Presented By: Ms. Fran Mutschler DDC J4/5 Supply Chain Transportation Distribution Planning and Management System (DPMS)

Transcript of DPMS SEPRT 13

Page 1: DPMS SEPRT 13

Presented By: Ms. Fran Mutschler DDC J4/5

Supply Chain Transportation

Distribution Planning and Management System (DPMS)

Page 2: DPMS SEPRT 13

2

• Goals

• Challenges

• Planned Direction

Agenda

Page 3: DPMS SEPRT 13

3

DLA’s Goals

DLA’s Enterprise Goal:Improve the flow of DOD cargo through the DefenseTransportation System.

Establish a DLA Enterprise-Wide Transportation Solution to Enhance the Supply Chain Through Centralized Management and Service.

Page 4: DPMS SEPRT 13

4

Purchase Order Data

A system change request has been submitted to EBS to make EDI purchase

order data feed to DPMS in real time.

(BPR-05-006)

Page 5: DPMS SEPRT 13

5

Hazardous Material

A system change currently underway to incorporate processing Hazardous

materials in DPMS.

(DPS-RE8-051)

Page 6: DPMS SEPRT 13

6

Custom Clearance

Customs documents are processed manually through Automated Export System

Customs will have to agree to an interface before the system change request can be done

(DPS-RE4-072)

Page 7: DPMS SEPRT 13

7

DLA HQ has re-engaging discussions with Business Transformation Agency

(BTA) regarding an interface to transmit transportation data to

WAWF

Connectivity to WAWF

Page 8: DPMS SEPRT 13

8

Software Upgrade

Ability to have a Status Screen of orders, query and export data

Page 9: DPMS SEPRT 13

9

Direction of DPMS

DPMS Mandatory Usage

DCMA Administered Contracts

Page 10: DPMS SEPRT 13

10

• Email Mailbox– [email protected]

• Helpdesk - Toll Free– 1-800-456-5507

• FAX– 717-770-2701

Supply Chain Transportation

QUESTIONS?