EST Case Study 1: TheST Case Study 1: TheMarikinaarikina Bikeways Programikeways ProgramEngrEngr. Sheila. Sheila FlorFlorT. DominguezT. Dominguez--JavierJavierNational Center for Transportation StudiesNational Center for Transportation Studies
-
8/14/2019 EST-20070216-Javier
2/25
Nonon-MotorizedotorizedTransportation (NMT)ransportation (NMT)
This includesThis includes
walking, cycling andwalking, cycling and
other forms of humanother forms of human
or animal poweredor animal poweredtransportation.transportation.
Source: Marikina Bikeways Office
-
8/14/2019 EST-20070216-Javier
3/25
Brief History ofrief History of MarikinaarikinaBikewaysikeways
Issues and Problems withinIssues and Problems within MarikinaMarikina City wereCity were
identifiedidentified Physical ReconstructionPhysical Reconstruction (started in 1992)(started in 1992)
Social Reorientation (started in 1992)Social Reorientation (started in 1992)
City ofCity ofMarikinaMarikinachosen for the pilot project of the nonchosen for the pilot project of the non--motorized component of the Metro Manila Urbanmotorized component of the Metro Manila UrbanTransport Integration Project (MMURTRIP) (1997)Transport Integration Project (MMURTRIP) (1997)
Feasibility StudyFeasibility Study MarikinaMarikina Bikeways (UPBikeways (UP--NCTS,NCTS,
2000)2000) Establishment ofEstablishment ofMarikinaMarikina Bikeways Office (2001)Bikeways Office (2001)
MarikinaMarikina Bikeways ProjectBikeways Project GEF Funded (2001GEF Funded (2001--2007)2007)
Information and Education CampaignInformation and Education Campaign
Exit
-
8/14/2019 EST-20070216-Javier
4/25
Marikinaarikina City: Issues andity: Issues andProblemsroblems
FloodingFlooding
No SidewalkNo Sidewalk
Presence of Vendors on the SidewalkPresence of Vendors on the Sidewalk
Roads as JunkyardsRoads as Junkyards
Uncollected GarbageUncollected Garbage
CongestionCongestion
Air PollutionAir Pollution
Security ProblemSecurity Problem
-
8/14/2019 EST-20070216-Javier
5/25
Floodinglooding
ExitSource: Marikina Bikeways Office (MBO)
-
8/14/2019 EST-20070216-Javier
6/25
No Sidewalko Sidewalk
ExitSource: Marikina Bikeways Office (MBO)
-
8/14/2019 EST-20070216-Javier
7/25
Presence of Sidewalkresence of SidewalkVendorsendors
ExitSource: Marikina Bikeways Office (MBO)
-
8/14/2019 EST-20070216-Javier
8/25
Road as Junkyardsoad as Junkyards
Exit
Source: Marikina Bikeways Office (MBO)
-
8/14/2019 EST-20070216-Javier
9/25
Uncollected Garbagencollected Garbage
ExitSource: Marikina Bikeways Office (MBO)
-
8/14/2019 EST-20070216-Javier
10/25
Congestionongestion
Exit
Source: Marikina Bikeways Office (MBO)
-
8/14/2019 EST-20070216-Javier
11/25
Physical Reconstructionhysical Reconstruction
Bangketa - Before
Bangketa - After
Source: Marikina Bikeways Office (MBO)
-
8/14/2019 EST-20070216-Javier
12/25
Clearing of Sidewalkslearing of Sidewalks
Operation Bangketa Demolition
Source: Marikina Bikeways Office (MBO)
Exit
-
8/14/2019 EST-20070216-Javier
13/25
Marikinaarikina Bikeways Projectikeways Project WBB-GEF FundedEF Funded
49.7 km of segregated bikeways on existing roads,49.7 km of segregated bikeways on existing roads,
16.6 km of bikeways along the16.6 km of bikeways along the MarikinaMarikina RiverRiver
traffic slowing and pedestrian facilities around schoolstraffic slowing and pedestrian facilities around schoolsand market areas, and provision of bicycle parkingand market areas, and provision of bicycle parking
facilities at key interchanges;facilities at key interchanges; lighting, where necessary, to ensure safety after hours;lighting, where necessary, to ensure safety after hours;
a public awareness campaign;a public awareness campaign;
a bicycle safety program;a bicycle safety program;
a rigorous monitoring and evaluation program anda rigorous monitoring and evaluation program andmajor dissemination effortmajor dissemination effort
Marikina City received $1.3 million from WB GEF. The CityGovernment spent USD 269,488 as local counterpart funds for GEF
supported bikeways and USD 1.4M for locally funded bikeways.
-
8/14/2019 EST-20070216-Javier
14/25
Results and Impactsesults and Impacts
Environmental BenefitsEnvironmental Benefits Livelihood BenefitsLivelihood Benefits
Health BenefitsHealth Benefits
Mobility BenefitsMobility Benefits
-
8/14/2019 EST-20070216-Javier
15/25
Environmental Benefitsnvironmental Benefits Bicycles are an emissionBicycles are an emission--free and noisefree and noise--freefree
form of transportationform of transportation Increasing share of trips taken by bicycle hasIncreasing share of trips taken by bicycle has
the potential of reducing overall emission ofthe potential of reducing overall emission of
greenhouse gases, thus, increasing the airgreenhouse gases, thus, increasing the airquality inquality in MarikinaMarikina CityCity
Based on 14-hour traffic count conducted by MBO, modal share ofbicycle increases from 4.25 % in 1999 to 9.54% in 2006.
Results of the air quality monitoring showed that TSP at the 2 sites are
relatively lower during carless day than other days where motorizedvehicles are allowed to run.
-
8/14/2019 EST-20070216-Javier
16/25
Livelihood Benefitsivelihood Benefits
Increase in number ofIncrease in number ofbikeshopsbikeshops Increase in gross sales ofIncrease in gross sales ofbikeshopsbikeshops
Based on the data from Business & LicensingOffice in Marikina City, number of bikeshopsincreases from ~ 5 in 1999 to ~ 22 in 2006 and
annual gross sales increases from ~ 1M in 1999to ~ 15M in 2006.
-
8/14/2019 EST-20070216-Javier
17/25
Health Benefitsealth Benefits
Excellent form of exerciseExcellent form of exercise Promoted cycling as a form of leisurePromoted cycling as a form of leisure
activity (alongactivity (along MarikinaMarikina River)River)
-
8/14/2019 EST-20070216-Javier
18/25
Mobility Benefitsobility Benefits
Improved mobilityImproved mobility Improved connection from residentialImproved connection from residential
communities with schools, employmentcommunities with schools, employment
centers and other public transportcenters and other public transport
terminals.terminals.
The construction of the bikeways connection tothe LRT 2 will be starting soon.
Marikina to the World
-
8/14/2019 EST-20070216-Javier
19/25
Lessons Learnedessons Learned
Issues and ChallengesIssues and Challenges
Strategies to address the issues andStrategies to address the issues and
problems in Mainstreamingproblems in Mainstreaming
-
8/14/2019 EST-20070216-Javier
20/25
Technical Issuesechnical Issues
Physical separatorPhysical separator
cause of delay ofcause of delay of
the projectthe project
Bicycle Design (utility)Bicycle Design (utility)
Pedestrian and Bicycle ConflictPedestrian and Bicycle Conflict
Motor Vehicle and Bicycle ConflictMotor Vehicle and Bicycle Conflict
-
8/14/2019 EST-20070216-Javier
21/25
Financial Issuesinancial Issues Funding for the bikewaysFunding for the bikeways
program is not at all aprogram is not at all a
problem. There is aproblem. There is astrong commitment fromstrong commitment fromthe local leaders. Budgetthe local leaders. Budgetfor bikeways was takenfor bikeways was takenfrom CDF and somefrom CDF and someprojects was included inprojects was included inthe generalthe generalconstruction/repair andconstruction/repair andmaintenance / roads andmaintenance / roads anddrainagesdrainages
They were able toThey were able tooutsource funding foroutsource funding forsome of their projects.some of their projects.
15.8015.801,131.001,131.0020052005
1.641.641,084.401,084.4020042004
7.907.90907.93907.9320032003
6.006.00870.05870.0520022002
17.0017.00707.40707.4020012001
BIKEWAYSBIKEWAYS
BUDGETBUDGET
(Million(Million
PhPPhP))
TOTALTOTAL
INCOMEINCOME
(Million(Million
PhPPhP))
YEARYEAR
Source: Marikina Bikeways Office (MBO)
USD 10,000 Japan Municipal
Coordinating Council.USD 5,000 From Senator Pangilinan tosupport of Bicycle Loan Program
-
8/14/2019 EST-20070216-Javier
22/25
Institutional Issuesnstitutional Issues
Coordination of projectsCoordination of projects
From 2002From 2002
--
2003, most of the activities of MBO are2003, most of the activities of MBO are
concentrated on preparing plans andconcentrated on preparing plans and
program because they had to wait for theprogram because they had to wait for theengineering department to finish otherengineering department to finish other
infrastructure projects.infrastructure projects.
-
8/14/2019 EST-20070216-Javier
23/25
Strategiestrategies
Strong Political Will of the local leadersStrong Political Will of the local leaders
Development of Safe Bicycle FacilitiesDevelopment of Safe Bicycle Facilities
Creative Cycling Culture PromotionCreative Cycling Culture Promotion
-
8/14/2019 EST-20070216-Javier
24/25
Questionsuestions
Do you think cycling is a feasible meansDo you think cycling is a feasible means
of urban transport in yourof urban transport in your
city/municipality?city/municipality?
Do you think the bicycle program will getDo you think the bicycle program will getpolitical support in your locality?political support in your locality?
What are the other environmentallyWhat are the other environmentallysustainable transport (EST) efforts insustainable transport (EST) efforts in
your locality?your locality?
-
8/14/2019 EST-20070216-Javier
25/25
Thank you very much!hank you very much!