combining scientific excellence with commercial relevance
Blue Energy
David Vermaas (Wetsus, Universiteit Twente, BetterBattery)Michel Saakes (Wetsus) Kitty Nijmeijer (Universiteit Twente)
2
Energie uit het mengen van zoet en zout water
Blue Energy
![Page 2: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/2.jpg)
9-10-2013
2
3
Theoretische mogelijkheden
Blue Energy
4
Blue Energy
IJsselmeer
zoet water
Waddenzee
Zout water
200m
![Page 3: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/3.jpg)
9-10-2013
3
5
Blue Energy
IJsselmeer
zoet water
Waddenzee
Zout water
x50
1 m2
6
Mogelijke locaties
![Page 4: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/4.jpg)
9-10-2013
4
7
Extra mogelijkheden
• Energie uit CO2-gradient
• Gebruik van osmose-membranen of capacitieve elektroden
8
Technische mogelijkheden
![Page 5: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/5.jpg)
9-10-2013
5
9
Principe Blue Energy
10
Reverse electrodialysis (RED)
1) Vermogen per membraanoppervlak2) Vervuiling (fouling)
![Page 6: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/6.jpg)
9-10-2013
6
11
1) Vermogen per membraanoppervlak
12
Elektrische weerstand
Vermaas et al, 2011, Environmental Science & Technology
![Page 7: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/7.jpg)
9-10-2013
7
13
Vermogen per membraanoppervlak
14
Geprofileerde membranen
Vermaas et al, 2011, J. Membr. Sci., pp. 234-242
![Page 8: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/8.jpg)
9-10-2013
8
15
Geprofileerde membranen
16
Pompverlies
![Page 9: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/9.jpg)
9-10-2013
9
17
State of the art
• 2.2 W/m2 (verdubbeld in 3 jaar)
• 35 - 80% energy efficiency
• Pompverlies ≈ theoretisch (500x lager in 3 jaar)
18
Economisch perspectief
• Met huidige state of the art
• Gevoelig voor– membraanprijs, – vermogen per oppervlak– Kosten voorzuivering
![Page 10: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/10.jpg)
9-10-2013
10
19
2) Fouling
20
Why?
![Page 11: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/11.jpg)
9-10-2013
11
21
Fouling
22
Fouling
Spacers Geprofileerde membranen
![Page 12: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/12.jpg)
9-10-2013
12
23
Effect van fouling
Vermaas et al, 2012, Water Research
24
Eisen fouling control
• Milieuvriendelijk• Goedkoop• Snel
![Page 13: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/13.jpg)
9-10-2013
13
25
Ontdekking
• Experiment pilot site Harlingen, 2011• Per ongeluk luchtbellen in systeem
– Lage pressure drop voor ca. 1 dag– Vooral effect bij geprofileerde membranen
From: D. Kunteng, BSc thesis, 2011
26
Pompverlies na fouling
![Page 14: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/14.jpg)
9-10-2013
14
27
Fouling
28
Elektrische spanning na fouling
![Page 15: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/15.jpg)
9-10-2013
15
29
Praktische mogelijkheden
30
Proefinstallatie Afsluitdijk
• Looptijd 4 jaar• Experimenten vanaf voorjaar 2013• Beheer REDstack, experimenten
i.s.m. Wetsus• Vermogen tot 50 kW• Toekomst: 200 MW
![Page 16: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/16.jpg)
9-10-2013
16
31
32
![Page 17: David Strik - Wetsus](https://reader033.fdocument.pub/reader033/viewer/2022052904/557c210cd8b42aa77f8b45d1/html5/thumbnails/17.jpg)
9-10-2013
17
33
Thank you
Questions?