CV-Ganesh Kumar - Project Management, Project Planning and Controls

6

Click here to load reader

Transcript of CV-Ganesh Kumar - Project Management, Project Planning and Controls

Page 1: CV-Ganesh Kumar - Project Management, Project Planning and Controls

Ganesh Kumar B.S. – B.E., PMP Contact: 00971564881538 ~ E‐Mail: [email protected] Emirates ID : 78419864602691‐8 Valid till 20‐Apr‐18 Driving License No : 3608217, Dubai, Valid till 23‐Nov‐25  Job Objective  Seeking Challenging assignments  in Project Management, Planning, Control, Cost Control & Management, Project Engineering and co‐ordination with an organization of repute preferably in Oil & Gas industry  Profile Summary  

A  successful Mechanical  Engineer  trained  for Managerial  skills  through  Harvard  University  and  completed  PMP training classes with 7.5   years of rich experience  in oil and gas new built / refurbishment /   Maintenance projects value from 3 million to 2.2 billion includes offshore Jack up rigs, Drillship, Land‐rig, topsides, platforms, skids etc.,  

Roles Handled o Asst. Manager – Projects & Maintenance o Asst. Manager – Planning and Control o Lead Engineer – Estimation & Costing 

 

Organization Served for  

   

  

Client Handled  

     

  

Countries Worked  

   

Responsibilities Handled  

As Asst. Manager / Lead (Planning and Control) o Planning, scheduling (L1 to L4), initiating, executing, procurement, monitoring and control projects along time 

and cost parameters by Primavera P6 o Developing of WBS and activities with all relationships, OBS, roles, resource and budget units inputs loaded o Resource estimation, resource loading, activity weightage assignment, Resource spent tracking, CPI analysis o To develop S curve for the project and to prepare daily, weekly and monthly reports and analyse with respect 

to the planned % Vs Actual Achieved and to analyse the CPM and SPI. o Defining the work methodology with project manager and to provide detailed engineering plan for schedule 

of ETC for feed drawings and fabrication drawings. o To ensure the engineering deliverables as per schedule within budgeted cost  o Co‐ordination with all department and vendors to ensure the committed deliverables. o To provide Master material plan  to procurement  to  enhance  a material  inflow  and  to  avoid  any delays  in 

material receipt. o To order ensure the material delivery within schedule and freight in optimistic manner o Regular interaction with engineering team to get the required output to facilitate the engineering and project 

progress o Breaking down of activities and to provide the micro plan on daily / weekly basis w.r.t to the daily progress % 

to be achieved 

Gujarat State Petroleum Corporation Oil and Gas Corporation of India

INDIA SINGAPORE SAUDI ARABIA UAE

Page 2: CV-Ganesh Kumar - Project Management, Project Planning and Controls

o To set baseline / Thresholds to monitor the actual work progress. o To analyse, identify and provide risk register for project and track schedule risk and cost risk o Report management by EVM, and  to maintain  the project  schedule  in  track  (schedule crashing /   catch up 

schedule if required) with respect to providing proper inputs to management o To provide technical input on material required for repair, refurbishment and maintenance, to get the quotes, 

evaluate, procure and follow ups till receipt of material o Tracking  of ordered material in order to keep up the required deliveries o Preparing  the  brief  of  projected  requirements  in  specific  parts  of  the  region  based  on marketing  inputs, 

viability analysis and business plans o Tracking of resource utilization and provide a detailed report  in order to maintain a timely mobilization and 

demobilization of equipments, manpower and other resources. o To ensure the manpower utilization within budgeted o To plan and provide Project Budget/ ACE with respective list of requirement including direct and indirect costs o To track the cost by capturing the costs from various MIS system and prepare the timely Budget Vs Actual (Job 

cost report) with estimate to complete as on report time and profit margin o Responsible for Preparation of Earned values (EV) and providing forecast and current scenario of the project. o Responsible for conducting meeting with top, middle  level management and operations team for the project 

performance reviews by EVM, variance analysis. o Responsible  for  recording  the minutes of performance  reviews  and  tracking of  actions being  taken on  the 

same.  o Responsible  for  providing  monthly,  quarterly  and  yearly  budget  requirement  for  projects  including 

contingency. o Supervising all construction activities  including providing  technical  inputs  for methodologies of construction 

and coordinating the site management activities o Identifying & developing a vendor source for achieving cost effective purchase of equipment, accessories & 

timely delivery so as to minimize project cost and ensuring on time payment to vendors o Managing  the  project  start‐up  contracts  /  agreements,  due  diligence,  formulation  and  negotiations  in  co‐

ordination with internal & external legal / commercial teams o To collect all the technical specification and commercial papers along with all required supporting documents 

as per tender and to submit both non priced and priced bid to client in a timely manner o Executing day‐to‐day contracts / commercial administration during various stages and finally handling claims 

& arbitration management towards achieving the targeted financial objectives  

As Asst. Project Manager – Projects and Maintenance o To make  rig  visit  at offshore  to  list out maintenance  requirements as per  Safety, Class  , API,   and  client 

specifications o To co‐ordinate with offshore team members for proper inputs and  maintenance requirements o Responsible for maintain the offshore maintenance engineers and mechanical engineers o To  prepare  a  List  of  Requirements  (LOR) with  budget  estimation  for  Structural,  Accommodation,  Power 

system,  Drilling  equipment, mud  system  equipment,  BOP  and  related  equipment,  lifesaving  equipment, utility equipment, all related piping and E&I etc., 

o To prepare a risk assessment register and project same to management for better understanding of expected risk and planned action plan to overcome in case of risk occurs  

o To  liaise with  rig  operation manager  ,rig  offshore  team  and  top management  for  finalizing  the  LOR  and budget without compromising 5yeraly repair / class / client requirement 

o To  prepare  a  schedule  for  the  refurbishment  / maintenance  and  responsible  for  deliver  the  rig without affecting client’s schedule and spud date 

o To raise and liaise to get Material Requisition (MR) from respective discipline heads from offshore team. o To  liaise with OEMs  and  vendors  to  get 5  yearly  spares  and  expected  repair parts  to  get  it ordered well 

before to avoid any delays o To monitor  MR and approve the same for proceeding procurement o To follow up / co‐ordinate procurement team and vendors for quotes  o To provide purchase orders to vendor / OEM based on best delivery and price to meet schedule and budget o To co‐ordinate with logistics team for getting the spares / materials in time and with proper documentation 

and make sure to claim all exemptions  o To  co‐ordinate  with  HR  for  all  personnel  related  activities  like  manpower  requirements,  VISAs, 

Accommodation etc., o To identify a qualified yard / dry‐dock for executing project in case of major refurbishment o To identify a qualified contractor in case of refurbishment / maintenance carried out at offshore location o To visit offshore on regular intervals to ensure work progress and managing o Responsible  to manage  all  execution  related  activities  at  offshore  /  yard  activities  and  report  to  project 

manager and top management. o Responsible for delivering rig within schedule and budgeted value 

Page 3: CV-Ganesh Kumar - Project Management, Project Planning and Controls

o Responsible to visit vendor /  third‐party workshops for expediting works and FAT test o To co‐ordinate  for commissioning activities with  rig  team and ensure completion of successful  third party 

inspection  o Responsible to close out all punch points o Responsible for successful completion of final rig Run‐test o To communicate and co‐ordinate with rig operations manager during operations and maintain a operational 

log and maintenance log.  Additional responsibilities handled: as Technical Co‐ordinator (Mechanical Equipment) 

Repair and recertification of subsea equipment and BOP, Cranes 

Engineering, procurement, and installation of new auxiliary equipment like cementing unit, AHUs, HPU etc 

Key  contribution  in material procurement,  logistics  control and  fulfil  to  input  the material  in  required  time  to meet  the project schedule  

Individually involved and responsible for “Cementing unit refurbishment and installation. Work scope –   Triplex Pump – HT 400 – Total dismantling and replacement of 90% internal spares. To test the pump at 11,000 

PSI. To check pump discharge at various transmission levels.  Detroit engine – Complete overhaul of engine. Dynamic test run.  Transmission – Complete overhaul.  Control Panel – Old panel replaced with new “Serva” system control panel.  Mixing system – New system with complete piping was carried out. 

Shop  expeditor  for  refurbishment  and  5  yearly  recertification  of  Subsea  items    ‐  “Drill  string  compensator,  Diverter assembly  with  housing,  Diverter  running  tool,  Flex  joint,  Spider,  Flex  spools,  Slip  Joint  (FD8),  BOP  double  ram  and annular”. 

Expeditor for new fabrication of “ Well head connector Test stump, Main risers, pub joints and riser running tool” 

Co‐ordination with the OEM for new fabrication of “Wellhead (H4) and riser (Collet) connectors.” 

Individually handled the “Removal of old elevator and Installation of new elevator” .Work Scope involves removal of Main car,  counter weight, motor,  top  sheaves  and  installation  of  supports,  rails, Main  car  assembly,  top  sheaves,  deflector sheaves, traction machine, and commissioning. 

Handling the job of “installation and commissioning of New AHU and ventilation system” 

Taken additional  interest  in expediting  the “Conversion of SCR  system  to DC‐DC Control  system”. Co‐ordination with  rig electrical team and contractor electrical team in order to keep up schedule. 

 Organisational Experience  Since Feb’15 – Lamprell, Sharjah, UAE  Project Title:    EPC‐Rig Mud system Period:      Dec’15 – Apr‐16 Description:    Rig – EPC – Mud system Role:      Project Lead ‐ (Project Planning and Controls) Project Value:    US $ 2.25 Million Planning Tool Used:  Primavera P6 R15.1  Project Title:    KD 23 Rig Refurbishment project Period:      Jul’15 – Jan’16 Description:    Land Rig refurbishment Role:      Project Lead ‐ (Project Planning and Controls) Project Value:    US $ 5 Million Planning Tool Used:  Primavera P6 R15.1  Project Title:    LAM2K – Lang Rig, New Built Period:      Feb’15 – Apr’16 Description:    New Built Land Rig (2000HP) Role:      Project Lead ‐ (Project Planning and Controls) Project Value:    US $ 22 Million Planning Tool Used:  Primavera P6 R15.1       

Page 4: CV-Ganesh Kumar - Project Management, Project Planning and Controls

Since Aug’14 – Saipem, Dammam, Saudi Arabia As Senior Production Planning Engineer Project Title:    WASIT Period:      Since Aug’14 to Jan’15 Description:    Fabrication of Platforms and Jackets Role:      Senior Production Planner (Lead – Piping Planning and Controls) Client:      Saudi Aramco Project Value:    US $ 2.2 Billion  Since Oct’ 13 to Jul’14  ‐ ABAN Offshore Limited  As Asst. Manager (Project control and Maintenance)  Project Title:    ABAN V – Refurbishment Project  Period:      Since Nov’ 13 Description:    Refurbishment of FNG – Jack up rig ‐ Independent leg cantilever type Role:      Asst. Project Manager Client:      ABAN Offshore Limited Project Value:    US$ 12 Million  Project Title:    ABAN IV – Refurbishment Project  Period:      Since Jan’ 14 Description:    Refurbishment of BMC – Jack up rig ‐ Independent leg cantilever type Role:      Deputy Project Manager Client:      ABAN Offshore Limited Project Value:    US $ 24.5 Million   Project Title:    ABAN III – Contract preparation project  Period:      Since Mar’14 Description:    Refurbishment of Jack up Rig – Independent leg cantilever type Role:      Deputy Project Manager  Client:      ABAN Offshore Limited Project Value:    US $ 7.5 Million   Project Title:    ABAN ICE Shipyard Project, Singapore – Sembawang Shipyard Period:      Since Jan’13 – Oct’13 Description:    Refurbishment of Drill Ship Role:      Deputy Project Manager Client:      ABAN Offshore Limited Project Value:    US $50 Million  Since Nov 2008 to Dec 2013  ‐ Larsen & Toubro (L&T) Ltd (HCP Division)  As Asst. Manager (Planning Department):  Project Title:    PLQP Jacket and Bridges Fabrication Project (6000MT) Period:      Dec’11‐Dec’12 Role:      Lead – Project Planning and Controls (Constructions) Client:      Gujarat State Petroleum Corporation (GSPC) PMC:      Engineers India Limited Project Value:    US $273 Million Planning Tool Used:  Primavera P6   As Senior Engineer (Planning Department):  Project Title:    DDW1 Wellhead Platform Fabrication and Erection Project – (2800 MT) Period:      Jun’10‐Jul’11 Role:      Lead – Project Planning and Controls (Construction) Client:      Gujarat State Petroleum Corporation (GSPC) PMC:      Engineers India Limited Project Value:    US $300 Million Planning Tool Used:  Primavera P6  

Page 5: CV-Ganesh Kumar - Project Management, Project Planning and Controls

As Graduate Trainee to Senior Engineer (Planning Department):  Project Title:    Barmer to Salaya Pipeline Project – (630KM) Period:      Nov’08‐Jun’10   Designation:    Execution Planner Client:      Cairn India Pvt Ltd (CEIL) Role:      Execution Planning Engineer Project Value:    US $ 245 Million  As Tendering Engineer:  Project Title:    ONGC Tender 2014 Period:      Since Mar’14 Designation:    Lead Co‐ordinator Rig Type:    300’ Jack up Rig – Independent leg cantilever type Role:      Co‐ordinator (Technical)  Project Title:    Sagar Samrat MODU to MOPU Conversion Project Period:      Oct’11‐Nov’11 Designation:    Tendering Engineer – Costing Client:      ONGC Role:      Costing Engineer  Project Title:    Wheatstone LNG (ISBL) Project Period:      Aug’11‐Oct’11 Designation:    Tendering Engineer – Costing Client:      Chevron PMC:      Becthel Role:      Costing Engineer  Professional Highlights: 

Consecutively rated as a Top Performer in the organisation  Training  

Attended a certified training in Primavera P 6.2 from CADD Centre (Authorised Project Management Institute)   

Education  2008  B.E (Mechanical Engineering) from Bannari Amman Institute of Technology, Sathyamangalam, Erode, Anna University 2011  Harvard Manage Mentor (Online) at Harvard University, USA 2004  12th from Little Flower Higher Secondary School, Salem, Tamilnadu State board  2002  10th from Holy Flower Matriculation Higher Secondary School, Salem, Tamilnadu Matriculation board   Other Credential    

Successfully completed Harvard Manage Mentor Course from Harvard University, USA in 2012 

Commencing the Project Management Professional (PMP) certification from Jan 2016  IT Skills  Tools:        Primavera P6, 15.1, MS Project, Oracle, ERP Tools, Maximo, MIS and EIP Operating Systems:     Windows (XP, Vista & 7) Packages:      MS‐Office Hardware Skills:      Basic knowledge of computer hardware  Social Engagements   

 

Regularly donated blood for the welfare of those in need 

Sponsoring studies of a kid by the means of an NGO – World Vision    

Page 6: CV-Ganesh Kumar - Project Management, Project Planning and Controls

Personal Details   Date of Birth:      7th September 1986 Permanent Address:   30, Nagalingam Street, Arisipalayam, Salem‐ 636009, Tamil Nadu  Current Address:    402, Al shaha supermarket building, Al Qasimia, Sharjah, UAE Languages Known:  English, Hindi, Tamil, Telugu, and Malayalam     Nationality:    Indian Marital Status:   Married Passport Details:  J9477835, Coimbatore, 26‐Dec‐12 to 25‐Dec‐22