Concrete terms

Click here to load reader

Transcript of Concrete terms

AE [AE ] /air entrained concrete/ CIP [CIP ] /cast in place pile method/ H [H ] /H-steel pile/steel H-beam pile/ PC [PC ] /prestressed-concrete caissons/ PC [PC ] /PC grillage girder bridge/ PC [PC ] /prestressed concrete pile/precast-concrete pile/ PC [PC ] /prestressing steel strand/ PC [PC ] /prestressing steel/ PC [PC ] /elongation of prestressing steel/ PC [PC ] /duct/ PC [PC ] /prestressing-steel wire/ PC [PC ] /prestressing-steel bar/ PIP [PIP ] /packed-in place pile method/ U [U ] /U-beam/ [] /double strand tie/ [] /cross tie/ (PC ) [(PC )] /clearance between prestressing steels/ [] /funnel/ [] /stirrup/ [] /bubble concrete/ [] /cribwork/ [] /cribwork/ [] /high chair/bar support/ [] /sawdust concrete/ [] /raising/rising/ [] /hammer/ [] /covering/clear/cover/space/ [] /covering depth/ [] /cover/coverage/ [] /plane/ [] /plane/ [] /planer/ [] /wedge/ [] /wedge bolt/ [] /boulder/ [] /puddling/ [] /twister/grip twister/ [] /radiationed shielding concrete/ [] /undermining/

[] /clearance/ [] /joggled/ [] /stop end board/bulkhead/shoring/sheathing board/sheeting board/ [] /fox drift/ [] /ponding/ [] /prop/ [] /support/prop/ [] /tie/ [] /lacing (horizontal)/post jointing (vertical)/ [] /pit excavation/shaft sinking/ [] /stake/ [] /grading/leveling/blading/ [] /rod/floating rule/ [] /threaded portion/ [] /saw/ [] /ditch at the top of slope/ [] /berm/top of slope/ [] /slope stake/ [] /slope toe/toe of slope/ [] /slope stake/batter rail/ [] /slope toe/toe of slope/ [] /gutter/ [] /slope pavement/ [] /slope/face of slope/bank/banking/ [] /slope stability/ [] /slope gradient/ [] /trimming of slope/ [] /slope drainage/ [] /oblique gutter/ [] /slope protection/ [] /erosion-control-planting on slope/ [] /slope protection method/ [] /brush mark/ [] /strut/ [] /form release agent/ [] /junction sheet pile/ [] /chipping/ () [] /removing/stripping/striking/ [] /strain/

[] /cracking/ () [] /belly/ [] /wire mat/ [] /ooze/organic soft soil/ [] /volume of loose soil/ [] /tipped fill/ [] /end-on-system/ [] /spreading/ [] /spreading depth/ [] /sleeper/ [] /fresh concrete/green concrete/ [] /follower/ [] /autogenous healing/ [] /strand/ [] /spiral hoop/ [] /screw pile/ [] /spiral hoop reinforcement/ [] /rutted road/ [] /rutting/ [] /earth anchor/tieback anchor/ [] /island process/ /honeycomb/ [] /alkali aggregate reaction/ [] /anchor pile/ [] /anchor bolt/ [] /tie-back/ [] /underpinning process/ PC [ PC ] /unbonded prestressing steel/ [] /unbonded post tensioned member/ [] /unbonded tendon/ [] /ICOS methodImpresa di Constuzione Opere Specializzate Spa/ /wet screening/ /well point/ /water gain/ /water jet/ /entrapped air/

[] /open cut/ [] /open caisson/ [] /all casing method/ /coupler sheath/ /collar piece/ [] /glass-fiber reinforced concrete/ [] /gully erosion/ /calibration/ /quick clay/ /quick sand/ /clamp/ /grouting/ /grout/grouting/ [] /green cut/ /casing/ /casing tube/ [] /cable/ [] /chemicolizer method/ [] /gelling time/ /caulking/ /cold joint/ [] /coil form/ [] /segregation/ [] /age of concrete/ [] /spreading of concrete/ [] /deterioration of concrete/ [] /concrete cutter/ [] /concrete pile/ [] /concrete spraying/ [] /concrete placement/ [] /concrete placing report/concrete pouring report/ [] /concrete-block pitching/ [] /concrete paving/ [] /screed/ [] /concrete sheet pile/ /consistency/ [] /rubber bearing/

[] /cycle time/ [] /saddle tie/ [] /shore/shoring/centering/dead shore (vertical/flying shore (horizontal)/raking shore (inclined)/ [] /sand compaction pile method/ [] /sand drain method/ () [()] /trestle/ [] /sheath/ [] /sheet pile/ [] /closer/ [] /Chicago(board) method/ /chute/ /shotcrete/ [] /jetting method/ [] /geo-textile method/ /jitterbug/ /honeycomb/ [] /stirrup/ [] /hold down devices/ [] /depressing devices/ /spiral hoop/ /span/depth ratio/ /spinneret/ /spacer/space block/bolster/chair/separator/ /spacer tie/ /spading/ /slag concrete/ [] /sleeve nut/turnbuckle/ /sleeve/ [] /slot-dizing method/ [] /segment/ (PC ) [(PC )] /set/ (PC ) [(PC )] /slip/pull-in/ /separator/insert/spacer/ [] /cement bacillus/ [] /cement paste/neat cement/ [] /cement milk/ [] /cement mortar/

[] /cement stabilization/ [] /heat of cement hydration/ [] /cement grouting/ [] /soil cement/ [] /cement modified asphaltemulsion stabilization/ /soil-asphalt/ /soil-cement mix/ [] /sleeve nut/turnbuckle/turnbuckle brace/ /dynaspan/ [] /duct/ /chair/ [] /test pit/ [] /Terre Armee method/ /deep well/ [] /Dywidag method/ /transit-mixed concrete/ [] /trench cut method/ /driving core/ [] /tightening nut/ /concreter's tongs/concreter's nippers/ [] /knee brace/ [] /reinforcing bar bender/hickey bender/ [] /haunch reinforcement/ [] /vertical-drain method/ [] /vibrator/ /piping/ [] /vibro-composer method/ /vibro-floatation/ [] /tubular wailing/ [] /tubular soldier/ [] /bucket/ /packer/ [] /packed drain method/ [] /batch/ [] /panel tie/ /heaving/ [] /bush hammering surfacing/

/footing/ [] /hooped bar/ [] /hoop pressers/ /finisher/ [] /form tie/ [] /hook/ [] /hooked at end/ [] /Frankie pile/ /bleeding/ /friction cut/ [] /flexible vibrator/ [] /Freyssinet method/ [] /segmental construction/ [] /concrete block pitching method/ () [] /heel/ /plasticity/ [] /plastic cone/ [] /plastic concrete/ /plastic soil cement/ [] /blanket/ /proof rolling/ /placeability/ /prewetting/ /precast concrete/ /precast concrete sheet pile/ [] /mold/ [] /mold/ /pre-cooling/ [] /a part of pressers/ [] /pressers force/ /prestressed concrete/ [] /PS concrete/prestressed concrete(PC)/ [] /prestressed concrete member/ [] /prestressed concrete work/

[] /loss calculation of prestressing/ [] /prestressing/de-tensioning/ [] /time of prestressing/ /pre-tensioning system/ [] /pretension member/ /prepacked concrete/ /hair crack/ [] /Benoto pile/ [] /Berlinoise method/ [] /bench cut/ [] /bentonite treatment/ /bend up/ /card-board wicks/ [] /pedestal pile/ /porous slab/ /hospital lock/ /chute with hopper/ () [] /boiling/ [] /post-tensioning system/ [] /pop out/ /pumpcrete/ / [ ] /pumpcrete/ [ ] /freshly mixed concrete/ /metal pan/ [] /reinforcing mesh/ [] /cement mortar/ [] /gunite-shooting/ [] /gunite shooting/ [] /mortar injection/ /rounding/ [] /reverse-circulation drill method/ /rebound/ /relaxation/ [] /laitance/ [] /Raymond pile/

[] /Leoba method/ [] /Leonhardt method/ [] /ready mixed concrete/ [] /wastage factor/ [] /rock bolt/ [] /long line system/ [] /welded wire mesh/reinforcing mesh/welded wire fabric/ [] /compressive strength/ [] /pneumatic caisson/ [] /stud joint/ [] /pumping grout/ [] /jacked pile/ [] /pressure gauge/ [] /pressure vessel/ [] /stabilizer/ [] /stabilization/ (PC ) [PC ] /location of prestressing steel/ PC [ PC ] /prestressing-deformed steel wire/ PC [ PC ] /prestressing-deformed steel bar/ [] /deformed bar/ [] /corner sheet pile/junction sheet pile/ [] /slip form/sliding form/ [] /brace/bracing/ [] /open caisson/ [] /open well method/ [] /in one operation/ [] /single-pile driving/ [] /butt joint/ [] /gully/ [] /handling/transportation/ [] /lead/transport distance/ [] /cylindrical shaft pile/ [] /cylindrical mold/ [] /vertical pile/ [] /plane vertical form/ [] /counter load/loading berm/counterweight fill/surcharge/ [] /launched construction/extruded construction/

[] /ledger/ [] /transverse prestressing/ [] /joist/ [] /breast board/ [] /wet sand blasting/ [] /wet sand curing/ [] /wet curing/ [] /thermal strains/ [] /temperature control/ [] /temperature rise/ [] /kicker plate/ [] /rustication strip/ [] /bulkhead/ [] /stock pile/ [] /temporary cofferdam/ [] /processing/ [] /bending schedule/ [] /treated wooden pile/ [] /heat curing/ [] /dragging piece/dragging beam/dragon beam/dragon piece/angle brace/ [] /load gauge/ [] /readings on pressure gauge/ [] /overstressing/ [] /overcompaction/ [] /open cut/ [] /form collapse/ [] /landscape/landscaping/ [] /outer form/ [] /test specified under applicable standard/ [] /sliding form/slip form/ [] /sumppit/shallow sump/ [] /drying shrinkage/ [] /winter concrete/winter concreting/ [] /winter construction/ [] /waviness/ [] /slow banking/ [] /slow curing/

[] /batter board (US)/stake (Br.) /leading frame/ [] /round bar/plain bar/ [] /plain bar/ () [] /corduroy road/ [] /moisture content adjustment/ [] /rocky soil/ [] /rock anchor/ [] /pedestal/foundation/footing/ [] /depth of foundation/ [] /underwork/grounding/foundation work/earthwork/ [] /foundation pile/ [] /foundation ground/ [] /mechanical screeding/ [] /machine excavation/ [] /mechanical stabilization/ [] /quick setting/ [] /air bubble/ [] /aerated concrete/cellular concrete/foamed concrete/ [] /standard product/ [] /soldierbeam/ [] /borrow material/ [] /rapid curing/ [] /moist curing/wet curing/ [] /rock crib/ [] /cyclopean concrete/ [] /saw/ [] /drawing-down/ [] /side stake/ PC [ PC ] /drape tendon/ [] /bending into a required shape/ [] /bend/bending/ [] /bender/bending machine/ [] /curved form/ [] /cobble/ [] /boulder concrete/ [] /bracing/strut/stay/ [] /lined turf/ [] /tension/

[] /prestressing-calculation sheets/ [] /tendon/ [] /accommodation and anchorage of tendons/ [] /tendon layout/ [] /tensioning force/ [] /introduce tensioning force/ [] /tension device/ [] /surfacing by steel trowel/trowel finish/ [] /metal form/metal pan/ [] /hammer/ [] /without entrapping air/ [] /pneumatic internal vibrator/ [] /air curing/ [] /dry excavation/ [] /void/ [] /dry mixing/ [] /corner sheet piles/ [] /overcutting/ [] /excavation/digging/ [] /spoil/excavated materials/ () [()] /cut and cover/ () [] /batter/ [] /plane sloping form/ [] /shuttering/form/ [] /alignment/ [] /verticalness/ [] /remove form/strike form/strip form/ [] /construct forms/install forms/ [] /form panel/ [] /framing/ [] /carpentry workshop/shuttering fabrication shop/ [] /form work/ [] /shop carpenter/shuttering carpenter/ [] /stripping/form removal/ [] /shuttering storage yard/ [] /tie wire/

[] /form on/ [] /joist/ [] /shore/shoring/ [] /splice/ [] /jointed pile/spliced pile/ [] /splice/splicing/ [] /observational procedure/monitoring/ [] /pumice concrete/ [] /lightweight concrete/ [] /span/depth ratio/ [] /tying twine/twine/wiring// [] /wire/tie/ [] /binding wire/tie wire/bag tie/ [] /erection/ [] /obstruction/ [] /natural ground/ [] /natural ground height (level)/ () [()] /pressure-reducing sinking of caisson/ [] /lubricating materials/ [] /field batching process/ [ ] /cast-in-place prestressed concrete/ [] /field curing/ [] /cast-in concrete/cast-in place concrete/ [] /cast in place/cast in-situ/ [] /job mix/field mix/ [] /job mixing/ [] /mixed in place/ [] /job mixed concrete/ [] /restoration to original state/ [] /undisturbed soil/ [] /existing ground line/ [] /existing ground surface/ [] /set/ [] /mud/ [] /soil-solidification method/ [] /fixed end moment/

[] /key wedge/ [] /after curing/ [] /nominal diameter/ [] /nominal weight/ [] /nominal diameter/ [] /slope stake/batter rail/ [] /plank/planking/ [] /epoxy resin joint/ [] /cat walk/ [ ] /prestressed concrete member produced at a factory/ () [()] /operation/one operation/ [] /strut/ [] /anchorage/ [] /buttress wall/ [] /pulling test of pile/ [] /pile spacing/ [] /pile foundation/piled foundation/ [] /pile foundation work/ [] /pile joint/ [] /load test on piles/ [] /pile toe/ [] /pile driving/piling work/ [] /pile driving test/ [] /pile driver/ [] /piling work/pile driving/ [] /pile length/ [] /head of pile/pile head/ [] /pile head treatment/ () [] /trench/ditch/gutter/dike/ [] /hardening/setting/ [] /hardened concrete/ [] /treatment after hardening of concrete/ [] /treatment before hardening of concrete/ [] /cold joint/ [] /concrete by dry consistency/ [] /mortar of dry consistency/ [] /rolled steel beams/ [] /steel-pipe pile/

[] /steel-sheet-pipe pile/ [] /steel sheet pile/ [] /steel form/ [] /steel pile/ [] /high-pressure steam curing/ [] /high strength concrete/ [] /high-strength-steel strand/ [] /high-strength steel wire/ [] /high-strength steel bar/ [] /manila grass/ [] /twin wailing/ [] /plywood/ [] /plywood facing/ [] /plywood panel/ [] /exposed aggregate surfacing/ [] /excavation/pit excavation/ [] /foot protection/ [] /stake/ [] /excavation/pit excavation/ [] /stringer/joist/ [] /ledger/ [] /embedment/penetration/ [] /rod/floating rule/ [] /sand streak/ [] /sand pile/ [] /sand pit/ [] /sandblasting/ [] /sand replacement/ [] /sandbag/ [] /gravel pit/ () [] /reuse/ [] /reusable form/ [] /re-vibration/ [] /retempering/ [] /finished grading/ [] /maximum-compressive stress/ [] /maximum-introduced stress/ [] /crushed stone/ [] /crushed concrete/

[] /surcharge/ [] /tendon jacking force/jacking force/ [] /unsupported excavation/excavation without timbering/ [] /land slide/ [] /breasting/shoring/sheathing/ [] /shore/shoring/ [] /watering/spraying/sprinkling/ () [] /yoke/cleat/batten/square timber/ [] /timber offcuts/ [] /surplus soil/excess material/ [] /removal of surplus soil/ [] /darby/ [] /open surface/formed surface/ [] /service load/ [] /service stress/ [] /usage/ [] /usage/ [] /usage/ [] /strut/support/bearer/prop/ [] /bearing capacity/ [] /bearing pile/ [] /strut/prop/stanchion/support/upright/ [] /support/timbering/staging/ [] /formation/ [] /waterstop/ [] /paper form/ [] /prospecting/ [] /test pile/ [] /experiment banking/ [] /trial mix/ [] /trial mix/ [] /specified mix/ [] /high-strength steel/ [] /adjustable clamp/movable clamp/ [] /longitudinal reinforcement/ [] /laboratory mix design/ [] /wet sand curing/ [] /wet curing/ [] /real operating time/

[] /net requirement/actual requirement/ [] /actual requirement/net requirement/ [] /lawn/turf/grass plot/greensward/ () [(] /divot/sod/ [] /sodding/turfing/ [] /turf/sod/ [] /waterjetting/ [] /blinding concrete/mud slab/leveling concrete/lean concrete/concrete sub-slab/mud concrete/ [] /compaction by watering/ [] /spon/waste/ [] /raking shore/raking/ [] /battered-pile anchorage/ [] /raker/rake/ [] /diagonal reinforcement/ [] /battered pile/ [] /oblique gutter/ [] /slope stability/ [] /ramp/ [] /radiation- shielding concrete/ [] /gabion/wire cylinder/ [] /wire-cylinder work/gabionade/ [] /main reinforcement/ [] /installation/ [] /hand tamping/spudding/ [] /hand iron cutter/ [] /hand mixing/ [] /mixing platform/ [] /seed spraying/ [] /seed mud spraying/ [] /bearer/ [] /bearer/ [] /shrinkage crack/contraction crack/ [] /contraction joint/ () [()] /dumpling/ [] /permanent form/ [] /ultimate moment of resistance/ [] /catchment well work/

[] /catch basin/catch pit/ [] /infiltration gallery/ [] /grouting/ [] /rip/ [] /vertical chute/ [] /soldier (beam)/ [] /stringer/ () [] /batter/ [] /stud/soldier/ [] /lap splicing/lapped splice/ [] /heavyweight concrete/high density concrete/ [] /weight mix/proportioning by weight/ [] /chamfer/bevel/ [] /initial crack/ [] /initial curing/ [] /initial tensioning/ [] /required-tensioning force/ [] /specified value/ [] /hot-weather concrete/ [] /spading/ [] /cut and replacement method/ [] /grubbing/ [] /plane battered form/ [] /joist/batten/ [] /berm/ [] /excavation for foundation/ [] /ground still/ [] /floor slab/ [] /bedding/groundsel/groundsill/ [] /subgrade/ [] /preparation of subgrade/ [] /impact/ [] /surplus soil/ [] /insitu concrete/poured in place concrete/ [] /cast in place concrete pile/mixed-in-place concrete pile/packed in place concrete pile/ [] /steam curing/

[] /planting/ [] /sodding/sprinkling/ [] /planting/ () [()] /hand tamping/spudding/ [] /telescopic steel prop/ [] /expansion joint/ [] /telescopic steel prop/ [] /erosion control/ [] /ramming/ [] /vibrated concrete/ [] /vibro-compaction/compaction by vibration/ [] /vibro-tamping/ [] /seepage failure/ [] /(Chicago board)method/ [] /deep mixing method/ [] /vacuum concrete/vacuum-processed concrete/ [] /vacuum method of drainage/ [] /driving by axle of drop hammer/ [] /Berlinoise method/ [] /access way/access road/ [] /artificial lightweight aggregate concrete/ [] /hand excavation/manual excavation/ () [] /cutting edge/ () [] /reinforcing steel plate of cutting edge/ [] /shotcrete/gunite/ [] /pneumatically applied concrete/gunite/shotcrete/ [] /spraying method/ [] /watering/ [] /sodium silicate/ [] /Leveling/levelling/ [] /dewatering/ () [] /dewatering/drainage/ [] /underwater excavation/ [] /water curing/ [] /hydraulic filling/water binding//

[] /horizontal construction joint/ [] /plane horizontal form/soffit form/ [] /water-tightening/ [] /watertight concrete/ [] /watertight construction joint/ [] /caulking/ [] /hydration/ [] /heat of hydration/ [] /crib/cribwork/ [] /surface-soil stabilization/ [] /steel strand/ [] /raising/rising/ [] /setting/installation/erection/ [] /level grade/ [] /gradestake/ [] /spreading and grading work/ [] /topsoil/ [] /proper-working condition/ [] /ready mixed concrete/ [] /ready mixed concrete/central mixed concrete/ [] /common fill/fill/filling/banking/structure fill/ [] /geo-textile/ () [] /banking/embankment/dike/ [] /casting yard/ [] /static load test/ [] /lime soil stabilization/ [] /covering plate/ [] /unloading/off-loading/ [] /loading/ [] /box girder/ [] /box section/ [] /box-out/form for void/ [] /rich concrete/ [] /turf/ [] /cutting/ [] /cut/cutting/ [] /cut/cutting/ [] /cutter/cutting machine/ () [] /offcuts/

[] /transition of cut and embankment/ [] /brace/strut/ [] /splice bar/ [] /coupler/ [] /deflected tendon/ [] /bent-up bar/bent bar/ [] /gross amount/ [] /design mix formula/ [] /specified-design strength/ [] /nodal point/ [] /nodal force/ [] /pre-loading/ [] /cleat/ [] /fiber reinforced concrete/ [] /slow embankment method/ [] /coarse aggregate/ [] /rough finishing/ [] /unsupported gutter/ [] /assemble/fabricate/ [] /assembly/ [] /erection bar/ [] /thickness of layer/ [] /mobility/trafficability/ [] /poling board/ [] /filling soil/fill material/ [] /lateral soil movement/lateral flow of soil/ [] /initial settlement/ [] /porous concrete/ [] /porous concrete/ [] /exposed concrete/ [] /stop end board/ [] /construction joint/ [] /roughening/ [] /cast-in anchor/ [] /wetting/ [] /pour concrete/deposit concrete/cast concrete/place concrete/concrete/ [] /fireproof concrete/

[] /durability/ [] /sulfate resisting concrete/ [] /bundling/ [] /tie hoop/hoop/ [] /pedestal/ [] /carpenter/ [] /carpentry workshop/ [] /berm/ [] /simple tie/ [] /numerous-single wires/ [] /single-strand tensioning/ [] /ponding/ [] /carbonization/ () [] /offcuts from rebar/ () [] /timber offcuts/ [] /batten/ [] /adiabatic curing/ [] /adiabatic curing/ [] /cross-sectional configuration/ [] /cross-sectional dimensions/ [] /faulting/ [] /benchcut/benching/stepping/ [] /grading/leveling/blading/ () [()] /dumpling/ [] /dead man/ [] /mix-in-place walls/slurry wall/ [] /earth anchor/ [] /soil-improvement method/earthimprovement method/ground-improvement method/ [] /replacement/ [] /removal and replacement/ [] /replacement method/displacement method/ [] /delayed fracture/ [] /embankment/banking/ [] /central mixing plant system/ [] /medium sand/ [] /carbonation/neutralization/ [] /medium consistency/ [] /sand filled in hollow structure/

[] /hoop/ [] /grouting/ [] /injection method/ [] /grout/ [] /stake/finishing stake/ [] /manila grass/turfing/sodding/ [] /funnel/ [] /right angled bend/ [] /deflected tendon/ [] /settlement/ [] /conventional reinforced concrete/ [] /fine sand/ [] /kicker/ [] /tendon anchorage/ [] /distribution plate/ [] /mechanical device/ [] /anchorage/ [] /anchorage zone/ [] /anchorage header/ [] /compaction/ [] /compaction pile/ [] /coffering/ [] /compacted thickness/ [] /nail/ [] /mud/dirt/mire/ [] /mud/mire/dirt/ [] /remove/demobilize/ [] /reinforcing bar/reinforcing steel/reinforcing rod/reinforcement/bar/rod/rebar// [] /reinforced concrete/ferroconcrete/ () [] /ferroconcrete/reinforced concrete/ [] /spacing/pitch/clear/ [] /bar bender/ [] /bar bender/bar cutter/rebar worker/rebar fixer/steel erector/steel fixer/ [] /bar cutter/ [] /rebar storage yard/

[] /steel framed reinforced concrete/ L [ L] /level setting/ [] /cleat/ [] /number of rolling coverage/number of passes/ [] /rolling compaction/ () [] /reuse/ [] /usage/ [] /electric external vibrator/ [] /electric internal vibrator/ [] /electro-osmosis/ [] /sandbag/ [] /mold/cover/ / [] /slope tamping/slope compaction/ [] /hauling of dirt/tipping/earth-moving/soil moving/ [] /earthen-ware pipe/soil pipe/ [] /earth-retaining structure/ [] /slab concrete/floor concrete/ () [()] /common worker/earth worker/ [] /earthwork/foundation work/ [] /standard cross section for earthwork/ [] /earth volume/ [] /borrow pit/ [] /soil stabilization/ [] /disposal/discharging/spoiling/dumping/ [] /spoil bank/disposal area/deposit area/ [] /mass curve/ [] /underwork/ [] /cofferdam/sheathing/ [] /soldier pile/ [] /lagging/ [] /lagging/ [] /freezing method/ [] /batten/ [] /lagging/ [] /honeycomb/

[] /reference line/datum/ [] /clearance/ [] /dynamic-consolidation method/ [] /dynamic load test/ [] /multiple-strand tensioning/ [] /guide wailing/ [] /introduced stress/ [] /strut/ [] /steel sheet pile/ [] /prop/ [] /tamping/impact compaction/ [] /stud welding/ [] /projection/ [] /support/prop/ [] /inner form/ [] /poor ground/soft ground/ [] /soft ground-stabilization method/ [] /treatment of poor subsoil/ [] /wet mortar/ /cement paste/neat cement/ [] /secondary stress/ [] /secondary blasting/ [] /double-sheet-pile coffer dam/ [] /numerous 2-wire strands/ [] /double-piles driving/ [] /fine aggregate/ [] /dewatering/ [] /sump/sump pit/catch basin/ [] /drain/drain pipe/waste-pipe/ [] /weep hole/drain hole/ [] /drainage/ [] /trench/drain ditch/box drain/drain/drainage gutter/ [] /mixture/proportioning/ [] /stringing/ [] /tendon profile/ [] /arrangement/ [] /distribution bar/ [] /blasting displacement method/

[] /blasting compaction method/ [] /clearing/ [] /stumping/ [] /rebound/ [] /stress distribution/ [] /tack weld/ [] /slab/ [] /revetment facing/ () [] /revet/ [] /molding/ [] /covering/ [] /standard mix proportions/ [] /topsoil/surface soil/overburden/ [] /strip topsoil/ [] /surface treatment/ [] /buttress (wall) /dead man (anchor)/ [] /lean mixed concrete/ [] /bond/ () [] /ledger/ [] /trench excavation/ [] /mortar layer/ [] /sand blanket/sand layer/ [] /plain bar/round bar/ [] /spall/flaking/ [] /humus/ [] /member/ [] /camber/ [] /end of member/ [] /weathering/aeration/ [] /spreader/ / [] /wale/ranger/waling strip/ [] /levee widening/widening of embankment/ [] /membrane curing/ [] /fog curing/ [] /flat casting/ [] /plane form/ [] /side by side operation/ [] /wall/ [] /eccentricity/

[] /eccentric prestressing/ [] /banking/ [] /cutting and embankment/ [] /negative draft/ [] /insulated curing/ [] /protective sheath/ [] /horizontal vibrator/ [] /borrowed soil/borrowed earth/borrow material/ [] /reinforced-earth method/ [] /geo-textile/ [] /tie/tie bar/ [] /collapse/ [] /colluvial deposit/ [] /expansive concrete/ [] /expansion/ [] /swelling ground/ [] /corrosion-inhibiting material/ [] /dust laying/dust prevention/ [] /waterproofing concrete/ [] /setting up/marking/ [] /final tensioning/ [] /weep hole/drain hole/ [] /friction pile/ [] /rubbed finish/ [] /rubbing/ [] /cast-in fitting/embedded bolt/ [] /cast-in fitting/embedded item/metal insert in concrete/ [] /cast-in component/ [] /left in place/ [] /backfill/backfilling/ [] /fill/filling/ [] /skin plate/ [] /membrane curing/ [] /masonry/plain concrete/ [] /soft shoulder/ [] /wire/ [] /steel bar/ [] /beveling/chamfer/molding/

[] /chamfer/chamfered strip/beveled strip/ [] /French drain/stone-filled drain/ [] /timber wedge/ [] /surfacing by wood float/float finish/ [] /wooden and concrete composite pile/ [] /(plain)wooden pile/timber pile/ [] /wooden sheet pile/ [] /wooden form/timber form/ [] /timber yoke/ [] /wooden sheet pile/ [] /timber frame/ [] /green cut/chipping/ [] /pointing/ [] /joint spacing/ [] /jointing/ [] /joint filler/ [] /lagging/sheet pile/ [] /sheeting/ [] /sheet pile cut off/sheet pile screen/ [] /sheet pile cofferdam/ [] /sheet pile wall/sheet pile bulkhead/ [] /stockade/ [] /chemical grouting/ [] /deleterious substance/ [] /organic soil/ [] /overexcavation/overbreak/ [] /extra banking/extra fill/earth overload/ [] /extra length/ [] /volume mixture/volumetric proportioning/ [] /wire fabric/wire mesh reinforcement/welded wire mesh/welded steel wire fabric/ [] /welded joint/ [] /additional bar/ [] /curing// [] /curing tank/ [] /curing compound/ [] /curing water/ [] /failing stone/

[] /backfilling/backing/ [] /landside/banquette/ [] /back slope/ [] /consistency/ [] /joist/beam/ [] /stirrup/ [] /mixing/ [] /overdamping/overcompaction/ [] /remixing/ [] /retempering/ [] /serial construction/sequential construction/ [] /cast-in-situ diaphragm wall method/ [] /continuous members/ [] /slurry wall/diaphragm wall/ [] /underlay/vapor barrier/ [] /subgrade/ [] /strain/ [] /wedge/ [] /plane/