CVFPB Meeting May 24, 2013 USACE INSPECTION RESULTS Meegan G Nagy, PE Levee Safety Program Manager
7
US Army Corps of Engineers BUILDING STRONG ® CVFPB Meeting May 24, 2013 USACE INSPECTION RESULTS Meegan G Nagy, PE Levee Safety Program Manager
description
CVFPB Meeting May 24, 2013 USACE INSPECTION RESULTS Meegan G Nagy, PE Levee Safety Program Manager. Putah Creek. Putah Creek Unit 1 – Yolo Bypass – Willow Slough Unit 2 Levee System. Small holes at surface, opening to continuous (and sometimes connected) subsurface cracks. - PowerPoint PPT Presentation
Transcript of CVFPB Meeting May 24, 2013 USACE INSPECTION RESULTS Meegan G Nagy, PE Levee Safety Program Manager
US Army Corps of EngineersBUILDING STRONG®
CVFPB Meeting May 24, 2013
USACE INSPECTION RESULTS
Meegan G Nagy, PELevee Safety Program Manager
BUILDING STRONG®
Putah Creek
BUILDING STRONG®
Putah Creek Unit 1 – Yolo Bypass – Willow Slough Unit 2 Levee System
BUILDING STRONG®
Small holes at surface, opening to continuous (and sometimes connected) subsurface cracks
BUILDING STRONG®
BUILDING STRONG®
Putah Creek right bank – Unit 2 levee system