DS-21.1 Fundamental Period of New Residential Buildings for Different Admissible IDRs in Damascus

5
09 co 9445 ontac 52988 ct@b ﻮم88 bilad ء داﻏﻮdco.c ع ا زن دcom ع. ﻣﺎز ا ر د. م. ﺪاد: د إﻋﺪ( ب ب أ أD A بDS-21 ASCE ب ء و[1/5 1.1 (D E 7- ا ء5] Dec. -10 ة ا.-13) : م ﯿ: ء م ت ا ا ا ء أ ﺿ ﯿ ت ا ﯿ ع ا ز) ر أ ة ﺿ ت ا ا ر ز ودة ا ءW ﺤﺪو ا ء ﻤﺤ ء د د ﯿ اﻟﻤ س و أ د ز ا ﺎء ا س و ھ ا ﯿ ﻠﺒﻨﺎ ر ا ا ر ھ ا ﯿ ا ﯿ ا ﻟﻠ ا و ر ا ع ا ا ر: ﯿ ﻼد ﻋﺪرا ا ﯿ و ر ا ر ع ا ر ﺑﻼ ا ا و ا ر ا ا ا ﻛﺔ84 ﺼﻨﺎﻋﯿﺔ ﺷﺮﻛ ت. 433 ﻨﺔ اﻟﺼ س. ت اﻟﻤﺪﯾﻨ

description

Direct relationship between: building height, Building fundamental period, admissible Interstory Drift Ratio, Seismic force resisting system type & sesimic design paramert.

Transcript of DS-21.1 Fundamental Period of New Residential Buildings for Different Admissible IDRs in Damascus

Page 1: DS-21.1 Fundamental Period of New Residential Buildings for Different Admissible IDRs in Damascus

[email protected]@[email protected]

مازن داغوم

[email protected]

ءان

مازن داغوم

[email protected]

نبلا ع

مازن داغوم

[email protected]

عافت

مازن داغوم.

ترا ل

.م.د

لماك

د:إعداد

ك ىلع

إعداد

لع)ھ ھل ب بوس سنم ى ىلعأ أ دنعھع ھت

DS

A

ھل بتدعاق

DS-21

ASCE

بوساقو ء

[1/51.1 (Dec

E 7-

سنم لءانبلا

5]Dec.

-10

لك دا ةدع

.-13)

:يكی

دنع معاق د

:ةیلاتكیرمأل

ءماظت

دنع

تلا تألا ای

ءانبلاتناب ةھسأ

تایضایندلا

ا عافةعّز

أر(

شركة بالد للبناء المحدودة

ضرفا تال

فتراّزوميثّلث

شركة بالد للبناء المحدودة

فلا ىالوم

لماWء

ثم ل

شركة بالد للبناء المحدودة

ىلعمحلا

اك ىءانبللكشبي

شركة بالد للبناء المحدودة

ءانبلدوكىند

ىلعلل ةّیل

ب ةعيملع

شركة بالد للبناء المحدودة

لل سك قفودأ دحتبالامجعّزومعلا ر

شركة بالد للبناء المحدودة

ساسألويح وھاث يقجإلا ةم ةیلرشنل

شركة بالد للبناء المحدودة

ألا ريلازلھ رّد

يقباطةّیلازلازلزلا دی

شركة بالد للبناء المحدودة

رودلالزلاّدقملطلا عزلزلزلا ةیق :ر

شركة بالد للبناء المحدودة

عدرا

ا ریلیلحلا روعافترلا ةلتةلومح

ردص

شركة بالد للبناء المحدودة

عدرا–المدینة الصناعیة

یدقت دحتلاودلارالاتكلامحلاصملا

شركة بالد للبناء المحدودة

8433المدینة الصناعیة

دنتس

شركة بالد للبناء المحدودة

8433.تالمدینة الصناعیة

سی

شركة بالد للبناء المحدودة

ت.سالمدینة الصناعیة

Page 2: DS-21.1 Fundamental Period of New Residential Buildings for Different Admissible IDRs in Damascus

شركة بالد للبناء المحدودة

Fundamental Period of Residential Building using Special Reinforced

55

Fundamental Period of Residential Building using Special ReinforcedConcrete Shear Walls in Building Frame System

for different admissible Interstory Drift Ratios in Damascus

45

50

55

k

Building Stiffness

35

40

45

Bu

ild

ing

Hei

gh

t,h

(m)

Site class: DSs = 1.19

30

35

Bu

ild

ing

Hei

gh

t,h

(m)

T= 0.0488h3/4

Ss = 1.19S1 = 0.48Ts = 0.6

20

25

Bu

ild

ing

Hei

gh

t,h

(m)

IDR= 4.0%

IDR= 3.0%

IDR= 2.0%

10

15

IDR= 2.0%

IDR= 1.0%

IDR= 0.75%

IDR= 0.5%

k

Cell: 0944 529888

Email: [email protected]

[2/5]

DS-21.1 (Dec.-13)

س.ت.: 8433

المدینة الصناعیة - عدرا

5

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00Building Period, T (sec)

IDR= 0.5%

Page 3: DS-21.1 Fundamental Period of New Residential Buildings for Different Admissible IDRs in Damascus

شركة بالد للبناء المحدودة

Fundamental Period of Residential Building using Special Reinforced

55

Fundamental Period of Residential Building using Special ReinforcedMasonry Shear Walls in Building Frame System

for different admissible Interstory Drift Ratios in Damascus

45

50

55

k

Building Stiffness

35

40

45

Bu

ild

ing

Hei

gh

t,h

(m)

Site class: DSs = 1.19

30

35

Bu

ild

ing

Hei

gh

t,h

(m)

T= 0.0488h3/4

Ss = 1.19S1 = 0.48Ts = 0.6

20

25

Bu

ild

ing

Hei

gh

t,h

(m)

IDR= 4.0%

IDR= 3.0%

IDR= 2.0%

10

15

IDR= 2.0%

IDR= 1.0%

IDR= 0.75%

IDR= 0.5%

k

Cell: 0944 529888

Email: [email protected]

[3/5]

DS-21.1 (Dec.-13)

س.ت.: 8433

المدینة الصناعیة - عدرا

5

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00Building Period, T (sec)

IDR= 0.5%

Page 4: DS-21.1 Fundamental Period of New Residential Buildings for Different Admissible IDRs in Damascus

شركة بالد للبناء المحدودة

Fundamental Period of Residential Building using Special Reinforced

55

Fundamental Period of Residential Building using Special ReinforcedConcrete Shear Walls in Bearing Wall System

for different admissible Interstory Drift Ratios in Damascus

45

50

55

k

Building Stiffness

35

40

45

Bu

ild

ing

Hei

gh

t,h

(m)

Site class: DSs = 1.19

30

35

Bu

ild

ing

Hei

gh

t,h

(m)

T= 0.0488h3/4

Ss = 1.19S1 = 0.48Ts = 0.6

20

25

Bu

ild

ing

Hei

gh

t,h

(m)

IDR= 4.0%

IDR= 3.0%

IDR= 2.0%

10

15

IDR= 2.0%

IDR= 1.0%

IDR= 0.75%

IDR= 0.5%

k

Cell: 0944 529888

Email: [email protected]

[4/5]

DS-21.1 (Dec.-13)

س.ت.: 8433

المدینة الصناعیة - عدرا

5

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00Building Period, T (sec)

IDR= 0.5%

Page 5: DS-21.1 Fundamental Period of New Residential Buildings for Different Admissible IDRs in Damascus

شركة بالد للبناء المحدودة

Fundamental Period of Residential Building using Special Reinforced

55

Fundamental Period of Residential Building using Special ReinforcedMasonry Shear Walls in Bearing Wall System

for different admissible Interstory Drift Ratios in Damascus

45

50

55

k

Building Stiffness

35

40

45

Bu

ild

ing

Hei

gh

t,h

(m)

Site class: DSs = 1.19

30

35

Bu

ild

ing

Hei

gh

t,h

(m)

T= 0.0488h3/4

Ss = 1.19S1 = 0.48Ts = 0.6

20

25

Bu

ild

ing

Hei

gh

t,h

(m)

IDR= 4.0%

IDR= 3.0%

IDR= 2.0%

10

15

IDR= 2.0%

IDR= 1.0%

IDR= 0.75%

IDR= 0.5%

k

Cell: 0944 529888

Email: [email protected]

[5/5]

DS-21.1 (Dec.-13)

س.ت.: 8433

المدینة الصناعیة - عدرا

5

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00Building Period, T (sec)

IDR= 0.5%