’s Skills & Responsibility4. Auditor’s Skills & Responsibility
AgendaAgenda
Course assessment
• Continual assessmentYou will be informed of progress as we goThe exam
• Exam Pass Criteria70% pass markOpen book
• Ask questionsIt’s your tutors job to make problems go away
Session 1
Purpose and structure of a QMS, PDCA and the 8 principles of quality management
What is Quality?
• Q is fitness for use.
• Q is conformance to requirements.
• Q is conformance to customer/user requirements.Meet/satisfy customer/user requirements,
needs, and expectations.
• Degree to which a set of inherent characteristics fulfills requirements.
(ISO 9000 : 2005)
What is Audit?
• Systematic, independent and documented process for obtaining audit evidence and evaluating it objectively to determine the extent to which the audit criteria are fulfilled
What is Audit Evidence?
• Records, statements of fact or other information, which are relevant to the audit criteria and verifiable
What is Audit Findings?
• Results of the evaluation of the collected audit evidence against audit criteria.
What is Audit Client?
• organization or person requesting an audit.
What is Auditee?
• Organization being audited
What is Auditor?
• Person with the competence to conduct Person with the competence to conduct an audit. an audit.
What is Technical Expert?
• person who provides specific knowledge or expertise to the audit team.
What is Audit Plan?
• Description of the activities and Description of the activities and arrangements for an arrangements for an audit.audit.
What is Audit Scope?
• extent and boundaries of an audit.
What is Nonconformance?
Non-fulfillment of a requirement
What is Correction, and C & P Actions?
Correction:Action to eliminate a detected nonconformity
Corrective Action:Action to eliminate the cause of a detected nonconformity
Preventive Action:Action to eliminate the cause of a potential nonconformity or other undesirable potential situation
What is Ident., Trac. And Status?
Identification:
To describe product/ raw material/ semi finish
product etc. Example Batch #, Lot #, Code etc
Traceability:
Ability to trace the history, application or location ofthat which is under consideration
Status:
To identify the current status of product/ raw material with regard
to inspection and test results. Tag/ sticker of HOLD, REWORK,
SCRAP Identified areas.
Types of Audits
• First-party
• Second-party
• Third-party
The purpose of an audit is ...
to collect objective evidence to permit an informed judgment about the status of the
quality management system
Objectivity of Auditing
AUDIT FINDINGS
AUDIT CRITERIA
AUDIT EVIDENCE
AUDIT CONCLUSION
RECOMMENDATION FOR AUDIT
Conformance Non-Conformance
Major Minor
Improvement
Audit Methods & Techniques
FORWARD TRACEFORWARD TRACE
BACKWARDS TRACEBACKWARDS TRACE
RECEIVEGOODS INSPECT STORES
What is ISO 9000:2008 QMS?
• ISO = International Organization for
Standards
• 9000 = code to denote QMS Family
• 2008 = year of last revision
• Is a family of standards for implementing a
Quality Management System (QMS)
ISO 9000:2008 Family
ISO 9000
ISO 9001
ISO 9004
ISO/DIS 19011
Only ISO 9001 can be used forcertification purposes
The ISO 9001:2008 Model
Continual Improvement of the QMSContinual Improvement of the QMS
Input Outputvalue adding
activities
info. flow
info. flow
CU
ST
OM
ER
RE
QU
IRE
ME
NT
S
CU
ST
OM
ER
SA
TIS
FA
CT
ION
managementresponsibility
managementresponsibility
productrealization
productrealization
resourcemanagement
resourcemanagement
meas, analysisimprovement
meas, analysisimprovement
productproduct
clause 4
clause 5clause 6 clause 8
clause 7
value adding
activities
Clauses/Requirements
Clause 4. Quality Management System
Clause 5. Management Responsibility
Clause 6. Resource Management
Clause 7. Product Realization
Clause 8. Measurement, Analysis and
Improvement
Count the number of requirement categories.
Quality Management Principles
Customer Focus
Leadership
Involvement of People
Process Approach
System Approach to Management
Continual Improvement
Factual Approach to Decision Making
Mutually Beneficial Supplier Relationships
1. Customer Focus
• Organizations depend on their customers;
therefore they shouldKnow their current and future needs
Meet their requirements
Exceed their expectations
Get their feedback
CU
ST
OM
ER
SA
TIS
FA
CT
ION
CU
ST
OM
ER
SA
TIS
FA
CT
ION
CU
ST
OM
ER
RE
QU
IRE
ME
NT
SC
US
TO
ME
R R
EQ
UIR
EM
EN
TS
2. Leadership
• Leaders create common purpose
and direction; therefore they
shouldMaintain a healthy internal
environment
Inspire workforce to excel
managementmanagementresponsibilityresponsibility
managementmanagementresponsibilityresponsibility
3. Involvement of People
• People are the essence of an
organization; thereforeThey should be fully involved
Their abilities should be used for
organization benefits
resourceresourcemanagementmanagement
resourceresourcemanagementmanagement
4.4. Process ApproachProcess Approach
Manage activities and related Manage activities and related
resources as a PROCESSresources as a PROCESS
OrderOrder ProductProduct
ReviewReviewPurchasePurchase DesignDesign MakeMake DeliverDeliver
“Turtle” Approach
PROCESSPROCESS
WITH WHAT?
INPUTS
HOW? OBJECTIVES/MEASURES?
OUTPUTS
WITH WHO?(Materials /
Equipment)
(Support Processes, Procedures & Methods)
(Performance Indicators)
(Competence / Skills / Training)
Example: Management, Responsibility
Management responsibility
& objective setting
with whatManagement Review
forumPrevious year’s results
inputsInternal audits
Customer satisfaction trends
Process/Product measures
Faults/Complaints data
measuresResults vs plan
Customer surveysMilestones
with whoManagement teamQuality manager
Team leaders
outputsAnnual plan
Improvement objectives
howImplementation planResource allocation
Roles & responsibilitiesCommunications
support processes
IT systemsPurchasingHR, Training
5. System Approach to Management
• Managing interrelated processes as a system helps the organization in achieving its objectives in an effective and efficient manner
managementmanagementresponsibilityresponsibility
managementmanagementresponsibilityresponsibility
productproductrealizationrealization
productproductrealizationrealization
resourceresourcemanagementmanagement
resourceresourcemanagementmanagement
meas., analysismeas., analysisimprovementimprovement
meas., analysismeas., analysisimprovementimprovement
PlanPlan
DoDo
ActAct
CheckCheck
6.6. Continual Improvement:Continual Improvement: PDCA CyclePDCA Cycle
Continual Improvement of the QMSContinual Improvement of the QMSContinual Improvement of the QMSContinual Improvement of the QMS
7. Factual Approach to Decision-Making
• Effective decisions are based on the analysis of data and information
info. flowinfo. flow
CU
ST
OM
ER
RE
QU
IRE
ME
NT
SC
US
TO
ME
R R
EQ
UIR
EM
EN
TS
CU
ST
OM
ER
SA
TIS
FA
CT
ION
CU
ST
OM
ER
SA
TIS
FA
CT
ION
managementmanagementresponsibilityresponsibility
managementmanagementresponsibilityresponsibility
meas., analysismeas., analysisimprovementimprovement
meas., analysismeas., analysisimprovementimprovement
info. flowinfo. flow
productproductrealizationrealization
productproductrealizationrealization
8. Mutually Beneficial Supplier Relationship
• Interrelated
• Win-Win
productproductrealizationrealization
productproductrealizationrealizationSupplierSupplier
Session 2
ISO 9000 series explored and understood
Structure of ISO 9001:2008
• 0.1 General• 0.2 Process Approach• 0.3 Relationship with ISO 9004• 0.4 Compatibility with other standards• 1 Scope• 2Normative References• 3 Terms & Definitions• 4. Quality Management system• 5. Management Responsibility• 6. Resource Management• 7. Product Realization• 8. Measurement, Analysis & Improvement
4: Quality Management System
• General requirements (4.1)– General requirements for approach & content of the
QMS (e.g. for the adoption of the process approach)– Outsourcing
• Documentation requirements (4.2)– Mandatory procedures– Manual, Policy & Objectives– General sufficiency of documentation and records– System for Document Control– System for Control of Records
5: Management Responsibility
• The areas where direct Top Management involvement is mandatory– Demonstrating commitment– Demonstrating customer focus– Input into policy development & review– Identification of objectives and input into the planning
process– Defining responsibilities, providing resources– Ensuring internal communications are effective– Involvement in management review
6: Resources
• Human ResourcesEnsuring adequacy particularly in respect of training
• InfrastructureBuildings, work space, equipment, vehicles,
information systems etc
• Environmental controls (Aligned with ISO14000)Heat, light, humidity, temperature, clean roomsIn fact any controls that are applicable
7: Product Realisation
• Think of this as “Production” or “Service Delivery”Control of the core day to day operationsOperational planning (7.1)Handling contracts, enquiries & customer
communication systems (7.2)Design (7.3)Management of supplies and suppliers (7.4)Operational controls (7.5)Calibration (7.6)
• Exclusions may apply
8: Measurement, Analysis & Improvement
• The collection and constructive use of data– Measuring product (conformity checks and inspection) – Measuring process (efficiency measures)– Customer satisfaction (Survey, Feedback, Complaint)– Internal audit– Control of quarantine/isolation activities– Analysis of data (you must do something with data)– Continual improvement (the standard encourages the
application of the process approach to improvement)– Corrective action (Correction + Corrective Action)– Preventive action
Session 3
Internal Quality Audit Steps
Internal Quality Audit Steps
Initiation
Preparation
Evaluation
Reporting
Fixing
Initiation STEPS RESPONSIBILITY1. Request Audit Program
Manager 2. Identify Lead Auditor Program
Manager 3. Define Audit Scope Program Manager
& Lead Auditor
STEPS RESPONSIBILITY1. Request Audit Program
Manager 2. Identify Lead Auditor Program
Manager 3. Define Audit Scope Program Manager
& Lead Auditor
Internal Quality Audit Steps
Importance of Preparation
Exercise: Initiation
• Who is responsible for scheduling the audits?
• When are internal audits scheduled?
• How often are audits performed?
• Who is responsible for selecting the auditors?
• What criteria are important for selecting auditors?
Annual Audit Plan
• Considerations
• Approvals
Exercise: Auditing the Training Activity
• Why is the audit performed?
• What is being audited?
• Which requirements?
SOLUTION:
• Purpose:To verify compliance with Quality Manual
and ISO 9001:2000
• Audit Scope:Training Activity
• Requirements:As specified in
ISO 9001:2008EEICQM-01EEICHR-P-01
STEPS RESPONSIBILITY4. Select Audit Team Lead Auditor5. Understand Org. Audit Team6. Review Documentation Audit Team7. Plan the Audit Lead Auditor8. Prepare Checklist &
Working Papers Audit Team
STEPS RESPONSIBILITY4. Select Audit Team Lead Auditor5. Understand Org. Audit Team6. Review Documentation Audit Team7. Plan the Audit Lead Auditor8. Prepare Checklist &
Working Papers Audit Team
Initiation
Preparation
Internal Quality Audit Steps
Audit Team
• Consider team member qualifications
• Consider activities being audited
• Consider type and degree of experience of the auditors
• Create a balanced team
Preparation Steps
initiationinitiation reviewdocuments
reviewdocuments
planaudit
planaudit
getapprovals
getapprovals
Exercise: Review Documentation
For the Training activity, which specific documents would you request to prepare your team for the audit?
Review Documentation
• Quality manual• Procedures• Forms• Organization chart• Facility floor plan
• Past audit performance• Customer feedback• Number of employees• Working hours
Plan Audit
• Confer with audit team members
• Don’t forget the approvals
Audit Plan: December 22-23, 2001
Purpose: To verify compliance with Quality Manual and ISO 9001:2000Audit Scope: TrainingRequirements: As specified in
- ISO 9001:2008- Quality Manual, - HR Procedure
Overall Schedule:December 22, 2001 December 23, 20018:00-8:30 Opening Meeting 8:00-11:00 Field Activities8:30-9:00 Audit Team Meeting 11:00-12:00 Audit Team Meeting9:00-12:00 Field Activities 12:00-1:00 Exit Meeting12:00-1:00 Audit Team Meeting1:00-3:00 Field Activities3:00-3:30 Daily Auditee Briefing
Audit Team Members: Ms. Ashraf Youssef, Lead AuditorMr. Wissam Toumeh, AuditorMr. Nelson Tenorio, Auditor
Approved: ________________ Approved: ________________ Mr. Ashraf Youssef Mr. Muntaser Kalahji.
STEPS RESPONSIBILITY9. Conduct Opening Meeting Lead Auditor10. Meet with Management Audit Team11. Interview & Observe Audit Team12. Assess Evidence Audit Team
STEPS RESPONSIBILITY9. Conduct Opening Meeting Lead Auditor10. Meet with Management Audit Team11. Interview & Observe Audit Team12. Assess Evidence Audit Team
Initiation
Preparation
Evaluation
Internal Quality Audit Steps
An auditor’s memory isas sharp as his pencil.
An auditor’s memory isas sharp as his pencil.
Focus of the Audit
To collect objective evidence to permit an informed judgment about the status
of the quality management system.
Objective evidence may be ...
• documented
• based on interview
• based on observation
• quantitative
• qualitative
• verifiable
Checklists & Working Papers
Checklists
Audit Questions
Audit Investigation
Audit Findings
Checklists
Checklists plan the flow of questions
Checklists plan the flow of questions
Checklists
Checklists guide the course
of the audit
Checklists guide the course
of the audit
Checklists
Checklists define
the sample
Checklists define
the sample
Checklists
Checklists help in writing
the report
Checklists help in writing
the report
Checklist should …
• Be based on information available before the audit
• Be modified when necessary
• Allow follow-up
• Be balanced to cover priority areas
• Be created by individual auditors
Checklist should NOT …
• Restrict auditor’s inquiry
• Be completely generic
• Be yes/no lists
To Create a Checklist
Who do I want to talk to?
Who do I want to talk to?
What am I looking for?
What am I looking for?
What will I ask?What will I ask?
IndividualIndividual
DocumentsDocuments
Questions on checklistQuestions on checklist
What am I looking for?
What am I looking for?
RECORDS ARE THE MOST RELIABLE SOURCE OF
INFORMATION
What am I looking for?
Sample should be representative, although not necessarily statistically valid
Who do I talk to?
• Talk to the right peopleThose responsible for the activity
Those doing the activity
Audit Team Meeting
• Informal briefings• Opportunity to share
information • Discuss necessary
adjustments to plan• Develop report• Helps keep communication
lines open among audit team members
Opening Meeting
• Conduct before start of field activities
• Audit team members must be present
• Auditee contacts should be present
• Creates an atmosphere of cooperation between auditors and auditee
Opening Meeting
• Sign-in sheet
• Distribute detailed audit schedule
• Address any auditee scheduling concerns
• Revise schedule, if necessary
Daily Auditee Briefing
• Review potential findings regularly with auditee
• Opportunity for auditee to close a finding before the end of the audit
• Helps strengthen communications
• Audit becomes constructive
Interview & Observe
• Asking questions
• Observing activities
• Examining documents & records
• Examining facilities
Observing Activities
Confirm that procedures are being followed
howhow??howhow??
Observing Activities
Look for undocumented activities
whatwhat??whatwhat??
Observing Activities
Confirm answers
whowho??whowho??
Observing Activities
• Auditee ReactionsTake over conversationsPlay “show & tell”Blame someone Act defensivelyWaste timeInterruptProvokeBribe!
Interviewing
Interviewing
• Introduce yourself
• Explain why you are there
• Investigate to depth necessary
• Ask, Listen, Verify
• Interview the right peopleThose responsible for the
activity
Those doing the activity
• Hearsay is not evidence
Interviewing
• Interview for:
elaboration
corroboration
perspective
basis for evidence
Interviewing
• Two eyes• Two ears• One mouth
• Ratio of use:One of speaking
to four receiving
Interviewing
whatwhatwhatwhat
whywhywhywhy
whowhowhowho wherewherewherewhere
howhowhowhow
whenwhenwhenwhen
When Something Seems Wrong
When Something Seems Wrong
• Is it really wrong?
• Does he know it is wrong?
• What is his explanation?
• Is it an isolated event, or a symptom of a deeper problem?
• Why didn’t quality system detect it?
• What lapse in the quality system allows this to happen?
Nonconformity
Nonconformity refers to a failure to meet a specified requirement:Quality Manual PoliciesProceduresISO 9001:2000 req.Government Regulations
90% or more of processes can be improved
by modifying organizational systems
(a management responsibility )rather
than attempting to modify an
individual employee’s performance.
W. Edwards Deming
• No problems …
don’t panic
• Move on
• Don’t keep looking
for something wrong
What if nothing seems to be wrong?
ROLE PLAY:
•Auditing role play
STEPS RESPONSIBILITY13. Write Nonconformities Audit Team14. Conduct Closing Meeting Audit Team 15. Write a Summary Report Lead Auditor
STEPS RESPONSIBILITY13. Write Nonconformities Audit Team14. Conduct Closing Meeting Audit Team 15. Write a Summary Report Lead Auditor
Initiation
Preparation
Evaluation
Reporting
Internal Quality Audit Steps
Do I have a Nonconformity?
YES
if you have objective evidence that:
• A requirement is not addressed
• Practice differs from defined system
• System is not effective
Major or Minor Nonconformity
• MajorSystem element is missingSystem element is not implementedSystem element is not effective
• MinorA single/isolated lapse in the system
EXERCISE: Nonconformity or Not
• For each situation, identify whether major nonconformity, Minor nonconformity, ornothing.
Nonconformity Statement
• State the evidenceWhat is it?
• State the requirementWhat is it against?
Writing a Nonconformity: The 4 C’s
• Clear … Simple language
• Correct … Objective
• Complete … Traceable
• ConciseWhat happened?What should happen?
Writing Nonconformity: Steps
1. Write )informally( the nonconformity on the spot.
2. Explain to auditee manager promptly.
3. Review with team members.
4. Write nonconformity statement on the NCR.
5. Get auditee manager signature.
Closing Meeting Keys
• Informal setting
• Report the results to management
• Agree on follow-up
• Entertain questions
Agenda of Closing Meeting
1. Introduction & purpose of meeting
2. Thanks for cooperation
3. Distribute list of attendees
4. Review audit purpose and scope
5. Explain nature of sampling
6. Summarize results: Good observations, no. of NCRs, overall weakness, recommendations, repeat good observations
7. Summary from each auditor
8. When to expect written report
9. Agreement on follow-up
10. Questions & Clarifications
Audit Summary Report• Prepared by Lead Auditor• Sent promptly to MR• Sent promptly to Heads of audited area
Audit Report Content• Audited area• Lead Auditor and members• Audit date• Audit scope• Audit criteria (list of key documents)• Summary of findings
• Good practices• Total number of nonconformities• Descriptions and discussion of nonconformities
• Conclusion
STEPS RESPONSIBILITY16. Take Corrective Actions Auditee17. Verify Corrective ActionsAudit Team
STEPS RESPONSIBILITY16. Take Corrective Actions Auditee17. Verify Corrective ActionsAudit Team
Initiation
Preparation
Evaluation
Reporting
Fixing
Internal Quality Audit Steps
Follow-Up Flowchart
Agree?Agree?
OK
not OK
Identify NC, issue NCR
Identify NC, issue NCR
Agree on need for CA, sign it
Agree on need for CA, sign it
Propose CAplan
Propose CAplan
ImplementCA
ImplementCA
Verify CA&
Close NCR
Verify CA&
Close NCR
Session 4
Auditor’s Skills & Responsibilities
Auditor’s Responsibilities
• Communicating
• Planning and executing
• Documenting
• Reporting
• Verifying
• Safeguarding
• Cooperating
Auditor’s Qualifications
• Education
• Training
• Experience
• Personal Attributes
• Management Skills
Auditor Skills
• Communication skills
• Interpersonal skills
• Analytic skills
Auditor Ethics
“I will inform each client or employer of any
business connections, interests, or
affiliations that might influence my
judgment or impair the equitable character
of my services.”
ASQ Code of Ethics
Internal Auditor
• Acts as a consultant
115
� �شــــكرًا شــــكرًا