    DWSD Sewage Disposal System

    Capital Improvement Program (CIP)for 2013-2017

    October 11, 2012

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    2/34

    |City of Detroit Water & Sewerage Department

    Agenda

    CIP Development Process Review of how we got here (2013-2017 CIP)

    Discussion of where we are going (2014-2018 CIP)

    Executive Summary - 2013-2017 CIPHighlights

    Program statistics and financing requirements

    Key Project Discussion

    Detailed information on 3 key projects of interest

    Questions and Discussion

    1

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    3/34

    |City of Detroit Water & Sewerage Department

    CIP Development Process

    Sewage Disposal System CIP

    2

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    4/34|City of Detroit Water & Sewerage Department

    2013-2017 CIP Development Process -Timeline

    Based on Customer requests, DRAFT CIP waspresented to Customer representatives in May2012

    First time this step was introduced to the process

    Comments reviewed and incorporated as appropriate

    DRAFT CIP presented to BOWC in June 2012 Comments reviewed and incorporated as appropriate

    BOWC approves CIP July 2012

    3

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    5/34|City of Detroit Water & Sewerage Department

    2013-2017 CIP Development Process -Summary

    Each Year the CIP is reviewed and updated toreflect the most current information forrecommended capital improvements over the

    five year planning horizon. The CIP incorporates needs from Master Plans

    and operating experience.

    For the July 2012 CIP, the plan presentsprojected expenditures for FYs 2013 through2017.

    4

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    6/34|City of Detroit Water & Sewerage Department

    2013-2017 CIP Process Summary (continued)

    The first year of the plan reflects an update ofthe original CIP incorporated into the existingrates for FY 2012-13, the current fiscal year.

    The second year is recommended for theupcoming budget/rate development, andestablishes the capital financing revenuerequirements for that plan.

    The CIP strikes a balance between identifiedSystem needs and rate affordability.

    5

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    7/34

    |City of Detroit Water & Sewerage Department

    2013-2017 CIP Process Summary (continued)

    Where capital improvements have beenidentified but are not projected to becompleted within the 5 year horizon, those

    remaining projected expenditures are notedbeyond the five year period.

    This column also reflects projects that havebeen deferred pending additional review.

    6

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    8/34

    |City of Detroit Water & Sewerage Department

    CIP Process Improvement Opportunities Forthe 2014-2018 CIP

    Improve overall linkage to budget/rates Improve the overall rating/ranking process to

    provide more distinctive project ratings

    Clarity on priorities (rationale) Enable adjustments (deferrals & advancements)

    Improve customer/customer community inputin the process

    Leverage Organizational Optimization project Asset Management Plans

    7

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    9/34

    |City of Detroit Water & Sewerage Department

    Executive Summary

    Sewage Disposal System CIP

    8

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    10/34

    |City of Detroit Water & Sewerage Department

    2013-2017 Sewer CIP SummaryExecutive Summary

    9

    The KEY element to our mid and long termcapital planning strategy is how we will dealwith mid-term and long-term biosolids

    management and disposal programs. The March 2012 Symposium on Biosolidsdisposal options caused us to revisit ourapproach envisioned by the prior CIP, which

    anticipated investment by 3rd parties infacilities and an operating expense impact onDWSD.

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    11/34

    |City of Detroit Water & Sewerage Department

    2013-2017 Sewer CIP SummaryExecutive Summary (cont.)

    The new CIP reflects the addition of DWSDinvestments in biosolids improvements, mostprominently the new dryer facility.

    Weve also added the 2nd (conduit) phase ofthe Rouge River Outfall project. The first phase was included in last years CIP and

    we knew the 2ndphase was coming.

    We have now included the 2

    nd

    phase in the CIP.

    10

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    12/34

    |City of Detroit Water & Sewerage Department

    2013-2017 Sewer CIP SummarySummary of Specific Changes

    11

    ~$257 million Increase (in 5-year funding reqts)primarily related to inclusion of: Biosolids Dryer Facility - $154 mm (see page 40) Incinerator Air Quality Improvements - $37 mm (see

    page 26) Dewatered Biosolids Improvements - $12 mm (see

    page 40) RRO#2 2nd(Conduit) phase - $91 million (see page

    41) Total CIP plan (5 year + Remaining) is $936

    million and the 5-year CIP plan is $829 million. Comparative figures from prior CIP: $608 million /

    $572 million

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    13/34

    |City of Detroit Water & Sewerage Department

    2013-2017 Sewer CIP Potential Financial Plan ImpactCIP only - does not reflect impacts of other issues

    12

    Financing plan for Bonds that closed in June2012 was based on July 2011 CIP. Anticipated no future bond sales needed prior to 2017

    Additional ~$257 million of capital requirementswould require: Additional Bond sales and/or additional SRF Loans

    Will not impact 2013 projections nor materially

    impact 2014 projections. May moderately impact 2015 2017 projections. Key to future financial plans will be the results of: The Organizational Optimization

    Board financing policies, which are under review

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    14/34

    |City of Detroit Water & Sewerage Department

    2013-2017 Sewer CIP SummaryPotential Financial Plan Impact

    13

    0.05

    0.055

    0.06

    0.065

    0.07

    0.075

    0.08

    0.085

    0.09

    0.095

    0.1

    0

    50

    100

    150

    200

    250

    2012 2013 2014 2015 2016

    RateIncrease

    CIP/Financ

    ing-$millions

    CIP Bond Sale Proceeds Rate Increase

    2012-2016 CIP

    5.0%

    5.5%

    6.0%

    6.5%

    7.0%

    7.5%

    8.0%

    8.5%

    9.0%

    9.5%

    10.0%

    0

    50

    100

    150

    200

    250

    2012 2013 2014 2015 2016

    RateIncrease

    CIP/Financing-$millions

    CIP Bond Sale Proceeds Rate Increase

    2013-2017 CIP

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    15/34

    |City of Detroit Water & Sewerage Department

    Sewer CIP Summary

    272

    77205

    67

    184

    24

    Projected 5-year CIP Expenditures ($millions)

    Solids Handling

    Disinfection

    Other WWTP

    CSO

    LocalCollection

    Other

    14

    S C $ $

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    16/34

    |City of Detroit Water & Sewerage Department

    The 2013-2017 Sewer CIP totals approximately $936 million ($829million for the 5-year CIP), of which $356 million is subject to the FY2013-14 rates financing plan

    15

    ($ millions)

    FY 2012-13 150.11

    FY 2013-14 205.82

    FY 2014 Financing Plan Subtotal 355.93

    FY 2014-15 234.91FY 2015-16 154.29

    FY 2016-17 83.67

    Total 5-year CIP 828.80

    Remaining beyond 2017 107.25TOTAL CIP 936.05

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    17/34

    |City of Detroit Water & Sewerage Department

    The CIP reports categorize projects based on their status

    ACTIVE Projects: Work is underway the CIP contains projected

    expenditures necessary to complete these ongoingprojects

    UNDER PROCUREMENT Projects: Project is in the procurement process and is about to

    begin. A DRMS number (accounting code) has beenassigned, but notice to proceed has not yet been issued

    NEW Projects: Project proposal has been approved but procurement

    process has not yet been initiated

    16

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    18/34

    |City of Detroit Water & Sewerage Department

    The Sewer System s investment in capitalimprovements has varied over the years

    During the 1990s, DWSD invested approximately $730million (~$73 million annually) in capital improvements tothe sewer system

    During the 2000s, the corresponding figure is $2.49

    billion (~$249 million annually) Estimated figures for FYs 2012-2016:

    2003 Master Plan = $1.88 billion ($376 million per year)

    2008 CIP = $1.85 billion ($371 million per year)

    2009 CIP = $736 million ($147 million per year)

    2010 CIP = $708 million ($142 million per year)

    2011 CIP = $572 million ($114 million per year)

    2012 CIP = $829 million ($166 million per year)

    17

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    19/34

    |City of Detroit Water & Sewerage Department

    Criteria in Report Primary Project Purpose 1 Directly Mandated for Regulatory Compliance 2 Necessary for Regulatory Compliance Mandates 3 System Reliability

    4 Technological Advance / Efficiency 5 New Service Areas Allocation Status D - Detroit Only S - Suburban Only

    OMI - Oakland Macomb Interceptor District Only 83/17 - New Wet Weather Facilities CTA - Common to all

    The CIP report contains criteria designed to identifyproject purpose and allocation status

    18

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    20/34

    |City of Detroit Water & Sewerage Department

    Specific Projects of Interest

    Sewage Disposal System CIP

    19

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    21/34

    |City of Detroit Water & Sewerage Department

    Projects of Interest

    20

    Summary of WWTP Projects

    Incinerator Air Quality Improvements (PC-791) Added to CIP to address internal investment in Solid Handling

    Facilities

    Biosolids Dryer Facility (PC-792) Added to CIP to address internal investment in Solid Handling

    Facilities

    Wastewater Treatment Plant Allowance Added to facilitate delivery of WWTP projects

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    22/34

    |City of Detroit Water & Sewerage Department

    Current and Future Capital Projects at Detroit WWTP

    21

    Number Description Amount ($M) Start End

    PC-756 New Troughs and Weirs for Primary Clarifiers 13-16 $7.7 2012 2013

    PC-757Improvements to Primary Clarifier Rectangular Tanks,Pipe Gallery

    $10.1 2013 2016

    PC-776Secondary Clarifiers, RAS Pumps and MCCImprovements

    $17.4 2012 2015

    PC-774 C-I and C-II Incinerator Improvements $29.9 2010 2014

    PC-780 Rehabilitate Sludge Pump Stations 1 and 2 $3.3 2012 2013PC-782 Plant-wide Fire Alarm Systems Upgrade $7.6 2012 2015

    PC-783Underground Electrical Duct Bank Repair and EB-1, EB-2, and EB-10 Primary Power Service Improvements,Repavement of Critical Roads

    $30.4 2012 2016

    PC-786Rouge River Outfall No. 2 (RRO-2) Segment 1 - WWTPModifications

    $14.4 2012 2014

    PC-787 Replacement of Belt Filter Presses for Complex I andUpper Level Complex II

    $33.2 2012 2015

    PC-789Pump Station 1 Rack & Grit and MP1 Sampling Station 1Improvements

    $21.1 2012 2015

    PC-791 Sewage Sludge Incinerator Air Quality Improvements $37.0 2013 2016

    PC-792 Biosolids Dryer Facility at WWTP $154.0 2013 2017

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    23/34

    |City of Detroit Water & Sewerage Department

    Current and Future Capital Projects at Detroit WWTP

    22

    Number Description Amount ($M) Start End

    961 Pump Station No.2 Pumping Improvements $5.7 2013 2015

    1141Rehabilitation of Primary Clarifiers, Drain Lines, HotWater and Scum Lines

    $15.6 2013 2016

    1194 Aeration System Improvements $23.7 2013 2016

    1220 Replacement of Lower Level C-II Dewatering Centrifuges $25.0 2015 2018

    1221 Rehabilitation of Central Offload Facility $6.0 2013 2016

    1251 Dewatered Biosolids Storage at WWTP $12.2 2013 20161224 Replacement of LIMS / PIMS Software System $5.0 2013 2015

    1257 Wastewater Treatment Plant Allowance $30.0 2012 2014

    1237Rehabilitation of Main Plant Maintenance Bldg, PlantMaintenance Areas

    $13.4

    1223Rehabilitation of Grit and Screening System at PS#2 andRehabilitation of Sampling Sites at WWTP

    $11.2 2013 2016

    1222Replacement of Chlorination and DechlorinationEquipment at the WWTP

    $4.1 2013 2017

    1250 Rouge River Outfall No. 2 Segment 2 - Conduit $90.7 2013 2017

    1140Study / Repair Potable Water, Screened Final Effluent,Natural Gas and Compressed Air Lines at the WWTP

    $2.3 2014 2016

    TOTAL $611.0

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    24/34

    |City of Detroit Water & Sewerage Department

    Chlorination/De-Chlorination Facilities

    N

    WWTP Capital Projects

    23

    PC-756New Troughs and Weirs for

    Primary Clarifiers 13-16$7.7 M 2012-2013

    PC-757Improvements to Primary

    Clarifier Rectangular Tanks,Pipe Gallery

    $10.1 M 2013-2016

    PC-776Secondary Clarifiers, RAS

    Pumps and MCCImprovements

    $17.4 M 2012-2015

    PC-774Complex I and Complex IIIncinerator Improvements

    $29.9 M 2010-2014

    PC-780Rehabilitate Sludge

    Pump Stations 1 and 2$3.3 M 2012-2013

    PC-780Underground ElectricalDuct Bank Repair andEB-1, EB-2, and EB-10Primary Power Service

    Improvements, Repavement

    of Critical Roads$30.4 M 2012-2016

    PC-787Replacement of Belt FilterPresses for Complex I and

    Upper Level Complex II$33.2 M 2012-2015

    PC-789Pump Station 1Rack & Grit and

    MP1 Sampling Station 1Improvements

    $21.1M 2012-2015

    PC-791Sewage Sludge IncineratorAir Quality Improvements

    $37 M 2013-2016

    PC-792Biosolids Dryer Facility

    at WWTP$154 M 2013-2017

    961Pump Station No. 2

    Pumping Improvements$5.7 M 2013-2015

    1141Rehabilitation of Primary

    Clarifiers, Drain Lines, HowWater and Scum Lines

    $5.7 M 2013-2015

    1194Aeration SystemImprovements

    $23.7 M 2013-2016

    1220Replacement of Lower

    Level Complex IIDewatering Centrifuges

    $25 M 2015-2018

    1221Rehabilitation of Central

    Offload Facility$6M 2013-2016

    1237Rehabilitation of Main PlantMaintenance Building, Plant

    Maintenance Areas$13.4 M

    1223Rehabilitation of Grit and

    Screening System at PS#2and Rehabilitation of

    Sampling Sites at WWTP$11.5 M 2013-2016

    1222Replacement ofChlorination and

    Dechlorination Equipmentat the WWTP

    $4.1 M 2013-2017

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    25/34

    |City of Detroit Water & Sewerage Department

    Chlorination/De-Chlorination Facilities

    N

    WWTP Capital Projects

    24

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    26/34

    |City of Detroit Water & Sewerage Department

    Other WWTP Capital Projects (not shown on map)

    25

    Project Description Amount Start End

    PC-782 Plant-wide Fire Alarm Systems Upgrade $7.6 M 2012 2015

    PC-786 River Rouge Outfall No. 2 (RRO-2)Segment 1 WWTP Modifications

    $14.4 M 2012 2014

    1251 Dewatered Biosolids Storage at WWTP $12.2 M 2013 2016

    1224 Replacement of LIMS / PIMS SoftwareSystem

    $5 M 2013 2015

    1257 Wastewater Treatment Plant Allowance $30 M 2012 2014

    1250 Rouge River Outfall No. 2 Segment 2

    Conduit

    $90.7 M 2013 2017

    1140 Study / Repair Potable Water, ScreenEffluent, Natural Gas and CompressedAir Lines at the WWTP

    $2.3 M 2014 2016

    PC 791 Complex II Incineration

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    27/34

    |City of Detroit Water & Sewerage Department

    PC-791 Complex II IncinerationAir Emissions Upgrade

    26

    Award recommendation by BOWC Sept 2012, awaiting City Councilapproval

    Design-Build Contract Designer: Black & Veatch

    Contractor: Walsh Contract Cost: $38 Million Schedule: Nov 2012 June 2017

    Project Drivers:

    Current emissions controls on incinerators will not meet 2016 EPAMACT Air Standards

    Page 26 of CIP Document $37 Million budget

    PC 791 Complex II Incineration

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    28/34

    |City of Detroit Water & Sewerage Department

    PC-791 Complex II IncinerationAir Emissions Upgrade

    Project Description:

    Scrubber replacement

    Afterburner hearth

    Induced draft (ID) fan replacement

    Variable-frequency drives (VFD) on fans & center drive

    Damper improvements

    27

    PC 791 Complex II Incineration

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    29/34

    |City of Detroit Water & Sewerage Department

    PC-791 Complex II IncinerationAir Emissions Upgrade

    28

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    30/34

    |City of Detroit Water & Sewerage Department

    PC-792 Biosolids Dryer Facility at WWTP

    29

    Request for Proposals issued Aug 2012

    Proposals due Nov 30, 2012

    Design-Build Facility (DWSD Capital)

    Operate Maintain for 20 years

    Project Drivers: Need for biosolids disposal capacity, approximately one-third of

    total disposal requirements at WWTP Drying provides flexibility to utilize both land-application and energyend-uses for dried product

    Page 40 of CIP document - Budget $154 Million

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    31/34

    |City of Detroit Water & Sewerage Department

    PC-792 Biosolids Dryer Facility at WWTP

    Project Description:

    Provide a dryer facility with 220 dry tons per day dryer capacityat WWTP

    Operate and Maintain facility for 20 years

    Reuse / dispose of dried product in a renewable method

    CIP budget is for construction costs only

    Ongoing operation and maintenance costs will be in O&Mbudget

    30

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    32/34

    |City of Detroit Water & Sewerage Department

    WWTP Capital Flowchart

    31

    Existing Capital Condition Assessment and

    Restoration Program Schedule Replacement

    Program Maintenance Engineering

    New Capital Master Plans Needs Assessment

    (WWTP)

    Regulations System Changes

    CapitalReplacementProgram

    New CapitalProgram

    CapitalImprovementProgram

    A

    B

    C

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    33/34

    |City of Detroit Water & Sewerage Department

    Wastewater Treatment Plant Allowance

    32

    Contracts: Approx 22 contracts, to be issued through DWSDpurchasing this year, size $50,000 - $1M

    Delivery Method

    Design-Build;

    Furnish & Install; Furnish

    Project Drivers

    Need for an efficient delivery method for projects

  • 7/30/2019 Dwsd Sewer Cip Presentation 101112

    34/34

    |City of Detroit Water & Sewerage Department

    Wastewater Treatment Plant Allowance

    Funds both Scheduled Replacement Projects (SRP) and SmallDollar Capital Projects

    SRP Examples Replacement of head motor pulley, vacuum pump motor, ash silo

    pump drive Rehabilitation of venturi meter building Replacement of sludge feed pumps

    Small Dollar Capital Examples

    Stair replacement at WWTP buildings Replacement of Ferric Chloride storage tanks New used oil storage tank and containment