CVE-hesham ahmed kamal

4
1 / 4 CURRICULUM VITAE PERSONAL DATA Family Name :HESHAM AHMED KAMAL First Name : HESHAM Middle Name : AHMED KAMAL Sex : MALE Marital status : MARRIED Date and Place of birth : 20/12/1972 Nationality : EGYPTIAN Languages : ENGLISH Religion : ISLAM Date of Employment : 27-3-1997 Graduated Date : 6/1995 Current job : Project manager Departement / Branch : BRIDGES AND SPECIALIZED STRUCTURES DPT. Address : 14 MOHAMMED HASSN ELSHOGAY-ABDEN-CAIRO Telephone : 00966541414698-0020119582883 ACADEMIC QUALIFICATIONS: BSC. FROM CAIRO UNIVERSITY PROFISSIONAL AFFILIATIONS: EGYPTIAN ENGINEERS SYNDICATE

Transcript of CVE-hesham ahmed kamal

Page 1: CVE-hesham ahmed kamal

1/4

CURRICULUM VITAE

PERSONAL DATA

Family Name :HESHAM AHMED KAMAL

First Name : HESHAM

Middle Name : AHMED KAMAL

Sex : MALE

Marital status : MARRIED

Date and Place of birth : 20/12/1972

Nationality : EGYPTIAN

Languages : ENGLISH

Religion : ISLAM

Date of Employment : 27-3-1997

Graduated Date : 6/1995

Current job : Project manager

Departement / Branch : BRIDGES AND SPECIALIZED STRUCTURES DPT.

Address : 14 MOHAMMED HASSN ELSHOGAY-ABDEN-CAIRO

Telephone : 00966541414698-0020119582883

ACADEMIC QUALIFICATIONS:

BSC. FROM CAIRO UNIVERSITY

PROFISSIONAL AFFILIATIONS: EGYPTIAN ENGINEERS SYNDICATE

Page 2: CVE-hesham ahmed kamal

2/4

POSITIONS HELD AND EXPERIENCES:

FROM 3/2007 – UP TILL NOW

PROJECT TITLE : AL-MADINA BRIDGE (400 MILLION SR.)

OWNER NAME : AL MADINA CITY-COUNCIL.

DESCRIPTION : A REINFORCED CONCRETE FLYOVER TO CREATE A

RANG ROAD IN AL-MADINA- K.S.A

POSITION : PROJECT MANAGER. FROM 4/2006 – 3/2007

PROJECT TITLE : AL-HAWAMDYA BRIDGE-PHASE III (24 MILLION L.E.)

OWNER NAME : AL HAWMDYA CITY-COUNCIL.

DESCRIPTION : A REINFORCED CONCRETE FLYOVER TO CREATE A

FREE INTERSECTION BETWEEN CAIRO-UPPER EGYPT

ROAD AND AL-HAWAMDYA SUGAR FACTOR

RAULWAY.THE FLYOVER COMPRISES A STEEL BUY.

POSITION : PROJECT MANAGER. FROM 6/2004 - 4/2006

PROJECT TITLE : KING FAYSAL UNDERPASS-GIZA.

OWNER NAME : GIZA GOVERNORATE.

DECRIPTION : IT IS A BI-DRECTIONAL UNDERPASS UNDER KING

FAYSAL STREET. THE TOTAL LENGTH IS 325 m, 16

m WIDTH AND 5 m TRAFFIC CLEARANCE.

(22 MILLION L.E)

POSITION : PROJECT MANAGER. FROM 6/2003 – 6/2004

PROJECT TITLE: AL-HAWAMDYA BRIDGE-PHASE II(7MILLION L.E.)

OWNER NAME : AL- HAWAMDYA CITY-COUNCIL

DESCRIPTION : AN EXTENSION OF AL-HAWANDYA FLYOVER.IT

IS A BI-DIRECTIONAL RAMP CROSSING CAIRO-

UPPER EGYPT ROAD.

POSITION : PROJECT MANAGER.

Page 3: CVE-hesham ahmed kamal

3/4

FROM 3/2002 – 6/2003

PROJECT TITLE: SOUTHERN DAHSHOUR BRIDGE.

OWNER NAME : MINISTRY OF RESIDENCE, UTILITIES & CONSTRUCTION.

DESCRIPTION : THE PROJECT IS A PART OF THE SECOND RING

ROAD AROUND GREATER CAIRO REGION,

CROSSING THE RIVER NILE, CAIRO-UPPER

EGYPT ROAD AND RAILWAY.

POSITION : CONSTRUCTION MANAGER. FROM 3/2001 – 3/2002

PROJECT TITLE: 10th

OF RANADAM CITY BOTABLE WATER PLANT

DESCRIPTION : FINISHING&REPAIR WORKS FOR THE PLANT.

(10MILLION L.E.)

POSITION : CONSTRUCTION MANAGER.

FROM 8/1999 TO 3/2001:

PROJECT TITLE : EL MARYOTIA BRIDGES (9-D SECTOR)

PROJECT LOCATION : EL MARYOTIA GIZA

DESCREPTION : 3 BRIDGES ON EL MARYOTIA AXIS

VALUE : 5 MILLION L.E.

FROM 7/1999 TO 8/1999:

PROJECT TITLE :2 PEDSTRIAN STELL FLYOVER

PROJECT LOCATION : G.CAIRO RING ROAD.

VALUE :2 MILLION L.E.

FROM 3/1997 TO 7/1999:

PROJECT TITLE : EL MARYOTIA ELEVATED ROAD ( (9-D SECTOR)

DESCREPTION : BRIDGE 2.5Km FROM EL MARYOTIA TO EL

MANSORIA – GREATER CAIRO.

VALUE :75 MILLION L.E.

Page 4: CVE-hesham ahmed kamal

4/4

FROM 2/1998 TO 8/1998:

PROJECT TITLE :2 REINFORCED CONCRETE BRIDGES

AS A PART OF 26th

JULY.AXIS.

PROJECT LOCATION : EL BRAGEEL – GIZA.

VALUE :2 MILLION L.E.

COURSES ATTENDED

o AUTOCAD

o SAP90

o EXCEL

o PRIMAVERA

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ