8/6/2019 D2-DWASA http://slidepdf.com/reader/full/d2-dwasa 1/26 3rd NRW Reduction Training, VietNam. 1 The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Transcript of D2-DWASA

Page 1: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 1/26

3rd NRW Reduction Training, VietNam. 1

The views expressed in this paper/presentation are the views of the authorand do not necessarily reflect the views or policies of the Asian DevelopmentBank (ADB), or its Board of Governors, or the governments they represent.ADB does not guarantee the accuracy of the data included in this paper and

accepts no responsibility for any consequence of their use. Terminologyused may not necessarily be consistent with ADB official terms.

Page 2: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 2/26

3rd Non-Revenue Water (NRW)

Reduction Training course

Dhaka Water Supply &Sewerage Authority,Bangladesh.

Presenters 

6 Md. Bazlur Rahman

6 Md. Mahmudul Islam

6 Kyaw Sha Ching

6 Md. Abdul Karim Patwary

Page 3: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 3/26

Selection of site for DMA

6

Located at Khilgaon Taltola in Dhaka city 6 No. of households: 650 +.

6 No. of connections: 675+ 

6 No. of Population: 24,000.6 Door to door survey is now in progress 

6 Area: 65 hectors 

Page 4: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 4/26

Description of existing network

6

200mm PVC pipes: 1300m.6 150mm PVC pipes: 2000m.

6 100mm PVC pipes: 500m.

6 100mm Asbestos Cement pipes: 400m.6 Total existing network: 4.2km.

6 Length of spaghetti pipes (for household connections) : 1500m.

Page 5: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 5/26

3rd NRW Reduction Training, VietNam. 5

The map of Dhaka city

DMA-1

Page 6: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 6/26

The DMA area.

Page 7: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 7/26

Description of existing network

200mm PVC pipes: �150mm PVC pipes: 

�100mm PVC pipes: 

�100mm Asbestos Cement pipes: 

The DMA area.

Page 8: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 8/26

The DMA

area.

Inflow-01

Inflow-02

Inflow-03

Inflow-04

Inflow-05

Page 9: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 9/263rd NRW Reduction Training, VietNam. 9

Work plan for establishment of first DMA

Preparatory works Activities

Problem analysis Done

Organizing a team Done

Deployment of Junior Engrs. Done

Ensure logistics Done

Guide, train & performance monitoring On going

Target: Jan, 09 – Dec, 09

Page 10: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 10/263rd NRW Reduction Training, VietNam. 10

Work plan for establishment of first DMA (Cont’d)

Water Usage Study Activities

Community awareness activities On going

Inventory of network Done

Hydraulic assessment Not yet done

Develop as-built drg. of existing networks DoneInstalling flow meters, valves & monitoringtools

Done

Target: Jan, 09 – Dec, 09

Page 11: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 11/263rd NRW Reduction Training, VietNam. 11

Work plan for establishment of first DMA (Cont’d)

Water Usage Study Activities

Isolation of total targeted area Done

Zero pressure test Done

Inventory & analysis of service connections On going

Develop baseline data On going

Customer data collection On going

Target: Jan, 09 – Dec, 09

Page 12: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 12/263rd NRW Reduction Training, VietNam. 12

Work plan for establishment of first DMA (Cont’d)

Rehabilitation works Activities

Assessment of volume of works On going

Prepare cost estimates and tender

documents

On going

Selection of Contractors Within 2 months

Improvement of existing system incl.rehab. of spaghetti lines Within 4 months

Replacement of spaghetti lines Within 4 months

Target: Jan, 09 – Dec, 09

Page 13: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 13/26

3rd NRW Reduction Training, VietNam. 13

Work plan for establishment of first DMA (Cont’d)

Water Loss Reduction Program Activities

Identify leaks, repair; again improvepressure and then repair

Not yet done.

Improve in-house plumbing Not yet done.

Replacement of domestic meters Within 5 months

Pressure monitoring Within 5 months

Flow monitoring Within 5 monthsWater Balance & NRW Calculations Within 5 months

Evaluate the result & reporting After completion

Target: Jan, 09 – Dec, 09

Page 14: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 14/26

3rd NRW Reduction Training, VietNam. 14

Work plan for establishment of first DMA (Cont’d)

Water Loss Reduction Program Activities

Presentation of the findings To be continued

Routine maintenance of improved

system

To be continued

Target: Jan, 09 – Dec, 09

Page 15: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 15/26

3rd NRW Reduction Training, VietNam. 15

The existing water supply scenario

6 The quantity of water is insufficient with very low

pressure6 The customers use jet-pumps to draw water from

networks

6 The quality of water is not safe for drinking6 The customers use to boil water for drinking

6 House connections are leaky at the meter &

connection point – poor workmanship

6 Customers are reluctant to pay the water bill

Page 16: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 16/26

3rd NRW Reduction Training, VietNam. 16

The objectives of improvements

6 To supply sufficient water on 24-hr basis under

reasonable pressure6 To ensure the good quality of water

6 To reduce the NRW by reducing physical &

commercial losses6 To enhance customers Willingness to Pay

6 To benefit the customers by eliminating the use of

jet-pumps and need to boil water

Page 17: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 17/26

3rd NRW Reduction Training, VietNam. 17

The mass awareness campaign

6 A leaflet was circulated in the area describing the

benefits of establishing DMAs6 Many formal & informal meetings held in the offices,

mosques & customers’ houses

6 The customers were requested to cooperate duringthe household surveys & other physical works.

Page 18: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 18/26

3rd NRW Reduction Training, VietNam. 18

The physical & socio-economic surveys

6 After collection of the existing maps & data an

extensive survey of the network was carried out6 Customers’ households were surveyed to obtain

information on – a) Functioning / accuracy of meters,

b) Status of bill payment & c) Status of houseconnections

6 Other socio-economic information

Page 19: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 19/26

3rd NRW Reduction Training, VietNam. 19

The problems in designing & establishment ofDMA

6 There are 5 nos. of inflow points & 1 source of supply(Production Well) – more gate valves & bulk meters

6 In some cases, there are 2 parallel lines – difficult to manage

flow and pressure6 In most cases, the pressure is very low

6 House connections & meters are placed at high depths –difficult for reading meters

6 Houses at distances (30m -100m) took connections throughlong spaghetti lines

6 Around 80% houses pumps water through jet-pumps

6 In 50% houses, there are no under-ground reservoirs – pumps

water directly to overhead reservoirs.6 Most of connections are leaky (use of MS clamps)

Page 20: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 20/26

3rd NRW Reduction Training, VietNam. 20

The flow rates at the inflow/ outflow points

6 There are 5 nos. of inflow points & 1 source of supply(Production Well) – more gate valves & bulk meters6 Inflow-1 (Production well): 3800 m3/day – only inflow

6 Inflow-2: Inflow comes from outside when Production well isnot operated – a bypass to be installed

6 Inflow-3: At present it is closed. In future may be used as aninflow.

6 Inflow-4: Only Inflow (860 m3/day).

6 Inflow-5: Only Outflow (360m3/day).

� All bulk meters match with the size of pipes.� All bulk meters are mechanical type.

Page 21: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 21/26

3rd NRW Reduction Training, VietNam. 21

Thank you.

Page 22: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 22/26

3rd NRW Reduction Training, VietNam. 22

Page 23: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 23/26

3rd NRW Reduction Training, VietNam. 23

Page 24: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 24/26

3rd NRW Reduction Training, VietNam. 24

Page 25: D2-DWASA

8/6/2019 D2-DWASA

http://slidepdf.com/reader/full/d2-dwasa 25/26

3rd NRW Reduction Training, VietNam. 25

Page 26: D2-DWASA