    ELECTRICITY BILLING:INTRODUCTION OF

    HARMONIC FACTORSURCHARGE

    To Present at National Conference on PowerDistribution NCPD-2014

    atCentral Power Research Institute (CPRI), Hyderabad

    on 6th & 7th February 2014

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    2/30

    OUTLINEOUTLINE Introduction

    Sources of ar!onics

    Types of ar!onics Effects of ar!onics

    "e#ulations on T$

    Tariff orders on T$ penalties

    Need of T$ "ecordin# Types of consu!er loads

    %ield Study on ar!onic !easure!ent

    &roposed 'ethodolo#y for ar!onic %actor Surchar#e

    ar!onic %actor !easure!ent for (illin#

    Su##estions

    Conclusion

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    3/30

    IntroductionIntroduction Non-Linear loads are increasing in the power

    system day by day Necessary to assess harmonic distortion level

    at consumer and generator level

    Commercial mechanism is essential

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    4/30

    Sources of HarmonicsSources of HarmonicsNon)Linear loads such as *C to $C + $C to *C Converters

    Electric arc furnaces, induction furnaces, electrolysis plants,

    Saturated reactors, transfor!ers under no)load - li#htloads,

    Inverters, $C converters, sitch)!ode poer supplies,

    /aria(le speed *C or $C !otor drives,

    Electronic li#htin# (allasts, #as dischar#e li#htin#, Electronic office and ho!e appliances, !icroave ovens, etc

    These produce hi#h har!onics and leads to distortion ofave for!s. $ue to i!prove!ent of life style, need and

    advance!ent in electronics technolo#y, the poer electronicdevices usa#e is e0pected to increase further in al!ost alltypes of sectors for consu!er friendly operation,i!prove!ent of efficiency, (etter 1uality and ener#yconservation.

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    5/30

    Tyes of HarmonicsTyes of Harmonics Odd triplens 2!ultiples of three3,

    Other odd har!onics, and Even har!onics,

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    6/30

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    7/30

    $efinition of T$ as per CE*$efinition of T$ as per CE* 5Total ar!onic $istortion5 2T$3

    !eans a !easure of distortion of thevolta#e or current ave for! 2hich shall

    ideally (e sinusoidal3 and is the s1uare

    root of the su! of s1uares of all volta#eor current har!onics e0pressed as a

    percenta#e of the !a#nitude of the

    funda!ental

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    8/30

    /T$ - IT$ as per IEEE/T$ - IT$ as per IEEE))678678 /olta#e Total ar!onic $istortion 9

    Current Total ar!onic $istortion 9

    here i7 and v7 are funda!ental current and volta#e respectively,

    Ikand vkare k order har!onic current and volta#e respectively,

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    9/30

    Re"u#a!ions on THDRe"u#a!ions on THDCE* in its 2Technical Standards for Connectivity of the ;rid3

    "e#ulation, &art)II 273263, &art)I/2?3

    The pro@ect of the re1uester shall not cause volta#e and current

    har!onics on the #rid hich e0ceed the li!its specified in

    Institute of Electrical and Electronics En#ineers 2IEEE3 Standard678

    273 The total har!onic distortion for volta#e at the connection

    point shall not e0ceed 6A ith no individual har!onic hi#her

    than ?A.

    2

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    10/30

    Tariff or$ers on THD ena#!iesTariff or$ers on THD ena#!ies Ta!ilnadu Electricity oard levied surchar#e

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    11/30

    Nee$ of THD Recor$in"Nee$ of THD Recor$in" Correct data is re1uired to Utilities,

    "e#ulators - Custo!ers on T$ To levy ar!onic %actor Surchar#e

    To install ar!onics %ilters+ Suppressors

    To purchase e1uip!ent, hich #enerate lessT$

    Evaluatin# perfor!ance of e1uip!ent

    *naly4in# e1uip!entF failures

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    12/30

    Standards for ar!onics Testin#Standards for ar!onics Testin#

    IEC D7===))?=: E'C ) Testin# and !easure!ent techni1ues G

    &oer 1uality !easure!ent !ethods,

    IECGD7===)?)D: E'C ) *ssess!ent of e!ission li!its for theconnection of distortion li!its to '/, /, and E/ poer syste!

    IS 7>== 2&art +See >3: 2

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    13/30

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    14/30

    Tyes of consumer #oa$sTyes of consumer #oa$s Grou%' Consumers

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    15/30

    Tyes of consumer #oa$sTyes of consumer #oa$s Grou%( Consumers

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    16/30

    Aroac) for HarmonicAroac) for Harmonic

    Ener"y measuremen!Ener"y measuremen! Total Ener#y 9

    = W1 + WHN + WHL

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    17/30

    Harmonic "enera!ion *y Aara!usHarmonic "enera!ion *y Aara!us

    SlNo

    Descripti

    on ofApparatu

    s

    Avg

    PhaseVolta

    ge (V)

    Avg

    Current

    (A)

    TotalPowe

    r (W)

    PF

    Voltage Distortion(%)

    Current distortion(%)

    V1 V2 V3 I1 I2 I3

    1

    VFD

    WaterPump

    Sets

    248 13.8 9500 0.924 1.13 1.17 1.12 40.95 41.34 40.03

    2

    6 No.s150 WHPSVLamps

    251 1.26 870 0.917 1.69 1.71 1.47 31.84 33.33 60.16

    3New 63

    KVA DTr251 1.08 154 0.189 1.98 2.30 2.43 16.83 18.25 15.57

    4RepairedDT250KVA

    241 7.08 683 0.133 2.49 2.80 2.89 30.66 35.82 28.90

    Measured on 04-10-2012 / 11-10-2012

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    18/30

    Current ar!onics #enerated (yCurrent ar!onics #enerated (y

    &S/ %ittin#s&S/ %ittin#sAIT$

    ar!onic Order

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    19/30

    Current ar!onics #enerated (yCurrent ar!onics #enerated (y

    /%$ ater &u!p sets/%$ ater &u!p sets

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    20/30

    Current ar!onics #eneration (y aCurrent ar!onics #eneration (y a

    Steel %urnace - "eSteel %urnace - "e))rollin# 'illrollin# 'ill

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    21/30

    ar!onic #eneration (y Consu!ersar!onic #eneration (y Consu!ers

    SlNo

    Type ofConsume

    r Load

    AvgPhaseVolta

    ge

    (KV)

    AvgCurrent (A)

    TotalPowe

    r(KVA

    )

    PF

    VoltageDistortion (%)

    Current distortion(%)

    V1 V2 V3 I1 I2 I3

    1

    PolysterIndustrywith verylight Load

    138 1.17 2800.91

    (Lead)0.82 1.05 0.98 22.66 38.75 27.50

    2Steel Re-rolling Mill

    11.02 37.34 713 1.00 2.48 2.28 1.83 38.07 51.30 34.35

    3

    SteelFurnace &Re-rolling

    Mill

    34.5 24.77 14800.91

    (Lead) 1.59 1.14 1.42 31.83 32.20 37.47

    4Cement

    Factory130 59.86

    1349

    30.99 1.21 1.37 0.95 2.37 2.56 2.12

    Measured on 11-10-2012 / 14-10-2012 / 30-10-2012

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    22/30

    &roposed 'ethodolo#y for ar!onic&roposed 'ethodolo#y for ar!onic

    %actor !easure!ent for (illin#%actor !easure!ent for (illin# *pproach)I: "atio of *vera#e value of har!onic content

    to *vera#e value of %unda!ental content like &%

    !easure!ent

    *pproach)II: *vera#e value of AT$

    *pproach)III: 'a0i!u! value of AT$ like '$ in K/*!easure!ent

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    23/30

    *pproach*pproach))I: "atio of *vera#e value of har!onicI: "atio of *vera#e value of har!onic

    content to *vera#e value of %unda!ental contentcontent to *vera#e value of %unda!ental contentlike &% !easure!entlike &% !easure!ent

    "ecorded Ih 9 %inal Ih readin# G Initial Ih readin# 9

    "ecorded If 9 %inal If readin# G Initial If readin# 9

    "ecorded /h 9 %inal /h readin# G Initial /h readin#9

    "ecorded /f 9 %inal /f readin# G Initial /f readin# 9

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    24/30

    *pproach*pproach))II: *vera#e value of AT$II: *vera#e value of AT$

    "ecorded AIT$ 9 %inal AIT$ readin# G Initial AIT$ readin# 9

    "ecorded &O 9 %inal &O readin# G Initial &O readin#

    "ecorded A/T$ 9 %inal A/T$ readin# G Initial A/T$ readin# 9

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    25/30

    *pproach*pproach))III: 'a0i!u! value of AT$III: 'a0i!u! value of AT$

    like '$ in K/* !easure!entlike '$ in K/* !easure!ent ar!onic %actor can (e considered as

    !a0i!u! value of inte#ration ith ti!e value

    of avera#e A/T$ - AIT$ for a ti!e (lock

    period are to (e recorded like '$ in K/*

    'a0i!u! inte#rated values of A/T$ - AIT$are to (e auto!atically reset to 4ero hen '$

    2K/*3 reset is done

    The A/T$ and AIT$ can (e recorded in theload survey of !eters as ti!e inte#rated values

    of instantaneous para!eters.

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    26/30

    &roposed !ethodolo#y of&roposed !ethodolo#y of

    ar!onic %actor Surchar#ear!onic %actor Surchar#e The ar!onic li!its for various consu!er loads and

    poer sources are specified in the IEEE Standard 678:

    788

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    27/30

    ar!onics recordin# facilities in

    present 'eters *s per the Central Electricity *uthority 2Installation and Operation

    of 'eters3 "e#ulations,

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    28/30

    Su##estionsSu##estions Separate !easure!ent of funda!ental and har!onic contents i.e.,

    volta#e - current (y tariff !eters in econo!ic ay ill need

    further efforts and research (y the !anufacturers Need of !uch !ore strin#ent re#ulations fro! the re#ulators and

    resolvin# of le#al issues for !easure!ent of har!onic contents,

    finali4ation of li!its for ar!onic %actors 2%3 and to levy

    ar!onic %actor Surchar#e

    Standardisin# a#encies shall revie per!itted li!its of T$s of

    various apparatus + #ad#ets and e1uip!ents to !eet the re#ulation

    li!its duly considerin# !anufacturin# constraints.

    They shall also finalise the testin# procedures and accuracy li!itsfor har!onic content and T$s in our contest.

    ;enerators shall !ake arran#e!ents to control har!onics (y

    installin# har!onic filters and to !ake co!pensation for the

    affected parties

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    29/30

    Su##estionsSu##estions ar!onics #eneration (y various electrical apparatus on a sa!ple

    (asis is to (e !easured, scope for its reduction is to (e identified

    and evaluated The tan#i(le and intan#i(le da!a#es to the netork + syste! +

    other consu!er e1uip!ent are to (e studied further and

    !iti#ation steps are to (e analysed in a proactive !anner

    The !easure!ent of har!onic contents, for!ulation ofre#ulations and resolvin# le#al issues pertainin# to

    pay!ent for these contents should encoura#e (oth

    poer supply co!panies and consu!ers to takeen#ineerin# and or#anisational !easures to decrease

    har!onic levels, hich leads to i!prove!ent of

    efficiency of electricity use, poer 1uality and !ini!ise

    e1uip!ent failures.

  • 8/11/2019 Eb Hfs Cpri Ncpd 2014 Presentation

    30/30

    *ny 1uestionsH

    Thank ouThank ou