COMPANY CONFIDENTIAL Page 1 Final Findings Briefing Client ABC Ltd CMMI (SW) – Ver 1.2 Staged...
-
Upload
meredith-gilbert -
Category
Documents
-
view
222 -
download
0
Transcript of COMPANY CONFIDENTIAL Page 1 Final Findings Briefing Client ABC Ltd CMMI (SW) – Ver 1.2 Staged...
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 1
Final Findings Briefing
<Date>
Client
ABC Ltd
CMMI (SW) – Ver 1.2Staged Representation
Conducted by:
QAI India
SM - CMMI is a service mark of the Carnegie Mellon University
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 2
Report Contents Prologue Context and Background Information Objectives of Gap Analysis Organizational Scope CMMI Scope Appraisal Team Gap Analysis Approach Coverage of Gap Analysis and Lessons Learnt Key Strengths Key Areas for Improvement Findings Summary Final Inference
Gap Gap Analysis Analysis ReportReport
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 3
The observations in this appraisal were based on consolidation of data from detailed review of documents and interviews with Project Team Members
While the data has been gathered from these sources, it shall not be
construed that it is encompassing all activities of the organization.
Data gathering is limited to the organizational scope and the CMMI scope that has been documented separately in this report.
The format for gathering data also included specifying expectations of CMMI, navigating the current process practices in the projects to verify adequacy and inadequacy of definition of practices .
The report is non-attributing meaning, it does not reflect the findings on any individual’s, group (s) or a team in the company. Confidentiality of data has been maintained and ensured throughout the data gathering sessions and will not be (was not) revealed to anyone at anytime.
Prologue
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 4
ABC Ltd. has operations base in multiple locations across the world
The company size is approx 10000 employees
The organization typically deals in full lifecycle development projects and few maintenance projects
The organization also engages with sub-contractors to provide services at different locations
……
Context and Background Information
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 5
Organizational Scope Software Solutions and Services across 2 locations of ABC Ltd. one in India
and one in Thailand
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 6
CMMI Scope – Staged RepresentationML PA In Scope
RM YesPP Yes
PMC YesCM Yes
PPQA YesSAM YesMA YesOPF NoOPD NoOT NoRD NoTS NoPI No
VER NoVAL NoIPM No
RSKM NoDAR NoQPM NoOPP NoCAR NoOID No
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
Note: SAM is applicable as there are sub-contracting activities across the projects for diverse needs.
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 7
Appraisal TeamTeam Leader
<Name> – QAI India Ltd
ABC Ltd. Technical Coordination and Logistics Team
1. <Name> - <Designation>
2. <Name> - <Designation>
3. <Name> - <Designation>
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 8
Gap Analysis Approach
Assemble & upload evidence
Fill the questionnaire
Review Evidences Conduct interviews
Consolidate data Present findings
Data Sources
• Project Documents
• Affirmations in Interviews
• Organizational Templates
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 9
Coverage of Gap Analysis and Lessons LearntCoverage Number of meetings planned : Number of meetings held : Number of hours planned : Number of hours actual : No of projects planned for reviews : No of projects actually reviewed :
Lessons Learnt In an enterprise-wide activity like a Gap Analysis, Logistics Management, available
facilitators and available administrative help are critical. Participants should be prepared by Sr. Management to not be threatened by the gap
analysis and to understand the purpose, expected level of participation, and long
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 10
Key Strengths Professional organization with a drive to implement formal processes Keenness to improve the rigor of process – Not just on achieving levels Many Business practices are consistent across the organization Experienced Professionals handle Project Management Receptive, cooperative and understanding staff
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 11
Key Areas of Improvement Usage of timesheet system is inadequate More formalized training on Process are required Requirements Management needs streamlining Project Success Measurements are not well defined Reviews and testing are not rigorous
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 12
Maturity Level 2 Process Areas
Findings Summary
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 13
Description
The purpose of Requirements Management is to manage the requirements of the project's products and product components and to identify inconsistencies between those requirements and the project's plans and work products.
Requirements Management
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 14
Requirements ManagementOpportunities for Improvement
1. Requirements change management practices are inconsistently practiced across the enterprise, there is no structured and defined process for Requirements Management
Brief Recommendations 1. Introduce templates with variations for each type of project
2. Provide detailed guidelines to ensure consistency in elicitation of requirements across the projects
3. Impart trainings to improve requirements gathering skills
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 15
Description
The purpose of Project Planning is to establish and maintain plans that define project activities.
Project Planning
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 16
Project Planning
Opportunities for Improvement 1. Current methods used for WBS is based on individual experiences and not based on
any benchmarks to establish rationale for estimations
2. A structured approach to plan and manage the project data is missing
Brief Recommendations 1. Provide detailed guidelines to ensure consistency in managing all types of projects
2. Deploy tools consistently across the organization to improve effectiveness and efficiency in planning and control of projects
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 17
Project Monitoring and ControlDescriptionThe purpose of Project Monitoring and Control is to provide an understanding of the project’s progress so that appropriate corrective actions can be taken when the project’s performance deviates significantly from the plan.
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 18
Project Monitoring and Control
Opportunities for Improvement 1. Involvement of relevant stakeholders needs to be monitored consistently across all
projects
2. Analysis of issues to determine corrective actions necessary and tracking them to closure needs to be done in all projects
Brief Recommendations 1. Provide detailed guidelines to ensure consistency in monitoring projects of all types
across the enterprise
2. Train key staff members on Issue tracking and corrective action methodologies
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 19
Supplier Agreement ManagementDescriptionThe purpose of Supplier Agreement Management is to manage the acquisition of products from suppliers
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 20
Supplier Agreement Management
Opportunities for Improvement 1. A defined process for formal technical evaluation and monitoring of suppliers for
diverse needs of the projects needs to be established.
2. Problem Reporting and Resolution Methodology is currently kept flexible in a few instances.
Brief Recommendations 1. Provide detailed guidelines to ensure consistency in subcontracting activities in
projects of all types across the enterprise
2. Provide guidelines to derive Project Acceptance Criteria from commitment and also methods to measure Project Success in subcontracted projects
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 21
Measurement and AnalysisDescriptionThe purpose of Measurement and Analysis is to develop and sustain a measurement capability that is used to support management information needs.
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 22
Measurement and Analysis
Opportunities for Improvement 1. Definition of measures, metrics and measurements needed both at the organization
and project level covering the life cycle
2. Data collection processes including data accuracy
Brief Recommendations 1. Introduce templates to perform measurement activities.
2. Ensure periodical release of organization standards or benchmarks of various measures based on detailed analysis of historical data
3. Provide guidelines to perform root cause analysis of problems and issues at the organization level
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 23
Process and Product Quality AssuranceDescription
The purpose of Process and Product Quality Assurance is to provide staff and management with objective insight into processes and associated work products.
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 24
Process and Product Quality Assurance
Opportunities for Improvement 1. Communicating quality issues and ensuring resolution of noncompliance issues with
the staff and managers
2. Introduce a formal structure for Quality Assurance function across the enterprise including staffing
3. Define an enterprise wide process to enable collection of improvement information periodically on quality assurance activity
Brief Recommendations 1. Staff the Quality Assurance pool at the enterprise and/or at the project level. This
function could be a combination of both central pool as well as dedicated staff at the project level
2. Provide extensive training to the quality assurance staff to be process consultants to help projects maintain standards enterprise wide
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 25
Configuration ManagementDescription
The purpose of Configuration Management is to establish and maintain the integrity of work products using configuration identification, configuration control, configuration status accounting, and configuration audits.
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 26
Configuration Management
Opportunities for Improvement 1. There is no defined criteria for identification of configuration items, components, and
related work products that will be placed under configuration management both in development and maintenance activities
2. There is no defined criteria for tracking changes to all the Configurable items
Brief Recommendations 1. Establish a CM knowledge center that will function as a enterprise resource for
configuration management activities.
2. Provide detailed guidelines to ensure consistency in implementation of configuration management activities
3. Provide training to all the projects management staff on the benefits, need and purpose of maintaining integrity of work products
COMPANY CONFIDENTIAL
CM
MI G
ap A
nal
ysis
CM
MI G
ap A
nal
ysis
Page 27
Level 2 Rigor – Final Inference
Definition Implementation Institutionalisation MeasurementsRM 2.5 3.5 3.5 1.5
PP 3.5 3.5 3.5 2
PMC 3.5 3.5 5 2.5
SAM 3 3 5 3
PPQA 1 2.5 2.5 1
MA 1 1.5 1 1
CM 3 6 6 3
Processes are well defined, implemented and insttutionalised
Rigor ProfilePA
Processes are non-existent or adhoc or are inadequately defined and implementedProcesses are moderately defined, implemented and institutionalised
Note . While there are few instances, in a few projects, where the capability might be higher, the above table should should serve as an indicator for current process capability from an enterprise stand point, given the samples drawn for this Gap Analysis.
Significance of numbers - 0 means, very weak capability and 10 means, very highly matured capability. The benchmark to pass a SCAMPI Class A Appraisal is atleast 7-8 on the above scale.