Installation Guide AB-QM (ANSI), 2-4, 2nd en.na.heating.danfoss.com/PCMPDF/VIA7B322_AB-QM_ANSI_2...
Transcript of Installation Guide AB-QM (ANSI), 2-4, 2nd en.na.heating.danfoss.com/PCMPDF/VIA7B322_AB-QM_ANSI_2...
1
Installation Guide
AB-QM (ANSI), 2½”-4”, 2nd gen.
Heating Solutions VI.A7.B3.22 SMT/SI
IP 54
AME 435 QM
Code No.: 003Z0695
+
AME 435 QM
+
Installation
2
Resetting
Note: best before applying pressure
1,65in (42 mm)Max. 25 Nm1 turn = 10%
Setting
Shut off
Δp max = 250psi (16 bar)
12 Nm
0,31in(8mm)
Max. 25 Nm1 turn = 10%
max
1 tu
rn
0,1
1in
(3 m
m)
0,1
1in
(3 m
m)
SMT/SI VI.A7.B3.22 Heating Solutions
Installation Guide AB-QM (ANSI), 2½”-4”
3
Locking
Measuring
0,1
1in
(3 m
m)
P1
P1 - P3
P3
Pump optimization
Q ≠ const Q = const
Q
P1 - P330 kPa4,35psi (30 kPa)
–10…120 °C Δpmax. = 400 kPa (4 bar)PN 1615…250°F(-10…120°C)
CLASS 150 58 psi (400 kPa)
3” l/h GPM40% 11340 5050% 13608 6060% 17010 7570% 19278 8580% 22680 10090% 24948 110
100% 27216 120Note: 1 turn = 10%
4” l/h GPM40% 14742 6550% 19278 8560% 22680 10070% 26082 11580% 29484 13090% 34020 150
100% 37422 165Note: 1 turn = 10%
2½” l/h GPM40% 7938 3550% 10206 4560% 11340 5070% 13608 6080% 15876 7090% 18144 80
100% 19278 85Note: 1 turn = 10%
Installation Guide AB-QM (ANSI), 2½”-4”, 2nd gen.
Heating Solutions VI.A7.B3.22 SMT/SI