HALTENBANKEN VILLAGE 2015 - NTNUkleppe/HaltenbankenVillage2015/kleppe...Wold Eirik 92865437...

14
HALTENBANKEN VILLAGE 2015

Transcript of HALTENBANKEN VILLAGE 2015 - NTNUkleppe/HaltenbankenVillage2015/kleppe...Wold Eirik 92865437...

  • HALTENBANKEN VILLAGE 2015

  • Bergen

    Stavanger

    •  Norne •  Heidrun

    •  Åsgard •  Kristin

    •  Njord •  Tyrihans

    •  Morvin

    •  Hyme

    Stjørdal Trondheim

    Harstad

    Haltenbanken

    HALTENBANKEN VILLAGE 2015

  • Overall objective Improvement of oil recovery

    from the Heidrun Field

    HALTENBANKEN VILLAGE 2015

  • External partner The Haltenbanken operations in

    Stjørdal (Statoil)

    HALTENBANKEN VILLAGE 2015

  • Studentgrupper - Gullfakslandsbyen 2010

    Students

    HALTENBANKEN VILLAGE 2015 discipline

    Ahmed Ali Joiya PE 92087786 [email protected] Asad ChE 94276935 [email protected] Nabin Hydropower 47142799 [email protected] Olusegun Damilare Gastech 94430569 [email protected] Anna PE 93680108 [email protected] Shi Marintech 94430129 [email protected] Stian Fossmo MechE 97186617 [email protected] Kenedy Geofrey PE 97393015 [email protected] Aman Desta IVT 48340215 [email protected] New 6.1.14Lund Elisabeth PE 91871042 [email protected]øklingholm Thomas PE 90285271 [email protected] Ganga Hugo Alexandre PE [email protected] Not present day 1Maghsoudi Behrouz PE 98649498 [email protected] Jimenez Francisco Javier Indecol 40336899 [email protected] Not present day 1Miranda Costa Talita PE 99873654 [email protected] Marie Houge PE 93057690 [email protected] Even Sunnanå Geol 99255574 [email protected] Sandra Sakarita EnvEnergy 90987342 [email protected] Encinas Juan Enrique ProjMgt 45128321 [email protected] Ina Cathrine PG 40635670 [email protected] Perez Ana Cristina Hydropower 94431498 [email protected] Karen ProjMgt 41449268 [email protected]æ Ingebjørg MechE 99355559 [email protected] Eirik Geol 92865437 [email protected] Dapeng Marintech 94430124 [email protected] Jina ProjMgt 94430537 [email protected] Nizar PE 94288674 [email protected] Bilal ChE 47147061 [email protected] Alexander PE 93660618 [email protected]

    9 Norwegians20 non-Norwegians10 females19 males

  • Village Leader/Assistant Leader v  Jon (Kleppe) v  Jan Ivar (Jensen)

    Learning Assistants

    v  Thea Dybvig v  Ingrid Mehn-Andersen

    Additional advisors at NTNU v Ole Torsæter v Milan Stanko v  Rasoul Khaledialidusti v  ...

    HALTENBANKEN VILLAGE 2015

  • Project advisors at Statoil (preliminary) v Rita Helen Sveen v Each group will be assigned an adviser from Statoil in

    addition to advisers from NTNU

    ullfaks village2013

    HALTENBANKEN VILLAGE 2015

  • Gullfakslandsbyen 2007

    Agenda 7.1.15

    0900 Coffee

    0915 Welcome by the Village Leader Jon Kleppe ❖  Introduction to the Haltenbanken Village, presentation of the

    involved staff , ”rules of the Village”, milestones, etc.

    ❖  Brief presentation of all students (name, study program, background, ...)

    1000 Short break

    1015 Introduction to group processes by the Learning Assistants

    Thea and Ingrid

    1100 Short break

    1115   Get to know each other exercises

    1200 Definition of groups

    HALTENBANKEN VILLAGE 2015

  • Gullfakslandsbyen 2007

    Agenda 7.1.15 (cont´d)

    1210 Initial group activity, competence triangle

    1230 Buffet lunch

    1330 More teambuilding activities

    1515 Writing of log for the day 1400 Bus to Heimdal

    ❖  Team-building (Bowling/GoCart) 1930 Bus to Mikrobryggeriet

    ❖  More team-building

    HALTENBANKEN VILLAGE 2015

  • Second Village Day 14.1.15 0900 Statoil presents challenges related to the Heidrun Field, and

    introduces the introductory group project (Part A) and possible Part B group projects 1200 Buffet lunch 1300 Group discussions 1430 Writing of logs 1500   Short Courses (?) 1700 End

    HALTENBANKEN VILLAGE 2015

  • Typical Village Day (Wednesday)

    0900 - 0930 Morning Meeting (mandatory) - Coffee, info, common issues, status reports by groups

    0930 - 1130 Project meetings in groups - LA will visit groups

    1130 - 1200 Writing of logs 1200 - 1230 Lunch 1230 - 1400 Group work 1400 - 1500 Plenum session

    1500 - More group work

    HALTENBANKEN VILLAGE 2015

  • Preliminary milestones for the semester Each group will develop its own milestones, however, a few common milestones are:

    January 7: Introduction, teambuilding January 14: Statoil presents group projects in Trondheim February 4: Visit to Statoil offices in Stjørdal March 11: Statoil advisors may visit groups for 2-3 hrs. if needed March 11: Social event at 18:00 arranged by Statoil April 22: Final presentations April 29: Deadline for reports

    HALTENBANKEN VILLAGE 2015

  • Group projects Details will be presented by Statoil next week

    •  Part A: common for all groups in order to familiarize you to the Haltenbanken fields and improved oil recovery activities

    •  Part B: each group will be assigned individual projects

    HALTENBANKEN VILLAGE 2015

  • Studentgrupper - Gullfakslandsbyen 2010 HALTENBANKEN VILLAGE 2015

    Groups

    Group 1 disciplineDanilova Anna 93680108 [email protected] PEMachado Ganga Hugo Alexandre [email protected] PENikolaisen Even Sunnanå 99255574 [email protected] GeolYang Jina 94430537 [email protected] ProjMgtValkvæ Ingebjørg 99355559 [email protected] MechE

    Group 2Xu Dapeng 94430124 [email protected] MarintechLund Elisabeth 91871042 [email protected] PELøklingholm Thomas 90285271 [email protected] PEArif Asad 94276935 [email protected] ChEBasnet Nabin 47142799 [email protected] HydropowerLemesse Aman Desta 48340215 [email protected] IVT

    Group 3Fikeni Kenedy Geofrey 97393015 [email protected] PEMiranda Costa Talita 99873654 [email protected] PESagen Ina Cathrine 40635670 [email protected] PGMedel Jimenez Francisco Javier 40336899 [email protected] IndecolBolarinwa Olusegun Damilare 94430569 [email protected] GastechDeng Shi 94430129 [email protected] Marintech

    Group 4Maghsoudi Behrouz 98649498 [email protected] PENesheim Marie Houge 93057690 [email protected] PEWold Eirik 92865437 [email protected] GeolSanchez Perez Ana Cristina 94431498 [email protected] HydropowerRivera Encinas Juan Enrique 45128321 [email protected] ProjMgtYousaf Bilal 47147061 [email protected] ChE

    Group 5Eliassen Stian Fossmo 97186617 [email protected] MechEAhmed Ali Joiya 92087786 [email protected] PEYounes Nizar 94288674 [email protected] PEZakharov Alexander 93660618 [email protected] PEOlsen Sandra Sakarita 90987342 [email protected] EnvEnergyShimabukuro Karen 41449268 [email protected] ProjMgt