Draglile Mining

download Draglile Mining

of 15

Transcript of Draglile Mining

  • 7/31/2019 Draglile Mining

    1/15

    Hoist Rope

    Boom Point Sheave

    Hoist Chain

    Dump Rope

    Bridge support Rope

    Mast

    Boom

    Boom Foot

    TubShoe

    Hoist Drum

    Drag Drum

    A Frame

    Drag Chain

    Dragline Bucket

    Major component of a dragline

    KhanindraPathaksLecture

    1

  • 7/31/2019 Draglile Mining

    2/15

    Hoisting line

    Boom

    Boom Point Sheave

    Dumping Line

    Drag Cable

    Bucket

    DRAG LINEKhanindra Pathaks Lecture 2

  • 7/31/2019 Draglile Mining

    3/15

    15-200

    Hdm

    Hdg

    Rdm

    Rdg th

    RcrRb

    Hb

    Hp

    Main Working Parameters of a Dragline

    Khanindra Pathaks Lecture 3

  • 7/31/2019 Draglile Mining

    4/15

    Dragline Faces

    End Face (Deep Cut) End Face (High Cut)

    Combination Digging

    Khanindra Pathaks Lecture 4

  • 7/31/2019 Draglile Mining

    5/15

    A

    h

    HB B

    A1

    y

    1 21wd

    Awd bFS

    Hwd

    Khanindra Pathaks Lecture 5

  • 7/31/2019 Draglile Mining

    6/15

    XXXXXXXXXXXXXX

    A TYPICAL DRAGLINE OPERATION

    HIGHWALL

    BOOM DIGGING POSITION

    DRAGLINE POSITION No. 3

    PREVIOUS DIGOUT

    KEY CUT

    DRAGLINE POSITION No. 1

    DRAGLINE POSITION No. 3

    NEXT DIGOUT

    DRAGLINE POSITION No. 2

    BOOM DUMPING POSITION

    EXPOSED COAL SEAM

    HIGHWALL

    FLOOR

    DRAGLINE POSITION No. 2

    DRAGLINE POSITION No. 1, 3

    KEY CUT

    PRODUCTION CUT

    BACKWALL

    SPOIL

    PREVIOUS CUTKEY CUT

    SPOILCOAL SEA M

    A A

    SECTION A-A

    Khanindra Pathaks Lecture 6

  • 7/31/2019 Draglile Mining

    7/15

    Extended Bench Method

    PIT WIDTH

    Overburden to be rehandled

    Dragline Dump Radius

    This method of face development is applied when effective reach of the dragline is to be extended.

    This is associated with certain degree of rehandling This method is useful when the overburden depths can not be handled by normal casting It may be necessary when overburden depths are gradually increasing or there is a temporary change in relief.

    Khanindra Pathaks Lecture 7

  • 7/31/2019 Draglile Mining

    8/15

    Bridge Length

    Block to be excavated

    Highwall bench to be excavated

    New Pit

    At the completion of the previous block, the dragline is located at the endof the bridge. From this position the last of the block of OB can bespoiled directly . To start excavation of the new block, the dragline iswalked off the bridge and placed in line with the new high wall at A. Thisis now ready for providing key cut for the block to be excavated.

    A

    Khanindra Pathaks Lecture 8

  • 7/31/2019 Draglile Mining

    9/15

    New Pit

    At this situation, the key cut is completed. Atthe start of this cut, the dragline must be farenough along the cut to allow the bucket tobe pulled right up to the length of the newblock without the drag rope limit switchesbeing activated. As the cut is deepened, themachine walks forward and across the cutto keep in line with the highwall batter at

    the depth it is digging. The key cut spoil isused to form the bulk of the next bridge.

    A

    New bridge beingBuilt from key cutspoil

    Khanindra Pathaks Lecture 9

  • 7/31/2019 Draglile Mining

    10/15

    New Pit

    Here the new bridge is completed to therequired lenth by part of the highwall benchand the top of the block. Same draglineposition is used to excavate the high wallbench as well as the top of the block. Dozris used to clean up loose bench materialwhile the dragline is digging from the top ofthe block.

    New bridge

    Highwall Bench

    Top of block

    Khanindra Pathaks Lecture 10

  • 7/31/2019 Draglile Mining

    11/15

    Corner of key cut

    After completion of the digging of thehighwall bench further excavation of thebulk of the block takes place. To directlydump the material , position ofhe draglinewill have to be proper.

    Start of new spoil pil

    Khanindra Pathaks Lecture 11

  • 7/31/2019 Draglile Mining

    12/15

    Corner of key cut

    Excavation with DL close to the edge of theworking face. Final clean up of top of coalsam is carried out at this stage.

    Working Face

    Khanindra Pathaks Lecture 12

  • 7/31/2019 Draglile Mining

    13/15

    Corner of key cut

    Final stage. Clears the last part of theprevious bridge

    Khanindra Pathaks Lecture 13

  • 7/31/2019 Draglile Mining

    14/15

    Khanindra Pathaks Lecture 14

  • 7/31/2019 Draglile Mining

    15/15

    y40

    20

    0

    -20

    -40

    20

    I40 60

    III

    IIRotationaxisofexc

    avator

    Variation of the angle of inclination of the bucket bottom within dragline working zone(I - Rotation axis of excavator)Khanindra Pathaks Lecture 15