DATA PENDUKUNG PERHITUNGAN KOEFISIEN UPAH, BAHAN, PERALATAN
Ukuran AyakanFULLER
TITIK KONTROL FAKTOR SURFACEASTM (mm) AC-Base Surf Area AREA
A B C = A x B1½” 37.5 100.0 100 100.0
1" 25 83.3 90 - 100 95.0¾” 19 73.6 90 83.0½” 12.5 61.0 67.0 0.41 0.4100
3/8” 9.5 53.9 57.0No.4 4.75 39.5 39.5 - 39.5 35.0 x 0.41 0.1435No.8 2.36 28.8 26.8 - 30.8 19 - 45 23.5 x 0.82 0.1927
No.16 1.18 21.1 18.1 - 24.1 15.0 x 1.64 0.2460No.30 0.6 15.6 13.6 - 17.6 10.5 x 2.87 0.3014No.50 0.3 11.4 11.4 - 11.4 8.5 x 6.14 0.5219
No.100 0.15 8.3 7.0 x 12.29 0.8603No.200 0.075 6.1 3 - 7 5.5 x 32.77 1.8024
TOTAL 4.4781PROPORSI AGREGAT (DALAM BAHASA LABORATORIUM) :
Tertahan #4 = ( 100 - 35.0 ) = 65.0 %Lolos #4 & Tertahan #200 = ( 35.0 - 6 ) = 29.5 %Lolos #200 = ( = 5.5 %
TOTAL = 100.0 %
PROPORSI AGREGAT (DALAM BAHASA LAPANGAN) : faktor diambilFraksi Pecah Mesin 5-10 &10-20 &20-30 = ( 65.0 x #VALUE! ) = #VALUE! % 1.1Fraksi Pecah Mesin 0 - 5 = 100 - ### - 1.0 = #VALUE! %FILLER ADDED = 1.0 %
TOTAL = #VALUE! %
PERKIRAAN ASP AKTUAL = 0.035 (>#8) + 0.045 (#200 ~ #8) + 0.18 (<#200) + K K diambil 0,5 - 1,0= 0.035 x (100 - 23.5) + 0.045 x (23.5 - 5.5) + 0.18 x (5.5) + 0.5 = 4.98 %
DIAMBIL = 4.50 %
KONTROL=
[(KDR ASP AKTUAL - ABSORBSI ASP) x 1000]TEBAL FILM [SURF AREA x BJ ASP x (100 - KDR ASP AKTUAL)]
( 4.5 - 1.0 ) x 1000= 7.95 μm4.4781 x 1.03 x (100 - 4.5 )
DAERAH LARANGAN
JMF YG DIAMBIL
(d/D)0.45
0.01 0.1 1 10 1000
10
20
30
40
50
60
70
80
90
100
GRADASI AC-Base DIBAWAH DAERAH LARANGAN
Batas Bawah AC-BaseBatas Atas AC-BaseContoh Gradasi AC-Base
Ukuran Partikel (mm)
% B
erat
Yan
g L
olo
s
![Page 2: DatautkHSAC Base(Bawah)](https://reader036.fdocument.pub/reader036/viewer/2022082815/563db966550346aa9a9cfead/html5/thumbnails/2.jpg)
JIKA mendekati 8.0 μm