hasil pengujian CBR
-
Upload
dea-anggiri-isdar-harahap -
Category
Documents
-
view
215 -
download
2
description
Transcript of hasil pengujian CBR
Sheet1
Tumbukan/lapis10 x25 x56 xPerhitungan Kadar Airt menitPenetrasiRing (div)Beban (kg)Ring (div)Beban (kg)Ring (div)Beban (kg)Tumbukan102565incimmAtasBawahAtas BawahAtasBawahAtas BawahAtasBawahAtas BawahNo.1212120.000.00000.00000-10.000.00000.000.00000.000.00W cawan (gr) 15.6915.7215.5815.6615.6915.880.250.01250.31755055.500.00140155.400.00123133.2033.20W cawan + tanah basah (gr)33.1936.737.4235.632.632.290.500.02500.63509099.900.00250.5277.505.55238255.3088.80W cawan + tanah kering (gr)29.532.533.231.429.1228.911.000.05001.7000171188.7011.10412455.1022.205919649.35205.35Berat air (gr)3.694.24.224.23.493.3215.000.07501.9050241.5266.4016.65543.5599.4038.8595301054.50333.00Berat tanah kering (gr)13.8116.7817.6215.7413.4313.052.000.10002.5400292321.9022.20635699.3055.50130411443.00455.10Kadar air (%)26.7225.0323.9526.625.9925.363.000.15003.8100382.5421.8027.7570.58.5782.5594.35171601898.10666.00Kadar air rata-rata (%)25.8725.3225.673.500.17504.4450433477.3033.307910.5876.99116.55190682109.00754.80Perhitungan Berat Isi Kering4.000.20005.080044.53493.9533.3081.510.5904.65116.55208762308.80843.60Tumbukan1025566.000.30007.6200554.5610.5044.9595121054.50133.20258.51052869.351165.50Kadar air asumsi / OMC31.531.531.58.000.400010.1600646710.4066.6011215.51243.20172.05300.51523335.501687.20Kadar air, w (%)25.8725.3225.6710.000.500012.7000757832.5077.70125191387.50210.903461963840.602175.60Berat tanah + mold (gr)167301795018450Berat mold (gr)137601431014260Diameter moulder (cm)15.115.215.08Tinggi moulder (cm)11.712.812.8Volume (cm3)2095.222322.672286.14Berat tanah (gr)297036404190Berat isi (gr/cm3)1.421.571.83Berat isi kering d (gr/cm3)1.131.521.77102556
Sheet2
Sheet3