Dart update bag_final

12
BAG DART PROJECT UPDATE Update July 2010 1

Transcript of Dart update bag_final

Page 1: Dart update bag_final

BAGDART PROJECT UPDATEUpdate July 20101

Page 2: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

PROJECT ORGANIZATION OVERVIEW

2

Page 3: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

Design, data conversion and programming will occur through

end of 2010

6-months extensive testing, final data verification, system tweaks, training, and unit readiness preparations

Go Live scheduled

for Summer 2011

TIMELINE

3

Page 4: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

DART – CURRENT ACTIVITIES

Software 1st Round Testing – Revenue

Design Teams Underway – Prospect Management, Planned Giving, Stewardship, Events

Change Management Planning –Collaborating with unit leadership on a Unit Liaison program for Development

Online Community – Consultant conducting campus-wide needs analysisResults to inform strategic planProject team will outline technical requirements based on results

4

Page 5: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

DEVELOPMENT UNIT LIAISON PROGRAM

Support model to help campus through the DART transition

Each S/C/U will have representation to help prepare their unit for DART launch

Over the summer, the project team, Program Managers and other unit leaders will determine the appropriate structure and representation for the UL program

FAQ has more details: http://bit.ly/DART-FAQ

5

Page 6: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

REVENUE DESIGN HIGHLIGHTS

Revenue Design teams reviewed: Pledge accrual Processing of gifts and pledges Matching Gifts Recurring Gifts Benefits/Premiums Coding gifts for the General Ledger Short Codes/Designations/Allocations Donor intent Donor challenges

6

Page 7: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

LIFE CYCLE OF THE GIFT

Donor Stewardship

Some gift utilization can be captured (e.g. scholarship recipients, named professors, etc.)

Gift Spent

Fund Intake by S/C/U Department Spends Funds

Gift Made

Development - Gift Officer Solicits Gift Donor Makes Gift

Development Enters Gift

Mpathways/General Ledger Tracks Fund Availability and Utilization

7

Page 8: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

HIGHLIGHTED REVENUE CAPABILITIES

Better tracking of Donor IntentCurrent State:

Unspent gifts due to difficulty in tracking specific purposes Difficulty identifying donor intent (spreadsheets or imaging) Supporting documents found in imaging

Future state in DART: Assign attributes to each gift fund Standards & free form attributes will be available. Will be able to query attributes, e.g., merit based or need based

scholarships. Big Win – DART users get at the core intent of the gift quickly Financial users will have access to revenue information

8

Page 9: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

REVENUE DESIGN TEAM MEMBERS

Jarrod Van Kirk – FinOps (Co-Lead)

Cathy Spickard – OUD (Co-Lead) Patrick Franklin – OUD Sharon Geva – ITS Barb Gomez – OUD Larry Jonas – Michigan Radio Linda Kline – OUD Darwin Matthews – OUD Kim McDade – Cancer Center Julie Niedbala – OUD Chris Ososki – ITS Carson Rizor – Michigan Radio Bobbie Simson – Engineering Sheryl Szady - OUD

Thomas Madden – ITS (Co-Lead)

Jean Rauchholz - FinOps (Co-Lead) Jennifer Barnett – Treasurer’s Office Shelly Crundwell - Engineering Lisa Harris - ITS Christina Luo – Law Lori Maddix de Hernandez - SNRE Darwin Matthews - OUD Ken Witherspoon - ITS

9

Page 10: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

QUESTIONS?

10

Page 11: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

RECENT ACTIVITIES June Project Update

PowerPoint contains project status information as of June 2010 DART Newsletter: (June issue)

Emailed to the community and posted on the website Change Management Plan - Overview

30 second overview, slidecast, and FAQ Unit Liaison Program - Overview

30 second overview and FAQ Revenue Design Highlights

An overview of what the revenue design team covered and a glimpse at some screenshot comparisons between EIS and DART.

Recorded Demonstration15 minute recording divided into three short segments

DART FAQNew resource where we’ll post responses to common questions

11

Page 12: Dart update bag_final

LifelongEngagement

DARTDAC Replacement / DART Implementation

KEEPING INFORMED / PROVIDING INPUT

Input opportunities E-mail a question to

[email protected]

DART Project Web Site

12

http://bit.ly/DART-home