INTAS Progress Report 2007: INTAS-CERN 05-103-7555Title: A proposal for R&D to establish the limitations
on the operation of the ATLAS end-cap calorimeters at high LHC luminosity
Coordinators: Peter Schacht, Sergei DenisovStart date: 8. 5. 2006
![Page 2: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/2.jpg)
![Page 3: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/3.jpg)
![Page 4: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/4.jpg)
Energy fluxes at L=1034:η = 2.5 5.0*105 GeV/cm2/sη = 3.2 2.5*106 GeV/cm2/sη = 4.9 2.0*108 GeV/cm2/s
Main factors: ion’s mobility and recombination.Signal starts to degrade significantly above critical charge density.
In HEC and EMEC, should not exceed 5 %.In FCAL ~ 64 V at nominal of 250 V. The resistors sit on the rear HEC side.
Reducing gap size, shaping time…
“dE/dx” + ohmic heatingAdditional cooling loops in critical places, more powerful HV power supplies
![Page 5: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/5.jpg)
![Page 6: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/6.jpg)
Radiational damage of materials, activation
β-decay of Ar41: = 6560 s
After 100 days running at L=10**34:
98 GBq in EMEC, 50 in Barrel, 11 in HEC, 1.1 in FCAl_1, 0.5 in FCAl_2,3
After 7 more days of cool-down:
9.7 GBq in EMEC, 2.1 in Barrel, 6.5 in HEC, 19 in FCAl_1, 600 (?) in FCAl_2,3
![Page 7: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/7.jpg)
![Page 8: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/8.jpg)
![Page 9: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/9.jpg)
![Page 10: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/10.jpg)
![Page 11: INTAS Progress Report 2007 : INTAS-CERN 05-103-7555](https://reader036.fdocument.pub/reader036/viewer/2022062314/56813398550346895d9aa546/html5/thumbnails/11.jpg)
LHC schedule (L.Evans & Dec 2006 Council):
last magnet installed March 07
machine closed August 07
450 GeV (lum~1029:1030, 75 ns between bunch crossings) November 07
7 TeV August 08
Calorimeters (plan of 20 February): end of access to
ECA - end of June, Barrel A – 15 July, Barrel C and ECC – 15 August
Problems:
calorimeters - LV power supplies (BNL and CERN, modified version should
be supplied starting from April)
Inner detector - SCT and TRT - heaters problem, Pixels on retard
LHC - failure of support structure of final focus “inner triplet” superconductive quadrupoles (1 of 28, all assembled by FNAL) during pressure test 27 March