GUIDELINES

FOR THE IMPORTATION, STORAGE, TRANSPORTATION,

DISTRIBUTION OF BIOFUEL & BIOFUEL

BLENDED GASOLINE AND ESTABLISHMENT OF BIOFUEL PLANT

IN NIGERIA  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

Page 2: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

1.0 INTRODUCTION  These guidelines are issued pursuant to Regulation (2) and (3) of the Petroleum Refining Regulations, 1974 and shall apply to the importation, storage, transportation, blending, distribution of Biofuel and establishment of Biofuel plant in Nigeria 

2.0 APPLICATION Applications for approval for importation, storage, transportation, distribution and establishment of Bio‐ethanol and Bio‐diesel or any other biomass fuel process plant shall be made in the manner described in this procedure guides. 

 

3.0 BACKGROUND 3.1 Ethanol  blended  gasoline  can  be  used  in  the  internal  combustion  engines  of 

modern  automobiles.    Ethanol  is  a  clean  burning  alcoholic  produced  from biomass and  is widely recognized as an environmentally  friendly  fuel additive.  It  contains  a  higher  percentage  of  oxygen,  enabling  more  complete  gasoline combustion.   This  is good because, even  though complete gasoline combustion produces carbon dioxide,  it  reduces emission of other more harmful pollutants such  as  carbon  monoxide,  and  those  causing  ground‐level  ozone  leading  to respiratory problems and severe environmental impacts 

3.2 Ethanol  is made  from  renewable plant sources such as corn, wheat, sugarcane, cassava,  waste  agricultural  products;  woods  and  wood  waste  and  produces lower  quantities  of  unburnt  carbon  emission  than  fossil  fuels  after  emission,  ethanol, when blended with gasoline or Premium Motor Spirit  (PMS)  is known as an oxygenate; an octane enhancer.   Therefore, ethanol  increases  the research octane number (RON) rating of gasoline, improves tale‐pipe emission, increases fuel  efficiency and helps  reduce  engine Knock.   Ethanol also partially  replaces benzene  and  other  harmful  chemicals  that  are  normally  added  to  gasoline  to make engine run more efficiently. 

3.3 Ethanol can be blended with gasoline as an oxygenate in any proportion.  Different countries such as USA, Brazil, etc 

3.4 Biodiesel is a diesel replacement fuel that is manufactured from vegetable oils, recycled cooking greases or oils, or animal fats. The biodiesel manufacturing process converts oils and fats into chemicals called long chain mono alkyl esters, or biodiesel. Raw or refined vegetable oil, or recycled greases that have not been processed into biodiesel, are not biodiesel and should be avoided.  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

2

Page 3: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

3.5 Biodiesel can be used in several different ways. You can use 1% to 2% biodiesel as a lubricity additive, which could be especially important for ultra low sulfur diesel fuels (ULSD, less than 15 ppm sulfur), which may have poor lubricating properties. You can blend 20% biodiesel with 80% diesel fuel (B20) for use in most applications that use diesel fuel. You can even use it in its pure form (B100) if you take proper precautions. 

3.6 B20 is the minimum blend level allowed for by the Government base on the official Gazette on Nigerian Bio‐fuel policy and incentives 20th June 2007.  B20 can be used in equipment designed to use diesel fuel. Equipment that can use B20 includes compression‐ignition (CI) engines, fuel oil and heating oil boilers, and turbines. 

3.7 Higher blend levels, such as B50 or B100, require special handling and fuel management and may require equipment modifications such as the use of heaters or changing seals and gaskets that come in contact with the fuel to those compatible with high blends of biodiesel. High blend levels are not recommended for the first‐time biodiesel users. 

3.8 The specification for biodiesel (B100) is ASTM D6751‐03. This specification is intended to insure the quality of biodiesel to be used as a blend stock at 20% and lower blend levels.  

 4.0 OBJECTIVES  Essentially, the objectives of these interim guidelines are to: i. Establish  requirements  and  minimum  standards  for  the  importation  and 

handling of D‐ethanol, biofuel  and biofuel‐blended gasoline  in Nigeria,  taking into  cognizance  existing  local  conditions,  cultural  practices,  infrastructure  and planned monitoring programme. 

ii. Standardize  the  monitoring  procedure,  as  well  as,  the  analytical  method  of ensure proper analysis and interpretation of data for effective quality checks and control. 

iii. Sensitize  consumers  particularly  motorist,  on  the  technical  characteristics  of biofuel and biofuel‐blended gasoline and compatibility of auto vehicles currently in use in Nigeria. 

     

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

3

Page 4: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

5.0 GENERAL 5.1  Target Audience:      These guidelines are issued for the benefit of the following  

categories of people: i.  Petroleum Products Importers/Traders ii.  Oil Marketing Companies iii.  Operators of Bulk Storage Facilities and Retail Outlets iv.  Oil Transportation Companies v  Automobiles Manufacturers  vi.  Vehicle Owners vii.  Refineries/Blending Companies viii.  Aviation Industry Operators ix. Regulatory Agencies x. General Public xi. Marine industry operators xii. Biofuel producers  6.0 REQUIREMENTS FOR IMPORTATION OF BIOFUEL BLENDED PETROL 6.1 Special Requirements i. The biofuel component of the imported fuel blends must be of biological or 

renewable source, not petroleum/ fossil oil origin. ii. Fuel blend must contain corrosion inhibitors comparable to regular unleaded 

gasoline. iii. The biofuel blend must meet the required specification as contained in table 1.  6.2 CONDITIONS FOR IMPORTATION  I. Any Marketer, manufacturer, hauler, blender, agent,  jobber, consignment agent 

or distributor who  imports,  store,  transport  and distributes motor vehicle  fuel products which contain at least zero point one per cent (0.1%) and not exceeding five per cent (5%) alcohol must state/declare on the certificate of quality (C of Q) or any invoice, bill of lading, shipping paper, or other documents used in normal customary business practices, the percentage of alcohol, and co‐solvent, the type of alcohol and the antiknock index of the products imported, stored, transported and distributed.  

 II. All  imported  biofuel  blended  gasoline must meet  the  acceptable  international 

standards  and  those  specifications  approved  by  the Department  of  Petroleum Resources as required in the specification table below. 

 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

4

Page 5: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

III. It is mandatory for the importer to obtain an Import Permit from the Department of Petroleum Resources (DPR) office prior to shipment of the product. 

 IV. At  least seven  (7) days prior  to  the arrival of  the  imported Cargo at a Nigerian 

Port,  the  importer  shall  ensure  that  the Certificate of Quality      (C of Q) of  the consignment  issued by  the exporting  refinery, blender, consignment agent or a competent authority  in  the country of origin  is submitted  to  the Department of Petroleum Resources (DPR) office at the receiving jetty. 

 V. The  under  listed  items  shall  be  submitted  to  the  Department  of  Petroleum 

Resources  by  the  importer  of  the  consignment within  seven  (7)  days  prior  to arrival of vessel: 

 (a) Relevant Invoices (b) Bill of Lading (c) Photocopy of Approval Form “M” (d) Clearance or Import duty Payment of Nigeria Customs & Excise (e) A tanker manifest which shall provide the following:  

Name of the tanker and its country of origin  Owner of the tanker  Detail  cargo  information  such  as  direct  shipment,  ship  to  ship,  name  of mother vessel, certificate of quantity and certificate of quality, last port of call, etc. 

Destination of the tanker after discharge.  

VI. Application  for  Import  Permit  which  must  be  made  on  company’s  letter headed  paper  and  on  DPR’s  prescribed  form  shall  be  forwarded  to  the Department of Petroleum Resources  (DPR), 7 Kofo Abayomi Street, Victoria Island, Lagos. 

 6.2.1  Requirement for the Importation and blending of De-natured

ethanol (D−C2H5OH)  A. STAGE I : Approval of Intent to Import (AII) Application for approval to import ethanol shall be submitted in writing to the Director of Petroleum Resources at least eight (8) weeks before the expected arrival of the consignment in Nigeria with the following documents:        

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

5

Page 6: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

a. Product data sheet and quality specifications of the D–ethanol to be imported from the manufacturer. 

b. Permit to operate as an oil industry Service issued by the DPR to the importer. 

c. Country and place of the product origin and expected Port of Entry / Discharge in Nigeria. 

d. Samples of the consignment with appropriate production batch number and the source tank identification for laboratory confirmatory  analysis. 

e. Safety and Environmental Impact programme for the handling and utilization of Ethanol. 

f.       Calibration certificates of ship and receiving facilities (jetties storage, depot storage and trucks). All local calibration exercises shall be witnessed and certified by the DPR.  

 g.        Importer should have a well equipped laboratory for sample analysis.    h.     None refundable application fee and service charge in bank draft    payable to “Federal Government of Nigeria DPR Fees Accounts” and 

    “Department of Petroleum Resources” respectively.        i          Modification of existing facilities for handling ethanol/ D‐ethanol shall be 

adequately monitored and approved by DPR.       j.      Facilities certification shall be carried out by the DPR to determine heir            suitability for handling of ethanol.        k. A trade name reflecting the percentage of Ethanol in gasoline should be    specified.  l.  The quality of ethanol added to gasoline is important. The industry standard 

specification for D natured Fuel ethanol for blending with gasoline is ASTM D 4806 as shown is table 1. 

     m.  All gasoline used in blending Ethanol shall be unleaded.  

Approval of Intent to Import granted:  Not transferable Validity of Approval:    Three (3) months  Statutory Approval Fee:    N50,000 DPR Service Charge:    N20,000:00  Approval of Intent to Import (AII) D‐Ethanol shall be issued upon satisfactory submission and review of the above.  Each AII issued shall have a transaction code which shall be quoted for the entire expiration / conclusion of an importation.   

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

6

Page 7: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

B. STAGE II: Permit to Import D-Ethanol (PIE) It shall be necessary for the importer to obtain an Import Permit after Approval of Intent to Import D‐Ethanol into Nigeria prior to shipment of the product.  Attestation of D‐ethanol quality and quantity (AQQ) per compartment by the ship captain, to be issued at the point of loading, should get to the Director, DPR before the vessel enters the Nigerian waters.   Design of AQQ format apart from the physical parameters, handling and hazards information shall also contain ethanol denaturing product and its percent (%) volume in the consignment.   A satisfactorily submitted AQQ along with the AII shall be processed within 24hours by the DPR for issuance of Permit to Import Ethanol (PIE).   No vessel carrying D‐Ethanol shall enter the Nigerian waters without a Permit to Import D‐Ethanol (PIE) issued by the Director, Department of Petroleum Resources.  C. Approval to discharge (ATD) Upon the arrival of vessel in Nigeria, the importer shall pay a non‐refundable service charge of one hundred thousand naira Only (N 100,000:00) to the DPR.  

1. D‐ethanol samples shall be taken from the vessel’s tanks in the presence of a DPR staff for quality re‐certification.  

 2. Quality/Quantity re‐certification shall be conducted in the presence of a DPR 

staff by a registered oil industry service company and minimum specifications shall be as per table 1. 

 3. Safety procedures and provisions necessary for discharge of Ethanol shall be 

confirmed as adequate and active. 4. Receiving facilities shall also be confirmed in line with approval intent to import 

(AII).  

5.   Discharge valve alignment to nominated tank, truck, pipeline shall be confirmed 

 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

7

Page 8: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

Approval to Discharge (ATD) shall be issued to the importer upon a satisfactory report on the above issues.   If samples are confirmed to be below the AQQ declarations, the DPR  shall refuse the discharge of such product (s).    DPR Service Charge:  N100,000:00  6.3 REQUIREMENTS FOR CARGO CLEARANCE AT DISCHARGE JETTY

FOR BIOFUELS  Vessel Discharge Schedule:‐   This information should be submitted to the DPR office at  the  jetty of  the  receiving  company, before  the vessel berths  to discharge  the cargo.  It should contain the following:‐ i. Name of vessel ii. Name  of  consignee  and  consignor  of  the  biofuel  and  biofuel‐blended  gasoline 

cargo iii. Estimated time of berthing and berth to be used iv. Estimated time of commencement of discharge v. Tonnage of product to be discharged vi. Tanks to be used to receive the product vii. Pump rate and estimated duration of discharge  NOTE:   Each  invoice,  loading  tickets, bill of  lading, delivery  tickets and any other document that accompanied a shipment of gasoline containing ethanol/biofuel shall contain a legible and conspicuous statement that the gasoline being shipped contains ethanol  or  any  biofuel,  the  percentage  concentration  of  biofuel  and  any  other additives therein.  6.4  MEASUREMENT OF PRODUCT RECEIPT AT THE JETTY  A  vessel  laden  with  imported  biofuel  blended  product  shall  only  be  allowed  to discharge where: i. There is an evidence of import permit issued by DPR and used in importing the 

product. ii. The  importing company complies with  the one week mandatory submission of 

the  “Certificate  of  Quality”,  bill  of  lading  and  other  relevant  documents  in respect of the imported product.  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

8

Page 9: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

iii. The  compartments  of  the  vessel  containing  the  imported  product  have  been jointly  fiscalized by an official of  the DPR and receiving company officials, and “Certificate of Quantity” issued.  

iv. A re‐certification analysis of  the product composite sample  is conducted  jointly by  DPR  officials  and  third  party  surveyors.    A  vessel  shall  therefore,  not discharge  until  the  laboratory  recertification  of  a  product  is  conducted  and accepted. 

v. Documents received from the vessel are not in conflict with those submitted by the importer of the product. 

 CAUTION:  In the event that the re‐certification of the products fails to conform with the prescribed specification, the DPR shall refuse the discharge of such product.  6.5  LABORATORY CERTIFICATION  

i. For every cargo of imported ethanol/biofuel or biofuel‐blended gasoline and other petroleum products, each vessel tank compartment shall be sampled for quality  recertification  by  staff  of  DPR  and  company  officials  and  shall conform with  specifications  in  table  1  in  the  case  of  imported  fuel  grade ethanol. 

ii. Product  sampling  and  test  protocol  shall  be  in  accordance  with  the requirement  of  the NIS  116 Revised  and ASTM D5798  for  biofuel‐blended gasoline with ethanol content of no more than 5% by volume (E5). 

iii. The  quality  of  the  biofuel‐blended  gasoline  (E5)  shall meet  the  following prescribed limits and standards as stipulated in Table 2: 

 TABLE 1: Standard Specification for D-Ethanol (denatured fuel grade ethanol) S/NO  PROPERTY  SPEC.  ASTM TEST METHOD 1  Ethanol vol%min  92.1  D5501 2  Methanol, vol%max  0.5   3  Solvent‐washed gum,mg/100ml max  5.0  D381 4  Water content, volume %, min  1.0  E203 5  Denaturant content, vol. %, min  1.96   6  vol % max  4.96   7  Inorganic Chloride content, 

   mass ppm (mg/L) max 40  (32)  D512 

8  Copper content, mg/kg, max  0.1  D1688 9  Acidity (as acetic acid CH3COOH),  

  mass percent (mg/L), max .007 (560)  D1613 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

9

Page 10: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

10  pHe  6.5‐9.0    D6423 11  Appearance‐visibility free of suspended 

or precipitated contaminants (clear &bright)   

   

       6.5.1 Acceptability of Ethanol

1. Purity: ASTM D 5501 should be the standard method for determination of ethanol purity. 

• To determine the impurity content in the D‐ethanol.  

2. pHe: To determine the acid strength and reports a pHe value, ASTM D 6423 is the recommended test method for D‐ethanol fuel. 

• Work by auto manufacturers has indicated that low pHe D‐ethanol can contribute to accelerated corrosion of certain fuel system parts. 

 3. Sulfur content: A low sulfur limit is expected in D‐ethanol (e.g. as low as 10ppm). 

Recommended test is ASTM 5453.  

4. Ethanol content: Recommended test for determining ethanol content of gasoline/ethanol blends shall be ASTM D 4815.  

 TABLE 2: Requirements for biofuel-blended gasoline (E5) NIS 116 Revised  

S/NO  Characteristic  Limits   Test Methods 

1.  Appearance  Clear & Bright  Visual 

2.  Color  To be reported  Visual 

3.  Biofuel content %vol. max  5  ASTM D 5501 4.  Specific Gravity @ 15/150C  0.720‐0.780  ASTM D1298 

D4052 D4815 5.  Distillation 

Distillation Temp 0C @ % Evaporated, @ 101.3kpa Pressure) 10% (v/v) 50%(v/v) 90%(v/v) End Point 

    65 max 77 – 121 190 max 225 max 

ASTMD86 

6.  Distillation Residue, % vol. max  2  ASTM D86 7.  Reid Vapor Pressure, kPa (psi)  69 (10)  ASTM D4953 

ASTM D5190 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

10

Page 11: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

ASTM D5191 8.  Oxidation Stability, 0C (min)  360  ASTM D525 9.  Existent Gum ( Solvent washed) 

mg/100ml (max) 4  ASTM D 381 

10.  Copper strip corrosion, ( 3h @ 50 0C) (max) 

Class 1b  ASTM D130 

11.  Lead content, MAX ppm  0.00  ASTM D3341 ASTM D5059 

12.  Sculpture content, % mass, max  0.10  ASTM D 2622 ASTM D1266 ASTM D5453 

13.  Benzene content, % volume, max  2.0  ASTM D5443 ASTM D6277 

14.  RON, min MON 

91 82 

ASTM D2699 ASTM D2700 

15.  Water content %  max  0.1  ASTM D5510 16.  Acidity (as Acetic Acid) mg/l max  0.007  ASTM  D1613 17..  pHe 6.5 ‐9.0  ASTM D6423  6.5.2 Special Requirements for Bio-diesel iv. The bio‐diesel products must be of biological or renewable source, not 

petroleum/ fossil oil origin. v. The 100% Bio‐diesel (B100)  has physical and chemical properties similar to 

petroleum based diesel but must meet the required specification as contained in table 3. 

vi. The B100 is specifically meant for blend with petrol‐diesel to produce the lower blends of  20% bio‐diesel and 80%  petroleum based diesel (B20) as approved by Federal Government vide official gazette: Nig. Bio‐fuel Policy and Incentives no: 72 Vo.l 94, June 2007. 

vii. Product sampling and test protocol shall be in accordance with the requirement of the ASTM D6751 

viii. The quality of the B100 shall meet the following prescribed limits and standards as stipulated in Table 3 and that of B20 as described on Table 4: 

Table 3. Requirements for Bio-diesel (B100) Blend Stock - ASTM D6751-03 Property   ASTM  

Method Limits   Units  

Flash Point   D93   130.0 min.   °C  

Water and Sediment   D2709   0.050 max.   % vol.  Kinematics Viscosity, 40°C   D445   1.9 ‐ 6.0   mm

2/s  

Sulfated Ash   D874   0.020 max.   % mass  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

11

Page 12: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

Sulfur* D5453   0.0015 max. (S15)  

0.05 max. (S500)  % mass  

Copper Strip Corrosion   D130   No. 3 max. Cetane Number   D613   47 min.  Cloud Point   D2500   Report to Customer   °C  

Carbon Residue** D4530   0.050 max.   % mass  

Acid Number   D664   0.80 max.   mg KOH/g Free Glycerin   D6584   0.020 max.   % mass  Total Glycerin   D6584   0.240 max.   % mass  Phosphorus Content   D4951   0.001 max.   % max.  

Distillation Temperature, 90% Recovered (T90)*** D1160   360 max.   °C  

 TABLE 4. Requirements for B20 bio-diesel blend.

Property   Requirement   Test Method  Volume percent biodiesel in B20  

20 ± 1 volume percent   Appendix A  

Appearance   Clear, bright, and visually free from undissolved water, sediment, and suspended matter  

ASTM D 4176  Procedure 1  

Kinematics Viscosity, 

mm2/s, @  

40°C  

1.3 – 4.1   ASTM D 445  

Flash Point, °C  April – September  October – March  

52°C min  38°C min  

ASTM D 93  

Low Temperature Properties  

1/   1/  

Total Acid Number, mg KOH/g  Sample  

0.2 max   ASTM D 664  

Water Content, volume %  

0.05 max   ASTM D 2709  

Sulfur Content, mass %   0.05 max   ASTM D 5453, D 2622  

Cetane Number   41 min   ASTM D 613  Ash Content, mass %   0.01 max   ASTM D 482  Distillation, °C  T90  

338 max   ASTM D 86  

Copper Strip Corrosion, 3 hours  

3 max   ASTM D 130  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

12

Page 13: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

@ 50°C  

Micro Carbon Residue, mass %  

0.05 max   ASTM D 4530  

   7.0 REQUIREMENTS FOR HANDLING & STORAGE OF BIOFUEL–BLENDED GASOLINE  7.1 General  Ethanol, even at 5% blend with gasoline, has been recognized to readily absorb water.  It may absorb significant amounts of water from the atmosphere in humid conditions.  If  too much water  is absorbed, phase separation of  the blended  fuel can occur, which results  in  the water and ethanol combing and falling  to  the bottom of  the  fuel storage tank.    The  combined water  and  ethanol  can  be  quite  corrosive  to metal  fuel  tanks, electric  fuel pumps,  rubber  seals  and other  fuel  system  components,  especially  if  the water  (absorbed) and alcohol are allowed  to remain at  the bottom of  the  fuel  tank  for some length of time.  7.2        REQUIREMENTS FOR HANDLING AND STORAGE AT THE DEPOT 7.2.1. Facilities Inspection And Certification All facilities for the storage of imported biofuel shall be inspected by the DPR prior to licensing.    The  facilities  must  meet  the  specification  for  the  storage  of  biofuel  as stipulated below:   

(i) All permanently placed bulk storage tanks shall be installed within a bund wall capable of containing the contents of the largest of the storage tanks plus ten per cent of the capacity of the remaining tanks.  

(ii) Where  there  is only one  tank,  the bund wall shall be capable of containing  the content of the tank.  

(iii) Be  fitted with  access  doors  sufficiently  large  to  enable  easy  access  and  vents capable of relieving any excess pressure or vacuum. 

(iv) Have access to the roofs by means of a ladder or staircase of a type approved by the Director, Petroleum Resources and all floating roof tanks shall have adequate wind girders. 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

13

Page 14: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

(v) Have  provision  for  containing  any  leakage  to  prevent  oil  contaminating  the water when located above water. 

(vi) Be provided with efficient spark arrestor and  lightening protector. 

(vii) All  facilities  handling  biofuel must  be  dedicated  to  the  product  only.  biofuel must not be commingled with other fuels. 

(viii) All storage tanks shall be fixed roof tank with a floating internal cover. 

(ix) Frequent check of seal and maintenance shall be carried out. 

(x) Suction point shall be at the top or 3/4 length level of the tanks. 

(xi) Daily  checks  for  water  using  approved  water  finding  paste  and  subsequent drainage to a dedicated sump and shall conform to specifications as prescribed in Environmental  Guideline  and  Standards  for  Petroleum  Industry  in  Nigeria (EGASPIN). 

(xii) It is mandatory to provide a well equipped and functional laboratory for sample analysis, which  shall  include  Gas  chromatography,  Research Octane Number (RON) equipment and sulfur analyzer amongst others. 

(xiii) The product quality specification shall be recertified daily in the presence of DPR representative before discharge or any loading operation commences. 

(xiv) Should  the product quality  falls short of specification as  in  table 1,  the product shall be evacuated and tanks properly cleaned. 

(xv) Existing diesel or other hydrocarbon tanks may be converted for use but it must be properly cleaned, with attached cleaning details and the tanks recalibrated. 

(xvi) Approval of  such  conversion  as  contained  in  item  (xv)  shall be obtained  from DPR before implementation. 

(xvii) An on‐line filter shall be provided upstream of the metering system.  

(xviii) The receiving facilities shall be grounded of static electricity and conductivity. 

(xix) The receiving facilities shall be adequately protected from corrosion by sacrificial anode  or  impressed  current  and  frequent  checks  shall  be  carried  out  on  the anode. 

(xx) Monthly returns of all intake and offtake shall be forwarded to DPR on or before 2 week of the proceeding month. 

(xxi) Safety warning signs must be conspicuously displayed at the facility; 

(xxii) Every  storage,  loading/  dispensing  devises which  contain  0‐5%  by  volume  of biofuel shall be labeled as follow  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

14

Page 15: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

“CONTAINS BIOFUEL”      

7.3 TRANSPORTATION: REQUIREMENTS FOR TRUCKING  

All  trucks used  for handling biofuel blended  fuels must be dedicated  to  the product only.  biofuel must  not  be  commingled with  other  fuels.  The  equipment  suitable  for transportation of gasoline may be acceptable for handling biofuel but: 

i. Truck compartment(s)  shall be cleaned and dried properly before  loading,  tamper proof and water tight must be secured. 

ii. The tank compartments shall be designed/ constructed of    forged or stainless steel  

iii. Contamination from water, leaded fuels or diesel shall be avoided. 

iv. There shall be no product transfer from truck to truck unless otherwise approved by DPR.  If  for any reason  there  is need  for such  transfer,  the product quality shall be recertified by DPR representative.  

v. Trucks must be grounded during loading and unloading operations. 

vi. Hoses must be purged; lines and pump must be cleaned before first delivery of the biofuel blend. 

vii. All entry points  to  the  trailer  shall be  sealed with  tamper proof,  identifiable  seals, and all seals accounted for on the ticket. 

viii. Trans‐shipment of certified product to another location shall be re‐certified by DPR representative at the new location before discharge is permitted. 

 7.4      TRANSPORTATION: REQUIREMENTS FOR PIPELINE

i. The existing pipeline facility for straight run gasoline shall be adequate for the biofuel blend. 

ii. In the event that the pipeline has been previously used for other hydrocarbon, the line shall be properly flushed before introducing biofuel blend. 

iii. The pipeline shall be adequately protected from corrosion by sacrificial anode or impressed current and frequent checks shall be carried out on the anode. 

iv. Periodic pigging of the pipeline shall be carried out every two years. 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

15

Page 16: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

 

7.5 TRANSPORTATION: REQUIREMENT FOR COASTAL VESSELS  i. In  the event  the vessel nominated  for  the  lifting of  the biofuel blend has never 

been  used  for  such  product  previously,  tanks  cleaning  and  re‐calibration exercises shall be witnessed and certified by DPR representative. 

ii.        Every other condition applicable to the BIOFUEL shipment as enumerated above shall imply. 

 8.0 REQUIREMENTS FOR HANDLING AND DISPENSING AT RETAIL

OUTLETS

8.1 Storage Tanks (i) All  facilities handling biofuel must be dedicated  to  the product only. BIOFUEL 

must not be commingled with other fuels. 

(ii) New  underground  tanks  shall  be  double‐walled,  low‐carbon/ mild  steel  tanks with corrosion protection or reinforced plastic. 

(iii) All existing single wall tanks that are more than 10 years shall be replaced. 

(iv) Daily  checks  for  water  using  approved  water  finding  paste  and  subsequent drainage to a dedicated sump and shall conform to specifications as prescribed in the EGASPIN. 

(v) Tank man‐hole cover must be water tight and the seal/gasket shall be subjected to frequent checks. 

(vi) Minimum tanks thickness shall be 7mm as prescribed in BS ‐2654 or  API‐ 650. 

(vii) Leak detection test shall be carried out every two years. 

(viii) Verification exercise shall be carried out monthly by DPR.  8.2 Dispensing Equipment (i)  All  facilities handling biofuel must be dedicated  to  the product only. BIOFUEL 

must not be commingled with other fuels. 

(ii)  All dispensing  equipment  shall  be  labeled  “CONTAIN BIOFUEL”  and  clearly independent of PMS equipment. 

(iii)  Monthly returns of all intake and offtake shall be forwarded to DPR on or before 2 week of the proceeding month. 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

16

Page 17: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

(iv)   The price for the biofuel shall be conspicuously displayed on the “products price bill board”. 

(i) Underground  piping  shall  be  galvanized  /  steel  plated  and  corrosion  free. Conventional zinc‐plated piping shall not be used. 

(ii) The  piping  arrangement  for  dispensing  biofuel  from  the  storage  tank  to  the dispensing pump shall be dedicated for biofuelL only. 

(iii) A micron filter is recommended for dispensing equipment (upstream the pump) to trap the debris from the storage tank.  

9.0 QUALITY ASSURANCE / CONTROL The quality of the biofuel product as indicated in Table 1 needs to be maintained from the point of shipment to the point of retailing at various retail outlets. Therefore quality certification/  re‐certification  shall  be  endorsed  by  recognized  laboratories  and  DPR representative(s) at the following points: 

a. At export loading point (separate tank compartment); b. At transshipment point(s) if any; c. At  the jetty before discharge d. Daily at the depot before truck loading e. Before truck discharge at retail outlets f. Daily at retail outlets g. The fuel BIOFUEL shall expire after 6 weeks of storage/ handling.  

            

10.0 PRE- CAUTIONS       The  advantages  of  biofuel  as  oxygenate,  an  octane  enhancer,  which  increases  the research  octane  number  (RON)  rating  of  gasoline,  improves  tale‐pipe  emission, increases fuel efficiency and helps reduce engine Knock may not be over emphasized. In  spite  of  the  advantages  enumerated,  the  following  precautions  based  on  the properties of the biofuel need to be observed: 

a. Biofuel readily absorbs water hence water ingress must be avoided at all points. b. It  is a solvent, which can readily dissolve many materials  including  fiber glass; 

therefore,  frequent  checks must  be  carried  out  on  handling  facilities,  storage tanks, vehicle fuel systems and the engines. 

c. Biofuel is a corrosive substance hence BIOFUEL product must contain corrosion inhibitors 

d. It  has  high  conductivity  hence  static  electricity  must  be  dissipated  through proper grounding. 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

17

Page 18: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

18

e. The  retention  time of  the BIOFUEL product must not  exceed  six weeks  in  the storage tanks to avoid phase separation, which will lead to reduction in RON. 

     

11.0 SIGNAGE:  a. All  facilities handling  biofuelL  shall  be displayed  conspicuously  labels  to  read  as 

“BIOFUEL BLEND”. b. This  signage below  shall be displayed at  appropriate  locations  in and around  the 

storage facilities area and dispensing pumps.  

   

PPooiissoonnoouuss

FFllaammmmaabbllee

GREEN

f

Page 19: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

GUIDELINES FOR THE ESTABLISHMENT OF

BIOFUEL PLANT IN NIGERIA.  These guidelines are issued pursuant to Petroleum Refining Regulations 1974 and shall be applied to the design, construction, installation, commissioning and operation of fuel grade ethanol plant, biofuel plant and any other petrochemical plants in Nigeria.  There shall be three stages of approval: 1. LICENCE TO ESTABLISH AN BIOFUEL PLANT                   

            (Concept Approval, Site Approval, Preliminary EIA Approval, Fees)  2. APPROVAL TO CONSTRUCT 

(Detailed Design Approval, Approval of Major / Metering Equipment Test  Procedures, Detailed EIA Approval) 

    3. LICENCE TO OPERATE AN BIOFUEL PLANT 

   (Successful Pre‐commissioning, Fees)  A. LICENCE TO ESTABLISH BIOFUEL PLANT This is the first documentation stage and the expected deliverables from the company is: 1. PRELIMINARY MARKETING PLAN 

  Indicating targeted markets whether domestic, export, or both .  2.  BLOCK FLOW DIAGRAM AND PROCESS DEFINITION OF THE PROJECT  

To better understand the integration of the intended process units,  configurations and capacities .    

3.  PLOT PLAN OF THE FACILITIES ON PROPOSED SITE This shall be accompanied by the property C of O with the beacon coordinates. DPR will inspect the site. 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

19

Page 20: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

 4.  BIOFUEL PRODUCT FISCALIZATION SYSTEM  

  To understand proposed metering systems and meter proving procedures.   5.  FINANCIAL PLAN  

  Indicating the project cost estimate and sourcing of funds  6.  PRELIMINARY FEEDSTOCK SLATE  

  To determine the specifications and sourcing of the proposed  feed stock   7.  PRELIMINARY PRODUCT SLATE 

  For product specifications and  proposed volumes or tonnage   8. PRELIMINARY PROJECT IMPLEMENTATION SCHEDULE 

 9.  PROPOSED SAFETY PROVISIONS 

  Hazard Identification (HAZID) and preliminary environmental impact statements.       10.  TECHNICAL PRESENTATION on the project shall be made to DPR  to review 

the above and the value of the project to the Nation.  

FEES   LICENCE FEE:    $50,000    DPR Service Charge:    N150,000:00  B. APPROVAL TO CONSTRUCT (ATC)

THE EXPECTED DELIVERABLES  ARE: 1.  Submission of final process configuration including detailed P&ID of the process units, utilities and offsite.  

• to ensure that proposed designs adhered to both international and local  codes and standards, as the case may be. 

 2.  Final process technology selection and licensors. • to ensure that technology commensurate to industrial best practices are proposed 

 3.  Proposed Feedstock Supply and Product evacuation scheme • to ensure adequate planning for feedstock and product transportation in & out of 

the plant 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

20

Page 21: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

 4.  List of major equipment and equipment test procedures. • to facilitate the statutory participation of DPR in FAT exercises. 

 5.  Detailed Environmental Impact Assessment (EIA).   

  6.  Final project implementation schedule. 

To facilitate statutory DPR participation schedule and milestone points for monitoring the progress of work 

 7. Detailed feedstock supply and product meter proving procedures and evacuation schemes. 

  8.  Electrical & Control system philosophy.   

To ensure adequate plans are made for power generation, safety purposes in terms of proper earthen protection, load flow analysis and short circuit study. A properly designed process control and instrumentations system will guarantee a good automated controlled of all installed critical equipment. 

 ROLE OF DPR :

1. Continuous Participation in engineering design phases and milestone reviews at the activities location 

2. Participation in factory acceptance tests and pre‐shipment inspections 3. All project activities necessary for milestone approvals. 

 Service Charge:  N50,000  per Milestone approval   B1. CONSTRUCTION

This comprises of fabrication, installation and erection stages.  Fabrication a)  All fabrication and welding procedures shall generally follow the relevant 

specifications in the under‐listed documents: i) American Welding Society – Structural Welding Code A.W.S.D.1.1 

88 and the subsequent revisions. ii) API Standards 1104 – 17th and subsequent editions  for welding of 

pipelines and related facilities.  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

21

Page 22: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

b)  The  refiner or plant operator  shall provide  the Honorable Minister with the following information before the commencement of fabrication: i) The name of the contractor and the fabrication program. ii) The  yard  in  which  all  pressure  vessels,  columns  and  ancillary 

equipment would be fabricated. iii) The arrangements made for the statutory monitoring of the various 

stages of the fabrication by officials of the Department of Petroleum Resources. 

iv) The name and  job references of the company appointed as quality control  inspectors  for  the  job  and  Curriculum  Vitae  (CV)  of  its principal technical staff. 

 c)  At  the completion of  fabrication,  the quality control  inspecting company 

shall compile a  report confirming  that all materials used were strictly  in accordance  with  approved  specifications  as  verified  through  steel mill certificates  with  the  approved  Standards  and  Codes  of  Practice.  The quality  control  inspection  shall  be  by  Non‐Destructive  Examination (NDE). Consequently,  inspection and  certification of all welded parts of vessels, columns and piping shall be by any of the following techniques as applicable viz.:  i) Liquid Penetrant Technique ii) Magnetic Particle Technique iii) Radiographic Technique iv) Ultrasonic Technique A  comprehensive  report  of  the  inspection  so  carried  out  shall  be forwarded to the Ministry through the refiner or plant operator. 

 B2. ENVIRONMENTAL FACTORS

These  shall  include  all  available  meteorological  parameters,  such  as  the prevailing wind  direction, maximum wind  velocity, maximum  and minimum atmospheric  temperature,  relative  humidity,  rainfall,  local  flood  or  tide conditions. a) All  environmental  parameters  shall  be  obtained  from  independent  site 

survey with all the data gathered being properly documented. b) Soil  test  and  geo‐technical  investigations  shall  be  carried  out  for 

foundation or load‐carrying characteristics of the site. c) Contour maps (site plan), showing ground elevations shall be prepared d) Effect  of  borehole  water  withdrawal  on  ground  water  table  shall  be 

investigated and result submitted.  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

22

Page 23: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

 B3. ENVIRONMENTAL PROTECTION

a) There shall be a detailed Environmental Impact Assessment (EIA) study of the  area  as provided  for  in  the National Environmental Guidelines  and Standards  for  the  Petroleum  Industries,  before  commencement  of construction. 

b) The general layout of the location and provisions for all waste disposal in the  Biofuel  plant  shall  comply with  the  applicable  specifications  in  the National  Environmental  Guidelines  and  Standards  for  the  Petroleum Industry in Nigeria, issued by the Department of Petroleum Resources 

c) The Biofuel/Biofuel plant shall be equipped with adequate provisions for containing  and  handling  spills  and  accidental  discharge  of  potential contaminants. 

d) All  the  systems  and  components  of  the  refinery  shall  be  designed  to withstand  any  anticipated  extremes  of  environmental  phenomena  on location. 

e) The provision of effluent and recipient water quality monitoring shall be in  accordance with  the Environmental Guidelines  and  Standards  issued by the Department of Petroleum Resources for the Petroleum Industry. 

 B4 SAFETY FACTORS

a) All  offices, warehouses  and process buildings  shall be  constructed with utmost  consideration  for  the  safety  of  the  workers  and  equipment. Laboratory building  construction  shall  take  into  consideration  the  safety of  personnel  and  provision  of  adequate  ventilation  as well  as  that  for proper disposal of waste. 

b) Material Safety Sheet (MSS) shall be prepared in respect of all potentially hazardous chemicals and materials. 

c) Emergency  alarm  system  and  evacuation  programs  shall  conform  to Standards Industry Practice to the satisfaction of the Honorable Minister. 

d) The noise  level at any point  in  the refinery emanating  from engines and fluid velocities in the piping shall not exceed 90dBA. Where this level is to be exceeded, wearing of ear protection device shall become mandatory. 

e) The flare stack shall be located at a distance of at least 60m (200ft) from the unit or storage tanks and the flare shall conform to the approved limit of atmospheric emission. 

f) The automatic control system for emergency shutdown of all strategic or critical equipment in the plant such as columns, fired heaters, separators, 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

23

Page 24: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

surge vessels, pipeline and manifolds  compressors and pump discharge headers shall be based on fail‐safe logic designs. 

g) Fire  sensors  and  gas  detection  and  alarm  system  shall  be  installed  at strategic points of  the Biofuel plant  and  its offsite  facilities.  In  addition, adequate fire mitigation systems shall be provided at all identified fire risk areas of the refinery. 

   B5. HAZARD AND OPERABILITY REVIEW (HAZOP)

Biofuel Plants designs shall be subjected to SAFE Chart and HAZOP reviews at the following stages of the design and development.  1) At the completion of the plot plans and engineering models.  2) At  the  completion of  the detailed engineering design and  specifications. 

Accredited representatives of the Ministry shall be present at these SAFE Chart and HAZOP reviews. It shall be mandatory for each of these stages of  engineering  design  successfully  scale  through  the  appropriate  SAFE Chart  and  HAZOP  reviews.  For  this  purpose,  a minimum  of  four  (4) weeks notice shall be given to the Ministry  for arrangements to be made for  the participation of  its  representatives at  those  review meetings with all relevant P&ID’s made available for appropriate review ahead of time. 

 C. APPROVAL FOR FACILITY MODIFICATION

Any proposed modification or enlargement of existing facilities for importation, dispensing,  storage  or  establishment  of  Biofuel  /Biofuel  plant  shall  be communicated  to  the  DPR  and  must  be  approved  in  accordance  with  the provisions  of Regulation  3  of  the Petroleum Refining Regulations,  1974 before being carried out. 

   DPR Service Charge:  N50,000:00  D. LICENCE TO OPERATE BIOFUEL PLANT

At mechanical completion, DPR & downstream experts will carry out inspection of the plant to ascertain conformance with approved design. 

 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

24

Page 25: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

Upon  receipt  of  a  satisfactory  inspection  report,  the Honorable Minister will grant the approval to commission and operate the plant. The following shall be the pre‐requisites to quality: 1) A  qualified Biofuel plant manager  is  appointed  and  his  appointment  is 

notified in writing to the Minister of Petroleum Resources. 2) Complete  equipment  reports  on  all  critical  equipment  such  as  pressure 

vessels, fired heaters, boilers, rotating equipment and storage tanks. 3) Completion  of  all  fiscalization  equipment  and  systems  to  approved 

standards. 4) Availability  of  adequate  spare parts,  chemicals,  catalysts,  lubes,  greases 

and other operating consumable materials in the warehouse appropriately codified and organized. 

5) Availability  of  commissioning  spare  parts,  apart  from  operating  spare parts, all properly coded and arranged in the warehouse. 

6) Approved  operating  manuals,  maintenance  manuals,  mechanical catalogues,  would  have  all  been  supplied,  subject  to  appropriate modifications after commissioning. 

7) Approved  operating  and  maintenance  organization  and  availability  of trained manpower in sufficient strength. 

8) Completion  of  all  fiscalization  equipment  and  system  to  approved standards.  

9) Functional and effective fire prevention and fighting organization already in existence. 

10) Functional  and  effective  Safety  enforcement  Organization  and  Policies already in existence. 

11) All  approved  engineering  drawings  in  agreed  numbers  of  copies  have been supplied by the contractor, subject to modifications to reflect changes during construction. 

12) The quality control laboratory is completed and functional. 13) A well‐staffed and equipped First Aid Clinic is in place. 14) All other provisions, which are reasonably required  to  facilitate effective 

commissioning of the plant, have been made. 15) An  effective  and  international  applicable  materials  codification  and 

management system is in place. 16) Confirmation  that  all‐environmental  protection  standards  and  during 

design have been met. 17) Payment of prescribed application and license fees.  FEES LICENSE :      $100,000  

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009

25

Page 26: GUIDELINES - nairametrics.comnairametrics.com/wp-content/uploads/2013/01/procedures_guides_4... · These guidelines are issued pursuant to Regulation (2) and ... modern automobiles.

Annual Renewals:    $100,000  Service Charge:    N150,000 

 DPR ROLE INVOLVES:  

1. Construction supervision 2. Certification of mechanical installation     3. Review of operating manuals 4. Safety and environmental provisions certification. 

DEPARTMENT OF PETROLEUM RESOURCES FEB 2009