    BHP Billiton Iron Ore Western AustraliaPresentation to Analysts June 2005

    Ian Ashby, President and COO BHP Billi ton Iron Ore

    I ron Ore

  • 8/8/2019 Ian Ash By

    2/24

    Iron Ore

    BHP Billiton Iron Ore Overview

    Record 53.6Mt of iron ore produced in the first half of FY2005

    On target to ship over 100Mt this year

    Record EBIT of US$408 million in first half of FY2005 (two years ago full-year EBIT was US$464 million)

    Renewed efforts towards Zero Harm following three fatalities last year

    Cost-efficient incremental expansions completed and underway, in linewith

    market demand

    Operating Excellence is continuing to deliver with almost 60 businessimprovement coaches driving incremental efficiency and effectivenessimprovements

    Preparing for the next phase of growth and beyond

  • 8/8/2019 Ian Ash By

    3/24

    Iron Ore

    Business Vision and Drivers

    VisionVision

    Safest, most profitable, productiveSafest, most profitable, productiveand efficient global iron ore producerand efficient global iron ore producer

    DriversDriversSustainable GrowthSustainable Growth Cost and EfficiencyCost and Efficiency

    People ManagementPeople Management Product QualityProduct QualityPlanningPlanning MarketMarketHealth, Safety, Environment and CommunityHealth, Safety, Environment and Community

  • 8/8/2019 Ian Ash By

    4/24

    Iron Ore

    OperationsBOODARIE IRON

    Extensive iron ore resourcessupporting a range of mines

    Communities: Newman (4,000) Hedland (15,000) Pilbara (40,000); and

    12% Indigenous

    Railway track 1000kmOre carriages 3395Locomotives 68Car dumpers 4Reclaimers 8Stackers 17Crushing plants 3

    OB 18

  • 8/8/2019 Ian Ash By

    5/24

    Iron Ore

    Continuing the Journey Towards Zero Harm

    Safety Initiatives

    Take 5 / Job Hazard Analysis

    Fit for Life

    Leaders Walk the Talk

    Job Safety Observations

    Near Miss Reporting

    BHP Iron Ore

    Page 2

    Take

    1. Think through the task

    2. Spot the hazard

    3. Asses the risk

    4. Make the change

    5. Do the task Safely

    BHP Iron Ore

    Page 2

    Take

    1. Think through the task

    2. Spot the hazard

    3. Asses the risk

    4. Make the change

    5. Do the task Safely

  • 8/8/2019 Ian Ash By

    6/24

    Iron Ore

    22

    20

    1016

    14

    12

    10

    8

    6

    42

    0Jun-03 Aug-03 Oct-03 Dec-03 Feb-04 Apr-04 Jun-04 Aug-04 Oct-04 Dec-04 Feb-05 Apr-05

    CIFR 12 Month Rolling Average

    Monthly CIFR

    Continuing the Journey Towards Zero Harm

  • 8/8/2019 Ian Ash By

    7/24

    Iron Ore

    Strong EBIT Performance (BHP Billiton Share)

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    Jun-0

    0

    Dec-0

    0

    Jun-0

    1

    Dec-0

    1

    Jun-0

    2

    Dec-0

    2

    Jun-0

    3

    Dec-0

    3

    Jun-0

    4

    Dec-0

    4

    Half Year Ended

    EBIT(US$

    million)

  • 8/8/2019 Ian Ash By

    8/24

    Iron Ore

    Strong Production Performance (100% Terms)

    0

    20

    40

    60

    80

    100

    Jul

    Aug

    Sep

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Cummulative Product ion FY2005

    Production

    (Mwmt)

    Q4 FY2005 Annualised Production Rate ~110Mtpa

  • 8/8/2019 Ian Ash By

    9/24

    Iron Ore

    Unit Cost Performance Relative A$/t Movement

    0

    20

    40

    60

    80

    100

    120

    2000 2001 2002 2003 2004 YTD 2005

    Index 2000 = 100

  • 8/8/2019 Ian Ash By

    10/24

    Iron Ore

    Growing Sales in Key Asian Markets (100% terms)

    Europe3%Taiwan

    6%

    SouthKorea

    15%

    Japan

    37%

    China

    35%

    Australia

    4%

    Europe4%

    Taiwan

    6%

    SouthKorea

    14%

    Japan

    35%

    China

    32%

    Australia

    9%

    FY2005* WA Iron Ore SalesFY2004 WA Iron Ore Sales

    * YTD FY2005

  • 8/8/2019 Ian Ash By

    11/24

    Iron Ore

    New JVs Strengthening Long Term Relationships

    Wheelarra Joint Venture (Sub Lease of Jimblebar) (12Mt/a) 51% BHP Billiton Minerals Pty Ltd

    10% Maanshan Iron & Steel Co

    10% Tangshan Iron & Steel (Group) Co

    10% Wuhan Iron & Steel Corporation 10% Jiangsu Shagang

    4.8% Itochu Minerals & Energy of Australia Pty. Ltd.

    4.2% Mitsui Iron Ore Corporation Pty Ltd

    POSMAC JV (Sublease of Mt. Goldsworthy JVs C Deposit) (~15Mt/a) 65% BHP Billiton Minerals Pty. Ltd.

    20% POSCO

    7% Mitsui Iron Ore Corporation Pty. Ltd.

    8% Itochu Mineral and Energy Australia Pty. Ltd.

    Mt. Newman JV (~38Mt/a)

    Mt. Goldsworthy Mining Associates JV (~7.5Mt/a)

    Yandi JV (~42Mt/a)

    BHPBIO is the operator and marketer for each of the above Joint Ventures

  • 8/8/2019 Ian Ash By

    12/24

    Iron Ore

    Growth - Maintaining Share of Expanding Markets

    Area C & PACE completed ahead of schedule and within budget

    RGP 1 (110Mtpa) completed end 2004 ahead of schedule and within budget

    RGP 2 (118Mtpa) expansion on schedule and budget for completion by the 2nd halfof 2006

    Blueprint for growth >152 Mtpadeveloped and team in place Extensive Pilbara resource base - major drilling program and studies underway

    Execution will be phased to meet market outlook and reduce exposure to

    overheated construction market in Western Australia

    Expect to announce the first phase of the expansion in Q4 CY05 following Board

    and Government approvals

  • 8/8/2019 Ian Ash By

    13/24

    Iron Ore

    Growth Expansion Options

    Feasibility study into several expansion options completed in early 2005

    Growth will primarily be achieved through the expansion of well-established

    Newman, Yandi and MACbrands and further growth of a new product (Brockman

    Sinter Fines)

    Expansion options include:

    A business redesign to improve efficiency and operating performance. Development of Mining hubs at Newman, Area C and Yandi

    Development of a further Mining hub for Brockman Sinter Fines product

  • 8/8/2019 Ian Ash By

    14/24

    Iron Ore

    Growth Expansion Options (contd)

    An expanded rail system and a reconfiguration of the port operations will support

    the expansion options

    Growth capital US$50 60/tpa, plus system efficiency investment of

    US$10 15/tpa. Compares favourably with previous projects given cost pressures

    and FX rate

    Expansion will also deliver significant environmental benefits, including ~30%

    reduction in dust emissions in Port Hedland.

  • 8/8/2019 Ian Ash By

    15/24

    Iron Ore

    Growth Opportunity - FY2012

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    66 68 1970 72 74 76 78 1980 82 84 86 88 1990 92 94 96 98 2000 02 04 06 08 2010 12

    YEJ

    BHPBWAIOSales(Mtpa)

    Chinese

    demand

    drives

    massive

    growth

    Area C and PACE +15 MtpaApril 02

    RGP 1 +10 MtpaFebruary 04

    RGP 2 +8 Mtpa

    October 04

    LTE +42 Mtpa1st phase by end 05

    Project + Incremental Vol.Approval Date

    Inter im Exp'n +7 Mtpa2003

    Options beyond 152 Mtpa

  • 8/8/2019 Ian Ash By

    16/24

    Iron Ore

    Addressing Issues Facing the Business

    Safety culture and performance

    Behavior based safety

    Leadership

    Contractor management

    Training

    Attraction & retention of good people Housing renewal and upgrade

    Community programs

    Strategic approach to education and training (including Indigenousemployment)

  • 8/8/2019 Ian Ash By

    17/24

    Iron Ore

    Addressing Issues Facing the Business (contd)

    Enhancing quality of l ife in Pilbara communit ies

    Town amenity (dust management, Enhancement Scheme, anti-crime

    programs)

    Community facilities & services (health, education, recreation, arts)

    Government services (working with Government on improved service

    provision)

    Community information (consultative forums, communication programs)

    Boodarie Iron

    Care & Maintenance announced November 2004

    Majority of employees have found alternative employment arrangements

    (including ~80 redeployed to other BHP Billiton operations)

    Decision on future of the plant expected in coming months

  • 8/8/2019 Ian Ash By

    18/24

    Iron Ore

    Conclusion

    Maintaining our focus on the achievement of Zero Harm to people and theenvironment

    On track for record production and EBIT in FY2005

    Expansion projects on schedule and budget

    Preparing for next stage of expansion focus on managing cost and supplypressures

    Consulting with local communities and Government to ensure win:win outcomesfrom growth projects

    Laying foundations to sustain position over the longer term

  • 8/8/2019 Ian Ash By

    19/24

    Iron Ore

  • 8/8/2019 Ian Ash By

    20/24

    Iron Ore

    Back up slides

  • 8/8/2019 Ian Ash By

    21/24

    Iron Ore

    RGP 1Area C Plant Expansion

  • 8/8/2019 Ian Ash By

    22/24

    Iron Ore

    RGP 1Area C Plant Expansion

  • 8/8/2019 Ian Ash By

    23/24

    Iron Ore

    BHP Billiton Iron Ore Products YEJ 2005

    1.30.0050.0461.504.964.3Goldsworthy HighGrade

    1.40.0060.0461.604.764.2Goldsworthy HighGrade

    6.20.020.0531.202.063.1MACTM

    2.20.0050.0551.807.5061.0

    0

    Goldsworthy Medium

    Grade

    9.40.0150.0360.765.059.1Yandi

    1.90.0120.0571.303.165.2Mt. Newman

    LOISPAl2O3SiO2Fe

    Lump For Direct BF Feed

    6.20.010.0661.903.061.8MACTM

    2.80.0060.0552.608.0060.0Goldsworthy MediumGrade

    9.70.010.0371.345.158.5Yandi

    2.50.010.0702.103.663.6Mt. Newman

    LOISPAl2O3SiO2

    Fe

    Fines for Sintering

  • 8/8/2019 Ian Ash By

    24/24

    Iron Ore

    Orebody Development

    OB 25

    OB 18 continuation

    Area C Expansion

    E depositA west

    F deposit

    D deposit

    Expansions

    Jimblebar

    Mining Hubs

    Yandi

    Area C

    Newman

    Port & RailDevelopments

    Eastern Yard

    4 ports

    Relocate C&S

    Passing SidingsRail loops andbridges

    Rolling stock

    Goldsworthy

    Cattle Gorge

    Y4 Crustal

    FI Bene Plantclosure

    OB 18

    BOODARIE IRON