    EST Case Study 1: TheST Case Study 1: TheMarikinaarikina Bikeways Programikeways ProgramEngrEngr. Sheila. Sheila FlorFlorT. DominguezT. Dominguez--JavierJavierNational Center for Transportation StudiesNational Center for Transportation Studies

  • 8/14/2019 EST-20070216-Javier

    2/25

    Nonon-MotorizedotorizedTransportation (NMT)ransportation (NMT)

    This includesThis includes

    walking, cycling andwalking, cycling and

    other forms of humanother forms of human

    or animal poweredor animal poweredtransportation.transportation.

    Source: Marikina Bikeways Office

  • 8/14/2019 EST-20070216-Javier

    3/25

    Brief History ofrief History of MarikinaarikinaBikewaysikeways

    Issues and Problems withinIssues and Problems within MarikinaMarikina City wereCity were

    identifiedidentified Physical ReconstructionPhysical Reconstruction (started in 1992)(started in 1992)

    Social Reorientation (started in 1992)Social Reorientation (started in 1992)

    City ofCity ofMarikinaMarikinachosen for the pilot project of the nonchosen for the pilot project of the non--motorized component of the Metro Manila Urbanmotorized component of the Metro Manila UrbanTransport Integration Project (MMURTRIP) (1997)Transport Integration Project (MMURTRIP) (1997)

    Feasibility StudyFeasibility Study MarikinaMarikina Bikeways (UPBikeways (UP--NCTS,NCTS,

    2000)2000) Establishment ofEstablishment ofMarikinaMarikina Bikeways Office (2001)Bikeways Office (2001)

    MarikinaMarikina Bikeways ProjectBikeways Project GEF Funded (2001GEF Funded (2001--2007)2007)

    Information and Education CampaignInformation and Education Campaign

    Exit

  • 8/14/2019 EST-20070216-Javier

    4/25

    Marikinaarikina City: Issues andity: Issues andProblemsroblems

    FloodingFlooding

    No SidewalkNo Sidewalk

    Presence of Vendors on the SidewalkPresence of Vendors on the Sidewalk

    Roads as JunkyardsRoads as Junkyards

    Uncollected GarbageUncollected Garbage

    CongestionCongestion

    Air PollutionAir Pollution

    Security ProblemSecurity Problem

  • 8/14/2019 EST-20070216-Javier

    5/25

    Floodinglooding

    ExitSource: Marikina Bikeways Office (MBO)

  • 8/14/2019 EST-20070216-Javier

    6/25

    No Sidewalko Sidewalk

    ExitSource: Marikina Bikeways Office (MBO)

  • 8/14/2019 EST-20070216-Javier

    7/25

    Presence of Sidewalkresence of SidewalkVendorsendors

    ExitSource: Marikina Bikeways Office (MBO)

  • 8/14/2019 EST-20070216-Javier

    8/25

    Road as Junkyardsoad as Junkyards

    Exit

    Source: Marikina Bikeways Office (MBO)

  • 8/14/2019 EST-20070216-Javier

    9/25

    Uncollected Garbagencollected Garbage

    ExitSource: Marikina Bikeways Office (MBO)

  • 8/14/2019 EST-20070216-Javier

    10/25

    Congestionongestion

    Exit

    Source: Marikina Bikeways Office (MBO)

  • 8/14/2019 EST-20070216-Javier

    11/25

    Physical Reconstructionhysical Reconstruction

    Bangketa - Before

    Bangketa - After

    Source: Marikina Bikeways Office (MBO)

  • 8/14/2019 EST-20070216-Javier

    12/25

    Clearing of Sidewalkslearing of Sidewalks

    Operation Bangketa Demolition

    Source: Marikina Bikeways Office (MBO)

    Exit

  • 8/14/2019 EST-20070216-Javier

    13/25

    Marikinaarikina Bikeways Projectikeways Project WBB-GEF FundedEF Funded

    49.7 km of segregated bikeways on existing roads,49.7 km of segregated bikeways on existing roads,

    16.6 km of bikeways along the16.6 km of bikeways along the MarikinaMarikina RiverRiver

    traffic slowing and pedestrian facilities around schoolstraffic slowing and pedestrian facilities around schoolsand market areas, and provision of bicycle parkingand market areas, and provision of bicycle parking

    facilities at key interchanges;facilities at key interchanges; lighting, where necessary, to ensure safety after hours;lighting, where necessary, to ensure safety after hours;

    a public awareness campaign;a public awareness campaign;

    a bicycle safety program;a bicycle safety program;

    a rigorous monitoring and evaluation program anda rigorous monitoring and evaluation program andmajor dissemination effortmajor dissemination effort

    Marikina City received $1.3 million from WB GEF. The CityGovernment spent USD 269,488 as local counterpart funds for GEF

    supported bikeways and USD 1.4M for locally funded bikeways.

  • 8/14/2019 EST-20070216-Javier

    14/25

    Results and Impactsesults and Impacts

    Environmental BenefitsEnvironmental Benefits Livelihood BenefitsLivelihood Benefits

    Health BenefitsHealth Benefits

    Mobility BenefitsMobility Benefits

  • 8/14/2019 EST-20070216-Javier

    15/25

    Environmental Benefitsnvironmental Benefits Bicycles are an emissionBicycles are an emission--free and noisefree and noise--freefree

    form of transportationform of transportation Increasing share of trips taken by bicycle hasIncreasing share of trips taken by bicycle has

    the potential of reducing overall emission ofthe potential of reducing overall emission of

    greenhouse gases, thus, increasing the airgreenhouse gases, thus, increasing the airquality inquality in MarikinaMarikina CityCity

    Based on 14-hour traffic count conducted by MBO, modal share ofbicycle increases from 4.25 % in 1999 to 9.54% in 2006.

    Results of the air quality monitoring showed that TSP at the 2 sites are

    relatively lower during carless day than other days where motorizedvehicles are allowed to run.

  • 8/14/2019 EST-20070216-Javier

    16/25

    Livelihood Benefitsivelihood Benefits

    Increase in number ofIncrease in number ofbikeshopsbikeshops Increase in gross sales ofIncrease in gross sales ofbikeshopsbikeshops

    Based on the data from Business & LicensingOffice in Marikina City, number of bikeshopsincreases from ~ 5 in 1999 to ~ 22 in 2006 and

    annual gross sales increases from ~ 1M in 1999to ~ 15M in 2006.

  • 8/14/2019 EST-20070216-Javier

    17/25

    Health Benefitsealth Benefits

    Excellent form of exerciseExcellent form of exercise Promoted cycling as a form of leisurePromoted cycling as a form of leisure

    activity (alongactivity (along MarikinaMarikina River)River)

  • 8/14/2019 EST-20070216-Javier

    18/25

    Mobility Benefitsobility Benefits

    Improved mobilityImproved mobility Improved connection from residentialImproved connection from residential

    communities with schools, employmentcommunities with schools, employment

    centers and other public transportcenters and other public transport

    terminals.terminals.

    The construction of the bikeways connection tothe LRT 2 will be starting soon.

    Marikina to the World

  • 8/14/2019 EST-20070216-Javier

    19/25

    Lessons Learnedessons Learned

    Issues and ChallengesIssues and Challenges

    Strategies to address the issues andStrategies to address the issues and

    problems in Mainstreamingproblems in Mainstreaming

  • 8/14/2019 EST-20070216-Javier

    20/25

    Technical Issuesechnical Issues

    Physical separatorPhysical separator

    cause of delay ofcause of delay of

    the projectthe project

    Bicycle Design (utility)Bicycle Design (utility)

    Pedestrian and Bicycle ConflictPedestrian and Bicycle Conflict

    Motor Vehicle and Bicycle ConflictMotor Vehicle and Bicycle Conflict

  • 8/14/2019 EST-20070216-Javier

    21/25

    Financial Issuesinancial Issues Funding for the bikewaysFunding for the bikeways

    program is not at all aprogram is not at all a

    problem. There is aproblem. There is astrong commitment fromstrong commitment fromthe local leaders. Budgetthe local leaders. Budgetfor bikeways was takenfor bikeways was takenfrom CDF and somefrom CDF and someprojects was included inprojects was included inthe generalthe generalconstruction/repair andconstruction/repair andmaintenance / roads andmaintenance / roads anddrainagesdrainages

    They were able toThey were able tooutsource funding foroutsource funding forsome of their projects.some of their projects.

    15.8015.801,131.001,131.0020052005

    1.641.641,084.401,084.4020042004

    7.907.90907.93907.9320032003

    6.006.00870.05870.0520022002

    17.0017.00707.40707.4020012001

    BIKEWAYSBIKEWAYS

    BUDGETBUDGET

    (Million(Million

    PhPPhP))

    TOTALTOTAL

    INCOMEINCOME

    (Million(Million

    PhPPhP))

    YEARYEAR

    Source: Marikina Bikeways Office (MBO)

    USD 10,000 Japan Municipal

    Coordinating Council.USD 5,000 From Senator Pangilinan tosupport of Bicycle Loan Program

  • 8/14/2019 EST-20070216-Javier

    22/25

    Institutional Issuesnstitutional Issues

    Coordination of projectsCoordination of projects

    From 2002From 2002

    --

    2003, most of the activities of MBO are2003, most of the activities of MBO are

    concentrated on preparing plans andconcentrated on preparing plans and

    program because they had to wait for theprogram because they had to wait for theengineering department to finish otherengineering department to finish other

    infrastructure projects.infrastructure projects.

  • 8/14/2019 EST-20070216-Javier

    23/25

    Strategiestrategies

    Strong Political Will of the local leadersStrong Political Will of the local leaders

    Development of Safe Bicycle FacilitiesDevelopment of Safe Bicycle Facilities

    Creative Cycling Culture PromotionCreative Cycling Culture Promotion

  • 8/14/2019 EST-20070216-Javier

    24/25

    Questionsuestions

    Do you think cycling is a feasible meansDo you think cycling is a feasible means

    of urban transport in yourof urban transport in your

    city/municipality?city/municipality?

    Do you think the bicycle program will getDo you think the bicycle program will getpolitical support in your locality?political support in your locality?

    What are the other environmentallyWhat are the other environmentallysustainable transport (EST) efforts insustainable transport (EST) efforts in

    your locality?your locality?

  • 8/14/2019 EST-20070216-Javier

    25/25

    Thank you very much!hank you very much!