VI. HEAT RECOVERY STEAM GENERATORS
1
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 2/50
Heat Recovery Steam Generators (HRSG)
• HRSG – ‘Steam-Raising Waste Heat Boilers’. A typical
oil refinery may have 30 or more HRSG’s.
• HRSGs – commonly employed in smaller electricalpower generators using diesel engines or gas turbine
.
• Combined-Cycle and Cogeneration applications where
heat from the exhaust of a combustion turbine is usedto produce steam for additional power production or
other industrial purposes.
- ,burn natural gas or oil, and easily installed in a short
period.
2
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 3/50
Heat Recovery Steam Generators (HRSG)
• HRSG’s – a key component in a Combined-Cycle or
Co eneration units.
• Several HRSG variations: Vertical Tube Drum-type, inwhich a single drum boiler is placed within the gas path.
• Natural or forced circulation, and once-through boilers
are also available.
•
those of multiple pressures, make boiler water
treatment, chemistry and control a critical and
c a eng ng as• High cycling HRSG’s are particularly vulnerable to
roblems such as FAC.
3
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 4/50
Erosion, Flow Accelerated Corrosion (FAC),
• Erosion – dama e resultin from water steam and/or
particulates on a material.• Erosion – evident as etching, distinct lines, or the
wa ow ng ou o a cer a n area; c em s ry an ve oc y
can be causative; often misdiagnosed as Flow
Accelerated Corrosion (FAC).
• FAC – Flow Accelerated (or Assisted) Corrosion is
defined as a process in which the normally protective
-into a stream of flowing water or steam-water mixture.
4
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 5/50
Erosion, Flow Accelerated Corrosion (FAC),
‐ , .
• FAC can occur in sin le- and in two- hase re ions
predominantly in the LP Section of the HRSG.• Chrome steels are required in this section of the
.
5
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 6/50
Differences Between Erosion, FAC , Erosion‐
orros on, an av tat on ros on
chemistry. Two phase FAC can be differentiatedbetween Cavitation by the evidence of ‘tiger stripes’ or
‘chevrons’.
•
FAC, often generically classif ied within the industry as- , .
• EPRI defines Erosion-Corrosion (EC) as ‘the
degradation of material caused by both mechanical
and chemical processes.’
• FAC is often mislabeled as Erosion-Corrosion, even
effects. 6
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 7/50
Differences Between Erosion, FAC , Erosion‐
orros on, an av tat on ros on
-
and corrosion mechanisms, while the term FAC is veryspecific.
• It would not be incorrect to call FAC erosion-
corrosion. However, FAC refers to a specific set of- .
• While general industry practices in identifies FAC as
Erosion-Corrosion, there are no mechanical
processes associated with FAC.
7
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 8/50
Differences Between Erosion, FAC , Erosion‐
orros on, an av tat on ros on, cont .
• Cavitation Erosion CE – occurs downstream of a
directional change or in the presence of an eddy, andis identified by round pits; often misdiagnosed as
.
• CE also involves fluids accelerating over the surface
of a material but unlike erosion, the actual fluid is notdoing the damage.
• Cavitation results when small bubbles in a liquid
.pressure of a fluid drops below the vapor pressure
(the pressure at which a liquid becomes a gas); when
these bubbles strike the surface, they collapse or
implode. 8
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 9/50
Differences Between Erosion, FAC , Erosion‐
orros on, an av tat on ros on, cont .
• A single bubble imploding does not carry much force
u , over me, e sma amage cause y eac
bubble exhibits cumulative effects.
•
formation of pits.
• Similar to erosion, the presence of chemical corrosionenhances the damage and rate of material removal.
• Cavitation is not a property of a material, but of the
’.
size and shape of the vessel, not the material. While a
stronger material can be highly resistant to cavitation,
no me a s mmune.
9
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 10/50
Combined Cycle Utility HRSG
10
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 11/50
11
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 12/50
Water Tube HRSG from Gas Turbines
Waste Heat Recovery
o ers use w as
Turbines provide 1 -15 MW, u to 40 MW
with a steam pressure
up to 60 bar and
up to 450°C.
• HRSG is a strategic part of a Combined Heat & Power(CHP) industrial system recovering the waste heat of
.• Benefits: High Thermal Efficiencies; Reduced Thermal
Emissions; Improved Overall Energy Economics. 12
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 13/50
Typical Design Features of GT HRSG
• Drums: The upper and lower drums are installed
crosswise to the GT flue gas flow. The internal steam
drum provides for high steam purity due to a wide steam
scrubber and free end-flow, to minimize turbulence and
• Primary Steam Generation: Uses a convection Steam
Heater (SH) consisting of sections of fully drainable,vertical-finned tubes or smooth-type coils with multi-
pass steam flow and gas cross-flow.
,section of the boiler, is shielded by a number of screen
tubes in order to avoid creep fatigue failure due to
exposure at high temperatures over a long period.
13
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 14/50
Typical Design Features of GT HRSG, contd.
• Convection Section: The HRSG tube bank consists of a
series of tubes properly bent and welded to the external
headers. The outer tubes forming the external wall are
membraned, providing a continuous gas enclosed
• Economizer: The HRSG Economizer recovers waste
energy from the flue gases downstream of theconvection section and transfers it to the boiler
feedwater, increasing thermal efficiency and reducing
thermal emissions.
14
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 15/50
Two‐Stage Combined Cycle Gas Turbine and
HRSG Steam Turbine Electricity Generation
15
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 16/50
Two‐Stage Combined Cycle –
16
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 17/50
HRSG Operation Problems
• Most large new combined cycle plants in the US were
designed under the assumption that they would be
ase- oa e , or a eas n requen y cyc e . s
basic assumption has proven to be far from the actualoperating modes for most new plants as gas energy
prices have fluctuated widely in recent years.
• Two-Shift cycling is now common and is differentiatedfrom Seasonal Duty, where plants are run essentially
base-load but only for a few months of the year.
17
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 18/50
HRSG Operation Problems, contd.
• Since combustion turbine ramp rates and startup
procedures directly affect HRSG component
empera ure ramp ra es, e pus o rap om us on
Turbine (CT) startups results in greater ramp rates inHRSG hot section components than was assumed in
plant design analyses.
Larger thermal stresses result with significantimplications for the fatigue life of affected
components such as drums, thick section headers,
and tube-to-header welds.
18
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 19/50
Additional HRSG Operational Problems
• Cycling produces a rapid thermal response, which results
in more condensate accumulation during startups and a
piping metal temperatures.
• The extreme conditions that are caused b c clin
operations sometimes result in water-hammer in affected
piping systems, thermal quenching of hot component
, ,
pressure boundary at tube-to-header welds, riser piping to
drums, crossover (connecting) piping, and drain
.
• Cold weather operations also provide a different challenge
with the need to maintain tem erature to revent header
failure from freezing conditions.
19
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 20/50
Additional HRSG Operational Problems, contd.
Many new combined-cycle plants have experienced premature
failures leading most operators to pursue a more aggressive
approach to assure that HRSG component integrity is verified
by periodic inspections more detailed than ‘statutory boiler
inspections). For example:
. sua nspec on o gas pa componen s: u es,
headers and their supports, crossover piping, risers,
drains, gas baffles, acoustic baffles and related structuralcomponents.
2. Ultrasonic Testing (UT) of wall thickness for selected (high
establish the condition of HRSG components early in their
service. Drum baffle plates and cyclone separator ‘can’
c nesses are a so measure .
20
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 21/50
Additional HRSG Operational Problems, contd.
3. Visual inspection of accessible HRSG water-side
components including: primary and secondary steam
and blowdown penetrations; and baffle plates and theirmechanical restraints (bolting and/or welds).
Plants with a history of HRSG component damage may also
schedule:
cracking.
• Radiographic Testing (RT) of tube-to-header welds
susp c on o we e ec s or su -sur ace crac s .• Thermography of HRSG casings to identify hot spots and
more thorough examination of older units with more
accumulated operating hours.
21
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 22/50
Additional HRSG Operational Problems, contd.
• Boroscope inspections are relatively uncommon for large
HRSG components due to a general lack of access to areas of
interest.
• Boroscopes are used to inspect attemperator spray liners.
•
a tendency to ‘overspray’ in order to control metal temperatures in
Reheater and
HP
Superheater
outlet
piping
to
below
design
values
for
.
22
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 23/50
Dewpoint and Chloride Stress Corrosion
Cracking ‐ Combined Cycle Cogeneration Facility
23
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 24/50
Fail HRSG Ga Baffl
24
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 25/50
Failed Casing Seal Weld Around Reheat
onnector to ower an o
25
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 26/50
B ckl Lin r Plat in Firin D ct
26
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 27/50
C clin nit: Kink in R h at r T
27
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 28/50
B w R h at T D t Wat r‐Hamm r
28
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 29/50
Cycling HRSG: Fatigue Failure of 304H
ta n ess tee e eater u e tu
29
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 30/50
Cycling HRSG: Stress Corrosion Cracking
a ure n ee water u e
30
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 31/50
Cycling HRSG: Leaking 16” Reheater
rossover n u e
31
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 32/50
Water Chemistry: Sticky Deposits (pH 3.0)
on conom zer u es
32
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 33/50
Water Chemistry: Ammonium Bisulfite
Acc m lati n n Final R w f F wat r
Heater Tubes
33
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 34/50
HRSG: Flame Impingement
on ownstream u es
34
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 35/50
HRSG Water Chemistry Control
• In some multi-pressure HRSG’s, the low-pressure(LP) boiler serves as a feedwater heating source forintermediate- (IP) and high-pressure (HP) boilers.
•
An All-Volatile Treatment (AVT) would probably bethe best choice for the LP boiler, so that the waterremained low in dissolved solids.
• Congruent or Coordinated Phosphate would be a
reasonable choice for the IP boiler and possibly theo er, epen ng upon e sever y o eou .
• Combined-cycle units are often cycled frequently.
chemistry than any other aspect of operation.Cycling also has more influence on the frequency of
35
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 36/50
HRSG Water Chemistry Control, contd.
• Each steam generating network in a multiple-boiler HRSGoperates at a different pressure. Intermediate pressuresma ran e from 200 to 500 si with low- ressureboilers operating from as low as saturation pressure to
around 100 psig. The different pressures requiredifferent chemistry control regimes.
• The low-pressure boiler may directly supply feedwater tothe intermediate-pressure and high pressure steam
generators. This factor dictates additional chemical- .
• The deaerator may be integral to the low pressure boiler.
•
Flow rates in HRSG’ s are generally higher than inconventional boilers. This increases the possibil ity offlow-assisted corrosion.
36
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 37/50
HRSG Water Chemistry Control, contd.
• Blowdown may be cascaded from high-pressureboilers to low-pressure boilers as an energy saving
.
• Makeup water requirements can be quite large forcogeneration units, where part or all of the steammay e consume n an n us r a process.
• Heat fluxes in HRSG boilers are lower than those in- ,
boilers are not exposed to radiant heat.
• Lower heat fluxes reduce scaling and corrosion
potent a . owever, t s a vantage may e o set yincreased cycling.
37
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 38/50
HRSG Water Chemistry Control, contd.
Hydrazine
• Several difficult ies have arisen from using Hydrazine.The most troublin roblem is Flow Assisted Corrosion (FAC). In completely deoxygenated environments,
flowing water wil l erode carbon steel, particularly at pipebends and other flow disturbances. Several catastrophic
- , ,occurred within the past decade.
• FAC is greatly minimized if a slight oxygen residual is,protective magnetite layer is maintained on the pipewalls. A dissolved oxygen residual of 1 to 2 ppb isrecommended. For this reason Oxygenated Treatments
(OT) have developed.• FAC in HRSG’s may be even more severe, due to the
higher flow rates. This can be combated by fabricating
38
elbows out of higher grade materials, such as the 1.25 Cr-0.5 Mo or 2.25 Cr- 1.0 Mo steels.
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 39/50
HRSG Water Chemistry Control, contd.
Alternate Oxygen Scavengers
• They are more expensive and will break down in
boilers to form organic acids and carbon dioxide,which in turn will carry over to turbines and other
- .
• Debate goes on regarding the corrosive effects on
turbine blades of the carr over roducts.
39
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 40/50
HRSG Water Chemistry Control, contd.
Oxygenated Treatment (OT)
• OT in which ox en is deliberatel in ected into the feedwater system, was developed in Germany about
25 years ago for replacement of all-volatile treatment(hydrazine/ammonia) in once-through steamgenera ng un s.
• The treatment involves the controlled injection of
feedwater system. The controlled feed causes themagnetite layer on the pipe walls to becomeoverlayed and interspersed with an even tighter film
of ferric oxide hydrate (FeOOH). This compact layeris more stable than magnetite and releases very li tt ledissolved iron or suspended iron oxide particles to
40
.
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 41/50
HRSG Water Chemistry Control, contd.
Oxygenated treatment (OT)
• Some once-through utilities that switched from AVTo ave repor e a sso ve ee wa er e
concentrations, which were often 10 ppb or higheron oxygen scavenger programs, dropped to as low
established.
• In the most popular OT program, known asom ne a er rea men , oxygen s oseto maintain a 50 to 150 ppb residual. Ammonia isadded to raise the pH to 8.0-8.5. Typically, 20 to 70
.
• OT is a very real consideration for once-throughHRSGs. One drawback is that OT requires extremely
41
,use of a condensate polisher.
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 42/50
HRSG Water Chemistry Control, contd.
pH Control
• Excursions of pH outside a relatively narrow range.
• Feedwater piping and heat exchanger tubes exhibitminimal corrosion at a mildly alkaline pH. For aee wa er sys em con a n ng a s ee me a urgy, e
optimum pH range is 9.0 to 9.6.
• Corrosion control in mixed-metallur s stems ismore complicated. Admiralty brass performs bestwithin a pH range of 8.5 to 9. Copper-nickel alloys(particularly the 90-10 material) are most stablearoun a p o . .
• For a system containing carbon-steel piping andco er-allo heat exchan er tubes a recommended
42
pH range with Admiralty materials is 8.8 to 9.1.
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 43/50
HRSG Water Chemistry Control, contd.
pH Control, contd.
• Ammonia and organic neutralizing amines are the pH.
• Amines will decompose to produce ammonia infeedwater. Whether the ammonia comes from directammon a ee or am ne ecompos on, a generarule of thumb recommends that ammoniaconcentrations be limited to 0.5 ppm in systems
- .too high where excess air in-leakage may occur.
• In systems with turbines, decomposition of aminescan po en a y n ro uce unwan e organ c ac sand CO2 into the turbine. Some experts recommendammonia over all other pH conditioning chemicals,
43
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 44/50
HRSG Water Chemistry Control, contd.
Phosphate Treatment
• Phosphate hideout and incongruent precipitation ofa3 4 on u e wa s can e pro ems.
• TSP is most soluble at 250⁰ F, but solubil ity rapidlyfalls off and becomes ver low at 600⁰ F. The effectmay become very pronounced in units above 2,000psi and/or are subjected to frequent load changes.
Hideout depletes the boiler water of the chemicales gne o con ro c em s ry. e p osp a ecompounds often precipitate incongruently, withdeposit sodium-to-phosphate molar ratios of 2:1 or
" “, .
44
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 45/50
HRSG Water Chemistry Control, contd.
Phosphate Treatment, contd.
• Hideout can be at its worst in a cycling unit.u owns an s ar ups, an even oa c anges,
cause precipitation and dissolution of phosphates.This in turn causes wide fluctuations in boiler water.
dissolution process have been known to force boilerwater pH below 7 in cycling units.
• osp a e eou appears o e ur er n uenceby the cleanliness of the boiler tubes, and becomesmore severe with increased deposit loading,
.
sodium phosphates form a sodium-iron-phosphatecomplex with the magnetite layer. Periodic boilerchemical cleanings can potentially reduce hideout
45
by minimizing the presence of porous magnetitedeposits.
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 46/50
HRSG Water Chemistry Control, contd.
Phosphate Treatment, contd.
• Lower heat fluxes in HRSG’s tend to reduce POdeposition. Frequent cycling is a problem.
• Equilibrium Phosphate Treatment (EPT) is designed.
maintained within a range of 0.2 to 2.5 ppm, and pHwithin a range of 9.0 to 9.7.
phosphate with supplemental addition of caustic,generally at unit startup. This treatment produces a
- - .
greater, with most of the control range at 3:1 orabove. Caustic alkalinity is from 0 to 1 ppm.
46
HRSG W t Ch i t C t l td
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 47/50
HRSG Water Chemistry Control, contd.
Caustic Treatment
• In a caustic treatment program, boiler water pH isma n a ne w n a range o . o . y a on o
caustic to maintain an NaOH level of 1.0 to 1.5 ppm.• Feedwater chemistr must be well controlled to
prevent excessive deposit formation in the boiler,which might lead to under-deposit caustic corrosion.
Sodium nitrate is frequently added with caustic topreven s ress corros on crac ng o o er u es.
• As is the case with EPT, the higher levels of causticin the boiler water may lead to greater carryover of
sodium hydroxide to the turbine.
47
HRSG W t Ch i t C t l td
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 48/50
HRSG Water Chemistry Control, contd.
All-Volatile Treatment
• AVT was developed mainly for once-through boilers-
program. Ammonia or amines and an oxygenscavenger carry through the boiler into the steam.
gu e nes or a once- roug un ca or a prange of 9.3 - 9.6 with less than 2 ppm dissolvedsolids. Ammonia levels from 1-2 ppm. Condensate
.
• AVT is also used in some drum boilers, especiallynear crit ical pressure (3,203.6 psia). AVT does notpro ec rum o ers rom con am nan n ro uc ondue to a condenser leak or other problem.
Condensate olishers are the most effective buffer
48
against chemistry upsets.
HRSG W t Ch i t C t l td
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 49/50
HRSG Water Chemistry Control, contd.
All-Volatile Treatment, contd.
• AVT has lost a lot of popularity as it tends toncrease carryover o c or e an su a e, w c
then deposit on the LP turbine blades. In addition,amines and organic oxygen scavengers can break,
potentially corrosive to turbine blades and after-boiler components.
• as proven o e muc e er a m n m z ngfeedwater system and boiler corrosion.
49
7/23/2019 EROSION -FAC. (1).pdf
http://slidepdf.com/reader/full/erosion-fac-1pdf 50/50
AVT and Ammonical Corrosion
In systems where ammonia is used, ammonical
and the pH is over 8.3.
Copper, its alloys, and other non-ferrous metals area ac e an severe amage resu s ue o eformation of a stable cupric ammonium complex ion.
- 3 2 3 4