CJK#20 B3G-WG CCSA Wang Li [email protected]

13
CJK#20 B3G-WG CCSA Wang Li [email protected] Evaluation Schedule for CJK EVAL SIG

description

Evaluation Schedule for CJK EVAL SIG. CJK#20 B3G-WG CCSA Wang Li [email protected]. Contents. 고객상담센터 조직구성 및 운영계획. Introduction ChEG Evaluation Schedule Simulation Model and Assumptions CJK Eval SIG Time Schedule(Proposal). Introduction. 고객상담센터 조직구성 및 운영계획. - PowerPoint PPT Presentation

Transcript of CJK#20 B3G-WG CCSA Wang Li [email protected]

Page 1: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

CJK#20 B3G-WG

CCSAWang Li

[email protected]

Evaluation Schedule for CJK EVAL SIG

Page 2: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

2

고객상담센터 조직구성 및 운영계획 Contents

Introduction

ChEG Evaluation Schedule

Simulation Model and Assumptions

CJK Eval SIG Time Schedule(Proposal)

Page 3: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

3

고객상담센터 조직구성 및 운영계획 Introduction

Page 4: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

4

고객상담센터 조직구성 및 운영계획

Sep ’09

May ’09

Apr ’09

• Output the evaluation result of

802.16m technology

• ……

• Evaluate basic radio characteristics

(e.g., geometry distribution, large scale loss distribution)

• Output the evaluation result of LTE-Advanced technology

• Compare the results with other companies or Eval Groups

• Focus on the SCM channel before Apr ’09

• Check the accuracy of SLS

ChEG Evaluation Schedule

Page 5: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

5

고객상담센터 조직구성 및 운영계획 Simulation Model and Assumptions(1)

Page 6: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

6

고객상담센터 조직구성 및 운영계획 Simulation Model and Assumptions(2)Parameter Value

Multiple Access OFDMA(DL)DFT-S-OFDMA (UL)

Number of Cells 19

Number of Sectors per Cell 3

Inter-site distance( m) 5001732

Antenna Configuration 2x2(DL) 1x2(UL)

Centre Frequency 2 GHz

Traffic model Full Buffer

BS transmit power 46dBm

MS transmit power 24 dBm

Lognormal Shadowing Standard deviation: 10 dB

Shadowing Correlation

Between cells 0.5

Between sectors 1

UE Noise Figure 9dB

MS Antenna Gain 0 dBi

BS Antenna Gain 14 dBi

Page 7: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

7

고객상담센터 조직구성 및 운영계획 Simulation Model and Assumptions(3)

Parameter Value

MIMO SU-MIMO

Path-Loss 128.1+37.6log10(R), R in km

HARQ Synchronous HARQ 6 Processes

Maximum Retransmission Number 3

Thermal Noise Density -174 dBm/Hz

Antenna Bore-sight points toward flat side of cell (for 3-sector sites with fixed antenna patterns)

BS Antenna pattern(horizontal)(For 3-sector cell sites with fixed antenna patterns)  

= 70 degrees,  Am = 20 dB

Minimum distance between UE and Cell >= 35 meters

Users dropped uniformly in entire cell

L2S interface EESM

m

dB

AA ,12min2

3

dB3

Page 8: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

고객상담센터 조직구성 및 운영계획

8

Some Ideas

• We would be glad to discuss IMT-A channel items with CJK Eval SIG colleagues

Page 9: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

9

May ’09May ’09

Apr ’09Apr ’09

CJK

Eval S

IGIT

U-R

IMT A

dvan

ced

IMT.EVAL

IMT.RADIO

Proposal SubmissionProposal Submission

Jan’09Jan’09

Conference Call for Conference Call for checking the result of IMT-checking the result of IMT-

A channelA channel

Proposal Evaluation & Consensus BuildingProposal Evaluation & Consensus Building

Develop Recommendation Develop Recommendation

Q1 Q2 Q3 Q4

2008 2009

Q1 Q2 Q3 Q4

JanJan FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDec JanJan FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDec JanJan FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDec

Q1 Q2 Q3 Q4

2010

Oct ’09 Oct ’09

Jun ’10 Jun ’10

AprApr MayMay JunJunJulJul AugAug SepSep OctOct NovNov DecDec JanJan FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDec JanJan FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDec JanJan FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDecITU-R WP5D

Oct ’08 Oct ’08

System Level

Link Level Conference for checking Conference for checking the result of SNR-BLER the result of SNR-BLER

curves of LLScurves of LLS

Conference Call for Conference Call for checking the geometry checking the geometry

distribution and large scale distribution and large scale loss of LTE-A systemloss of LTE-A system

Apr ’09Apr ’09

Conference for checking the result of Conference for checking the result of user throughput and the cell edge user user throughput and the cell edge user

spectral efficiency of LTE-A systemspectral efficiency of LTE-A system

May ’09May ’09

Conference for Conference for checking the result checking the result of 802.16m systemof 802.16m systemSep ’09 Sep ’09

Conference for checking the result Conference for checking the result of any other candidate technologiesof any other candidate technologies

CJK Eval SIG Time schedule for IMT-A Evaluation (Proposal)

CJK Eval SIG Time schedule for IMT-A Evaluation (Proposal)

Page 10: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

10

ANNEX :Part of Simulation Results

Page 11: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

Geometrey Distribution

11

-25 -20 -15 -10 -5 0 5 10 15 200

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

Geometry [dB]

CD

F

Case 1

Case 3

Page 12: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

12

Large Scale Loss (Urban Macrocell and Suburban Macrocell)

-150 -140 -130 -120 -110 -100 -90 -80 -70 -600

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

L a r g e S c a l e L o s s ( d B )

CDF

S M A S c e n a r i o

-160 -150 -140 -130 -120 -110 -100 -90 -80 -70 -600

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

L a r g e S c a l e L o s s ( d B )

CDF

U M A S c e n a r i o

Page 13: CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

13

Thank you!