Safety and Health Committee Faculty of Civil Engineering, Universiti Teknologi MARA Cawangan Pulau Pinang
i HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
FCE-SOSHCo
FAKULTI KEJURUTERAAN AWAM
UiTM CAWANGAN PULAU PINANG
13500 PULAU PINANG
1ST Edition
Copyright@ 2017 by the Universiti Teknologi MARA, Pulau Pinang.
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical including photocopy, recording or any information storage and retrieval system, without permission in writing from the publisher.
e-ISBN NO. 978-967-0841-26-7
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
ii HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
FACULTY OF CIVIL ENGINEERING
HIRARC GUIDELINES
FOR CIVIL ENGINEERING
PROGRAM
Prepared by:
ANAS IBRAHIM ROZAINI RAMLI DALIAH HASAN
MD FAIZAL ZAKARIA KAY DORA ABD GHANI
MOHD RAFE ABDUL MAJID
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
iii HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
ACKNOWLEDGEMENT
First and foremost, all praises be to Allah the
Almighty for His showers of blessing throughout
the process of completing the HIRARC
Guidelines for Civil Engineering Program. The
authors would like to express sincere gratitude to
the management team of Faculty of Civil
Engineering for support and encouragement.
Many thanks to our colleagues from FCE Safety
and Health Committee who provided insight and
expertise that greatly assisted in completion of
HIRARC Guidelines for Civil Engineering
Program.
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
iv HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
CONTENTS
Acknowledgement iii
Contents iv
List of Abbreviation
v
Preface vi
1 HIRARC MATTERS 1
2
3
PROCESS OF HIRARC
STEP 1 C lass i f y Work Ac t iv i t ies
STEP 2 Identify Hazards
STEP 3 Assess The Risk
STEP 4 Select Risk Control
STEP 5 Review Risk Control
EXAMPLES OF HIRARC REGISTER
EXAMPLE 3.1 for Concrete Lab
EXAMPLE 3.2 for Light Structure Lab
EXAMPLE 3.3 for Heavy Structure Lab
EXAMPLE 3.4 for Hydraulics Lab
EXAMPLE 3.5 for Geotechnical Lab
EXAMPLE 3.6 for Highway & Traffic Lab
EXAMPLE 3.7 for Geology Lab
EXAMPLE 3.8 for Building Services Lab
EXAMPLE 3.9 for Environmental Lab
EXAMPLE 3.10 for Computer Lab Work
EXAMPLE 3.11 for Surveying Practical Work
EXAMPLE 3.12 for Office Work
4
5
7
10
16
21
22
23
24
25
26
27
28
29
30
31
32
33
34
4 5
REFERENCES
APPENDICES
APPENDIX A FCE HIRARC Form APPENDIX B Examples of Workplace Hazards APPENDIX C Example of Safety Work Procedure (SWP)
35
36
37
38
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
v HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
LIST OF ABBREVIATION
FCE Faculty of Civil Engineering, UiTMCPP
DOSH Department of Occupational Safety and health
OSH Occupational Safety and Health
OSHA 1994 Occupational of Safety and Health Act (ACT 514)
PPE Personal Protective Equipment
SDS Safety Data Sheet
SWP Safe Work Procedure
SOSHco Sub-Occupational Safety and Health Committee
UiTM Universiti Teknologi MARA
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
vi HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
PREFACE
This HIRARC Guidelines for Civil Engineering Program
book was prepared to provide a standard procedure on
Occupational Safety and Health (OSH) management in work
place, laboratory experiments and equipment for the needs of
students and all faculty members. This guideline was
developed systematically to satisfy the requirements stated by
Department of Occupational Safety and Health (DOSH). This
book was intended to give a full-scale view of how hazard and
risk assessment is being carried out by giving related samples
from laboratory experiments. It is hoped that this book can be
a good source of reference for the end-user in identifying
hazards, assessing the risk, and at the same time to control
the hazards.
The approach adopted in developing this book is to make a
simple note by minimizing words and giving real examples for
different types of hazard risk tasks. A special gratitude was
presented to the Safety and Health Committee of the
Faculty of Civil Engineering Universiti Teknologi MARA
Pulau Pinang as the authors of this book whom succeeded to
produce a useful yet informative guideline. The authors would
sincerely welcome any constructive critic, comments or
suggestions to improve the book in near future.
Dr Kay Dora Abd Ghani Head of Centre of Studies Faculty of Civil Engineering Universiti Teknologi MARA Pulau Pinang September 2017
Safety and Health Committee Faculty of Civil Engineering, Universiti Teknologi MARA Cawangan Pulau Pinang
1 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
1.0 HIRARC MATTERS
HIRARC is a short term for Hazard Identification Risk
Assessment and Risk Control. These three (3) principles
used in workplaces to manage safety and health.
According to OSHA 1994 in section 15(2)(a): “the
provision and maintenance of plant and systems of work
that are, so far as is reasonable and practicable, safe
and without risks to health.
What is Objectives of HIRARC?
To identify types of Hazards in work area
Evaluate the Risk
Suggest Risk Controls to Organization
Implementing Risk Controls, and
Review Risk Controls
What is Basic Component of HIRARC?
The basic components of HIRARC are as follows;
1. Hazard identification
2. Risk Assessment
3. Risk Control
Safety and Health Committee Faculty of Civil Engineering, Universiti Teknologi MARA Cawangan Pulau Pinang
2 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
4. Review of Exist Risk Control
Why HIRARC is Important?
According to Section 15 (2)(a) of OSHA 1994:
“ the provision and maintenance of plants and systems
of work that are, so far as is reasonable and practicable,
safe and without risks to health”
Who Can Conduct HIRARC?
1. Someone who’s trained to conduct HIRARC in
Organization.
2. Safety and Health committee
3. Safety and health Officer
When We Need to Conduct HIRARC?
1. The situations where hazard exists Harmful.
2. The situation is uncertain whether the controls are
available is enough or not.
3. Before implementing corrective measures or
prevention.
4. By an organization that continuously improves security
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
3 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
management.
Where to Conduct HIRARC?
In any workplace that is likely to be hazardous and
needs to be controlled.
How to conduct HIRARC?
Briefly, HIRARC can be implemented in the following
steps:
Step 1. Classify work activities
Step 2. Perform hazard identification
Step 3. Get the risk level
Step 4. Control high risk
Step 5. Review the effectiveness of controls
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
4 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
2.0 PROCESS OF HIRARC
The process of HIRARC start from classify activities,
identify hazards, assess the risk, select risk control and
review the risk control.
Classify activities/ work/ task
Identify hazards
Assess the risk
Select risk control
Review the risk control exist
*Note: All the process of HIRARC documented in FCE
HIRARC Form (Appendix A) based on types of activities
works or workplace.
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
5 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
STEP 1: CLASSIFY ACTIVITIES WORK
How to classify the activities work?
The activities work can be classify based on;
1. Workplace or location – laboratory, office,
construction site, computer lab, studio
2. Procedure of experiment – specific gravity test,
concrete cube test, BOD test, Tensile test
3. Procedure of equipment – uses of mobile crane,
forklift, cutter machine
Tips:
The work activities selected for HIRARC register must be:
1. not too big e.g. manufacturing a car;
2. not too small e.g. fixing a nut; or
3. defined task e.g. loading, packing, mixing,
fixing the door
The workplace selected for HIRARC Register must be:
1. Specific area – Concrete Lab, IDP Office,
Computer Lab
2. Not too small area – small store, Janitor room
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
6 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
3. Easy to in and exit
4. The place not declared as caution/ restricted
area – TNB sub-station
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
7 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
STEP 2: IDENTIFY HAZARD
Generally, Hazard describe as a source or a situation
with a potential of harm in terms of human injury or
health, damage to properties, damage to environments
or a combination of these.
What is the different between hazard, danger and
risk?
Danger is relative exposure to hazard and meanwhile,
risk is combination of the likelihood of an occurrence of a
hazardous event with specified period or in specified
circumstances and the severity of injury or damage to
the health of people, property, environment or any
combination of these caused by the event.
Types of Hazard
Generally, hazards can be divided into three (3) main
groups;
A. Safety Hazards - is any force strong enough to
cause injury, or damage to Property.
B. Health hazards - is any agent that can cause
illness to an individual.
C. Environmental Hazards – pollution release to the
environment that may cause harm or deleterious
effects.
(source: DOSH HIRARC Guideline 2008)
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
8 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
To facilitate hazard identification, it can be categorized
as follows;
1. Chemical Hazard
2. Physical Hazard
3. Biological Hazard
4. Ergonomics Hazard
5. Psychosocial Hazard
6. Mechanical Hazard
7. Electrical Hazard
What are The Sources of Hazard?
The main sources of hazard are from unsafe act and
unsafe condition.
How to identify Hazards?
We can identify hazards by doing these activities;
1. Workplace Inspections
2. Discussions & Interview
3. Internal & external Audit
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
9 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
4. OSH Training
We can also identify the hazards by refer to these
documents below;
1. Accident Statistics or report
2. Policy – UiTM Safety Policy, UiTM Policy
3. Legal – OSHA 94, FMA 67
4. Manual – Lab manual, equipment manual
5. SOP – Standard Operating Procedure
6. ERP – Emergency Response Plan
7. SDS – Safety Data Sheet
8. Feedback & complaint
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
10 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
STEP 3: ASSESS THE RISK
Risk assessment is the process of evaluating the risk to
safety and health arising from hazards at work.
How to assess risk in the workplace?
Step 1: Look for hazards.
Step 2: Decide who might be harmed and how.
Step 3: Evaluate the likelihood (probability) and the
severity (consequence) risks and decide whether the
existing precautions are adequate or whether more
should be done.
A. Likelihood – this value is based on the likelihood
of an event occurring.
You can ask the question “How many times has this
event happened in the past?”
Assessing likelihood is based on worker experience,
analysis or measurement.
Likelihood levels range from “most likely” to
“inconceivable.”
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
11 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
TABLE A: Likelihood level (Based on UiTM OSH
Manual 2016)
LIKELIHOOD EXAMPLES RATING
Most Likely The most likely result of
the hazard / event being
realized
5
Possible Has a good chance of
occurring and is not
unusual.
4
Conceivable Might be occur at
sometimes in future
3
Remote Has not been known to
occur after many years.
2
Inconceivable Is practically impossible
and has never occurred.
1
B. Severity – it can be divided into five categories.
Severity are based upon an increasing level of
severity to an individual’s health, the environment
or to property. Table B indicates severity by using
the following table;
Safety and Health Committee Faculty of Civil Engineering, Universiti Teknologi MARA Cawangan Pulau Pinang
12 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
TABLE B: Severity Level (Based on UiTM OSH
Manual 2016)
NATURE OFINJURY
ESTIMATE
LOSS (RM)
UiTM
REPUTATION
RATING
Fatal > 10,000 Becomes an issue
at the level of the
Ministry of Higher
Education
5
Permane
nt
disability
< 10,000 Becomes an issue
among the public
Universities
4
Major
Injury
(>4
days
MC)
< 1,000 Becomes an issue
to the clients
3
Minor
Injury
(1 day
MC)
< 100 Discussion at the
management level
2
First aid
only
< 10 Slightly affected 1
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
13 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
C. Risk Assessment
Procedure using Risk Matrix (TABLE C);
1. Find the severity column that best describes the
outcome of risk.
2. Then follow the likelihood row to find the description
that best suits the likelihood that the severity will occur.
3. The risk level is given in the box where the row and
column meet.
Risk can be calculated using the following formula:
Relative Risk = Likelihood X Severity
The relative risk value can be used to prioritize necessary
actions to effectively manage work place hazards. Table
D determine priority based on the following Risk Priority
Number (RPN) in Table D.
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
14 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
TABLE C: Risk Matrix (Based on UiTM OSH Manual 2016)
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
15 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
TABLE D: Relative Risk
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
16 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
STEP 4: SELECT RISK CONTROL
“Risk control is the process used to identify all
practicable measures for eliminating or reducing the
likelihood of injury, illness or disease in the workplace, to
implement the measures and to continually review the
measures in order to measure their effectiveness.”
What is the matter that must be consider in
implementing risk control?
1. Review measures regularly and modify if necessary.
2. Comply with national laws and regulations.
3. Reflect good management practice.
4. Consider the current state of knowledge.
5. Include information or reports from organizations
related i.e., DOSH, OSH services.
What is Hierarchy of Control?
The hierarchy is in a descending order from the control
measure which gives the greatest level of safety, but
they may be used in combination. Generally the order is;
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
17 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
1. Elimination most effective
2. Substitution
3. Engineering Control
4. Administration Control
5. Personal Protective Equipment least effective
Tips* Administrative control and PPE should be
considered only as “back-up” control measures.
1. Elimination
Getting rid of a hazardous job, tool, process,
machine or substance is perhaps the best way of
protecting workers.
Example; a salvage firm might decide to stop buying and
cutting up scrapped bulk fuel tank due to explosion
hazards.
2. Substitution
Sometimes doing the same work in a less
hazardous way is possible.
Example; a hazardous chemical can be replaced with a
less hazardous one. Controls must protect workers from
any new hazards that are created.
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
18 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
3. Engineering Control
a. Redesign – jobs and processes can be
reworked to make them safer.
Example; container can be made easier to hold and lift.
b. Isolation – if a hazard cannot be eliminated
or replaced, it can sometimes be isolated, contained or
otherwise kept away from workers.
Example; an insulated and air-conditioned control room
can protect operators from a toxic chemical.
c. Automation – dangerous processes can be
automated or mechanized. Example; computer-
controlled robots can handle spot welding operations in
car plants. Care must be taken to protect workers from
robotic hazards.
d. Barriers – a hazard can be blocked before it
reaches workers.
Example; special curtains can prevent eye injuries from
welding arc radiation. Proper equipment guarding will
protect workers from contacting moving parts.
e. Absorption – baffles can block or absorb
noise. Lockout systems can isolate energy sources during
repair and maintenance. Usually, the further a control
keeps a hazard away from workers, the more effective it
is.
f. Dilution – some hazards can be diluted or
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
19 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
dissipated.
Example; ventilation systems can dilute toxic gasses before they reach operators.
4. Administrative Controls
a. Safe Work Procedures (SWP) – workers
can be required to use standardized safety practices. The
employer is expected to ensure that workers follow these
practices. Work procedures must be periodically
reviewed with workers and updated.
b. Supervision and Training – initial training
on safe work procedures and refresher training should
be offered. Appropriate supervision to assist workers in
identifying possible hazards and evaluating work
procedures.
c. Job rotations and reschedule task – it can
reduce the time that workers are exposed to a hazard.
For example, workers can be rotated through jobs
requiring repetitive tendon and muscle movements to
prevent cumulative trauma injuries. Noisy processes can
be scheduled when no one is in the workplace.
d. Housekeeping, repair and maintenances
programs – housekeeping includes cleanings, waste
disposal and spill cleanup. Tools, equipment and
machinery are less likely to cause injury if they are kept
clean and well maintained.
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
20 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
e. Hygiene – hygiene practices can reduce the
risk of toxic materials being absorbed by workers or
carried home to their families. Street clothing should be
kept in separate lockers to avoid being contaminated by
work clothing. Eating areas must be segregated from
toxic hazards. Eating should be forbidden in toxic work
areas. Where applicable, workers should be required to
shower and change clothes at the end of the shift.
5. Personal Protective Equipment
- Personal Protective equipment (PPE) and
clothing is used when other controls measures are not
feasible and where additional protection is needed.
- Workers must be trained to use and maintain
equipment properly.
- The employer and workers must understand the
limitations of the personal protective equipment.
- The employer is expected to require workers to
use their equipment whenever it is needed.
- Care must be taken to ensure that equipment is
working properly.
- Otherwise, PPE may endanger a worker’s health
by providing an illusion of protection.
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
21 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
STEP 5: REVIEW RISK CONTROL EXIST
A review follow-up is always essential. Review is an
important aspect of any risk management process. It is
essential to review what has been done to ensure that
the controls put in place are effective.
Inspect, evaluate and monitor hazard controls during
inspections, routine maintenance, and other activities.
Ask the following questions;
a. have the risk controls exist solved the problem?
b. is any risk to workers posed by the risk controls
contained?
c. are all new hazards being identified?
d. are significant, new hazards appropriately controlled?
e. are accident reports being analyzed?
f. are any other risk control required?
(source: DOSH HIRARC Guidelines 2008)
Lastly, each HIRARC must be fully documented and
completed by using FCE HIRARC Register Form.
(Appendix A)
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
22 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
3.0 EXAMPLES OF HIRARC REGISTER
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
23 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3.1: HIRARC Register for Concrete Lab
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
S RPN = LxS RC
Vibration
Carpel
tunnel
syndrome
3 3 9 II
NoiseHearing
Impairment4 16 III
Mineral dust cancer 4 4 I
heavy liftingsprain
muscle3 12 II
2 R Repeatitive works stress 3 9 II
3 R Lifting the rodsprain
muscle3 9 II
4 R Lifting the mouldsprain
muscle3 9 II
5 R Heat stress dehydrate 2 10 II
6 R Slip & fall (wet floor) injury 3 6 II
1 Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health Estimate loss (RM) UiTM Reputation
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
Is practically impossible and has never occurred
Has not been known to occur after many years
M ight be occur at sometime in future
Has a good chance of occurring and is not unusual
The most likely result o f the hazard/ event being relized
Title of Activity : Slump Test
Function / Department : Structural Division
Job performed by : Student
Prepared by / Date : Aliah Binti Abu / 10 Sept. 2017 Checked by / Date : Daliah Hasan / 15 Sept. 2017 Approved by / Date : Anas Ibrahim / 16 Sept. 2017
Lab manual
Fabric Glove, Safety Boot, lab
manual
none
Safety Boot
Section : Concrete Lab
Assessor: Habibullah (PJ)
L
15 - 25
RISK ASSESSMENT
Into lerable
Fabric Glove, Lab manual
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
Recommendation
Person in Charge/Due
date/ Status
Risk Priority Number ( RPN )
Recommended Risk
Control
Take frequent break
(SWP)
1 - 4 I Tolerable
A M EDIUM risk requires a planned approach to
contro lling the hazard and applies temporary measure if
required. Actions taken must be documented on the risk
assessment Form including date for completion.
R = Routine
NR = Non Routine
2
SWP & buddy system
Significant5 - 12 II
Measure the height of the collapse
Clean the all apparatus
Description
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Sub-ActivityNo.
HAZARD IDENTIFICATION
Compact each layer
Insert material into the mold of 3
layers
Existing Risk Control
RISK CONTROL
Type
housekeeping (wipe up
spills immediately)
1. drink plenty of water
2. Take frequent breaks
Risk Level Action and Time Scale
Hazard Effect
Likelihood
Fabric Glove,Safety Boot,
Lab manual
A HIGH risk requires immediate action to contro l the
hazard as detailed in the hierarchy of contro l. Actions
taken must be Documented on the risk assessment
form Including date for completion.
III
Lab manual 4 use small buckle (SWP)
1. prepare SWP for slump
test.
2. Implementing task
rotation and time limits on
this activity.
4 use ear plug
Satisfied1
SWP & buddy system
Risk Category
( RC )
< 10
< 100
Prepare sample : Concrete mix R1none
Fabric Glove, face mask N95
Type of Activity
Lift up the mold
Severity of Harm ( S )
< 1000
< 10,000
> 10,000
Aliah / 10 Oct. 17/ in
progress
Aliah / 12 Sept. 17/
completed
3
3
3
5
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
24 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3.2: HIRARC Register for Light Structure Lab
Function / Department :
Title of Activity :
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Job performed by : Student
Prepared by / Date :
S RPN = LxS RC
1 R
2 R
3 R
4 RRepeatitive
workstress 2 6 II
5 RFalling
Object
Minor
Injury2 4 I
6 RRepeatitive
workstress 2 6 II
7 RFalling
Object
Minor
Injury2 4 I
1 Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Efforts shall be made to reduce the risk.
Risk reduction measures should be implemented
within a defined time period.
Rating Nature of Injury / ill health Estimate loss (RM) UiTM Reputation
1 First A id only < 10 Slightly effected
2 M inor injury (1 day M C) <100 Discussion amongst UiTM management level Work should not be started until the risk has been
3 M ajor injury (> 4 days M C) <1000 Be a customer inquiry reduced. Considerable resources may have to be
4 Permanent disability <10,000 Be a question amongst Universities allocated to reduce the risk. Where the risk invo lves
5 Fatal >10,000 Be a KPT enquiry work in progress, urgent action must be taken.
Hanum Binti Mohamad / 10 Sept. 2017 Checked by / Date : Daliah Hasan / 18 Sept. 2017 Approved by / Date : Anas Ibrahim / 18 Sept. 2017
Assessor: Habibullah (PJ)
Section : Concrete lab
Likelihood
lab manual
lab manual
3
2
3
2
lab manual, safety shoes
lab manual, safety shoes
DEFLECTION OF FIXED END BEAM
Hazard Effect
Risk Priority Number ( RPN )
Do by grouping
Satisfied
Satisfied
Do by groupingPJ / 14 Sept. 17/
completed
Existing Risk Control
STRUCTURAL DIVISION
RISK CONTROL
Recommendation
Person in Charge/Due
date/ StatusL
SignificantII
Type
Type of Activity
The most likely result o f the hazard/ event being relized
FCE-HAZARD IDENTIFICATION, RISK ASSESSMENT & CONTROL ( HIRARC ) REGISTER
Sub-ActivityNo.
HAZARD IDENTIFICATION
Place load on the load hanger on the
material.
1 - 4 I Tolerable
Severity of Harm ( S )
Risk Level Action and Time ScaleRisk Category
( RC )
R = Routine
NR = Non Routine
No additional contro ls required. M onitoring required to
ensure existing contro ls are maintained.
15 - 25
RISK ASSESSMENT
Into lerableIII
5 - 12
Recommended Risk
Control
2
Has not been known to occur after many years
M ight be occur at sometime in future
Has a good chance of occurring and is not unusual
Increase the load and record reading.
Repeat step 3 to 5 until complete the
experiments.
Uninstall all apparatus and stacking
neatly.
Record reading at dial gauge.
Falling
Object
Minor
Injury
Install dial gauge and load hanger.
Identify type of material for experiment.
Install material to existing support. Make
sure all the screws are
tightened.(depend on type of support)I Satisfied
PJ / 14 Sept. 17/
completed
Description
Is practically impossible and has never occurred
lab manual, Safety shoes 2 4
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
25 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3.3: HIRARC Register for Heavy Structure Lab
Title of Activity : BENDING TEST ( REACTION FRAME )
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Prepared by / Date :
S RPN = LxS RC
2 R
Fallen object,(
lifting by overhead
crane)
major injury
on head4 12 II
3 RPieces and dust hit
eyes
blind / minor
injury4 4 I
4 R Falling object major injury 3 12 II
5 R Heat stress Dehydrate 2 4 I
6
7
1 Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health UiTM Reputation
1 First A id only < 10 Slightly effected
2 M inor injury (1 day M C) < 100 Discussion at the management level
3 M ajor injury (> 4 days M C) < 1000 Becomes an issue to the clients
4 Permanent disability < 10,000 Becomes an issue among the public Universities
5 Fatal > 10,000 Becomes an issue at the level o f the M inistry o f Higher Education
I Satisfied
Wilson/ 15 Sept. 17 /
completed
Pieces and dust hit
arm, eyes, fingers
and fall
Rblind, minor
injury
Safety gloves, googles, mask,
LAB MANUAL1 4
Estimate loss (RM)
1 Switch on the machine & Computer R Short circuit
major injury,
electric
shock
Description
Is practically impossible and has never occurred
Has not been known to occur after many years
M ight be occur at sometime in future
3
1
4
2
1
4
Function / Department : Structural Division
Wilson Wilfred / 12 Sep. 2017
Checked by / Date : Rossefendy (JKKP) / 17 Sept. 2017 Approved by / Date : Anas Ibrahim / 17 Sept. 2017
Section : Heavy Structure LabJob performed by : Student
safety shoes
Satisfied
A HIGH risk requires immediate action to contro l the hazard as
detailed in the hierarchy of contro l. Actions taken must be
Documented on the risk assessment form Including date for
completion.
III
I
Hazard Effect
Likelihood
Safety googles and safety
helmet/ LAB MANUAL
Safety gloves / LAB MANUAL 4
1. Need provide SWP for
whole process
2. Safety Shoes
1. Faizul/ 10 Oct. 17/ in
progress 2. Wilson/ 15 Sept.
17 / completed
Satisfied
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Sub-ActivityNo.
HAZARD IDENTIFICATION
Place the concrete sample on the
machine
Existing Risk Control
RISK CONTROL
4
Type
Type of Activity
Place the failed sample in the provided
container
Test running until sample failed
L
Clean the machine after used
Severity of Harm ( S )
Risk Level Action and Time ScaleRisk Category
( RC )
R = Routine
NR = Non RoutineRisk Priority Number ( RPN )
Significant
Has a good chance of occurring and is not unusual
The most likely result o f the hazard/ event being relized
5 - 12 II
Recommended Control
Measure
1 - 4 I Tolerable
A M EDIUM risk requires a planned approach to contro lling the
hazard and applies temporary measure if required. Actions taken
must be documented on the risk assessment Form including
date for completion.
Satisfied
Assessor: Faizul (PJ)
15 - 25
RISK ASSESSMENT
Into lerable
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
Recommendation
Person in Charge/Due date/
Status
Safety gloves, LAB MANUAL,
safety helmet
Safety gloves, googles, mask,
LAB MANUAL, safety helmet
Ekzos(ventilation system)
Take out the sample after test
Measure the crack of the sample
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
26 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3.4: HIRARC Register for Hydraulics Lab
Function / Department : Water Division
Title of Activity : Hydrometer Test
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Job performed by : Student
Prepared by / Date :
S RPN = LxS RC
1 R
2 R
3 R
4 R
5 R
6 R
7 R
8 R rushing to finish the test Stress 1 2 I
Rating Likeihood
1 Inconceivable
2 Remote/unlikely
3Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
ISatisfied (Job rotation or
frequent rest breaks)
UiTM Reputation
Broken Glass injury
Repetitive works
Musculoskelet
al disorder
(MSD)
lab manual, Safety glove
teamwork
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Assessor: Abdul Malek Ishak (PJ)
Section : Hydraulic Lab
Faradiba Binti Fadhil / 6 Sept. 2017 Checked by / Date : Suzana Ahmad (JKKP-FKA)/ 10 Sept. 17 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17
HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL
Recommendation
No. Sub-Activity Type Hazard EffectRecommended Risk
Control
Person in Charge/Due date/
StatusExisting Risk Control L
Faradiba/ 8 Sept. 17/
CompletedNeed wear Safety ShoesII623
2
Repeat the procedure (step 3 to 5) three
times
Follow above procedure for other given
liquids also.
2 4
Compare specific gravities of the given
liquids.teamwork 2 satisfied
Type of Activity
R = Routine DescriptionRisk Priority Number ( RPN ) Risk Category
( RC )
Risk Level Action and Time Scale NR = Non Routine Is practically impossible and has never occurred
Has not been known to occur after many years
1 - 4 I Tolerable
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
M ight be occur at sometime in future
Has a good chance of occurring and is not unusual
The most likely result o f the hazard/ event being relized
5 - 12 II Significant
A M EDIUM risk requires a planned approach to contro lling
the hazard and applies temporary measure if required.
Actions taken must be documented on the risk assessment
Form including date for completion.
Severity of Harm ( S )
Estimate loss (RM)
< 10
III Into lerable
A HIGH risk requires immediate action to contro l the hazard
as detailed in the hierarchy of contro l. Actions taken must be
Documented on the risk assessment form Including date for
completion.
< 1000
< 10,000
> 10,000
< 100
15 - 25
Place tall glass cylinders on the flat
working surface
Fill with a liquid and allow air to rise to
the top
Carefully insert the hydrometer and
allow it to settle in the centre of the
cylinder.
Read the scale,after the hydrometer has
settled at the bottom of the free
watersurface
Record the reading and take out the
hydrometer.
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
27 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3 5: HIRARC Register for Geotechnical Lab
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Job performed by : Student
Prepared by / Date :
S RPN = LxS RC
1 R Wrong lifting muscle pain 2 6 II
2 R Hot environment Heat stress 2 8 II
3 R Direct sun exposure Dehydrate 2 8 II
4 R hit by Hammer injury 2 2 I
5 R Ergonomic back pain 2 6 II
6 R
entanglement between
hammer and rod during
weight fall freely.
Injury 2 8 II
7
8
9 R Wrong lifting musle pain 2 6 II
Rating Likeihood
1Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health UiTM Reputation
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
R
None 4
1. SWP,
2. Safety briefing by
instructor before
experiment started.
1. PJ / 6 Oct.17 / in progress
2. PJ / 8 Sept. 2017/
completed
Teamwork 2 2 4 I Satisfied
Function / Department : Geotren Division
Title of Activity : JKR Probe Test
Assemble the JKR probe set up.
Repititive works stress
< 100
15 - 25 III Into lerable
A HIGH risk requires immediate action to contro l the hazard as
detailed in the hierarchy of contro l. Actions taken must be
Documented on the risk assessment form Including date for
completion.
< 1000
< 10,000
> 10,000
The most likely result o f the hazard/ event being relized
5 - 12 II Significant
A M EDIUM risk requires a planned approach to contro lling the
hazard and applies temporary measure if required. Actions taken
must be documented on the risk assessment Form including
date for completion.
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
Severity of Harm ( S )
Estimate loss (RM)
< 10
Action and Time Scale NR = Non Routine
Is practically impossible and has never occurred
Has not been known to occur after many years
1 - 4 I TolerableM ight be occur at sometime in future
Has a good chance of occurring and is not unusual
Type of Activity
R = Routine Description
Risk Priority Number ( RPN ) Risk Category
( RC )
Risk Level
Clean & bring back all equipment to lab. None 3
1. SWP,
2. Safety briefing by
instructor before
experiment started.
1. PJ / 6 Oct.17 / in progress
2. PJ / 8 Sept. 2017/
completed
Repeat the step 4 and 5 for the next 300
mm penetration.
Determine the allowable Bearing
capacity using correlation chart for JKR
dynamic cone penetrometer.
Lift the 5kg hammer up to the 280 mm
mark.Teamwork 3 Job rotation (SWP) 1. PJ / 6 Oct.17 / in progress
Let the weight fall freely. Repeat the act
and go on counting the no. of blows
required for 300 mm penetration.
Lab Manual 4
1. Safety briefing by
instructor before
experiment started.
2. Safety Glove
1. PJ/ 8 Sept. 17/ completed
2. Ali / 8 Sept. 17/ Completed
mark 300 mm mark on proving rod. None 4
Keep the set up vertically Safety Shoes 1 Satisfied
Person in Charge/Due date/
StatusExisting Risk Control L
Bring the JKR Probe set to site location. None 3
HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL
Recommendation
No. Sub-Activity Type Hazard EffectRecommended Risk
Control
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Assessor: Azrul Aswad (PJ)
Section : Geotechnics Lab
Ali Bin Ahmad / 6 Sept. 2017 Checked by / Date : Rozaini Ramli (JKKP-FKA)/ 10 Sept. 17 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
28 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3.6: HIRARC Register for Highway & Traffic Lab
Function / Department :
Title of Activity : SKID RESISTANCE TEST
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Prepared by / Date :
S RPN = LxS RC
Moving
traffic major injury 3 3 I
Wrong
liftingback pain 2 6 II
2 RMoving
traffic major injury 3 3 I
3 Rmoving
of skidminor injury 3 3 I
4 RRepeatit
ive stress 2 2 I
Moving
traffic
Accident,
major injury3 3 I
Falling
objectinjured 2 4 I
1 Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health UiTM Reputation
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
5
1
safety jacket/colour cone 1 Satisfied
RBring the equipment back to the lab
Satisfied
SatisfiedRecord the data (3 points)
Geotren Division
Bring the equipment at the site ( within
UiTM Pulau Pinang)R
lab manual 3safety briefing before
experiment
Hazard EffectType
< 10
< 100
< 1000
< 10,000
> 10,000
II
A M EDIUM risk requires a planned approach to
contro lling the hazard and applies temporary
measure if required. Actions taken must be
documented on the risk assessment Form including
date for completion.
Likelihood
lab manual, Team work
A HIGH risk requires immediate action to contro l
the hazard as detailed in the hierarchy of contro l.
Actions taken must be Documented on the risk
assessment form Including date for completion.
1
1
1
1
Satisfied
2
1 - 4 I Tolerable
Assessor: Suzana Ahmad (PJ)
NR = Non Routine
Risk Priority Number ( RPN )
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Sub-ActivityNo.
HAZARD IDENTIFICATION
Setup the equipment ( Skid Resistance
)
Place equipment on the pavement /
experiment location
Satisfied
Recommendation
Person in Charge/Due
date/ Status
III
5 - 12
Type of Activity
Severity of Harm ( S )
Risk Level Action and Time ScaleRisk
Category (
RC )
R = Routine
RISK CONTROL
Description
Is practically impossible and has never occurred
Daliah / 8 Sept. 17 /
Completed
15 - 25
RISK ASSESSMENT
Into lerable
safety shoes & jacket/colour
cone
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control
measures
Should be implemented and recorded.
Significant
safety shoe & jacket/colour
cone
safety shoes / lab manual
Safety Shoes
LExisting Risk ControlRecommended Risk
Control
Satisfied
Has not been known to occur after many years
M ight be occur at sometime in future
Has a good chance of occurring and is not unusual
The most likely result o f the hazard/ event being relized
Estimate loss (RM)
Section : Highway and traffic Lab
Daliah Binti Hasan / 6 September 2017 Checked by / Date : Mohd Rafe Abdul Majid / 11 Sep. 2017 Approved by / Date : Anas Ibrahim / 12 Sept. 2017
Job performed by : Lecturer
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
29 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3.7: HIRARC Register for Geology Lab
Title of Activity : Point Load Test
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Prepared by / Date :
S RPN = L x S RC
(i) Mineral dust
Silicosis /
Lung
Cancer
4 16 III
(ii) flying object (small
crush rock)Injury 2 8 II
(iii) wet floor (slip & fall) Injury 2 4 I
(iv)core bit (vibration)
Carpal
tunnel
syndrome
4 12 II
(v)noise
Hearing
impairme
nt
4 4 I
3 Rtilting of sample (falling
object)injury 1 3 I
4 Push the plunger Rflying rock due to small
explosionInjury 1 3 I
1 Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health Estimate loss (RM) UiTM Reputation
1 First A id only < 10 Slightly effected
2 M inor injury (1 day M C) < 100 Discussion at the management level
3 M ajor injury (> 4 days M C) < 1000 Becomes an issue to the clients
4 Permanent disability < 10,000 Becomes an issue among the public Universities
5 Fatal > 10,000 Becomes an issue at the level o f the M inistry o f Higher Education
Type
Type of Activity
Severity of Harm ( S )
1
2
Likelihood
Goggle, safety shoes
A M EDIUM risk requires a planned approach to contro lling the hazard and
applies temporary measure if required. Actions taken must be
documented on the risk assessment Form including date for completion.
A HIGH risk requires immediate action to contro l the hazard as detailed in
the hierarchy of contro l. Actions taken must be Documented on the risk
assessment form Including date for completion.
3
Action and Time Scale
Hazard Effect
4
4
3
Existing Risk Control Person in Charge/Due date/ Status
RISK CONTROL
Satisfied
1. Mask N95
2. Prepare Safe Work
Procedure (SWP) for Point
load test.
Risk Level
Rossefendy / 11 sept. 17 /
Completed
Satisfied
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Sub-ActivityNo.
Slowly level the platens to avoid apply
any pressure or force to specimen
before the test.
Ali / 11 sept. 17 / completed
Risk Category
( RC )
R = Routine
NR = Non Routine
Risk Priority Number ( RPN )
Significant
Is practically impossible and has never occurred
Has not been known to occur after many years
M ight be occur at sometime in future
Has a good chance of occurring and is not unusual
The most likely result o f the hazard/ event being relized
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
Description
III
5 - 12 II
Recommended Control
Measure
Goggle / full mask shield
1 - 4 I Tolerable
Function / Department : Geotren Division
Job performed by : Student
Lab Manual, Fabric Glove
Lab Manual, Fabric Glove,
safety shoes
L
15 - 25
RISK ASSESSMENT
Into lerable
Lab Manual
Ali Bin Amran / 6 Sept. 2017 Checked by / Date : Rozaini Binti Ramli(JKKP-FKA) / 9 Sept. 2017 Approved by / Date : Anas Ibrahim (Ketua JKKP-FKA)/ 9 sept. 17
Assessor: En. Roseffendy Ramlan
Section : Geology Lab
Satisfied. Display "wet
Floor" signs as needed.
For diametral test, core the sample so
that the length should be more than 0.5
of the depth or (L>0.5D)
For block test, cut samples into cubical
rectangle shape with length more than
0.5 of its drpth (L>0.5D) and the dpeth
should less than the width but lesser
than 0.3 of the width (0.3W<D<W).
Recommendation
Satisfied.
Implementing task rotation
and time limits on this
activity.
1. Ali / 11 sept. 17 / completed
2. Rossefendy / 10 Oct. 17 / in
progress
Rhousekeeping
Lab Manual, Fabric Glove
Lab Manual, Ear plug 1
2
3
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
30 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3.8: HIRARC Register for Building Services lab
Title of Activity : Fire Alarm System
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Job performed by : Student
Prepared by / Date :
S RPN = LxS RC
1
2
3
4 R Rushing to finish the test Stress 1 2 I
5 R Heat skin burn 2 2 I
6 R smoke asthma 2 2 I
7
8
Rating Likeihood
1Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
Satisfied
ElectrocutionElectric shock proper plug 1 3 3 I Satisfied
Function / Department : CEPM Division
< 100
15 - 25 III Into lerable
A HIGH risk requires immediate action to contro l the hazard
as detailed in the hierarchy of contro l. Actions taken must be
Documented on the risk assessment form Including date for
completion.
< 1000
< 10,000
> 10,000
The most likely result o f the hazard/ event being relized
5 - 12 II Significant
A M EDIUM risk requires a planned approach to contro lling
the hazard and applies temporary measure if required.
Actions taken must be documented on the risk assessment
Form including date for completion.
Severity of Harm ( S )
Estimate loss (RM)
< 10
UiTM Reputation
Action and Time Scale NR = Non Routine
Is practically impossible and has never occurred
Has not been known to occur after many years
1 - 4 I Tolerable
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
M ight be occur at sometime in future
Has a good chance of occurring and is not unusual
Type of Activity
R = Routine Description
Risk Priority Number ( RPN ) Risk Category
( RC )
Risk Level
Switch off of the main switch of training
unit.
Electrocution proper plug 1 3 3
R
R
Apply smoke by using smoke tester on
the smoke sensor
experiment isolate by
fiberglass1 Satisfied
Push the emergency/ panic button
Open the cover of the motion sensor
and create the movement in front of the
sensor
Teamwork 2 Satisfied
Apply heat by using hair dryer on the
heat sensor
experiment isolate by
fiberglass1 Satisfied
Open the magnetic contact
I
Person in Charge/Due date/
StatusExisting Risk Control L
Switch on the Fire Alarm Training Unit
Electric shockActivate the test key provided at the
breakglass
HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL
Recommendation
No. Sub-Activity Type Hazard EffectRecommended Risk
Control
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Assessor: Nurul Nor Fazlina (PJ)
Section : Building Services Lab
Amin Bin Abdul Halim / 8 Sept. 2017 Checked by / Date : Rozaini Ramli (JKKP-FKA)/ 10 Sept. 17 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
31 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3 9: HIRARC Register for Environmental Lab
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Job performed by : Student
Prepared by / Date :
S RPN = LxS RC
1
2
3
4
5
6
7
8
9 R
10 R
11
12
13
Rating Likeihood
1Inconceivable
2Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
Electric ShockR
Spill dermatitis
Nitrile glove, latex glove,
spill kit , safety glass , N95
mask
2R
Electrocution Proper plug 1
2 4 I Satisfied
Electric Shock Electrocution Proper plug 1 3
Seal QuantiTray using Tray Sealer
Transfer sealed Quantitray into
incubator (incubate for 24 hours)
Turn OFF Tray Sealer
After 24 hours, observe Quantitray using
UV lamp
< 100
15 - 25 III Into lerable
A HIGH risk requires immediate action to contro l the hazard as
detailed in the hierarchy of contro l. Actions taken must be
Documented on the risk assessment form Including date for
completion.
< 1000
< 10,000
> 10,000
The most likely result o f the hazard/ event being relized
5 - 12 II Significant
A M EDIUM risk requires a planned approach to contro lling the
hazard and applies temporary measure if required. Actions taken
must be documented on the risk assessment Form including
date for completion.
Severity of Harm ( S )
Estimate loss (RM)
< 10
UiTM Reputation
Action and Time Scale NR = Non Routine
Is practically impossible and has never occurred
Has not been known to occur after many years
1 - 4 I Tolerable
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
M ight be occur at sometime in future
Has a good chance of occurring and is not unusual
Type of Activity
R = Routine Description
Risk Priority Number ( RPN ) Risk Category
( RC )
Risk Level
Discard sample container into
designated bin
Turn OFF Incubator and UV Lamp
3 3
Heat skin burn safety Heat Glove
R 3 I Satisfied
SatisfiedI
3 1
Discard Colilert Reagent snap pack into
designated bin
Pour (water sample + colilert reagent)
into QuantiTray
3 I Satisfied
Cap tight and shake vigorously untill all
Colilert reagent dissolved
Pour 100 mL water sample into sample
container
Snap 1 Colilert Reagent and pour into
the same container
Person in Charge/Due date/
StatusExisting Risk Control L
Power ON Tray Sealer
Power ON incubator (35°C)
HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL
Recommendation
No. Sub-Activity Type Hazard EffectRecommended Risk
Control
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Function / Department : Water Division
Title of Activity : Coliform Test
Assessor: Md. Faizal Zakaria (Science Asst. Officer)
Section : Environmental Lab
Kamal Bin Kassim / 6 Sept. 2017 Checked by / Date : Suzana (JKKP-FKA)/ 10 Sept. 17 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
32 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example 3.10: HIRARC Register for Computer Lab Works
Function / Department : Structural Division
Title of Activity : Using computer
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Job performed by : Student
Prepared by / Date : Checked by / Date : Rozaini Ramli (JKKP-FKA)/ 10 Sept. 17
S RPN = LxS RC
long hour of seating back pain 2 8 II
repeatitive work Stress / RSI 2 8 II
Radiation cancer 4 8 II
Radiation Eye sore 3 9 II
hit by falling object injury 2 4 I
Rating Likeihood
1Inconceivable
2Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health UiTM Reputation
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
Ali / 10.10.17/ in progress
Housekeeping 2 satisfied
< 100
15 - 25 III Into lerable< 1000
< 10,000
> 10,000
The most likely result o f the hazard/ event being relized
5 - 12 II SignificantSeverity of Harm ( S )
Estimate loss (RM)
< 10
Action and Time Scale
NR = Non RoutineIs practically impossible and has never occurred
Has not been known to occur after many years
1 - 4 I Tolerable
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.M ight be occur at sometime in future
Has a good chance of occurring and is not unusual
Type of Activity
R = Routine DescriptionRisk Priority Number ( RPN )
Risk Category
( RC )
Risk Level
2
A HIGH risk requires immediate action to contro l the hazard
as detailed in the hierarchy of contro l. Actions taken must be
Documented on the risk assessment form Including date for
completion.
A M EDIUM risk requires a planned approach to contro lling
the hazard and applies temporary measure if required.
Actions taken must be documented on the risk assessment
Form including date for completion.
Printing R
Manual instruction 3Prepare SWP for whole
process
Ali / 10.1.18/ KIV
none 4rest for every 2 hrs (include
in SWP)Ali / 10.10.17/ in progress
none 2rest for every 2 hrs (include
in SWP)Ali / 10.10.17/ in progress
1 Use of Computer R
none 4 ergonomic chair
Person in Charge/Due date/
StatusExisting Risk Control L
HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL
Recommendation
No. Sub-Activity Type Hazard EffectRecommended Risk
Control
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Assessor: Azri (Computer Assistant)
Section : Computer Lab
Ali Bin Ahmad / 6 Sept. 2017 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
33 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
EXAMPLE 3.11: HIRARC Register for Surveying Practical
Title of Activity : Traverse Surveying
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
S RPN = LxS RC
heavy load back pain 2 4 I
hit by falling object injury 2 8 II
long hour of stand back pain 1 3 I
repeatitive work Stress 2 4 I
Heat stress dehydrate 2 8 II
repeatitive work stress 2 4 I
Heat stress dehydrate 2 8 II
heavy load injury 2 4 I
hit by falling object injury 2 8 II
Rating Likeihood
1Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
3
Description
Is practically impossible and has never occurred
Has not been known to occur after many years
M ight be occur at sometime in future
Observation works
safety briefing from
lecturer/ PJ in first week
of class
PJ / 9/9/17 (on progress)
safety briefing from
lecturer/ PJ in first week
of class
R
R
Satisfied
Drink a plenty of water
Drink a plenty of water
instruction from PJ/ lecturer
Team work
Into lerable
A HIGH risk requires immediate action to contro l the
hazard as detailed in the hierarchy of contro l. Actions
taken must be Documented on the risk assessment
form Including date for completion.
< 1000
< 10,000
> 10,000
Bring the survey equipment to survey
lab
Has a good chance of occurring and is not unusual
The most likely result o f the hazard/ event being relized
UiTM Reputation
Severity of Harm ( S )
Estimate loss (RM)
< 10
< 100
15 - 25 III
1 - 4 I Tolerable
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
5 - 12 II Significant
A M EDIUM risk requires a planned approach to
contro lling the hazard and applies temporary measure if
required. Actions taken must be documented on the risk
assessment Form including date for completion.
Type of Activity
R = Routine
Risk Priority Number ( RPN ) Risk Category
( RC )
Risk Level
2 Satisfied
Action and Time Scale NR = Non Routine
44 safety shoes PJ / 9/10/17/ completed
none 4
Team work 2
none 4
Satisfied
Team work 2 Satisfied
instruction from PJ/ lecturer 4 safety shoes PJ / 9/10/17/ completed
2 Setup equipment R
Team work 3
Recommended Risk
Control
Person in Charge/Due
date/ StatusExisting Risk Control L
1 Bring the survey equipment to site R
Team work 2 Satisfied
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL
Recommendation
No. Sub-Activity Type Hazard Effect
Function / Department : Geotren Division
Job performed by : Lab Assistant Engineer (PJ)
Prepared by / Date : Mohd Saleh / 6 Sept. 2017 Checked by / Date : Mohd Rafe Abdul Majid (JKKP-FKA) / 12 Sep.17 Approved by / Date : Anas Ibrahim (Ketua JKKP-FKA) / 13 Sep. 2017
Assessor: Amer Khomeny (Lecturer)
Section : Surveying Lab
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
34 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Example3.12: HIRARC Register for Office Works
Function / Department : Office
Title of Activity : Office Work
Legal : ACT 514 / ACT 139 / ACT302 / ACT 127
Job performed by : Student
Prepared by / Date :
S RPN = LxS RC
Radiation Eye sore 3 9 II
hit by falling object injury 2 4 I
long hour of seating back pain 2 8 II
repeatitive work Stress / RSI 2 8 II
Radiation cancer 4 8 II
3 R hit by falling object injury 1 4 I
4 NR Electric shock electrocution 2 4 I
5 R Wet floor (slip & fall) injury 3 12 II
6
7
Rating Likeihood
1Inconceivable
2 Remote/unlikely
3 Conceivable
4 Possible
5 M ost likely
Rating Nature of Injury / ill health UiTM Reputation
1 First A id only Slightly effected
2 M inor injury (1 day M C) Discussion at the management level
3 M ajor injury (> 4 days M C) Becomes an issue to the clients
4 Permanent disability Becomes an issue among the public Universities
5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education
Ali Bin Ahmad / 6 Sept. 2017
Description
Is practically impossible and has never occurred
Has not been known to occur after many years
M ight be occur at sometime in future
Checked by / Date : Rozaini Ramli (JKKP-FKA)/ 10 Sept. 17
Assessor: Nil
proper plug
L
RISK CONTROL
4
satisfied
Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17
< 100
< 1000
Has a good chance of occurring and is not unusual
The most likely result o f the hazard/ event being relized
> 10,000
Photocopying, binding, printing & faxing R1
R2 Use of Computer
Severity of Harm ( S )
< 10,00015 - 25
RISK ASSESSMENT
Into lerable
Manual instruction
A risk ident if ied as LOW may be considered as acceptable
and further reduct ion may not be necessary. However, if the
risk can be resolved quickly and eff icient ly, control measures
Should be implemented and recorded.
Housekeeping
none
Recommendation
Person in Charge/Due date/
Status
III
5 - 12 II
Recommended Risk
Control
satisfied
1 - 4 I Tolerable
Risk Level Action and Time Scale
Significant
Type
Type of Activity
none
Estimate loss (RM)
< 10
none 2
Risk Category
( RC )
R = Routine
NR = Non RoutineRisk Priority Number ( RPN )
Pantry
Housekeeping
Wash room
FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER
Sub-ActivityNo.
HAZARD IDENTIFICATION
4
Ali / 10.10.17/ in progress
Section : Ruang Pejabat Ting. 6 Kompleks perdana, UiTMPP
Filing
Hazard Effect
none Ali / 10.10.17/ in progress
Prepare SWP for whole
processAli / 10.10.17/ in progress
A M EDIUM risk requires a planned approach to contro lling
the hazard and applies temporary measure if required.
Actions taken must be documented on the risk assessment
Form including date for completion.
Ali / 10.10.17/ in progress
Existing Risk Control
4
2
put anti-slip mat + signage
rest for every 2 hrs (include
in SWP)
3
2
4
A HIGH risk requires immediate action to contro l the hazard
as detailed in the hierarchy of contro l. Actions taken must be
Documented on the risk assessment form Including date for
completion.
satisfied
ergonomic chair Ali / 10.1.18/ KIV
rest for every 2 hrs (include
in SWP)
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
35 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
REFERENCES
List of references
1. DOSH (2008), Guidelines for HIRARC
2. Malaysia ACT 514 (Occupational Safety and Health
Act (1994)).
3. Manual Keselamatan Dan Kesihatan Pekerjaan UiTM
(2016), Unit Pengurusan Risiko, UiTM Malaysia.
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
36 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Appendix A
FCE HIRARC REGISTER FORM
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
37 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Appendix B
EXAMPLES OF WORKPLACE HAZARDS
Hazard Workplace
(Unsafe Condition / unsafe Act)
Effects/ Consequences
broken chair fall & injury
poor lighting slip, trip & fall
sharp edge injury
heat stress dehydrate
wrong lifting back pain
noise Hearing impairment
repetitive works stress
faulty equipment stress, injury
overload job stress
wet floor slip & fall, injury
uneven floor trip & fall, injury
light from computer (radiation) Eye sore
demotivated stress
Working alone Stress / injury
Electric shock Skin burn
Working at height Fall
Heavy load Back pain
Mineral dust Lung cancer/ Silicosis
Safety and Health Committee Faculty of Civil Engineering,
Universiti Teknologi MARA Cawangan Pulau Pinang
38 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM
Appendix C
EXAMPLE OF SAFE WORK PROCEDURE (SWP)
Title: Safe Work Procedure
(SWP)
FKA-EVT-2017
Authorised By: SHO
Issue Date: 10 Jan. 2017
Last Reviewed: June 2017
Next Review Date: June 2018
Page Number: 1 of 1
DO NOT use this machine/equipment unless you have been trained in its safe use and operation.