División de La Industria Pesada
Mercado de SudamericaPlan de Negocios
26 de junio del 2011Dong-gi An (DK)
![Page 2: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/2.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
Index Market Product Customers Sales Staff Future Plan
2 / 112011-06-26
![Page 3: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/3.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
Market
● Blue circle : Already obtained an order
● Red circle : High possibility of obtaining an order
● Yellow circle : High potential to grow up / Demands for high voltage transformers (over 500kV)
3 / 112011-06-26
![Page 4: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/4.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
ProductTransformer (Transformador de Potencia)
• More than 70 years experience (from 1938)• Voltage and capacity are up to 500kV, 500MVA• 8 months for delivery available• Full type test certificate from KEMA (enero del 2010)
– Three Phase 220/72.5kV 75/100/125MVA (Egypt EETC)
• Lots of world wide supply records– En Sudamerica
» Costa Rica / Panama / Trinidad Tobago» Colombia / Argentina
For detailed information, please see our catalogue and printed broucher (informacion basica de ILJIN Electric Co., LTD)
4 / 112011-06-26
![Page 5: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/5.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
Customers in SudamericaCosta Rica (ICE)
– 230/138/138kV 22/36.66MVA TR 7EA– Delivery date : 2011/11/28 (DDU)
Colombia (EPM)– 230/115/46kV 67.5/90MVA TR 1EA– Delivery date : 2011/09/07 (FOB-Masan)
Panama (ETESA)– 230/115/34.5kV 60/80/100MVA TR 3EA– Delivery date : 2011/10 (subject to change)
Argentina (EDENOR, EDESUR)– 132/13.8kV 40MVA TR 6EA, 1EA– Delivery date : 2012 (subject to change)
5 / 112011-06-26
![Page 6: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/6.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
Sales staff Dong-gi An (DK)
• From 2010. 08• Native Korean, Fluent English, Entry-Level Spanish• In charge of Costa Rica, Peru, Ecuador
Work Experience• Participating in several public tenders
– Panama - ENSA, ETESA– Colombia – EPM, ISA– Venezuela - CorpoElec– Peru – Luz del Sur, ElectroPeru– Ecuador – Celec EP– Chile – Chilectra, CGE EMEL– Paraguay - ANDE– Uruguay – UTE... And so on.
6 / 112011-06-26
![Page 7: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/7.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
Sales staff Work Experience
• Carrying out projects– Costa Rica (ICE)
» Managing total time line and delivery schedule as a PM» Planing a Short Circuit test in KEMA Netherlands
• Arranging full schedule with logistics partners, SMIT, our fac-tory and KEMA
– Colombia (EPM)» Managing total time line and delivery schedule as a PM» Taking care of customers for final factory inspection test
– Panama» Managing total time line and delivery schedule as a PM
• Market Development– Found a new agent in Peru (Mr. Wilfredo)
» Wilfredo has a partnerships in Dominican Republic and Nicaragua
• Managing clients and agent– Giving a prompt response to general inquiries
7 / 112011-06-26
![Page 8: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/8.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
Future Plan Costarican Market
• Carrying out current project of ICE– Arranging a schedule for KEMA witness inspection test– Arranging a schedule for ICE witness inspection test
• Finding a reliable local EPC contractors
Ecuadorian Market• Following up submitted tenders
– Celec EP (145kV 160MVA TR 1 Unit)
• Participating in upcoming public tender– Celec EP (Expected)
» 500kV (More information is needed)
• Business trip for company promotion– Celec EP or local EPC contractors
8 / 112011-06-26
![Page 9: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/9.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
Future PlanPeruvian Market
• Establishing solid partnerships with EPC contractors such as ABENGOA PERU, GyM, Alstom
– Business Trip and Invitation for Factory Homologation
• Following up submitted tenders– Moyobamba PJT, Cerro del Aguila PJT (EPC – Alstom)
» 154kV 100MVA 1EA / 220kV 1P 83MVA 10EA
• Participating in upcoming public tender– ElectroPeru (CD : 6 de julio del 2011)
» 220kV 40MVA TR 1 Unit (Replacement)
9 / 112011-06-26
![Page 10: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/10.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
10 / 112011-06-26
¿Tiene Preguntas Usted?
![Page 11: División de La Industria Pesada Mercado de Sudamerica Plan de Negocios 26 de junio del 2011 Dong-gi An (DK)](https://reader036.fdocument.pub/reader036/viewer/2022082612/56649ea85503460f94bab4c7/html5/thumbnails/11.jpg)
For a Global Future – ILJIN Electric
ILJIN Building 50-1, Dohwa-Dong, Mapo-Gu,Seoul Korea 121-040Tel) 82-8-707-9290, Fax) 82-2-707-9381
Email : [email protected]
¿Sabe Usted? “We, ILJIN Electric is the fastest growing company
in heavy industry field in the whole world.”
11 / 112011-06-26